  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    1/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration Contents

    Issue 08 (2006-08-20) Huawei Technologies Proprietary i

    Contents

    3 BTS Data Configuration ...........................................................................................................3-1

    3.1 Adding a Site.................................................................................................................................................3-3

    3.1.1 Task Description .................................................................... .............................................................. 3-3

    3.1.2 Procedure ............................................................ ................................................................. ................3-3

    3.1.3 Verification.........................................................................................................................................3-18

    3.1.4 Data Table .......................................................... .................................................................... ............3-19

    3.2 Deleting a Site.............................................................................................................................................3-21

    3.2.1 Task Description .................................................................... ............................................................ 3-21

    3.2.2 Procedure ............................................................ ................................................................... ............3-21

    3.2.3 Verification.........................................................................................................................................3-25

    3.2.4 Data Table .......................................................... .................................................................... ............3-25

    3.3 Adding a TRX ............................................................... ................................................................... ...........3-26

    3.3.1 Task Description .................................................................... ............................................................ 3-26

    3.3.2 Procedure ............................................................ ................................................................... ............3-26

    3.3.3 Verification.........................................................................................................................................3-30

    3.3.4 Data Table .......................................................... .................................................................... ............3-30

    3.4 Deleting a TRX ................................................................. ......................................................................... .3-31

    3.4.1 Task Description .................................................................... ............................................................ 3-31

    3.4.2 Procedure ............................................................ ................................................................... ............3-31

    3.4.3 Verification.........................................................................................................................................3-35

    3.4.4 Data Table .......................................................... .................................................................... ............3-35

    3.5 Adding or Deleting a Board .................................................................... .................................................... 3-37

    3.5.1 Task Description .................................................................... ............................................................ 3-37

    3.5.2 Procedure ............................................................ ................................................................... ............3-37

    3.5.3 Verification.........................................................................................................................................3-40

    3.5.4 Data Table .......................................................... .................................................................... ............3-40

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    2/92

    Contents

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    ii Huawei Technologies Proprietary Issue 08 (2006-08-20)

    3.6 Modifying Board Type ............................................................... ................................................................. 3-41

    3.6.1 Task Description .................................................................... ............................................................ 3-41

    3.6.2 Procedure ............................................................ ................................................................... ............3-41

    3.6.3 Verification.........................................................................................................................................3-47

    3.6.4 Data Table .......................................................... .................................................................... ............3-47

    3.7 Configuring Site Tower-Top Amplifier .................................................................. .....................................3-47

    3.7.1 Task Description .................................................................... ............................................................ 3-47

    3.7.2 Procedure ............................................................ ................................................................... ............3-47

    3.7.3 Verification.........................................................................................................................................3-50

    3.7.4 Data Table .......................................................... .................................................................... ............3-50

    3.8 Modifying Site Data....................................................................................................................................3-51

    3.8.1 Task Description .................................................................... ............................................................ 3-51

    3.8.2 Procedure ............................................................ ................................................................... ............3-51

    3.8.3 Verification.........................................................................................................................................3-53

    3.8.4 Data Table .......................................................... .................................................................... ............3-53

    3.9 Modifying the Site Output Property............................................................................................................3-54

    3.9.1 Task Description .................................................................... ............................................................ 3-54

    3.9.2 Procedure ............................................................ ................................................................... ............3-54

    3.9.3 Verification.........................................................................................................................................3-55

    3.9.4 Data Table .......................................................... .................................................................... ............3-55

    3.10 Starting Up Traffic Stat. Task Re-Register ....................................................................... .........................3-56

    3.10.1 Task Description ............................................................. ................................................................. 3-56

    3.10.2 Procedure ............................................................... ........................................................................ ..3-56

    3.11 Renaming a Site or Cell.............................................................................................................................3-58

    3.11.1 Task Description...............................................................................................................................3-58

    3.11.2 Procedure ............................................................... .......................................................................... 3-58

    3.11.3 Verification.......................................................................................................................................3-61

    3.11.4 Data Table ................................................................... ................................................................... ..3-61

    3.12 Modifying a Ring Topology Mark ............................................................... ............................................. 3-63

    3.12.1 Task Description ............................................................. ................................................................. 3-63

    3.12.2 Procedure ............................................................... ........................................................................ ..3-63

    3.12.3 Verification.......................................................................................................................................3-66

    3.12.4 Data Table ............................................................. ......................................................................... ..3-66

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    3/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration Contents

    Issue 08 (2006-08-20) Huawei Technologies Proprietary iii

    3.13 Adding a Slave Chain to a Site..................................................................................................................3-67

    3.13.1 Task Description ............................................................. ................................................................. 3-67

    3.13.2 Procedure ............................................................... ........................................................................ ..3-67

    3.13.3 Verification.......................................................................................................................................3-70

    3.13.4 Data Table ............................................................. ......................................................................... ..3-70

    3.14 Deleting a Slave Chain of a Site................................................................................................................3-71

    3.14.1 Task Description ............................................................. ................................................................. 3-71

    3.14.2 Procedure ............................................................... ........................................................................ ..3-71

    3.14.3 Verification.......................................................................................................................................3-74

    3.14.4 Data Table ............................................................. ......................................................................... ..3-74

    3.15 Configuring Site Idle Timeslots ........................................................... ..................................................... 3-74

    3.15.1 Task Description ............................................................. ................................................................. 3-74

    3.15.2 Procedure ............................................................... ........................................................................ ..3-74

    3.15.3 Verification.......................................................................................................................................3-78

    3.15.4 Data Table ............................................................. ......................................................................... ..3-78

    3.16 Modifying Site Properties in Batches........................................................................................................3-79

    3.16.1 Task Description ............................................................. ................................................................. 3-79

    3.16.2 Procedure ............................................................... ........................................................................ ..3-79

    3.16.3 Verification.......................................................................................................................................3-83

    3.16.4 Data Table ............................................................. ......................................................................... ..3-83

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    4/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration Figures

    Issue 08 (2006-08-20) Huawei Technologies Proprietary v

    Figures

    Figure 3-1 Selecting a module and BIE board....................................................................................................3-4

    Figure 3-2 Selecting a BIE port and upper site...................................................................................................3-4

    Figure 3-3 Site configuration..............................................................................................................................3-5

    Figure 3-4 Selecting the mode of BIE port adjustment ............................................................................ ..........3-5

    Figure 3-5 Site BIE Port Cascade List dialog box..............................................................................................3-6

    Figure 3-6 Adding TRXs....................................................................................................................................3-6

    Figure 3-7 Adding a cell.....................................................................................................................................3-7

    Figure 3-8 Configuring the property of site device ..................................................................... .......................3-8

    Figure 3-9 Modifying site internal connections..................................................................................................3-8

    Figure 3-10 Adding cells ..................................................................... ............................................................... 3-9

    Figure 3-11 Added cells....................................................................................................................................3-10

    Figure 3-12 Setting cell properties .................................................................. ................................................. 3-11

    Figure 3-13 Modifying reserved parameters ....................................................................... .............................3-12

    Figure 3-14 Command list for dynamic configuration ....................................................................... ..............3-12

    Figure 3-15 Selecting the Manual Mode option...............................................................................................3-13

    Figure 3-16 Manual timeslot adjustment..........................................................................................................3-14

    Figure 3-17 TRX property................................................................................................................................3-15

    Figure 3-18 RSL property configuration ........................................................................ ..................................3-16

    Figure 3-19 Site trunk mode configuration ..................................................................... .................................3-17

    Figure 3-20 BSC BIE description data.............................................................................................................3-18

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    5/92

    Figures

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    vi Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-21 Selecting a site .................................................................... .......................................................... 3-22

    Figure 3-22 Deleting a site .................................................................. ............................................................. 3-22

    Figure 3-23 Site trunk mode.............................................................................................................................3-23

    Figure 3-24 Site TRX property.........................................................................................................................3-24

    Figure 3-25 Command list for dynamic configuration ....................................................................... ..............3-25

    Figure 3-26 Selecting a site .................................................................... .......................................................... 3-26

    Figure 3-27 Adding TRXs................................................................................................................................3-27

    Figure 3-28 Configuring the cell ........................................................... ........................................................... 3-28

    Figure 3-29 Assigning TRXs to the cell ............................................................................ ...............................3-28

    Figure 3-30 Configuring the related properties ................................................................ ................................3-29

    Figure 3-31 Selecting a cell..............................................................................................................................3-32

    Figure 3-32 Selecting TRXs.............................................................................................................................3-33

    Figure 3-33 Prompt to modify the reserved channel number................................................................. ..........3-33

    Figure 3-34 Information prompt.......................................................................................................................3-34

    Figure 3-35 Changing the reserved channel number........................................................................................3-34

    Figure 3-36 Command list for dynamic configuration ....................................................................... ..............3-35

    Figure 3-37 Selecting a site .................................................................... .......................................................... 3-37

    Figure 3-38 Adding or deleting a board............................................................................................................3-38

    Figure 3-39 Configuring the property of site device ............................................................ ............................3-39

    Figure 3-40 Command list for dynamic configuration ....................................................................... ..............3-40

    Figure 3-41 Selecting a site .................................................................... .......................................................... 3-41

    Figure 3-42 Changing the board type...............................................................................................................3-42

    Figure 3-43 Site device property ............................................................... ....................................................... 3-42

    Figure 3-44 Changing the PBU card type ......................................................................... ...............................3-43

    Figure 3-45 Changing the CDU type................................................................................................................3-44

    Figure 3-46 Selecting the EDU type.................................................................................................................3-44

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    6/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration Figures

    Issue 08 (2006-08-20) Huawei Technologies Proprietary vii

    Figure 3-47 Changing the TRX type ................................................................ ................................................ 3-45

    Figure 3-48 Command list for dynamic configuration ....................................................................... ..............3-46

    Figure 3-49 Selecting a site .................................................................... .......................................................... 3-48

    Figure 3-50 Configuring the tower-top amplifier.............................................................................................3-48

    Figure 3-51 Modifying the property of site device...........................................................................................3-49

    Figure 3-52 Site tower-top amplifier configuration..........................................................................................3-49

    Figure 3-53 Command list for dynamic configuration ....................................................................... ..............3-50

    Figure 3-54 Selecting a site .................................................................... .......................................................... 3-51

    Figure 3-55 Modifying site data ...................................................................... ................................................. 3-52

    Figure 3-56 Changing the site device property.................................................................................................3-52

    Figure 3-57 Command list for dynamic configuration ....................................................................... ..............3-53

    Figure 3-58 Selecting a site .................................................................... .......................................................... 3-54

    Figure 3-59 Modifying site output parameters ..................................................................... ............................3-55

    Figure 3-60 Selecting a startup mode...............................................................................................................3-57

    Figure 3-61 Command list for dynamic configuration ....................................................................... ..............3-57

    Figure 3-62 Renaming a site or cell..................................................................................................................3-58

    Figure 3-63 Renaming the site ............................................................... .......................................................... 3-59

    Figure 3-64 Renaming a cell ................................................................. ........................................................... 3-60

    Figure 3-65 Renaming an external cell.............................................................................................................3-60

    Figure 3-66 Renaming a 3G external cell.........................................................................................................3-61

    Figure 3-67 Selecting a BIE ............................................................ ................................................................. 3-64

    Figure 3-68 Selecting a BIE port......................................................................................................................3-64

    Figure 3-69 Configuring the closed loop BIE port...........................................................................................3-65

    Figure 3-70 Command list for dynamic configuration ....................................................................... ..............3-66

    Figure 3-71 Selecting a BIE ............................................................ ................................................................. 3-68

    Figure 3-72 Selecting a BIE port......................................................................................................................3-68

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    7/92

    Figures

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    viii Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-73 Selecting a site .................................................................... .......................................................... 3-69

    Figure 3-74 Selecting a port number .................................................................. ..............................................3-69

    Figure 3-75 SiteBIE Port Cascade List dialog box..........................................................................................3-70

    Figure 3-76 Selecting a BIE ............................................................ ................................................................. 3-72

    Figure 3-77 Selecting a port ........................................................... .................................................................. 3-72

    Figure 3-78 Deleting the slave chain................................................................................................................3-73

    Figure 3-79 Site BIEPort Cascade List dialog box..........................................................................................3-73

    Figure 3-80 Selecting a BIE ............................................................ ................................................................. 3-75

    Figure 3-81 Selecting a port ........................................................... .................................................................. 3-75

    Figure 3-82 Port Idle Timeslot Assignment dialog box.................................................................. ..................3-76

    Figure 3-83 Failed idle timeslot assignment.....................................................................................................3-76

    Figure 3-84 Detailed information about assigned timeslots .................................................................. ...........3-77

    Figure 3-85 Command list for dynamic configuration ....................................................................... ..............3-78

    Figure 3-86 Selecting a site type and sites .......................................................... .............................................3-80

    Figure 3-87 Selecting site properties................................................................................................................3-80

    Figure 3-88 Modifying site properties..............................................................................................................3-81

    Figure 3-89 Site Device Property dialog box.................................................................... ...............................3-82

    Figure 3-90 Command list for dynamic configuration ....................................................................... ..............3-83

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    8/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration Tables

    Issue 08 (2006-08-20) Huawei Technologies Proprietary ix

    Tables

    Table 3-1 Mapping between port number and TRX number .............................................................. ................3-9

    Table 3-2 Modified data tables during the addition or deletion of a site .......................................................... 3-19

    Table 3-3 Modified data tables during the addition of a TRX ................................................................... .......3-30

    Table 3-4 Modified data tables during the deletion of a TRX .................................................................. ........3-35

    Table 3-5 Modified data tables during the addition or deletion of a board.......................................................3-40

    Table 3-6 Modified data tables during the modification of the board type.......................................................3-47

    Table 3-7 Modified data table during the configuration of site tower-top amplifier.........................................3-51

    Table 3-8 Modified data tables during the modification of site data ................................................................ 3-53

    Table 3-9 Modified data table during the modification of site output property ................................................ 3-56

    Table 3-10 Modified data tables during the renaming of a site or cell............................................................. 3-61

    Table 3-11 Modified data tables during the modification of a ring topology mark .......................................... 3-66

    Table 3-12 Modified data tables during the addition of a slave chain to a site.................................................3-70

    Table 3-13 Modified data tables during the deletion of a slave chain of a site.................................................3-74

    Table 3-14 Modified data tables during the configuration of site idle timeslots............................................... 3-78

    Table 3-15 Modified data tables during the modification of a batch of site properties.....................................3-83

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    9/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-1

    3 BTS Data Configuration

    About This Chapter

    The following table lists the contents of this chapter.

    Title Description

    3.1 Adding a Site Describes how to add a site.

    3.2 Deleting a Site Describes how to delete a site.

    3.3 Adding a TRX Describes how to add a TRX.

    3.4 Deleting a TRX Describes how to delete a TRX.

    3.5 Adding or Deleting aBoard

    Describes how to add or delete a board.

    3.6 Modifying Board Type Describes how to modify the board type.

    3.7 Configuring Site Tower-

    Top Amplifier

    Describes how to configure the site tower top amplifier.

    3.8 Modifying Site Data Describes how to modify site data.

    3.9 Modifying the Site Output

    Property

    Describes how to modify the site output property.

    3.11 Renaming a Site or Cell Describes how to rename a site or cell.

    3.12 Modifying a Ring

    Topology Mark

    Describes how to modify a ring topology mark.

    3.13 Adding a Slave Chain to

    a Site

    Describes how to add a slave chain to a site.

    3.14 Deleting a Slave Chain of

    a Site

    Describes how to delete a slave chain of a site.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    10/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-2 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Title Description

    3.15 Configuring Site Idle

    Timeslots

    Describes how to configure site idle timeslots.

    3.16 Modifying Site Propertiesin Batches

    Describes how to modify site properties in batches.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    11/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-3

    3.1 Adding a Site

    3.1.1 Task Description

    Purpose To add a site without resetting the BSC

    Prerequisitez The BSC is configured with idle E1 ports.z The data to be configured is consistent and correct.

    Note

    z You can add only one site to one BIE port in one operation. If the newTRXs are distributed on multiple chains, add TRXs or cells after adding

    the site.z Adding a site also involves adding a cell. Perform Modify Cell

    Handover Parameter to configure the neighbor cell after adding thesite.

    3.1.2 Procedure

    Adding a Site Without Timeslot Manual Adjustment

    Using an example, this part shows how to add a site without timeslot manual adjustment.

    Assume that you have to add Site2, and TRX 0, TRX 3, TRX 5, TRX 8, TRX 18, TRX 21 andTRX 24 in BM1 for two cells.

    The conditions of the example are as follows:

    z Cell1 includes TRX 0, TRX 5, TRX 18 and TRX 24; Cell2 includes TRX 3, TRX 8 andTRX 21.

    z Cell1 and Cell2 are bi-directionally adjacent.z No timeslot manual adjustment is required for the new site.z The new site is connected to port0 of BIE0.z The trunk mode is 2E1 port*15:1multiplexing/port.The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BTS > Add a Site.The Add a Site dialog box as shown in Figure 3-1is displayed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    12/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-4 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-1Selecting a module and BIE board

    Step 2 Select a module and BIE board.Step 3 ClickNext.

    The Add a Site dialog box is refreshed, as shown in Figure 3-2.

    Figure 3-2Selecting a BIE port and upper site

    The trunk mode can be changed only when no site is connected to the BIE.

    Step 4 Select the BIE port 0 andupper site Site0. Then clickAdd Site.The Add Site dialog box as shown in Figure 3-3 is displayed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    13/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-5

    Figure 3-3Site configuration

    Step 5 EnterSite2 in the Site Name text box. Select BTS312 from the Site Typedrop-down list and Port[0] from the Port to This Site drop-down list.

    Step 6 ClickOK.The Confirm dialog box as shown in Figure 3-4 is displayed.

    Figure 3-4Selecting the mode of BIE port adjustment

    Step 7 ClickNo.

    After a site is added, Add Site, Trunk Mode, and all the BIE ports in the Add a Site dialog box asshown in Figure 3-2 are unavailable.

    Step 8 ClickSite Ports Table.The Site BIE Port Cascade List dialog boxas shown inFigure 3-5 is displayed. Ensure thatthe connection between the upper site and lower site is correct.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    14/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-6 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-5Site BIE Port Cascade List dialog box

    Step 9 ClickOKto return to the Add a Site dialog box as shown in Figure 3-2.

    z In the Site BIE Port Cascade List dialog box, Modify BIE Port and Site Connection is availableonly when the selected BIE port is the sub-chain port.

    z For the Next Site whose Inlet Port No. is 0, the inter-site port cascade relationship cannot beremoved.

    z The inlet port 0 of the next site cannot be modified.

    Step 10 ClickNext.The Add a Site dialog box is refreshed, as shown in Figure 3-6.

    Figure 3-6Adding TRXs

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    15/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-7

    Step 11 Select 0 TRX fromthe Available TRX list box, and then clickAdd TRX to add it to theInstalled TRX list box. Repeat the same steps to add 3 TRX, 5 TRX,

    8 TRX, 18 TRX, 21 TRX and 24 TRX to the Installed TRX list box.

    Step 12

    ClickNext.

    The Add a Site dialog box is refreshed, as shown in Figure 3-7.

    Figure 3-7Adding a cell

    Step 13 ClickModify Site Device's Property.The Site Device's Property dialog box as shown in Figure 3-8 is displayed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    16/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-8 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-8Configuring the property of site device

    Step 14 Select the rack from the Current Rackdrop-down list. Delete the excessive boards, anddouble-click the CDU to configure the CDU board property.

    Step 15 ClickBTS Property to configure site property. Then clickOKto return totheSite Device's Property dialog box.

    Step 16 ClickInter-site Link.The Modify Site Internal Connections dialog box as shown in Figure 3-9 is displayed.

    Figure 3-9Modifying site internal connections

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    17/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-9

    Step 17 Configure the site internal connections.Table 3-1 lists the mapping between port number and TRX number.

    Table 3-1Mapping between port number and TRX numberCabinetGroup No.

    Port No. TRX No. Correspondingto BTS30

    TRX No. Corresponding toBTS312

    0 07 017 023

    1 811 1835 2447

    2 1619 3653 4871

    Step 18 ClickOKto return to the Site Device's Property dialog box as shown inFigure 3-8.

    Step 19 ClickComplete to return to the Add a Site dialog box as shown in Figure 3-7.Step 20 ClickAdd Cell. Select 2 from the Cell Number box, as shown in Figure 3-10.

    Figure 3-10Adding cells

    In the Add Cell dialog box as shown in Figure 3-10, note the following conditons:

    z Cell Name cannot be changed ifCell Number exceeds 1 orName Cell by Site's Nameis selected.

    z IfName Cell by Site's Name is selected, the naming convention of the cell is site name-serial number. The two cells added in this example are named Site2-1 and Site2-2.

    z IfCell Number exceeds 1 and Name Cell by Site's Name is not selected, Cell-Cell No.is used as the Cell Name.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    18/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-10 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    The default cell template is used for the added cell. The system also supports customized cell template.For details, see section 4.1 "Adding Cell."

    Step 21

    ClickOK.

    The Add a Site dialog box is refreshed, as shown in Figure 3-11. The two cells are displayed

    in the Cell List box.

    Figure 3-11Added cells

    Step 22 Select Site2-1. Then ClickModify Cell Property.The Set Cell's Property dialog box as shown in Figure 3-12 is displayed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    19/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-11

    Figure 3-12Setting cell properties

    Step 23 Assign 0 TRX, 5 TRX, 18 TRX and 24 TRX as well as properties such as availablefrequency and network parameters to Site2-1.

    To set the advanced property, see section 4.1 "Adding a Cell."

    In the Add a Site dialog box shown in Figure 3-11, you can select the added cell and clickDelete Cell

    to delete it.

    Step 24 ClickComplete&Exit to return to the Add a Site dialog box as shown inFigure 3-11.

    Step 25 Add TRX 3, TRX 8, and TRX 21 to Site2-2 in the same way as adding the TRXs to Site2-1by following step 22 through step 24.

    Step 26 ClickModify Reserved Parameters in the Add a Site dialog box as shown in Figure 3-11.The Modify Reserved Parameters dialog box as shown inFigure 3-13is displayed. You can

    change the reserved parameters of the added site, cell or TRX, or retain the default value65535.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    20/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-12 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-13Modifying reserved parameters

    Step 27 ClickOKto return to the Add a Site dialog box as shown in Figure 3-11.Step 28 ClickNext.

    The Add a Site dialog box is refreshed, as shown in Figure 3-14.

    Figure 3-14Command list for dynamic configuration

    Step 29 Click Start Dynamic Configuration.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    21/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-13

    You can only change the physical link No. and the signaling connection No. of the LAPD of the selectedsite under the selected BIE port.

    Step 30

    Choose Cell > Modify Cell Handover Parameter to configure the adjacent relationship forthe two cells after adding the site.

    ----End

    Adding a Site with Timeslot Manual Adjustment

    To add a site with timeslot manual adjustment, perform the following steps:

    Step 1 Perform step 1 through step 6 of "Adding a Site Without Timeslot Manual Adjustment."Step 2 In the Confirm dialog box as shown in Figure 3-4, clickYes.

    The Manual Mode check box appears in the Add a Site dialog box as shown in Figure 3-15.

    To manually adjust timeslots, see theM900/M1800 BSC Data Configuration Manual InitialConfiguration.

    Figure 3-15Selecting the Manual Mode option

    Step 3 Select Manual Mode.Step 4 ClickNext.

    The following procedure for adding a cell is the same as that for adding a cell without the

    timeslot manual adjustment.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    22/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-14 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    After the cell is added, the Add a Site dialog box is refreshed, as shown in

    Figure 3-16.

    Figure 3-16Manual timeslot adjustment

    The Add a Site dialog box shown in Figure 3-16 lists all the sites on the chain where theadded site resides. If the TRXs of the level 1 site on the chain where the added site resides aredistributed on multiple chains, the Add a Site dialog box lists all the sites on the main chain.

    To manually adjust the timeslots, you need to enter all the TRX properties such as Abis TS

    No., Abis Sub-TS No. and Trunk Circuit No., and the RSL and OML properties. If site

    cascading is involved, you also need to configure the site trunk mode and BIE port property.

    You can check the Idle Timeslot if the selected site has idle timeslots.

    Step 5 Select the new site. ClickTRX Property in the Add a Site dialog box.The TRX Property dialog box is displayed as shown in Figure 3-17.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    23/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-15

    Figure 3-17TRX property

    The TRX Property dialog box lists the default values of the properties. The Abis TS No. and

    Abis Sub-TS No. are 0; the Trunk Circuit No. is 65535; the BSC BIE E1 TimeSlot No. is

    255.

    Rev. OML Trunk Circuit No., Rev. OML ABIS TS No., Rev. OML BSC BIE E1 TS No.

    and Rev. OML Physical Link No. are available if the relay mode of BIE board is full ratering topology or half rate ring topology.

    In timeslot manual adjustment mode, the physical links of RSL and OML are calculatedautomatically.

    The dynamic configuration can modify only the TRX properties of the new site, and view but not

    modify the TRX properties of other sites.

    RSLs are multiplexed according to Abis TS No. entered. You must ensure that the data is correct.

    Step 6 In the TRX Property dialog box as shown in Figure 3-17, double-click the row of the TRXwhose RSL properties are to be modified.

    The RSL Property dialog box as shown in Figure 3-18is displayed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    24/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-16 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-18RSL property configuration

    Step 7 Enter the related information, and then clickOKto return to TRX Property dialog box asshown in Figure 3-17.

    Step 8 ClickOKto return to the Add a Site dialog box as shown in Figure 3-16.If the new site is a cascaded site, clickSite Trunk Mode Description in the Add a Site

    dialog box to display the Site Trunk Mode dialog box as shown inFigure 3-19. Configure the BIE trunk mode.

    For detailed information about the parameters in the Site Trunk Mode dialog box, see theM900/M1800 BSC Data Configuration Reference Engineering Parameters.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    25/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-17

    Figure 3-19Site trunk mode configuration

    Trunk Mode No. in the Site Trunk Mode dialog box as shown in Figure 3-19 should be twice the

    upper site number.

    If the networking mode is full rate ring topology or half rate ring topology, the reverse trunk modenumber should be twice the upper site number plus one.

    Step 9 ClickOKto return to the Add a Site dialog box as shown in Figure 3-16.Step 10 ClickBIE Port Property.

    The BSC BIE Description Data dialog box as shown in Figure 3-20 is displayed.For detailed information about the BIE description data, see theM900/M1800 BSC Data

    Configuration Reference Engineering Parameters.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    26/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-18 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-20BSC BIE description data

    Step 11 Adjust the properties of the Abis interface and BS interface.Step 12 ClickOKto return to the Add a Site dialog box as shown in Figure 3-16.Step 13 ClickNext.

    The Add a Site dialog box is refreshed.

    Step 14 ClickStart Dynamic Configuration to activate the data.----End

    z In the chain topology or tree topology, reset the sites from the one at the top level of the chain orreset the BIE if the new site is not functional.

    z After adding a site, re-register the traffic statistics tasks of this site.z If the added site is the level 1 site of the BIE port, reset the BIE after adding the site.

    3.1.3 Verification

    After adding a site, check that:

    z The channels of all the cells are in idle state.After the node icons of the newly added site are displayed on the OMC SHELL, start theSite Maintenance System of the newly added site. If all the TRXs are powered on and arefunctional, the channels of all the cells are in idle state.

    z Calls in the newly added sites can be established.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    27/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-19

    3.1.4 Data Table

    Table 3-2 lists the modified data tables in the BSC Data Management System.

    Table 3-2Modified data tables during the addition or deletion of a siteNo. Table Name

    1 HWII Power Control Table

    2 BSC Cell Table

    3 TRX Configuration Table

    4 Radio Channel Configuration Table

    5 LAPD Semi-perm. Connection Table

    6 LAPD Signaling Connection Table

    7 BSC BIE Active/Stby. Group Table

    8 BSC BIE Description Table

    9 Site BIE Trunk Mode Description Table

    10 Site BIE Configuration Table

    11 Signaling Channel Link Table

    12 System Information Table

    13 Cell Configuration Table

    14 Normal Handover Table

    15 Cell Allocation Table

    16 BA1(BCCH) Table

    17 BA2(SACCH) Table

    18 Cell Attribute Table

    19 Cell Alarm Threshold Table

    20 Cell Call Control Table

    21 Cell Call Control Parameter Table

    22 Cell Module Information Table

    23 Handover Control Table

    24 GSM0508 Handover Table

    25 Load Handover Table

    26 Intra-cell Continuous HO Control Table

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    28/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-20 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    No. Table Name

    27 Penalty Table

    28 Filter Table

    29 Emergency Handover Table

    30 Adjacent Cell Relation table

    31 Power Control Selection Table

    32 Ordinary Cell Power Control Table

    33 BTS Power Control Table

    34 MS Power Control Table

    35 Radio Channel Management Control Table

    36 Site Description Table

    37 Site Slot Description Table

    38 Carrier Configuration Table

    39 External Cell Description Table

    40 Fast-Moving Handover Table

    41 Cell Module Information Table

    42 Frequency Hopping Table

    43 Site Frame Description Table

    44 HW II Channel Allocation Table

    45 Antenna and Feeder Configuration Table

    46 Concentric Cell Handover Table

    47 Site Software Configuration Table

    48 Site Reserved Parameter Table

    49 Cell Reserved Parameter Table

    50 TRX Reserved Parameter Table

    51 3G BA1Table

    52 3G System Information Table

    53 Inter-RAT Handover Table (UTRAN FDD)

    54 UTRAN FDD Adjacent Relation Table

    55 3G Filter Table

    56 3G BA2 Table

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    29/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-21

    3.2 Deleting a Site

    3.2.1 Task Description

    Purpose To delete sites that are no longer required

    Prerequisite z Block all the cells of the site to be deleted on the Site MaintenanceSystem. This avoids call processing in the site during deletion.

    z If the site has sub cascading sites, delete these sub sites.Note

    z If the site to be deleted is not the level 1 site connected to the BIE portand the BIE port is in timeslot manual adjustment mode, change the BIEtrunk mode of the site by implementing timeslot manual adjustment.

    z After deleting a site, you need to delete the site icon on the OMCSHELL.

    zWhen a site is deleted, all the cells connected to it will also be deleted.

    3.2.2 Procedure

    Using an example, this part shows how to delete a site. Assume you have to delete Site2 inBM1.

    The conditions of the example are as follows:

    zThe BIE port of Site2 is in the timeslot manual adjustment mode.

    z Site2 is the sub-site of Site0.The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BTS > Delete a Site.The Delete a Site dialog box as shown in Figure 3-21is displayed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    30/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-22 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-21Selecting a site

    Step 2 Select Site2.

    If no site is selected or the site selected is not the last level site, the Nextbuttonin the Delete a Site

    dialog box is unavailable.

    Step 3 ClickNext.The Delete a Site dialog box is refreshed, as shown in Figure 3-22.

    Figure 3-22Deleting a site

    All the sites connected to the BIE port of the site to be deleted (Site2 in BM1) are listed in the

    Delete a Site dialog box as shown in Figure 3-22. If the connection is in multi-chain mode, all

    the sites of the main chain BIE port are listed. The site to be deleted is not listed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    31/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-23

    If the BIE port connected to the selected site is not in timeslot manual adjustment mode, the dynamicconfiguration dialog box instead of the timeslot manual adjustment dialog box will be displayed.

    The Idle Timeslot button is available if the selected site has idle timeslots.

    Step 4 Select the last site in the list box, and then clickSite trunk mode description in the Delete aSite dialog box.

    The Site Trunk Mode dialog box as shown in Figure 3-23 is displayed. You can manually

    change the site BIE trunk mode.

    For detailed information about the BIE trunk mode, see theM900/M1800 BSC Data

    Configuration Reference Engineering Parameters.

    Figure 3-23Site trunk mode

    Step 5 Delete all the records of the site with Trunk Mode No. as 0 by pressing Delete.The site BIE trunk mode description of Site2 is deleted.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    32/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-24 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 6 ClickOKto return tothe Delete a Site dialog box as shown in Figure 3-22.Step 7 ClickTRX Property to view the site TRX property, as shown in Figure 3-24.

    The TRX Property dialog box lists the TRX property of Site0.

    Figure 3-24Site TRX property

    Do not change the value of any parameter in the TRX Property dialog box as shown in Figure 3-24.

    Step 8 ClickOKto return to the Delete a Site dialog box as shown in Figure 3-22.Step 9 ClickNext.

    The Delete a Site dialog box is refreshed, as shown in Figure 3-25.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    33/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-25

    Figure 3-25Command list for dynamic configuration

    Step 10 ClickStart Dynamic Configuration to activate the data.----End

    After a site is deleted, the adjacent relationship between cells under this site is also deleted. Therefore,the Configure handover data command must be sent to the adjacent cells for automatic update of theadjacent relationship.

    3.2.3 Verification

    After deleting the site, check that:

    z The maintenance of the deleted site is not available on the OMC SHELL.z The system prompts the error site number.z The OMLs and RSLs corresponding to the sites are released in the switching network

    boards.

    3.2.4 Data Table

    Table 3-2 lists the modified data tables in the BSC Data Management System.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    34/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-26 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    3.3 Adding a TRX

    3.3.1 Task Description

    Purpose To add TRXs to a site for cell capacity expansion

    Prerequisite Block the cells of the site on the Site Maintenance System.

    Notez You can add TRXs to only one site of one BIE port in one operation. If

    you have to add TRXs to multiple sites of one BIE port or to multiple

    BIE ports of one site, add TRXs to one site of one BIE port first, andthen repeat the steps to add the TRXs to more sites or ports.

    z If the BIE port of the site is in timeslot manual adjustment mode, youalso need to adjust the timeslot manually.

    3.3.2 Procedure

    Using an example, this part shows how to add TRXs to a site. Assume that you have to addTRXs 0 and 7 to Site0-1 and Site0-2 under Site0 in BM1. The BIE port of Site0 is in timeslot

    manual adjustment mode.

    The procedure is as follows:

    Step 1 On the BSC Data Auto Configuration System, choose BTS > Add TRX.The Add TRX dialog box as shown in Figure 3-26 is displayed.

    Figure 3-26Selecting a site

    Step 2 Select Site0 in BM1.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    35/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-27

    If no site is selected, the Next button in the Add TRX dialog box as shown in Figure 3-26 is unavailable.

    Step 3 ClickNext.The Add TRX dialog box as shown in Figure 3-27 is displayed.

    Figure 3-27Adding TRXs

    Step 4 Select 1 TRX, and then clickAdd TRX to add it to the Installed TRX list box. Repeat thesame steps to add 7 TRX to the Installed TRX list box.

    The BIE the Site Belongs to drop-down list box andthe Select Port option buttons are unavailable ifthe Installed TRX list already has TRXs.

    Step 5 ClickNext.The Add TRX dialog box is refreshed, as shown in Figure 3-28.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    36/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-28 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-28Configuring the cell

    If the new TRXs change the intra-site transparent transmission relationship, for example, TRX18 is added to site30 that earlier had only TRX 1 and TRX 4, you need to clickModify SiteProperty to configure the intra-site link. For details of intra-site link configuration, seesection 3.1 "Adding a Site."

    You cannot add or delete cells in the Add TRX dialog box as shown inFigure 3-28.

    Step 6 Select Site0-1. Then clickModify Cell Property.The Assign TRX to Cell dialog box as shown inFigure 3-29 is displayed. You can click

    Modify CA to add frequencies to the cell.

    Figure 3-29Assigning TRXs to the cell

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    37/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-29

    Step 7 Assign 1 TRX to Site0-1, and then double-click1 TRX listed in the Assigned TRX box toassign frequencies to Site0-1. Repeat the same steps to assign 7 TRX and frequenciesto

    Site0-2.

    Step 8

    In the Assign TRX to Cell dialog box, clickComplete & Exit to return to theAdd TRX dialog box as shown in Figure 3-28.

    You can clickModify Reserved Parameters to change the reserved parameters or retain the default

    value 65535.

    If no TRX is assigned to the cell, the Next button in the Add TRX dialog box is unavailable.

    Step 9 ClickNext in the Add TRX dialog box as shown in Figure 3-28.The Add TRX dialog box is refreshed, as shown in Figure 3-30.

    Figure 3-30Configuring the related properties

    Step 10 Select the added site from the list box. ClickTRX Property, Site Trunk Mode Description,and BIE Port Property to configure the related properties.

    In the TRX Property dialog box, you can only change the TRX properties of the selected BIEport and site. Do not change the TRX properties of other BIE ports and sites. This principle isapplicable to all dynamic configuration operations.

    If the BIE port of the BIE where the TRXs reside is not in the timeslot manual adjustment mode, choosethe dynamic configuration mode as described in section 3.1 "Adding a Site."

    For details of timeslot manual adjustment, see section 3.1 "Adding a Site."

    Step 11 ClickNext.The Add TRX dialog box is refreshed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    38/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-30 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 12 ClickStart Dynamic Configuration to activate the data.----End

    In the star or tree topology, if the new TRX or other equipment fails to operate, reset the sites on the linkwhere the site resides one by one starting from the top level site. You can also reset the BIE.

    After adding a TRX, you need to re-register the traffic statistics tasks of the site.

    3.3.3 Verification

    After adding the TRXs, check that:

    z The new TRXs are functional on the Site Maintenance System.z The conversations over the new TRXs are normal.z The related data in the data tables and in the host are correct.

    3.3.4 Data Table

    Table 3-3 lists the modified data tables in the BSC Data Management System.

    Table 3-3Modified data tables during the addition of a TRXNo. Table Name

    1 Site BIE Configuration Table

    2 Site Slot Description Table

    3 Site Description Table

    4 Antenna and Feeder Configuration Table

    5 Site Frame Description Table

    6 TRX Configuration Table

    7 Carrier Configuration Table

    8 Radio Channel Configuration Table

    9 LAPD Semi-perm. Connection Table

    10 LAPD Signaling Connection Table

    11 Signaling Channel Link Table

    12 Frequency Hopping Table

    13 Cell Attribute Table

    14 BA1(BCCH) Table

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    39/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-31

    No. Table Name

    15 BA2(SACCH) Table

    16 Site BIE Trunk Mode Description Table

    17 BSC BIE Description Table

    18 TRX Reserved Parameter Table

    3.4 Deleting a TRX

    3.4.1 Task Description

    Purpose To delete a faulty TRX, or to adjust the capacity of the cells within onesite

    Prerequisite z Block the TRX on the Site Maintenance System.z To delete main BCCH TRX, choose Cell > Modify TRX Channel

    Type first to change the TRX into non-main BCCH TRX and assign anew BCCH to the cell. If the cell has only one main BCCH TRX left,choose Cell > Delete Cell to delete the cell.

    z If the number of full rate channels the cell can provide is smaller thanthat reserved after the TRXs are deleted, change the reserved channelnumber first.

    Note z You can delete the TRXs (except main BCCH TRXs) of only one cell inone site at a time.

    z For the BTS20, the associated FPU is also deleted when the TRX isdeleted. For the BTS3001C, the associated MFU is also deleted whenthe TRX is deleted.

    z After the TRX is deleted, the rack will be deleted (except for rack0) ifthere is no TRX on it.

    z If the BIE port is in timeslot manual adjustment mode, adjust thetimeslot manually when deleting the TRX. For details, see section 3.1"Adding a Site" or section 3.3 "Adding a TRX."

    3.4.2 Procedure

    Using an example, this part shows how to delete TRXs. Assume that you have to delete TRX

    18 and TRX 21 of Site2 in BM1. These two TRXs reside in Site2-1 that contains TRX 0, TRX18 and TRX 20.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    40/92

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    41/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-33

    Figure 3-32Selecting TRXs

    Step 4 Select 18 TRX in the Assigned TRX list box, and then add it to the Deleted TRX list box.Repeat the same steps to add 21 TRX to the Deleted TRX list box.

    Step 5 ClickNext.The Delete TRX dialog box is refreshed, as shown in Figure 3-33.

    Figure 3-33Prompt to modify the reserved channel number

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    42/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-34 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    If you delete the main BCCH TRX, the Informationprompt as shown in

    Figure 3-34 appears.

    Figure 3-34Information prompt

    If the number of full rate channels the cell can provide is less than that reserved after the TRXis deleted, you need to change the reserved channel number first.

    Step 6 ClickOK.The Delete TRX dialog box is refreshed, as shown in Figure 3-35.

    Figure 3-35Changing the reserved channel number

    Step 7 Change the number in the Correct the Reserved Channel Number text box.Step 8 ClickNext.

    The Delete TRX dialog box is refreshed, as shown Step 9.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    43/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-35

    Figure 3-36Command list for dynamic configuration

    Step 9 ClickStart Dynamic Configuration to activate the data.----End

    In the star or tree topology, if the new TRX or other equipment fails to operate, reset the sites on the link

    where the site resides one by one starting from top level site. You can also reset the BIE.

    After deleting a TRX, you need to re-register the traffic statistics tasks of the site.

    3.4.3 Verification

    Check that the TRXs are deleted on the Site Maintenance System.

    3.4.4 Data Table

    Table 3-4 lists the modified data tables in the BSC Data Management System.

    Table 3-4Modified data tables during the deletion of a TRXNo. Table Name

    1 Site BIE Configuration Table

    2 Site Slot Description Table

    3 Site Description Table

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    44/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-36 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    No. Table Name

    4 Antenna and Feeder Configuration Table

    5 Site Frame Description Table

    6 TRX Configuration Table

    7 Carrier Configuration Table

    8 Radio Channel Configuration Table

    9 LAPD Semi-perm. Connection table

    10 LAPD Signaling Connection Table

    11 Signaling Channel Link Table

    12 Frequency Hopping Table

    13 Cell Attribute Table

    14 BA1(BCCH) Table

    15 BA2(SACCH) Table

    16 Site BIE Trunk Mode Description Table

    17 BSC BIE Description Table

    18 TRX Reserved Parameter Table

    19 Radio Channel Management and Control Table

    20 HW Channel Allocation Table

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    45/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-37

    3.5 Adding or Deleting a Board

    3.5.1 Task Description

    Purpose To delete:

    z The standby TMU and standby OMUz The PSU, PMU, EAC, PBU, CDU, EDU, TES, TEU, MCK, and HPA

    Prerequisite None

    Note z You cannot delete the active TMU, OMU, TRX, FPU, MFU, or MMU.z The FPU in the BTS20 and the MFU in the BTS3001C can be deleted

    only when the TRXs have been deleted.

    z The site output property and extended parameter will be adjusted as thedefault value when the EAC is deleted. For details, see section 3.8"Modifying Site Data" and section 3.9 "Modifying the Site OutputProperty."

    3.5.2 Procedure

    To add or delete a board, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BTS > Add or Delete Board.The Add or Delete Board dialog box as shown in Figure 3-37is displayed.

    Figure 3-37Selecting a site

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    46/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-38 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 2 Select the site in which the board is to be added or deleted.Step 3 ClickNext.

    The Add or Delete Board dialog box is refreshed, as shown in Figure 3-38.

    Figure 3-38Adding or deleting a board

    Step 4 ClickAdd/Delete BTS Board.The Site Device's Property dialog box as shown in Figure 3-39 is displayed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    47/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-39

    Figure 3-39Configuring the property of site device

    Step 5 Select the board and press Delete to delete it. Right-click in the blank of the panel and chooseAdd Board to add a board.

    You can also select and right-click the board, and then choose Add Board orDelete Board in

    the floating menu to add or delete the board.

    TRXs cannot be deleted in this operation.

    Step 6 ClickComplete to return to the Add or Delete Board dialog box as shown in Figure 3-38.Step 7 ClickNext.

    The Add or Delete Board dialog box is refreshed, as shown in Figure 3-40.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    48/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-40 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-40Command list for dynamic configuration

    This operation leads to fourth level reset of the site.

    Step 8 ClickYes in the Confirm dialog box, and then clickStart Dynamic Configuration to activate the data.

    ----End

    3.5.3 Verification

    After adding or deleting a board, check that:

    z The board status is normal on the Site Maintenance System.z The related data in the data tables and in the host are correctly modified.

    3.5.4 Data Table

    Table 3-5 lists the modified data tables in the BSC Data Management System.

    Table 3-5Modified data tables during the addition or deletion of a boardNo. Table Name

    1 Site Frame Description Table

    2 Site Slot Description Table

    3 Antenna and Feeder Configuration Table

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    49/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-41

    No. Table Name

    4 Site Description Table

    3.6 Modifying Board Type

    3.6.1 Task Description

    Purpose To change the types of the CDU, EDU, TRX or PBU

    Prerequisite None

    Note None

    3.6.2 Procedure

    To change the type of a board, perform the following steps:

    Step 1

    On the BSC Data Auto Configuration System, choose BTS > Modify Board Type.

    The Modify Site Board Type dialog box as shown in Figure 3-41is displayed.

    Figure 3-41Selecting a site

    Step 2 Select a site.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    50/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-42 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 3 ClickNext.The Modify Site Board Type dialog box is refreshed, as shown in Figure 3-42.

    Figure 3-42Changing the board type

    Step 4 ClickModify BTS Board Type.The Site Device's Property dialog box as shown in Figure 3-43 is displayed.

    Figure 3-43Site device property

    Step 5 through step 7 show how to change the type of the PBU board.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    51/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-43

    Step 5 Double-click the PBU board.The Set PBU Board Property dialog box as shown in Figure 3-44 is displayed.

    Figure 3-44Changing the PBU card type

    Step 6 Select the PBU board type from the PBU Card Type drop-down list.Step 7 ClickOKto return to the Site Device's Property dialog box as shown in

    Figure 3-43.

    Step 8 through step 10 show how to change the type of the CDU board.

    Step 8 Double-click the CDU board.The Set CDU Board Property dialog box as shown in Figure 3-45 is displayed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    52/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-44 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-45Changing the CDU type

    Step 9 Select the CDU type from the CDU Type drop-down list.Step 10 ClickOKto return to the Site Device's Property dialog box as shown in Figure 3-43.

    Step 11 through step 13 show how to change the EDU type.

    Step 11

    Double-click the EDU board.

    The Set CDU Board Property as shown in Figure 3-46is displayed.

    Figure 3-46Selecting the EDU type

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    53/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-45

    Step 12 Select the EDU type from the CDU Type drop-down list.Step 13 ClickOKto return to the Site Device's Property dialog box as shown in

    Figure 3-43.

    Step 14 through step 16 show how to change the TRX type.

    Step 14 Double-click the TRX board.The TRX Property dialog box as shown in Figure 3-47 is displayed.

    Figure 3-47Changing the TRX type

    Step 15 Select the TRX type from the TRX Type drop-down list.Step 16 ClickOKto return to the Site Device's Property dialog box as shown in

    Figure 3-43.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    54/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-46 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    The value range of the TRX frequency is as follows:

    z PTRX: 1124z ETRX: 0124 or 9751023z RTRX: 0124 or 9551023z DTRX: 512885The value range of the ETR frequency is as follows:

    z PETR: 512810z DETR: 512885z RETR: 0124 or 9551023z EETR: 128251

    Step 17 ClickComplete to return to the Modify Site Board Type dialog box as shown in Figure 3-42.Step 18 ClickNext.

    The Modify Site Board Type dialog box is refreshed, as shown in Figure 3-48.

    Figure 3-48Command list for dynamic configuration

    This operation leads to third level reset of the site.

    Step 19 ClickYes in the Confirm dialog box, and then clickStart Dynamic Configuration to activate the data.

    ----End

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    55/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-47

    3.6.3 Verification

    Check that the related data in the data tables are correctly modified.

    3.6.4 Data Table

    Table 3-6 lists the modified data tables in the BSC Data Management System.

    Table 3-6Modified data tables during the modification of the board typeNo. Table Name

    1 Site Slot Description Table

    3.7 Configuring Site Tower-Top Amplifier

    3.7.1 Task Description

    Purpose To configure the site tower-top amplifier

    Prerequisite None

    Note The BSC Data Auto Configuration System will send a third level resetcommand after the site tower-top amplifier is modified.

    3.7.2 Procedure

    To configure the site tower-top amplifier, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BTS > Configure Site Tower-topAmplifier.The Configure Site Tower-top Amplifier dialog box is displayed, as shownin Figure 3-49.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    56/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-48 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Figure 3-49Selecting a site

    Step 2 Select a site.Step 3 ClickNext.

    The Configure Site Tower-top Amplifier dialog box is refreshed, as shown in Figure 3-50.

    Figure 3-50Configuring the tower-top amplifier

    Step 4 ClickConfigure Site Tower-top Amplifier.The Site Device's Property dialog box as shown in Figure 3-51 is displayed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    57/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-49

    Figure 3-51Modifying the property of site device

    Step 5 Double-click the CDU (orEDU).The Set CDU Board Property dialog box as shown in Figure 3-52 is displayed.

    Figure 3-52Site tower-top amplifier configuration

    Step 6 Configure the site tower-top amplifier.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    58/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-50 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    For detailed information about the parameters, refer to the M900/M1800 BSC Data

    Configuration Reference Engineering Parameters.

    Step 7 ClickOKto return to the Site Device's Property dialog box as shown inFigure 3-51.

    Step 8 ClickComplete to return to the Configure Site Tower-top Amplifier dialog box as shown inFigure 3-50.

    Step 9 ClickNext.The Configure Site Tower-top Amplifier dialog box is refreshed, as shown in Figure 3-53.

    Figure 3-53Command list for dynamic configuration

    This operation leads to third level reset of the site.

    Step 10 ClickYes, and then clickStart Dynamic Configuration to activate the data.

    ----End

    3.7.3 Verification

    Check that the tower-top amplifier is correctly modified on the Site Maintenance System.

    3.7.4 Data Table

    Table 3-7 lists the modified data tables in the BSC Data Management System.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    59/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-51

    Table 3-7Modified data table during the configuration of site tower-top amplifierNo. Table Name

    1 Antenna and Feeder Configuration Table

    3.8 Modifying Site Data

    3.8.1 Task Description

    Purpose To modify the clock mode, clock parameter, and transmission mode of the

    sitePrerequisite None

    Note If the transmission mode is modified, the BSC Data Auto ConfigurationSystem will send the fourth level reset command.

    3.8.2 Procedure

    To modify the site data, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BTS > Modify Site Data.The Modify Site Data dialog box as shown in Figure 3-54is displayed.

    Figure 3-54Selecting a site

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    60/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-52 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Step 2 Select a site.Step 3 ClickNext.

    The Modify Site Data dialog box is refreshed, as shown in Figure 3-55.

    Figure 3-55Modifying site data

    Step 4 ClickModify Site Data.The Site Device Property dialog box as shown in Figure 3-56 is displayed.

    Figure 3-56Changing the site device property

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    61/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-53

    Step 5 Change the site device property.For detailed information about the site description, refer to theM900/M1800 BSC Data

    Configuration Reference Engineering Parameters.

    Step 6 ClickOKto return to the Modify Site Data dialog box as shown in Figure 3-55.Step 7 ClickNext.

    The Modify Site Data dialog box is refreshed, as shown in Figure 3-57.

    Figure 3-57Command list for dynamic configuration

    Step 8 ClickStart Dynamic Configuration to activate the data.----End

    3.8.3 Verification

    Check that the related data in the data tables and in the host are correctly modified.

    3.8.4 Data Table

    Table 3-8 lists the modified data tables in the BSC Data Management System.

    Table 3-8Modified data tables during the modification of site dataNo. Table Name

    1 Site Description Table

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    62/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-54 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    No. Table Name

    2 BSC BIE Description Table

    3 BSC BIE Active/Stby. Group Table

    4 Cell Call Control Table

    3.9 Modifying the Site Output Property

    3.9.1 Task Description

    Purpose To change the relay status of the environment alarm box

    Prerequisite The site is configured with EAC. If no EAC is configured, see section 3.5"Adding or Deleting a Board" to add it.

    Note The function is available only when the site is configured with EAC.

    3.9.2 Procedure

    To modify the site output property, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BTS > Modify Site Output Property.The Modify Site Output Property dialog box as shown in Figure 3-58 is displayed.

    Figure 3-58Selecting a site

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    63/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-55

    Step 2 Select a site.Step 3 ClickNext.

    The Modify Site Output Property dialog box is refreshed, as shown inFigure 3-59.

    Figure 3-59Modifying site output parameters

    Step 4 ClickModify Site Output Property to modify the EAC relay status.Step 5 ClickNext in the Modify Site Output Property dialog box as shown in

    Figure 3-59.

    Step 6 ClickStart Dynamic Configuration in the displayed dialog box to activate the data.----End

    3.9.3 Verification

    Check that the related data in the data tables and in the host are correctly modified.

    3.9.4 Data Table

    Table 3-9 lists the modified data tables in the BSC Data Management System.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    64/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-56 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    Table 3-9Modified data table during the modification of site output propertyNo. Table Name

    1 Site Description Table

    3.10 Starting Up Traffic Stat. Task Re-Register

    3.10.1 Task Description

    Purpose To start up traffic statistics task re-registration

    Prerequisite None

    Note The function is usually used when the operations that affect cell handoverrelationship are performed. These operations include dynamicallyadding/deleting a site, adding/deleting TRX, adding/deleting a cell,modifying cell adjacency relationship and modifying CGI.

    3.10.2 Procedure

    To start up traffic statistics task re-registration, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BTS > Startup Traffic Stat. Task Re-register.

    The Startup Traffic Stat. Task Re-register dialog box as shown in Figure 3-60 is displayed.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    65/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-57

    Figure 3-60Selecting a startup mode

    Step 2 Select the startup mode.Step 3 ClickNext.

    The Startup Traffic Stat. Task Re-register dialog box is refreshed, as shown in Figure 3-61.

    Figure 3-61Command list for dynamic configuration

    Step 4 Click Start Dynamic Configuration to activate the data.----End

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    66/92

    3 BTS Data Configuration

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration

    3-58 Huawei Technologies Proprietary Issue 08 (2006-08-20)

    This operation does not change any data table.

    3.11 Renaming a Site or Cell

    3.11.1 Task Description

    Purpose To rename a site or cell

    Prerequisite None

    Note You can rename all the sites and cells in one operation.

    3.11.2 Procedure

    Renaming a Site

    To rename a site, perform the following steps:

    Step 1 On the BSC Data Auto Configuration System, choose BTS > Rename Site or Cell.The Rename Site or Cell dialog box as shown in Figure 3-62is displayed.

    Figure 3-62Renaming a site or cell

    Step 2 Select a site, and then clickRename Selected Object.

  • 7/28/2019 01-3 Dynamic Configuration (BTS).pdf

    67/92

    M900/M1800 Base Station Controller

    Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration

    Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-59

    The Rename Site dialog box as shown in Figure 3-63is displayed.

    Figure 3-63Renaming the site

    Step 3 Change the site name.Step 4 ClickOKto return to the Rename Site or Cell dialog box as shown in Figure 3-62.Step 5 ClickNext.Step 6 ClickStart Dynamic Configuration to activate the data.

    ----End

    Renaming a Cell

    The procedure for renaming a cell, external cell, or 3G external cell is the same as that for

    renaming a site.

    The procedure is as follows:

    Step 1 Choose BTS > Rename Site or Cell.The Rename Site or Cell dialog box as shown in Figure 3-62is displayed.

    Step 2 Select a cell, and then clickRename Selected Object.The Rename Cell dialog box, External Cell Property dialog box, or3G External CellProperty dialog box is displayed as shown in Figure 3-64,