1 2005: stages of the power industry reform moscow, march 9, 2005 member of the rao uesr executive...
TRANSCRIPT
![Page 1: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/1.jpg)
1
2005: Stages of the Power Industry Reform
Moscow, March 9, 2005
Member of the RAO UESR Executive BoardV. A. Zubakin
![Page 2: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/2.jpg)
2
Report Contents
• Resolutions of the Russian Federation Government (2004).
• Formation of WGC.
• Formation of TGC.
• Formation of IDGC.
• Performance the Competitive Sector.
• Wholesale Market of Electric Power (Capacity) in the Transition Period.
• New Model for the Regulated Market.
• Balancing Market, System Service Market, and Capacity Market.
• Rules and Specifics of the Retail Market of Electric Power.
![Page 3: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/3.jpg)
3
Resolutions of the Russian Federation Government (2004)
Decree No. 966 of 17.07.2004
On the 2004-2005 Plan of Measures For Reforming the Power Industry
Decree No. 1367-р of 25.10.2004
On The Formation of WGC No. 7 (HydroWGC).
Meeting of the Russian Federation Government of 24.12.2004
On the Course of the Russian Federation Power Industry Reform: approval of the course of the industry reform; summation of the reform progress and development of the reform plans; appraisal of the reform progress (rate and schedule).
Resolution No. 854 of 27.12.2004
Authorization of rules for operating and dispatching.
Resolution No. 861
of 27.12.20 04
Authorization of rules for a non-discriminatory access to:
• power transmission services;
• operating and dispatching services in the power industry;
• wholesale market sales system administrator services;
Authorization of rules for technological attachment of power-receiving devices.
![Page 4: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/4.jpg)
4
Formation of Wholesale Generation Companies (WGC)
WGC 1
WGC 2
WGC 3
WGC 4
WGC 5
WGC 6
WGC 7 HydroWGC
03.09.04
WGC establishment approved by the RAO UESR Board of Directors
Completion of transition to the unified WGC share
2004 2005 2006
26.11.04
01.10.04
24.12.04
1Q 2Q 3Q 4Q4Q 1Q 2Q 3Q 4Q3Q
Schedule under development
24.12.04
24.12.04
24.12.04
State registration of WGC
27.10.04
23.11.04
29.12.04
04.03.05
09.03.05
![Page 5: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/5.jpg)
5
Formation of Territorial Generation Companies (TGC)
State registration of TGC
2004 2005 2006 2007
holding
holding
leasing
leasing
leasing
leasing
leasing
leasing
TGC 1
TGC 3
TGC 5
TGC 7
TGC 8
TGC 9
TGC 10
TGC 13
TGC 14
TGC 11, 12 The set-up model and schedule to be determined after authorization of the project for reorganizing Kuzbassenergo
merge
merge
merge
merge
merge
merge
merge
merge
merge
merge
TGC 2
TGC 4
TGC 6
holdingmerge
01.04.05 to be established on completion of Mosenergo reorganization
09.12.04
07.12.04
25.02.05
25.02.05
25.02.05
24.12.04
24.12.04
03.09.04
03.09.04
29.10.04
26.11.04
26.11.04
TGC establishment approved by the RAO UESR Board of Directors
![Page 6: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/6.jpg)
6
Formation of Interregional Distribution Grid Companies (IDGC)
IDGC configuration authorized by the RAO UESR Board of Directors on 23.04.04:
IDGC 1 (Central and Northern Caucasia Regions) IDGC 2 (Northwestern Region ) IDGC 3 (Ural and Mid-Volga Regions ) IDGC 4 (Siberia)
Establishment of IDGC-5 (Far East Region) may be decided on in the future in the context of restructuring of regional AO-Energo companies.
Introduction of shares into equity capital of
100% subsidiary affiliate of RAO UES of Russia
of relevant IDGC
territorial contingence of RGC included in IDGC;
comparable total balance-sheet value of IDGC; comparable total length of lines on the balance
of RGC that are included in IDGC.
Completion of basic formation of IDGC: late 2005.
Completion of formation of all IDGC: 2006.
Sch
edu
le
Pri
nci
ple
s o
f ID
GC
C
on
fig
ura
tio
n
IDGC< 49% ownedby RAO UES of Russia,
> 49%, by minorityshareholders
additional share issue
RGC1
…
RGC2
IDGC100%
subsidiary affiliate of RAO UES
of Russia
![Page 7: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/7.jpg)
7
Performance of the Competitive Sector
5th in Europe As per volume of sales in physical terms.
9 th in the world As per volume of sales in physical terms.
purchased in free market sector, MWh
weighted average purchase price in free market sector, RUR/MWh
price in regulated sector (from January 2004, including capacity), RUR/MWh
volume, MWh = 1% of aggregate volume of production
Data from Karana company
![Page 8: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/8.jpg)
8
Not earlier than 2007: fully liberalized power market.
From January 1, 2006: unified wholesale market for the Ural-European and Siberian price zones.
From April 1, 2005: launch of the 5-15 market in Siberia.From September 1, 2005: launch of the balancing market.
Wholesale Market of Electric Power (Capacity) in the transition period
2005 2006 2007
SPECIFICS OF THE WHOLESALE POWER MARKET MODEL IN SIBERIA
Differentiation of hourly power volume in the free trade market: 5% for thermal power plants; 2% for hydropower plants + 15% during floods;
• Consumers can purchase 15%.
• System Operator - Central Dispatch Administration is entitled to introduce idle discharge hazard mode for hydropower plants;
During floods, hydropower plants may increase electric power sales (up to 15 %).
Transition Period
![Page 9: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/9.jpg)
9
New Model for the Regulated Market
Launch of the model in Europe and Siberia: early 2006.
• Package of contracts between suppliers and buyers;
• Under “take or pay” terms;
• For Capacity and electric power;
• Provision for two prices (tariffs): electric power price and capacity price;
• Electric power volumes not covered with regulated bilateral contracts to be sold and bought in the competitive sector.
Type Buyer Category Contract Time Periodicity of Contracting
1 Individual consumers (homes)
Up to 3 years Once
2 Majorpower-intensive consumers
Up to 5 years Once
3 Other 1 year Annually, with possibility of prolongation
Schedule
Specifics
Content
![Page 10: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/10.jpg)
10
Balancing Market, System Service Market, and Capacity Market
BALANCING MARKET SYSTEM SERVICE MARKET CAPACITY MARKET
To replace the existing deviation sector;
Selection of suppliers on the basis of price bids;
Change of load for suppliers;
Minimization of power supply costs;
Balanced nodal prices.
Self-determination of agents; Mechanism for selecting
suppliers;• Composition of services; Absence of strict regulation in
the sphere of SS;• (!) No increase in ultimate tariffs
for consumers.
Mechanism for selling
capacity; Participants: all entities of the
Wholesale Market of Electric Power
Capacity-based reliability of power supply;
Smoothening of volatility (of power prices and supplies;
Capacity auction for 3 years.
Launch of the market in Europe +Ural+Siberia: August-September 2005.
• Launch of the pilot project: November 2005 Russian Federation
Government’s resolution on the rules: 3 quarter of 2005
Launch of the SS market: March 2006.
• Launch of the market: May 2006
• Market of the transition period: until December2008
• Target market: from 2008.
S
CH
ED
UL
E
O
BJE
CT
IVE
, MA
IN P
OIN
T
![Page 11: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/11.jpg)
11
Rules and Specifics of the Retail Market of Electric Power
Basic Provisions
• procedure for granting guarantee supplier (GS) status and definition of borders:
1) for the first time, GS’s to be appointed;2) next time, GS’s to be determined on a bidding basis;
• rules for entering into contracts for power consumers and GS’s;
• rules for “pickup” of consumers in case of problems with power grid companies;
• procedure for interaction of entities.
• 3 quarter of 2005 – authorization of the rules by the Russian Federation Government
• Throughout 2005 – participants, retail and network tariffs to be determined.
• Preferential tariff regulation;
• Applicability of the cross-subsidy system;
• Inadmissibility of free change of suppliers for consumers;
• Unpreparedness of the Wholesale Market of Electric Power for a large number of participants.
Specifics of the Transition
Period
Schedule
![Page 12: 1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin](https://reader035.vdocuments.site/reader035/viewer/2022070408/56649e6a5503460f94b67a99/html5/thumbnails/12.jpg)
12
Thank you for your attention