All Eng_ineer-tn-Chief/Chief Engineer (DS),Under punjab State power Corporation Limited.
Memo No.: 409/i3lSWSA/ot_t/DB-9BDated: 12.5.2020
Sub: Regarding new In_house software for online:sub-divisilni and DGd;;;;i:;i",i:1il",?,1:ff;t'* ror arr road or Non-sApIt is informed that in
i;i:":ltli{1i;:il*gil{{f ilf l;lffl x*'-"#31""".,';;ilni""i'.Yii";,?i jti1224t2e dated L ;;;;;; Tffff lidi.,|;":Hfiill l", 10,o6 dared oilo.roro ""0upto 100 kVA (Non-SAp) n"" "i""'^".I"*::^""::::u .'n?
online submission of connectionssoftware n". nJ""
"il"J"ot-"i1_b":l started on this In-nouse software. Now this In_nouse
connections for Non_SAp Sror connections of lbad above 2ooo kVA i.".,r"rn
""*""#lros arrveru ano cari o;;; ;;;,,#"?,;:T;'J31,lff3j::il:^'lrl" w,.0"* 5,,*, ",
roand links already informed in aDove referred letters.
tware as per the following procedure
"rr ",0_o,Tui.1jltlo:t:"_::"ffJ,;.""iso;lH::::*:l_lslstratio.l of apprications of cpp/rc sets of
;Jfl il T.Yf i:# il;;::'#;yJ':l il:: :il:J'l'' bei n s a pp' ied o n s i ns' eiv"rndow
Itware for which the procedure and
^ PSPCL website>New Conr
;;'it;:i:*tq35:i!11,:',ij",1',:?1T,T,."?Tiffi e.":lffi :;i'E,Iil,l:l?"?,i:;Ihttps://wss pspcl'in:50001/webdynpro/resources/pspcr.com/srngrewindow/RequestdetairsApp#l
Username & password has arready been shared with concerned officiars through e-mair.the procedure being followed online on the new sofiwrra .u^,, ^^ ^- I
-
?1Ti".1" software and as per instructions passed-a;;;;;"iq9TyrurT "t:
:AilB,A:d8l;;1,, ano other instructions issued by il;;ffi;; rJdr.rng ontine software sha'remarn
^ --_, U:"1 TTual for consumers & Field offices for conrll:€) and DG-TG sets is avairaoL on';;;;"::lll'-::jleclons above 500 kVA (Non-sApro,owed on onrin" si,_id";":",ffiij::i^"Jll&r[:f:Jor$n", low charts r"i pii,,j"o,,,"'I o"
-
As such you are requested to pass requisite instructions to all the concerned offices
under your control to guide the consumer properly regarding the same'
Incaseofany.in-congistencyintheon|ineapp|iedcases,theprovisionofSupp|ycode-2014 (amended up td date) & ESIM -2018 will prevail in that order'
lf there are any querres/complaints regarding this change please contact on 96461-
11725 or on helpline No. shown online.
Meticu|ouscomp|ianceoftheaboveinstructionsmaybeensuredbya||thefie|dofficers.
This issues with the approval of competent authority'
l^.!ffi2,11.0>
,,H&*^,-For CE/Commercieil,
PSPCL, Patiala.
i. CEllT PSPCL, Patiala for information please.ii. GE/TS, pSpcL, patiala for information and necessary action in regard to applications of
CPP/TG sets Please.iii.CE/Therma|DesignPatia|aforinformationandnecessaryactioninregardto
applications of CPP/TG sets please.
iv. Dy. CE/tech to Director/D PSPCL, Patiala for information please'v. All Dy.CE/SE/DS, under PSPCL for information and necessary action please'
-
Annexure - A
Flow Chart for New Connection/Extension in Load for
load above 2000 kVA
Consumer apply for new
connection (above 2000 kVA)
Consumer uploads supporting
documents
Nodal Officer (i.e. Officer of
Commercial organization) to verify
& accept documents
Consumer to pay Initial Security i.e. 5% of ACD
SE/DS to upload proposal
Nodal Officer (i.e. ASE/Sales-4) to issue FCC Letter
Applicant to submit A&A form and pay
20% of ACD charges
SE/DS to issue Demand Notice
Applicant to do compliance of Demand Notice i.e.
upload Test Report and pay remaining 75% ACD charges
and SCC
SE/DS to release connection
CE/DS to submit comments
Nodal Officer (i.e. Officer of Commercial organization) to prepare agenda
CE/Commercial to Circulate Agenda and Fix FCC Meeting Date.
Release of Minutes
-
Annexure – B
1. Steps for DG/Tg Sets b/w 11 KVA to 1000 KVA without synchronisation:
i. Submit TG/DG Sets Application Online
ii. Nodal Officer Verifies and Accepts
iii. Approval from SE/DS
2. Steps for DG/Tg Sets b/w 1001 KVA to 5000 KVA without synchronisation:
i. Submit TG/DG Sets Application Online
ii. Nodal Officer Verifies and Accepts
iii. SE/DS Uploads Proposal
iv. Approval from CE / DS
3. Steps for DG/Tg Sets above 5000KVA without synchronisation:
i. Submit TG/DG Sets Application Online
ii. Nodal Officer Verifies and Accepts
iii. SE/DS Uploads Proposal
iv. Approval From Nodal Officer (On behalf of competent Authority)
4. Steps for DG/Tg Sets with synchronisation:
i. Submit TG/DG Sets Application Online
ii. Nodal Officer Verifies and Accepts
iii. Se/Ds uploads proposal
iv. Approval of Protection Drawing by CE/TS
v. Approval of Technical Feasibility By CE/Thermal Design.
vi. Final Approval From Nodal Officer.