01_connection_atp_20150225-0
DESCRIPTION
01_Connection_ATP_20150225-0TRANSCRIPT
Category:
Test Case:
AIM:
INITIAL CONDITIONS:
EXPECTED RESULT:
Estimated Time
01.Connection
01-01
Confirm DSR can connect/disconnect Diameter connections
All of Diameter connections defined by LLD can be established to any nodes in VNP network.
All connections can be established
30minutes
Environment Result
Procedure
Prepare to capture packets (ISTT/NSSOL)
1. Login to all DAMPs who has a connection to GGSN with SSH and start tshark command
Enable the connection (ISTT/NSSOL)
1. Login to SOAM GUI
2. Enable a connection between GGSN and DSR
Prepare to establish connection (VNP)
1. Prepares to start GGSN connection.
Disable the connection (ISTT/NSSOL)
1. Save a screen shot of connection status
2. Wait 2 minutes before next procedure.
3. Disable a connection between GGSN and DSR
4. Save a screen shot of connection status
Stop and Check the packet capture (ISTT/NSSOL)
1. Stop tshark on all DAMPs
2. Download pcap files from DAMPs
3. Check the pcap file of DAMPs and that DSR sends and receives Diameter CER/CEA.
4. Check the pcap file of DAMPs and that DSR sends and receives Diameter DWR/DWA.
5. Check the pcap file of DAMPs and that DSR sends and receives Diameter DPR/DPA.
□
□
□
□
□
□
□
□
□
□
□
□
□
OutputsScreenshot of connection status
pcap files of DAMPs
□
□
Result
Company VINAPHONE ISTT/NSSOL
Remark
1
Category:
Test Case:
AIM:
INITIAL CONDITIONS:
EXPECTED RESULT:
Estimated Time
01.Connection
01-02
Confirm DSR can connect/disconnect Diameter connections
All of Diameter connections defined by LLD can be established to any nodes in VNP network.
All connections can be established
30minutes
Environment Result
Procedure
Prepare to capture packets (ISTT/NSSOL)
1. Login to DAMP who has a connection to OCS with SSH and start tshark command
Prepare to establish connection (VNP)
1. Prepares to start OCS connection.
Enable the connection (ISTT/NSSOL)
1. Login to SOAM GUI
2. Enable a connection between OCS and DSR
Disable the connection (ISTT/NSSOL)
1. Save a screen shot of connection status
2. Wait 2 minutes before next procedure.
3. Disable a connection between OCS and DSR
4. Save a screen shot of connection status
Stop and Check the packet capture (ISTT/NSSOL)
1. Stop tshark on DAMP
2. Download pcap files from DAMP
3. Check the pcap file of DAMP and that DSR sends and receives Diameter CER/CEA.
4. Check the pcap file of DAMP and that DSR sends and receives Diameter DWR/DWA.
5. Check the pcap file of DAMP and that DSR sends and receives Diameter DPR/DPA.
□
□
□
□
□
□
□
□
□
□
□
□
□
OutputsScreenshot of connection status
pcap files of DAMP
□
□
Result
Company VINAPHONE ISTT/NSSOL
Remark
2
Category:
Test Case:
AIM:
INITIAL CONDITIONS:
EXPECTED RESULT:
Estimated Time
01.Connection
01-03
Confirm DSR can connect/disconnect Diameter connections
All of Diameter connections defined by LLD can be established to any nodes in VNP network.
All connections can be established
30minutes
Environment Result
Procedure
Prepare to capture packets (ISTT/NSSOL)
1. Login to DAMP who has a connection to PCRF with SSH and start tshark command
Prepare to establish connection (VNP)
1. Prepares to start PCRF connection.
Enable the connection (ISTT/NSSOL)
1. Login to SOAM GUI
2. Enable a connection between PCRF and DSR
Disable the connection (ISTT/NSSOL)
1. Save a screen shot of connection status
2. Wait 2 minutes before next procedure.
3. Disable a connection between PCRF and DSR
4. Save a screen shot of connection status
Stop and Check the packet capture (ISTT/NSSOL)
1. Stop tshark on DAMP
2. Download pcap files from DAMP
3. Check the pcap file of DAMP and that DSR sends and receives Diameter CER/CEA.
4. Check the pcap file of DAMP and that DSR sends and receives Diameter DWR/DWA.
5. Check the pcap file of DAMP and that DSR sends and receives Diameter DPR/DPA.
□
□
□
□
□
□
□
□
□
□
□
□
□
OutputsScreenshot of connection status
pcap files of DAMP
□
□
Result
Company VINAPHONE ISTT/NSSOL
Remark
3