M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration Contents
Issue 08 (2006-08-20) Huawei Technologies Proprietary i
Contents
3 BTS Data Configuration ...........................................................................................................3-1
3.1 Adding a Site.................................................................................................................................................3-3
3.1.1 Task Description .................................................................... .............................................................. 3-3
3.1.2 Procedure ............................................................ ................................................................. ................3-3
3.1.3 Verification.........................................................................................................................................3-18
3.1.4 Data Table .......................................................... .................................................................... ............3-19
3.2 Deleting a Site.............................................................................................................................................3-21
3.2.1 Task Description .................................................................... ............................................................ 3-21
3.2.2 Procedure ............................................................ ................................................................... ............3-21
3.2.3 Verification.........................................................................................................................................3-25
3.2.4 Data Table .......................................................... .................................................................... ............3-25
3.3 Adding a TRX ............................................................... ................................................................... ...........3-26
3.3.1 Task Description .................................................................... ............................................................ 3-26
3.3.2 Procedure ............................................................ ................................................................... ............3-26
3.3.3 Verification.........................................................................................................................................3-30
3.3.4 Data Table .......................................................... .................................................................... ............3-30
3.4 Deleting a TRX ................................................................. ......................................................................... .3-31
3.4.1 Task Description .................................................................... ............................................................ 3-31
3.4.2 Procedure ............................................................ ................................................................... ............3-31
3.4.3 Verification.........................................................................................................................................3-35
3.4.4 Data Table .......................................................... .................................................................... ............3-35
3.5 Adding or Deleting a Board .................................................................... .................................................... 3-37
3.5.1 Task Description .................................................................... ............................................................ 3-37
3.5.2 Procedure ............................................................ ................................................................... ............3-37
3.5.3 Verification.........................................................................................................................................3-40
3.5.4 Data Table .......................................................... .................................................................... ............3-40
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
2/92
Contents
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
ii Huawei Technologies Proprietary Issue 08 (2006-08-20)
3.6 Modifying Board Type ............................................................... ................................................................. 3-41
3.6.1 Task Description .................................................................... ............................................................ 3-41
3.6.2 Procedure ............................................................ ................................................................... ............3-41
3.6.3 Verification.........................................................................................................................................3-47
3.6.4 Data Table .......................................................... .................................................................... ............3-47
3.7 Configuring Site Tower-Top Amplifier .................................................................. .....................................3-47
3.7.1 Task Description .................................................................... ............................................................ 3-47
3.7.2 Procedure ............................................................ ................................................................... ............3-47
3.7.3 Verification.........................................................................................................................................3-50
3.7.4 Data Table .......................................................... .................................................................... ............3-50
3.8 Modifying Site Data....................................................................................................................................3-51
3.8.1 Task Description .................................................................... ............................................................ 3-51
3.8.2 Procedure ............................................................ ................................................................... ............3-51
3.8.3 Verification.........................................................................................................................................3-53
3.8.4 Data Table .......................................................... .................................................................... ............3-53
3.9 Modifying the Site Output Property............................................................................................................3-54
3.9.1 Task Description .................................................................... ............................................................ 3-54
3.9.2 Procedure ............................................................ ................................................................... ............3-54
3.9.3 Verification.........................................................................................................................................3-55
3.9.4 Data Table .......................................................... .................................................................... ............3-55
3.10 Starting Up Traffic Stat. Task Re-Register ....................................................................... .........................3-56
3.10.1 Task Description ............................................................. ................................................................. 3-56
3.10.2 Procedure ............................................................... ........................................................................ ..3-56
3.11 Renaming a Site or Cell.............................................................................................................................3-58
3.11.1 Task Description...............................................................................................................................3-58
3.11.2 Procedure ............................................................... .......................................................................... 3-58
3.11.3 Verification.......................................................................................................................................3-61
3.11.4 Data Table ................................................................... ................................................................... ..3-61
3.12 Modifying a Ring Topology Mark ............................................................... ............................................. 3-63
3.12.1 Task Description ............................................................. ................................................................. 3-63
3.12.2 Procedure ............................................................... ........................................................................ ..3-63
3.12.3 Verification.......................................................................................................................................3-66
3.12.4 Data Table ............................................................. ......................................................................... ..3-66
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
3/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration Contents
Issue 08 (2006-08-20) Huawei Technologies Proprietary iii
3.13 Adding a Slave Chain to a Site..................................................................................................................3-67
3.13.1 Task Description ............................................................. ................................................................. 3-67
3.13.2 Procedure ............................................................... ........................................................................ ..3-67
3.13.3 Verification.......................................................................................................................................3-70
3.13.4 Data Table ............................................................. ......................................................................... ..3-70
3.14 Deleting a Slave Chain of a Site................................................................................................................3-71
3.14.1 Task Description ............................................................. ................................................................. 3-71
3.14.2 Procedure ............................................................... ........................................................................ ..3-71
3.14.3 Verification.......................................................................................................................................3-74
3.14.4 Data Table ............................................................. ......................................................................... ..3-74
3.15 Configuring Site Idle Timeslots ........................................................... ..................................................... 3-74
3.15.1 Task Description ............................................................. ................................................................. 3-74
3.15.2 Procedure ............................................................... ........................................................................ ..3-74
3.15.3 Verification.......................................................................................................................................3-78
3.15.4 Data Table ............................................................. ......................................................................... ..3-78
3.16 Modifying Site Properties in Batches........................................................................................................3-79
3.16.1 Task Description ............................................................. ................................................................. 3-79
3.16.2 Procedure ............................................................... ........................................................................ ..3-79
3.16.3 Verification.......................................................................................................................................3-83
3.16.4 Data Table ............................................................. ......................................................................... ..3-83
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
4/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration Figures
Issue 08 (2006-08-20) Huawei Technologies Proprietary v
Figures
Figure 3-1 Selecting a module and BIE board....................................................................................................3-4
Figure 3-2 Selecting a BIE port and upper site...................................................................................................3-4
Figure 3-3 Site configuration..............................................................................................................................3-5
Figure 3-4 Selecting the mode of BIE port adjustment ............................................................................ ..........3-5
Figure 3-5 Site BIE Port Cascade List dialog box..............................................................................................3-6
Figure 3-6 Adding TRXs....................................................................................................................................3-6
Figure 3-7 Adding a cell.....................................................................................................................................3-7
Figure 3-8 Configuring the property of site device ..................................................................... .......................3-8
Figure 3-9 Modifying site internal connections..................................................................................................3-8
Figure 3-10 Adding cells ..................................................................... ............................................................... 3-9
Figure 3-11 Added cells....................................................................................................................................3-10
Figure 3-12 Setting cell properties .................................................................. ................................................. 3-11
Figure 3-13 Modifying reserved parameters ....................................................................... .............................3-12
Figure 3-14 Command list for dynamic configuration ....................................................................... ..............3-12
Figure 3-15 Selecting the Manual Mode option...............................................................................................3-13
Figure 3-16 Manual timeslot adjustment..........................................................................................................3-14
Figure 3-17 TRX property................................................................................................................................3-15
Figure 3-18 RSL property configuration ........................................................................ ..................................3-16
Figure 3-19 Site trunk mode configuration ..................................................................... .................................3-17
Figure 3-20 BSC BIE description data.............................................................................................................3-18
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
5/92
Figures
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
vi Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-21 Selecting a site .................................................................... .......................................................... 3-22
Figure 3-22 Deleting a site .................................................................. ............................................................. 3-22
Figure 3-23 Site trunk mode.............................................................................................................................3-23
Figure 3-24 Site TRX property.........................................................................................................................3-24
Figure 3-25 Command list for dynamic configuration ....................................................................... ..............3-25
Figure 3-26 Selecting a site .................................................................... .......................................................... 3-26
Figure 3-27 Adding TRXs................................................................................................................................3-27
Figure 3-28 Configuring the cell ........................................................... ........................................................... 3-28
Figure 3-29 Assigning TRXs to the cell ............................................................................ ...............................3-28
Figure 3-30 Configuring the related properties ................................................................ ................................3-29
Figure 3-31 Selecting a cell..............................................................................................................................3-32
Figure 3-32 Selecting TRXs.............................................................................................................................3-33
Figure 3-33 Prompt to modify the reserved channel number................................................................. ..........3-33
Figure 3-34 Information prompt.......................................................................................................................3-34
Figure 3-35 Changing the reserved channel number........................................................................................3-34
Figure 3-36 Command list for dynamic configuration ....................................................................... ..............3-35
Figure 3-37 Selecting a site .................................................................... .......................................................... 3-37
Figure 3-38 Adding or deleting a board............................................................................................................3-38
Figure 3-39 Configuring the property of site device ............................................................ ............................3-39
Figure 3-40 Command list for dynamic configuration ....................................................................... ..............3-40
Figure 3-41 Selecting a site .................................................................... .......................................................... 3-41
Figure 3-42 Changing the board type...............................................................................................................3-42
Figure 3-43 Site device property ............................................................... ....................................................... 3-42
Figure 3-44 Changing the PBU card type ......................................................................... ...............................3-43
Figure 3-45 Changing the CDU type................................................................................................................3-44
Figure 3-46 Selecting the EDU type.................................................................................................................3-44
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
6/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration Figures
Issue 08 (2006-08-20) Huawei Technologies Proprietary vii
Figure 3-47 Changing the TRX type ................................................................ ................................................ 3-45
Figure 3-48 Command list for dynamic configuration ....................................................................... ..............3-46
Figure 3-49 Selecting a site .................................................................... .......................................................... 3-48
Figure 3-50 Configuring the tower-top amplifier.............................................................................................3-48
Figure 3-51 Modifying the property of site device...........................................................................................3-49
Figure 3-52 Site tower-top amplifier configuration..........................................................................................3-49
Figure 3-53 Command list for dynamic configuration ....................................................................... ..............3-50
Figure 3-54 Selecting a site .................................................................... .......................................................... 3-51
Figure 3-55 Modifying site data ...................................................................... ................................................. 3-52
Figure 3-56 Changing the site device property.................................................................................................3-52
Figure 3-57 Command list for dynamic configuration ....................................................................... ..............3-53
Figure 3-58 Selecting a site .................................................................... .......................................................... 3-54
Figure 3-59 Modifying site output parameters ..................................................................... ............................3-55
Figure 3-60 Selecting a startup mode...............................................................................................................3-57
Figure 3-61 Command list for dynamic configuration ....................................................................... ..............3-57
Figure 3-62 Renaming a site or cell..................................................................................................................3-58
Figure 3-63 Renaming the site ............................................................... .......................................................... 3-59
Figure 3-64 Renaming a cell ................................................................. ........................................................... 3-60
Figure 3-65 Renaming an external cell.............................................................................................................3-60
Figure 3-66 Renaming a 3G external cell.........................................................................................................3-61
Figure 3-67 Selecting a BIE ............................................................ ................................................................. 3-64
Figure 3-68 Selecting a BIE port......................................................................................................................3-64
Figure 3-69 Configuring the closed loop BIE port...........................................................................................3-65
Figure 3-70 Command list for dynamic configuration ....................................................................... ..............3-66
Figure 3-71 Selecting a BIE ............................................................ ................................................................. 3-68
Figure 3-72 Selecting a BIE port......................................................................................................................3-68
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
7/92
Figures
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
viii Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-73 Selecting a site .................................................................... .......................................................... 3-69
Figure 3-74 Selecting a port number .................................................................. ..............................................3-69
Figure 3-75 SiteBIE Port Cascade List dialog box..........................................................................................3-70
Figure 3-76 Selecting a BIE ............................................................ ................................................................. 3-72
Figure 3-77 Selecting a port ........................................................... .................................................................. 3-72
Figure 3-78 Deleting the slave chain................................................................................................................3-73
Figure 3-79 Site BIEPort Cascade List dialog box..........................................................................................3-73
Figure 3-80 Selecting a BIE ............................................................ ................................................................. 3-75
Figure 3-81 Selecting a port ........................................................... .................................................................. 3-75
Figure 3-82 Port Idle Timeslot Assignment dialog box.................................................................. ..................3-76
Figure 3-83 Failed idle timeslot assignment.....................................................................................................3-76
Figure 3-84 Detailed information about assigned timeslots .................................................................. ...........3-77
Figure 3-85 Command list for dynamic configuration ....................................................................... ..............3-78
Figure 3-86 Selecting a site type and sites .......................................................... .............................................3-80
Figure 3-87 Selecting site properties................................................................................................................3-80
Figure 3-88 Modifying site properties..............................................................................................................3-81
Figure 3-89 Site Device Property dialog box.................................................................... ...............................3-82
Figure 3-90 Command list for dynamic configuration ....................................................................... ..............3-83
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
8/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration Tables
Issue 08 (2006-08-20) Huawei Technologies Proprietary ix
Tables
Table 3-1 Mapping between port number and TRX number .............................................................. ................3-9
Table 3-2 Modified data tables during the addition or deletion of a site .......................................................... 3-19
Table 3-3 Modified data tables during the addition of a TRX ................................................................... .......3-30
Table 3-4 Modified data tables during the deletion of a TRX .................................................................. ........3-35
Table 3-5 Modified data tables during the addition or deletion of a board.......................................................3-40
Table 3-6 Modified data tables during the modification of the board type.......................................................3-47
Table 3-7 Modified data table during the configuration of site tower-top amplifier.........................................3-51
Table 3-8 Modified data tables during the modification of site data ................................................................ 3-53
Table 3-9 Modified data table during the modification of site output property ................................................ 3-56
Table 3-10 Modified data tables during the renaming of a site or cell............................................................. 3-61
Table 3-11 Modified data tables during the modification of a ring topology mark .......................................... 3-66
Table 3-12 Modified data tables during the addition of a slave chain to a site.................................................3-70
Table 3-13 Modified data tables during the deletion of a slave chain of a site.................................................3-74
Table 3-14 Modified data tables during the configuration of site idle timeslots............................................... 3-78
Table 3-15 Modified data tables during the modification of a batch of site properties.....................................3-83
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
9/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-1
3 BTS Data Configuration
About This Chapter
The following table lists the contents of this chapter.
Title Description
3.1 Adding a Site Describes how to add a site.
3.2 Deleting a Site Describes how to delete a site.
3.3 Adding a TRX Describes how to add a TRX.
3.4 Deleting a TRX Describes how to delete a TRX.
3.5 Adding or Deleting aBoard
Describes how to add or delete a board.
3.6 Modifying Board Type Describes how to modify the board type.
3.7 Configuring Site Tower-
Top Amplifier
Describes how to configure the site tower top amplifier.
3.8 Modifying Site Data Describes how to modify site data.
3.9 Modifying the Site Output
Property
Describes how to modify the site output property.
3.11 Renaming a Site or Cell Describes how to rename a site or cell.
3.12 Modifying a Ring
Topology Mark
Describes how to modify a ring topology mark.
3.13 Adding a Slave Chain to
a Site
Describes how to add a slave chain to a site.
3.14 Deleting a Slave Chain of
a Site
Describes how to delete a slave chain of a site.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
10/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-2 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Title Description
3.15 Configuring Site Idle
Timeslots
Describes how to configure site idle timeslots.
3.16 Modifying Site Propertiesin Batches
Describes how to modify site properties in batches.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
11/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-3
3.1 Adding a Site
3.1.1 Task Description
Purpose To add a site without resetting the BSC
Prerequisitez The BSC is configured with idle E1 ports.z The data to be configured is consistent and correct.
Note
z You can add only one site to one BIE port in one operation. If the newTRXs are distributed on multiple chains, add TRXs or cells after adding
the site.z Adding a site also involves adding a cell. Perform Modify Cell
Handover Parameter to configure the neighbor cell after adding thesite.
3.1.2 Procedure
Adding a Site Without Timeslot Manual Adjustment
Using an example, this part shows how to add a site without timeslot manual adjustment.
Assume that you have to add Site2, and TRX 0, TRX 3, TRX 5, TRX 8, TRX 18, TRX 21 andTRX 24 in BM1 for two cells.
The conditions of the example are as follows:
z Cell1 includes TRX 0, TRX 5, TRX 18 and TRX 24; Cell2 includes TRX 3, TRX 8 andTRX 21.
z Cell1 and Cell2 are bi-directionally adjacent.z No timeslot manual adjustment is required for the new site.z The new site is connected to port0 of BIE0.z The trunk mode is 2E1 port*15:1multiplexing/port.The procedure is as follows:
Step 1 On the BSC Data Auto Configuration System, choose BTS > Add a Site.The Add a Site dialog box as shown in Figure 3-1is displayed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
12/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-4 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-1Selecting a module and BIE board
Step 2 Select a module and BIE board.Step 3 ClickNext.
The Add a Site dialog box is refreshed, as shown in Figure 3-2.
Figure 3-2Selecting a BIE port and upper site
The trunk mode can be changed only when no site is connected to the BIE.
Step 4 Select the BIE port 0 andupper site Site0. Then clickAdd Site.The Add Site dialog box as shown in Figure 3-3 is displayed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
13/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-5
Figure 3-3Site configuration
Step 5 EnterSite2 in the Site Name text box. Select BTS312 from the Site Typedrop-down list and Port[0] from the Port to This Site drop-down list.
Step 6 ClickOK.The Confirm dialog box as shown in Figure 3-4 is displayed.
Figure 3-4Selecting the mode of BIE port adjustment
Step 7 ClickNo.
After a site is added, Add Site, Trunk Mode, and all the BIE ports in the Add a Site dialog box asshown in Figure 3-2 are unavailable.
Step 8 ClickSite Ports Table.The Site BIE Port Cascade List dialog boxas shown inFigure 3-5 is displayed. Ensure thatthe connection between the upper site and lower site is correct.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
14/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-6 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-5Site BIE Port Cascade List dialog box
Step 9 ClickOKto return to the Add a Site dialog box as shown in Figure 3-2.
z In the Site BIE Port Cascade List dialog box, Modify BIE Port and Site Connection is availableonly when the selected BIE port is the sub-chain port.
z For the Next Site whose Inlet Port No. is 0, the inter-site port cascade relationship cannot beremoved.
z The inlet port 0 of the next site cannot be modified.
Step 10 ClickNext.The Add a Site dialog box is refreshed, as shown in Figure 3-6.
Figure 3-6Adding TRXs
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
15/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-7
Step 11 Select 0 TRX fromthe Available TRX list box, and then clickAdd TRX to add it to theInstalled TRX list box. Repeat the same steps to add 3 TRX, 5 TRX,
8 TRX, 18 TRX, 21 TRX and 24 TRX to the Installed TRX list box.
Step 12
ClickNext.
The Add a Site dialog box is refreshed, as shown in Figure 3-7.
Figure 3-7Adding a cell
Step 13 ClickModify Site Device's Property.The Site Device's Property dialog box as shown in Figure 3-8 is displayed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
16/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-8 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-8Configuring the property of site device
Step 14 Select the rack from the Current Rackdrop-down list. Delete the excessive boards, anddouble-click the CDU to configure the CDU board property.
Step 15 ClickBTS Property to configure site property. Then clickOKto return totheSite Device's Property dialog box.
Step 16 ClickInter-site Link.The Modify Site Internal Connections dialog box as shown in Figure 3-9 is displayed.
Figure 3-9Modifying site internal connections
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
17/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-9
Step 17 Configure the site internal connections.Table 3-1 lists the mapping between port number and TRX number.
Table 3-1Mapping between port number and TRX numberCabinetGroup No.
Port No. TRX No. Correspondingto BTS30
TRX No. Corresponding toBTS312
0 07 017 023
1 811 1835 2447
2 1619 3653 4871
Step 18 ClickOKto return to the Site Device's Property dialog box as shown inFigure 3-8.
Step 19 ClickComplete to return to the Add a Site dialog box as shown in Figure 3-7.Step 20 ClickAdd Cell. Select 2 from the Cell Number box, as shown in Figure 3-10.
Figure 3-10Adding cells
In the Add Cell dialog box as shown in Figure 3-10, note the following conditons:
z Cell Name cannot be changed ifCell Number exceeds 1 orName Cell by Site's Nameis selected.
z IfName Cell by Site's Name is selected, the naming convention of the cell is site name-serial number. The two cells added in this example are named Site2-1 and Site2-2.
z IfCell Number exceeds 1 and Name Cell by Site's Name is not selected, Cell-Cell No.is used as the Cell Name.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
18/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-10 Huawei Technologies Proprietary Issue 08 (2006-08-20)
The default cell template is used for the added cell. The system also supports customized cell template.For details, see section 4.1 "Adding Cell."
Step 21
ClickOK.
The Add a Site dialog box is refreshed, as shown in Figure 3-11. The two cells are displayed
in the Cell List box.
Figure 3-11Added cells
Step 22 Select Site2-1. Then ClickModify Cell Property.The Set Cell's Property dialog box as shown in Figure 3-12 is displayed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
19/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-11
Figure 3-12Setting cell properties
Step 23 Assign 0 TRX, 5 TRX, 18 TRX and 24 TRX as well as properties such as availablefrequency and network parameters to Site2-1.
To set the advanced property, see section 4.1 "Adding a Cell."
In the Add a Site dialog box shown in Figure 3-11, you can select the added cell and clickDelete Cell
to delete it.
Step 24 ClickComplete&Exit to return to the Add a Site dialog box as shown inFigure 3-11.
Step 25 Add TRX 3, TRX 8, and TRX 21 to Site2-2 in the same way as adding the TRXs to Site2-1by following step 22 through step 24.
Step 26 ClickModify Reserved Parameters in the Add a Site dialog box as shown in Figure 3-11.The Modify Reserved Parameters dialog box as shown inFigure 3-13is displayed. You can
change the reserved parameters of the added site, cell or TRX, or retain the default value65535.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
20/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-12 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-13Modifying reserved parameters
Step 27 ClickOKto return to the Add a Site dialog box as shown in Figure 3-11.Step 28 ClickNext.
The Add a Site dialog box is refreshed, as shown in Figure 3-14.
Figure 3-14Command list for dynamic configuration
Step 29 Click Start Dynamic Configuration.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
21/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-13
You can only change the physical link No. and the signaling connection No. of the LAPD of the selectedsite under the selected BIE port.
Step 30
Choose Cell > Modify Cell Handover Parameter to configure the adjacent relationship forthe two cells after adding the site.
----End
Adding a Site with Timeslot Manual Adjustment
To add a site with timeslot manual adjustment, perform the following steps:
Step 1 Perform step 1 through step 6 of "Adding a Site Without Timeslot Manual Adjustment."Step 2 In the Confirm dialog box as shown in Figure 3-4, clickYes.
The Manual Mode check box appears in the Add a Site dialog box as shown in Figure 3-15.
To manually adjust timeslots, see theM900/M1800 BSC Data Configuration Manual InitialConfiguration.
Figure 3-15Selecting the Manual Mode option
Step 3 Select Manual Mode.Step 4 ClickNext.
The following procedure for adding a cell is the same as that for adding a cell without the
timeslot manual adjustment.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
22/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-14 Huawei Technologies Proprietary Issue 08 (2006-08-20)
After the cell is added, the Add a Site dialog box is refreshed, as shown in
Figure 3-16.
Figure 3-16Manual timeslot adjustment
The Add a Site dialog box shown in Figure 3-16 lists all the sites on the chain where theadded site resides. If the TRXs of the level 1 site on the chain where the added site resides aredistributed on multiple chains, the Add a Site dialog box lists all the sites on the main chain.
To manually adjust the timeslots, you need to enter all the TRX properties such as Abis TS
No., Abis Sub-TS No. and Trunk Circuit No., and the RSL and OML properties. If site
cascading is involved, you also need to configure the site trunk mode and BIE port property.
You can check the Idle Timeslot if the selected site has idle timeslots.
Step 5 Select the new site. ClickTRX Property in the Add a Site dialog box.The TRX Property dialog box is displayed as shown in Figure 3-17.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
23/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-15
Figure 3-17TRX property
The TRX Property dialog box lists the default values of the properties. The Abis TS No. and
Abis Sub-TS No. are 0; the Trunk Circuit No. is 65535; the BSC BIE E1 TimeSlot No. is
255.
Rev. OML Trunk Circuit No., Rev. OML ABIS TS No., Rev. OML BSC BIE E1 TS No.
and Rev. OML Physical Link No. are available if the relay mode of BIE board is full ratering topology or half rate ring topology.
In timeslot manual adjustment mode, the physical links of RSL and OML are calculatedautomatically.
The dynamic configuration can modify only the TRX properties of the new site, and view but not
modify the TRX properties of other sites.
RSLs are multiplexed according to Abis TS No. entered. You must ensure that the data is correct.
Step 6 In the TRX Property dialog box as shown in Figure 3-17, double-click the row of the TRXwhose RSL properties are to be modified.
The RSL Property dialog box as shown in Figure 3-18is displayed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
24/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-16 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-18RSL property configuration
Step 7 Enter the related information, and then clickOKto return to TRX Property dialog box asshown in Figure 3-17.
Step 8 ClickOKto return to the Add a Site dialog box as shown in Figure 3-16.If the new site is a cascaded site, clickSite Trunk Mode Description in the Add a Site
dialog box to display the Site Trunk Mode dialog box as shown inFigure 3-19. Configure the BIE trunk mode.
For detailed information about the parameters in the Site Trunk Mode dialog box, see theM900/M1800 BSC Data Configuration Reference Engineering Parameters.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
25/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-17
Figure 3-19Site trunk mode configuration
Trunk Mode No. in the Site Trunk Mode dialog box as shown in Figure 3-19 should be twice the
upper site number.
If the networking mode is full rate ring topology or half rate ring topology, the reverse trunk modenumber should be twice the upper site number plus one.
Step 9 ClickOKto return to the Add a Site dialog box as shown in Figure 3-16.Step 10 ClickBIE Port Property.
The BSC BIE Description Data dialog box as shown in Figure 3-20 is displayed.For detailed information about the BIE description data, see theM900/M1800 BSC Data
Configuration Reference Engineering Parameters.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
26/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-18 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-20BSC BIE description data
Step 11 Adjust the properties of the Abis interface and BS interface.Step 12 ClickOKto return to the Add a Site dialog box as shown in Figure 3-16.Step 13 ClickNext.
The Add a Site dialog box is refreshed.
Step 14 ClickStart Dynamic Configuration to activate the data.----End
z In the chain topology or tree topology, reset the sites from the one at the top level of the chain orreset the BIE if the new site is not functional.
z After adding a site, re-register the traffic statistics tasks of this site.z If the added site is the level 1 site of the BIE port, reset the BIE after adding the site.
3.1.3 Verification
After adding a site, check that:
z The channels of all the cells are in idle state.After the node icons of the newly added site are displayed on the OMC SHELL, start theSite Maintenance System of the newly added site. If all the TRXs are powered on and arefunctional, the channels of all the cells are in idle state.
z Calls in the newly added sites can be established.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
27/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-19
3.1.4 Data Table
Table 3-2 lists the modified data tables in the BSC Data Management System.
Table 3-2Modified data tables during the addition or deletion of a siteNo. Table Name
1 HWII Power Control Table
2 BSC Cell Table
3 TRX Configuration Table
4 Radio Channel Configuration Table
5 LAPD Semi-perm. Connection Table
6 LAPD Signaling Connection Table
7 BSC BIE Active/Stby. Group Table
8 BSC BIE Description Table
9 Site BIE Trunk Mode Description Table
10 Site BIE Configuration Table
11 Signaling Channel Link Table
12 System Information Table
13 Cell Configuration Table
14 Normal Handover Table
15 Cell Allocation Table
16 BA1(BCCH) Table
17 BA2(SACCH) Table
18 Cell Attribute Table
19 Cell Alarm Threshold Table
20 Cell Call Control Table
21 Cell Call Control Parameter Table
22 Cell Module Information Table
23 Handover Control Table
24 GSM0508 Handover Table
25 Load Handover Table
26 Intra-cell Continuous HO Control Table
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
28/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-20 Huawei Technologies Proprietary Issue 08 (2006-08-20)
No. Table Name
27 Penalty Table
28 Filter Table
29 Emergency Handover Table
30 Adjacent Cell Relation table
31 Power Control Selection Table
32 Ordinary Cell Power Control Table
33 BTS Power Control Table
34 MS Power Control Table
35 Radio Channel Management Control Table
36 Site Description Table
37 Site Slot Description Table
38 Carrier Configuration Table
39 External Cell Description Table
40 Fast-Moving Handover Table
41 Cell Module Information Table
42 Frequency Hopping Table
43 Site Frame Description Table
44 HW II Channel Allocation Table
45 Antenna and Feeder Configuration Table
46 Concentric Cell Handover Table
47 Site Software Configuration Table
48 Site Reserved Parameter Table
49 Cell Reserved Parameter Table
50 TRX Reserved Parameter Table
51 3G BA1Table
52 3G System Information Table
53 Inter-RAT Handover Table (UTRAN FDD)
54 UTRAN FDD Adjacent Relation Table
55 3G Filter Table
56 3G BA2 Table
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
29/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-21
3.2 Deleting a Site
3.2.1 Task Description
Purpose To delete sites that are no longer required
Prerequisite z Block all the cells of the site to be deleted on the Site MaintenanceSystem. This avoids call processing in the site during deletion.
z If the site has sub cascading sites, delete these sub sites.Note
z If the site to be deleted is not the level 1 site connected to the BIE portand the BIE port is in timeslot manual adjustment mode, change the BIEtrunk mode of the site by implementing timeslot manual adjustment.
z After deleting a site, you need to delete the site icon on the OMCSHELL.
zWhen a site is deleted, all the cells connected to it will also be deleted.
3.2.2 Procedure
Using an example, this part shows how to delete a site. Assume you have to delete Site2 inBM1.
The conditions of the example are as follows:
zThe BIE port of Site2 is in the timeslot manual adjustment mode.
z Site2 is the sub-site of Site0.The procedure is as follows:
Step 1 On the BSC Data Auto Configuration System, choose BTS > Delete a Site.The Delete a Site dialog box as shown in Figure 3-21is displayed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
30/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-22 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-21Selecting a site
Step 2 Select Site2.
If no site is selected or the site selected is not the last level site, the Nextbuttonin the Delete a Site
dialog box is unavailable.
Step 3 ClickNext.The Delete a Site dialog box is refreshed, as shown in Figure 3-22.
Figure 3-22Deleting a site
All the sites connected to the BIE port of the site to be deleted (Site2 in BM1) are listed in the
Delete a Site dialog box as shown in Figure 3-22. If the connection is in multi-chain mode, all
the sites of the main chain BIE port are listed. The site to be deleted is not listed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
31/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-23
If the BIE port connected to the selected site is not in timeslot manual adjustment mode, the dynamicconfiguration dialog box instead of the timeslot manual adjustment dialog box will be displayed.
The Idle Timeslot button is available if the selected site has idle timeslots.
Step 4 Select the last site in the list box, and then clickSite trunk mode description in the Delete aSite dialog box.
The Site Trunk Mode dialog box as shown in Figure 3-23 is displayed. You can manually
change the site BIE trunk mode.
For detailed information about the BIE trunk mode, see theM900/M1800 BSC Data
Configuration Reference Engineering Parameters.
Figure 3-23Site trunk mode
Step 5 Delete all the records of the site with Trunk Mode No. as 0 by pressing Delete.The site BIE trunk mode description of Site2 is deleted.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
32/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-24 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Step 6 ClickOKto return tothe Delete a Site dialog box as shown in Figure 3-22.Step 7 ClickTRX Property to view the site TRX property, as shown in Figure 3-24.
The TRX Property dialog box lists the TRX property of Site0.
Figure 3-24Site TRX property
Do not change the value of any parameter in the TRX Property dialog box as shown in Figure 3-24.
Step 8 ClickOKto return to the Delete a Site dialog box as shown in Figure 3-22.Step 9 ClickNext.
The Delete a Site dialog box is refreshed, as shown in Figure 3-25.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
33/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-25
Figure 3-25Command list for dynamic configuration
Step 10 ClickStart Dynamic Configuration to activate the data.----End
After a site is deleted, the adjacent relationship between cells under this site is also deleted. Therefore,the Configure handover data command must be sent to the adjacent cells for automatic update of theadjacent relationship.
3.2.3 Verification
After deleting the site, check that:
z The maintenance of the deleted site is not available on the OMC SHELL.z The system prompts the error site number.z The OMLs and RSLs corresponding to the sites are released in the switching network
boards.
3.2.4 Data Table
Table 3-2 lists the modified data tables in the BSC Data Management System.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
34/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-26 Huawei Technologies Proprietary Issue 08 (2006-08-20)
3.3 Adding a TRX
3.3.1 Task Description
Purpose To add TRXs to a site for cell capacity expansion
Prerequisite Block the cells of the site on the Site Maintenance System.
Notez You can add TRXs to only one site of one BIE port in one operation. If
you have to add TRXs to multiple sites of one BIE port or to multiple
BIE ports of one site, add TRXs to one site of one BIE port first, andthen repeat the steps to add the TRXs to more sites or ports.
z If the BIE port of the site is in timeslot manual adjustment mode, youalso need to adjust the timeslot manually.
3.3.2 Procedure
Using an example, this part shows how to add TRXs to a site. Assume that you have to addTRXs 0 and 7 to Site0-1 and Site0-2 under Site0 in BM1. The BIE port of Site0 is in timeslot
manual adjustment mode.
The procedure is as follows:
Step 1 On the BSC Data Auto Configuration System, choose BTS > Add TRX.The Add TRX dialog box as shown in Figure 3-26 is displayed.
Figure 3-26Selecting a site
Step 2 Select Site0 in BM1.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
35/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-27
If no site is selected, the Next button in the Add TRX dialog box as shown in Figure 3-26 is unavailable.
Step 3 ClickNext.The Add TRX dialog box as shown in Figure 3-27 is displayed.
Figure 3-27Adding TRXs
Step 4 Select 1 TRX, and then clickAdd TRX to add it to the Installed TRX list box. Repeat thesame steps to add 7 TRX to the Installed TRX list box.
The BIE the Site Belongs to drop-down list box andthe Select Port option buttons are unavailable ifthe Installed TRX list already has TRXs.
Step 5 ClickNext.The Add TRX dialog box is refreshed, as shown in Figure 3-28.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
36/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-28 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-28Configuring the cell
If the new TRXs change the intra-site transparent transmission relationship, for example, TRX18 is added to site30 that earlier had only TRX 1 and TRX 4, you need to clickModify SiteProperty to configure the intra-site link. For details of intra-site link configuration, seesection 3.1 "Adding a Site."
You cannot add or delete cells in the Add TRX dialog box as shown inFigure 3-28.
Step 6 Select Site0-1. Then clickModify Cell Property.The Assign TRX to Cell dialog box as shown inFigure 3-29 is displayed. You can click
Modify CA to add frequencies to the cell.
Figure 3-29Assigning TRXs to the cell
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
37/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-29
Step 7 Assign 1 TRX to Site0-1, and then double-click1 TRX listed in the Assigned TRX box toassign frequencies to Site0-1. Repeat the same steps to assign 7 TRX and frequenciesto
Site0-2.
Step 8
In the Assign TRX to Cell dialog box, clickComplete & Exit to return to theAdd TRX dialog box as shown in Figure 3-28.
You can clickModify Reserved Parameters to change the reserved parameters or retain the default
value 65535.
If no TRX is assigned to the cell, the Next button in the Add TRX dialog box is unavailable.
Step 9 ClickNext in the Add TRX dialog box as shown in Figure 3-28.The Add TRX dialog box is refreshed, as shown in Figure 3-30.
Figure 3-30Configuring the related properties
Step 10 Select the added site from the list box. ClickTRX Property, Site Trunk Mode Description,and BIE Port Property to configure the related properties.
In the TRX Property dialog box, you can only change the TRX properties of the selected BIEport and site. Do not change the TRX properties of other BIE ports and sites. This principle isapplicable to all dynamic configuration operations.
If the BIE port of the BIE where the TRXs reside is not in the timeslot manual adjustment mode, choosethe dynamic configuration mode as described in section 3.1 "Adding a Site."
For details of timeslot manual adjustment, see section 3.1 "Adding a Site."
Step 11 ClickNext.The Add TRX dialog box is refreshed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
38/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-30 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Step 12 ClickStart Dynamic Configuration to activate the data.----End
In the star or tree topology, if the new TRX or other equipment fails to operate, reset the sites on the linkwhere the site resides one by one starting from the top level site. You can also reset the BIE.
After adding a TRX, you need to re-register the traffic statistics tasks of the site.
3.3.3 Verification
After adding the TRXs, check that:
z The new TRXs are functional on the Site Maintenance System.z The conversations over the new TRXs are normal.z The related data in the data tables and in the host are correct.
3.3.4 Data Table
Table 3-3 lists the modified data tables in the BSC Data Management System.
Table 3-3Modified data tables during the addition of a TRXNo. Table Name
1 Site BIE Configuration Table
2 Site Slot Description Table
3 Site Description Table
4 Antenna and Feeder Configuration Table
5 Site Frame Description Table
6 TRX Configuration Table
7 Carrier Configuration Table
8 Radio Channel Configuration Table
9 LAPD Semi-perm. Connection Table
10 LAPD Signaling Connection Table
11 Signaling Channel Link Table
12 Frequency Hopping Table
13 Cell Attribute Table
14 BA1(BCCH) Table
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
39/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-31
No. Table Name
15 BA2(SACCH) Table
16 Site BIE Trunk Mode Description Table
17 BSC BIE Description Table
18 TRX Reserved Parameter Table
3.4 Deleting a TRX
3.4.1 Task Description
Purpose To delete a faulty TRX, or to adjust the capacity of the cells within onesite
Prerequisite z Block the TRX on the Site Maintenance System.z To delete main BCCH TRX, choose Cell > Modify TRX Channel
Type first to change the TRX into non-main BCCH TRX and assign anew BCCH to the cell. If the cell has only one main BCCH TRX left,choose Cell > Delete Cell to delete the cell.
z If the number of full rate channels the cell can provide is smaller thanthat reserved after the TRXs are deleted, change the reserved channelnumber first.
Note z You can delete the TRXs (except main BCCH TRXs) of only one cell inone site at a time.
z For the BTS20, the associated FPU is also deleted when the TRX isdeleted. For the BTS3001C, the associated MFU is also deleted whenthe TRX is deleted.
z After the TRX is deleted, the rack will be deleted (except for rack0) ifthere is no TRX on it.
z If the BIE port is in timeslot manual adjustment mode, adjust thetimeslot manually when deleting the TRX. For details, see section 3.1"Adding a Site" or section 3.3 "Adding a TRX."
3.4.2 Procedure
Using an example, this part shows how to delete TRXs. Assume that you have to delete TRX
18 and TRX 21 of Site2 in BM1. These two TRXs reside in Site2-1 that contains TRX 0, TRX18 and TRX 20.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
40/92
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
41/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-33
Figure 3-32Selecting TRXs
Step 4 Select 18 TRX in the Assigned TRX list box, and then add it to the Deleted TRX list box.Repeat the same steps to add 21 TRX to the Deleted TRX list box.
Step 5 ClickNext.The Delete TRX dialog box is refreshed, as shown in Figure 3-33.
Figure 3-33Prompt to modify the reserved channel number
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
42/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-34 Huawei Technologies Proprietary Issue 08 (2006-08-20)
If you delete the main BCCH TRX, the Informationprompt as shown in
Figure 3-34 appears.
Figure 3-34Information prompt
If the number of full rate channels the cell can provide is less than that reserved after the TRXis deleted, you need to change the reserved channel number first.
Step 6 ClickOK.The Delete TRX dialog box is refreshed, as shown in Figure 3-35.
Figure 3-35Changing the reserved channel number
Step 7 Change the number in the Correct the Reserved Channel Number text box.Step 8 ClickNext.
The Delete TRX dialog box is refreshed, as shown Step 9.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
43/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-35
Figure 3-36Command list for dynamic configuration
Step 9 ClickStart Dynamic Configuration to activate the data.----End
In the star or tree topology, if the new TRX or other equipment fails to operate, reset the sites on the link
where the site resides one by one starting from top level site. You can also reset the BIE.
After deleting a TRX, you need to re-register the traffic statistics tasks of the site.
3.4.3 Verification
Check that the TRXs are deleted on the Site Maintenance System.
3.4.4 Data Table
Table 3-4 lists the modified data tables in the BSC Data Management System.
Table 3-4Modified data tables during the deletion of a TRXNo. Table Name
1 Site BIE Configuration Table
2 Site Slot Description Table
3 Site Description Table
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
44/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-36 Huawei Technologies Proprietary Issue 08 (2006-08-20)
No. Table Name
4 Antenna and Feeder Configuration Table
5 Site Frame Description Table
6 TRX Configuration Table
7 Carrier Configuration Table
8 Radio Channel Configuration Table
9 LAPD Semi-perm. Connection table
10 LAPD Signaling Connection Table
11 Signaling Channel Link Table
12 Frequency Hopping Table
13 Cell Attribute Table
14 BA1(BCCH) Table
15 BA2(SACCH) Table
16 Site BIE Trunk Mode Description Table
17 BSC BIE Description Table
18 TRX Reserved Parameter Table
19 Radio Channel Management and Control Table
20 HW Channel Allocation Table
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
45/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-37
3.5 Adding or Deleting a Board
3.5.1 Task Description
Purpose To delete:
z The standby TMU and standby OMUz The PSU, PMU, EAC, PBU, CDU, EDU, TES, TEU, MCK, and HPA
Prerequisite None
Note z You cannot delete the active TMU, OMU, TRX, FPU, MFU, or MMU.z The FPU in the BTS20 and the MFU in the BTS3001C can be deleted
only when the TRXs have been deleted.
z The site output property and extended parameter will be adjusted as thedefault value when the EAC is deleted. For details, see section 3.8"Modifying Site Data" and section 3.9 "Modifying the Site OutputProperty."
3.5.2 Procedure
To add or delete a board, perform the following steps:
Step 1 On the BSC Data Auto Configuration System, choose BTS > Add or Delete Board.The Add or Delete Board dialog box as shown in Figure 3-37is displayed.
Figure 3-37Selecting a site
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
46/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-38 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Step 2 Select the site in which the board is to be added or deleted.Step 3 ClickNext.
The Add or Delete Board dialog box is refreshed, as shown in Figure 3-38.
Figure 3-38Adding or deleting a board
Step 4 ClickAdd/Delete BTS Board.The Site Device's Property dialog box as shown in Figure 3-39 is displayed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
47/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-39
Figure 3-39Configuring the property of site device
Step 5 Select the board and press Delete to delete it. Right-click in the blank of the panel and chooseAdd Board to add a board.
You can also select and right-click the board, and then choose Add Board orDelete Board in
the floating menu to add or delete the board.
TRXs cannot be deleted in this operation.
Step 6 ClickComplete to return to the Add or Delete Board dialog box as shown in Figure 3-38.Step 7 ClickNext.
The Add or Delete Board dialog box is refreshed, as shown in Figure 3-40.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
48/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-40 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-40Command list for dynamic configuration
This operation leads to fourth level reset of the site.
Step 8 ClickYes in the Confirm dialog box, and then clickStart Dynamic Configuration to activate the data.
----End
3.5.3 Verification
After adding or deleting a board, check that:
z The board status is normal on the Site Maintenance System.z The related data in the data tables and in the host are correctly modified.
3.5.4 Data Table
Table 3-5 lists the modified data tables in the BSC Data Management System.
Table 3-5Modified data tables during the addition or deletion of a boardNo. Table Name
1 Site Frame Description Table
2 Site Slot Description Table
3 Antenna and Feeder Configuration Table
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
49/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-41
No. Table Name
4 Site Description Table
3.6 Modifying Board Type
3.6.1 Task Description
Purpose To change the types of the CDU, EDU, TRX or PBU
Prerequisite None
Note None
3.6.2 Procedure
To change the type of a board, perform the following steps:
Step 1
On the BSC Data Auto Configuration System, choose BTS > Modify Board Type.
The Modify Site Board Type dialog box as shown in Figure 3-41is displayed.
Figure 3-41Selecting a site
Step 2 Select a site.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
50/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-42 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Step 3 ClickNext.The Modify Site Board Type dialog box is refreshed, as shown in Figure 3-42.
Figure 3-42Changing the board type
Step 4 ClickModify BTS Board Type.The Site Device's Property dialog box as shown in Figure 3-43 is displayed.
Figure 3-43Site device property
Step 5 through step 7 show how to change the type of the PBU board.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
51/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-43
Step 5 Double-click the PBU board.The Set PBU Board Property dialog box as shown in Figure 3-44 is displayed.
Figure 3-44Changing the PBU card type
Step 6 Select the PBU board type from the PBU Card Type drop-down list.Step 7 ClickOKto return to the Site Device's Property dialog box as shown in
Figure 3-43.
Step 8 through step 10 show how to change the type of the CDU board.
Step 8 Double-click the CDU board.The Set CDU Board Property dialog box as shown in Figure 3-45 is displayed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
52/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-44 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-45Changing the CDU type
Step 9 Select the CDU type from the CDU Type drop-down list.Step 10 ClickOKto return to the Site Device's Property dialog box as shown in Figure 3-43.
Step 11 through step 13 show how to change the EDU type.
Step 11
Double-click the EDU board.
The Set CDU Board Property as shown in Figure 3-46is displayed.
Figure 3-46Selecting the EDU type
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
53/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-45
Step 12 Select the EDU type from the CDU Type drop-down list.Step 13 ClickOKto return to the Site Device's Property dialog box as shown in
Figure 3-43.
Step 14 through step 16 show how to change the TRX type.
Step 14 Double-click the TRX board.The TRX Property dialog box as shown in Figure 3-47 is displayed.
Figure 3-47Changing the TRX type
Step 15 Select the TRX type from the TRX Type drop-down list.Step 16 ClickOKto return to the Site Device's Property dialog box as shown in
Figure 3-43.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
54/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-46 Huawei Technologies Proprietary Issue 08 (2006-08-20)
The value range of the TRX frequency is as follows:
z PTRX: 1124z ETRX: 0124 or 9751023z RTRX: 0124 or 9551023z DTRX: 512885The value range of the ETR frequency is as follows:
z PETR: 512810z DETR: 512885z RETR: 0124 or 9551023z EETR: 128251
Step 17 ClickComplete to return to the Modify Site Board Type dialog box as shown in Figure 3-42.Step 18 ClickNext.
The Modify Site Board Type dialog box is refreshed, as shown in Figure 3-48.
Figure 3-48Command list for dynamic configuration
This operation leads to third level reset of the site.
Step 19 ClickYes in the Confirm dialog box, and then clickStart Dynamic Configuration to activate the data.
----End
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
55/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-47
3.6.3 Verification
Check that the related data in the data tables are correctly modified.
3.6.4 Data Table
Table 3-6 lists the modified data tables in the BSC Data Management System.
Table 3-6Modified data tables during the modification of the board typeNo. Table Name
1 Site Slot Description Table
3.7 Configuring Site Tower-Top Amplifier
3.7.1 Task Description
Purpose To configure the site tower-top amplifier
Prerequisite None
Note The BSC Data Auto Configuration System will send a third level resetcommand after the site tower-top amplifier is modified.
3.7.2 Procedure
To configure the site tower-top amplifier, perform the following steps:
Step 1 On the BSC Data Auto Configuration System, choose BTS > Configure Site Tower-topAmplifier.The Configure Site Tower-top Amplifier dialog box is displayed, as shownin Figure 3-49.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
56/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-48 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Figure 3-49Selecting a site
Step 2 Select a site.Step 3 ClickNext.
The Configure Site Tower-top Amplifier dialog box is refreshed, as shown in Figure 3-50.
Figure 3-50Configuring the tower-top amplifier
Step 4 ClickConfigure Site Tower-top Amplifier.The Site Device's Property dialog box as shown in Figure 3-51 is displayed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
57/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-49
Figure 3-51Modifying the property of site device
Step 5 Double-click the CDU (orEDU).The Set CDU Board Property dialog box as shown in Figure 3-52 is displayed.
Figure 3-52Site tower-top amplifier configuration
Step 6 Configure the site tower-top amplifier.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
58/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-50 Huawei Technologies Proprietary Issue 08 (2006-08-20)
For detailed information about the parameters, refer to the M900/M1800 BSC Data
Configuration Reference Engineering Parameters.
Step 7 ClickOKto return to the Site Device's Property dialog box as shown inFigure 3-51.
Step 8 ClickComplete to return to the Configure Site Tower-top Amplifier dialog box as shown inFigure 3-50.
Step 9 ClickNext.The Configure Site Tower-top Amplifier dialog box is refreshed, as shown in Figure 3-53.
Figure 3-53Command list for dynamic configuration
This operation leads to third level reset of the site.
Step 10 ClickYes, and then clickStart Dynamic Configuration to activate the data.
----End
3.7.3 Verification
Check that the tower-top amplifier is correctly modified on the Site Maintenance System.
3.7.4 Data Table
Table 3-7 lists the modified data tables in the BSC Data Management System.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
59/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-51
Table 3-7Modified data table during the configuration of site tower-top amplifierNo. Table Name
1 Antenna and Feeder Configuration Table
3.8 Modifying Site Data
3.8.1 Task Description
Purpose To modify the clock mode, clock parameter, and transmission mode of the
sitePrerequisite None
Note If the transmission mode is modified, the BSC Data Auto ConfigurationSystem will send the fourth level reset command.
3.8.2 Procedure
To modify the site data, perform the following steps:
Step 1 On the BSC Data Auto Configuration System, choose BTS > Modify Site Data.The Modify Site Data dialog box as shown in Figure 3-54is displayed.
Figure 3-54Selecting a site
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
60/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-52 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Step 2 Select a site.Step 3 ClickNext.
The Modify Site Data dialog box is refreshed, as shown in Figure 3-55.
Figure 3-55Modifying site data
Step 4 ClickModify Site Data.The Site Device Property dialog box as shown in Figure 3-56 is displayed.
Figure 3-56Changing the site device property
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
61/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-53
Step 5 Change the site device property.For detailed information about the site description, refer to theM900/M1800 BSC Data
Configuration Reference Engineering Parameters.
Step 6 ClickOKto return to the Modify Site Data dialog box as shown in Figure 3-55.Step 7 ClickNext.
The Modify Site Data dialog box is refreshed, as shown in Figure 3-57.
Figure 3-57Command list for dynamic configuration
Step 8 ClickStart Dynamic Configuration to activate the data.----End
3.8.3 Verification
Check that the related data in the data tables and in the host are correctly modified.
3.8.4 Data Table
Table 3-8 lists the modified data tables in the BSC Data Management System.
Table 3-8Modified data tables during the modification of site dataNo. Table Name
1 Site Description Table
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
62/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-54 Huawei Technologies Proprietary Issue 08 (2006-08-20)
No. Table Name
2 BSC BIE Description Table
3 BSC BIE Active/Stby. Group Table
4 Cell Call Control Table
3.9 Modifying the Site Output Property
3.9.1 Task Description
Purpose To change the relay status of the environment alarm box
Prerequisite The site is configured with EAC. If no EAC is configured, see section 3.5"Adding or Deleting a Board" to add it.
Note The function is available only when the site is configured with EAC.
3.9.2 Procedure
To modify the site output property, perform the following steps:
Step 1 On the BSC Data Auto Configuration System, choose BTS > Modify Site Output Property.The Modify Site Output Property dialog box as shown in Figure 3-58 is displayed.
Figure 3-58Selecting a site
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
63/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-55
Step 2 Select a site.Step 3 ClickNext.
The Modify Site Output Property dialog box is refreshed, as shown inFigure 3-59.
Figure 3-59Modifying site output parameters
Step 4 ClickModify Site Output Property to modify the EAC relay status.Step 5 ClickNext in the Modify Site Output Property dialog box as shown in
Figure 3-59.
Step 6 ClickStart Dynamic Configuration in the displayed dialog box to activate the data.----End
3.9.3 Verification
Check that the related data in the data tables and in the host are correctly modified.
3.9.4 Data Table
Table 3-9 lists the modified data tables in the BSC Data Management System.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
64/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-56 Huawei Technologies Proprietary Issue 08 (2006-08-20)
Table 3-9Modified data table during the modification of site output propertyNo. Table Name
1 Site Description Table
3.10 Starting Up Traffic Stat. Task Re-Register
3.10.1 Task Description
Purpose To start up traffic statistics task re-registration
Prerequisite None
Note The function is usually used when the operations that affect cell handoverrelationship are performed. These operations include dynamicallyadding/deleting a site, adding/deleting TRX, adding/deleting a cell,modifying cell adjacency relationship and modifying CGI.
3.10.2 Procedure
To start up traffic statistics task re-registration, perform the following steps:
Step 1 On the BSC Data Auto Configuration System, choose BTS > Startup Traffic Stat. Task Re-register.
The Startup Traffic Stat. Task Re-register dialog box as shown in Figure 3-60 is displayed.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
65/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-57
Figure 3-60Selecting a startup mode
Step 2 Select the startup mode.Step 3 ClickNext.
The Startup Traffic Stat. Task Re-register dialog box is refreshed, as shown in Figure 3-61.
Figure 3-61Command list for dynamic configuration
Step 4 Click Start Dynamic Configuration to activate the data.----End
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
66/92
3 BTS Data Configuration
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration
3-58 Huawei Technologies Proprietary Issue 08 (2006-08-20)
This operation does not change any data table.
3.11 Renaming a Site or Cell
3.11.1 Task Description
Purpose To rename a site or cell
Prerequisite None
Note You can rename all the sites and cells in one operation.
3.11.2 Procedure
Renaming a Site
To rename a site, perform the following steps:
Step 1 On the BSC Data Auto Configuration System, choose BTS > Rename Site or Cell.The Rename Site or Cell dialog box as shown in Figure 3-62is displayed.
Figure 3-62Renaming a site or cell
Step 2 Select a site, and then clickRename Selected Object.
-
7/28/2019 01-3 Dynamic Configuration (BTS).pdf
67/92
M900/M1800 Base Station Controller
Data Configuration Manual - Dynamic Configuration 3 BTS Data Configuration
Issue 08 (2006-08-20) Huawei Technologies Proprietary 3-59
The Rename Site dialog box as shown in Figure 3-63is displayed.
Figure 3-63Renaming the site
Step 3 Change the site name.Step 4 ClickOKto return to the Rename Site or Cell dialog box as shown in Figure 3-62.Step 5 ClickNext.Step 6 ClickStart Dynamic Configuration to activate the data.
----End
Renaming a Cell
The procedure for renaming a cell, external cell, or 3G external cell is the same as that for
renaming a site.
The procedure is as follows:
Step 1 Choose BTS > Rename Site or Cell.The Rename Site or Cell dialog box as shown in Figure 3-62is displayed.
Step 2 Select a cell, and then clickRename Selected Object.The Rename Cell dialog box, External Cell Property dialog box, or3G External CellProperty dialog box is displayed as shown in Figure 3-64,