SESSION 7

The Project Cycle Part 1

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 2/42

Eight Things You Need to Know 

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 3/42

Project Definition

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 4/42

Project Definition

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 5/42

Project Definition

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 6/42

Charter

Par Heading

1. Project Need/Opportunity 

2. Final Product/Deliverable

3. H

igh Level Deliver

ables4. Milestones

5.  Limits and Exclusions A ssumptions Potential Barriers

6. S cope statements

In Scope Out of Scope

7. Technical/ Functional Requirements

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 7/42

Charter

Par Heading

8. Organizational Arr angements Project Governance Project Team Project Reporting A rrangements

9. Stakeholder  A nalysis

10. Budget Estimate

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 8/42

Charter

³ Thus, the Project Charter providesa broad definition and essentially mandate the project and based on

this it is possible to break down work to be performed (throughthe Work Breakdown Structure),and then to put the work into asequence (with network diagramming) and on a time line

(scheduling, using techniquessuch as the Gant/Schedule BarChart´)

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 9/42

Project Definition

Broad scope and mandateBroad scope and mandate

Work Breakdown Structure (Work Breakdown Structure (WBSWBS) )

Integrating the WBS with theIntegrating the WBS with theOrganization StructureOrganization Structure

Coding the WBS for the InformationCoding the WBS for the InformationSystemSystem

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 10/42

Creating the Work Breakdown Structure

Work Breakdown Structure (WBS):

A  hier ar chical outline (map) that identifies theproducts (deliverables) and work elements involved in

a project;

 Defines t he r elationship of the final deliverable(the project) to its sub deliverables, and in turn, their relationships to work packages (collection of elementsrelated to work that must be done);

Best suited for design and build projects that havetangible outcomes rather than process-orientedprojects.

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 11/42

Creating the Work Breakdown Structure

 WBS

Facilitates evaluation of cost, time, and technicalperformance of the organization on a project

Provides management with information appropriate toeach organizational level

Helps in the development of the organization breakdownstructure (OBS), which assigns project responsibilities toorganizational units and individuals

Helps manage plan, schedule, and budget

Defines communication channels and assists incoordinating the various project elements

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 12/42

 Work Package

It is output-oriented (not output in itself)in that it:

Defines work ( what);

Identifies time to complete a work package(how long);

Identifies a time-phased budget to complete a

 wor

k package(cost ± linked to a cost cent

r

e); Identifies resources needed to complete a work 

package (how much)

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 13/42

 Work Package

It is output-oriented (not output in itself)in that it:

Identifies a single person responsible for units

of work ( who); Identifies monitoring points (milestones) for 

measuring success;

Roughly 10

days maximum(80

hour

s) ±experience shows.

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 14/42

Creating the Work Breakdown Structure

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 15/42

Creating the Work Breakdown Structure

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 16/42

Project Definition

Broad scope and mandateBroad scope and mandate

Work Breakdown Structure (Work Breakdown Structure (WBSWBS) )

Integrating the WBS with theIntegrating the WBS with theOrganization StructureOrganization Structure

Coding the WBS for the InformationCoding the WBS for the InformationSystemSystem

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 17/42

Example

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 18/42

Project Definition

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 19/42

The Work-Package

It is output-oriented (not output in itself) in that it:

Defines work ( what);

Identifies time to complete a work package (how long);

Identifies a time-phased budget to complete a work package(cost ± linked to a cost centre);

Identifies resources needed to complete a work package (how much);

Identifies a single person responsible for units of work ( who);

Identifies monitoring points (milestones) for measuringsuccess;

Roughly 10 days maximum (80 hours) ± experience shows.

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 20/42

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 21/42

³RingFence´

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 22/42

Project Definition

Broad scope and mandateBroad scope and mandate

Work Breakdown Structure (Work Breakdown Structure (WBSWBS) )

Integrating the WBS with theIntegrating the WBS with theOrganization StructureOrganization Structure

Coding the WBS for the InformationCoding the WBS for the InformationSystemSystem

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 23/42

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 24/42

 1. TY PE FIN A L DELIV ER  A BLE2. TY PE IN SUB DELIV ER  A BLES

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 25/42

 3. INDENT A LL SUB DELIV ER  A BLES(CRE A TES REL A TIONSHIPS)

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 26/42

 4. INSERT A ND TY PE T A SKS TH A T A RE REL A TED TO RESPECTIV ESUB DELIV ER  A BLES

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 27/42

 5. INDENT ACTIVITES TO RELE VA NTSUB-DELIV ER  A BLE

(CRE A TES REL A TIONSHIPS)

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 28/42

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 29/42

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 30/42

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 31/42

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 32/42

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 33/42

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 34/42

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 35/42

35

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 36/42

FIGURE 4.1

SCOPE

RESOUR CES

DELIV ERY 

CLIM A TE

TIME

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 37/42

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 38/42

Labor

MaterialDirect Cost

Office rent Electricity 

Indirect Cost

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 39/42

Labor Material Proratedcosts

Other

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 40/42

R 100

R 100

R 100

R 300

R 100

R 100

R 100

R 300

R 600

R 600

R 300

R 300

R 900

R 300

R 300

R 300

R 1500 R 1000

R 600R 400

R 100

R 100

R 100

R 100 R 200

R 200

R 200

R 2100

8/8/2019 07 PROJECT CYCLE A

http://slidepdf.com/reader/full/07-project-cycle-a 41/42

R 1000

R 600R 400

R 100

R 100