05 14-maypresentation final

28
May 2012 Rapidly Developing North American Gold Resources at Low Cost and Low Risk 1

Upload: jennieg

Post on 04-Jul-2015

444 views

Category:

Business


1 download

TRANSCRIPT

Page 1: 05 14-maypresentation final

May 2012

Rapidly Developing North American Gold Resources at Low Cost and Low Risk

1

Page 2: 05 14-maypresentation final

TSX:MOZ

2

Forward Looking Information

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION Except for statements of historical fact relating to the Company, certain information contained herein constitutes "forward-looking statements". Forward-looking statements include statements that are predictive in nature, depend upon or refer to future events or conditions, or include words such as “expects”, “anticipates”, “plans”, “believes”, “considers”, “intends”, “targets”, or negative versions thereof and other similar expressions, or future or conditional verbs such as “may”, “will”, “should”, “would” and “could”. We provide forward-looking statements for the purpose of conveying information about our current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved. These risks and uncertainties include but are not limited to those identified and reported in Marathon Gold Corporation’s public filings, which may be accessed at www.sedar.com . Other than as specifically required by law, we undertake no obligation to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made, or to reflect the occurrence of unanticipated events, whether as a result of new information, future events, results or otherwise.

Page 3: 05 14-maypresentation final

TSX:MOZ

3

Investment Highlights

Three robust gold projects

Valentine Lake Project in central Newfoundland (50/50 JV with Mountain Lake Resources)

Fully permitted Golden Chest Mine in Idaho’s prolific Coeur d’Alene Mining District (50/50 JV with New Jersey Mining Company) - Can earn 60% by putting $3.5 M in the ground

Bonanza Mine in Oregon’s prolific Greenhorn Gold District (100% owned)

Near-term resource growth

potential

Blue Sky

Several near-term catalysts

Initial Resource Estimate at Golden Chest Mine Updated Resource Estimate at Valentine Lake Project Potential to advance Golden Chest Mine to development as early as 2013 given

underground infrastructure and permits in place

Aggressive drilling programs - 40,000 m 2012 drill program at Valentine Lake Project - 25,000 m 2012 drill program at Golden Chest Mine NI 43-101 compliant resource estimates at the Valentine Lake Project and the Golden

Chest Mine

Several large properties with large geological systems Five gold prospects identified along 17 km of strike at Valentine Lake Project

- Leprechaun Gold Deposit Resource contained within 750 m strike Significant exploration potential at both Valentine Lake Project and Golden Chest Mine

Page 4: 05 14-maypresentation final

TSX:MOZ

4

Proven Management

Phillip Walford, P.Geo. | President , CEO & Director • 40 years in the mining industry, primarily in mining geology • Has held senior management roles at a number of companies

throughout the Americas, including Anaconda Gold, Geomaque Exploration, LAC Minerals, Pamour Porcupine Mines, and Hudson Bay Exploration and Development

Sherry Dunsworth, P.Geo. | VP of Exploration • 25+ years in the mining industry • Has held positions with Anaconda Gold and Marathon PGM • Former member of the Mineral Rights Adjudication Board of

Newfoundland and Labrador • Former Geoscience Councilor for the Association of

Professional Engineers and Geoscientists of Newfoundland and Labrador

Jim Kirke, CA | CFO • 15+ years involvement in the mining industry • Former CFO of BacTech Mining and Golden Odyssey Mining

Phillip Walford, P.Geo. | See Management

George Faught, CA | Non-Executive Chairman • 30+ years in the financial management and resources

industries • Former CFO of North American Palladium

Joe Spiteri, P.Geo. | Director • 30+ years in the mining industry • Former senior Manager and Officer with Placer Dome,

Northgate Explorations, Lac Minerals and Campbell Resources

Page Chilcott | Director • Former President of the Vancouver Stock Exchange

David Poynton | Director • 30+ years of legal and business experience • Former Senior VP, General Counsel and Corporate Secretary for

Iberian Minerals and Cadillac Ventures

Management Board of Directors

Page 5: 05 14-maypresentation final

TSX:MOZ

5

Capital Structure

Share Price Performance

Share Price (05-01-12) $0.94

Shares Outstanding 29,871,928

Warrants ($1.80) 2,140,995

Options (at $1.61) 2,689,000

Fully diluted 34,701,923

Market Cap ~C$28 million

Investors Stillwater (15%) Sprott

Sentry Select

Capitalization

Analysts • Fraser Mackenzie • Octagon Capital Corp.

Pri

ce (

CA

D)

Month

Page 6: 05 14-maypresentation final

TSX:MOZ

6

Focused on North American Gold Resources

Marathon Gold takes a 3-Prong approach to de-risking your investment

Marathon Gold currently has 554,650 oz of Resource and growing!

Current Resource Development (100%)

Valentine Lake Project: M&I 424,000 oz Au @ 2.05 g/t Au, Inferred 305,000 oz Au @ 1.65 g/t Au

Golden Chest Mine: M&I 147,000 oz Au @ 1.47 g/t Au, Inferred 233,300 oz Au @ 1.46 g/t Au

Marathon Gold

Focused on developing gold Resources in

Canada and USA only- current Resources are

expanding!

Projects have solid infrastructure and are

located in mining-friendly jurisdictions

Projects have >1,000,000 oz Au potential of good grade potential

Page 7: 05 14-maypresentation final

TSX:MOZ

7

Deposit Tonnes

Au Grade g/t

Gold (oz)

Tonnes Au Grade g/t

Gold (oz)

Valentine Lake Project1

Global Updated Resource Estimate

6,450,000 2.05 424,000 5.740,000 1.65 305,000

Summary of Global Resources

Inferred Resources

1. Source: Technical Report on the Mineral Resource Estimate for the Leprechaun Gold deposit Valentine Lake Gold Project Central Newfoundland, Canada, dated March 29, 2012 2. The Golden Chest Mine is a 50/50 Joint Venture with New Jersey Mining Company, therefore Marathon Gold Reserves and Resource account for half

Deposit Tonnes

Au Grade g/t

Gold (oz)

Tonnes Au Grade g/t

Gold (oz)

Reserves & M and I Inferred Resources

Golden Chest Mine Global Initial

Resource Estimate 2

3,107,000 1.47 147,000 4,978,000 1.46 233,300

TOTAL M&I and TOTAL Inferred

Valentine Lake Project and Golden

Chest Mine

9,557,000 1.86 571,000 10,718,000 1.56 538,300

Reserves & M and I

Page 8: 05 14-maypresentation final

TSX:MOZ

8

Our Projects

Legend

Advanced Stage

1. Valentine Lake – Leprechaun Deposit

2. Golden Chest

Early Stage

1. Bonanza 2. Baie Verte 3. Finger Pond

Page 9: 05 14-maypresentation final

TSX:MOZ

9

Newfoundland

Page 10: 05 14-maypresentation final

TSX:MOZ

10

Valentine Lake Project: Flagship Project

Page 11: 05 14-maypresentation final

TSX:MOZ

11

Leprechaun Gold Deposit: Updated NI 43-101 Resource Estimate

Updated NI 43-101 compliant Resource Estimate; M&I Increase of 54%

Aggressive 40,000 m drill program

underway The most explored deposit among the five

known gold occurrences Leprechaun Gold Deposit has been

extended along strike and down-dip

Hanging-wall zones are open in all directions

Coarse and free gold have excellent metallurgical recoveries with ~50% by gravity, total >90%

GLOBAL RESOURCE ESTIMATE

Total Resource Above 0.50 g/t cut

off1

Tonnes

Cut Au (g/t)

Au oz

Measured 1,378,000 1.90 84,000

Indicated 5,068,000 2.09 340,000

M+I 6,446,000 2.05 424,000

Inferred 5,742,000 1.65 305,000

Page 12: 05 14-maypresentation final

TSX:MOZ

12

Valentine Lake Project Resource Growth

050,000

100,000150,000200,000250,000300,000350,000400,000450,000

2011Measured

andIndicated

2012Measured

andIndicated

2011Inferred

2012Inferred

Valentine Lake Project Resource Growth

2011 Measuredand Indicated

2012 Measuredand Indicated

2011 Inferred

2012 Inferred

424,000 oz Au

305,000 oz Au

Measured and Indicated has increased by 53% since 2011 – based on 25,000 m of drilling and growing!

Page 13: 05 14-maypresentation final

TSX:MOZ

13

Leprechaun Gold Deposit: Resource Boundary Expansion

Page 14: 05 14-maypresentation final

TSX:MOZ

14

Leprechaun Gold Deposit: Ideal for Open Pit

Page 15: 05 14-maypresentation final

TSX:MOZ

15

Leprechaun Gold Deposit: Ideal for Open Pit

Page 16: 05 14-maypresentation final

TSX:MOZ

16

Leprechaun Gold Deposit: Ideal for Open Pit

Page 17: 05 14-maypresentation final

TSX:MOZ

17

High grade grab samples consisting of quartz-tourmaline-pyrite with coarse visible gold returned assays of up to 581.88 g/t Au, 287.95 g/t Au, 152.75 g/t Au and 88.60 g/t Au

The newly exposed quartz-tourmaline-pyrite-gold stacked veins occur 100 m into the hanging-wall Ongoing prospecting and stripping continues to exposes additional quartz veining along strike and

into the hanging wall Channel sampling continues, with assays pending

Leprechaun Gold Deposit, New Discovery: J. Frank Zone

Page 18: 05 14-maypresentation final

TSX:MOZ

18

Leprechaun Gold Deposit, New Discovery: J. Frank Zone Extends deposit in excess of 850 m in length and 250 m in width, and is located up to 1.5 km southwest along strike from the current resource boundary of the Leprechaun Gold deposit

Page 19: 05 14-maypresentation final

TSX:MOZ

19

Selected 2012 Drill Results

• Marathon expects a steady stream of drill results from its 40,000 m drill program • The deposit remains open down-dip and along strike to the northeast and southwest

Hole ID From To Length Gold

VL-12-393 115 130 13.5 4.31

including 120 122 1.8 25.42

and 135 139 3.6 8.85

including 136 137 0.9 32.31

VL-12-395 252 261 7.7 11.28

including 252 254 1.7 41.8

VL-12-403 210 232 20.9 7.23

including 228 230 1.9 48.99

VL-12-402 277 301 21.6 4.05

including 297 299 1.8 24.55

VL-12-407 289 304 13.5 9.19

including 291 293 1.8 34.92

VL-12-408 153 172 18.1 13.81

including 164 166 1.9 109.941. True Thickness

1

Page 20: 05 14-maypresentation final

TSX:MOZ

20

Idaho Golden Chest Mine

Page 21: 05 14-maypresentation final

TSX:MOZ

21

Golden Chest Mine: Historical Producer with Initial NI 43-101 Compliant Resource

Initial Resource Estimate based on 10,000 m of

drilling in 2011 - M&I 147,000 oz Au - Inferred 233,000 oz Au Aggressive 20,000 m drill program underway Past producing mine located within Idaho’s

prolific Coeur d’Alene Mining District -Road accessibility Recent localized mining by JV partner New

Jersey Mining Company, produced 8,500 t of ore with an average grade of 6.90 g/t and an average recovery of ~94%

Can earn 60% by putting $3.5 M in the ground

Fully permitted surface and timber rights with

an existing reserve and exploration potential

GLOBAL RESOURCE ESTIMATE

Total Cut-off 0.40 g/t

Tonnes

g/t Au

Au oz

M+I 3,107,000 1.47 147,000

Inferred 4,978,000 1.46 233,300

IN OPEN PIT Total Cut-off

0.40g/t

Tonnes g/t Au Au oz

M+I 2,788,000 1.35 121,100

Inferred 3,847,500 1.45 179,000

GC-12-106 – 3.9 m @ 8.22 g/t Au GC-12-107 – 5.2m @ 12.39 g/t Au GC-12-117 – 5.1 m @ 3.56 g/t Au

Selected 2012 Drill Results1

1. True Thickness

Page 22: 05 14-maypresentation final

TSX:MOZ

22

Golden Chest Mine: Near Surface Open-Pit

Page 23: 05 14-maypresentation final

TSX:MOZ

23

Oregon

Page 24: 05 14-maypresentation final

TSX:MOZ

24

Bonanza Mine: Historical High-Grade Producer

100% Owned Historical Producer

• 128,500 tons grading 1.2 oz/ton and 99,900 oz Au was produced

with an average recovery of 65% • Historic mining cut off grade of 0.60

oz/ton (17 grams)

Three main veins are important for mining • South Vein • Bonanza Vein; can be followed on

surface from more than 2,500 ft • North Vein

The veins vary from a foot to 6 ft wide and locally can be up to 30 ft wide, dipping steeply to the southwest

Page 25: 05 14-maypresentation final

TSX:MOZ

25

Bonanza Mine: Property boundary

Page 26: 05 14-maypresentation final

TSX:MOZ

26

Reasons to Invest: Delivering on Milestones

2010 2011 2012 2013

Stillwater Resources purchases Marathon PGM for $110 Million

Gold assets of Marathon PGM are spun out; Marathon Gold is formed

Golden Chest Mine is acquired

Initial Resource Estimate is released on Valentine Lake Project

25,000 m drill program commences at Valentine Lake

10,000 m drill program commences at Golden Chest Mine

Bonanza Mine is acquired

40,000 m drill program commences at Valentine Lake Project

20,000 m drill program commences at Golden Chest Mine

Initial NI 43-101 Resource Estimate released on the Golden Chest Mine

Updated NI 43-101 Resource Estimate released on Valentine Lake Project; M&I increase of 53%

PEA anticipated for Valentine Lake Project

2009

Valentine Lake Project acquired by Marathon PGM

Updated Resource Estimate at Valentine Lake Project expected Q1 2013

Updated Resource Estimate at Golden Chest Mine expected Q1 2013

Page 27: 05 14-maypresentation final

TSX:MOZ

27

Reasons to Invest

LOCATION

Mining-friendly jurisdictions: Newfoundland, Idaho and Oregon

Strong infrastructure; road access, water, fully equipped on sight camp

Socio-economic and political stability

MANAGEMENT

Over 80 years of proven management experience in mining exploration, development and production

RESOURCE DEVELOPMENT

Valentine Lake Project:

- NI 43-101 compliant Updated Resource Estimate with M&I increase of 53%

-40,000 m drill program underway

Golden Chest Mine:

-NI 43-101 compliant Initial Resource Estimate

-20,000 m drill program underway

Doubling drill programs in 2012

SIGNIFICANT EXPLORATION

POTENTIAL

Orgogenic gold deposits at Valentine Lake and Golden Chest have significant exploration potential

Mineralization covering only a fraction of Valentine’s total 30 km strike has been delineated

Page 28: 05 14-maypresentation final

TSX:MOZ

28

www.marathon-gold.com 416-987-0714

Phillip Walford President and CEO [email protected]

Jennie Guay Investor Relations Manager [email protected]