08032012 secondary containment report
TRANSCRIPT
Sketch No. Consultant Client Title PPoko Date
Secondary Cyanide Containment
Sk-
Sketch No. Consultant Client Title PPoko Date
Secondary Cyanide Containment
Sk-
Cyanide Secondary Containment Bunds and Drains
NortenGrup Engineers - 1 -
Secondary Containment Areas
Area 1 Wall Construction
• Process Areas to TSF
Area 2 Area under pipe rack Concrete bund drain
Cyanide Secondary Containment Bunds and Drains
NortenGrup Engineers - 2 -
Area 3 Area Under Pipe rack concrete bund
Area 4 Area under pipe rack concrete bund
Area 5
Area 6
Cyanide Secondary Containment Bunds and Drains
NortenGrup Engineers - 3 -
Area 7 Scats Bay Concrete Extension
Area 8 Reduce Road Level
Part of Area 8 Area under pipe rack Concrete bund drain
Area 9 Install and Tidy Drainage
Cyanide Secondary Containment Bunds and Drains
NortenGrup Engineers - 4 -