Page 1: 001 Prelim Site Inspection Report Rev 5 PDF€¦ · Note - Stage 1, 2 & 3 Limited to 80ha to the 2021 planning horizon, and a further 115ha to the 2041 planning horizon. Stage 5-7
Page 2: 001 Prelim Site Inspection Report Rev 5 PDF€¦ · Note - Stage 1, 2 & 3 Limited to 80ha to the 2021 planning horizon, and a further 115ha to the 2041 planning horizon. Stage 5-7

MNP

Page 3: 001 Prelim Site Inspection Report Rev 5 PDF€¦ · Note - Stage 1, 2 & 3 Limited to 80ha to the 2021 planning horizon, and a further 115ha to the 2041 planning horizon. Stage 5-7

Ruakura Indicative Uptake and Staging Plan - TGH Summary Spreadsheet - 30 May 2013

Stage 4 Stage R1b Stage 5 Stage 6 Stage 7

Desciption: Knowledge Zone Residential Industrial Industrial Industrial

Commentary:

Total Area: 34.57ha 8.98ha 32.57ha 67.86ha 7.04ha

Assumptions:

35% of land area is taken

up through roads,

reserves and servicing. 1

Stage of development

Land available

for Uptake

1ha developed per year

intially and then blocks of

1ha every few years up

to 2031.

4ha initially then the

remainder from 2017Post 2041 Post 2041 Post 2041

2012

2013

2014

2015

2016 Const Const Const

2017 1ha

2018 Const Const Const 1ha

2019 1ha

2020 1ha

2021 Const Const Const

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

2036

2037

2038

2039

2040

2041

Beyond 2041

Note - Stage 1, 2 & 3 Limited to 80ha to the 2021 planning horizon, and a further 115ha to the 2041 planning horizon. Stage 5-7 are not developed until post 2041

16ha

24ha

68.59ha

Stage 3

Industrial

Stage 1

Inland Port + Logistics.

20ha to be developed prior to realignment of

Ruakura Road.

104.27ha

5ha intially to a total of 20ha to 2021, then a

further 45ha to 2041. The remaining area

will be developed post 2041.

3ha intially to a total of 10ha to 2021, then a

further 30ha to 2041. The remaining area

will be developed post 2041.

3ha

35% of land area is taken up through roads,

reserves and servicing. 4 substages of

development.

Tainui Group Holdings Limited

Stage 2

Industrial

75.41ha

35% of land area is taken up through roads,

reserves and servicing. 4 substages of

development.

1ha

1ha

Plan Change

10ha intially to a total of 50ha to 2021, then

a further 40ha to 2041. The remaining area

will be developed post 2041.

10ha

Consenting, Design and Construction Consenting, Design and ConstructionConsenting, Design and

ConstructionConsenting, Design and Construction

Consenting, Design and

Construction

40ha 45ha 30ha

35% of land area is taken up through roads,

reserves and servicing. 4 substages of

development.

1ha

5ha

4ha5ha

6ha 3ha

1ha

9ha 4ha

Page 4: 001 Prelim Site Inspection Report Rev 5 PDF€¦ · Note - Stage 1, 2 & 3 Limited to 80ha to the 2021 planning horizon, and a further 115ha to the 2041 planning horizon. Stage 5-7
Page 5: 001 Prelim Site Inspection Report Rev 5 PDF€¦ · Note - Stage 1, 2 & 3 Limited to 80ha to the 2021 planning horizon, and a further 115ha to the 2041 planning horizon. Stage 5-7

Photograph 1: Maintenance Workshop

Photograph 2: Dairy milking sheds

Tainui Group Holdings Photographs 1 & 2

June 2013 2-32113.00 Ruakura Development

Page 6: 001 Prelim Site Inspection Report Rev 5 PDF€¦ · Note - Stage 1, 2 & 3 Limited to 80ha to the 2021 planning horizon, and a further 115ha to the 2041 planning horizon. Stage 5-7

Photograph 3: Farm Out buildings

Photograph 4: Maintenance Workshop. Chemical storage. Local stains on floor.

Tainui Group Holdings Photographs 3 & 4

June 2013 2-32113.00 Ruakura Development

Page 7: 001 Prelim Site Inspection Report Rev 5 PDF€¦ · Note - Stage 1, 2 & 3 Limited to 80ha to the 2021 planning horizon, and a further 115ha to the 2041 planning horizon. Stage 5-7

Photograph 5: Maintenance Workshop. Agricultural chemical mixing area

Photograph 6: Maintenance Workshop. 400litre diesel tank / bowser

Tainui Group Holdings Photographs 5 & 6

June 2013 2-32113.00 Ruakura Development

Page 8: 001 Prelim Site Inspection Report Rev 5 PDF€¦ · Note - Stage 1, 2 & 3 Limited to 80ha to the 2021 planning horizon, and a further 115ha to the 2041 planning horizon. Stage 5-7

Photograph 7: Offal Pits. Current one marked by concrete cover

Photograph 8: Effluent ponds

Tainui Group Holdings Photographs 7 & 8

June 2013 2-32113.00 Ruakura Development