1 1 slide 2003 south-western/thomson learning slides prepared by john s. loucks st. edwards...

53
1 © 2003 South-Western/Thomson Learning™ © 2003 South-Western/Thomson Learning™ Slides Prepared by Slides Prepared by JOHN S. LOUCKS JOHN S. LOUCKS St. Edward’s University St. Edward’s University

Upload: junior-phillips

Post on 19-Jan-2018

216 views

Category:

Documents


0 download

DESCRIPTION

3 3 Slide © 2003 South-Western/Thomson Learning™ Quality Terminology n Quality is “the totality of features and characteristics of a product or service that bears on its ability to satisfy given needs.”

TRANSCRIPT

Page 1: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

1 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Slides Prepared bySlides Prepared byJOHN S. LOUCKSJOHN S. LOUCKS

St. Edward’s UniversitySt. Edward’s University

Page 2: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

2 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

| | | | | | | | | | | | | | | | | | | | | | | |

|

|

|

|

|

| |

|

|

|

|

| |

| |

|

|

|

|

| |

|

|

|

|

|

UCLUCL

CLCL

LCLLCL

Chapter 19Chapter 19Statistical Methods for Quality ControlStatistical Methods for Quality Control

Statistical Process ControlStatistical Process Control Acceptance SamplingAcceptance Sampling

Page 3: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

3 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Quality TerminologyQuality Terminology

QualityQuality is “the totality of features and is “the totality of features and characteristics of a product or service that characteristics of a product or service that bears on its ability to satisfy given needs.”bears on its ability to satisfy given needs.”

Page 4: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

4 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Quality TerminologyQuality Terminology

Quality assuranceQuality assurance refers to the entire system refers to the entire system of policies, procedures, and guidelines of policies, procedures, and guidelines established by an organization to achieve and established by an organization to achieve and maintain quality.maintain quality.

The objective of The objective of quality engineeringquality engineering is to is to include quality in the design of products and include quality in the design of products and processes and to identify potential quality processes and to identify potential quality problems prior to production.problems prior to production.

Quality controlQuality control consists of making a series of consists of making a series of inspections and measurements to determine inspections and measurements to determine whether quality standards are being met.whether quality standards are being met.

Page 5: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

5 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Statistical Process Control (SPC)Statistical Process Control (SPC)

The goal of SPC is to determine whether the The goal of SPC is to determine whether the process can be continued or whether it should process can be continued or whether it should be adjusted to achieve a desired quality level.be adjusted to achieve a desired quality level.

If the variation in the quality of the production If the variation in the quality of the production output is due to output is due to assignable causesassignable causes (operator (operator error, worn-out tooling, bad raw material, . . . ) error, worn-out tooling, bad raw material, . . . ) the process should be adjusted or corrected as the process should be adjusted or corrected as soon as possible.soon as possible.

If the variation in output is due to If the variation in output is due to common common causescauses (variation in materials, humidity, (variation in materials, humidity, temperature, . . . ) which the manager cannot temperature, . . . ) which the manager cannot control, the process does not need to be control, the process does not need to be adjusted.adjusted.

Page 6: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

6 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

SPC HypothesesSPC Hypotheses

SPC procedures are based on hypothesis-SPC procedures are based on hypothesis-testing methodology.testing methodology.

The The null hypothesisnull hypothesis HH00 is formulated in terms is formulated in terms of the production process being in control.of the production process being in control.

The The alternative hypothesisalternative hypothesis HHaa is formulated in is formulated in terms of the process being out of control.terms of the process being out of control.

As with other hypothesis-testing procedures, As with other hypothesis-testing procedures, both a both a Type I errorType I error (adjusting an in-control (adjusting an in-control process) and a process) and a Type II errorType II error (allowing an out- (allowing an out-of-control process to continue) are possible.of-control process to continue) are possible.

Page 7: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

7 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Decisions and State of the ProcessDecisions and State of the Process

Type I and Type II ErrorsType I and Type II Errors State of Production State of Production ProcessProcess

DecisionDecisionCorrectCorrectDecisionDecision

Type II ErrorType II ErrorAllow out-of-controlAllow out-of-controlprocess to continueprocess to continue

CorrectCorrectDecisionDecision

Type I ErrorType I ErrorAdjust in-controlAdjust in-control

processprocessAdjustAdjust

ProcessProcess

ContinueContinueProcessProcess

HH0 0 TrueTrueIn ControlIn Control

HHa a TrueTrueOut of ControlOut of Control

Page 8: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

8 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Control ChartsControl Charts

SPC uses graphical displays known as SPC uses graphical displays known as control control charts charts to monitor a production process.to monitor a production process.

Control charts provide a basis for deciding Control charts provide a basis for deciding whether the variation in the output is due to whether the variation in the output is due to common causes (in control) or assignable common causes (in control) or assignable causes (out of control).causes (out of control).

Page 9: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

9 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Control ChartsControl Charts

Two important lines on a control chart are the Two important lines on a control chart are the upper control limitupper control limit (UCL) (UCL) and and lower control lower control limitlimit (LCL) (LCL)..

These lines are chosen so that when the These lines are chosen so that when the process is process is inin control, there will be a high control, there will be a high probability that the sample finding will be probability that the sample finding will be between the two lines.between the two lines.

Values outside of the control limits provide Values outside of the control limits provide strong evidence that the process is strong evidence that the process is outout of of control.control.

Page 10: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

10 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Types of Control ChartsTypes of Control Charts

An An xx chart chart is used if the quality of the output is is used if the quality of the output is measured in terms of a variable such as measured in terms of a variable such as length, weight, temperature, and so on.length, weight, temperature, and so on.

xx represents the mean value found in a sample represents the mean value found in a sample of the output.of the output.

An An RR chart chart is used to monitor the range of the is used to monitor the range of the measurements in the sample.measurements in the sample.

A A pp chart chart is used to monitor the proportion is used to monitor the proportion defective in the sample.defective in the sample.

An An npnp chart chart is used to monitor the number of is used to monitor the number of defective items in the sample.defective items in the sample.

Page 11: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

11 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

xx Chart Structure Chart Structure

UCLUCL

LCLLCL

Process MeanProcess MeanWhen in ControlWhen in Control

Center LineCenter Line

TimeTime

x

Page 12: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

12 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Control Limits for an Control Limits for an xx Chart Chart

Process Mean and Standard Deviation KnownProcess Mean and Standard Deviation Known

UCL = 3 xLCL = 3 x

Page 13: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

13 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Example: Granite Rock Co.Example: Granite Rock Co.

Control Limits for an Control Limits for an xx Chart: Process Mean Chart: Process Meanand Standard Deviation Knownand Standard Deviation Known

The weight of bags of cement filled by The weight of bags of cement filled by Granite’s packaging process is normally Granite’s packaging process is normally distributed with a mean of 50 pounds and a distributed with a mean of 50 pounds and a standard deviation of 1.5 pounds.standard deviation of 1.5 pounds.

What should be the control limits for What should be the control limits for samples of 9 bags?samples of 9 bags?

Page 14: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

14 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Example: Granite Rock Co.Example: Granite Rock Co.

Control Limits for an Control Limits for an xx Chart: Process Mean Chart: Process Meanand Standard Deviation Knownand Standard Deviation Known

= 50, = 50, = 1.5, = 1.5, nn = 9 = 9

UCL = 50 + 3(.5) = 51.5UCL = 50 + 3(.5) = 51.5 LCL = 50 - 3(.5) = 48.5LCL = 50 - 3(.5) = 48.5

x n 15 9 05. .

Page 15: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

15 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Process Mean and Standard Deviation UnknownProcess Mean and Standard Deviation Unknown

where:where:xx = overall sample mean = overall sample mean RR = average range = average range AA22 = a constant that depends on = a constant that depends on nn; taken from; taken from “ “Factors for Control Charts” tableFactors for Control Charts” table

Control Limits for an Control Limits for an xx Chart Chart

2UCL = x A R

==__

2LCL = x A R

Page 16: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

16 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Factors for Factors for xx and and RR Control Charts Control Charts

Factors Table (Partial)Factors Table (Partial)

n d2 A 2 d3 D3 D45 2.326 0.577 0.864 0 2.1146 2.534 0.483 0.848 0 2.0047 2.704 0.419 0.833 0.076 1.9248 2.847 0.373 0.820 0.136 1.8649 2.970 0.337 0.808 0.184 1.81610 3.078 0.308 0.797 0.223 1.777. . . . . .. . . . . .

Page 17: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

17 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

UCL = UCL = RDRD44

LCL = LCL = RDRD33

where:where: RR = average range = average range

DD33, , DD44 = constants that depend on = constants that depend on nn; found ; found in “Factors for in “Factors for Control Charts” Control Charts” table table

Control Limits for an Control Limits for an RR Chart Chart

__

____

Page 18: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

18 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Factors for Factors for xx and and RR Control Charts Control Charts

Factors Table (Partial)Factors Table (Partial)

n d2 A 2 d3 D3 D45 2.326 0.577 0.864 0 2.1146 2.534 0.483 0.848 0 2.0047 2.704 0.419 0.833 0.076 1.9248 2.847 0.373 0.820 0.136 1.8649 2.970 0.337 0.808 0.184 1.81610 3.078 0.308 0.797 0.223 1.777. . . . . .. . . . . .

Page 19: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

19 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Example: Granite Rock Co.Example: Granite Rock Co.

Control Limits for Control Limits for xx and and RR Charts: Process Charts: Process MeanMeanand Standard Deviation Unknownand Standard Deviation UnknownSuppose Granite does not know the true mean Suppose Granite does not know the true mean and standard deviation for its bag filling and standard deviation for its bag filling process. In this case, the process mean and process. In this case, the process mean and standard deviation must be estimated by using standard deviation must be estimated by using samples that are selected from the process samples that are selected from the process when it is assumed to be operating in control. when it is assumed to be operating in control. Granite will develop Granite will develop xx and and RR charts based on charts based on twenty samples of 5 bags each. twenty samples of 5 bags each.

Page 20: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

20 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

““Data” WorksheetData” Worksheet

Using Excel to ConstructUsing Excel to Constructan an RR Chart and an Chart and an xx Chart Chart

Note: Rows 12-21 are not shown.Note: Rows 12-21 are not shown.

A B C D E F1 Sample Observ. 1 Observ. 2 Observ. 3 Observ. 4 Observ. 52 1 50.22 49.91 50.05 50.12 49.793 2 50.13 50.09 50.17 50.23 50.044 3 50.30 50.11 49.91 49.89 50.095 4 49.91 50.20 50.16 50.05 50.246 5 50.11 49.89 49.94 50.17 49.887 6 49.78 50.07 49.78 49.79 50.048 7 49.84 49.92 50.11 50.04 49.819 8 50.08 49.88 49.90 49.97 49.78

10 9 49.89 50.10 50.14 49.99 49.9011 10 50.11 50.16 50.20 50.06 50.06

Page 21: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

21 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Formula Worksheet (for Formula Worksheet (for RR control limits) control limits)

Using Excel to ConstructUsing Excel to Constructan an RR Chart and an Chart and an xx Chart Chart

Note: Rows 7-19 are hidden.Note: Rows 7-19 are hidden.

A B C D E1 Samp. R LCL Mean UCL2 1 =MAX(Data!B2:F2)-MIN(Data!B2:F2) =$D$24*$B$22 =$B$22 =$D$25*$B$223 2 =MAX(Data!B3:F3)-MIN(Data!B3:F3) =$D$24*$B$22 =$B$22 =$D$25*$B$224 3 =MAX(Data!B4:F4)-MIN(Data!B4:F4) =$D$24*$B$22 =$B$22 =$D$25*$B$225 4 =MAX(Data!B5:F5)-MIN(Data!B5:F5) =$D$24*$B$22 =$B$22 =$D$25*$B$226 5 =MAX(Data!B6:F6)-MIN(Data!B6:F6) =$D$24*$B$22 =$B$22 =$D$25*$B$2220 19 =MAX(Data!B20:F20)-MIN(Data!B20:F20) =$D$24*$B$22 =$B$22 =$D$25*$B$2221 20 =MAX(Data!B21:F21)-MIN(Data!B21:F21) =$D$24*$B$22 =$B$22 =$D$25*$B$2222 Rbar =AVERAGE($B$2:$B$21)2324 D3 025 D4 2.114

Page 22: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

22 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Value Worksheet (for Value Worksheet (for RR control limits) control limits)

Using Excel to ConstructUsing Excel to Constructan an RR Chart and an Chart and an xx Chart Chart

Note: Rows 7-19 are hidden.Note: Rows 7-19 are hidden.

A B C D E1 Sample R LCL Mean UCL2 1 0.43 0 0.32 0.68073 2 0.19 0 0.32 0.68074 3 0.41 0 0.32 0.68075 4 0.33 0 0.32 0.68076 5 0.29 0 0.32 0.680720 19 0.49 0 0.32 0.680721 20 0.28 0 0.32 0.680722 Rbar 0.3222324 D3 025 D4 2.114

Page 23: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

23 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Constructing an Constructing an RR Chart ChartStep 1Step 1 Select cells A29:E48 Select cells A29:E48Step 2Step 2 Select the Select the Chart WizardChart Wizard button on main button on main toolbartoolbarStep 3Step 3 When the Chart Wizard-Step 1 0f 4- When the Chart Wizard-Step 1 0f 4-Chart TypeChart Type dialog box appears:dialog box appears: Choose Choose XY (Scatter)XY (Scatter) in the in the Chart TypeChart Type list list Choose Choose Scatter with data points connected Scatter with data points connected by lines by lines from the Chart subtype display from the Chart subtype display Select Select Next >Next >Step 4Step 4 When the Chart Wizard-Step 2 of 4- When the Chart Wizard-Step 2 of 4- ChartChart Source DataSource Data dialog box appears: dialog box appears: Select Select Next >Next >

Using Excel to ConstructUsing Excel to Constructan an RR Chart and an Chart and an xx Chart Chart

Page 24: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

24 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Constructing an Constructing an RR Chart ChartStep 5Step 5 When the When the Chart Wizard-Step 3 of 4-Chart Wizard-Step 3 of 4-Chart Chart Options Options dialog box dialog box appears:appears:

Type Type R Chart for Granite Rock R Chart for Granite Rock Co.Co. in the in the Chart titleChart title box box

Type Type Sample NumberSample Number in the in the Value Value (X)(X) axis boxaxis box

Type Type Sample Range RSample Range R in the in the Value (Y)Value (Y) axis boxaxis box

… … continuedcontinued

Using Excel to ConstructUsing Excel to Constructan an RR Chart and an Chart and an xx Chart Chart

Page 25: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

25 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Constructing an Constructing an RR Chart Chart Select the Select the Legend Legend tab and thentab and thenRemove the check in the Remove the check in the Show LegendShow Legend box box Select the Select the Gridlines Gridlines tab and thentab and thenRemove the check in the Remove the check in the Major GridlinesMajor Gridlines box box Select Select Next >Next >Step 6Step 6 When the When the Chart Wizard- Step 4 of 4 – Chart Wizard- Step 4 of 4 – ChartChart LocationLocation dialog box appears: dialog box appears:Specify a location for the chartSpecify a location for the chartSelect Select FinishFinish

Using Excel to ConstructUsing Excel to Constructan an RR Chart and an Chart and an xx Chart Chart

Page 26: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

26 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Control Limits for Control Limits for RR Chart: Process Mean Chart: Process Meanand Standard Deviation Unknownand Standard Deviation Unknown

xx = 50.01, = 50.01, RR = .322, = .322, nn = 5 = 5

UCL = UCL = RDRD44 = .322(2.114) = .322(2.114) = .681= .681

LCL = LCL = RDRD33 = .322(0) = .322(0) = = 00

Example: Granite Rock Co.Example: Granite Rock Co.

__==

__

__

Page 27: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

27 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

RR Chart ChartA B C D E FR Chart for Granite Rock Co.

0.000.100.200.300.400.500.600.700.80

0 5 10 15 20Sample Number

Sam

ple

Rang

e R

LCL

UCL

Using Excel to ConstructUsing Excel to Constructan an RR Chart and an Chart and an xx Chart Chart

Page 28: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

28 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Formula Worksheet (for Formula Worksheet (for xx control limits) control limits)

Using Excel to ConstructUsing Excel to Constructan an RR Chart and an Chart and an xx Chart Chart

Note: Rows 34-46 are hidden.Note: Rows 34-46 are hidden.

A B C D E28 Sample x bar LCL Mean UCL29 1 =AVERAGE(Data!B2:F2) =$B$49-$D$51*$B$22 =$D$51 =$B$49+$D$51*$B$2230 2 =AVERAGE(Data!B3:F3) =$B$49-$D$51*$B$22 =$D$51 =$B$49+$D$51*$B$2231 3 =AVERAGE(Data!B4:F4) =$B$49-$D$51*$B$22 =$D$51 =$B$49+$D$51*$B$2232 4 =AVERAGE(Data!B5:F5) =$B$49-$D$51*$B$22 =$D$51 =$B$49+$D$51*$B$2233 5 =AVERAGE(Data!B6:F6) =$B$49-$D$51*$B$22 =$D$51 =$B$49+$D$51*$B$2247 19 =AVERAGE(Data!B20:F20) =$B$49-$D$51*$B$22 =$D$51 =$B$49+$D$51*$B$2248 20 =AVERAGE(Data!B21:F21) =$B$49-$D$51*$B$22 =$D$51 =$B$49+$D$51*$B$2249 Mean =AVERAGE(B29:B48)5051 A2 0.57752

Page 29: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

29 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Value Worksheet (for Value Worksheet (for xx control limits) control limits)

Using Excel to ConstructUsing Excel to Constructan an RR Chart and an Chart and an xx Chart Chart

A B C D E28 Sample x bar LCL Mean UCL29 1 50.018 49.824 50.01 50.19530 2 50.132 49.824 50.01 50.19531 3 50.060 49.824 50.01 50.19532 4 50.112 49.824 50.01 50.19533 5 49.998 49.824 50.01 50.19547 19 49.972 49.824 50.01 50.19548 20 49.966 49.824 50.01 50.19549 Mean 50.0105051 A2 0.577

Note: Rows 34-46 are hidden.Note: Rows 34-46 are hidden.

Page 30: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

30 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Control Limits for Control Limits for xx Chart: Process Mean Chart: Process Meanand Standard Deviation Unknownand Standard Deviation Unknown

xx = 50.01, = 50.01, RR = .322, = .322, nn = 5 = 5

UCL = UCL = xx + + AA22RR = 50.01 + .577(.322) = 50.01 + .577(.322) = 50.196= 50.196

LCL = LCL = x x - - AA22R R = 50.01 - .577(.322) = = 50.01 - .577(.322) = 49.82449.824

Example: Granite Rock Co.Example: Granite Rock Co.

==

==

==

Page 31: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

31 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

xx Chart Chart

x Chart for Granite Rock Co.

49.7

49.8

49.9

50.0

50.1

50.2

50.3

0 5 10 15 20Sample Number

Sam

ple

Mea

n

UCL

LCL

Using Excel to ConstructUsing Excel to Constructan an RR Chart and an Chart and an xx Chart Chart

Page 32: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

32 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Control Limits for a Control Limits for a pp Chart Chart

where:where:

assuming:assuming: npnp >> 5 5 nn(1-(1-pp) ) >> 5 5 Note: If computed LCL is negative, set LCL = Note: If computed LCL is negative, set LCL = 00

UCL = p p 3LCL = p p 3

pp p

n

( )1

Page 33: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

33 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Example: Norwest BankExample: Norwest Bank

Every check cashed or deposited at Every check cashed or deposited at Norwest Bank must be encoded with the Norwest Bank must be encoded with the amount of the check before it can begin the amount of the check before it can begin the Federal Reserve clearing process. The Federal Reserve clearing process. The accuracy of the check encoding process is of accuracy of the check encoding process is of utmost importance. If there is any discrepancy utmost importance. If there is any discrepancy between the amount a check is made out for between the amount a check is made out for and the encoded amount, the check is and the encoded amount, the check is defective.defective.

Page 34: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

34 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Example: Norwest BankExample: Norwest Bank

TwTwenty samples, each consisting of 250 enty samples, each consisting of 250 checks, were selected and examined when the checks, were selected and examined when the encoding process was known to be operating encoding process was known to be operating correctly. The number of defective checks correctly. The number of defective checks found in the samples follow.found in the samples follow.

4 1 5 3 2 7 4 5 2 32 8 5 3 6 4 2 5 3 6

Page 35: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

35 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Example: Norwest BankExample: Norwest Bank

Control Limits for a Control Limits for a pp Chart ChartSuppose Norwest does not know the Suppose Norwest does not know the

proportion of defective checks, proportion of defective checks, pp, for the , for the encoding process when it is in control.encoding process when it is in control.

We will treat the data (20 samples) We will treat the data (20 samples) collected as one large sample and compute collected as one large sample and compute the average number of defective checks for all the average number of defective checks for all the data. That value can then be used to the data. That value can then be used to estimate estimate pp..

Page 36: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

36 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Example: Norwest BankExample: Norwest Bank

Control Limits for a Control Limits for a pp Chart Chart

Estimated Estimated pp = 80/((20)(250)) = 80/5000 = 80/((20)(250)) = 80/5000 = .016= .016

(1 ) .016(1 .016) .015744 .007936250 250pp p

n

UCL = 3 .016 3(.007936) .039808pp

LCL = 3 .016 3(.007936) -.007808 0pp

Page 37: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

37 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Using Excel to Construct a Using Excel to Construct a pp Chart Chart

Formula WorksheetFormula WorksheetA B C D E F

1 SampleNumber Defect.

Proportion Defective LCL CL UCL

2 1 4 =B2/250 =MAX(0,$C$22-3*$C$23) =$C$22 =$C$22+3*$C$233 2 1 =B3/250 =MAX(0,$C$22-3*$C$23) =$C$22 =$C$22+3*$C$234 3 5 =B4/250 =MAX(0,$C$22-3*$C$23) =$C$22 =$C$22+3*$C$235 4 3 =B5/250 =MAX(0,$C$22-3*$C$23) =$C$22 =$C$22+3*$C$2320 19 3 =B20/250 =MAX(0,$C$22-3*$C$23) =$C$22 =$C$22+3*$C$2321 20 6 =B21/250 =MAX(0,$C$22-3*$C$23) =$C$22 =$C$22+3*$C$2322 =AVERAGE(C2:C21)23 =SQRT(C22*(1-C22)/250)

Estimated p Estim. Std. Error

Note: Rows 6-19 are hidden.Note: Rows 6-19 are hidden.

Page 38: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

38 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Using Excel to Construct a Using Excel to Construct a pp Chart Chart

Value WorksheetValue Worksheet

Note: Rows 6-19 are hidden.Note: Rows 6-19 are hidden.

A B C D E F

1 SampleNumber Defect.

Proportion Defective LCL CL UCL

2 1 4 0.016 0 0.01600 0.0317433 2 1 0.004 0 0.01600 0.0317434 3 5 0.020 0 0.01600 0.0317435 4 3 0.012 0 0.01600 0.03174320 19 3 0.012 0 0.01600 0.03174321 20 6 0.024 0 0.01600 0.03174322 0.0160023 0.00794

Estimated p Estim. Std. Error

Page 39: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

39 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Example: Norwest BankExample: Norwest Bank

pp Chart Chartp Chart for Norwest Bank

0.000

0.005

0.010

0.015

0.020

0.025

0.030

0.035

0.040

0.045

0 5 10 15 20Sample Number

Sam

ple

Prop

ortio

n p

UCL

LCL

Page 40: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

40 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Control Limits for an Control Limits for an npnp Chart Chart

assuming:assuming: npnp >> 5 5 nn(1-(1-pp) ) >> 5 5

Note: If computed LCL is negative, set Note: If computed LCL is negative, set LCL = 0LCL = 0

UCL = np np p 3 1( )LCL = np np p 3 1( )

Page 41: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

41 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Interpretation of Control ChartsInterpretation of Control Charts

The location and pattern of points in a control The location and pattern of points in a control chart enable us to determine, with a small chart enable us to determine, with a small probability of error, whether a process is in probability of error, whether a process is in statistical control.statistical control.

A primary indication that a process may be out A primary indication that a process may be out of control is a of control is a data point outside the control data point outside the control limitslimits..

Certain patternsCertain patterns of points within the control of points within the control limits can be warning signals of quality limits can be warning signals of quality problems:problems:• Large number of points on one side of Large number of points on one side of

center line.center line.• Six or seven points in a row that indicate Six or seven points in a row that indicate

either an increasing or decreasing trend.either an increasing or decreasing trend.• . . . and other patterns.. . . and other patterns.

Page 42: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

42 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Acceptance SamplingAcceptance Sampling

Acceptance samplingAcceptance sampling is a statistical method is a statistical method that enables us to base the accept-reject that enables us to base the accept-reject decision on the inspection of a sample of items decision on the inspection of a sample of items from the lot.from the lot.

Acceptance sampling has advantages over Acceptance sampling has advantages over 100% inspection including: less expensive, 100% inspection including: less expensive, less product damage, fewer people less product damage, fewer people involved, . . . and more.involved, . . . and more.

Page 43: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

43 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Acceptance Sampling ProcedureAcceptance Sampling Procedure

Lot receivedLot received

Sample selectedSample selected

Sampled itemsSampled itemsinspected for qualityinspected for quality

Results compared withResults compared withspecified quality characteristicsspecified quality characteristics

Accept the lotAccept the lot Reject the lotReject the lot

Send to productionSend to productionor customeror customer

Decide on dispositionDecide on dispositionof the lotof the lot

Quality is Quality is notnot satisfactorysatisfactory

Quality isQuality issatisfactorysatisfactory

Page 44: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

44 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Acceptance SamplingAcceptance Sampling

Acceptance sampling is based on hypothesis-Acceptance sampling is based on hypothesis-testing methodology.testing methodology.

The hypothesis are:The hypothesis are:

HH00: Good-quality lot: Good-quality lot HHaa: Poor-quality lot: Poor-quality lot

Page 45: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

45 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

The Outcomes of Acceptance SamplingThe Outcomes of Acceptance Sampling

Type I and Type II ErrorsType I and Type II Errors State of the LotState of the Lot

DecisionDecision

CorrectCorrectDecisionDecision

Type II ErrorType II ErrorConsumer’s RiskConsumer’s Risk

CorrectCorrectDecisionDecision

Type I ErrorType I ErrorProducer’s RiskProducer’s Risk

RejectReject HH00

Reject the Lot Reject the Lot

AcceptAccept HH00

Accept the LotAccept the Lot

HH0 0 TrueTrueGood-Quality LotGood-Quality Lot

HHa a TrueTruePoor-Quality LotPoor-Quality Lot

Page 46: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

46 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Binomial Probability Function for Acceptance Binomial Probability Function for Acceptance SamplingSampling

where:where:nn = sample size = sample sizepp = proportion of defective items in lot = proportion of defective items in lotxx = number of defective items in sample = number of defective items in sample ff((xx) = probability of ) = probability of xx defective items in defective items in samplesample

Probability of Accepting a LotProbability of Accepting a Lot

f x nx n x

p px n x( ) !!( )! ( )( )

1

Page 47: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

47 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Example: Acceptance Sampling Example: Acceptance Sampling

An inspector takes a sample of 20 items from a lot.An inspector takes a sample of 20 items from a lot.Her policy is to accept a lot if no more than 2 defectiveHer policy is to accept a lot if no more than 2 defectiveitems are found in the sample.items are found in the sample.

Assuming that 5 percent of a lot is defective, what isAssuming that 5 percent of a lot is defective, what isthe probability that she will accept a lot? Reject a lot?the probability that she will accept a lot? Reject a lot?

n n = 20, = 20, cc = 2, and = 2, and pp = .05 = .05 PP(Accept Lot) = (Accept Lot) = ff(0) + (0) + ff(1) + (1) + ff(2)(2)

= .3585 + .3774 + .1887= .3585 + .3774 + .1887 = .9246= .9246 PP(Reject Lot) = 1 - .9246 (Reject Lot) = 1 - .9246 = .0754 = .0754

Page 48: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

48 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Example: Acceptance SamplingExample: Acceptance Sampling

Using the Tables of Binomial ProbabilitiesUsing the Tables of Binomial Probabilitiesp

n x .05 .10 .15 .20 .25 .30 .35 .40 .45 .5020 0 .3585 .1216 .0388 .0115 .0032 .0008 .0002 .0000 .0000 .0000

1 .3774 .2702 .1368 .0576 .0211 .0068 .0020 .0005 .0001 .00002 .1887 .2852 .2293 .1369 .0669 .0278 .0100 .0031 .0008 .00023 .0596 .1901 .2428 .2054 .1339 .0716 .0323 .0123 .0040 .00114 .0133 .0898 .1821 .2182 .1897 .1304 .0738 .0350 .0139 .00465 .0022 .0319 .1028 .1746 .2023 .1789 .1272 .0746 .0365 .01486 .0003 .0089 .0454 .1091 .1686 .1916 .1712 .1244 .0746 .03707 .0000 .0020 .0160 .0545 .1124 .1643 .1844 .1659 .1221 .07398 .0000 .0004 .0046 .0222 .0609 .1144 .1614 .1797 .1623 .12019 .0000 .0001 .0011 .0074 .0271 .0654 .1158 .1597 .1771 .1602

Page 49: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

49 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Selecting an Acceptance Sampling PlanSelecting an Acceptance Sampling Plan

In formulating a plan, managers must specify In formulating a plan, managers must specify two values for the fraction defective in the lot.two values for the fraction defective in the lot.• aa = the probability that a lot with = the probability that a lot with pp00

defectives will defectives will be rejected. be rejected. • b b = the probability that a lot with = the probability that a lot with pp11

defectives will defectives will be accepted. be accepted. Then, the values of Then, the values of nn and and cc are selected that are selected that

result in an acceptance sampling plan that result in an acceptance sampling plan that comes closest to meeting both the comes closest to meeting both the aa and and bb requirements specified. requirements specified.

Page 50: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

50 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Operating Characteristic CurveOperating Characteristic Curve

.10

.20

.30

.40

.50

.60

.70

.80

.90Pr

obab

ility

of A

ccep

ting

the

Lot

0 5 10 15 20 25

1.00

Percent Defective in the Lot

pp00 pp11

(1 - (1 - ))

nn = 15, = 15, cc = 0 = 0pp00 = .03, = .03, pp11 = .15 = .15 = .3667, = .3667, = .0874 = .0874

Page 51: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

51 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

Multiple Sampling PlansMultiple Sampling Plans

A A multiple sampling planmultiple sampling plan uses two or more uses two or more stages of sampling.stages of sampling.

At each stage the At each stage the decision possibilitiesdecision possibilities are: are:• stop sampling and accept the lot,stop sampling and accept the lot,• stop sampling and reject the lot, orstop sampling and reject the lot, or• continue sampling.continue sampling.

Multiple sampling plans often result in a Multiple sampling plans often result in a smaller total sample sizesmaller total sample size than single-sample than single-sample plans with the same Type I error and Type II plans with the same Type I error and Type II error probabilities.error probabilities.

Page 52: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

52 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

A Two-Stage Acceptance Sampling PlanA Two-Stage Acceptance Sampling PlanInspect Inspect nn11 items items

Find Find xx11 defective items in this sample defective items in this sample

xx11 << cc11 ? ?

xx11 >> cc22 ? ?

Inspect Inspect nn22 additional items additional items

AcceptAcceptthe lotthe lot

RejectRejectthe lotthe lot

xx1 1 + + xx22 << cc33 ? ?

Find Find xx22 defective items in this sample defective items in this sample

YesYes

YesYesNoNo

NoNo

NoNoYesYes

Page 53: 1 1 Slide  2003 South-Western/Thomson Learning Slides Prepared by JOHN S. LOUCKS St. Edwards University

53 Slide

© 2003 South-Western/Thomson Learning™© 2003 South-Western/Thomson Learning™

End of Chapter 19End of Chapter 19