Main Civil CTO Areas – Power Island Details 1
CTO_P_B CTO_P_C1.1CTO_P_B1.1
CTO_P_B3.1
CTO_P_A1.1 CTO_P_A2.1 CTO_P_A3.1
CTO‘s to M E: A1.1) CTO – GT Foundation
A2.1) CTO – Generator Foundation
A3.1) CTO – ST Foundation
B1.1) CTO – Aux. Found. GT System
B2.1) CTO – Aux. Found. Geno Systems
B3.1) CTO – Aux. Found. ST Systems
C1.1) CTO – Condenser and ADV Area Complete
E1.1) CTO - OTC Foundation
Internal CTO‘s: C0.1) CTO
–
Condenser and ADV Area for St eel
Erection
CTO_P_E1.1
-
8/13/2019 090011 f 08047 b 341
4/44
Main Civil CTO Areas – Power Island Details 2
CTO‘s to M E: D3.1) CTO – Turbine Hall Floor Slabs
D3.2) CTO – Annex Building Complete
F1.1) CTO - Auxiliary Closed Cooling Foundation Optional)Internal CTO‘s: D0.1) CTO – TH Foundations for Steel Erection (MA – MD)
D0.2) CTO – TH Foundations for Steel Erection (MD – MG)
D0.3) CTO - Annex Building Foundations for Steel Erection
CTO_P_D0.1 CTO_P_D0.2
CTO_P_D3.1
CTO_P_D3.1
CTO_P_D0.3CTO_P_D3.2
-
8/13/2019 090011 f 08047 b 341
5/44
-
8/13/2019 090011 f 08047 b 341
6/44
Main Civil CTO Areas – Power Island Details 4
CTO_P_D2.1
CTO‘s to M E : G1.3) CTO - Air Intake Steel Structure for Equipment Installation
CTO_P_D2.1
-
8/13/2019 090011 f 08047 b 341
7/44
Main Civil CTO Areas – Power Island Details 5
CTO_P_D2.1CTO‘s to M E: D2.1) CTO – Turbine Hall (Structural
Steel and Cladding complete)
-
8/13/2019 090011 f 08047 b 341
8/44
Main Civil CTO Areas – HRSG Overview
CTO_H_
-
8/13/2019 090011 f 08047 b 341
9/44
Main Civil CTO Areas – HRSG Details 1
CTO_H_B1.1
CTO_H_A1.1 CTO‘s to M E: A1.1) CTO – HRSG Foundation incl. Stack
A1.2) CTO – GT Exhaust Duct Foundation
B1.1) CTO–
HRSG Blow Down Pit Area Complete
D1.1) CTO – Flue Gas Monitoring Station/CEMS
Foundation
Internal CTO‘s: B0.1) CTO – HRSG Blow Down Pit Area for Steel
Erection
CTO_H_A1.2CTO_H_D1.1
-
8/13/2019 090011 f 08047 b 341
10/44
Main Civil CTO Areas – HRSG Details 2
CTO_H_C1.1Enclosure
CTO‘s to M E: C1.1) CTO – HRSG Enclosure Foundation
Internal CTO‘s: C1.2) CTO – HRSG Cladding Optional)
-
8/13/2019 090011 f 08047 b 341
11/44
Main Civil CTO Areas – Pipe Rack Overview
CTO_R_
-
8/13/2019 090011 f 08047 b 341
12/44
Main Civil CTO Areas – Pipe Rack Details 1
CTO_R_A1.1CTO_R_A1.2TO_R_A1.4 CTO_R_A1.3
CTO‘s to M E: A1.1) CTO – Pipe Rack Found. ST Area
A1.2) CTO–
Pipe Rack Found. Air Intake Area
A1.3) CTO – Pipe Rack Found. GT Area
A1.4) CTO – Pipe Rack Found. OTC Area
Internal CTO‘s: A0.1) CTO – Pipe Rack Found. ST Area for Steel Erection
A0.2) CTO–
Pipe Rack Found. Air Intake Area for Steel Erection
A0.3) CTO – Pipe Rack Found. GT Area for Steel Erection
A0.4) CTO – Pipe Rack Found. OTC Area for Steel Erection
Annex Building,see Power sland
-
8/13/2019 090011 f 08047 b 341
13/44
Main Civil CTO Areas – Pipe Rack Details 2
CTO‘s to M E : A2.1) CTO – Pipe Rack Floor Slabs (incl. Small Foundations for Equipment Installation)
Small Foundations:1. Fuel Gas Block 3. CO2 Tank 5. Ammonia/Hydrazine Dosing Unit
2. GT Nitrogen Block 4. Phosphate Dosing Skid
CTO_R_A2.1
-
8/13/2019 090011 f 08047 b 341
14/44
Main Civil CTO Areas – Feedwater Tower Overview
CTO_F_
-
8/13/2019 090011 f 08047 b 341
15/44
Main Civil CTO Areas – Feedwater Tower Details 1
CTO_F_A1.1
CTO_F_A1.2CTO_F_A1.3 CTO‘s to M E: A1.1) CTO – Feedwater Tower Ready for Tank
Installation
A1.2) CTO – Feedwater Tower (Structural Steel
complete)
A1.3) CTO – Feedwater Tower Cladding
Optional)
Internal CTO‘s: A0.1) CTO – Feedwater Tower Foundations for
Steel Erection
CTO_F_A0.1
-
8/13/2019 090011 f 08047 b 341
16/44
-
8/13/2019 090011 f 08047 b 341
17/44
Main Civil CTO Areas – Transformer and GCB Overview
CTO_T_
-
8/13/2019 090011 f 08047 b 341
18/44
Main Civil CTO Areas – Transformer and GCB Details 1
CTO_T_A1.2
CTO_T_B1.1CTO_T_A1.1
CTO_T_C1.1CTO_T_D1.1
CTO_T_D1.2
CTO_T_E1.1
CTO‘s to M E: A1.1) CTO - Main Transformer Area for Equipment Installation
A1.2) CTO - Auxiliary Transformer Area for Equipment Installation
A2.1) CTO –Transformer Area Complete
A3.1) CTO – Site Transformer Optional)B1.1) CTO - GCB Area Complete
B1.2) CTO - Bus Duct Support Structure
C1.1) CTO - Local Switchyard Area/HV Support Structure
D1.1) CTO - Electrical Module Area
D1.2) CTO - Electrical Module (Platforms)
E1.1) CTO–
Standby-Diesel Foundation
F1.1) CTO – Black Start Diesel Generator Foundation Optional)
Internal CTO‘s: A0.1) CTO - Transformer Area for Steel Erection
B0.1) CTO - GCB Area for Steel Erection
D0.1) CTO - Electrical Module Platform Foundation
F0.1) CTO – Black Start Diesel Generator Foundation Optional)
CTO_T_A2.1CTO_T_B2.1
-
8/13/2019 090011 f 08047 b 341
19/44
Main Civil CTO Areas – Switchyard or GIS/AIS Area Overview Optional)
CTO_Y_
Reference:Tzafit
-
8/13/2019 090011 f 08047 b 341
20/44
Main Civil CTO Areas – Switchyard or GIS/AIS Area Optional)
CTO_Y_
CTO‘s to M E: A1.1) CTO – GIS/AIS Cable Cellar
A1.2) CTO – GIS/AIS Control Room
A1.3) CTO – GIS/AIS Building Complete
A2.1) CTO – GIS/AIS Pylons and Gantry Area
B1.1) CTO – GIS/AIS Switchyard Control Builiding Option)B1.2) CTO – GIS/AIS Switchyard Pylons and Gantry Area Option)
CTO_Y_A1.2
CTO_Y_A1.2
CTO_Y_A2.1
Reference:Tzafit
-
8/13/2019 090011 f 08047 b 341
21/44
Main Civil CTO Areas – Cooling Water System Overview
CTO_C_
-
8/13/2019 090011 f 08047 b 341
22/44
Main Civil CTO Areas – Cooling Water System Details 1
CTO_C_A1.1 CTO_C_A2.1
CTO_C_E2.3
CTO_C_B1.1CTO_C_B2.1 CTO_C_B3.1
CTO_C_E2.1
CTO_C_E2.2
Internal CTO‘s: B0.1) CTO-MCW Pump Area for Steel Erection (CT Area)
C0.1) CTO-MCW Treatment Station Foundation for Steel
Erection
D0.1) CTO -MCW Electrical Module Foundation for Steel
Erection
CTO_C_C1.1
CTO‘s to M E : A1.1) CTO-Cooling Tower Basin (Part 1)
A1.2) CTO-Cooling Tower Basin (Part 2)
B1.1) CTO- MCW Pump Area (CT Area)
B2.1) CTO- MCW Platform Complete (CT Area)
B2.2) CTO-MCW Pumps Aux. Found. (CT Area)
CTO‘s to M E: C1.1) CTO-MCW Treatment Station Foundation
D1.1) CTO-MCW Electrical Module Area
E2.1) CTO - MCW Pipeline Part I (Turbine Area)
E2.2) CTO - MCW Pipeline Part II (TH to CT )
E2.3) CTO - MCW Pipeline Part III (Cooling Tower)
CTO_C_D1.1
nextslide
-
8/13/2019 090011 f 08047 b 341
23/44
Main Civil CTO Areas – Cooling Water System Details 2
CTO_C_E1.1
Internal CTO‘s: E0.1) CTO - MCW Supports/Foundations for Steel Erection (TH internal & TH
external)
D0.1) CTO - CCW Pump Supports/Foundations for Steel Erection
CTO_C_D1.2
CTO‘s to M E: E1.1) CTO - MCW Supports/Foundations (TH internal & TH external)
E1.2) CTO - MCW Pipeline (Interface Civil/M&E)
D1.1) CTO - CCW Module Foundation Complete
D1.2) CTO - CCW Pump Supports/Foundations Complete
CTO_C_E1.2
CTO_C_D1.1
-
8/13/2019 090011 f 08047 b 341
24/44
Main Civil CTO Areas – ACC Area Overview Optional)
CTO_A_
Reference: Tzafit
l
-
8/13/2019 090011 f 08047 b 341
25/44
Main Civil CTO Areas – ACC Area Optional)
Internal CTO‘s: B0.1) CTO - ACC Electrial Module for Steel Erection
C0.1) CTO- ACC Condensate Pumps & Tank Foundation for Steel Erection
D0.1) CTO - ACC Ducting into Turbine Hall incl. Pit for Steel Erection
CTO‘s to M E: A1.1) CTO - ACC Foundation
B1.1) CTO - ACC Electrial Module Complete
C1.1) CTO- ACC Condensate Pumps & Tank Foundation Complete
D1.1) CTO - ACC Ducting into Turbine Hall incl. Pit for Steel Erection
CTO_C_E1.2
CTO_C_D1.2
CTO_C_D1.1
CTO_C_E1.1
Reference: Tzafit
M C l CTO A G Pl O
-
8/13/2019 090011 f 08047 b 341
26/44
Main Civil CTO Areas – Gas Plant Overview
CTO_G_
M i Ci il CTO A C li W S D il
-
8/13/2019 090011 f 08047 b 341
27/44
Main Civil CTO Areas – Cooling Water System Details
CTO_C_E1.1
Internal CTO‘s: E0.1) CTO - MCW Supports/Foundations for Steel Erection (TH internal & TH
external)
D0.1) CTO - CCW Pump Supports/Foundations for Steel Erection
CTO_C_D1.2
CTO‘s to M E: E1.1) CTO - MCW Supports/Foundations (TH internal & TH external)
E1.2) CTO - MCW Pipeline (Interface Civil/M&E)
D1.1) CTO - CCW Module Foundation Complete
D1.2) CTO - CCW Pump Supports/Foundations Complete
CTO_C_E1.2
CTO_C_D1.1
M i Ci il CTO A G Pl t D t il
-
8/13/2019 090011 f 08047 b 341
28/44
Main Civil CTO Areas – Gas Plant Details
CTO_G_A1.1
CTO_G_C1.1
CTO_G_B1.1
CTO‘s to M E : A1.1) CTO - Fuel Gas Treatment Area Complete
A1.2) CTO - Fuel Gas Plant Gas Compressor Area
A2.1) CTO - Fuel Gas Plant Electrical Module
B1.1) CTO - Fuel Gas Plant Transfer to GT Area (incl. Preheater Area,
Pipe Sleepers and Trench)
C1.1) CTO - Gas Storage Shelter H2-N2-CO2 Area
Internal CTO‘s: A0.1) CTO - Fuel Gas Treatment Area for Steel Erection
B0.1) CTO - Fuel Gas Plant Transfer to GT Area (incl. Preheater Area ,
Pipe Sleepers and Pipe Trench)
C0.1) CTO - Gas Storage Shelter Foundation
CTO_G_A1.2
CTO_G_A2.1
M i Ci il CTO A F l Oil A O i
-
8/13/2019 090011 f 08047 b 341
29/44
Main Civil CTO Areas – Fuel Oil Area Overview
CTO_O_
Main Civil CTO Areas Fuel Oil Area Details
-
8/13/2019 090011 f 08047 b 341
30/44
Main Civil CTO Areas – Fuel Oil Area Details
CTO‘s to M E: A1.1) CTO - Fuel Oil Tank Foundation
A1.2) CTO - Fuel Oil Storage Area
B1.1) CTO - Fuel Oil Unloading Station
C1.1) CTO - Fuel Oil Forwarding/Pumping Station (Structural Steel)
C1.2) CTO - Fuel Oil Forwarding/Pumping Station Foundations
C2.1) CTO - Fuel Oil Treatment Area
D1.1) CTO - Fuel Oil El ectrical Modules Foundation
E1.1) CTO - Pipe Rack - Rest of Plant
E1.2) CTO - Pipe Sleepers/Trench Fuel Oil Line
CTO_O_E1.2
Internal CTO‘s: C0.1) CTO - Fuel Oil Forwarding/Pumping Station for Steel Erection
D0.1) CTO - Fuel Oil Electrical Modules Foundation for Steel Erection
E0.1) CTO - Pipe Rack Foundations - Rest of Plant
E0.2) CTO - Pipe Sleepers/Trench Fuel Oil Line Optional)
CTO_O_A1.1
CTO_O_A1.2
CTO_O_B1.1
CTO_O_E1.1
CTO_O_D1.1TO_O_C
Main Civil CTO Areas Water Treatment Overview
-
8/13/2019 090011 f 08047 b 341
31/44
Main Civil CTO Areas – Water Treatment Overview
CTO_W_
Main Civil CTO Areas – Water Treatment Details
-
8/13/2019 090011 f 08047 b 341
32/44
Main Civil CTO Areas – Water Treatment Details
CTO_W_A1
CTO_W_B3.1
CTO_W_B4.1 CTO_W_C1.1
CTO_W_GCTO_W_B2.1 CTO_W_A2.1
CTO_W_A2.2 CTO‘s to M E : A1.1) CTO - WTP Building complete (Steel Structure and Cladding)
A1.2) CTO - WTP Building complete
A2.1) CTO - WTP Chemical Unloading Station
A2.2) CTO - WTP Storage (Tank) Area
B1.1) CTO - Pre-treated Water Storage Optional) B2.1) CTO - Demin Water Tank Foundation
B3.1) CTO - Raw & Fire Fighting Water Tank
B4.1) CTO - WT Transfer Pump Area
C1.1) CTO - Pipe Sleepers/Pipe bridge/trench BoP to PI
Internal CTO‘s: A0 .1) CTO - WT Plant Foundation for Steel Erection
Main Civil CTO Areas – Non Technical Buildings Overview
-
8/13/2019 090011 f 08047 b 341
33/44
Main Civil CTO Areas Non Technical Buildings Overview
CTO_N_
Main Civil CTO Areas – Non Technical Buildings Details 1
-
8/13/2019 090011 f 08047 b 341
34/44
Main Civil CTO Areas Non Technical Buildings Details 1
CTO_N_A1 CTO_N_B1
CTO_N_C1
CTO‘s to M E: A1.1) CTO - Control & Electrical Room in Admin Building
A1.2) CTO - Admin & Control Building Complete
B1.1) CTO - Switchgear & Battery Room in Workshop Building
B1.2) CTO - Workshop & Warehouse Complete
C1.1) CTO - Electrical Room Gatehouse
C1.2) CTO - Gatehouse Complete
D1.1) CTO - Hazardous Goods Store Optional)
CTO_N_D1.1
Main Civil CTO Areas – Miscellaneous Overview
-
8/13/2019 090011 f 08047 b 341
35/44
Main Civil CTO Areas Miscellaneous Overview
CTO_M_
CTO_M_
Main Civil CTO Areas – Miscellaneous Details 1
-
8/13/2019 090011 f 08047 b 341
36/44
CTO_M_C1.1
CTO‘s to M E : A1 .1) CTO - Fire Fighting Pump Station
B1 .1) CTO - Sampling Container /Rack
B2 .1) CTO - Fuel Oil Nox Water Block
C1 .1) CTO - Compressed Air Station
CTO_M_A1.1 CTO_M_B1.1
CTO_M_B2.1
Internal CTO‘s: A0 .1) CTO - Fire Fighting Pump Station Foundation for Steel Erection
Main Civil CTO Areas – Miscellaneous Details 2
-
8/13/2019 090011 f 08047 b 341
37/44
CTO_M_D1.1CTO‘s to M E: D1 .1) CTO - Chemical Storage Area
E1 .1) CTO - Roads, Fences and Street Lighting (incl. Maintenance Area)
E2 .1) CTO - Boundary Fence
E3 .1) CTO - Maintenance Area
E4 .1) CTO - L andscaping / Finishing
CTO_M_E
Main Civil CTO Areas – Underground Networks and Services Overview
-
8/13/2019 090011 f 08047 b 341
38/44
g
CTO_U_
Main Civil CTO Areas – Underground Networks and Services Details 1
-
8/13/2019 090011 f 08047 b 341
39/44
g
CTO‘s to M E: A1.1) CTO - U/G's Cable Conduits & Pull Pits - Power
Island incl.TH & Machine Foundations
A1.2) CTO - U/G's Cable Conduits & Pull Pits –
Transformer, GCB & HV Area
A1.3) CTO - U/G's Cable Conduits & Pull Pits - WTP
Area
A1.4) CTO - U/G's Cable Conduits & Pull Pits - Cooling
Tower
A1.5) CTO - U/G's Cable Conduits & Pull Pits - Fuel Gas
Plant
A1.6) CTO - U/G's Cable Conduits & Pull Pits - Fuel Oil
Plant
A1.7) CTO - U/G's Cable Conduits & Pull Pits - Non-technical Buildings
A1.8) CTO - U/G's Cable Conduits & Pull Pits - BoP
CTO_U_A1.1
CTO_U_A1.2
CTO_U_A1.3CTO_U_A1.4
CTO_U_A1.5
CTO_U_A1.6
CTO_U_A1.7
CTO_U_G1.1
-
8/13/2019 090011 f 08047 b 341
40/44
Main Civil CTO Areas – Underground Networks and Services Details 3
-
8/13/2019 090011 f 08047 b 341
41/44
CTO_U_C1.1CTO_U_D1.1CTO_U_F1.1
CTO_U_C2.1
CTO‘s to M E: C1.1) CTO - Oily Water L ine - Power Island incl. TH & Machine
Foundations
C1.2) CTO - Oily Water Line - BoP
C1.3) CTO - Oily Water L ine - Non-technical Building Area
C2.1) CTO - Oil Separator Pit
D1.1) CTO - Raw & Service Water Line - Power Island Area
D1.2) CTO - Raw & Service Water Line ) - BoP
D1.3) CTO - Raw & Service Water Line - Non-technical Building
Area
F1.1) CTO - Fire Fighting Line - Power Island
F1.2) CTO - Fire Fighting Line - BoP
F1.3) CTO - Fire Fighting Line - Non-technical Building Area
CTO_U_C1.2CTO_U_D1.2CTO_U_F1.2
CTO_U_C1.3CTO_U_D1.3CTO_U_F1.3
Main Civil CTO Areas – Underground Networks and Services Details 2
-
8/13/2019 090011 f 08047 b 341
42/44
CTO_U_E1.1
CTO‘s to M E: E1.1) CTO - Waste Water Treatment Lines - Power Island Area
E1.2) CTO - Waste Water Treatment Lines - BoP Area
E1.3) CTO - Waste Water Treatment Lines - Non-technical Building
Area
E2.1) CTO - Waste Water Treatment Pump Station
E3.1) CTO - Waste Water Treatment Area
E4.1) CTO - Industrial Water Recovery Pit Optional) E5.1) CTO - Neutralisation Basin Optional) E6.1) CTO - Sanitary Water Line - Non-technical Building Area
E6.2) CTO - Sanitary Water Pit - Non-technical Building AreaCTO_U_E1.3CTO_U_E6.1CTO_U_E6.2
CTO_U_E1.2CTO_U_E2.1CTO_U_E3.1
Main Civil CTO Areas–
Site Preparation, Soil Improvement and Temporary
Works
-
8/13/2019 090011 f 08047 b 341
43/44
Works
Internal CTO‘s: A1.1) CTO - Site Preparation Works / Site Leveling & Tree Cutting
A2.1) CTO–
Site Drainage
A3.1) CTO - Concrete Works for Temporary Site Facilities
A4.1) CTO - Water, Sanitary & Electricity Supply for Temporary Site Facilities
B1.1) CTO - CTO - Soil Improvement
B2.1) CTO - Installation of Piling Carpet
B2.2) CTO - Piling Works
C1.1) CTO - Temporary Works (Condenser & HRSG Blow Down Pit)
C2.1) CTO - Excavation Condenser & HRSG Blow Down Pit
-