Construction & Manufacturing Overview                         EMAIL:    [email protected]   2                       Table  of  contents   EMAIL:    [email protected]          

TRANSCRIPT

Page 1: 004-Skylar MFG & Construction Process V4

 

 

   

 Fábrica  Network  

Building  high  quality  homes  quickly  and  at  lower  costs.            

     

Construction & Manufacturing Overview                

Page 2: 004-Skylar MFG & Construction Process V4

  THE  SKYLAR  PROJECT:    FÁBRICA  NETWORK  300  NEW  TORONTO  STREET,  SUITE  3600,  M8V  2E8  TORONTO,    ONTARIO,  CANADA  TEL:  +1  647  977  9176  or  TEL:    +1  888  788  8034,    FAX:  +1  888  588  1945  EMAIL:    [email protected]  

 

2    THE  SKYLAR  PROJECT  

 

   

©  The  Skylar  Project  2011.    All  rights  Reserved    NOTICE OF CONFIDENTIALITY This document including any information transmitted with it is intended only for the use of the addressees and is confidential. If you are not an intended recipient or responsible for delivering the message to an intended recipient, any review, disclosure, conversion to hard copy, dissemination, reproduction or other use of any part of this communication is strictly prohibited, as is the taking or omitting of any action in reliance upon this document. If you receive this document in error or without authorization please notify us immediately or otherwise and permanently delete the entire document from any computer, disk drive, or other storage medium.                

Page 3: 004-Skylar MFG & Construction Process V4

  THE  SKYLAR  PROJECT:    FÁBRICA  NETWORK  300  NEW  TORONTO  STREET,  SUITE  3600,  M8V  2E8  TORONTO,    ONTARIO,  CANADA  TEL:  +1  647  977  9176  or  TEL:    +1  888  788  8034,    FAX:  +1  888  588  1945  EMAIL:    [email protected]  

 

 THE  SKYLAR  PROJECT   3  

 

   

Table  of  contents  Table  of  Contents .......................................................................................................................................3  Generate  Thousands  of  Hours  for  Local  Populations.................................................................4  The  Construction  Process..................................................................................................................4  The  Manufacturing  Process ..............................................................................................................5  

The  Skylar  Project  Factory  Overview................................................................................................6  Factory  Purchase  and  Implementation  Cycle ................................................................................8  Appendix  1  Benchmark  Home  Sample  Design..............................................................................9    

Page 4: 004-Skylar MFG & Construction Process V4

  THE  SKYLAR  PROJECT:    FÁBRICA  NETWORK  300  NEW  TORONTO  STREET,  SUITE  3600,  M8V  2E8  TORONTO,    ONTARIO,  CANADA  TEL:  +1  647  977  9176  or  TEL:    +1  888  788  8034,    FAX:  +1  888  588  1945  EMAIL:    [email protected]  

 

4    THE  SKYLAR  PROJECT  

 

 

Generate  thousands  of  hours  for  local  populations  

The  Construction  Process  

The  Skylar  Project  home  designs  are  optimized  for  exceptionally  fast  onsite  construction.    For  example,  the  Benchmark  Home  shown  in  Appendix  1  is  estimated  to  take  approximately  179  hours  of  labor  to  construct.    The  technology  and  construction  process  have  been  simplified  so  as  to  significantly  reduce  the  requirements  for  traditional  skilled  construction  labor.    This  makes  it  possible  to  generate  substantial  employment  opportunities  for  local  populations.        For  3000  homes,  the  total  employment  hours  generated  is  estimated  to  be  well  in  excess  of  540,000  hours  for  construction  and  approximately  35,000  hours  for  training  for  a  total  of  575,000  hours.    See  table  below  for  a  break  down  of  hours  and  duration  for  each  home.    

Day  Step   Labourers  

Duration  (hrs)  

Total  Effort  (hrs)   1   2   3   4   5   6   7   8   9  

Lot  Surveying   2   2   4                                      Foundation                                                  

Excavation 2   2   4                                      Forming   2   2   4                                      Reinforcing  steel   2   4   8                                      Pouring   2   2   4                                      

Service  rough  in   1   1   1                                      Slab  on  grade   3   2   6                                      Track  layout  measuring  and  installation  

2   2   4                                      

Erecting  exterior  and  interior  walls   3   12   36                                      Erecting  roof  trusses   3   8   24                                      Install  roof  tile/  standing  seam   3   8   24                                      Install  exterior  foam  and  flashing   2   8   16                                      Interior  electrical  complete   1   12   12                                      Interior  plumbing  complete   1   12   12                                      Interior  trim,  doors  and  locks   1   8   8                                      Kitchen   1   8   8                                      

Inspection   1   4   4                                      

Total  Hours    32      97      179                      

Page 5: 004-Skylar MFG & Construction Process V4

  THE  SKYLAR  PROJECT:    FÁBRICA  NETWORK  300  NEW  TORONTO  STREET,  SUITE  3600,  M8V  2E8  TORONTO,    ONTARIO,  CANADA  TEL:  +1  647  977  9176  or  TEL:    +1  888  788  8034,    FAX:  +1  888  588  1945  EMAIL:    [email protected]  

 

 THE  SKYLAR  PROJECT   5  

 

 Figure  1:  Estimated  construction  labor  per  home  built  

 

The  Manufacturing  Process  

Considerable  design  effort  has  been  spent  to  ensure  factory  process  can  be  executed  effectively,  efficiently,  and  safely  by  local  populations  with  little  or  no  experience  in  manufacturing  environments.  For  the  benchmark  home  shown  in  Appendix  1,  manufacturing  is  estimated  to  take  approximately  70  hours  to  produce.    Time  requirements  will  vary  depending  on  overall  units  produce  and  local  conditions.  For  3000  homes,  the  total  employment  hours  generated  is  estimated  to  be  well  in  excess  of  237,000  hours  for  manufacturing  and  approximately  13,300  hours  for  training  for  a  total  of  250,300  hours.    See  table  below  for  a  break  down  of  manufacturing  hours  and  duration  for  each  home.    

Day  Step   Labourers  

Duration  (hrs)  

Total  Effort  (hrs)   1   2   3   4   5   6   7   8   9  

Drying   0   0   0                                      

Metal  fabrication   5   0.25   1.25                                      

Inventory  management   1   2   2                                      

Administration   1   2   2                                      

Internal  logistics  management   1   2   2                                      CNC  cutting  &  coating   8   2.73   21.84                                      Drying   0   0.00   0.00                                      Panel  assembly,  stud  installation   6   2.56   15.36                                      Window  &  Door  Assembly   2   0.85   1.70                                      Roof  truss  assembly   6   2.56   15.36                                      Supervision   2   0.43   0.86                                      Fork  lift  Operations   1   0.43   0.43                                      Office  of  production  mgmt   1   0.43   0.43                                      Delivery  to  site   3   1.28   3.84                                      

Maintenance   2   1.28   2.56                                      

Total  Hours    39.00      18.80      69.63                      

   Figure  2:  Estimate  manufacturing  hours  per  home  built  

Page 6: 004-Skylar MFG & Construction Process V4

  THE  SKYLAR  PROJECT:    FÁBRICA  NETWORK  300  NEW  TORONTO  STREET,  SUITE  3600,  M8V  2E8  TORONTO,    ONTARIO,  CANADA  TEL:  +1  647  977  9176  or  TEL:    +1  888  788  8034,    FAX:  +1  888  588  1945  EMAIL:    [email protected]  

 

6    THE  SKYLAR  PROJECT  

 

 

The  Skylar  Project  Factory  Overview  The  Skylar  Project  has  a  unique,  and  proprietary  system  for  manufacturing  components  for  the  construction  of  residential  and  commercial  building  up  to  5  stories.    Specific  implementations  of  factories  depend  on  local  conditions,  volume  of  homes/buildings,  and  geographic  distribution  of  construction  sites.        The  monthly  production  capacity  of  the  base  factory  system  is  estimated  to  be  approximately  120  units  per  month  and  it  is  estimated  the  facility  will  run  at  approximately  70-­‐80%  capacity.    Base  factories  can  easily  be  expanded  to  facilitate  production  of  an  addition  100  units  per  month.    The  initial  base  factory  and  subsequent  expansion  can  be  provisioned  on  a  3  to  4  month  lead-­‐time.    

Specifications  

• Land:    approximately  4000M2  • Building:    approximately  3000M2  • Employees:  100  +/-­‐  10  • Capacity:  30  -­‐    houses  per  week*  • Expansion  Potential:  +25  houses  per  week*  

Production  

• Residential  houses  complete  with  pre-­‐installed  windows  and  doors  • Commercial  buildings  up  to  5  stories  

   

Page 7: 004-Skylar MFG & Construction Process V4

  THE  SKYLAR  PROJECT:    FÁBRICA  NETWORK  300  NEW  TORONTO  STREET,  SUITE  3600,  M8V  2E8  TORONTO,    ONTARIO,  CANADA  TEL:  +1  647  977  9176  or  TEL:    +1  888  788  8034,    FAX:  +1  888  588  1945  EMAIL:    [email protected]  

 

 THE  SKYLAR  PROJECT   7  

 

 Figure  3:    ISO  Layout  Side  A  View  

 Figure  4:  ISO  Layout  Front  View  

Page 8: 004-Skylar MFG & Construction Process V4

  THE  SKYLAR  PROJECT:    FÁBRICA  NETWORK  300  NEW  TORONTO  STREET,  SUITE  3600,  M8V  2E8  TORONTO,    ONTARIO,  CANADA  TEL:  +1  647  977  9176  or  TEL:    +1  888  788  8034,    FAX:  +1  888  588  1945  EMAIL:    [email protected]  

 

8    THE  SKYLAR  PROJECT  

 

Factory  Purchase  and  Implementation  cycle  

• Blue  Phase  Lead  Time:  3-­‐4  months  • Green  Phase  Lead  Time:  3-­‐4  months  

 

     

Page 9: 004-Skylar MFG & Construction Process V4

  THE  SKYLAR  PROJECT:    FÁBRICA  NETWORK  300  NEW  TORONTO  STREET,  SUITE  3600,  M8V  2E8  TORONTO,    ONTARIO,  CANADA  TEL:  +1  647  977  9176  or  TEL:    +1  888  788  8034,    FAX:  +1  888  588  1945  EMAIL:    [email protected]  

 

 THE  SKYLAR  PROJECT   9  

 

 

Appendix  1:  Benchmark  Home  Sample  Design  for  Social  Housing    

 Figure  5:    Front  View  of  Benchmark  Home  

The  Benchmark  home  is  approximately  88m2    (other  designs  available  for  social  and  residential  and  commercial  building  types).    It  is  a  T3  home  (3  bedroom  1  bathroom,  Living/dining’/kitchen)  

Page 10: 004-Skylar MFG & Construction Process V4

  THE  SKYLAR  PROJECT:    FÁBRICA  NETWORK  300  NEW  TORONTO  STREET,  SUITE  3600,  M8V  2E8  TORONTO,    ONTARIO,  CANADA  TEL:  +1  647  977  9176  or  TEL:    +1  888  788  8034,    FAX:  +1  888  588  1945  EMAIL:    [email protected]  

 

10    THE  SKYLAR  PROJECT  

 

 Figure  6:  Rear  View  of  Benchmark  Home  

 

Page 11: 004-Skylar MFG & Construction Process V4

ENGLISH

EATON DONALDTHE SKYLAR PROJECT: FÁBRICA NETWORK

300 New Toronto Street, Suite 3600Toronto, Ontario, M8V 2E8TEL: +1 647 977 933 9090, FAX: +1 888 588 1945EMAIL: [email protected]

PORTUGUESE

MANUEL LIMATHE SKYLAR PROJECT: FÁBRICA NETWORK

300 New Toronto Street, Suite 3600Toronto, Ontario, M8V 2E8

TEL: +1 416 8915818 FAX: +1 888 588 1945

EMAIL: [email protected]

For more information, contact:

Page 12: 004-Skylar MFG & Construction Process V4

© The Skylar Project 2011. All Rights Reserved