/ z YUCCA MOUNTAIN PROJECT Overview of Major Site Recommendations, Environmental Impact Statements, and License Application Milestones and Schedule Presented to: DOE/NRC Technical Exchange on Total System Performance Assessment San Antonio, Texas Presented by: Abraham Van Luik Senior Technical Advisor for Performance Assessment Office of Licensing and Regulatory Compliance U.S. Department of Energy May 25-27, 1999 A, r z' ' U.S. Department of Energy Office of Civilian Radioactive Waste Management Ci / 'i! a~ , 2 v

Upload: others

Post on 12-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 05/25/1999 - 05/27/1999 Presentation 'Overview of Major ... · Objectives of DOE TSPA-Related Presentations (27 May 1999) * Discuss the TSPA in the context of the overall SR/LA plan

/ z

YUCCAMOUNTAIN

PROJECT

Overview of Major Site Recommendations,Environmental Impact Statements, and LicenseApplication Milestones and Schedule

Presented to:DOE/NRC Technical Exchange on Total SystemPerformance AssessmentSan Antonio, Texas

Presented by:Abraham Van LuikSenior Technical Advisor for Performance AssessmentOffice of Licensing and Regulatory ComplianceU.S. Department of Energy

May 25-27, 1999A, r z' '

U.S. Department of EnergyOffice of Civilian Radioactive

Waste Management

Ci / 'i! a~ , 2 v

Page 2: 05/25/1999 - 05/27/1999 Presentation 'Overview of Major ... · Objectives of DOE TSPA-Related Presentations (27 May 1999) * Discuss the TSPA in the context of the overall SR/LA plan

Objectives of DOE TSPA-RelatedPresentations (27 May 1999)

* Discuss the TSPA in the context of the overallSR/LA plan

* Present general information on the driving forces,planned technical content, and schedule for TSPASR and TSPA-LA

* Provide more detailed information on development ofthe TSPA-SR

M&O Graphics Presentations NRC YMVanLuikL525-2799.ppt 2

Page 3: 05/25/1999 - 05/27/1999 Presentation 'Overview of Major ... · Objectives of DOE TSPA-Related Presentations (27 May 1999) * Discuss the TSPA in the context of the overall SR/LA plan

Objectives of This Presentation

* Provide an overview of major programmaticmilestones for SR, EIS, and LA

* Discuss the general focus and linkage of majormilestones

* Show the schedule for delivery of the majormilestones

M&O Graphics Presentations NRC YMVanLuikL525-2799.ppt 3

Page 4: 05/25/1999 - 05/27/1999 Presentation 'Overview of Major ... · Objectives of DOE TSPA-Related Presentations (27 May 1999) * Discuss the TSPA in the context of the overall SR/LA plan

Major DOE Programmatic SR/LA Milestones

* Draft Environmental Impact Statement* Final Environmental Impact Statement* Process Model Reports* Consideration Hearing Draft SR* Notification Draft SR* Final Site Recommendation* Draft License Application* Final License Application

M&O Graphics Presentations NRC YMVanLuikL525-2799.ppt 4

Page 5: 05/25/1999 - 05/27/1999 Presentation 'Overview of Major ... · Objectives of DOE TSPA-Related Presentations (27 May 1999) * Discuss the TSPA in the context of the overall SR/LA plan

Linkage of Major Programmatic SR/LA MilestonesRev 0/1 PMRs

7100

Sir

--- -- --

21012101

-- -- -- - *

9M1U (9

CC;

(a

In

08

pB11/00

ConsiderationHearings - ---

Draft -SR

7/01

_ .

FY2000 FY2001 I FY2002

L Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 H

M&O Graphics Presentations NRC YMVanLuik_525-2799.ppt 5

Page 6: 05/25/1999 - 05/27/1999 Presentation 'Overview of Major ... · Objectives of DOE TSPA-Related Presentations (27 May 1999) * Discuss the TSPA in the context of the overall SR/LA plan

Implications of SR Schedule

* Primary information feeds to TSPA-SR Rev. 00- Must take place by August of 1999

* Limited additional information feeds expectedfor TSPA-SR Rev. 01 - July of 2000

* A reprioritization of FY2000 work is underwayassuming requested budget

- Possibility is high for FY2000 not being at requested level

M&O Graphics Presentations NRC YMVanLuik_525-2799.ppt 6

Page 7: 05/25/1999 - 05/27/1999 Presentation 'Overview of Major ... · Objectives of DOE TSPA-Related Presentations (27 May 1999) * Discuss the TSPA in the context of the overall SR/LA plan

Site Recommendation Documentation Structure*Include:,

Compelling argument basedon Technical Basis"-(Vols I & 11) :

:'"Public Policy Considerations(Vols. I & IV)

President'sRecommendation

A

* Assuming the site is found to be suitableM&O Graphics Presentations NRC YMVanLuik 525-2799.ppt 7

Page 8: 05/25/1999 - 05/27/1999 Presentation 'Overview of Major ... · Objectives of DOE TSPA-Related Presentations (27 May 1999) * Discuss the TSPA in the context of the overall SR/LA plan

Summary of Today's Presentations

Presenter

Overview of Major SR,LA Milestones

EIS, and Abraham Van Luik

Overview of TSPA-SR, andTSPA-LA Strategy

Robert Andrews

YMP Response to NRC'sTSPAI IRSR

Holly Dockery

Summary of TSPA-SR Methodsand Assumptions

Jerry McNeish

M&O Graphics Presentations NRC YMVanLuik525-2799.ppt 8

Page 9: 05/25/1999 - 05/27/1999 Presentation 'Overview of Major ... · Objectives of DOE TSPA-Related Presentations (27 May 1999) * Discuss the TSPA in the context of the overall SR/LA plan

Summary of DOE PresentationsPresenter

Approach to Features, Events andProcesses Development andScreening for TSPA-SR

Planned Updates of Natural SystemModel Abstractions for TSPA-SR

Planned Updates of Engineered SystemModel Abstractions for TSPA-SR

Planned Updates of the TSPA-SRModel to Improve Tracebility

Possible Approach to EvaluateHuman Intrusion Requirementof Proposed Part 63

Peter Swift

Mike Wilson

Dave Sevougian

Vinod Vallikat

Jerry McNeish