Category: Test Case: AIM: INITIAL CONDITIONS: EXPECTED RESULT: Estimated Time 01.Connection 01-01 Confirm DSR can connect/disconnect Diameter connections All of Diameter connections defined by LLD can be established to any nodes in VNP network. All connections can be established 30minutes Environmen t Resu lt Procedure Prepare to capture packets (ISTT/NSSOL) 1. Login to all DAMPs who has a connection to GGSN with SSH and start tshark command Enable the connection (ISTT/NSSOL) 1. Login to SOAM GUI 2. Enable a connection between GGSN and DSR Prepare to establish connection (VNP) 1. Prepares to start GGSN connection. Disable the connection (ISTT/NSSOL) 1. Save a screen shot of connection status 2. Wait 2 minutes before next procedure. 3. Disable a connection between GGSN and DSR 4. Save a screen shot of connection status Stop and Check the packet capture (ISTT/NSSOL) 1. Stop tshark on all DAMPs 2. Download pcap files from DAMPs 3. Check the pcap file of DAMPs and that DSR sends and receives Diameter CER/CEA. 4. Check the pcap file of DAMPs and that DSR sends and receives Diameter DWR/DWA. 5. Check the pcap file of DAMPs and that DSR sends and receives Diameter DPR/DPA. Outputs Screenshot of connection status pcap files of DAMPs Result Company VINAPHONE ISTT/NSSOL Remark 1

Upload: phamtrunghieu1985

Post on 21-Dec-2015

213 views

Category:

Documents


0 download

DESCRIPTION

01_Connection_ATP_20150225-0

TRANSCRIPT

Page 1: 01_Connection_ATP_20150225-0

Category:

Test Case:

AIM:

INITIAL CONDITIONS:

EXPECTED RESULT:

Estimated Time

01.Connection

01-01

Confirm DSR can connect/disconnect Diameter connections

All of Diameter connections defined by LLD can be established to any nodes in VNP network.

All connections can be established

30minutes

Environment Result

Procedure

Prepare to capture packets (ISTT/NSSOL)

1. Login to all DAMPs who has a connection to GGSN with SSH and start tshark command

Enable the connection (ISTT/NSSOL)

1. Login to SOAM GUI

2. Enable a connection between GGSN and DSR

Prepare to establish connection (VNP)

1. Prepares to start GGSN connection.

Disable the connection (ISTT/NSSOL)

1. Save a screen shot of connection status

2. Wait 2 minutes before next procedure.

3. Disable a connection between GGSN and DSR

4. Save a screen shot of connection status

Stop and Check the packet capture (ISTT/NSSOL)

1. Stop tshark on all DAMPs

2. Download pcap files from DAMPs

3. Check the pcap file of DAMPs and that DSR sends and receives Diameter CER/CEA.

4. Check the pcap file of DAMPs and that DSR sends and receives Diameter DWR/DWA.

5. Check the pcap file of DAMPs and that DSR sends and receives Diameter DPR/DPA.

OutputsScreenshot of connection status

pcap files of DAMPs

Result

Company VINAPHONE ISTT/NSSOL

Remark

1

Page 2: 01_Connection_ATP_20150225-0

Category:

Test Case:

AIM:

INITIAL CONDITIONS:

EXPECTED RESULT:

Estimated Time

01.Connection

01-02

Confirm DSR can connect/disconnect Diameter connections

All of Diameter connections defined by LLD can be established to any nodes in VNP network.

All connections can be established

30minutes

Environment Result

Procedure

Prepare to capture packets (ISTT/NSSOL)

1. Login to DAMP who has a connection to OCS with SSH and start tshark command

Prepare to establish connection (VNP)

1. Prepares to start OCS connection.

Enable the connection (ISTT/NSSOL)

1. Login to SOAM GUI

2. Enable a connection between OCS and DSR

Disable the connection (ISTT/NSSOL)

1. Save a screen shot of connection status

2. Wait 2 minutes before next procedure.

3. Disable a connection between OCS and DSR

4. Save a screen shot of connection status

Stop and Check the packet capture (ISTT/NSSOL)

1. Stop tshark on DAMP

2. Download pcap files from DAMP

3. Check the pcap file of DAMP and that DSR sends and receives Diameter CER/CEA.

4. Check the pcap file of DAMP and that DSR sends and receives Diameter DWR/DWA.

5. Check the pcap file of DAMP and that DSR sends and receives Diameter DPR/DPA.

OutputsScreenshot of connection status

pcap files of DAMP

Result

Company VINAPHONE ISTT/NSSOL

Remark

2

Page 3: 01_Connection_ATP_20150225-0

Category:

Test Case:

AIM:

INITIAL CONDITIONS:

EXPECTED RESULT:

Estimated Time

01.Connection

01-03

Confirm DSR can connect/disconnect Diameter connections

All of Diameter connections defined by LLD can be established to any nodes in VNP network.

All connections can be established

30minutes

Environment Result

Procedure

Prepare to capture packets (ISTT/NSSOL)

1. Login to DAMP who has a connection to PCRF with SSH and start tshark command

Prepare to establish connection (VNP)

1. Prepares to start PCRF connection.

Enable the connection (ISTT/NSSOL)

1. Login to SOAM GUI

2. Enable a connection between PCRF and DSR

Disable the connection (ISTT/NSSOL)

1. Save a screen shot of connection status

2. Wait 2 minutes before next procedure.

3. Disable a connection between PCRF and DSR

4. Save a screen shot of connection status

Stop and Check the packet capture (ISTT/NSSOL)

1. Stop tshark on DAMP

2. Download pcap files from DAMP

3. Check the pcap file of DAMP and that DSR sends and receives Diameter CER/CEA.

4. Check the pcap file of DAMP and that DSR sends and receives Diameter DWR/DWA.

5. Check the pcap file of DAMP and that DSR sends and receives Diameter DPR/DPA.

OutputsScreenshot of connection status

pcap files of DAMP

Result

Company VINAPHONE ISTT/NSSOL

Remark