    Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

    Howard IndustriesSubstation Transformer Diision

    InstructionsInstaation, Operation, and Maintenance

    of Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

  • 8/20/2019 02 - Transformer Instruction Manual

    2/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

    IMPORTANT SAFETY INFORMATION

    Read these instructions carefuy before proceeding with instaation, operation, or maintenance of this equipment.

    Medium power transformers contain extremey hazardous otages. To preent death, serious persona injury, or property

    damage, a information in these instructions shoud be read and obsered. Safe use of this equipment is dependent

    on proper instaation, operation, and maintenance procedures.

    Certain information in this manua is marked with the words DANGER, WARNING, or CAUTION. DANGER indicates an

    imminenty hazardous situation which, if not aoided, wi resut in death, serious persona injury, and property damage.

    WARNING indicates a potentiay hazardous situation which, if not aoided, coud resut in death, serious persona

    injury, and property damage. CAUTION indicates a potentiay hazardous situation which, if not aoided, may resut in

    minor or moderate persona injury, and property damage.

    Personne shoud not attempt to serice this equipment unti it has been competey de-energized and a high-otage

    and ow-otage bushing terminas hae been propery grounded.

    Ony quaied personne shoud insta, maintain, and operate this equipment. Quaied personne are those who are

    trained in the instaation, maintenance, and operation of high-otage equipment; trained in the proper use of protectie

    equipment (such as rubber goes, safety gasses, protectie cothing, hard hats, etc.); and trained in appropriate rst

    aid procedures.

    IMPORTANT INFORMATION ABOUT THESE INSTRUCTIONS

    The instructions contained herein are intended to be a genera guide for the instaation, operation, and of Howard

    Industries medium power transformers, when they are used in typica appications and are operated in norma

    enironments. Athough efforts hae been made to ensure accuracy and competeness, these instructions do not

    address eery conceiabe appication or circumstance that might be encountered. Features presented herein may

    not be present in a transformer designs. Standard and optiona features are subject to change without notice.

    Howard Industries makes no representation or warranty with respect to and assumes no responsibiity for the

    competeness, accuracy, sufciency, or usefuness of these instructions. Questions regarding instaation, operation,

    and maintenance (particuary when encountering unusua or specia circumstances not sufcienty coered by

    these instructions) shoud be directed to the Howard Industries Substation Transformer Diision.

    2

  • 8/20/2019 02 - Transformer Instruction Manual

    3/24

  • 8/20/2019 02 - Transformer Instruction Manual

    4/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

    RECEIvINg INSPECTION

    These instructions appy to medium power transformers

    manufactured by Howard Industries. It is important to

    read the safety information on Page 2 before attemptingany instaation, operation, or maintenance actiities.

    Athough a transformers, components, and accessories

    are carefuy inspected and tested prior to shipment,

    a thorough receiing inspection shoud be conducted

    to detect any damage or oss that might hae occurred

    during shipment. The receiing inspection shoud be

    done upon receipt and before unoading from the truck

    or rai car. Note any damage or discrepancies on the

    bi of ading and e a caim with the carrier, and notify

    the Howard Substation Transformer Diision prior to

    unoading the transformer.

     

    Impact RecorderImpact recorders are proided on a rai shipments

    and on some truck shipments. An impact recorder is

    a mechanica recording acceerometer that can record

    shock and impact from a directions. The impact

    recorder records on pressure sensitie chart paper each

    impact that has occurred, its magnitude, direction, and

    time of occurrence. These impacts are recorded through

    three independenty operating styi in each of three

    separate axes: ongitudina, atera, and ertica.

    The impact recorder shoud be checked for eidenceof possibe damage to the transformer due to impacts

    during shipment. This check shoud be performed prior

    to unoading the transformer. A representatie of the

    shipper shoud be present when the recorder is checked.

    Any eidence of damage shoud be noted on the bi of

    ading and signed by the shipper’s representatie before

    the transformer is accepted. Consut with the Howard

    Substation Transformer Diision if shipping damage is

    found or suspected.

    Refer to the operating manua accompanying the impact

    recorder for instructions expaining how to turn off the

    recorder and to interpret the chart. If it appears thechart recorder stopped running before arria at the na

    destination, the shutdown time shoud be noted and this

    fact shoud be brought to the attention of the shipper

    representatie and to the Howard Industries Substation

    Transformer Diision.

    Impacts in any axis of ess than 4 G’s are considered

    acceptabe. Impacts in any axis of 4 G’s or greater

    indicate rough handing that coud potentiay hae

    caused damage to the equipment. If rough handing

    is indicated, this fact shoud be noted on the shipping

    documents and brought to the attention of the shipperrepresentatie and the Howard Industries Substation

    Transformer Diision before proceeding with inspection

    of the transformer.

    Drawins and Documentslocate a shipping papers, packing ists, outine

    drawings, and other pertinent information. Use these

    documents and this instruction manua during the

    inspection.

     

    The transformer outine drawing indicates the ocations

    of namepates and warning abes, and proides physica

    dimensions and weights. The namepate proides

    eectrica characteristics, winding connections, and

    weights. The wiring diagram proides detais of contro,

    fan and aarm wiring.

     

    DO NOT REMOvE OR OBSCURE ANY WARNING lABElS

    OR NAMEPlATES.

    Externa InspectionThe foowing externa inspections shoud be made at a

    minimum.

    1. Ensure that a equipment, accessories, and

    components isted on the bi of ading are

    present.

    2. Ensure that there are no signs of externa

    damage.

    3. Ensure that the paint nish has not been

    damaged.

    4. Ensure that ttings, conduit, wiring, and other

    attachments are tight and undamaged.

    5. Check for eidence of uid eakage on the tank,

    aes, or cooing assembies.

    6. Check for damage to bushings.

    7. Check for damage to shipping crates, packages,or other materias shipped separatey from the

    transformer.

    4

  • 8/20/2019 02 - Transformer Instruction Manual

    5/24

    Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

    Tank PressureThe tank acuum/pressure gauge may indicate positie

    or negatie when the transformer is receied, depending

    on the reatie uid and ambient temperatures. This

    indicates that the transformer is seaed effectiey. If the

    acuum/pressure gauge reads zero, this may indicate

    the possibiity of a tank eak, athough a zero reading can

    occur occasionay with changing interna and externa

    temperatures. In the case of a zero reading the tank

    shoud be pressure tested according to the instructions

    on Page 14 (Pre-energization Tests and Checklist).

    Report any suspected tank eaks to the Howard

    Substation Transformer Diision.

    Moisture Test (for units shipped dry)The transformer core and coi assemby was thoroughy

    dried before shipping from the factory. Precautionswere taken to ensure that dryness is maintained during

    shipment. Since it is possibe that moisture coud

    enter the transformer tank due to mishanding or other

    causes, perform a dew point test as described beow to

    ensure the core and cois are sufcienty dry.

    A dew point measurement of the gas inside the

    transformer tank can be used to estimate dryness of the

    insuation system. Using this technique, it is assumed

    that moisture content of the gas is in equiibrium with

    the moisture content at the surface of the insuation

    materia.

    The dew point test shoud be performed as described

    beow. The easiest way to ensure reasonabe accuracy

    is to take the dew point and temperature measurements

    during the eary morning hours, when the ambient

    temperature and the insuation temperature are in

    equiibrium. The gas in the transformer tank shoud be

    at a sight positie pressure (5 PSI max.) when the dew

    point measurement is made.

    1. Use a dew point tester to measure the dew point

    of the gas inside the transformer tank.

    2. Using Chart A (Page 6), conert the dew point

    measurement to apor pressure.

    3. Measure the temperature of the insuating

    materia.

    4. Using Chart B (Page 6), estimate the moisture

    content of the insuating materia.

    5. Moisture content aboe the cure is in the

    acceptabe range. Moisture content beow the

    cure is excessie and shoud be brought to the

    attention of the Howard Industries Substation

    Transformer Diision before proceeding.

    Interna InspectionAn interna inspection of the transformer tank is

    rarey necessary and is required ony when there are

    indications that the transformer has receied seere

    impact damage during transit. If an interna inspection

    is necessary, foow the instructions on Page 10 for

    opening the transformer tank. Contact the Howard

    Substation Transformer Diision before proceeding with

    any interna inspection.

    It is important to foow a carefu receiing inspection

    program to record the condition of the transformer when

    receied and to identify the source of any damage that

    may hae occurred during shipping and handing. A

    compete inspection of the transformer and detached

    parts shoud be made as soon as possibe to identify any

    such damage.

    5

  • 8/20/2019 02 - Transformer Instruction Manual

    6/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

     

    vapor Pressure (Micrometers of Mercury)

       D   e  w   P   o   i   n   t   T   e   m   p   e   r   a   t  u   r   e   (   °   C   )

    +20

    +10

    0

    -10

    -20

    -30

    -40

    -50

    -70

    -60

    10 100 1,000 10,000

    6

    TABlE A: Conersion of dew point in degrees centigrade to apor pressure in micrometers of mercury

       I   n   s  u   l   a   t   i   o   n   T   e   m   p   e   r   a   t  u   r   e   (   °   C   )

    vapor Pressure (Micrometers of Mercury)

    10 100 1,000 10,000

    TABlE B: Moisture equiibrium chart showing acceptabe and unacceptabe moisture imits.

    +80

    +70

    +60

    +50

    +30

    +20

    +10

    0

    +40

    Acceptabe rane is aboe the cure

    Unacceptabe rane is beow the cure     `

    `

  • 8/20/2019 02 - Transformer Instruction Manual

    7/24

  • 8/20/2019 02 - Transformer Instruction Manual

    8/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

    STORAgE

    Transformer StoraeTransformers can be stored if propery prepared. It is

    recommended that stored transformers be competeyassembed. Prior to storage, transformers shoud be

    pressure tested according to the instructions on Page

    14 (Pre-energization Tests and Checklist). The gas

    space aboe insuating uid shoud be pressurized with

    dry nitrogen to a pressure of between two to three PSIG.

    This wi preent a negatie interna pressure which

    might draw moisture into the tank. Transformers not

    designed for outdoor use must be stored indoors. If

    the transformer is not competey assembed, separate

    components and accessories shoud be stored in a

    cean dry area in their origina shipping containers.

    Transformer uid containers or totes shoud be coered

    or stored in a protected area to preent exposure to

    rain water or other contaminants. Condenser bushings

    shoud be stored in an upright position.

    Extended StoraeIf the transformer is to be stored for an extended period

    of time before being paced into serice, it shoud

    be paced on a rm ee surface. The foowing test

    procedure shoud be used prior to storage (in addition

    to foowing the Receiving Inspection instructions

    on Pages 4 and 5 and Transformer Storage

    recommendations on this page).

    1. Measure and record ambient temperature andbarometric pressure (for correction of test data).

    2. Pressure test the tank using the procedure on

    Page 14 (Pre-energization Tests and Checklist)

    and check for uid eaks. Foowing pressure

    test, reduce tank pressure to two (2) PSIG.

    3. Test insuating uid for dieectric strength and

    moisture content.

    4. Test insuation with a 1000-vot or 2500-vot

    Megger test set. (Omit if bushings hae not been

    instaed.)

    5. Measure insuation power factor using Dobe or

    simiar test set. (Omit if bushings hae not beeninstaed.)

    6. Measure coi ratios in each tap position to

    ensure proper operation of the de-energized

    tap changer. (Omit if bushings hae not been

    instaed.)

    7. Obsere uid ee gauge to erify proper uid

    ee.

    Sidewa-mounted bushings, if exposed and not

    contained in a termina chamber or switch encosure,

    shoud be protected from moisture and utraioet

    damage with an appropriate coering. This coering

    shoud be checked periodicay to ensure it is intact.

    Coer-mounted bushings which are shipped separatey

    from the transformer shoud be stored in a cean,

    dry ocation in their origina shipping cartons. These

    bushings shoud be carefuy inspected for damage prior

    to instaation on the transformer.

    A space heaters (if suppied) in termina chambers,

    switch cabinets, contro cabinets or other encosures,

    must be connected and energized at a times to contro

    moisture. Desiccant packets may be used to contro

    moisture in contro cabinets ony, if it is not practica to

    energize the contro cabinet space heater. Desiccant

    packets must be repaced periodicay to maintain

    effectieness.

    It is recommended that the transformer be inspected

    periodicay as described beow whie it is in extended

    storage. Resuts shoud be recorded and compared with

    preious resuts to ensure that no damage or change in

    condition has occurred.

    Quartery InspectionThe quartery inspection described beow shoud be

    performed after the rst month of storage and then

    quartery thereafter.

    1. Inspect protectie coering on sidewa-mounted

    bushings. Repace coering if damaged.

    2. Inspect space heaters to ensure they are

    working propery. Inspect desiccant packets (if

    any) in contro cabinets; repace if necessary.

    3. Record uid-ee and pressure/acuum

    gauge readings. Ensure that tank pressure ismaintained at approximatey 2 PSIG.

    4. Measure and record ambient temperature and

    barometric pressure.

    5. If acuum/pressure gauge or uid ee gauge

    readings indicate a possibe tank eak, perform

    a tank pressure test according to instructions

    found on Page 14 (Pre-energization Tests and

    8

  • 8/20/2019 02 - Transformer Instruction Manual

    9/24

    Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

    9

    Checklist). Any eaks found shoud be repaired

    immediatey and then rechecked during

    subsequent inspections.

    6. Transformer uid containers or totes shoud be

    isuay inspected for damage and any indication

    of water intrusion or other contamination.

    Annua InspectionThe annua inspection shoud incude the foowing

    checks in addition to the quartery inspection checks

    isted aboe.

    1. Check paint nish and repair any damage.

    2. Test insuating uid for dieectric strength and

    moisture content.

    3. Test insuation with a Megger test set. (Omit if

    bushings hae not been instaed.)

    4. Check insuation power factor with a Dobe or

    simiar test set. (Omit if bushings hae not beeninstaed.)

    5. Transformer uid containers or totes shoud be

    isuay inspected for damage and any indication

    of water intrusion or other contamination.

  • 8/20/2019 02 - Transformer Instruction Manual

    10/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

    location and MountinThe transformer shoud be mounted on a ee concrete

    foundation of sufcient strength to support the weightof the competey assembed transformer. If the

    transformer is not ee, insuating uid may not circuate

    propery through the cooing assemby, possiby causing

    oerheating and reduced transformer ife. The mounting

    ocation shoud proide for adequate entiation and

    easy access for inspection. The transformer shoud be

    ocated at east 24 inches from any obstruction. When

    instaing transformers designed for indoor operation,

    adequate air inets and outets must be proided for

    proper cooing. Aoid ocating transformers in corrosie

    areas.

    Openin Transformer TankTransformers are usuay shipped seaed and shoud not

    be opened uness necessary. Opening the transformer

    wi be necessary when transformers are shipped without

    bushings, when interna ed connections are required,

    or when core ground tests are required.

    DANgER: SlOWlY RElEASE INTERNAl

    PRESSURE PRIOR TO REMOvING TANK

    ACCESSORIES. FAIlURE TO DO SO COUlD RESUlT

    IN SEvERE PERSONAl INJURY, DEATH, OR PROPERTY

    DAMAGE.

      DANgER: TO AvOID DEATH FROM

    SUFFOCATION NEvER AllOW ANYONE TO

    ENTER THE TRANSFORMER TANK UNlESS AN

    ANAlYSIS OF THE AIR IN THE TANK SHOWS AT lEAST

    19.5% OXYGEN. THE GAS SPACE IN AN OPERATING

    TRANSFORMER USUAllY CONSISTS OF NITROGEN

    GAS. WHENEvER ANYONE IS IN THE TANK, A

    PERSON SHOUlD BE STATIONED AT THE MANHOlE

    OUTSIDE THE TANK TO ENSURE SAFETY OF THE

    PERSON INSIDE.

    Transformer shoud not remain open for more than24 hours at a time. If work is interrupted, the tank

    shoud be reseaed, eacuated, and ed with dry air or

    nitrogen.

    To preent contamination of the transformer tank, do

    not open the transformer in an unprotected area during

    incement weather or where the air may contain dirt

    or other partices. Either of the aboe coud cause

    a transformer faiure. The tank opening shoud be

    protected against entry of foreign matter.

    If it is necessary to remoe some uid from the tank to

    aow for inspection or other work, the transformer mustbe reed with uid after work is competed.

    Personne shoud not be permitted on top or inside the

    transformer whie it is open uness they hae emptied

    a pockets and checked for oose objects that might fa

    into the tank. A toos shoud be accounted for after

    work is competed. It is recommended that any toos

    used on top of the transformer or inside the tank be

    attached with safety cords to preent them from being

    ost inside the transformer.

    Personne must not stand directy on any eectrica

    insuation. Cean drop coths shoud be used under

    working areas in the transformer to preent objects from

    dropping into the core/coi assemby.

    The foowing procedure shoud be used to remoe the

    manhoe coer.

    1. Thoroughy cean the manhoe coer.

    Remoe a moisture, dirt, and grease to

    aoid contaminating the transformer’s uid

    compartment.

    2. Reiee interna tank pressure by manuay

    operating the pressure reief ae.

    3. Remoe coer fasteners.

    4. Genty pry the coer upward, making sure that

    the coer gasket does not fa into the tank. lift

    the coer erticay to preent damage to coer,

    bots, and gasket.

    5. Remoe the gasket sections from the manhoe

    ange. Record the ocation and orientation of

    each gasket piece, so they can be reinstaed

    correcty.

    The foowing procedure shoud be used to reinsta the

    manhoe coer.

    1. Pace gasket sections in their origina positionsand orientations.

    2. Reinsta manhoe coer. Reinsta fasteners

    and torque to 25 ft-bs. After tightening a

    fasteners, re-torque each one to ensure proper

    torque.

    3. Remoe the pressure reief ae and pressurize

    the headspace and check for uid eaks. Do not

    exceed 7 PSIG during this test. This pressure

    shoud be maintained for at east four hours.

    INSTAllATION

    10

  • 8/20/2019 02 - Transformer Instruction Manual

    11/24

    Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

    11

    When interna work is being done on the transformer,

    dry air shoud be used to entiate the inside of the tank.

    Dry air can be obtained in high-pressure cyinders or

    from desiccant-type air-drying equipment. When using

    dry air, the foowing precautions shoud be obsered.

    1. The temperature of dry air entering thetransformer shoud equa to or greater than the

    temperature of the transformer uid and at east

    10°F higher than the dew point of the ambient

    air.

    2. The dry air ow shoud be directed so as to

    continuousy purge the transformer gas space.

    3. The dew point in the tank gas space shoud

    neer exceed 20°F.

    Whie the tank is open, the foowing tests shoud be

    conducted.

    1. A ratio test shoud be made on a windingsand on each tap position. Contact the Howard

    Industries Substation Transformer Diision if any

    measurement is off-ratio by more than 0.5%.

    2. Insuation resistance of each winding to a

    other windings and from each winding to ground

    shoud be measured. (Coi windings must be

    competey coered with uid.) Record the

    temperature of the uid. These readings shoud

    be comparabe with factory measurements.

    3. Disconnect the core ground connection, when

    accessibe, on core-form transformers and

    measure the resistance from the core to thetank or end frames, using a 1000-vot Megger

    test set. The resistance shoud exceed 100

    megohms if the core is not coered with uid or

    200 megohms if the core is coered with uid.

    When the interna inspection is compete, resea the

    tank and re with uid (if any was remoed prior to

    inspection). The gas space shoud be ed with dry

    air or dry nitrogen. Contact the Howard Substation

    Transformer Diision if any interna damage is found

    during the interna inspection.

    Instaation of Detachabe RadiatorsWhen radiators are shipped detached, they shoud be

    instaed according to the instructions beow.

    1. verify that a aes on the tank are in the

    cosed position.

    2. Remoe shipping pates from the aes on the

    tank and from the radiator anges. Take care

    not to damage gaskets.

    3. Inspect for moisture and contamination

    inside the radiator headers. Contact the

    Howard Substation Transformer Diision if any

    contamination is found.

    4. Cean a mating surfaces on the tank aes

    and radiator anges and appy a sma amount

    of petroeum jey to the gaskets on the tank

    ae anges to hod them in pace during

    instaation of the radiators.

    5. lift the radiators into position using the ifting

    eyes on top of the radiators and aign hoes

    in the radiator anges with hoes in the ae

    anges. If fans are proided, attach the

    radiators haing fans rst, then attach the other

    radiators.

    6. Insert bots in the top and bottom anges, with

    bot heads adjacent to the transformer tank.

    7. Tighten bots eeny, aternating across corners,

    unti meta-to-meta tightness is achieed at a

    four corners of each ange.

  • 8/20/2019 02 - Transformer Instruction Manual

    12/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

    Fiin Instaed Radiators with FuidFoow the steps beow to instaed radiators with

    insuating uid.

      DANgER: TRANSFORMER OIl SHOUlD

    AlWAYS BE HANDlED AS A FlAMMABlE FlUID.

    SEAlED TRANSFORMER TANKS MAY UNDER SOME

    CONDITIONS ACCUMUlATE EXPlOSIvE GASES, AND

    HANDING OF TRANSFORMERS MAY GENERATE

    STATIC ElECTRICITY. SAFETY PRECAUTIONS BEFORE

    OIl-FIllING OR FIlTERING SHOUlD INClUDE

    PURGING All GAS SPACES WITH NITROGEN AND

    GROUNDING THE TRANSFORMER, All BUSHINGS,

    AND All OIl HANDlING EQUIPMENT. FAIlURE TO DO

    SO COUlD RESUlT IN SEvERE PERSONAl INJURY,

    DEATH, OR EQUIPMENT DAMAGE.

    WARNINg: TRANSFORMERS SHOUlD NOT BE

    lEFT UNDER vACUUM EXCEPT DURING THE

    vACUUM FIllING OPERATION. THE TANK SHOUlD

    BE UNDER POSITIvE PRESSURE DURING PERIODS

    OF RAIN OR HIGH HUMIDITY IN ORDER TO PREvENT

    MOISTURE FROM BEING DRAWN INTO THE TANK.

    FAIlURE TO FOllOW THESE PRECAUTIONS COUlD

    RESUlT IN SEvERE PERSONAl INJURY, DEATH, OR

    EQUIPMENT DAMAGE.

    Eery container or tote of transformer uid used in the

    ing process shoud be isuay inspected and tested

    for water and other possibe contaminants beforeproceeding with the ing process.

    During the process do not aow the uid ee to drop

    beow the top of the core and coi assemby. If the

    uid ee in the transformer becomes too ow, stop the

    radiator ing procedure and add uid to the tank before

    competing the ing process.

    1. loosen the top header pugs and sowy open

    the bottom radiator aes one at a time to start

    the ow of uid.

    2. Add uid to the tank if necessary during the

    process to maintain uid ee in the tank at its

    proper ee.

    3. After the radiators are ed, open the top

    radiator aes.

    4. Remoe the top header pugs and reinsta them

    using Teon pipe thread tape.

    5. Ensure that top and bottom radiator aes on

    each radiator are in the fu “OPEN” position.

    6. Obsere the uid ee gauge and ensure that

    the uid ee is correct. If the ee is ow, add

    uid to the tank.

    Instaation of Hih-votae BushinsTransformers are usuay furnished with draw-ead or

    condenser type high-otage bushings. If bushings

    were remoed prior to shipment and shipped separatey

    from the transformer, insta them according to the

    instructions beow.

      WARNINg: DO NOT OvERSTRESS BUSHINGS

    WHEN MAKING CONNECTIONS TO AvOID

    DAMAGE. DAMAGED BUSHINGS COUlD CAUSE

    SEvERE PERSONAl INJURY, DEATH, OR PROPERTY

    DAMAGE.

    Instaation of Draw-lead BushinsIf draw-ead type bushings are furnished, insta each

    bushing as foows.

    1. Remoe the bind ange coering the bottom

    end of the bushing.

    2. locate and uncoi the draw ead.

    3. Insta the gasket suppied with the bushing to

    the bushing boss. For cork-neoprene gaskets,

    appy a uniform coating of gasket cement to

    the gasket area of the bushing boss and to the

    bottom of the gasket. Aow cement to become

    tacky and then position gasket on the bushing

    boss. Then appy a thin coating of petroatumto the top surface of the cork-neoprene gasket.

    For nitrie or iton gaskets, appy a thin coating

    of petroeum jey to the bottom surface of the

    gasket and pace the gasket in the center of the

    gasket area on the bushing boss.

      WARNINg: WHEN APPlYING GASKET

    CEMENT, KEEP All SPARKS AND FlAMES

    AWAY FROM WORK AREA. AvOID BREATHING lARGE

    QUANTITIES OF vAPOR AND AvOID CONTINUOUS OR

    EXCESSIvE CONTACT WITH SKIN. FAIlURE TO DO SO

    COUlD RESUlT IN SEvERE PERSONAl INJURY OR

    DEATH.

    4. Insert a sh wire through the bushing porceain

    and attach the bottom end of it to the top of the

    termina on the end of the draw ead.

    5. Straighten the draw ead, so that it is free of

    twists and kinks.

    12

  • 8/20/2019 02 - Transformer Instruction Manual

    13/24

    Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

    13

    6. Using the sh wire, carefuy pu the draw-ead

    through the bushing, taking care not to damage

    the insuation on the ead.

    7. Insta the bushing mounting hardware and

    fuy tighten by aternatey tightening opposite

    corners. For bushings with porceain ange and

    camping ange, torque hardware to 8 ft-bs.

    For bushings with meta ange, tighten unti the

    bushing ange has contacted the bushing boss

    and ock washers are attened.

    8. Rotate the termina unti the stee pin pressed

    in the draw ead seats in the sot inside the

    porceain top end. With the pin seated in the

    grooe, approximatey 1/2 inch of thread shoud

    protrude aboe the porceain top. If the ead

    appears to be too short, a probem may exist

    that shoud be corrected before proceeding.

    9. Appy a thin coating of petroeum jey to the topsurface of the termina cap seaing gasket and

    press the coated surface into the gasket recess

    in the termina cap.

    10. Remoe the sh wire taking care to preent

    the draw ead from sipping back inside the

    porceain bushing.

    11. Insta the termina cap on the draw ead

    termina and hand tighten, being carefu to

    keep the stee pin seated in the sot inside the

    porceain top.

    12. verify that the gasket is propery seated and the

    termina cap is centered on the porceain.

    13. Torque the termina cap to 35 ft-bs.

    14. Test for gasket eaks by pressurizing the

    transformer with dry air or nitrogen to a

    pressure of approximatey 2-3 PSIG and

    appying a soap bubbe soution.

    Instaation of Condenser BushinsIf condenser type bushings are furnished, insta them

    according to the instruction iterature shipped with the

    bushings. These instructions wi coer instaation

    maintenance, and use of the power factor test termina.

    vacuum Oi Fi ProcessThis procedure is for the acuum oi ing of a

    transformer. This procedure appies for transformers

    which hae been shipped dry air ed. It aso appies

    if the oi ee in the transformer has been owered to

    a ee that exposes part or a of the cois to air at anytime during the instaation of the transformer.

    1. Check a radiators to be sure the radiator aes

    are in the open positions and to erify that a

    the radiator anges are tightened.

    2. Check a high otage bushing bot anges and

    a ow otage bushing bot anges and be sure

    a are propery tightened.

    3. If the manhoe access coer has been remoed

    for any reason erify that the bots securing the

    manhoe coer(s) are propery tightened.

    4. Connect the acuum pump suction ine to the

    tank coer tting. If the transformer has an OlTC

    then acuum must be appied to the OlTC tank

    at the same time as the main tank is acuumed.

    Connect acuum ines and pu a acuum on the

    OlTC tank.

    5. Connect the oi ine to the tank at the bottom

    drain ae connection.

    6. Start the acuum pump.

    7. When the acuum ee inside the tank reaches

    500 microns (500 miiTorr) start timing and

    when this acuum ee has been maintained for

    24 hours the oiing may be started. Oiing

    rate to be 30 – 40 gpm.

    8. Continue to unti the oi gauge registers

    sighty aboe the 25 C oi ee.

    9. After the oi ing has been competed continue

    to hod the acuum ee for 1 additiona hour.

    10. The acuum pump may now be stopped. Use

    dry nitrogen to ent the transformer tank.

    11. After the transformer has been ed with oi

    it shoud be aowed to sit for 24 hours before

    energizing in order to aow bubbes of gas

    (which hae been pued out of soution by the

    acuum ing process) to be reabsorbed by the

    oi.

    12. At any time during the instaation of the

    transformer if the oi ee in the transformer

    has been owered to a ee that exposes part or

    a of the cois to air, the oi must be competey

    remoed and the aboe procedure foowed.

  • 8/20/2019 02 - Transformer Instruction Manual

    14/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

    14

    Instaation of Sure ArrestersSurge arresters shoud be instaed according to the

    foowing instructions and the outine drawing.

      WARNINg: FAIlURE TO FOllOW THESE

    INSTRUCTIONS COUlD RESUlT IN SEvEREPERSONAl INJURY, DEATH, OR EQUIPMENT DAMAGE.

    1. Carefuy unpack and inspect surge arresters for

    damage.

    2. When instaing arresters, a mounting feet

    must be ush with the mounting surface before

    tightening bots. Use shims if necessary.

    3. Do not cimb or stand on arrester. Do not pace

    undue mechanica stress on arrester.

    4. Use ony the ifting deices proided on the

    arrester for ifting.

    5. Arrester exhaust ports (if suppied) must be

    oriented so that exhaust wi be directed away

    from other arresters and other equipment.

    Instaation of Air Termina Chamber and

    15 Kv and 5 Kv Switchear AdaptersAir termina chambers are designed to protect

    personne from high otages and to proide a cean, dry

    enironment for bushings. Air termina chambers must

    be instaed according to instructions on the drawing.

    Refer to transformer outine drawing, detai drawing, and

    station pan drawing.

      WARNINg: IMPROPER INSTAllATION OF

    CONNECTING CHAMBERS AND ADAPTERS

    MAY AllOW WATER OR OTHER CONTAMINANTS

    TO CONTACT lIvE PARTS, POSSIBlY RESUlTING IN

    SEvERE PERSONAl INJURY, DEATH, OR PROPERTY

    DAMAGE.

    Securey attach the exibe connectors to the switchgear

    bus bars (The number of exibe connectors suppied

    is determined by the transformer current and not

    by the current rating of the bus bar.). Check theength of exibe connectors and ensure that there is

    approximatey 0.375 inch (10 mm) of sack. This wi

    permit some moement of the bus bars to aow for

    expansion and contraction and possibe setting of the

    transformer. Securey attach the ground bus connection

    between the transformer and switchgear. Before

    reinstaing the adapter housing, check for adequate

    eectrica cearances as indicated on the outine drawing

    and check tightness of connections and supports.

    Compete the instaation by assembing the housing.

    Insta the adjustabe pate and ensure proper gasket

    seaing of the switchgear throat.

    Pre-enerization Tests and CheckistThe foowing tests and checks shoud be performed at

    a minimum to ensure that the transformer is ready to

    be energized. Do not energize the transformer without

    performing these tests and checks.

    1. Insuating Fuid Test. Draw a uid sampe and

    test its dieectric strength. Dieectric strength of

    new uid shoud be 26 kv or greater.

    2. Pressure Test. Check the transformer tank for

    eaks by pressurizing the tank with dry air or

    dry nitrogen through the pressure test tting toa pressure of 3 to 4 PSIG. let the tank stand

    under pressure for one to two hours, then

    examine the tank and ttings for eaks. leaks

    aboe the uid ee can be detected by appying

    soap soution to a weds, joints, pipe ttings,

    and cabe connections. Upon competion of this

    test, reduce the interna pressure to 1 or 2 PSIG.

    3. Insuation Megger Test. Perform a 1000-vot

    Megger test and a power factor test to ensure

    that none of the windings is grounded.

    4. Ratio Test. Perform a ratio test at each tap

    position to ensure that transformer coi ratios

    and tap changer connections are correct.

    5. Continuity Test and Resistance Test. Perform

    a continuity check on each winding. Measure

    the winding resistance of each winding and

    compare resuts to factory test aues. An

    increase of more than 10% coud indicate a

    oose interna connection.

  • 8/20/2019 02 - Transformer Instruction Manual

    15/24

    Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

    15

    6. line Connections. In preparation for making

    ine connections, check to make sure that

    a mating connector surfaces are cean and

    smooth. Connections must be tightened

    appropriatey to preent oerheating and

    possibe subsequent faiure of the connection.Connections to shoud be made with care to

    aoid pacing undue stress on the bushings.

    Refer to bushing connection information on

    Pages 12 and 13.

    7. Tap Changer Setting. Check the tap changer

    setting to ensure it is set to the proper position

    for the required otage.

    8. Deta/Wye and Series/Mutipe Switch Settings.

    Check deta/wye and series/mutipe switch

    settings to make sure they are set correcty. If

    these connections are made using an interna

    termina board, check to ensure that theseconnections are made propery according to

    the chart on the transformer namepate. If

    the transformer is equipped with an interna

    termina board, refer to Page 10 for instructions

    and warnings prior to opening tank.

    9. Grounding. Check to ensure that the

    transformer tank is permanenty and effectiey

    grounded. The transformer tank ground pad is

    ocated near the bottom of the tank.

    10. Wiring. Check wiring of contro and aarm

    circuits (if proided) to make sure there are no

    oose connections and no damage to insuation.11. Fuid lee. Check to make sure the uid

    ee as indicated by the uid ee gauge is as

    indicated on Page 17.

    12. Tank Finish. Check a painted surfaces to

    make sure that there is no damage or corrosion.

    13. Boted Connections. Check a boted

    connections for tightness.

    14. Toos. Check to make sure that a toos and

    equipment are accounted for and hae been

    remoed from the transformer.

    15. Fuid Temperature. Read the uid temperature

    gauge and make sure the temperature is noower than minus 20°C before the unit is

    energized.

  • 8/20/2019 02 - Transformer Instruction Manual

    16/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

    Refer to the outine drawing for a ist of accessories

    furnished with the transformer.

    Transformer NamepateA namepate is suppied on each transformer according

    to ANSI standard C57.12.00. The namepate proides

    certain physica and eectrica information about the

    transformer.

    Contro CabinetRefer to the wiring diagram for a description of eectrica

    circuits inside the contro cabinet. Use caution when

    testing aarm switches to preent damage to the switch.

     

    DANgER: THE CONTROl CABINET

    CONTAINS DANGEROUS vOlTAGES. DE-

    ENERIGZE THE CONTROl CABINET vOlTAGE

    SUPPlY PRIOR TO PERFORMING WORK INSIDE THE

    CONTROl CABINET OR ON EXTERNAl ACCESSORIES

    CONNECTED TO EQUIPMENT WITHIN THE CONTROl

    CABINET. FAIlURE TO DO SO COUlD RESUlT IN

    SEvERE PERSONAl INJURY, DEATH, OR PROPERTY

    DAMAGE.

    Aarm Switch Ratins

    When contro wiring or aarm contacts are proided, referto the contro wiring diagram, or the outine drawing for

    contact type, contact ratings, and termina ocations.

    Current TransformersCurrent transformers (if proided) are mounted inside

    the transformer tank around the transformer ine eads.

    For coer-mounted bushings, current transformers are

    ocated underneath the transformer coer. For tank-wa

    mounted bushings, current transformers are usuay

    ocated on top of the core and coi assemby. Current

    transformer eads are aways terminated inside a

     junction box. Refer to the transformer wiring diagram toidentify the wire markings. Current transformer eads

    are aways shorted and grounded to the tank at the

    factory before shipment.

    WARNINg: CURRENT TRANSFORMER

    SECONDARIES MUST BE CONNECTED TO A

    lOAD OR SHORT CIRCUITED TO AvOID DAMAGING

    vOlTAGES AT THE TERMINAlS. FAIlURE TO MAKE

    THESE CONNECTIONS COUlD RESUlT IN SEvERE

    PERSONAl INJURY, DEATH, OR PROPERTY DAMAGE.

    Pressure/vacuum gaueThe pressure/acuum gauge indicates the pressure in

    the tank gas space reatie to atmospheric pressure.

    The pressure wi normay ary as a function of

    transformer temperature. If the transformer is ighty

    oaded or de-energized during times of ow ambient

    temperature, the gauge may indicate a negatie

    pressure.

    Pressure/vacuum gauges can be suppied with an

    optiona aarm/signa switch. Refer to the schematic

    wiring diagram furnished with the transformer.

      WARNINg: IF THE PRESSURE/vACUUM

    GAUGE CONSTANTlY READS ZERO UNDERvARYING lOAD AND AMBIENT CONDITIONS,

    THE TRANSFORMER SHOUlD BE CHECKED FOR

    A POSSIBlE TANK lEAK. A lEAK WIll AllOW

    MOISTURE AND AIR TO ENTER THE TRANSFORMER,

    WHICH COUlD DEGRADE THE INSUlATION AND

    FlUID. lEFT UNREPAIRED, lEAKS COUlD lIMIT

    TRANSFORMER lIFE OR CAUSE A vIOlENT FAIlURE

    THAT COUlD RESUlT IN SEvERE PERSONAl INJURY,

    DEATH, OR EQUIPMENT DAMAGE.

    Automatic Pressure Reief DeiceMedium power transformers are usuay furnished with

    a weatherproof, coer-mounted automatic pressure

    reief deice (PRD) to reiee excessie tank pressures

    that might occur during operation of the transformer.

    The deice consists of a sef-resetting, spring-oaded

    diaphragm and a isua indicating ag. When gas

    pressure in the tank exceeds the PRD’s specied imit,

    the gas pressure wi open the diaphragm, ent the

    excess pressure, and trip the isua indicating ag.

    After the interna pressure decreases beow the PRD

    resea rating, the ae wi automaticay cose and

    resea the transformer. The isua indicating ag mustbe manuay reset. The cause of PRD actiation shoud

    aways be inestigated, since pressure enting indicates

    a potentia probem inside the transformer.

    COMPONENTS AND ACCESSORIES

    16

  • 8/20/2019 02 - Transformer Instruction Manual

    17/24

    Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

    17

    Winding temperature gauges can be suppied with an

    aarm/signa switch. Refer to the schematic wiring

    diagram furnished with the transformer.

    Therma Oeroad ReayTransformers may be suppied with a therma oeroad

    reay, which is simiar in operation to the winding

    temperature gauge described aboe. The reay proides

    aarm/signa contacts that cose at approximatey 100%

    and 110% rated oad.

    Rapid Pressure Rise ReayThe optiona Rapid Pressure Rise Reay (RPRR) monitors

    the rate of pressure rise in the transformer’s gas space

    and signas when the rate exceeds a safe threshod.

    This signa can trigger circuit breaker operation to de-

    energize the transformer and can send an aarm. The

    RPRR wi not be actuated by norma pressure ariationsduring operation of the transformer. A sea-in reay

    atches the output reay and iuminates an indicator

    amp unti the unit is manuay reset. The sea-in reay

    and associated circuitry is mounted in a separate contro

    cabinet.

    If the RPRR has actiated, interna arcing has ikey

    occurred in the transformer tank, and the cause of such

    arcing must be inestigated. The foowing steps are

    suggested to determine the extent of damage to the

    transformer, in any.

    1. Using a combustibe gas detector, check for

    combustibe gas products of decompositionin the gas space. Refer to the operating

    instructions that came with the gas detector.

    2. Test the RPRR and sea-in reay pane to make

    sure they are operating propery. Refer to

    instructions furnished with RPRR and sea-in

    reay pane.

    3. Test for insuation power factor, insuation

    resistance tests, and transformer turns ratio.

    4. Remoe the manhoe coer and inspect the tank

    interior for appearance and sme. (A burning

    odor may be present.)

    5. Make any other tests which may be appropriate

    considering resuts of the tests isted aboe.

      WARNINg: DO NOT ATTEMPT TO

    DISASSEMBlE A PRESSURE RElIEF DEvICE.

    TO DO SO COUlD RESUlT IN EQUIPMENT DAMAGE

    AND SEvERE PERSONAl INJURY.

    PRD’s can be suppied with an optiona aarm/signaswitch. Refer to the schematic wiring diagram furnished

    with the transformer.

    Fuid lee gaueThe uid ee gauge indicates the uid ee inside the

    tank. The transformer tank is ed with uid at the

    factory to the norma ee at a reference temperature of

    25°C.

    Fuid Temperature gaueThe uid temperature gauge indicates the uid

    temperature at the top of the uid coumn. Thetemperature gauge is mounted in a dry, eak proof

    we, permitting remoa of the gauge without owering

    the uid ee in the tank. The gauge is furnished with

    a resettabe drag-hand pointer which indicates the

    maximum temperature reached since it was ast reset.

    The drag-hand can be reset by rotating the magnet at

    the center of the dia or, on some modes, by pressing a

    reset button.

    During norma operation the uid temperature

    gauge shoud read ess than the sum of the ambient

    temperature and the rated temperature rise. For

    exampe, a 50°C gauge reading at an ambient

    temperature of 25°C yieds a top oi temperature of

    75°C, which is beow the transformer’s 85°C rated

    temperature rise.

    Windin Temperature gaueTransformers may be furnished with a gauge that

    dispays estimated winding hot-spot temperature. The

    gauge uses a probe that measures the temperature of

    the transformer uid pus auxiiary heat from a heating

    eement that is energized by a current transformer

    mounted inside the transformer tank.

    The gauge’s temperature probe is mounted in a dry we,

    permitting remoa of the gauge without owering the

    uid ee. The gauge is furnished with a resettabe drag-

    hand pointer that indicates the maximum temperature

    reached since it was ast reset. The drag-hand can be

    reset by rotating the magnet at the center of the dia, or

    on some modes, by means of a pushbutton.

  • 8/20/2019 02 - Transformer Instruction Manual

    18/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

    18

    Transformer Cooin FansOptiona cooing fans may be proided to increase

    the transformer oad capabiity without oerheating

    the transformer windings. Operation of the fans is

    controed by a contact in the uid temperature gauge

    or winding temperature gauge (when furnished) andby an “auto/manua” contro switch. Contros for the

    fans are contained in a contro cabinet mounted on the

    transformer.

    DANgER: AlWAYS DE-ENERGIZE THE FAN

    CIRCUIT WHEN INSTAllING OR PERFORMING

    MAINTENANCE ON FANS. IN ADDITION, DE-ENERGIZE

    THE TRANSFORMER WHEN IT IS POSSIBlE TO COME

    ClOSE TO ElECTRICAllY CHARGED/lIvE PARTS.

    FAIlURE TO DO SO COUlD RESUlT IN SEvERE

    PERSONAl INJURY OR DEATH. FAN GUARDS ARE

    FURNISHED AND INSTAllED AT THE FACTORY TO

    PREvENT ACCIDENTAl CONTACT WITH ROTATING FAN

    BlADES. DO NOT REMOvE FAN GUARDS OR AllOW

    PERSONNEl TO REACH INSIDE A GUARD. DOING SO

    CAN RESUlT IN SERIOUS PERSONAl INJURY AND

    EQUIPMENT DAMAGE.

    The auto/manua switch determines the mode of

    operation for the fan motors. When the switch is in

    the “manua” position, fans wi operate continuousy.

    When the switch is in the “auto” position, fans wi

    be automaticay controed by contacts in the uid

    temperature gauge or winding temperature gauge.Refer to the schematic wiring diagram proided with the

    transformer.

    Fan motors are proided with therma oeroad

    protection. The oeroad protection is usuay contained

    within the motor. Howeer, if the motors are ocated in a

    hazardous ocation, the oeroad protection deice may

    be ocated in the contro box. Refer to the wiring diagram

    proided with the transformer.

    Fan motors hae permanenty seaed ba bearings

    and do not normay require maintenance, except as

    expained on Page 20.

    When fan assembies are instaed by the user, it

    is important to permanenty remoe the drain pug

    from the motor housing of each motor. This wi aow

    condensation to drain from the motor housing.

    De-Enerized Tap ChanerThe de-energized tap changer may be used to adjust the

    otage ratio of a transformer whie it is de-energized.

    It is intended to aow adjustment of the output

    (secondary) otage to the rated aue. Do not use the

    tap changer to raise or ower the output otage to anyotage other than that indicated on the transformer

    namepate. If the tap changer is set to proide an output

    otage different from rated otage, a high noise ee,

    high core oss, and core saturation may resut.

    DANgER: DO NOT OPERATE A DE-ENERGIZED

    TAP CHANGER UNlESS THE TRANSFORMER IS

    TOTAllY DE-ENERGIZED. FAIlURE TO DO SO WIll

    RESUlT IN DAMAGE TO THE TRANSFORMER AND

    COUlD RESUlT IN SEvERE PERSONAl INJURY OR

    DEATH. DO NOT RE-ENERGIZE THE TRANSFORMER

    UNlESS THE TAP CHANGER IS FIRMlY lOCKED INTO

    POSITION.

    The tap changer is operated by use of a rotating

    hande ocated on the outside of the transformer tank.

    Neer operate a de-energized tap changer whie the

    transformer is energized. Tap changers normay hae

    e or seen tap positions as indicated on the tap

    changer dia pate and the transformer namepate. A

    ocking mechanism is proided to ock the tap changer

    in position and preent accidenta operation. Do not

    re-energize the transformer unti the tap changer is rmy

    ocked into a tap position.

    The transformer is shipped from the factory with the tap

    changer in the rated otage position, uness otherwise

    specied by the customer.

    Dua-votae or Deta/Wye SwitchTransformers designed with dua-otage windings or

    reconnectabe deta/wye windings as indicated on the

    namepate are proided with a de-energized two-position

    dua-otage or deta/wye switch. The transformer must

    be competey de-energized before operating the switch.

    If the transformer is not de-energized before operating

    the switch, permanent damage wi resut.

      WARNINg: DO NOT OPERATE DUAl-vOlTAGE OR

      DElTA/WYE SWITCH UNlESS THE

    TRANSFORMER IS TOTAllY DE-ENERGIZED.

    FAIlURE TO DO SO WIll RESUlT IN DAMAGE TO THE

    TRANSFORMER AND COUlD RESUlT IN SEvERE

    PERSONAl INJURY OR DEATH. DO NOT RE-ENERGIZE

    THE TRANSFORMER UNlESS THE DUAl-vOlTAGE

    OR DElTA/WYE SWITCH IS FIRMlY lOCKED INTO

    POSITION.

  • 8/20/2019 02 - Transformer Instruction Manual

    19/24

    Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

    On-load Tap ChanerSome transformers are proided with an on-oad tap

    changer that can change taps whie under oad, thereby

    reguating the output otage. A user-programmabe

    contro unit automaticay operates the on-oad tap

    changer to maintain the seected output otage. Referto the manua proided with the on-oad tap changer for

    warnings and for operating and maintenance

    instructions.

    Hih-votae BushinsTransformers are normay suppied with draw-ead

    or condenser type high-otage bushings. If bushings

    were remoed for shipment, insta draw-ead bushings

    according to instructions found on Pages 12 and 13,

    and insta condenser-type bushings according to

    instructions furnished with the transformer.

     

    WARNINg: DO NOT EXCEED THE CANTIlEvER

      lOAD RATING OF THE BUSHING. GREATER

    lOADS MAY CAUSE BUSHING DAMAGE THAT COUlD

    RESUlT IN SEvERE PERSONAl INJURY, DEATH, OR

    PROPERTY DAMAGE.

    Draw-ead bushings usuay require no maintenance

    except as described on Page 20. Maintenance

    instructions for condenser-type bushings are furnished

    with the bushings.

    low-votae BushinsTransformers are normay suppied with cast resin or

    porceain draw-ead bushings. These bushings usuay

    require no maintenance except as recommended on

    Page 20.

    Sure ArrestersTransformers may be furnished with optiona distribution

    cass, intermediate cass, or station cass surge

    arresters. Arresters are shipped separatey from the

    transformer to preent damage. Upon deiery, unpack

    the arresters and carefuy inspect them for damage,especiay the porceain components. Insta surge

    arresters according to instruction found on Page 14.

    19

    RadiatorsTransformers are furnished with radiator assembies

    (usuay pane type) to dissipate heat from the

    transformer. Cooing fans may aso be furnished to

    proide additiona oading capabiity without oerheating

    the transformer. Radiator assembies may be shippedseparatey from the transformer to reduce the shipping

    size of the transformer and to preent damage. When

    radiators are shipped unattached, they shoud be

    instaed in the ed according to the instructions on

    Pages 11 and 12.

  • 8/20/2019 02 - Transformer Instruction Manual

    20/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

      DANgER: THE TRANSFORMER MUST BE

    DE-ENERGIZED BEFORE BEGINNING ANY

    MAINTENANCE WORK. FAIlURE TO DO SO COUlD

    RESUlT IN SEvERE PERSONAl INJURY, DEATH, OR

    PROPERTY DAMAGE.

    It is the responsibiity of the owner to inspect, maintain,

    and keep the transformer in proper operating condition.

    Report a faiures during the warranty period to the

    Howard Substation Transformer Diision. A warranty

    repairs must be made or approed by the Howard

    Substation Transformer Diision.

     

    WARNINg: TANK lEAKS MUST BE REPAIREDIMMEDIATElY UPON DISCOvERY. FAIlURE TO

    DO SO COUlD RESUlT IN SEvERE PERSONAl INJURY,

    DEATH, OR PROPERTY DAMAGE.

    Periodic Tests and InspectionsThe foowing periodic tests and inspections are

    recommended for routine maintenance of the

    transformer.

    1. Gauge readings (one month after initia

    energization and annuay thereafter). Gauge

    readings, ambient temperature, and kvA

    oad shoud be measured and recorded. Anyabnorma reading suggests that further

    diagnostic testing or inspection shoud be

    done. If pressure/acuum gauge and/or

    uid ee gauge readings suggest a possibe

    tank eak, perform a pressure test according

    to instructions found on Page 14 (Pre-

    energization Tests and Checklist). Tank eaks

    must be repaired immediatey to preent serious

    damage to the transformer and danger to ife.

    2. Cooing fans (annua). Check the cooing fans

    (if any) by setting the fan “auto/manua” contro

    switch to the “manua” position. The fansshoud rotate at fu speed within approximatey

    e seconds. The fans shoud rotate smoothy

    with minima ibration.

    3. Contro wiring (annua). Contro wiring shoud be

    checked to insure that wire insuation is in good

    condition. The contro cabinet and associated

    conduit shoud be inspected to ensure that

    weather seas are intact. Contro power suppy

    otage shoud be checked and compared to the

    otage stated on the wiring diagram.

    4. Paint nish (annua). Inspect the paint nish for

    damage or weathering that exposes the primer

    coat or bare meta. Repair any paint damage

    that might be found.

    5. Fuid dieectric test (annua). Sampe the

    insuating uid as described beow. The

    dieectric strength of the insuating uid shoud

    measure at east 26 kv.

    6. Bushing and surge arrester insuators (annua).

    Bushing and surge arrester insuators shoud be

    cean. If the surfaces are excessiey dirty, they

    shoud be ceaned whie the transformer is not

    energized.

    7. Bushing terminas (one month after initia

    energization and annuay thereafter). If the

    transformer is energized and under oad,

    measure bushing termina temperatures

    using an infrared scanner. Excessie bushing

    termina temperature indicates a oose or dirty

    connection. If the transformer is not energized,

    use a torque measuring deice to make sure

    termina connections are tight.

    Sampin of Insuatin FuidTransformers are ed with insuating uid, which

    proides eectrica insuation within the transformer

    tank and transfers heat generated in the cois to thetank wa and radiators. The uid is either conentiona

    transformer oi (minera oi), Enirotemp® FR3 uid, or

    siicone uid.

    Periodicay check the transformer for proper uid ee

    by reading the uid ee gauge. Add uid if necessary.

    When adding uid, add ony the same type uid that is in

    the transformer.

    It is aso recommended that a uid sampe be drawn

    annuay and tested for dieectric strength. Sampes

    shoud be drawn from the bottom of the tank. Use

    proper samping procedures to preent erroneous test

    resuts. Dieectric strength shoud measure 26 kv

    minimum.

    MAINTENANCE

    20

  • 8/20/2019 02 - Transformer Instruction Manual

    21/24

    Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

    21

    gasketsvisuay check a gaskets for cracking or other signs of

    deterioration. Repace as necessary. When repacing

    a gasket carefuy cean mating surfaces to remoe any

    rust, dirt, transformer uid, od gasket materia, or other

    contamination that might preent a good sea. Use anappropriate gasket cement when instaing new gaskets.

    Do not reuse od gaskets. Six months after repacing a

    gasket, check and retighten if necessary.

    Additiona Maintenance InstructionsContact the Howard Substation Transformer Diision for

    additiona maintenance instructions.

    Repair PartsRepair parts can be ordered from the Howard Substation

    Transformer Diision. A description of the part and the

    transformer seria number wi be required to ensure thatthe correct part has been ordered.

    Warranty CaimsThe Howard Substation Transformer Diision shoud

    be notied immediatey when probems are discoered

    during the warranty period. A warranty repairs must be

    made or approed by the Howard Substation Transformer

    Diision.

  • 8/20/2019 02 - Transformer Instruction Manual

    22/24

  • 8/20/2019 02 - Transformer Instruction Manual

    23/24

    Medium Power Substation Transformers

    Document 2.4.06, Reision 2

    December 2011

    23

    NOTES

  • 8/20/2019 02 - Transformer Instruction Manual

    24/24

    Document 2.4.06, Reision 2December 2011 Medium Power Substation Transformers

    Instructions for Instaation, Operation, and Maintenanceof Medium Power Substation Transformers

    Document 2.4.06, Reision 2 (December 2011)

    Copyright © 2011, Howard Industries, Inc.

    laure, Mississippi

    Teephone: 601-425-3151

    Fax: 601-649-8090

    Web: howardtransformers.com