09-2857 cross-town improvement project project update ron schaefer january 20, 2009
TRANSCRIPT
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
2Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
Contents
• CTIP project background
• Confirmed participants
• Recent activities
• Development status
• Upcoming tasks
• Schedule
• Sneak preview
• Questions
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
3Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
Cross-Town Improvement Project
• CTIP Components– Intermodal Exchange (IMEX)– Chassis Utilization (CUT)– Wireless Drayage Updating (WDU)– Real Time Traffic Monitoring (RTTM)– Dynamic Routing Guidance (DRG)
CTIP Problem StatementThe inefficiency of cross-town rubber tire interchanges creates conditions that adversely impact:
• Congestion• Efficiency of the transportation network• Safety of the motoring public• Environment of neighboring communities• Energy consumption
CTIP Goal
To develop and deploy an information sharing / transfer capability that enables the coordination of moves between parties. Maximize loaded moves and minimize unproductive moves.
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
4Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
Confirmed Participants
• Railroads: UP, BNSF, NS– Signed letters of authority– Data direct and through Railinc
• Dray Carriers: ITS, IXT, Lake Country Logistics, Comtrak
• Local and Regional Stakeholders:– MODOT, KDOT– KC Scout– Kansas City SmartPort– Mid-America Regional Council (MARC)
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
5Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
Recent Activities
• Re-engagement of motor carriers:– ITS, IXT, Lake Country Logistics, Comtrak– Refine motor carrier role in CTIP with respect to:
• RTTM requirements• DRG requirements• WDU expectations
» Hardware needs
• Kickoff of RTTM and DRG in October 2009– Schedule– Risks– Interface to other CTIP applications
• Railroad data feeds• Support of CTIP Evaluation:
– Escape EZ product for engine parameter data• Selection of wireless device and mobile gateway products for WDU:
– Apple iPhone– Vavni VMAP
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
6Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
CTIP Development Status
• IMEX:– Code and unit testing completed by
12/11/09– Begin data feeds for railroads in
January 2010– CTIP detailed design document draft
complete by 2/2010
• CUT– Requirements and preliminary
architecture complete– Finalize CUT data requirements by
1/2010– Begin collecting chassis data 2/2010
• WDU:– Hardware selections:
• VMAP Mobile gateway = Vavni
• Wireless device = Apple iphone (15-20 phones)
– Considering use of Xscape Ez Ez-TAP™ Bluetooth device to wirelessly transmit engine parameter data to support CTIP evaluation
– Development underway; interface to external devices (mobile gateway, iPhones, etc.) will begin December 2009
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
7Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
CTIP Development Status
• RTTM– RTTM Kickoff held in KC on October
1, 2009.– Assessment of trucking company
requirements and coordination with WDU application – October 2009.
– Documentation of risks– Use cases and business rules
complete.
• DRG:– System design underway– Use cases and business rules
complete– Documentation of risks
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
8Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
Upcoming planned tasks
• IMEX:– Complete coding and testing including data feed from railroads/Railinc– Update IMEX based on development milestones from other applications (January – May 2010)
• WDU:– Interface from mobile gateway to IMEX– Interface from wireless device to mobile gateway– Finalize role of Escape EZ Bluetooth product to collect engine parameter
• CUT:– Refinement of user requirements based on chassis management company inputs
• RTTM:– Determine interface requirements for RTTM to WDU through mobile gateway– Complete system design
• DRG:– Evaluation of existing dynamic routing algorithm and existing roadway network– Complete system design
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
9Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
CTIP Schedule
• Application Development:– IMEX: December 2009 (SAIC)– CUT: February 2010 (SAIC)– WDU: March 2010 (SAIC)– RTTM: April 2010 (Delcan)– DRG: April 2010 (Delcan with
Georgia Tech)• Application Testing:
– IMEX: January 2010 (SAIC)– CUT: March 2010 (SAIC)– WDU: May 2010 (SAIC)– RTTM: May 2010 (Delcan)– DRG: May 2010 (Delcan with
Georgia Tech)
• USDOT Design Review: Late February 2010
• Detailed Design Document (all applications): February 2010
• User Training: May 2010
• Deployment Test: May – December 2010
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
10Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
CTIP Front Page
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
11Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
Terminal Administration
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
12Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
Truck Company Capacity
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
13Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
Motor Carrier Work Order
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
14Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
Trip Assignments
© 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries.
15Energy | Environment | National Security | Health | Critical Infrastructure
09-
285
7
Questions?
• CTIP Website:
www.ctip-us.com
- Project management plan
- Schedule
- Project documents
• CTIP Program Manager:
Ron Schaefer
618-257-8435