09 site maintenance

Upload: hamzayakan967

Post on 04-Jun-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 09 Site Maintenance

    1/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Table of Contents

    Table of Contents

    Chapter 2 Site Maintenance ......................................................................................................... 2-12.1 Overview............................................................................................................................ 2-12.2 Site Administrationship ...................................................................................................... 2-12.3 Start Site Operation ........................................................................................................... 2-32.4 View Resource................................................................................................................... 2-42.5 Force Load SW.................................................................................................................. 2-52.6 SW Activate ....................................................................................................................... 2-62.7 Site Hierarchical Reset ...................................................................................................... 2-82.8 Site Test............................................................................................................................. 2-92.9 Site Environment Monitoring............................................................................................ 2-10

    Huawei Technologies Proprietary

    i

  • 8/13/2019 09 Site Maintenance

    2/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    Chapter 2 Site Maintenance

    2.1 Overview

    There may be one or more cells at a site. The maintenance of the site involves the

    maintenance over the entire BTS.

    Figure 2-1 shows the interface [Site Maintenance Terminal System] in the BTS

    maintenance console.

    In the following sections, site maintenance functions are explained in detail.

    Figure 2-1 The interface [Site Maintenance Terminal System]

    2.2 Site Administrationship

    I. Function

    Site administrationship is the authority to set the various BTS parameters. BTS

    parameters can be set either at the BSC or the local BTS maintenance terminal.

    However, BTS parameter setting cannot be performed at the same time at both the

    Huawei Technologies Proprietary

    2-1

  • 8/13/2019 09 Site Maintenance

    3/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    BSC and the local BTS terminal. Therefore, site administrationship will be granted to

    one side at a time.

    When a site is installed and begins to run, BSC has the site administrationship by

    default. Therefore the maintenance personnel need to obtain site administrationship

    before performing any operation at a BTS terminal.

    When the operation is over, please release the site administrationship.

    II. Access

    Activate BTS terminal maintenance console, and select [Site/Site

    Administrationship]. Click or in the popped up dialogue box

    to obtain or release site administrationship, and the operational result will be

    displayed in this box, as shown in Figure 2-2.

    Figure 2-2 Site administrationship (obtain administrationship)

    When the operation is over, the administrationship must be released. Otherwise,

    maintenance personnel will be blocked from performing remote maintenance.

    The interface of releasing the administrationship is shown in Figure 2-3.

    Huawei Technologies Proprietary

    2-2

  • 8/13/2019 09 Site Maintenance

    4/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    Figure 2-3 Release the administrationship

    2.3 Start Site Operation

    I. Function

    To put the site data set in BTS operation and maintenance unit into effect and start

    the service of the site.

    II. Access

    Activate BTS terminal maintenance console, and select [Site/Site OpStart]. Click

    in the popped up message box [Start Site Operation]. The result of the

    operation will be displayed in the status bar, as shown in Figure 2-4.

    Figure 2-4 Start Site Operation

    Huawei Technologies Proprietary

    2-3

  • 8/13/2019 09 Site Maintenance

    5/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    2.4 View Resource

    I. Function

    The maintenance personnel can view the status of resource utilization in the

    terminal maintenance system of the BTS, specifically, the utilization ratio of the CPU

    and the RAM of TMU and TRX.

    II. Access

    Activate BTS terminal maintenance console, and select [Site/View Resource], and

    the resource utilization status of the TRX and the TMU of the site will be displayed in

    the popped-up window.

    Select in [Resource Type] to determine the type of resource whose utilization

    status is to be viewed. As is shown in Figure 2-5,Figure 2-6.

    Figure 2-5 View the status of resource

    Huawei Technologies Proprietary

    2-4

  • 8/13/2019 09 Site Maintenance

    6/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    Figure 2-6 View CPU status

    2.5 Force Load SW

    I. Function

    The BTS software can be upgraded from both the local and the remote terminal.

    Software upgrading for TMU, TRX and PBU can therefore be easily achieved.

    II. Access

    Activate BTS terminal maintenance console, select [Site/Forced Load SW], and

    the dialogue box [SW Download]will pop up.

    Select in this dialogue box the name of the software and the type of the files to be

    loaded, and click .

    The progress of software loading will be displayed at the maintenance console, as

    shown in Figure 2-7.

    When it is promoted that Software loading successful, click to complete

    the forced software loading from the maintenance console to the BTS.

    Huawei Technologies Proprietary

    2-5

  • 8/13/2019 09 Site Maintenance

    7/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    Figure 2-7 The Dialogue Box [SW Download]

    III. Interface description

    For the description of the interface in Figure 2-7,please see Table 2-1 below.

    Table 2-1 [SW Download]

    Field Descript ion Value range Recommended value

    File NameThe name of the file saved on themaintenance console that is to beloaded

    SendWindow Size

    The data for software loading istransferred with the window size as oneunit

    1~49 49

    VersionVersion number of the software to beloaded

    Must be the same as the versionnumber specified in the file to beloaded, otherwise the loading willfail.

    File ID

    For which type of board the software

    upgrading is to be carried out

    Must be the same as the type of

    the file to be loaded.

    2.6 SW Activate

    I. Function

    After the forced BTS software loading, activate the software. The software upgrading

    task is not yet completed before the loaded software is activated.

    Huawei Technologies Proprietary

    2-6

  • 8/13/2019 09 Site Maintenance

    8/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    II. Access

    Activate BTS terminal maintenance console, select [Site/SW Activate], and the

    interface [SW Activate](as shown in Figure 2-8 and Figure 2-9)will pop up. Input

    the version of the software to be activated, select the corresponding board number

    and file ID, and click . If the activation is successful, the prompt SW activation

    request is confirmed will be displayed.

    Figure 2-8Activating the TMU board software

    Figure 2-9Activating the TRXboard software

    Huawei Technologies Proprietary

    2-7

  • 8/13/2019 09 Site Maintenance

    9/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    III. Interface description

    For the description of the software activation interface, see Table 2-2.

    Table 2-2 The Interface [SW Activate]

    Field Meaning Value range Recommended value

    VersionVersion number of theloaded software

    Must be the same as the versionnumber of the software to be loaded,otherwise the activation will fail.

    Board No.Number of the specifiedboard that is to beactivated

    Format: 0, 1, 0-X,etc. (X being thenumber of the TRXsconfigured)

    File IDType of board for whichthe software upgrading isto be carried out

    2.7 Site Hierarchical Reset

    I. Function

    Site resetting is performed as a remedy when a site is abnormal.

    Resetting a site will stop the services of the cells for several minutes under this site.

    Therefore, care should be taken with this function.

    II. Access

    Enter the maintenance console of the BTS, select [Site/Site Reset Hierarchically].

    The interface [Site Hierarchical Reset]will pop up. Select the level of the resetting

    in this interface, and click , as shown in Figure 2-10.

    Huawei Technologies Proprietary

    2-8

  • 8/13/2019 09 Site Maintenance

    10/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    Figure 2-10 The 'Site Hierarchical Reset' interface

    III. Interface description

    For description of the interface [Site Hierarchical Reset], see Table 2-3.

    Table 2-3 Site resetting levels

    Reset level Meaning

    First Level Reset Currently not supported by the BTSs.

    Please see the definition of this level of resetting on the interface.

    Second Level ResetCurrently not supported by the BTSs.

    Please see the definition of this level of resetting on the interface.

    Third Level Reset

    Please see the definition of this level of resetting on the interface.

    In this level of resetting, the base station applies to BSC side for the re-sendingof data configuration.

    Fourth Level ResetPlease see the definition of this level of resetting on the interface. In this levelof resetting, base station TMU hardware resetting is performed, and the base

    station re-applies for BSC data configuration.

    2.8 Site Test

    I. Function

    To test the functional boards configured for the site, and return the test results.

    Huawei Technologies Proprietary

    2-9

  • 8/13/2019 09 Site Maintenance

    11/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    II. Access

    Activate BTS terminal maintenance console, and select [Site/Site Test]. The

    interface [Site Test] will pop up. Click , and the test results will be

    displayed in this interface, as shown in Figure 2-11.

    Figure 2-11 Site test results

    2.9 Site Environment Monitoring

    I. Function

    To implement operations on the environment monitoring box such as resetting the

    environment monitoring box, clearing the burglary alarm, setting the upper and

    lower limits for humidity and temperature alarms, relay operation and disable the

    EAC alarm.

    Caution:

    In this system, burglary alarm, fire alarm and smoke alarm are all reported as burglary alarm.

    Therefore, the occurrence of any of them will trigger the burglary alarm.

    II. Access

    Activate BTS terminal maintenance console, and select [Site/Environment

    Monitoring Setting]. The interface [Environment Monitoring Setting]will pop up,

    as shown in Figure 2-12.

    Huawei Technologies Proprietary

    2-10

  • 8/13/2019 09 Site Maintenance

    12/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    Figure 2-12 Environment monitoring setup

    Resetting of the environment monitoring instrument is performed when the

    equipment is in abnormal service. Select Reset in [Select Operation Type]. Click

    , then the resetting can be performed and the operational result will be

    displayed, as shown in Figure 2-13.

    Figure 2-13 Resetting operation

    When the burglary alarm is confirmed or cleared, please clear the burglary alarm

    record. Select Clear Burglary alarm in [Select Operation Type]. Click , and

    Huawei Technologies Proprietary

    2-11

  • 8/13/2019 09 Site Maintenance

    13/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    the burglary alarm record will be cleared, and the operational result will be displayed

    in the status bar, as shown in Figure 2-14.

    Figure 2-14 Clear burglary alarm

    Conditions for the generation of environment alarms can be determined by the

    upper and lower limits for temperature and humidity. Select Set Temperature and

    Humidity in [Select Operation Type]and set the upper and lower limits for alarmgeneration in [Temperature and Humidity]. Click . The operational result is

    displayed in the status bar, as shown in Figure 2-15.

    Figure 2-15 Set upper and lower limits for temperature and humidity

    Huawei Technologies Proprietary

    2-12

  • 8/13/2019 09 Site Maintenance

    14/14

    User ManualM900/M1800 Base Transceiver Station (BTS30) Chapter 2 Site Maintenance

    With the implementation of relay operation, maintenance can startup and close

    some relevant equipment. Select Relay Operation in[Select Operation Type], and

    set the starting and closing of the relevant relays in Relay Operation. Click

    and the operational result will be displayed, as shown in Figure 2-16.

    Figure 2-16 Relay operation

    Select Disable the EAC Alarm, and the alarm report will be shut down for 10

    minutes. This is performed by the maintenance personnel in equipmentmaintenance to prevent the mis-generation of false alarms caused by their

    operations. Select Disable the EAC Alarm in [Select Operation Type], and click

    . The operational result will be displayed, as shown in Figure 2-17.

    Figure 2-17 Disable the EAC alarm

    Huawei Technologies Proprietary

    2-13