    POWER SYSTEMS

    Status: 21st  of February 2013

    CAA Reference Plant KA 26-1 SSPT

    CTO Outlines (Input Document)

    Main Civil & Steelworks

  • 8/13/2019 090011 f 08047 b 341

    2/44

  • 8/13/2019 090011 f 08047 b 341

    3/44

    Main Civil CTO Areas – Power Island Details 1

    CTO_P_B CTO_P_C1.1CTO_P_B1.1

    CTO_P_B3.1

    CTO_P_A1.1 CTO_P_A2.1 CTO_P_A3.1

    CTO‘s to M E:  A1.1) CTO – GT Foundation

     A2.1) CTO – Generator Foundation

     A3.1) CTO – ST Foundation

    B1.1) CTO – Aux. Found. GT System

    B2.1) CTO – Aux. Found. Geno Systems

    B3.1) CTO – Aux. Found. ST Systems

    C1.1) CTO – Condenser and ADV Area Complete

    E1.1) CTO - OTC Foundation

    Internal CTO‘s: C0.1) CTO

     Condenser and ADV Area for St eel

    Erection

    CTO_P_E1.1

  • 8/13/2019 090011 f 08047 b 341

    4/44

    Main Civil CTO Areas – Power Island Details 2

    CTO‘s to M E: D3.1) CTO – Turbine Hall Floor Slabs

    D3.2) CTO – Annex Building Complete

    F1.1) CTO - Auxiliary Closed Cooling Foundation Optional)Internal CTO‘s: D0.1) CTO – TH Foundations for Steel Erection (MA – MD)

    D0.2) CTO – TH Foundations for Steel Erection (MD – MG)

    D0.3) CTO - Annex Building Foundations for Steel Erection

    CTO_P_D0.1 CTO_P_D0.2

    CTO_P_D3.1

    CTO_P_D3.1

    CTO_P_D0.3CTO_P_D3.2

  • 8/13/2019 090011 f 08047 b 341

    5/44

  • 8/13/2019 090011 f 08047 b 341

    6/44

    Main Civil CTO Areas – Power Island Details 4

    CTO_P_D2.1

    CTO‘s to M E : G1.3) CTO - Air Intake Steel Structure for Equipment Installation

    CTO_P_D2.1

  • 8/13/2019 090011 f 08047 b 341

    7/44

    Main Civil CTO Areas – Power Island Details 5

    CTO_P_D2.1CTO‘s to M E: D2.1) CTO – Turbine Hall (Structural

    Steel and Cladding complete)

  • 8/13/2019 090011 f 08047 b 341

    8/44

    Main Civil CTO Areas – HRSG Overview

    CTO_H_

  • 8/13/2019 090011 f 08047 b 341

    9/44

    Main Civil CTO Areas – HRSG Details 1

    CTO_H_B1.1

    CTO_H_A1.1 CTO‘s to M E:  A1.1) CTO – HRSG Foundation incl. Stack

     A1.2) CTO – GT Exhaust Duct Foundation

    B1.1) CTO–

     HRSG Blow Down Pit Area Complete

    D1.1) CTO – Flue Gas Monitoring Station/CEMS

    Foundation

    Internal CTO‘s: B0.1) CTO – HRSG Blow Down Pit Area for Steel

    Erection

    CTO_H_A1.2CTO_H_D1.1

  • 8/13/2019 090011 f 08047 b 341

    10/44

    Main Civil CTO Areas – HRSG Details 2

    CTO_H_C1.1Enclosure

    CTO‘s to M E: C1.1) CTO – HRSG Enclosure Foundation

    Internal CTO‘s: C1.2) CTO – HRSG Cladding Optional)

  • 8/13/2019 090011 f 08047 b 341

    11/44

    Main Civil CTO Areas – Pipe Rack Overview

    CTO_R_

  • 8/13/2019 090011 f 08047 b 341

    12/44

    Main Civil CTO Areas – Pipe Rack Details 1

    CTO_R_A1.1CTO_R_A1.2TO_R_A1.4 CTO_R_A1.3

    CTO‘s to M E:  A1.1) CTO – Pipe Rack Found. ST Area

     A1.2) CTO–

     Pipe Rack Found. Air Intake Area

     A1.3) CTO – Pipe Rack Found. GT Area

     A1.4) CTO – Pipe Rack Found. OTC Area 

    Internal CTO‘s:  A0.1) CTO – Pipe Rack Found. ST Area for Steel Erection

     A0.2) CTO–

     Pipe Rack Found. Air Intake Area for Steel Erection

     A0.3) CTO – Pipe Rack Found. GT Area for Steel Erection

     A0.4) CTO – Pipe Rack Found. OTC Area for Steel Erection

    Annex Building,see Power sland

  • 8/13/2019 090011 f 08047 b 341

    13/44

    Main Civil CTO Areas – Pipe Rack Details 2

    CTO‘s to M E :  A2.1) CTO – Pipe Rack Floor Slabs (incl. Small Foundations for Equipment Installation)

    Small Foundations:1. Fuel Gas Block 3. CO2 Tank 5. Ammonia/Hydrazine Dosing Unit

    2. GT Nitrogen Block 4. Phosphate Dosing Skid 

    CTO_R_A2.1

  • 8/13/2019 090011 f 08047 b 341

    14/44

    Main Civil CTO Areas – Feedwater Tower Overview

    CTO_F_

  • 8/13/2019 090011 f 08047 b 341

    15/44

    Main Civil CTO Areas – Feedwater Tower Details 1

    CTO_F_A1.1

    CTO_F_A1.2CTO_F_A1.3 CTO‘s to M E:  A1.1) CTO – Feedwater Tower Ready for Tank

    Installation

     A1.2) CTO – Feedwater Tower (Structural Steel

    complete)

     A1.3) CTO – Feedwater Tower Cladding

    Optional)

    Internal CTO‘s:  A0.1) CTO – Feedwater Tower Foundations for

    Steel Erection

    CTO_F_A0.1

  • 8/13/2019 090011 f 08047 b 341

    16/44

  • 8/13/2019 090011 f 08047 b 341

    17/44

    Main Civil CTO Areas – Transformer and GCB Overview

    CTO_T_

  • 8/13/2019 090011 f 08047 b 341

    18/44

    Main Civil CTO Areas – Transformer and GCB Details 1

    CTO_T_A1.2

    CTO_T_B1.1CTO_T_A1.1

    CTO_T_C1.1CTO_T_D1.1

    CTO_T_D1.2

    CTO_T_E1.1

    CTO‘s to M E:  A1.1) CTO - Main Transformer Area for Equipment Installation

     A1.2) CTO - Auxiliary Transformer Area for Equipment Installation

     A2.1) CTO –Transformer Area Complete

     A3.1) CTO – Site Transformer Optional)B1.1) CTO - GCB Area Complete

    B1.2) CTO - Bus Duct Support Structure

    C1.1) CTO - Local Switchyard Area/HV Support Structure

    D1.1) CTO - Electrical Module Area

    D1.2) CTO - Electrical Module (Platforms)

    E1.1) CTO–

     Standby-Diesel Foundation

    F1.1) CTO – Black Start Diesel Generator Foundation Optional)

    Internal CTO‘s:  A0.1) CTO - Transformer Area for Steel Erection

    B0.1) CTO - GCB Area for Steel Erection

    D0.1) CTO - Electrical Module Platform Foundation

    F0.1) CTO – Black Start Diesel Generator Foundation Optional)

    CTO_T_A2.1CTO_T_B2.1

  • 8/13/2019 090011 f 08047 b 341

    19/44

    Main Civil CTO Areas – Switchyard or GIS/AIS Area Overview Optional)

    CTO_Y_

    Reference:Tzafit

  • 8/13/2019 090011 f 08047 b 341

    20/44

    Main Civil CTO Areas – Switchyard or GIS/AIS Area Optional)

    CTO_Y_

    CTO‘s to M E:  A1.1) CTO – GIS/AIS Cable Cellar

     A1.2) CTO – GIS/AIS Control Room

     A1.3) CTO – GIS/AIS Building Complete

     A2.1) CTO – GIS/AIS Pylons and Gantry Area

    B1.1) CTO – GIS/AIS Switchyard Control Builiding Option)B1.2) CTO – GIS/AIS Switchyard Pylons and Gantry Area Option) 

    CTO_Y_A1.2

    CTO_Y_A1.2

    CTO_Y_A2.1

    Reference:Tzafit

  • 8/13/2019 090011 f 08047 b 341

    21/44

    Main Civil CTO Areas – Cooling Water System Overview

    CTO_C_

  • 8/13/2019 090011 f 08047 b 341

    22/44

    Main Civil CTO Areas – Cooling Water System Details 1

    CTO_C_A1.1 CTO_C_A2.1

    CTO_C_E2.3

    CTO_C_B1.1CTO_C_B2.1 CTO_C_B3.1

    CTO_C_E2.1

    CTO_C_E2.2

    Internal CTO‘s: B0.1) CTO-MCW Pump Area for Steel Erection (CT Area)

    C0.1) CTO-MCW Treatment Station Foundation for Steel

    Erection

    D0.1) CTO -MCW Electrical Module Foundation for Steel

    Erection

    CTO_C_C1.1

    CTO‘s to M E :  A1.1) CTO-Cooling Tower Basin (Part 1)

     A1.2) CTO-Cooling Tower Basin (Part 2)

    B1.1) CTO- MCW Pump Area (CT Area)

    B2.1) CTO- MCW Platform Complete (CT Area)

    B2.2) CTO-MCW Pumps Aux. Found. (CT Area)

    CTO‘s to M E: C1.1) CTO-MCW Treatment Station Foundation

    D1.1) CTO-MCW Electrical Module Area

    E2.1) CTO - MCW Pipeline Part I (Turbine Area)

    E2.2) CTO - MCW Pipeline Part II (TH to CT )

    E2.3) CTO - MCW Pipeline Part III (Cooling Tower)

    CTO_C_D1.1

    nextslide

  • 8/13/2019 090011 f 08047 b 341

    23/44

    Main Civil CTO Areas – Cooling Water System Details 2

    CTO_C_E1.1

    Internal CTO‘s: E0.1) CTO - MCW Supports/Foundations for Steel Erection (TH internal & TH

    external)

    D0.1) CTO - CCW Pump Supports/Foundations for Steel Erection

    CTO_C_D1.2

    CTO‘s to M E: E1.1) CTO - MCW Supports/Foundations (TH internal & TH external)

    E1.2) CTO - MCW Pipeline (Interface Civil/M&E)

    D1.1) CTO - CCW Module Foundation Complete

    D1.2) CTO - CCW Pump Supports/Foundations Complete

    CTO_C_E1.2

    CTO_C_D1.1

  • 8/13/2019 090011 f 08047 b 341

    24/44

    Main Civil CTO Areas – ACC Area Overview Optional)

    CTO_A_

    Reference: Tzafit

    l

  • 8/13/2019 090011 f 08047 b 341

    25/44

    Main Civil CTO Areas – ACC Area Optional)

    Internal CTO‘s: B0.1) CTO - ACC Electrial Module for Steel Erection

    C0.1) CTO- ACC Condensate Pumps & Tank Foundation for Steel Erection

    D0.1) CTO - ACC Ducting into Turbine Hall incl. Pit for Steel Erection

    CTO‘s to M E:  A1.1) CTO - ACC Foundation

    B1.1) CTO - ACC Electrial Module Complete

    C1.1) CTO- ACC Condensate Pumps & Tank Foundation Complete

    D1.1) CTO - ACC Ducting into Turbine Hall incl. Pit for Steel Erection

    CTO_C_E1.2

    CTO_C_D1.2

    CTO_C_D1.1

    CTO_C_E1.1

    Reference: Tzafit

    M C l CTO A G Pl O

  • 8/13/2019 090011 f 08047 b 341

    26/44

    Main Civil CTO Areas – Gas Plant Overview

    CTO_G_

    M i Ci il CTO A C li W S D il

  • 8/13/2019 090011 f 08047 b 341

    27/44

    Main Civil CTO Areas – Cooling Water System Details

    CTO_C_E1.1

    Internal CTO‘s: E0.1) CTO - MCW Supports/Foundations for Steel Erection (TH internal & TH

    external)

    D0.1) CTO - CCW Pump Supports/Foundations for Steel Erection

    CTO_C_D1.2

    CTO‘s to M E: E1.1) CTO - MCW Supports/Foundations (TH internal & TH external)

    E1.2) CTO - MCW Pipeline (Interface Civil/M&E)

    D1.1) CTO - CCW Module Foundation Complete

    D1.2) CTO - CCW Pump Supports/Foundations Complete

    CTO_C_E1.2

    CTO_C_D1.1

    M i Ci il CTO A G Pl t D t il

  • 8/13/2019 090011 f 08047 b 341

    28/44

    Main Civil CTO Areas – Gas Plant Details

    CTO_G_A1.1

    CTO_G_C1.1

    CTO_G_B1.1

    CTO‘s to M E :  A1.1) CTO - Fuel Gas Treatment Area Complete

     A1.2) CTO - Fuel Gas Plant Gas Compressor Area

     A2.1) CTO - Fuel Gas Plant Electrical Module

    B1.1) CTO - Fuel Gas Plant Transfer to GT Area (incl. Preheater Area,

    Pipe Sleepers and Trench)

    C1.1) CTO - Gas Storage Shelter H2-N2-CO2 Area

    Internal CTO‘s:  A0.1) CTO - Fuel Gas Treatment Area for Steel Erection

    B0.1) CTO - Fuel Gas Plant Transfer to GT Area (incl. Preheater Area ,

    Pipe Sleepers and Pipe Trench)

    C0.1) CTO - Gas Storage Shelter Foundation

    CTO_G_A1.2

    CTO_G_A2.1

    M i Ci il CTO A F l Oil A O i

  • 8/13/2019 090011 f 08047 b 341

    29/44

    Main Civil CTO Areas – Fuel Oil Area Overview

    CTO_O_

    Main Civil CTO Areas Fuel Oil Area Details

  • 8/13/2019 090011 f 08047 b 341

    30/44

    Main Civil CTO Areas – Fuel Oil Area Details

    CTO‘s to M E:  A1.1) CTO - Fuel Oil Tank Foundation

     A1.2) CTO - Fuel Oil Storage Area

    B1.1) CTO - Fuel Oil Unloading Station

    C1.1) CTO - Fuel Oil Forwarding/Pumping Station (Structural Steel)

    C1.2) CTO - Fuel Oil Forwarding/Pumping Station Foundations

    C2.1) CTO - Fuel Oil Treatment Area

    D1.1) CTO - Fuel Oil El ectrical Modules Foundation

    E1.1) CTO - Pipe Rack - Rest of Plant

    E1.2) CTO - Pipe Sleepers/Trench Fuel Oil Line 

    CTO_O_E1.2

    Internal CTO‘s: C0.1) CTO - Fuel Oil Forwarding/Pumping Station for Steel Erection

    D0.1) CTO - Fuel Oil Electrical Modules Foundation for Steel Erection

    E0.1) CTO - Pipe Rack Foundations - Rest of Plant

    E0.2) CTO - Pipe Sleepers/Trench Fuel Oil Line  Optional) 

    CTO_O_A1.1

    CTO_O_A1.2

    CTO_O_B1.1

    CTO_O_E1.1

    CTO_O_D1.1TO_O_C

    Main Civil CTO Areas Water Treatment Overview

  • 8/13/2019 090011 f 08047 b 341

    31/44

    Main Civil CTO Areas – Water Treatment Overview

    CTO_W_

    Main Civil CTO Areas – Water Treatment Details

  • 8/13/2019 090011 f 08047 b 341

    32/44

    Main Civil CTO Areas – Water Treatment Details

    CTO_W_A1

    CTO_W_B3.1

    CTO_W_B4.1 CTO_W_C1.1

    CTO_W_GCTO_W_B2.1 CTO_W_A2.1

    CTO_W_A2.2 CTO‘s to M E :  A1.1) CTO - WTP Building complete (Steel Structure and Cladding)

     A1.2) CTO - WTP Building complete

     A2.1) CTO - WTP Chemical Unloading Station

     A2.2) CTO - WTP Storage (Tank) Area

    B1.1) CTO - Pre-treated Water Storage Optional) B2.1) CTO - Demin Water Tank Foundation

    B3.1) CTO - Raw & Fire Fighting Water Tank

    B4.1) CTO - WT Transfer Pump Area

    C1.1) CTO - Pipe Sleepers/Pipe bridge/trench BoP to PI

    Internal CTO‘s:  A0 .1) CTO - WT Plant Foundation for Steel Erection

    Main Civil CTO Areas – Non Technical Buildings Overview

  • 8/13/2019 090011 f 08047 b 341

    33/44

    Main Civil CTO Areas  Non Technical Buildings Overview

    CTO_N_

    Main Civil CTO Areas – Non Technical Buildings Details 1

  • 8/13/2019 090011 f 08047 b 341

    34/44

    Main Civil CTO Areas  Non Technical Buildings Details 1

    CTO_N_A1 CTO_N_B1

    CTO_N_C1

    CTO‘s to M E:  A1.1) CTO - Control & Electrical Room in Admin Building

     A1.2) CTO - Admin & Control Building Complete

    B1.1) CTO - Switchgear & Battery Room in Workshop Building

    B1.2) CTO - Workshop & Warehouse Complete

    C1.1) CTO - Electrical Room Gatehouse

    C1.2) CTO - Gatehouse Complete

    D1.1) CTO - Hazardous Goods Store Optional) 

    CTO_N_D1.1

    Main Civil CTO Areas – Miscellaneous Overview

  • 8/13/2019 090011 f 08047 b 341

    35/44

    Main Civil CTO Areas  Miscellaneous Overview

    CTO_M_

    CTO_M_

    Main Civil CTO Areas – Miscellaneous Details 1

  • 8/13/2019 090011 f 08047 b 341

    36/44

    CTO_M_C1.1

    CTO‘s to M E :  A1 .1) CTO - Fire Fighting Pump Station

    B1 .1) CTO - Sampling Container /Rack

    B2 .1) CTO - Fuel Oil Nox Water Block

    C1 .1) CTO - Compressed Air Station

    CTO_M_A1.1 CTO_M_B1.1

    CTO_M_B2.1

    Internal CTO‘s:  A0 .1) CTO - Fire Fighting Pump Station Foundation for Steel Erection

    Main Civil CTO Areas – Miscellaneous Details 2

  • 8/13/2019 090011 f 08047 b 341

    37/44

    CTO_M_D1.1CTO‘s to M E: D1 .1) CTO - Chemical Storage Area

    E1 .1) CTO - Roads, Fences and Street Lighting (incl. Maintenance Area)

    E2 .1) CTO - Boundary Fence

    E3 .1) CTO - Maintenance Area

    E4 .1) CTO - L andscaping / Finishing

    CTO_M_E

    Main Civil CTO Areas – Underground Networks and Services Overview

  • 8/13/2019 090011 f 08047 b 341

    38/44

    g

    CTO_U_

    Main Civil CTO Areas – Underground Networks and Services Details 1

  • 8/13/2019 090011 f 08047 b 341

    39/44

    g

    CTO‘s to M E:  A1.1) CTO - U/G's Cable Conduits & Pull Pits - Power

    Island incl.TH & Machine Foundations

     A1.2) CTO - U/G's Cable Conduits & Pull Pits – 

    Transformer, GCB & HV Area

     A1.3) CTO - U/G's Cable Conduits & Pull Pits - WTP

     Area

     A1.4) CTO - U/G's Cable Conduits & Pull Pits - Cooling

    Tower

     A1.5) CTO - U/G's Cable Conduits & Pull Pits - Fuel Gas

    Plant

     A1.6) CTO - U/G's Cable Conduits & Pull Pits - Fuel Oil

    Plant

     A1.7) CTO - U/G's Cable Conduits & Pull Pits - Non-technical Buildings

     A1.8) CTO - U/G's Cable Conduits & Pull Pits - BoP

    CTO_U_A1.1

    CTO_U_A1.2

    CTO_U_A1.3CTO_U_A1.4

    CTO_U_A1.5

    CTO_U_A1.6

    CTO_U_A1.7

    CTO_U_G1.1

  • 8/13/2019 090011 f 08047 b 341

    40/44

    Main Civil CTO Areas – Underground Networks and Services Details 3

  • 8/13/2019 090011 f 08047 b 341

    41/44

    CTO_U_C1.1CTO_U_D1.1CTO_U_F1.1

    CTO_U_C2.1

    CTO‘s to M E: C1.1) CTO - Oily Water L ine - Power Island incl. TH & Machine

    Foundations

    C1.2) CTO - Oily Water Line - BoP

    C1.3) CTO - Oily Water L ine - Non-technical Building Area

    C2.1) CTO - Oil Separator Pit

    D1.1) CTO - Raw & Service Water Line - Power Island Area

    D1.2) CTO - Raw & Service Water Line ) - BoP

    D1.3) CTO - Raw & Service Water Line - Non-technical Building

     Area

    F1.1) CTO - Fire Fighting Line - Power Island

    F1.2) CTO - Fire Fighting Line - BoP

    F1.3) CTO - Fire Fighting Line - Non-technical Building Area

    CTO_U_C1.2CTO_U_D1.2CTO_U_F1.2

    CTO_U_C1.3CTO_U_D1.3CTO_U_F1.3

    Main Civil CTO Areas – Underground Networks and Services Details 2

  • 8/13/2019 090011 f 08047 b 341

    42/44

    CTO_U_E1.1

    CTO‘s to M E: E1.1) CTO - Waste Water Treatment Lines - Power Island Area

    E1.2) CTO - Waste Water Treatment Lines - BoP Area

    E1.3) CTO - Waste Water Treatment Lines - Non-technical Building

     Area

    E2.1) CTO - Waste Water Treatment Pump Station

    E3.1) CTO - Waste Water Treatment Area

    E4.1) CTO - Industrial Water Recovery Pit Optional) E5.1) CTO - Neutralisation Basin Optional) E6.1) CTO - Sanitary Water Line - Non-technical Building Area

    E6.2) CTO - Sanitary Water Pit - Non-technical Building AreaCTO_U_E1.3CTO_U_E6.1CTO_U_E6.2

    CTO_U_E1.2CTO_U_E2.1CTO_U_E3.1

    Main Civil CTO Areas–

     Site Preparation, Soil Improvement and Temporary

    Works

  • 8/13/2019 090011 f 08047 b 341

    43/44

     Works

    Internal CTO‘s:  A1.1) CTO - Site Preparation Works / Site Leveling & Tree Cutting

     A2.1) CTO–

     Site Drainage

     A3.1) CTO - Concrete Works for Temporary Site Facilities

     A4.1) CTO - Water, Sanitary & Electricity Supply for Temporary Site Facilities

    B1.1) CTO - CTO - Soil Improvement

    B2.1) CTO - Installation of Piling Carpet

    B2.2) CTO - Piling Works

    C1.1) CTO - Temporary Works (Condenser & HRSG Blow Down Pit)

    C2.1) CTO - Excavation Condenser & HRSG Blow Down Pit

  • 8/13/2019 090011 f 08047 b 341

    44/44

    POWER SYSTEMS

    www.alstom.com