JUMLAH HARGA
(Rp)
I MATERIAL
1 Tiang besi 11 meter 200 daN Btg 90 2 Isolator tumpu 20 kV Bh 254 3 Isolator tarik 20 kV Bh 60 4 Cut Out 20 kV + Fuse Bh 3 5 Lighting Arester 20 kV Bh 3 6 Konduktor AAAC 70 mm2 km 11,169
JUMLAH I
II ANGKUTAN
1 Tiang besi 11 meter 200 daN btg 90 2 Isolator tumpu 20 kV m3 3,632 3 Isolator tarik 20 kV m3 1,386 4 Cut Out 20 kV + Fuse m3 0,025 5 Lighting Arester 20 kV m3 0,025 6 Konduktor AAAC 70 mm2 m3 2,234
JUMLAH II
TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN
Terbilang ;
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kVKABUPATEN SABU
DESA JADU KEC. SABU BARAT KAB. SABU RAIJUA023.DL/611/LISDES.NTT/2015
NO URAIAN STN VOLHARGA SATUAN
(Rp)
-
JUMLAH HARGA(Rp)
I MATERIAL
1. Trafo 3 P 50 KVA 20 KV - B2 Buah 1 - 2. Cut Out 20 KV 100 A + Fuse Link Bh 3 - 3. L Arrester 20 KV 10 kA Bh 3 -
JUMLAH I
II ANGKUTAN
1. Trafo 3 P 50 KVA 20 KV - B2 m3 0,693 2. Cut Out 20 KV 100 A + Fuse Link m3 0,069 3. L Arrester 20 KV 10 kA m3 0,025
JUMLAH II
TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN
Terbilang ;
RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV
KABUPATEN SABUDESA JADU KEC. SABU BARAT KAB. SABU RAIJUA
023.DL/611/LISDES.NTT/2015
NO URAIAN STN VOLHARGA SATUAN
(Rp)
-
JUMLAH HARGA(Rp)
I MATERIAL1 Tiang Besi 9 meter 100 daN btg 108 2 LVTC 3 X 50+1X35 mm2 km 6
JUMLAH I
II ANGKUTAN
1 Tiang Besi 9 meter 100 daN btg 108 2 LVTC 3 X 50+1X35 mm2 m3 8
JUMLAH II
TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN
Terbilang ;
RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)
KABUPATEN SABUDESA JADU KEC. SABU BARAT KAB. SABU RAIJUA
NO JENIS MATERIAL STN VOLHARGA SATUAN
(Rp)
-
PAKET 003 A3C 70 mm2 = 3,650 kms
SA- JUMLAH
NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA
AN RP RP RP RP RP
I MATERIAL UTAMA
1 Tiang besi 11 meter 200 daN Btg 89
2 Isolator tumpu 20 kV Bh 251
3 Isolator tarik 20 kV Bh 60
4 Cut Out 20 kV + Fuse Bh 3
5 Lighting Arester 20 kV Bh 3
6 Konduktor AAAC 70 mm2 kms 3,65
II MATERIAL NON UTAMA
1 Perlengkapan druck schoor set 9
2 Perlengkapan kontramast set 1
3 Treck schoor set 13
4 Cross Arm UNP 100 (Balance) :
a. Type A1 set 58
b. Type A2 set 11
c. Type A3 set 13
d. Type B3 set -
5 H. Type Conector 70 mm2 Bh 39
6 Alluminium Bending wire Mtr 376,50
7 Joint sleeve 70 mm2 Bh 6
8 Penghalang panjat Bh 38
9 Tanda kilat Bh 79
10 Arde TM u/ Arrester Set 1
11 Beton kaki tiang Btg 89
III PEKERJAAN PERSIAPAN
1 Angkutan Material m3 17,81
2 Angkutan Tiang Besi Btg 89
3 Pembersihan Trase Kms 3,65
IV PEKERJAAN FINISHING
1 Foto dokumentasi Lbr 30
2 Gambar Lbr 8
3 Pengecatan tiang Btg 89
4 Komisioning Kms 3,65
SUB. JUMLAH Rp
PPN 10 % Rp
JUMLAH Rp
DIBULATKAN Rp
VOLUME
HARGA SATUAN HARGA BAGIAN
RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kV
KABUPATEN SABUDESA JADU KEC. SABU BARAT KAB. SABU RAIJUA
023.DL/611/LISDES.NTT/2015
-
PAKET 003 TRAFO 3 PHS 50 KVA = 1 BH
SA- JUMLAH
NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA
AN RP RP RP RP RP
I MATERIAL UTAMA
1 Tiang besi 11 meter 200 daN Btg 1
2 Isolator tumpu 20 kV Bh 3
3 Cut Out 20 kV + Fuse Bh 3
4 Lighting Arester 20 kV Bh 3
5 Trafo 3 phs 50 kVA - 20 kV Bh 1
II MATERIAL NON UTAMA
1 Penghalang panjat Bh 1
2 Tanda kilat Bh 1
3 Rangka Dudukan u/.trafo 3 phs Set 1
4 Cross Arm type A1 Set 1
5 Cross Arm u/ dudukan CO Set 1
6 LV Board 3 phs 1 tiang 2 Jurusan 2 Pintu Set 1
7 Cross Arm u/ dudukan Arester Set 1
8 Pipa Inlet-Outlet Medium B + Invoring Set 1
9 Alluminium Bending wire Mtr 4,50
10 Arde Gardu Set 1
11 Arde TM u/ Arrester Set 1
12 Pondasi Lantai Kerja Bh 1
13 Paralel Grove 35 - 70 mm Bh 3
14 Kabel NYY 50 mm2 mtr 96,00
15 Sepatu Kabel AL-CU 35-50 mm2 Bh 3
16 Sepatu Kabel CU 50 mm2 Bh 16
17 Beton kaki tiang Btg 1
III PEKERJAAN PERSIAPAN
1 Pengedropan Material m3 1,56
2 Pengedropan Tiang Besi btg 1
IV PEKERJAAN FINISHING
1 Foto dokumentasi Lbr 2
2 Penomoran Tiang Btg 1
3 Penomoran Tiang Btg 1
4 Komisioning Bh 1
SUB. JUMLAH Rp
PPN 10 % Rp
JUMLAH Rp
DIBULATKAN Rp
RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV
KABUPATEN SABUDESA JADU KEC. SABU BARAT KAB. SABU RAIJUA
023.DL/611/LISDES.NTT/2015
VOLUME
HARGA SATUAN HARGA BAGIAN
-
PAKET 003 LVTC 3X50+1X35 MM2 = 6,150 KMS
SA- JUMLAH
NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA
AN RP RP RP RP RP
I MATERIAL UTAMA
1 Tiang besi 9 mtr 100 daN Btg 108
3 LVTC 3 x 50- + 1 x 35 mm2 km 6,15
II MATERIAL NON UTAMA
1 Perlengkapan druck schoor Set 10
2 Perlengkapan kontramast Set -
3 Treck schoor Set 19
4 Beton kaki tiang btg 108
ACCESSORIES LVTC :
5 Suspension Assembly Set 96
6 Large Angle Assembly Set 29
7 Fixed Dead End Assembly Set 12
8 Adjustable Dead End Assembly Set 12
9 Bundle End Protection Set 12
10 Bimetalic Joint 50 mm2 Bh 6
11 Joint Sleves 50 mm2 Bh 20
12 Arde TR ( 5 ohm ) Set 22
13 Tap Conector bh 16
III PEKERJAAN PERSIAPAN
1 Pengedropan Material m3 22,99
2 Pengedropan Tiang Besi Btg 108
3 Pembersihan Trase kms 6,15
IV PEKERJAAN FINISHING
1 Foto dokumentasi Lbr 32
2 Gambar revisi Lbr 14
3 Penomoran tiang Btg 137
4 Pengecatan tiang Btg 108
5 Komisioning kms 6,15
SUB. JUMLAH Rp
PPN 10 % Rp
JUMLAH Rp
DIBULATKAN Rp
VOLUME
HARGA SATUAN HARGA BAGIAN
RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)
KABUPATEN SABUDESA JADU KEC. SABU BARAT KAB. SABU RAIJUA
023.DL/611/LISDES.NTT/2015
-
SATUAN KERJA LISTRIK PERDESAAN
PROVINSI NUSA TENGGARA TIMUR
I JARINGAN TEGANGAN MENENGAH
- PENGADAAN
- PEMASANGAN
II GARDU DISTRIBUSI 1 50
- PENGADAAN
- PEMASANGAN
III JARINGAN TEGANGAN RENDAH
- PENGADAAN
- PEMASANGAN
Terbilang :
KMS
6,150
KMS
BH/KVA
PT. PLN (PERSERO)
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN JARINGAN DISTRIBUSI DAN GARDUKABUPATEN SABU
DESA JADU KEC. SABU BARAT KAB. SABU RAIJUA023.DL/611/LISDES.NTT/2015
NO URAIAN SATUANJUMLAH HARGA
RPVOLUME
3,650
-
PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT
JUMLAH
URAIAN STN VOLUME HARGA
( Rp.) (Rp.)
1 Type A1 Balance UNP 100x50x5x2000
1 UNP 100x50x5x2000 mm Btg 1
2 Pole band 1/2, 4" (6x50) Bh 1
3 Pole band 2/2, 4" (6x50) set 1
4 Arm Tie ( Besi L. 50x4x1270 mm) btng 1
5 Steel plat type 2 bh 2
6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 5
7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 2
Jumlah
Pembulatan
2 Type A2 Balance UNP 100x50x5x2000
1 UNP 100x50x5x2000 mm Btg 2
2 Pole band 2/2, 4" (6x50) bh 2
3 Steel Plate typre I (6x100x37,5) bh 4
4 Steel Plate typre II (6x100x12) bh 4
5 Arm Tie ( Besi L. 50x4xx 1270 mm) btng 1
6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 3
7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 14
Jumlah
Pembulatan
3 Type A3 Balance UNP 100x50x5x2000
1 UNP 100x50x5x2000 mm btng 2
2 Pole band 2/2, 4" (6x50) bh 2
3 Steel Plate typre I (6x100x37,5) bh 4
4 Steel Plate typre II (6x100x12) bh 4
5 Arm Tie ( Besi L. 50x4xx 1270 mm) btng 1
6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 3
7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 14
Jumlah
Pembulatan
4 Type B3 Balance UNP 100x50x5x2200
1 UNP 10x50x5x2200 mm btng 2
2 Pole band 2/2, 4" (6x50) set 2
3 Steel Plate typre I (6x100x37,5) bh 6
4 Bollt & nut 5/8 x 140 + ring (galvanis) bh 12
5 Bollt & nut 5/8 x200 + 4 mur (galv) bh 4
Jumlah
Pembulatan
5 Treck scoor - Guy Wire TM
1 Stall drad 64 mm2 mtr 15
2 Pole band 2/2, 4" (6x50) set 1
3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 2
4 Spanschroef 3/4" / Turn Bucle 50 KN bh 1
5 Guy isolator/tui isolator bh 1
6 Wire clip/cros by 35 mm2 bh 4
7 Stay road 16 mm2 panjang = 2500 mm (anker) btng 1
8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 2
9 Beton Block 40x40x10 bh 110 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok set 1
Jumlah
Pembulatan
6 Kontramast - Horizontal Guy Wire
1 Stall drad 64 mm2 mtr 26
2 Pole band 2/2, 4" (6x50) set 2
3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 4
4 Spanschroef 3/4" / Turn Bucle 50 KN bh 2
5 Guy isolator/tui isolator bh 2
6 Wire clip/cros by 12 mm2 bh 6
7 Stay road 16 mm2 panjang = 2500 mm (anker) bh 1
8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 4
9 Beton Block 40 cmx40 cmx10 cm bh 1
10 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok set 1
Jumlah
Pembulatan
ANALISA HARGA SATUAN MATERIAL AKSSESORIS
TAHUN 2015
HARGA SATUANHARGA BAGIAN
NO.
( Rp.)
-
7 Druck Schoor TM
1 Pole band galvanise 1/2 4" bh 1
2 Pole band galvanise 2/2 4" (atas) bh 2
3 Pole band galvanise 2/2 8' (bawah) u/sekang bh 2
4 Pipa galvanise Diameter 2"- panajang 2000 mm btng 1
5 Besi UNP 100x50x5x200 mm u/stop druck btng 1
6 Bolt nut + plat & spring plat 5/8' x 50 mm galv bh 9
Jumlah
Pembulatan
1 M2 CAT TIANG BESI
Cat dasar Kg 0,1
Minyak cat Ltr 0,05
Cat besi Kg 0,15
kuas Lbr 0,1
Pekerja HO 0,3
Mandor HO 0,125
Tukang HO 0,25
Jumlah
Pembulatan
8 Pengecatan T. besi 9 mtr (1 batang) - Material m2/btg 2,814
Upah m2/btg 2,814
Jumlah
Pembulatan
9 Pengecatan T. besi 11 mtr (1 batang) - Material m2/btg 4,691
Upah m2/btg 4,691
Jumlah
Pembulatan
8 ARDE ARESTER
1 Grounding Rod 16 mm2 L = 1750 mm bh 2,00
2 BC 50 mm2 Mtr 15,00
3 Pipa Galvanis 1/2" L= 6000 mm Btg 1,00
4 Klem Steinless Steel 4 titik mtr 4,00
5 Connector CU 35 - 50 mm2 Buah 3,00
6 Stoping Bukle bh 4,00
7 Link 25 x 25 bh 4,00
Jumlah
Pembulatan
9 ARDE GARDU
1 Grounding Rod 16 mm2 L = 1750 mm bh 1,00
2 BC 50 mm2 Mtr 11,00
3 Pipa Galvanis 1/2" L = 2000 mm bh 1,00
4 Klem Steinless Steel 4 titik mtr 4,00
5 Connector Cu 35 - 50 mm mm2 bh 2,00
6 Sepatu Kabel CU 50 mm2 bh 1,00
7 Stoping Bukle bh 4,00
8 Link bh 4,00
Jumlah
Pembulatan
10 RANGKA DUDUKAN TRAFO 25-50 KVA (CANTOL) :
1 UNP 100 x 45x4x1500 mm galv Btg 2,00
2 UNP 100 x 45x4x750 mm galv Btg 2,00
3 UNP 100 x 45x4x 600mm galv btg 2,00
4 Arm tie galvanise 50x50x5 1000 mm btg 2,00
5 Arm tie galvanise 50x50x5 1200 mm btg 2,00
6 Bolt nut + plat & spring plat 5/8" 300 mm bh 2,00
7 Bolt nut + plat & spring plat 5/8" 50 mm bh 18,00
8 Pole band 1/2 6" u penahan dudukan trafo bh 4,00
Jumlah -
Pembulatan -
11 TRAVERS UNTUK CUT OUT DAN ARRESTER :
1 UNP 100x50x5x2000 mm u/dudukan CO dan Arester btg 1,00
2 Pole band 1/2, 4" (6 X 70) bh 1,00
3 Bolt nut + plat & spring plat 5/8" 50 mm bh 2,00
Jumlah
Pembulatan
12 BETON BLOCK UNTUK SCHOOR TARIK
1 Beton Cor : 1 ; 2 ; 3 (40cmx40 cm x10 cm) M3 0,0160
2 Besi Beton 16 mm2 Galvanis L=2500 mm btg 1,0000
3 U. Bolt 3/4" Buah 1,00
Jumlah -
Pembulatan -
-
13 LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu
1 LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu set 1,00
2 UNP 100 x 50x100 mm L 1000 mm galv btg 2,00
3 Pole band 1/2, 7" bh 2,00
4 Bolt nut + plat & spring plat 5/8" 50 mm bh 4,00
Jumlah -
Pembulatan
14 Pipa Inlet / Oulet Gardu
1 Pipa 2" Galvanise btg 3,00
2 L - bow pipa PVC 2" u/ bagian atas bh 3,00
3 UNP 100 x 50 x 5 x 500 mm u/ dudukan pipa galv btng 2,00
4 Pole band 1/2 4" bh 2,00
5 Pole band 1/2 2" bh 6,00
6 Bolt nut + plat & spring plat 5/8" 50 mm bh 16,00
Jumlah
Pembulatan
15 PONDASI COR BETON MANSET :
1 M3 COR BETON 1:2:3 :
1 Semen (PC) Zak 8,30
2 Kerikil Beton M3 0,83
3 Pasir Pasangan M3 0,54
4 Pekerja Org 6,00
5 Tukang Batu Org 1,00
6 Kepala Tukang Org 0,10
7 Mandor Org 0,30
Jumlah
Pembulatan
8 Cor Kaki Tiang Besi 11 mtr 200 daN m3 0,118
9 Cor Kaki Tiang Besi 9 mtr 100 daN m3 0,093
10 Cor Lantai Kerja Gardu 120cm x 100 cm x 10 cm m3 0,269
Jumlah
Pembulatan
16 1 M3 GALIAN TANAH BIASA SEDALAM 2 M :
1 Pekerja OH 0,667
2 Tukang Batu OH 0,333
3 Tukang Listrik OH
4 Mandor OH 0,333
Jumlah
Pembulatan
17 1 M3 GALIAN BATU CADAS SEDALAM 2 M :
1 Pekerja OH 2,500
2 Tukang Batu OH 1,250
3 Tukang Listrik OH
4 Mandor OH 1,250
Jumlah
Pembulatan
18 1 M3 URUGAN KEMBALI :
1 Pekerja OH 0,400
2 Tukang Batu OH -
3 Kepala Tukang OH -
4 Mandor OH 0,200
Jumlah
Pembulatan
19 1 M3 PEMADATAN TANAH :
1 Pekerja OH 0,250
2 Tukang Batu OH
3 Kepala Tukang OH
4 Mandor OH 0,125
Jumlah
Pembulatan
RATA2 GALIAN PER M3 NTT(1/2 CADAS+1/2 TANAH) m3 1,00
Volumer galian satu lubang tiang 11m 200 daN m3 0,45
Volumer galian satu lubang tiang 9m 100 daN m3 0,38
Mendirikan tiang 11 m 200 daN
Pekerja HO 0,50
Tukang Listrik HO 0,13
Mandor HO 0,13
Jumlah
Pembulatan
Mendirikan tiang 9 m 100 daN
Pekerja HO 0,33
Tukang Listrik HO 0,08
Mandor HO 0,08
Jumlah
Pembulatan
-
20 MENDIRIKAN TIANG 11 M 200 daN PERMANENT btg 1
21 MENDIRIKAN TIANG 9 M 100 daN PERMANENT btg 1
22 Alluminium Bending wire mtr 1
23 Joint sleeve 70 mm2 bh 1
24 Penghalang panjat bh 1
25 Tanda kilat Kecil bh 1
26 Tanda kilat Besar u. Gardu bh 1
27 Parel Grove 35-70 mm bh 1
28 Sepatu Kabel Cu 50 mm bh 1
29 Sepatu Kabel AL-CU 35-50 mm bh 1
-
PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT
JUMLAH
NO. URAIAN STN VOL HARGA
( Rp.) ( Rp.) (Rp.)
1 Suspension Assembly
1 Suspension Clamp bh 1
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 3
Jumlah
Pembulatan
2 Large Angle Assembly
1 Strain Clamp 25 - 70 bh 2
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 3
Jumlah
Pembulatan
3 Fixed Dead And Assembly
1 Strain Clamp 25 - 70 bh 1
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 2
Jumlah
Pembulatan
4 Adjustable Dead And Assembly
1 Strain Clamp 25 - 70 bh 1
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 2
6 Turn Buckle/Span Scroef bh 1
Jumlah
Pembulatan
5 Bundle Protection
1 Pipa PVC 2" 50 cm bh 1
2 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
3 Stopping bukle Bh 2
4 Link Set 2
5 End cap Set 4
Jumlah
Pembulatan
ANALISA HARGA SATUAN MATERIAL SUTR
TAHUN 2015
HARGA
SATUAN
HARGA
BAGIAN
-
PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT
JUMLAH
NO. URAIAN STN VOL HARGA
( Rp.) ( Rp.) (Rp.)
ANALISA HARGA SATUAN MATERIAL SUTR
TAHUN 2015
HARGA
SATUAN
HARGA
BAGIAN
6 Treck scoor - Guy Wire TR1 Stall drad 35 mm2 mtr 11 2 Pole band 2/2" dia 4" (45 x 4 mm) bh 1 3 Mur Baut 5/8"-50 mm +Plat+Ring Plat bh 2 4 Spanschroef/ Turn Bucle 17 KN bh 1 5 Guy isolator/tui isolator dia 8 mm bh 1 6 Cousen gegalv 8 mm2 bh 2 7 Stay road 16 mm2 panjang = 1800 mm bh 1 8 Cros by 8 mm2 bh 4 9 Beton Block 40x40x10 dengan besi penguat 8 mm bh 1
10 U bolt 16 mm + nut plat u. Beton block bh 1
Jumlah - Pembulatan -
7 Kontramast - Horizontal Guy Wire
1 Stall drad 35 mm2 mtr 26 2 Pole band 2/2, 4" (6x50) bh 2 3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 4 4 Spanschroef 3/4" / Turn Bucle 17 KN bh 2 5 Guy isolator/tui isolator bh 2 6 Wire clip/cros by 12 mm2 bh 8 7 Stay road 16 mm2 panjang = 2500 mm (anker) bh 1 8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 4
9 Beton Block 40 cmx40 cmx10 cm bh 1
10 U bolt 16 mm + nut plat u. Beton block bh 1
Jumlah -
Pembulatan -
8 Druck Schoor TR
1 Pole band galvanise 1/2 3" bh 1
2 Pole band galvanise 2/2 3" (atas) bh 2
3 Pole band galvanise 2/2 5' (bawah) u/sekang bh 2
4 Pipa galvanise Diameter 2"- panjang 1200 mm btng 1
5 Besi UNP 8 L=160 mm btng 1
6 Bolt nut + plat & spring plat 5/8' x 50 mm galv bh 9
Jumlah -
Pembulatan -
9 GROUNDING TR
1 Grounding Rod 16 mm2 L = 1750 mm bh 1
2 BC 50 mm2 Mtr 10
3 Pipa Galvanis 1/2" L= 6000 mm Btg 1
4 Klem Steinless Steel 4 titik 3 titik mtr 4
5 AL/CU 35 - 50 mm2 bh 1
6 Electroda clam cu bh 1
7 Stoping bukle bh 4
8 Link 25 x 25 bh 4
Jumlah -
Pembulatan -
10 Tap Connector 25 - 50 mm2 bh 1
11 Compression Joint 50 mm2+ heat shrink set 1
-
LVTC 3x35+1x50 mm'?= 0,900 kmsTiang besi I meter 100 dAN = 29 batans
Skala : Non Skala
GAMBAR RENCANAPEMBANGUNAN JARINGAN TEGANGAN RENDAH
DESA JADU KEC. SABU BARAT KAB. SABU RAIJUA
PT. PLN ( PERSERO ) WLAYAH NTTUNIT PELAKSANA KONSTRUKSI
K UPANG Group Distribusi
-
'q'"o
6qaCt
Skala : Non SkalaDigambar:
GAMBAR RENCANAPEMBANGUNAN JARINGAN TEGANGAN RENDAH
DESA TITINA LEDA KEC. SABU BARAT KAB. SABU RAIJUA
No. Gambar :PT. PLN ( PERSERO ) WLAYAH NTT
UNIT PELAKSANA KONSTRUKSIK UPANG Group Distribusi