01.05.2014 mining infrastructure case study - examining the development of infrastructure to support...
TRANSCRIPT
1 May 2014
Erdenes Tavan Tolgoi JSC
Infrastructure Projects to increase ETT competitiveness
● Company overview
● The development of infrastructure projects:
- Water supply
- Coal Handling and Preparation Plant (CHPP)
- Road & Railway Cross-Border Railway
Tavan tolgoi mine-Chinese border railway
- Power Plant
Agenda
Company overview
– Erdenes Tavan Tolgoi JSC (ETT) was established in 2010.
– The ETT owns 6 mining licenses, out of which, the Tsankhi is world-class coking coal deposits.
– Pre-stripping and box cut development started in 2010, 2013 exported in 2011, 2013 respectively.
– Over 500 employees in the company.
Tavan Tolgoi is one of the largest developing
coking coal deposits in the world
Company overview
4
According to Norwest’s preliminary estimation of TT In-Situ coal resource by JORC code, there are 7.5
billion tons of thermal and coking coal within 300 m depth range limit.
West Tsankhi coal field
East Tsankhi coal field 1.2 Bt* Coking coal 65 %
1.08 Bt* Coking coal 78 %
Eastern (Onch Kharaat) Borteeg
South-Western (Oortsog)
Tavan Tolgoi JSC
Measured
Indicated
Inferred
282.5 Mt
Calculation within *200m depth
1,21 Bt* Coking coal 63%
765 Mt* Coking coal 72 %
Calculation by JORC code
60.3 Mt Coking coal 70%
74,5 Mt Coking coal 61%
78.8 Mt Coking coal 82%
298 Mt Coking coal 53% Bor tolgoi
Ukhaa khudag
Formation of Tavan Tolgoi deposit
How the infrastructure projects will bring greater operational capacity?
Feasibility study completed and approved by
the Mineral Resource Professional
Committee’s meeting in June 2013.
Front end engineering study of the plant is
completed.
Selection of EPC contractor will be completed
in 2014.
Commissioning first 5 Mt capacity module in
2015.
CHPP ramping up to processing 20mt of ROM
coal per year in 2017.
Coal Handling and Preparation Plant (CHPP)
GoM approved water use permit minimum
150 liters/sec from Balgasyn Ulaan Nuur
ground water in 2011 (~70km from mine
site).
Feasibility study completed and ready to
announce bidding for potential contractors.
Exploration to be commenced for
additional water supplies.
Completion of water supply pipeline and
structure targeted in 2015.
Water Supply
Dalanzadgad
Sainshand
Zuunbayan
Tavan Tolgoi
Oyu tolgoi
Gashuun sukhait
Zamiin-Uud
Khangi
Balgasiin Ulaan Nuur
240 km paved road from Tavan Tolgoi coalfield to Gashuun Sukhait,
Chinese Border.
Road and Railway
SOE MTZ plans to Construct 257 km railway from Tavan Tolgoi
area to Chinese Border by 2016.
GoM has allocated 200 mln USD.
Tavantolgoi-Gashuunsukhait Railway
Cross-Border Railway Projects
Mongolian and Chinese enterprises established the Consortium for
building a cross-border railway.
The Consortium (ETT, ER, TT and Shenhua group) is responsible for
project financing and construction.
This project will boost the transportation capacity of border ports and
reduce transportation costs.
450MW thermal power plant (GoM has allocated 50 mln USD).
Feasibility Study of PP was approved by the Ministry of Energy in
September 2013
Expected to be commenced the power plant in early 2016.
Tavan Tolgoi Power Plant
ETT Supply Chain and the project
Operating cost- 50%
Transportation to Tsagaan Khad
25-30%
Cross Border Transportation
14%
Mine Stockpile Stockpile Stockpile
China
B C
Stockpile charge
3%
A Mongolia
Stockpile charge
3%
240 km paved road
Operating cost- 50%
Haul truck to Tsagaan Khad
25-30%
Cross Border Transportation
3%
Stockpile charge
3%
Stockpile charge
3%
240 km paved road
Operating cost- 50%
Stockpile charge
3%
Stockpile charge
3%
257 km railway
Mongolia
Mongolia China
China
1
2
3 Transportation cost will reduce
c. 40-50%
Cross Border transportation
will reduce c.25%
1-Current supply chain 2-Cross Border Railway project is expected to be completed by the end of 2014 3 -Mine to Chinese Border railway is expected to commenced in 2015
A-Mine Mouth Sale B-Tsagaan Khad Sale C-Gants Mod Sale
Tsankhi Stockpile
Tavan Tolgoi Mine Stockpile
Thank you for attention!