Approach to Environmental ManagementReactive vs. Proactive
Reactive
Unlimited Pollution Generation
React & Treat
Anticipate & PreventCurtail Pollution Generation
Proactive
3
CLEANER PRODUCTION:
“The continuous application of
an integrated preventative
environmental strategy applied to
processes, products and services to
increase efficiency and to reduce risk for
human and the environment”.
- UNEP , September 1990
4
CP is relatively a newer way of thinking about› Products and its Production Processes
It is achieved by the continuous application of strategies to minimize the generation of wastes and emissions
What is Cleaner Production ?
5
DO YOU WANT CLEANER PRODUCTION?
No, we have no budget for this program
No, we are already covering all these things
No, our people are very busy ?
6
WHY YOU STILL NEED CLEANER PRODUCTION?
Cleaner Production improves:› Process Efficiency› Product Quality
Even when investment costs are high, the payback period can be low.
There is generally very low / no payback on end-of-pipe investments
Cleaner Production lowers the costs of:› Production› End-of-pipe treatment› Cleaning up the environment› Energy
Improved Quality
7
Benefits of Cleaner Production
Cleaner Production lowers the risks to:› Worker› Community› Product Consumer› Future Generations
Hence CP is a tool for Management of :› Production › Cost › Environment› Quality Improvement › Resources › Energy
“WIN-WIN Situation”
Better Image
8
CP Barriers
In the course of evolving & implementing waste minimization program at different units, several barriers are encountered.
Barriers as well as enabling measures are specific to individual enterprises.
Lets take a look at these barriers
9
CP Barriers (Contd..)
Cleaner Production › Good only for large / export companies› Require large funds › Require modern technology › Require qualified professionals › Require Automation › One time activity › Limited potential
Myths
10
Proven Idea Killers
Let’s think about it tomorrow Been there, Done that It is not the right time You don’t understand the problem Talk to the hand, this is not my field
Sounds nice in theory, but it will not work in practice We are too small / big for it Has someone elsewhere tried it It doesn’t fit into our planning
11
Textile Industry Issues - Bangladesh
Raw Material Shortages Conditions of Exporting Markets Shortage of Skilled manpower Barriers to access to world markets (Compliance Issues) Energy Shortages (Natural Gas, Electricity) Inflation Wages / Salaries Escalating cost of doing business
12
CP ASSESSMENT
A written and compiled document of unit facilities and operations
Environmental Status of Resource Consumption like water, dyes & chemicals, natural gas,
Environmental Status of Air emission, solid waste & effluent
Energy Status of Thermal, electrical & pneumatic systems from generation, distribution and consumption point of view.
Overview of Occupational Safety
Noise and light intensity levels at each locations
Chemical and Utilities consumptions
Adequacy and toxicity of chemicals used
Recommendations for Cleaner Production options tailored for your unit