0816672(1)
DESCRIPTION
0816672(1)TRANSCRIPT
Read this entire installation manual to ensure proper installation. When finished with the installation, file this manual with the owner or maintenance department. Compliance and conformity to local codes and ordinances is the responsibility of the installers.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
Make sure that all water supply lines have been flushed and then completely turned off before beginning installation. Debris in supply lines can cause valves to malfunction.
LIMITED WARRANTYUnless otherwise noted, Sloan Valve Company warrants its Products to be made of first class materials, free from defects of material or workmanship under normal use and to perform the service for which they are intended in a thoroughly reliable and efficient manner when properly installed and serviced, for a period of three years (1 year for SF Fau-cets, special finishes and PWT electronics and 30 days on PWT software) from date of purchase. During this period, Sloan Valve Company will, at its option, repair or replace any part or parts which prove to be thus defective if returned to Sloan Valve Company, at customer’s cost, and this shall be the sole remedy available under this warranty. No claims will be allowed for labor, transportation or other incidental costs. This warranty extends only to persons or organizations who purchase Sloan Valve Company’s products directly from Sloan Valve Company for purpose of resale. This warranty does not cover the life of the batteries.THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF. IN NO EVENT IS SLOAN VALVE COMPANY RESPONSIBLE FOR ANY CONSEQUENTIAL DAMAGES OF ANY MEASURE WHATSOEVER.
AD-81000 Deck Sink Lavatory System
Corian/Quartz (Pages 2-3)
AD-82000 Deck Sink Lavatory System
Corian/Quartz (Pages 4-5)
AD-83000 Deck Sink Lavatory System
Corian/Quartz (Pages 6-7)
AD-84000 Deck Sink Lavatory System
Corian/Quartz (Pages 8-9)
AER-DEC™-81000/82000/83000/84000 Integrated Sink System Single/Double/Triple/Quadruple Station Corian® or Quartz Lavatory Systems
IMPORTANT
Turn OFF electrical power to the electrical outlets, then unplug all electrical units prior to installation. Electrical power MUST remain off until installation is complete.
Installer’s hardware must be appropriate for wall construction. Wall anchors must have a minimum pull-out rating of 1,000 lbs.
For standard height mounting, do not exceed the recommended 34” distance from the top of the lav deck to the finished floor. To meet ADA requirements, the lav deck cannot exceed the 34” maximum height dimension.
1
InstallationInstructionCode No. 0816672Rev.2 (07/15)
PRIOR TO INSTALLATIONImportant:• Adequate structural support in or behind the wall is required. Refer to the
appropriate rough-in diagram for dry weight of sink. Refer to pages 10 and 11 for sink and stud support requirements.
• All plumbing should be installed in accordance with applicable codes and regulations.
• Before connecting flex hoses to supply stops, flush all water lines until water is clear.
• Hot and cold water supply lines/tempered supply line and drain lines.
• 3/8” x 2 1/2” lag screws, wall anchors, bolts (minimum pull-out rating of 1000 Ibs./450 kg). See Frame Mounting Support drawing for required lag screws for your specific lavatory system.
• 1/2” NPT hot/cold or tempered supply piping• 1 1/2” NPT drain piping including p-trap
• Adhesive: Loctite® PL Premium® FAST GRAB Polyurethane Construction Adhesive
• 110 volt GFCI protected electrical outlet for 100-120 VAC plug-in trans-former
• Screen filter(s) included with faucet(s)• Backing supplied by others to meet local codes
SUPPLIES REQUIRED FOR INSTALLATION OF SINKS
Wear all proper safety equipment prior to installation.
LAVATORY SYSTEM ROUGH-IN DIMENSIONS FRONT VIEW SINGLE STATION
2
Backing material (required)(not supplied)
20”Water Supplies
19” drain
14”to bottomof DryerMounting Plate
12” tobottom of frame
Hand DryerMotor
NOTE:1. Backing materialshould equal thicknessof drywall (1/2” min.)
23” A.F.F.
21”frame
Sloan Foam Soap Dispenser
1/2” Backing material
Muf�er (patent applied for)
Trough 1” deep at start of trough3/4” width at bottom of trough2” Hand Dryer Motor Hose (overall 56 3/4”)Electrical outlet boxes (not supplied)Standard 3” x 5” duplex GFI receptaclesHand dryers - 120V/20AmpFaucets/Soap - 120V/15Amp
Drywall
1/2” Solid surface
1/2” Backing Material1/4” x 4” Steel plateVented basin design(patent applied for)
Drain box & clean out (patent applied for)
Optional aluminum C-Channel w/LEDs inside tract (120 volt transformer required)
34”
5”
7 1/4”
27”
8” min.
16 1/8”Accesspanel
5 1/2”3/4”
11 1/8”
17” min.
11”
9”
6” Max.
6” max.
Drywall
3”1/2”
1”
Air dam (patent applied for)
23 1/2”23”
22” to end of frameSloan BASYS Mid Faucet
Sloan BASYS Hand Dryer Spout(patent applied for)
Finished Floor
Push button latches snapinto place inside tubing
Stainless steelaccess door hangs on rectangular tubing frame
LAVATORY SYSTEM ROUGH-IN DIMENSIONS SIDE VIEW SINGLE STATION
Muf�er with 2” Hand Dryer Motor Hose (Overall 56 3/4”) Fasten Frame to 1/8”
thick steel strappingor backing material
22” backingmaterial
1/2” or 5/8”x 30” x 22” backing material(not supplied)securely fasten tostuds
3/4”
30”
2”34”
Hot water supply
21”frame
33” to topof frame
Drainclean-out
Cold water supply
HAND DRYER MOTOR12.5” x 11.4” x 12.4” deep
Finished Floor
6 1/4” x 9 1/4” x 7.63”Soap Reservior
NOTES:1. Mount Hand Dryer Motor Hose and soap dispenser to spec. location2. Slip frame over mounted components and properly fasten frame tobacking material
LAVATORY SYSTEM ROUGH-IN PLUMBING & ELECTRICAL DIMENSIONS FRONT VIEW SINGLE STATION
34”
33” to top of frame
19”Drain
Finished FloorCold Water Supply
Hotwater supply
26” Water Supplies 30” Basin ONLY
Fasten frame to 1/8” thick steelstrapping or backing material
(1) Hand dryerGFI Receptacle120V/20AMPStandard 3” x 5”duplex receptaclesper sink manufacturerrequirements
(1) GFI Receptacle for soap& sensor faucets, TransformerPlug 120V/20AMP required by National Electrical Code
30”
23”A.F.F.
Hand dryermotor mounting plate
Soap Reservior
NOTES:1. Hand Dryer Motor alone is only 500 watts or less with speed control2. Hand Dryer Motor with heater requires 1500 watts or less with speed control3. Hand Dryer Motor must be plugged into a dedicated 20 amp GFI safety circuit4. Hand Dryer Motor to have a dedicated circuit with power cord and grounded plug5. cut backing to allow for electrical and plumbing componentsROUGH-IN PLUMBING & ELECTRICAL
2”4”4”
7 1/2”
Adhesive
FRAME SUPPORT1. Back edge of Deck may require scribing to �nished wall.2. Shim all gaps between frame and deck, especialy under trough area.
MOUNTING FAUCETS, SOAP DISPENSERS & HAND DRYERS / ATTACHING DECK TO FRAME ENCLOSURE SINGLE STATION
3
DRAIN ASSEMBLY AND FRAME ENCLOSURE MOUNTING SUPPORT SINGLE STATION
Wood Stud per schedule
2”x10” wood reinforcement between studs
Backing (supplied by others) to meet local codes
Drywall
33"
Frame Enclosure
Hand Dryer Motor w/ Mufer Attachment
Soap Reservior
GFI 4 gang outlet(not supplied)
Lag Bolts
Access Panel
LAVATORY SYSTEM ROUGH-IN DIMENSIONS TOP VIEW SINGLE STATION
HAND DRYER/SOAP DISPENSERRefer to installation instructions withcomponent.
1. Measure outside of frame. Cut-out drywall window.2. Remove drywall window.3. Replace with backing supplied by others (per local code).4. Using mounting template,
mount hand dryer motor, Soap Dispenser
Pump (optional) and electrical outlets to backing.
1. For ease of installation, leave the deck laying on its back. Install faucets, optional soap dispens-ers and hand dryers according to manufacturers instructions.
2. Hook-up hand dryer motor hose to hand dryer motors. Do not connect power until air spout is completely installed.
3. Install all water connections, drain lines and components.
Sloan BASYS Mid Faucet Spout
Sloan BASYS Hand Dryer
Drain w/clean-outGRID STRAINER TO BE CLEANEDOUT AS REQUIRED
1/2” Solid Surface
Air Dam Vent
Sloan Foam Soap Dispenser
23 1/2”
3/4”
5 3/8”
1/2” 1”
3”
21”30”
4 1/2”4 1/2”1 3/4”
8 1/2”6 1/2”4 1/2” 2”
CONNECT CONTROLCABLE TO HAND DRYERMOTOR
BAYONET TURNTO LOCK HOSE TOHAND DRYER MOTOR
PROGRAMINGCABLE. LEAVEUNATTACHED
HAND DRYER MOTOR
BASYS DRYER SPOUT SUBASSEMBLY
HOSE & MUFFLER HOLDING NUT ASSEMBLY
CONNECT GROUND
BAYONET TURNTO LOCK HOSE
TO SPOUT
WIRE TO HANDDRYER MOTOR
HAND DRYER MOTOR
SOAP DISPENSER MOTOR ASSEMBLY
BASYS SOAP SPOUT SUBASSEMBLY
HOLDING NUT ASSEMBLY
SOAP DISPENSER LINES
POWER ADAPTOR
12” 12”
12” 12”
6” 6”
*Hole Location for Mounting Frame
5. Mount top of frame at 33” above finished floor.
6. Securely fasten with 1,000 Lb pull out lag bolts.7. Attach access panel to frame.
*Due to manufacturing tolerances, all dimensions are for reference only.
EHD-510 ESD-400
LAVATORY SYSTEM ROUGH-IN DIMENSIONS FRONT VIEW DOUBLE STATION
4
Fasten frame to1/8” thick steelstrapping or backing (not supplied)
1/2” or 5/8” x 60” x 22” backingsecurely fasten to studs
Finished �oor
Hot water supplyCold water supply
Drain clean-outMuf�er with 2” Hand Dryer Motor Hose (Overall 56 3/4”)
21” frame
Brace11 1/2”Brace
34”
22”Backing
33”to topof frame
Hand Dryer Motor12.5” x 11.4“ x 12.4” deep
6 1/4” x 9 1/4” x 7.63 Soap Reserviors
NOTES:1. Mount hand dryer motor & soap dispenser to spec location2. Slip frame over mounted components & properly fasten frame to backed wall3. Hot & Cold water supply lines location subject to local code
60”
18”18”
LAVATORY SYSTEM ROUGH-IN DIMENSIONS SIDE VIEW DOUBLE STATION
LAVATORY SYSTEM ROUGH-IN PLUMBING & ELECTRICAL DIMENSIONS FRONT VIEW DOUBLE STATION
NOTES:1. Hand Dryer Motor alone is only 500 watts or less with speed control2. Hand Dryer Motor with heater requires 1500 watts or less with speed control3. Hand Dryer Motor must be plugged into a dedicated 20 amp GFI safety circuit4. Hand Dryer Motor to have a dedicated circuit with power cord and grounded plug5. cut backing to allow for electrical and plumbing componentsROUGH-IN PLUMBING & ELECTRICAL
(2) Hand dryer motorGFI Receptacle120V/20AMP
Standard 3” x 5”duplex receptaclesper sink manufacturerrequirements
Hand dryermotor mounting plate
Soap Reservior
Soap ReserviorHand dryer
motor mounting plate
33” to top of frame34”
(2) GFI Receptacle for soap& sensor faucets, transformerplug 120V/20AMP required by national electrical code
6”
23”A.F.F.
Finished �oorHotwater supply
20”water supplies
Fasten frame to 1/8” thick steelstrapping or backing material5” 5” 5”2”10 3/4” 9 1/4”
5”Coldwater supply
11 1/2”
60”
Backing material (required)(not supplied)
20”Water Supplies
19” drain
14”to bottomof DryerMounting Plate
12” tobottom of frame
Hand DryerMotor
NOTE:1. Backing materialshould equal thicknessof drywall (1/2” min.)
23” A.F.F.
21”frame
Sloan Foam Soap Dispenser
1/2” Backing material
Muf�er (patent applied for)
Trough 1” deep at start of trough3/4” width at bottom of trough2” Hand Dryer Motor Hose (overall 56 3/4”)Electrical outlet boxes (not supplied)Standard 3” x 5” duplex GFI receptaclesHand dryers - 120V/20AmpFaucets/Soap - 120V/15Amp
Drywall
1/2” Solid surface
1/2” Backing Material1/4” x 4” Steel plateVented basin design(patent applied for)
Drain box & clean out (patent applied for)
Optional aluminum C-Channel w/LEDs inside tract (120 volt transformer required)
34”
5”
7 1/4”
27”
8” min.
16 1/8”Accesspanel
5 1/2”3/4”
11 1/8”
17” min.
11”
9”
6” Max.
6” max.
Drywall
3”1/2”
1”
Air dam (patent applied for)
23 1/2”23”
22” to end of frameSloan BASYS Mid Faucet
Sloan BASYS Hand Dryer Spout(patent applied for)
Finished Floor
Push button latches snapinto place inside tubing
Stainless steelaccess door hangs on rectangular tubing frame
DRAIN ASSEMBLY AND FRAME MOUNTING SUPPORT DOUBLE STATION
MOUNTING FAUCETS / ATTACHING DECK TO FRAME DOUBLE STATION
5
Wood Stud per schedule
2”x10” wood reinforcement between studs
Backing supplied by others to meet local codes
Drywall
33"
GFI 4 gang outlet
Hand Dryer Motorw/ Mufer Attachment Frame Enclosure
Wood ScrewsLag Bolts
Soap Reservior
Access Panel
Sloan BASYSHand Dryer
Sloan BASYSMid FaucetSloan Foamsoap dispensers
Drain w/clean-outGrid strainer to be cleaned out as required
1/2” Solid surface
Air dam/vent
4 1/2” 4 1/2”1 3/4”
23 1/2”
3”
3/4”
5 3/8”
1/2” 1”1”
7 1/2” 6 1/2” 8 1/2” 7 1/2” 6 1/2” 7 1/2”
60”51”
32”
LAVATORY SYSTEM ROUGH-IN DIMENSIONS TOP VIEW DOUBLE STATION
AdhesiveAdhesive
FRAME SUPPORT1. Back edge of Deck may require scribing to �nished wall.2. Shim all gaps between frame and deck, especially under trough area.
1. For ease of installation, leave the deck laying on its back. Install faucets, optional soap dispens-ers and hand dryers according to manufacturers instructions.
2. Hook-up hand dryer motor hose to hand dryer motors. Do not connect power until air spout is completely installed.
3. Install all water connections, drain lines and components.
1. Measure outside of frame. Cut-out drywall window2. Remove drywall window.3. Replace with backing supplied by
others (per local code).
4. Using mounting template, mount hand dryer motor, soap dispenser pump (optional) and electrical outlets to backing.
5. Mount top of frame at 33” above finished floor.
6. Securely fasten with 1,000 Lb pull out lag bolts.7. Attach access panel to frame.
12” 12”
12” 12”
6” 6”
12” 12”
*Hole Location for Mounting Frame
*Due to manufacturing tolerances, all dimensions are for reference only.
HAND DRYER/SOAP DISPENSERRefer to installation instructions withcomponent.
CONNECT CONTROLCABLE TO HAND DRYERMOTOR
BAYONET TURNTO LOCK HOSE TOHAND DRYER MOTOR
PROGRAMINGCABLE. LEAVEUNATTACHED
HAND DRYER MOTOR
BASYS DRYER SPOUT SUBASSEMBLY
HOSE & MUFFLER HOLDING NUT ASSEMBLY
CONNECT GROUND
BAYONET TURNTO LOCK HOSE
TO SPOUT
WIRE TO HANDDRYER MOTOR
HAND DRYER MOTOR
SOAP DISPENSER MOTOR ASSEMBLY
BASYS SOAP SPOUT SUBASSEMBLY
HOLDING NUT ASSEMBLY
SOAP DISPENSER LINES
POWER ADAPTOR
EHD-510 ESD-400
LAVATORY SYSTEM ROUGH-IN DIMENSIONS FRONT VIEW TRIPLE STATION
6
LAVATORY SYSTEM ROUGH-IN DIMENSIONS SIDE VIEW TRIPLE STATION
NOTES:1. Mount hand dryer motor & soap dispenser to spec location2. Slip frame over mounted components & properly fasten frame to backed wall3. Hot & Cold water supply lines location subject to local code
Finished FloorHot water supply
Cold water supplyHand Dryer Motor12.5” x 11.4“ x 12.4” deep
6 1/4” x 9 1/4” x 7.63 Soap Reserviors
Fasten frame to1/8” thick steelstrapping or backing(not supplied)
1/2” or 5/8” x 60” x 22” backingsecurely fasten to studs
21” frame
33”to topof frame
Drain clean-outs Muf�er with 2” hand dryer motor hose
90”30” 30”
22”Backing
BraceBrace
Soap Reservior
Soap Reservior
Soap Reservior
OPTIONAL Coldwater supply
OPTIONAL Hotwater supply
34”
Backing material (required)(not supplied)
20”Water Supplies
19” drain
14”to bottomof DryerMounting Plate
12” tobottom of frame
Hand DryerMotor
NOTE:1. Backing materialshould equal thicknessof drywall (1/2” min.)
23” A.F.F.
21”frame
Sloan Foam Soap Dispenser
1/2” Backing material
Muf�er (patent applied for)
Trough 1” deep at start of trough3/4” width at bottom of trough2” Hand Dryer Motor Hose (overall 56 3/4”)Electrical outlet boxes (not supplied)Standard 3” x 5” duplex GFI receptaclesHand dryers - 120V/20AmpFaucets/Soap - 120V/15Amp
Drywall
1/2” Solid surface
1/2” Backing Material1/4” x 4” Steel plateVented basin design(patent applied for)
Drain box & clean out (patent applied for)
Optional aluminum C-Channel w/LEDs inside tract (120 volt transformer required)
34”
5”
7 1/4”
27”
8” min.
16 1/8”Accesspanel
5 1/2”3/4”
11 1/8”
17” min.
11”
9”
6” Max.
6” max.
Drywall
3”1/2”
1”
Air dam (patent applied for)
23 1/2”23”
22” to end of frameSloan BASYS Mid Faucet
Sloan BASYS Hand Dryer Spout(patent applied for)
Finished Floor
Push button latches snapinto place inside tubing
Stainless steelaccess door hangs on rectangular tubing frame
LAVATORY SYSTEM ROUGH-IN PLUMBING & ELECTRICAL DIMENSIONS FRONT VIEW TRIPLE STATION
NOTES:1.Hand Dryer Motor alone is only 500 watts or less with speed control2. Hand Dryer Motor with heater requires 1500 watts or less with speed control3. Hand Dryer Motor must be plugged into a dedicated 20 amp GFI safety circuit4. Hand Dryer Motor to have a dedicated circuit with power cord and grounded plug5. cut backing to allow for electrical and plumbing componentsROUGH-IN PLUMBING & ELECTRICAL
Soap Reservior
Hand dryermotor mounting plate
33” to top of frame
34”
(3) GFI Receptacle for soap& sensor faucets, transformerplug 120V/20AMP required by national electrical code
20”water supplies
5”Fasten frame to 1/8” thick steelstrapping or backing material (not supplied)
Standard 3” x 5”duplex receptaclesper sink manufacturerrequirements
(3) Hand dryer motorGFI Receptacle120V/20AMP
2” 4 1/4” 11 1/2”6 5/8”
19”Drains Hot
water supply
Coldwater supply
23”A.F.F.
Finished Floor
OPTIONAL Cold water supply
OPTIONAL Hotwater supply
Hand dryermotor mounting plate
Soap Reservior
Soap Reservior6” 6”
2”
90”
2 7/8”
Hand dryermotor mounting plate
DRAIN ASSEMBLY AND FRAME MOUNTING SUPPORT TRIPLE STATION
33”
Drywall Backing supplied by others to meet local codes
Steel/Wood Stud2”x4” or 2”x6”(See page 10 for steel stud installationrequirements)
2”x10” WoodReinforcementin between studs(See page 10 for steel stud installationrequirements)
Hand Dryer Motorw/ Muf�er Attachment
Frame EnclosureLag Bolts
Soap Reservior
Access Panels (2)
MOUNTING FAUCETS / ATTACHING DECK TO FRAME TRIPLE STATION
LAVATORY SYSTEM ROUGH-IN DIMENSIONS TOP VIEW TRIPLE STATION
Adhesive
FRAME SUPPORT1. Back edge of Deck may require scribing to �nished wall.2. Shim all gaps between frame and deck, especialy under trough area.
81”
Sloan BASYSHand Dryer
Sloan BASYSMid Faucet
Sloan FoamSoap Dispensers
Drain w/clean-outGrid strainer to be cleaned out as required
1/2” Solid surface
Air dam/vent
90” 4 1/2” 4 1/2”
1 3/4”
23 1/2”
3”
3/4”
5 3/8”
31”31”7 1/2” 6 1/2” 8 1/2” 8 1/2” 6 1/2” 7 1/2”
High Point
8 1/2” 6 1/2”
1. For ease of installation, leave the deck laying on its back. Install faucets, optional soap dispens-ers and hand dryers according to manufacturers instructions.
2. Hook-up hand dryer motor hose to hand dryer motors. Do not connect power until air spout is completely installed.
3. Install all water connections, drain lines and components.
1. Measure outside of frame. Cut-out drywall window2. Remove drywall window.3. Replace with backing supplied by
others (per local code).
4. Using mounting template, mount hand dryer motor, soap dispenser pump (optional) and electrical outlets to backing.
5. Mount top of frame at 33” above finished floor.
6. Securely fasten with 1,000 Lb pull out lag bolts.7. Attach access panel to frame.
12” 12”
12” 12”
6” 6”
12” 12”12” 12” 12”
12”
*Hole Location for Mounting Frame
*Due to manufacturing tolerances, all dimensions are for reference only.
7
HAND DRYER/SOAP DISPENSERRefer to installation instructions withcomponent.
CONNECT CONTROLCABLE TO HAND DRYERMOTOR
BAYONET TURNTO LOCK HOSE TOHAND DRYER MOTOR
PROGRAMINGCABLE. LEAVEUNATTACHED
HAND DRYER MOTOR
BASYS DRYER SPOUT SUBASSEMBLY
HOSE & MUFFLER HOLDING NUT ASSEMBLY
CONNECT GROUND
BAYONET TURNTO LOCK HOSE
TO SPOUT
WIRE TO HANDDRYER MOTOR
HAND DRYER MOTOR
SOAP DISPENSER MOTOR ASSEMBLY
BASYS SOAP SPOUT SUBASSEMBLY
HOLDING NUT ASSEMBLY
SOAP DISPENSER LINES
POWER ADAPTOR
EHD-510 ESD-400
LAVATORY SYSTEM ROUGH-IN DIMENSIONS FRONT VIEW QUADRUPLE STATION
LAVATORY SYSTEM ROUGH-IN DIMENSIONS SIDE VIEW QUADRUPLE STATION
8
NOTES:1. Mount hand dryer motor & soap dispenser to spec location2. Slip frame over mounted components & properly fasten frame to backed wall3. Hot & Cold water supply lines location subject to local code
Fasten frame to1/8” thick steelstrapping or backing
1/2” or 5/8” x 60” x 22” backing securely fasten to studs
22”Backing
Finished �oorHot water supply
Cold water supply
Drain clean-outsBrace
Soap Reservior
Soap Reservior
Soap Reservior
Cold water supplyHot water supply
Hand dryer motor12.5” x 11.4“ x 12.4” deep
6 1/4” x 9 1/4” x 7.63 deep soap reserviors
12” tobottom offrame
3 1/2”
21 3/4”16 3/8” 9 1/4” 9 1/4” 20 5/8” 16 3/8”
120”29”
Muf�er with 2” hand dryer motor hose
29”
33”to topof frame
21” frame
34”
Soap Reservior
Brace
LAVATORY SYSTEM ROUGH-IN PLUMBING & ELECTRICAL DIMENSIONS FRONT VIEW QUADRUPLE STATION
Backing material (required)(not supplied)
20”Water Supplies
19” drain
14”to bottomof DryerMounting Plate
12” tobottom of frame
Hand DryerMotor
NOTE:1. Backing materialshould equal thicknessof drywall (1/2” min.)
23” A.F.F.
21”frame
Sloan Foam Soap Dispenser
1/2” Backing material
Muf�er (patent applied for)
Trough 1” deep at start of trough3/4” width at bottom of trough2” Hand Dryer Motor Hose (overall 56 3/4”)Electrical outlet boxes (not supplied)Standard 3” x 5” duplex GFI receptaclesHand dryers - 120V/20AmpFaucets/Soap - 120V/15Amp
Drywall
1/2” Solid surface
1/2” Backing Material1/4” x 4” Steel plateVented basin design(patent applied for)
Drain box & clean out (patent applied for)
Optional aluminum C-Channel w/LEDs inside tract (120 volt transformer required)
34”
5”
7 1/4”
27”
8” min.
16 1/8”Accesspanel
5 1/2”3/4”
11 1/8”
17” min.
11”
9”
6” Max.
6” max.
Drywall
3”1/2”
1”
Air dam (patent applied for)
23 1/2”23”
22” to end of frameSloan BASYS Mid Faucet
Sloan BASYS Hand Dryer Spout(patent applied for)
Finished Floor
Push button latches snapinto place inside tubing
Stainless steelaccess door hangs on rectangular tubing frame
NOTES:1. Hand Dryer Motor alone is only 500 watts or less with speed control2. Hand Dryer Motor with heater requires 1500 watts or less with speed control3. Hand Dryer Motor must be plugged into a dedicated 20 amp GFI safety circuit4. Hand Dryer Motor to have a dedicated circuit with power cord and grounded plug5. cut backing to allow for electrical and plumbing componentsROUGH-IN PLUMBING & ELECTRICAL
(4) GFI Receptacle for soap& sensor faucets, transformerplug 120V/20AMP required by National Electrical Code
(4) Hand dryer GFI Receptacle120V/20AMP
Standard 3” x 5”duplex receptacles per sink manufacturer requirements
20”water supplies
Hotwater supply
Coldwater supply
23”A.F.F.
Hotwater supply
Coldwater supply Finished Floor
Hand dryermotor mounting plate
Hand Dryermotor mounting plate
Hand Dryermotor mounting plate
Hand dryermotor mounting plate
Soap Reservior
Soap Reservior
Soap Reservior
Soap Reservior
2” 2”
14”
6”
11” 8” 2” 10 7/8” 8” 2” 12 3/8”
19”Drains
6”
Fasten frame to 1/8” thick steelstrapping or backing material (not supplied)
33” to top of frame34”
7 7/8”
120”
9
33”
Steel/Wood Stud2”x4” or 2”x6”(See page 10 for steel stud installationrequirements)
Drywall2”x10” WoodReinforcementin between studs(See page 10 for steel stud installationrequirements)
Backing supplied by others to meet local codes
Frame EnclosureLag Bolts
Access Panels (2)
Hand Dryer Motorw/ Muf�er Attachment
Soap Reservior
Drain w/clean-outGrid strainer to be cleaned out as required
Drain w/clean-outGrid strainer to be cleaned out as required
7”31” 31” 7”
23 1/2”
31”
1/2” Solid surface
Air Dam/Vent1/2”
4 1/2” 4 1/2” 111”120”
1 3/4”
3/4”
8 1/2”6 1/2”6 1/2”
Sloan BASYSHand Dryer
Sloan BASYSMid Faucet
Sloan FoamSoap Dispensers
DRAIN ASSEMBLY AND FRAME MOUNTING SUPPORT QUADRUPLE STATION
MOUNTING FAUCETS / ATTACHING DECK TO FRAME QUADRUPLE STATION
LAVATORY SYSTEM ROUGH-IN DIMENSIONS TOP VIEW QUADRUPLE STATION
Adhesive
FRAME SUPPORT1. Back edge of Deck may require scribing to �nished wall.2. Shim all gaps between frame and deck, especialy under trough area.
1. For ease of installation, leave the deck laying on its back. Install faucets, optional soap dispens-ers and hand dryers according to manufacturers instructions.
2. Hook-up hand dryer motor hose to hand dryer motors. Do not connect power until air spout is completely installed.
3. Install all water connections, drain lines and components.
1. Measure outside of frame. Cut-out drywall window2. Remove drywall window.3. Replace with backing supplied by
others (per local code).
4. Using mounting template, mount hand dryer motor, soap dispenser pump (optional) and electrical outlets to backing.
5. Mount top of frame at 33” above finished floor.
6. Securely fasten with 1,000 Lb pull out lag bolts.7. Attach access panel to frame.
12” 12”
12” 12”
6” 6”
12” 12”12” 12” 12”
12”
12”
12” 12”12”
*Hole Location for Mounting Frame
*Due to manufacturing tolerances, all dimensions are for reference only.
HAND DRYER/SOAP DISPENSERRefer to installation instructions withcomponent.
CONNECT CONTROLCABLE TO HAND DRYERMOTOR
BAYONET TURNTO LOCK HOSE TOHAND DRYER MOTOR
PROGRAMINGCABLE. LEAVEUNATTACHED
HAND DRYER MOTOR
BASYS DRYER SPOUT SUBASSEMBLY
HOSE & MUFFLER HOLDING NUT ASSEMBLY
CONNECT GROUND
BAYONET TURNTO LOCK HOSE
TO SPOUT
WIRE TO HANDDRYER MOTOR
HAND DRYER MOTOR
SOAP DISPENSER MOTOR ASSEMBLY
BASYS SOAP SPOUT SUBASSEMBLY
HOLDING NUT ASSEMBLY
SOAP DISPENSER LINES
POWER ADAPTOR
EHD-510 ESD-400
10
Wall/Stud Height Depth Flange Min.
Gauge
10’
3-5/8”
1-3/8” 14
1-5/8” 16
2” 16
2-1/2” 18
6”
1-3/8” 18
1-5/8” 18
2” 18
2-1/2” 18
3” 16
12’
3-5/8”
1-3/8” 14
1-5/8” 16
2” 16
2-1/2” 16
6”
1-3/8” 16
1-5/8” 18
2” 18
2-1/2” 18
3” 16
14’
3-5/8”
1-3/8” 12
1-5/8” 16
2” 16
2-1/2” 16
6”
1-3/8” 16
1-5/8” 18
2” 18
2-1/2” 18
3” 16
16’
3-5/8”
1-3/8” 14
1-5/8” 14
2” 16
2-1/2” 16
6”
1-5/8” 16
2” 18
2-1/2” 18
3” 16
18’
3-5/8”
1-3/8” 12
1-5/8” 12
2” 16
2-1/2” 12
6”
1-5/8” 16
2” 18
2-1/2” 18
3” 16
20’
3-5/8”
1-5/8” 12
2” 14
2-1/2” 16
3” 16
6”
2” 18
2-1/2” 18
3” 16
Wall/ Stud
HeightStud
Studs Req. @16” o.c.
(See Note 1)Species Grade
10’2x4 2
SPF No. 2
2x6 1
12’2x4 3
2x6 1
14’2x4 3
2x6 1
16’2x4 3
2x6 1
18’2x4 3
2x6 1
20’2x4 3
2x6 2Note 1: Where mutiple studs are listed, bunch multiple studs and space multiple studs @16” o.c. across width of sink
Wood Framing for AD Series Corian Sinks
Cold Formed Steel Framing for AD Series Corian Sinks
Corian Sink Design Requirements:Max. sink deck depth = 25”Max. sink dead weight (including stone and fixture = 10 psfMax. concentrated live load at edge of sink = 500lbs.Provide anchor spacing noted within product drawings
SINK BRACKET STUD SUPPORT
Backing supplied by others to meet local codes
COLD FORMED STEEL FRAME MOUNTING SUPPORT
Metal Stud per schedule
5” - 18 gauge stud reinforcement between studs
Sink Length
Sink SystemEnclosure
Drywall
Drywall
2"
35"
42"
Wood Stud per schedule
2”x10” wood reinforcement between studs
Sink Length
Sink SystemEnclosure
Backing supplied by others to meet local codes
WOOD FRAME MOUNTING SUPPORTDrywall
35"
2'42"
Drywall
11
CLEANING AND MAINTENANCE
Material Description: Corian Material is made from a blend of acrylic modified bio-based polyester resin. Engineered Stone is 90% natural quartz and polyester resin and is resistant to chemicals, stains, burns and impact. Surface damage can be easily repaired with everyday cleansers or fine grit abrasives.
Routine Cleaning: For regular cleaning, use standard commercial or household products such as Simple Green®, Creamy Cleanser brand, Formula 409® or Windex® .
Stubborn Stains: Remove tough stains, with non abrasive cleaners and pads such as a white Scotch Brite® pad and Lysol®. Special Situations for Corian and Engineered Stone
Hard Water Deposits: Remove hard water deposits with a mild solution of vinegar and water. Always rinse the unit thoroughly after cleaning.
Restoring the surface: Refresh and restore the rich surface with one of the following:
Geo Series: Color enhancer such as Tenax® Ager
Pearl Series: Impregnating sealer such as DryTreat Stain - Proof Original™ or Miracle Sealants 511 Impregnator Do not use strong acid or alkaline chemicals and cleansers to clean Engineered Stone. If these chemicals come in contact with the surface, wipe them off immediately and rinse with soapy water. Avoid contact with harsh chemicals such as paint remover, bleach, acetone, etc. Avoid contact with hot pans and objects.
Repair Kits: Corian repair kits are available. Contact your Sloan Stone Sink Systems representative or distributor for part numbers and pricing. Repair kits are made to order and have a shelf life of 30 days. Engineered Stone shades of color can vary from product to product.
BRAND NAMES
Use of brand names is intended only to indicate a type of cleaner. This does not constitute an endorsement, nor does the omission of any brand name cleaner imply inadequacy. Many products named are regional in distribution, and can be found in local supermarkets, department and hardware stores, or through your cleaning service. It is emphasized that all products should be used in strict accordance with package instructions.
REGULAR CLEANING OF DRAIN BOX REQUIRED.
Wall/ Stud
HeightStud
Studs Req. @16” o.c.
(See Note 1)Species Grade
10’2x4 3
SPF No. 2
2x6 1
12’2x4 3
2x6 1
14’2x4 3
2x6 1
16’2x4 3
2x6 2
18’2x4 3
2x6 2
20’2x4 3
2x6 2Note 1: Where mutiple studs are listed, bunch multiple studs and space multiple studs @16” o.c. across width of sink
Wood Framing for AD Series Quartz Sinks
Quartz Sink Design Requirements:Max. sink deck depth = 25”Max. sink dead weight (including stone and fixture = 20 psfMax. concentrated live load at edge of sink = 500lbs.Provide anchor spacing noted within product drawings
Wall/Stud Height Depth Flange Min.
Gauge
10’
3-5/8”
1-3/8” 14
1-5/8” 16
2” 16
2-1/2” 18
6”
1-3/8” 18
1-5/8” 18
2” 18
2-1/2” 18
3” 16
12’
3-5/8”
1-3/8” 14
1-5/8” 16
2” 16
2-1/2” 16
6”
1-3/8” 16
1-5/8” 18
2” 18
2-1/2” 18
3” 16
14’
3-5/8”
1-3/8” 12
1-5/8” 16
2” 16
2-1/2” 16
6”
1-3/8” 16
1-5/8” 18
2” 18
2-1/2” 18
3” 16
16’
3-5/8”
1-3/8” 14
1-5/8” 14
2” 16
2-1/2” 16
6”
1-5/8” 16
2” 18
2-1/2” 18
3” 16
18’
3-5/8”
1-3/8” 12
1-5/8” 12
2” 16
2-1/2” 12
6”
1-5/8” 16
2” 18
2-1/2” 18
3” 16
20’
3-5/8”
1-5/8” 12
2” 14
2-1/2” 16
3” 16
6”
2” 18
2-1/2” 18
3” 16
Cold Formed Steel Framing for AD Series Corian Sinks
ACCESS PANEL
DRAIN BOX
FINISHED FLOOR
FINISHED WALL
DRAIN BOX
GRID STRAINER
1. Lift access panel up by pressing button(s) on bottom of frame.
2. Swing outward until panel separates frame.
3. Lift and separate from frame.
4. Clean grid strainer with rag and dispose of properly.
5. Close access panel.
1
2
3
4
Deck
Enclosure
Grid Strainer Assembly DS-57
OptionalNot Provided Chrome or Plastic P-Trap
Rubber GasketSlip WasherFlange Nut
Sloan Optional Water Temperature Mixing Valves
Mix-60-A Mix-135-A
Basys Mid Faucet (EFX Series)
Basys High Faucet (EFX Series)
Basys Low Pedestal Faucet (EFX Series)
Basys Low Integrated Faucet (EFX Series)
Basys Wall Mount Faucet (EFX Series)
Basys Hand Dryer
Basys Soap Dispenser
COMPONENTS QUADRUPLE STATION
Enclosure
DeckGrid Strainer Assembly DS-57
OptionalNot Provided Chrome or Plastic P-Trap
Rubber GasketSlip WasherFlange Nut
Sloan Optional Water Temperature Mixing Valves
Mix-60-A Mix-135-A
Basys Mid Faucet (EFX Series)
Basys High Faucet (EFX Series)
Basys Low Pedestal Faucet (EFX Series)
Basys Low Integrated Faucet (EFX Series)
Basys Wall Mount Faucet (EFX Series)
Basys Hand Dryer
Basys Soap Dispenser
COMPONENTS TRIPLE STATION
COMPONENTS DOUBLE STATION
Deck
Enclosure
Grid Strainer Assembly DS-57
OptionalNot Provided Chrome or Plastic P-Trap
Rubber GasketSlip WasherFlange Nut
Sloan Optional Water Temperature Mixing Valves
Mix-60-A Mix-135-A
Basys Mid Faucet (EFX Series)
Basys High Faucet (EFX Series)
Basys Low Pedestal Faucet (EFX Series)
Basys Low Integrated Faucet (EFX Series)
Basys Wall Mount Faucet (EFX Series)
Basys Hand Dryer
Basys Soap Dispenser
COMPONENTS SINGLE STATION
Deck
Enclosure
Grid Strainer Assembly DS-57
OptionalNot Provided Chrome or Plastic P-Trap
Rubber GasketSlip WasherFlange Nut
Sloan Optional Water Temperature Mixing Valves
Mix-60-A Mix-135-A
Basys Mid Faucet (EFX Series)
Basys High Faucet (EFX Series)
Basys Low Pedestal Faucet (EFX Series)
Basys Low Integrated Faucet (EFX Series)
Basys Wall Mount Faucet (EFX Series)
Basys Hand Dryer
Basys Soap Dispenser
12
Sloan Valve Company10500 Seymour AvenueFranklin Park, IL [email protected] Tel. 800.982.5839
The information contained in this document is subject to change without notice.Copyright © 2015 Sloan Valve Company CODE NO. 0816672– Rev. 2 (07/15)