INTERNAL AUDIT ANNUAL PLANNING, ENGAGEMENT
PLANNING AND EXECUTION
1Internal Audit Annual Planning, Engagement Planning and
Execution
![Page 2: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/2.jpg)
• Annual Audit Planning,• Engagement Planning,• Engagement Execution.
SESSION PLAN
2Internal Audit Annual Planning, Engagement Planning and
Execution2
![Page 3: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/3.jpg)
Calculation of Total Available Resources,Allocation of Total Available Resources among appropriate
engagements,Assignment of staff to the appropriate engagements, Coordination of annual plan with other assurance providersContinued review of the Actual vs Annual Plan.
Elaboration of Annual Plan
3Internal Audit Annual Planning, Engagement Planning and
Execution3
![Page 4: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/4.jpg)
Available Resources Necessary Resources<
Integration of External Resources
Integration of External Resources
4Internal Audit Annual Planning, Engagement Planning and
Execution4
![Page 5: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/5.jpg)
Should be derived from Internal Audit Strategic Plan,
Details allocated time and resources for each engagement and provides more detailed information to the user compared to Strategic Plan,
Resource allocation is made based on experience and competences of the team members.
Allocation of resources andassignment of staff
5Internal Audit Annual Planning, Engagement Planning and
Execution5
![Page 6: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/6.jpg)
External Audit, External assessment of internal audit activity, Inspections undertaken by various public authorities.
Coordination of annual plan with other assurance providers
6Internal Audit Annual Planning, Engagement Planning and
Execution6
![Page 7: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/7.jpg)
Engagement cannot be planned if not included in the annual plan,
For non planned engagements, annual plan is revised,Changes made to the activity of the entity (auditee),Changes made to the assessed risks of the entity
(auditee),Changes made to the resource plan,Errors/omissions identified in prior year annual plan,
that should be included in the present annual plan.
Actual vs Annual Plan
7Internal Audit Annual Planning, Engagement Planning and
Execution7
![Page 8: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/8.jpg)
1• PLANNING
2• EXECUTION
3• REPORTING
4• FOLLOW UP
ENGAGEMENT MANAGEMENT PHASES
8Internal Audit Annual Planning, Engagement Planning
and Execution8
![Page 9: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/9.jpg)
1) Composition of audit team and kick-off meeting with the team and auditee,
2) Preliminary survey,3) Audit objectives,4) Audit scope,5) Audit program.
Engagement Planning: Phase 1
9Internal Audit Annual Planning, Engagement Planning
and Execution9
![Page 10: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/10.jpg)
Independence of auditors,Scope and nature of activities of the auditee,Risk grade of the auditee, Competence of the staff, Training needs.
Composition of audit team
10Internal Audit Annual Planning, Engagement Planning
and Execution10
![Page 11: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/11.jpg)
Kick of meeting with the team
Nature, stance and timing of
the work
Kick off meeting with auditee
Demanded information, timing of the
works
Kick off meetings
11Internal Audit Annual Planning, Engagement Planning
and Execution11
![Page 12: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/12.jpg)
1) Composition of audit team and kick-off meeting with the team and auditee,
2) Preliminary survey,3) Audit objectives,4) Audit scope,5) Audit program.
Engagement Planning: Phase 1
12Internal Audit Annual Planning, Engagement Planning
and Execution12
![Page 13: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/13.jpg)
Legal acts regulating activity of the auditee,Charter of the auditee,Prior period engagement files,Job descriptions of the auditee staff,Risk register provided by the auditee,External audit reports,Reports provided by other assurance providers.
Preliminary survey
13Internal Audit Annual Planning, Engagement Planning
and Execution13
![Page 14: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/14.jpg)
Risk groupInternal
control risk grade
Overall risk grade
Risk Reassessment
14Internal Audit Annual Planning, Engagement Planning
and Execution14
![Page 15: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/15.jpg)
1) Composition of audit team and kick-off meeting with the team and auditee,
2) Preliminary survey,3) Audit objectives,4) Audit scope,5) Audit program.
Engagement Planning: Phase 1
15Internal Audit Annual Planning, Engagement Planning
and Execution15
![Page 16: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/16.jpg)
Should be derived from annual plan,Should be based on risk assessments,Should be based on the internal controls of the
auditee, Should be based on the risk grade of the auditee,Should provide link to auditee’s objectives
Audit objectives
16Internal Audit Annual Planning, Engagement Planning
and Execution16
![Page 17: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/17.jpg)
1) Composition of audit team and kick-off meeting with the team and auditee,
2) Preliminary survey,3) Audit objectives,4) Audit scope,5) Audit program.
Engagement Planning: Phase 1
17Internal Audit Annual Planning, Engagement Planning
and Execution17
![Page 18: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/18.jpg)
Audit team in charge should decide: Internal controls to be tested, Timing of tests, Stance of the tests.
Audit scope should be sufficient enough to achieve the audit objectives
Audit scope
18Internal Audit Annual Planning, Engagement Planning
and Execution18
![Page 19: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/19.jpg)
The audit program defines:Audit objectives, Audit procedures/tests,Audit assertions.
Audit program
19Internal Audit Annual Planning, Engagement Planning
and Execution19
![Page 20: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/20.jpg)
Appropriate
Sufficient Quantity
Quality
Audit evidence
20Internal Audit Annual Planning, Engagement Planning
and Execution20
![Page 21: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/21.jpg)
Completeness
Existence
Cut off
Legality
Presentation
Obligations and rights
Accuracy
Valuation
CEAVOP&L
Audit Assertion
21Internal Audit Annual Planning, Engagement Planning
and Execution21
![Page 22: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/22.jpg)
Verification Observation
External confirmation
InquiryRe-performance
Recalculation
Analytical procedures
Audit techniques
22Internal Audit Annual Planning, Engagement Planning
and Execution22
![Page 23: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/23.jpg)
Audit tests
Substantive tests Control tests
Test of details Analytical tests
Testing design and implementation of internal control
Testing operating effectiveness of internal controls
23Internal Audit Annual Planning, Engagement Planning
and Execution23
![Page 24: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/24.jpg)
Audit techniques
• Verification• Recalculation• External confirmation• Analytical procedures• Inquiry
Substantive tests Control tests
• Verification• Observation• Re-performance• Inquiry
24Internal Audit Annual Planning, Engagement Planning
and Execution24
![Page 25: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/25.jpg)
Control systems
Preventive control systems
Detective control systems
Intern control systems
25Internal Audit Annual Planning, Engagement Planning
and Execution25
![Page 26: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/26.jpg)
Audit techniques
Audit tests
Audit asserti
ons
Control syste
m of the
entity
26Internal Audit Annual Planning, Engagement Planning
and Execution26
![Page 27: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/27.jpg)
1 • PLANNING
2 • EXECUTION
3 • REPORTING
4 • FOLLOW UP
ENGAGEMENT MANAGEMENT PHASES
27Internal Audit Annual Planning, Engagement Planning
and Execution27
![Page 28: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/28.jpg)
1) Testing design and implementation of controls,2) Testing operating effectiveness of controls,3) Substantive tests,4) Preparing working papers,5) Review of working papers,6) Wrap up,7) Closing meeting.
Engagement Execution: Phase 2
28Internal Audit Annual Planning, Engagement Planning
and Execution28
![Page 29: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/29.jpg)
Internal control system documentation/description of the auditee,
Walkthrough testing,Identification of internal control design
weaknesses and conclusion on effectiveness of the system
Testing design and implementation of control
29Internal Audit Annual Planning, Engagement Planning
and Execution29
![Page 30: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/30.jpg)
Public sector entityDepartment of
cash operations of MoF (auditee)
Central Bank of Armenia
Contract
Yes/No
Payment Order
Approved Invoice
Payment
Refusal
Information Flow Chart
30Internal Audit Annual Planning, Engagement Planning
and Execution30
![Page 31: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/31.jpg)
31Internal Audit Annual Planning, Engagement Planning
and Execution
Engagement Execution: Phase 2The second phase consists of the following steps:1) Testing design and implementation of controls,2) Testing operating effectiveness of controls,3) Substantive tests,4) Preparing working papers,5) Review of working papers,6) Wrap up,7) Closing meeting.
31
![Page 32: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/32.jpg)
• The nature of the tests,• The timing of the tests,• The stance.
Testing operating effectiveness of control
32Internal Audit Annual Planning, Engagement Planning
and Execution32
![Page 33: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/33.jpg)
During the organization of a sample the following points should be observed:Type of sampling,Sample size,Detected errors and extrapolation of the results.
Sampling
33Internal Audit Annual Planning, Engagement Planning
and Execution33
![Page 34: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/34.jpg)
Statistical samplesRandom,Systematic,Sequential,Monetary Unit Sampling (MUS).
Non-statistical sampling haphazard sampling, Snowball sampling.
Sampling Types
34Internal Audit Annual Planning, Engagement Planning
and Execution34
![Page 35: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/35.jpg)
35Internal Audit Annual Planning, Engagement Planning
and Execution
Engagement Execution: Phase 2The second phase consists of the following steps:1) Testing design and implementation of controls,2) Testing operating effectiveness of controls,3) Substantive tests,4) Preparing working papers,5) Review of working papers,6) Wrap up,7) Closing meeting.
35
![Page 36: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/36.jpg)
Substantive tests
Test of details Analytical tests
36Internal Audit Annual Planning, Engagement Planning
and Execution36
![Page 37: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/37.jpg)
- Examination of supporting documentation, - Errors and omissions are detected,- The nature and extent of tests depends on:• Risk grade of the auditee,• Results of control tests,• Fraud risk.
Substantive tests
37Internal Audit Annual Planning, Engagement Planning
and Execution37
![Page 38: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/38.jpg)
38Internal Audit Annual Planning, Engagement Planning
and Execution
Engagement Execution: Phase 2The second phase consists of the following steps:1) Testing design and implementation of controls,2) Testing operating effectiveness of controls,3) Substantive tests,4) Preparing working papers,5) Review of working papers,6) Wrap up,7) Closing meeting.
38
![Page 39: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/39.jpg)
Audit objective,Work done,Audit assertions,Results of the work, including errors, omissions and
weaknesses identified, audit evidence,Auditor judgement fo achieving audit objective,Audit objective conclusion,Who has prepared the WP,Date of the WP.
Preparing audit WP (working papers)
39Internal Audit Annual Planning, Engagement Planning
and Execution39
![Page 40: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/40.jpg)
40Internal Audit Annual Planning, Engagement Planning
and Execution
Engagement Execution: Phase 2The second phase consists of the following steps:1) Testing design and implementation of controls,2) Testing operating effectiveness of controls,3) Substantive tests,4) Preparing working papers,5) Review of working papers,6) Wrap up,7) Closing meeting.
40
![Page 41: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/41.jpg)
All the WPs should be reviewed by both team in charge and Chief Internal Auditor,
Appropriateness of reached conclusions,Conduct of on job training and
supervision.
Review of the WP
41Internal Audit Annual Planning, Engagement Planning
and Execution41
![Page 42: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/42.jpg)
42Internal Audit Annual Planning, Engagement Planning
and Execution
Engagement Execution: Phase 2The second phase consists of the following steps:1) Testing design and implementation of controls,2) Testing operating effectiveness of controls,3) Substantive tests,4) Preparing working papers,5) Review of working papers,6) Wrap up,7) Closing meeting.
42
![Page 43: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/43.jpg)
Predefined formatCriteria,Condition, Cause, Effect.
Exception Report
43Internal Audit Annual Planning, Engagement Planning
and Execution43
![Page 44: 1 1 Internal Audit Annual Planning, Engagement Planning and Execution](https://reader036.vdocuments.site/reader036/viewer/2022081503/56649e9f5503460f94ba0bc4/html5/thumbnails/44.jpg)
• Exception report produced based on the WPs,• Closing meeting with auditee– Discussing errors, omissions and internal control
weaknesses,– Exception report.
Wrap up and Closing Meeting
44Internal Audit Annual Planning, Engagement Planning
and Execution44