การก่อสร้างโครงการใต้ดิน06.pdf
DESCRIPTION
referenceTRANSCRIPT
-
1. 2. 3. 4. 5.
, , Maxim 7 -15.90
3 King Post Platform Hydraulic Jack Strut
-
:ORIENTAL RESIDENCE, WIRELESS ROAD :110 . : -
- - - - - - - Landscape - - Interior -ABACUS DESIGN CO., LTD.
-
: 31 , 4.5
- B1-B4.5
- 1-5
- 6-21
( Bore Pile )- 22-31 -- 22
-
SITE LAY-OUT PLAN
-
Bottom up
-
CONSTRUCTION TIP
-
1. Cost Budget
1.1
-
1.1 4-6 Pile wall (Pile wall) Pile wall 2-3
* Cap-beam, Pile wall *
-
1.2 Pile cut off -16 m. ()
* , *
-
1.3 Concrete (Wale Bracing) Pile wall Pre-
load 24 .* - Lean
Concrete*
-
1.4 . Layer -16.00 m. 5-6 Test
* Test , *
1.5 Pile wall Seismic Test
-
2)
2.1
-
2.1 Cap-beam , Sheet Pile Cap-beam, Pile Wall Cap-beam Strut Cap - beam
Cap-beam
-
2.2 Cap-beam Cap-beam Pile wall
Cap-beam Strut Pre-load Strut Layer
-
2.3 Cap-beam Cap-beam Pile cut off Pile wall Pile wall , , Ground Hard Scape Pile cut off Pile Wall
-
2.4 Pre-load Strut Pre-load Strut Strut Pre-load Pre-load 4-6 ./ Pre-load 10 //Strut 1 . () Pre-load Pre-load
-
2.5 Plat-form Temporary Platform - Lay-out Plan ,
- Platform Platform Bracing King Post - Platform ( Mat foundation 3,000-5,000 m3 One Way)
-
-
2.6 , H-beam Strut King Post, Strut - , Tower crane - Strut 1.00 m.
-
2.7 Strut Layer
Strut
-
3)
Platform (Ea)
(m.) (m3/Day)0 - 4.00 m.( PC.200 2 900 , )
4.00 - 13.00 m. PC. 200 Long Boom2
( ( 22.00 m.) 450 , ) PC. 40 2
13.00 - 16.00 PC. 200 Long Boom
2
( ( 22.00 m.) PC. 60 2 350 ) PC. 40 1
-
- Platform & Strut & Pre-load = 470 m3/Day
- 24 10.00 -15.00 . 22.00-05.00 . ( 12 /) 09.00 -16.00 . 21.00-05.00
.( 15 /)
-
Site Lay Out Plan Pile Wall
-
Static Pile Load Test
-
Bracing
-
Pile Cut-out
-
Platform
-
Platform
-
Preload
-
Inclinometer
-
Inclinometer
-
Inclinometer
-
Inclinometer
-
Inclinometer
-
Learning is a lifelong journey.
Two ways of learning.1.Learning by experience = BUY2.Learning from others = BORROW
-
The wise learns from his mistakes.
The wiser learns from the mistakes of others.
The wisest learns from the successes of others.
- John C. Maxwell