CopperString Supplementary Environmental Impact Statement PART B 43 CopperString Supplementary Environmental Impact Statement PART B
Figure 1.13: Conductor transposition arrangement
Source: Powerlink Queensland, 2008
ThephysicallocationsofthetranspositionswillbefinalisedwiththetowerlocationsasthedetaileddesignoftheProject progresses, with two transpositions anticipated between each substation site. The additional impact related to these sites has been taken into account with both the conservative estimation of construction disturbance and landholder compensation packages.
02 SubstationsThe majority of substations that were detailed in the EIS for the Project remain in the same location with minor amendments proposed to either the physical land requirements or the high voltage equipment and support services. Revisions in land requirements and locations have occurred to the Hughenden, Mount Isa and Cannington Substations, while the Phosphate Hill Substation which, as described in Part B: Section 1.4 of the SEIS, will not be constructed at this time. One new substation site adjacent to the Woodstock Substation has also been added to the Project scope (Upper Haughton Substation) (refer to Part B: Section 2.2 of the SEIS).
A more detailed description of the changes to substations planned as part of the Project is provided in the following sections. The construction requirements of the substation sites and an overview of the required workforce are provided in Part B: Section 6.2 of the SEIS.
2.1 General and technical substation descriptionThe locations of the Woodstock, Dajarra Road and Cannington Substations have not changed since the release oftheEIS,thoughsomelandrequirementshavebeenmodified.Asummaryofthelandrequirementsofeachsupplementary substation site and amendments to the EIS location of the substation and the transmission line sections in the vicinity of the substation sites is illustrated in Figure 2.1 to 2.6 and the physical description of the substation sites are summarised below in Table 2.1.
CopperString SEIS_Part B_cs55.indd 43 14/09/11 8:36 PM
44 CopperString Supplementary Environmental Impact Statement PART B
Table 2.1: Physical description of the substation sites
Substation Lot / Plan Land Tenure Type Approximate Physical Land Requirements (fenced area)#
Total Land Area Acquired (ha)
WoodstockLot 3 on GS603 Freehold
8 ha(Irregular boundaries)
35
Upper Haughton17 ha
(Irregular boundaries)
Hughenden NA Road Reserve200 x 300 m
(4 ha)27
Dajarra Road Lot 521 on CP905413Lease Land
(Pastoral Holding)250 x 250 m
(6.25 ha)22
Mount Isa Lot 422 on SP128451 State Land250 x 250 m
(6.25 ha)62
Cannington Lot 1 on CP865897Lease Land
(Term Lease)0.6 ha
(Irregular boundaries)NA*
* The substation at Cannington will be constructed on the Cannington mining lease (ML 90059) and no land will be acquired for this site.# Note that there will be some infrastructure requirements outside of the fenced area of the substation (e.g. helicopter pad and where
appropriate operations and maintenance control centres).
Due to the progression of detailed design and the potential for additional connection applications from prospective networkusers,CopperStringhasamendedthespecificdesignparametersofeachofthesubstationstoaccountforfuture load growth, which accounts for the total land area required to be greater than the physical land area of the proposed substation infrastructure (refer to Table 2.1). The summary of major electrical equipment at each substation site is provided below in Table 2.2.
CopperString SEIS_Part B_cs55.indd 44 14/09/11 8:36 PM
CopperString Supplem
entary Environmental Im
pact Statement PA
RT B
1280 m
1010
m
700 m
0 WD
3GS603(Freehold)
4GS926(Leasehold/Lands Lease)
2GS909(Leasehold/Lands Lease)
(Road)(Road)
Oak
y C
reek
146°59'E
146°59'E
146°58'30"E
146°58'30"E
146°58'E
146°58'E
146°57'30"E
146°57'30"E19
°51'
S
19°5
1'S
19°5
1'30
"S
19°5
1'30
"S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\EIS\Chapter2\Substation_Sites.mxdCreated on 27/09/2010 by KR
PROJECT
DATE
FIGURE 2.1
COPPERSTRING SEIS - PART B
°0 150 300 450 600
MetresDatum: GDA94
Projection: MGA94 Zone 55
AUGUST 2011
Easements, Cadastre: Dept of Natural Resources & Water, June 10Transmission Lines: RLMS databaseBase Data: Geoscience Australia, Geodata V3Imagery: Worldview 2, DigitalGlobe
Note: Measurements are approximate only WOODSTOCK AND UPPER HAUGHTON SITES
LEGEND
Kilometre Post
Woodstock to Dajarra Alignment(Supplementary)
EIS Alignment
Substation Site (Supplementary)
EIS Substation Site
Property Boundary
Registered Easement
Secondary Road
Minor Road
Access Track
Watercourse Line
")
")") ")
")
Mt IsaHughenden
Woodstock
Cannington
Dajarra Road
CopperString SEIS_Part B_cs55.indd 45
14/09/11 8:36 PM
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 16/08/2011 by KR\Fig2-2_Substation Layout.mxd
146°58'30"E
146°58'30"E
146°58'20"E
146°58'20"E
146°58'10"E
146°58'10"E
146°58'0"E
146°58'0"E
19°5
0'50
"S
19°5
0'50
"S
19°5
1'0"
S
19°5
1'0"
S
19°5
1'10
"S
19°5
1'10
"S
19°5
1'20
"S
19°5
1'20
"S
°Datum: GDA94
Projection: MGA94 Zone 55Scale is approximate only
In preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
NOTES
DISCLAIMER
Substation Layout: Powerlink Preliminary Drawing PROJECT
FIGURE 2.2
DATE AUGUST 2011
UPPER HAUGHTON & WOODSTOCKSUBSTATION SITE
COPPERSTRING SEIS - PART B
Layout: A4 Portrait
0 50 100 150 200
Meters
LEGEND
Supplementary Alignment
Shared Access Road
Upper Haughton Substation Area
Woodstock Substation AreaTo Strathm
ore
To Ross
CopperString SEIS_Part B_cs55.indd 46 14/09/11 8:36 PM
300 m
900 m
4DG48(Freehold)
2DG35(Leasehold/Lands Lease)
5DG248(Freehold)
(Road)
HU
GH
EN
DE
N M
UTT
AB
UR
RA
RO
AD
330 WD
329 WD
328 WD
327 WD
326 WD325 WD
144°13'E
144°13'E
144°12'30"E
144°12'30"E
144°12'E
144°12'E
144°11'30"E
144°11'30"E
144°11'E
144°11'E
144°10'30"E
144°10'30"E20
°53'
30"S
20°5
3'30
"S
20°5
4'S 20
°54'
S
20°5
4'30
"S
20°5
4'30
"S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\EIS\Chapter2\Substation_Sites.mxdCreated on 27/09/2010 by KR
PROJECT
DATE
FIGURE 2.3
COPPERSTRING SEIS - PART B
°0 190 380 570 760
MetresDatum: GDA94
Projection: MGA94 Zone 55
AUGUST 2011
Easements, Cadastre: Dept of Natural Resources & Water, June 10Transmission Lines: RLMS databaseBase Data: Geoscience Australia, Geodata V3Imagery: Worldview 2, DigitalGlobe
Note: Measurements are approximate only HUGHENDEN SUBSTATION SITE
LEGEND
Kilometre Post
Woodstock to Dajarra Alignment(Supplementary)
EIS Alignment
Substation Site (Supplementary)
EIS Substation Site
Property Boundary
Stock Route
Registered Easement
Secondary Road
Minor Road
Access Track
Watercourse Line
")
")") ")
")
Mt IsaHughenden
Woodstock
Cannington
Dajarra Road
CopperString SEIS_Part B_cs55.indd 47
14/09/11 8:36 PM
500 m
500
m
1 DM
0 DM
0 DE 0 DH0 DG
0 DC
723 WD
CLONC
URR
Y DAJAR
RA RO
AD
521CP905413(Leasehold/Lands Lease)
521CP905413(Leasehold/Lands Lease)
2SW40(Leasehold/Lands Lease)
(Road)
140°25'E
140°25'E
140°24'30"E
140°24'30"E
140°24'E
140°24'E
20°4
5'S
20°4
5'S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\EIS\Chapter2\Substation_Sites.mxdCreated on 27/09/2010 by KR
PROJECT
DATE
FIGURE 2.4
COPPERSTRING SEIS - PART B
°0 100 200 300 400
MetresDatum: GDA94
Projection: MGA94 Zone 55
AUGUST 2011
Easements, Cadastre: Dept of Natural Resources & Water, June 10Transmission Lines: RLMS databaseBase Data: Geoscience Australia, Geodata V3Imagery: Worldview 2, DigitalGlobe
Note: Measurements are approximate only DAJARRA RD SUBSTATION SITE
LEGEND
Kilometre Post
CopperString Supplementary Alignments
Woodstock to Dajarra Rd
Dajarra Rd to Cannington
Dajarra Rd to Mount Isa
Dajarra Rd to Chumvale Substation
Dajarra Rd to Ernest Henry Transmission Line
Dajarra Rd to MMG Transmission Line
Substation Site (Supplementary)
EIS Alignments
EIS Substation Site
Property Boundary
Registered Easement
Secondary Road
Minor Road
Access Track
Watercourse Line
")
")") ")
")
PentlandMt Isa
Hughenden
Woodstock
Cannington
Dajarra Road
CopperString SEIS_Part B_cs55.indd 48
14/09/11 8:36 PM
700 m
670 m920 m
250 m
422SP128451(State Land)
573SP110102(Leasehold/Lands Lease)
422SP128451(State Land)
10USL45826(State Land)
46USL45826(State Land)
14RD217(Leasehold/Lands Lease)
(Roa
d)
(Roa
d)
(Road)
DU
CH
ESS
MT
ISA
RO
AD
DIAMANTINA D
EVELOPMENTAL R
OAD
99 DM
98 DM 97 DM
96 DM
100 DM
Leichhardt River
Lena Creek
Mic
a C
reek
139°30'30"E
139°30'30"E
139°30'E
139°30'E
139°29'30"E
139°29'30"E
139°29'E
139°29'E
139°28'30"E
139°28'30"E20
°46'
S
20°4
6'S
20°4
6'30
"S
20°4
6'30
"S
20°4
7'S
20°4
7'S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\EIS\Chapter2\Substation_Sites.mxdCreated on 27/09/2010 by KR
PROJECT
DATE
FIGURE 2.5
COPPERSTRING SEIS - PART B
°0 180 360 540 720
MetresDatum: GDA94
Projection: MGA94 Zone 55
AUGUST 2011
Easements, Cadastre: Dept of Natural Resources & Water, June 10Transmission Lines: RLMS databaseBase Data: Geoscience Australia, Geodata V3Imagery: Worldview 2, DigitalGlobe
Note: Measurements are approximate only MOUNT ISA SUBSTATION SITE
LEGEND
Kilometre Post
Dajarra Rd to Mt Isa Alignment(Supplementary)
EIS Alignment
Substation Site (Supplementary)
Indicative Substation Disturbance Area
EIS Substation Site
Property Boundary
Registered Easement
Principal Road
Secondary Road
Minor Road
Access Track
Watercourse Line
")
")") ")
")
")Mt IsaHughenden
Woodstock
Cannington
Dajarra Road
CopperString SEIS_Part B_cs55.indd 49
14/09/11 8:36 PM
1CP865897(Leasehold/Lands Lease)
140°55'10"E
140°55'10"E
140°55'E
140°55'E
140°54'50"E
140°54'50"E
21°5
1'30
"S
21°5
1'30
"S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\EIS\Chapter2\Substation_Sites.mxdCreated on 27/09/2010 by KR
PROJECT
DATE
FIGURE 2.6
COPPERSTRING SEIS - PART B
°0 30 60 90 120
Metres
Datum: GDA94Projection: MGA94 Zone 54
AUGUST 2011
Easements, Cadastre: Dept of Natural Resources & Water, June 10Transmission Lines: RLMS databaseBase Data: Geoscience Australia, Geodata V3Imagery: Worldview 2, DigitalGlobe
Note: Measurements are approximate only CANNINGTON SUBSTATION SITE
LEGEND
Kilometre Post
Dajarra Rd to Cannington Alignment(Supplementary)
EIS Alignment
Substation Site (Supplementary)
EIS Substation Site
Property Boundary
Registered Easement
Secondary Road
Minor Road
Access Track
Watercourse Line
")
")") ")
")")
Mt IsaHughenden
Woodstock
Cannington
Dajarra Road
75m
55m
CopperString SEIS_Part B_cs55.indd 50
14/09/11 8:36 PM
CopperString Supplementary Environmental Impact Statement PART B 51
Table 2.2: Technical description of the substation sites
Substation Technical Description of Major Electrical Equipment
Woodstock
- 275/330 kV switchgear and general substation equipment - 2 x 275/330 kV transformers (600 MVA – 150 000 L oil volume each transformer) - 2 x shunt reactors may be required each containing up to 50 000 litres of oil (subject to further detailed design)
Upper Haughton
- 275 kV switchgear and general substation equipment - Several new 275 kV transmission line towers will be required to connect to the existing 275 kV Strathmore to Ross transmission line
- No large transformers will be required for this substation
Hughenden
- 330 kV switchgear and general substation equipment - 4 x 330/132 kV, approximately 375 MVA transformers and 132 kV switchyard and associated services for renewable energy connections (wind and solar).
- Transformers contain up to 125 000 L oil volume each. - 2 x 330/21 kV SVC transformers (250 MVA – 100 000 L oil volume each transformer) - 2 x 330/21 kV SVC transformers (250 MVA – 100 000 L oil volume each transformer) - 2 x 330 kV shunt reactors (50 MVAr – 50 000 L oil volume each reactor)
Dajarra Road
- 330/220 kV switchgear and general substation equipment - 2 x 330/220 kV transformers (600 MVA – 150 000 L oil volume each transformer) - 1 x 220/21 kV SVC transformer (250 MVA – 100 000 L oil volume each transformer) - 2 x 330 kV shunt reactors (50 MVAr – 50 000 L oil volume each reactor)
Mount Isa - 220/132 kV switchgear and general substation equipment - 2 x 220/132 kV transformers (350 MVA – 120 000 L oil volume each transformer) - 1 x 220/21 kV static var compensator Transformer (250 MVA - 100 000 L oil volume)
Cannington - 220 kV switchgear and general substation equipment - 1 or 2 x 220/11 kV transformers (60 MVA – 40 000 L oil volume each)
The design requirements and layout of the substation infrastructure remains as generally described in the EIS, though some amendment has been made to the internal design of the major electrical equipment in order to facilitate potential connectionsfromnewusersinthefuture.SincethereleaseoftheEISithasbeenidentifiedthatthesubstationsmayrequire connection to local council services such as water, electricity and telephone connections though each site is beingdesignedtobeself-sufficientandtheseconnectionswouldbeaprecautionarymeasure.
All CopperString-owned and operated substation sites will have an allowance for a maintenance depot that would consistofadust-freebuildingwithaninternalcubiclethatincludesamenities,anofficeandahardstandfortheloadingand unloading of storage, that would include a vehicle washdown area. Additional areas are required for hazardous substance enclosures and fuel storage tanks or areas.
The designs of the substation sites have also been amended to incorporate a helicopter pad, with the exception of the Cannington Substation. Access to the Cannington Substation by air would be reliant on the Trepell Aerodrome, which.is in close proximity to the substation site
This design and operation of the required helicopter pads will comply with the relevant Civil Aviation Safety Authority’s Guidelines for the establishment and use of helicopter landing sites (CAAP 92-2) and the Queensland Government’s Helicopter Landing Site Guidelines (Department of Public Works, 2006). The helicopter pads would be utilised during the operation of the substations and allow CopperString personnel to quickly reach the substation site for infrequent maintenance or emergency situations.
AnassessmentofthefloodimmunityofeachofthesubstationsitesisprovidedinPartC:Section3andaFloodStudyReport is presented in Appendix 5,whichdetailsthepotentialoffloodingatsitesofcriticalinfrastructure.
The following sections of the SEIS provide an overview of the new or amended substations that have been incorporated into the Project’s scope since the release of the EIS.
2.2 Upper haughton SubstationThe Upper Haughton Substation is proposed to be located on a portion of freehold land to be subdivided from the landparcelidentifiedfortheproposedWoodstockSubstationsite(Lot3onGS603).ThisPowerlinksubstationwouldfacilitate CopperString accessing electricity from the Powerlink operated 275 kV Strathmore to Ross Transmission Line. The substation would supply electricity to the Woodstock Substation via a short 275 kV transmission line connection between the two adjacent sites (refer to Figure 2.2).
CopperString SEIS_Part B_cs55.indd 51 14/09/11 8:36 PM
52 CopperString Supplementary Environmental Impact Statement PART B
The Upper Haughton Substation is being proposed as part of the CopperString Project though the ownership of the substation assets and the operation of the substation will rest with Powerlink as it forms part of their electricity supply network. Approvals, including Ministerial designation of the Upper Haughton Substation as community infrastructure under the Sustainable Planning Act 2009 is being sought as part of the CopperString Project in order to facilitate the construction of the site in a timely manner, meeting the needs of the CopperString network users. The Upper Haughton Substation will also allow for future load growth within the Powerlink network.
TheUpperHaughtonSubstationisexpectedtobeconstructedabovetheQ500AnnualReturnIntervalfloodlevelplus300mmforfloodimmunityinaccordancewiththeState Planning Policy 1/03: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide for major substation infrastructure. Powerlink will require a local electricity supply from the Ergon Energy network for substation auxiliary power. Powerlink may also require a local water supply pipe to back upthefireprotectionbulkwaterstoragetank.
A common access road is to be constructed for both the Upper Haughton and Woodstock substations. The road will be constructed to Powerlink substation standards, including the provision for transporting large transformers. The access road will provide permanent access to the substation sites and necessitate the construction of a number of waterway crossings, including crossing a SunWater water channel. The access road will be approximately 23 km in length, connecting to the Keith Venables Road with 10 km of the required access track being an already formed private road.
2.3 hughenden SubstationDiscussions held with DERM and the relevant landholder has resulted in the relocation of the Hughenden Substation, from Lot 4 on DG48 onto the State-controlled road reserve of the Hughenden Muttaburra Road (DTMR Category – 5701). This is a minor amendment to the substation location that has been amended in coordination with the landholder and DERM. The EIS and supplementary locations of the Hughenden Substation are highlighted in Figure 2.3.
Due to the relocation of this site and the requirement to limit potential impacts to the safety and amenity of the Hughenden Muttaburra Road, CopperString has amended the design of the substation site to accommodate a more rectangular area of 900 x 300 m (27 ha), with comparison to the EIS substation site that was 500 x 500 m (25 ha).
CopperString has applied to be a public utility provider under the Land Act 1994 and the Land Title Act 1994 (refer toPartC:Section1.4.3.3).Oncethestatushasbeenconfirmed,CopperStringproposestoapplyforapermanentroadclosureoftherequiredland.Itisnotedthattheroadreserveisclassifiedasaminorstockroute,thoughit is anticipated that CopperString will not impact on the continued use of the road reserve for travelling stock. CopperString has received support for the permanent road closure from the Flinders Shire Council, as the trustee of the stock route.
2.4 Mount isa SubstationThelocationoftheMountIsaSubstationhasbeenrevisedduetoconstraintsassociatedwiththelandidentifiedin the EIS, which limits the ability to expand the substation for future growth. In order to address these constraints CopperString has relocated the proposed substation within Lot 422 on SP128451, to a site approximately 1 km north of the proposed EIS substation site. Consultation has occurred with Mount Isa Mines Limited as the holder of the mining lease (ML 8058) that covers the previous EIS and current supplementary substation sites and they are supportive of the proposed supplementary location.
Thefinalsitingoftheinfrastructurewithinthislandparcelisdependentonfurtherdetaileddesignandgeotechnicalstudies, though CopperString will only impact on an area of approximately 500 x 500 m (25 ha). The site of the Mount Isa substation proposed in the SEIS is 62 ha, compared to the 6.25 ha in the EIS proposed site. This requirement foradditionalareahasbeenidentifiedontheunderstandingofthesubstationdesignandpotentialforfuturegrowthof the network. The substation disturbance area is now a similar size to the other substation sites proposed to be constructed as part of the Project. The EIS and supplementary locations of the Mount Isa Substation are illustrated in Figure 2.5.
2.5 cannington SubstationThe area proposed for the Cannington Substation has increased in size from approximately 0.3 ha to 0.6 ha. This increaseinlandisduetotherefinementofthesubstationdesignandtoaccommodatethenecessarysedimentbasininfrastructure. The location of the site within the Cannington Mine remains unchanged and consultation with BHP Billitonhasconfirmedthattheadditionalsiteareadoesnotconflictwiththecurrentorfutureusesofthesite.TheEISand supplementary boundaries of the Cannington Substation are illustrated in Figure 2.6.
CopperString SEIS_Part B_cs55.indd 52 14/09/11 8:36 PM
CopperString Supplementary Environmental Impact Statement PART B 53 CopperString Supplementary Environmental Impact Statement PART B
2.6 Potential future substationsSection2.2.2oftheEISidentifiedtheprovisionoffuturesubstationsitesthatwouldallowCopperStringtofacilitateaccess to new network users. It was detailed that terminal towers would be incorporated into the Project’s design to allow future access in the vicinity of Julia Creek.
SincethereleaseoftheEISCopperStringhasfurtheridentifiedtheneedtoincorporateasubstationonthemainlinearound Pentland or Charters Towers to allow future connection from potential renewable energy projects in the region and to facilitate the potential connection of mining operations in the northern Galilee Basin.
Although preliminary analysis into potential locations of these sites have occurred and the site investigation will continue during the design stages of the Project, CopperString is not seeking to assess or approve these sites as part of the current Project. Any future substation site will be subject to a separate environmental assessment and approval process once greater information is known on the future connection requirements.
03 Transmission network communication and monitoringSubstation protection, control and communication systems need precise and high quality monitoring to ensure safety standards and security of electricity supply and transmission. Modern substation and transmission line protection, control and communication systems integrate control, protection and monitoring functions into the one coordinated network.
The NER require duplicate communications links to the network to ensure the dual redundancy of the transmission networks operation. The OPGW, located on the transmission towers, will form the primary communication infrastructure network connecting the supervisory system to the remote terminal units. The second communications network will be the Nextgen Networks Facility, which is currently being installed between Townsville and Mount Isa.
3.1 ceV hutsSection2.3.2.5oftheEISidentifiedthatCEVhutswillberequiredatsitesapproximately80-120kmapartalongthetransmission network in order to amplify the optical signal. These stations are used to extend the reach of optical communicationsbyovercominglossesassociatedwithattenuationoftheopticalfibre.Furtherinformationisnowavailable on the design and proposed locations of these sites.
The CEV huts will be located close to transmission towers and will be fenced with optional CCTV monitoring and intruder alarms. The CEV huts are unmanned, passively cooled equipment shelters, though they will be equipped with a single inverter type split air-conditioning unit. As the telecommunications equipment in the shelter will be capable of operating at up to 65oC, the air-conditioning units will only operate for staff comfort during infrequent maintenance visits.
The CEV huts will be a maximum of approximately 10 m long, 3.5 m wide and 3 m high, and mounted on concrete piers. Transmission and support equipment will be powered by main electricity where available or solar power. Solar power sites will have a solar array of around 3 kW to support a 300 watt equipment load or 4 solar array modules of 4 x 3 m (i.e. about 6 kW to support a load of around 530 watt). Valve regulated lead acid batteries will be used at all sites, will be contained within acid-resistant bunding and protected from the weather.
An indicative CEV hut layout is provided below in Figure 3.1.
CopperString SEIS_Part B_cs55.indd 53 14/09/11 8:36 PM
54 CopperString Supplementary Environmental Impact Statement PART B
Figure 3.1: Indicative CEV hut Layout
The area around the CEV hut needs to be cleared of vegetation for a width of at least 20-25 m from the site to protect itfrompotentialbushfires.Anareaofapproximately15x16mwillbefencedfortheCEVhut,howevertoensurethatvegetationmanagementismaintainedanareaofapproximately60x65misrequiredtomaintainfiresecurity.Anindicative CEV hut design is shown in Figure 3.2.
CopperString SEIS_Part B_cs55.indd 54 14/09/11 8:36 PM
CopperString Supplementary Environmental Impact Statement PART B 55 CopperString Supplementary Environmental Impact Statement PART B
Figure 3.2: Indicative CEV Hut location within the easement
TheCEVhutswillbeconstructedandfittedoutatthesupplier’spremisesandinstalledonpre-preparedconcretefootingsorraisedpiers,subjecttothefloodstudyassessmentofthesesites,withatransportablecrane.Siteworkswill comprise installation of an earth grid, conduits for power cables, a 2.2 m high cyclone mesh security fence, weed mats and a gravel surface. The earth grid will be constructed of driven copper rods, connected by copper or galvanised steel strap, trenched within the compound. The solar array frames will be mounted on strip footings, and be rated for local wind or cyclone conditions.
ThirteenCEVhutsarerequiredintotalfortheProject.FivewillbelocatedwithintheidentifiedCopperStringsubstation sites (Woodstock, Hughenden, Dajarra Road, Cannington and Mount Isa substations) and eight are stand alone. The property descriptions of the eight CEV huts (where not associated with a substation site), the tenure type and the approximate areas of land under investigation for the sites are provided in Table 3.1. These sites are shown in detail in Figure 3.3 to 3.10 and at a regional scale above in Figure 1.12.
CopperString SEIS_Part B_cs55.indd 55 14/09/11 8:36 PM
65 m
120 m
Charters Towers South
1MPH13914(Freehold)
5260PH1598(Leasehold/Lands Lease)
1MPH13929(Freehold)
84 WD
83 WD
(Road)
146°20'30"E
146°20'30"E
146°20'E
146°20'E
20°1
3'30
"S
20°1
3'30
"S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR
PROJECT
DATE
COPPERSTRING SEIS - PART B
°0 50 100 150 200
MetresDatum: GDA94
Projection: MGA94 Zone 54
AUGUST 2011
Parcel Boundaries: DERM, June 10LEGEND
Kilometre Post
WoodStock to Dajarra RdAlignment (Supplementary)
Proposed CEV Hut Site
Principal Road
Secondary Road
Minor Road
Access Track
Property Boundary
CHARTERS TOWERS SOUTH CEV HUT SITE
!!! !
!
!
!
")
")
")")")")") ")
")Richmond
Woodstock
Mount Isa Cloncurry Hughenden
Cannington
Townsville
Charters Towers South
1MPH13914
FIGURE 3.3
5
CopperString SEIS_Part B_cs55.indd 56
14/09/11 8:36 PM
Pentland South
61GF812272(Leasehold/Lands Lease)
174 WD
173 WD
145°36'E
145°36'E
145°35'30"E
145°35'30"E20
°37'
30"S
20°3
7'30
"S
20°3
8'S
20°3
8'S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR
PROJECT
DATE
COPPERSTRING SEIS - PART B
°0 50 100 150 200
MetresDatum: GDA94
Projection: MGA94 Zone 54
AUGUST 2011
Parcel Boundaries: DERM, June 10LEGEND
Kilometre Post
WoodStock to Dajarra RdAlignment (Supplementary)
Proposed CEV Hut Site
Principal Road
Secondary Road
Minor Road
Access Track
Property Boundary
PENTLAND SOUTH CEV HUT SITE
!!! !
!
!
!
")
")
")")")")") ")
")Richmond
Woodstock
Mount Isa Cloncurry Hughenden
Cannington
Townsville
Pentland South
61GF812272
FIGURE 3.4
65m
120m
CopperString SEIS_Part B_cs55.indd 57
14/09/11 8:36 PM
65 m
123
m
Torrens Creek 25OL212(Leasehold/Lands Lease)
6SP118964(Leasehold/Lands Lease)
25OL212(Leasehold/Lands Lease)
4SP118964(Leasehold/Lands Lease)
25OL212(Leasehold/Lands Lease)
240 WD
239 WD
(Road)
(Road)
145°2'E
145°2'E
145°1'30"E
145°1'30"E
145°1'E
145°1'E
20°5
2'30
"S
20°5
2'30
"S
20°5
3'S
20°5
3'S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR
PROJECT
DATE
COPPERSTRING SEIS - PART B
°0 50 100 150 200
MetresDatum: GDA94
Projection: MGA94 Zone 54
AUGUST 2011
Parcel Boundaries: DERM, June 10LEGEND
Kilometre Post
WoodStock to Dajarra RdAlignment (Supplementary)
Proposed CEV Hut Site
Principal Road
Secondary Road
Minor Road
Access Track
Property Boundary
TORRENS CREEK CEV HUT SITE
!!! !
!
!
!
")
")
")")")")") ")
Richmond
Woodstock
Mount Isa Cloncurry Hughenden
Cannington
Townsville
Torrens Creek25OL212
FIGURE 3.5
CopperString SEIS_Part B_cs55.indd 58
14/09/11 8:36 PM
120
m
60 m
Marathon
MA
RAT
HO
N S
TAM
FOR
D R
OA
D
13DG158(Leasehold/Lands Lease)
1PER6044(Leasehold/Lands Lease)
394 WD
393 WD(Road)
143°35'E
143°35'E
143°34'30"E
143°34'30"E
143°34'E
143°34'E20
°53'
S20
°53'
30"S 20°5
3'30
"S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR
PROJECT
DATE
COPPERSTRING SEIS - PART B
°0 50 100 150 200
MetresDatum: GDA94
Projection: MGA94 Zone 54
AUGUST 2011
Parcel Boundaries: DERM, June 10LEGEND
Kilometre Post
WoodStock to Dajarra RdAlignment (Supplementary)
Proposed CEV Hut Site
Principal Road
Secondary Road
Minor Road
Access Track
Property Boundary
MARATHON CEV HUT SITE
!!! !
!
!
!
")
")
")")")")") ") ")
Richmond
Woodstock
Mount Isa Cloncurry Hughenden
Cannington
TownsvilleMarathon
13DG158
FIGURE 3.6
CopperString SEIS_Part B_cs55.indd 59
14/09/11 8:36 PM
60 m
120 m
7RT60(Leasehold/Lands Lease)
Maxwelton
478 WD477 WD
476 WD
142°47'E
142°47'E
142°46'30"E
142°46'30"E
142°46'E
142°46'E
20°5
0'S
20°5
0'S
20°5
0'30
"S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR
PROJECT
DATE
COPPERSTRING SEIS - PART B
°0 60 120 180 240
MetresDatum: GDA94
Projection: MGA94 Zone 54
AUGUST 2011
Parcel Boundaries: DERM, June 10LEGEND
Kilometre Post
WoodStock to Dajarra RdAlignment (Supplementary)
Proposed CEV Hut Site
Principal Road
Secondary Road
Minor Road
Access Track
Property Boundary
MAXWELTON CEV HUT SITE
!!! !
!
!
!
")
")
")")")")") ")")
Richmond
Woodstock
Mount Isa Cloncurry Hughenden
Cannington
Townsville
Maxwelton7RT60
FIGURE 3.7
CopperString SEIS_Part B_cs55.indd 60
14/09/11 8:36 PM
60 m
120 m
Yorkshire Downs
1EN3(Leasehold/Lands Lease)
565 WD
564 WD
141°56'30"E
141°56'30"E
141°56'E
141°56'E
141°55'30"E
141°55'30"E20
°48'
S
20°4
8'S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR
PROJECT
DATE
COPPERSTRING SEIS - PART B
°0 50 100 150 200
MetresDatum: GDA94
Projection: MGA94 Zone 54
AUGUST 2011
Parcel Boundaries: DERM, June 10LEGEND
Kilometre Post
WoodStock to Dajarra RdAlignment (Supplementary)
Proposed CEV Hut Site
Principal Road
Secondary Road
Minor Road
Access Track
Property Boundary
YORKSHIRE DOWNS CEV HUT SITE
!!! !
!
!
!
")
")
")")")")") ")
Richmond
Woodstock
Mount Isa Cloncurry Hughenden
Cannington
Townsville
Yorkshire Downs
1EN3
FIGURE 3.8
5
CopperString SEIS_Part B_cs55.indd 61
14/09/11 8:36 PM
OO
RIND
I MCK
INLA
Y RO
AD
Oorindi
1BD52(Freehold)
1BD2(Freehold)
656 WD 655 WD 654 WD
(Road)
141°4'30"E
141°4'30"E
141°4'E
141°4'E
141°3'30"E
141°3'30"E
20°4
6'S
20°4
6'S
20°4
6'30
"S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR
PROJECT
DATE
COPPERSTRING SEIS - PART B
°0 60 120 180 240
MetresDatum: GDA94
Projection: MGA94 Zone 54
AUGUST 2011
Parcel Boundaries: DERM, June 10LEGEND
Kilometre Post
WoodStock to Dajarra RdAlignment (Supplementary)
Proposed CEV Hut Site
Principal Road
Secondary Road
Minor Road
Access Track
Property Boundary
OORINDI CEV HUT SITE
!!! !
!
!
!
")
")
")")")")") ")")
Richmond
Woodstock
Mount Isa Cloncurry Hughenden
Cannington
Townsville
Oorindi1BD52
OO
RIN
DI M
CKI
NLA
Y R
OAD
FIGURE 3.9
65m
120m
CopperString SEIS_Part B_cs55.indd 62
14/09/11 8:36 PM
Mt Elliott
13SP150177(Leasehold/Lands Lease)
5364PH1891(Leasehold/Lands Lease)
5364PH1891(Leasehold/Lands Lease)
13SP150177(Leasehold/Lands Lease)
93 DC
(Road)
(Road)
140°27'30"E
140°27'30"E
140°27'E
140°27'E
21°3
3'S
21°3
3'30
"S
21°3
3'30
"S
DISCLAIMERIn preparing this map, RLMS have endeavoured to ensurethat the data and information are as accurate and reliable aspossible. However RLMS cannot accept liability for anydecisions or actions of whatever kind or nature based on this study.RLMS expressly disclaims any loss or damage that mayarise therefrom.
DATA SOURCE
WKSP Z:\clients\HMA_Consulting\08-0004_CuString\Mapping\Workspaces\EIS\ReportMaps\SEIS\Project_DescriptionCreated on 17/08/2011 by KR
PROJECT
DATE
COPPERSTRING SEIS - PART B
°0 50 100 150 200
MetresDatum: GDA94
Projection: MGA94 Zone 54
AUGUST 2011
Parcel Boundaries: DERM, June 10LEGEND
Kilometre Post
WoodStock to Dajarra RdAlignment (Supplementary)
Proposed CEV Hut Site
Principal Road
Secondary Road
Minor Road
Access Track
Property Boundary
MT ELLIOTT CEV HUT SITE
!!! !
!
!
!
")
")
")")")")") ")
")
Richmond
Woodstock
Mount Isa Cloncurry Hughenden
Cannington
Townsville
13SP150177
Mt Elliott
FIGURE 3.10
65m
120m
CopperString SEIS_Part B_cs55.indd 63
14/09/11 8:36 PM
64 CopperString Supplementary Environmental Impact Statement PART B
Table 3.1: Location and required land for CEV hut sites (where not associated with a substation)
CEV Hut Location Land Parcel (Lot/Plan) Tenure Type Approximate Land Area IdentifiedforSite
Charters Towers South Lot 1 on MPH13914 Freehold 7800 m2
Pentland South Lot 61 GF812272 Lease Land 7800 m2
Torrens Creek Lot 25 on OL212 Lease Land 7800 m2
Marathon Lot 13 on DG158 Lease Land 7800 m2
Maxwelton Lot 7 on RT60 Lease Land 7800 m2
Yorkshire Downs Lot 1 on EN13 Lease Land 7800 m2
Oorindi Lot 1 on BD52 Freehold 7800 m2
Mt Elliott Lot 13 on SP150177 Lease Land 8520 m2
TheareaoflandidentifiedateachCEVhutisgreaterthantheareaoflandtobeacquiredandusedforeachCEVhut(approximately 4000 m2).TheadditionallandareathathasbeenidentifiedwillallowCopperStringtositetheCEVhutsinrelationtothefinaltransmissionlinealignment.TheproposedlandareasoftheCEVhutsareidentifiedinFigure 3.3 to 3.10.Itisimportanttonotethatthefinallocationofthesesiteswillbedependentonthetransmissiontower siting as they are proposed to be co-located (refer to Figure 3.2).
04 Access tracksThe access tracks required for the Project’s construction and operational maintenance remain as generally described in the EIS for the Project. CopperString has a requirement to utilise access tracks to enter the transmission line easement and access tracks within the easement to access individual transmission tower locations. The inclusion of the access tracks in the Project’s scope causes impact to a further 26 land parcels, which were not detailed in the EIS. A listing of these additional land parcels is provided in Appendix 3.
The access tracks that CopperString will utilise to reach the easement from the State and local controlled road network are shown in Figure 1.12. The locations of the tracks required to access individual transmission tower locations are not able to be detailed until the tower spotting is complete as part of the Project’s detailed design.
In the EIS CopperString made a commitment to utilise existing tracks and avoid impact to the environment and the potential to establish land degradation by the creation of new tracks. This commitment has been realised with 88 percent of the access tracks (excluding principal and secondary roads) proposed to be used by CopperString being already formed. The distribution of formed and unformed access tracks is further detailed in Figure 1.12.
CopperString SEIS_Part B_cs55.indd 64 14/09/11 8:36 PM