0 20' 30'10' 50' attachment 2 - sacramento district...claffey ecological...

8
4 Project Location 4 Location of Lawson Hill Alternatives SCALE 1:48000 0 1 2 MILES 0 1000 2000 3000 YARDS 0 1 2 3 KILOMETE Declination MN 10.24° E MN Location: 037° 56' 20.35" N 107° 51' 00.41" W Name: TELLURIDE Date: 01/16/15 Scale: 1 inch = 4,000 ft. Copyright (C) 2009 MyTopo FIGURE 1 Attachment 1

Upload: others

Post on 10-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 0 20' 30'10' 50' Attachment 2 - Sacramento District...Claffey Ecological Consulting, Inc. Scale - 1:3,600 1 Inch = 300 Feet at Letter Layout Source: ESRI World Imagery 2011 Alternative

4Project Location

4Location of Lawson Hill Alternatives

Copyright (C) 2009 MyTopo

SCALE 1:480000 1 2 MILES

0 1000 2000 3000 YARDS

0 1 2 3 KILOMETE

Declination

MN 10.24° E

MN

Location: 037° 56' 20.35" N 107° 51' 00.41" WName: TELLURIDEDate: 01/16/15Scale: 1 inch = 4,000 ft.

Copyright (C) 2009 MyTopo

FIGURE 1

Attachment 1

Page 2: 0 20' 30'10' 50' Attachment 2 - Sacramento District...Claffey Ecological Consulting, Inc. Scale - 1:3,600 1 Inch = 300 Feet at Letter Layout Source: ESRI World Imagery 2011 Alternative

HelicopterPad

Telluride Medical CenterProposed Site

Service Access Drive (to level below)

AmbulanceDrop-o�

Mountain VillageTown Hall Gondola

Station

Existing GondolaParking Garage

EXISTING SIDEWALKGONDOLA LIFT

CHAIRLIFT 10

Double CabinSki Run

PedestrianEntryPlaza

Snow Removal Easement / Maintenance Vehicle Access

LEGENDProposed Building

New Grading / Fill

New Vehicle Access

Wetlands impacted (19,187 sqft)

Wetlands to remain

Piped Channel Connection

W E T L A N D S B O U N D A R I E S

T E L L U R I D E M E D I C A L C E N T E R

2 9 J U N E 2 0 1 5

M A H L U M A R C H I T E C T S I N C 0 20' 30'10' 50'

Attachment 2

Page 3: 0 20' 30'10' 50' Attachment 2 - Sacramento District...Claffey Ecological Consulting, Inc. Scale - 1:3,600 1 Inch = 300 Feet at Letter Layout Source: ESRI World Imagery 2011 Alternative

LEGENDProposed Building

New Grading / Fill

Wetlands impacted (19,187 sqft)

Proposed Two Story Medical CenterDrop-OffEntry Plaza

Lower Level Beyond

Attachment 3

Page 4: 0 20' 30'10' 50' Attachment 2 - Sacramento District...Claffey Ecological Consulting, Inc. Scale - 1:3,600 1 Inch = 300 Feet at Letter Layout Source: ESRI World Imagery 2011 Alternative

December 2014

TELLURIDE MEDICAL CENTER ALTERNATIVES

Alternatives

MOUNTAIN VILLAGE, CO

1,200 0 1,200600 Feet

Datum: NAD_1983_UTM_Zone_13N Figure 5GIS Prepared by Esa Crumb

Claffey Ecological Consulting, Inc.

Scale - 1:14,4001 Inch = 1,200 Feet at Letter Layout

Source: ESRI World Imagery 2011

Alternative ALawson Hill Site: Big Dog Holdings

Alternative BLawson Hill Site:

Lot H&I

Proposed AlternativeMountain Village Site:

Town Hall

Town of Telluride

7 miles from Mountain Village Site

145

145

Attachment 4

Page 5: 0 20' 30'10' 50' Attachment 2 - Sacramento District...Claffey Ecological Consulting, Inc. Scale - 1:3,600 1 Inch = 300 Feet at Letter Layout Source: ESRI World Imagery 2011 Alternative

December 2014

TELLURIDE MEDICAL CENTER ALTERNATIVES

Lawson Hill Alternatives

MOUNTAIN VILLAGE, CO

300 0 300150 Feet

Datum: NAD_1983_UTM_Zone_13N Figure 6GIS Prepared by Esa Crumb

Claffey Ecological Consulting, Inc.

Scale - 1:3,6001 Inch = 300 Feet at Letter Layout

Source: ESRI World Imagery 2011

Alternative ALawson Hill Site: Big Dog Holdings

Alternative BLawson Hill Site:

Lot H&I

To Town of Telluride4 miles from Lawson Hill Sites

145

145

Society Drive

San Miguel River Rd

Attachment 5

Page 6: 0 20' 30'10' 50' Attachment 2 - Sacramento District...Claffey Ecological Consulting, Inc. Scale - 1:3,600 1 Inch = 300 Feet at Letter Layout Source: ESRI World Imagery 2011 Alternative

Table 1. Telluride Medical Center Site Alternatives Analysis Matrix for Practicability

Alt 1: Lawson Hill Big Dog Parcel Alt 2: Lawson Hill Lots H and I Alt 3: Mnt Village Town Hall

Availability YES YES YES

Space for Proposed Medical Facility YES YES YES

Space and Approvals for Future Expansion

YESEnough space on lot, but would require new PUD through County, and the Yes is only for technicalities of the 404 b 1 process, and comments on alternatives from EPA. It cannot be proven that the County approvals would be denied, but the lack of certainty does remove this alternative for consideration for the TMC.

NO The LHPOC would not approve future expansion, and would not approve the larger 40,000 sf building.

YES Space availble to expand to about 50,000 sf

County and Local Approval of Project * (Simple yes or no at present time), and theuncertainty of approvals is critical for this particular project

NO Approval complexities are significant for Big Dog Parcel. Rejection would occur if even one of the owners did not approve, also requires two governments and the Lawson Hill HOA company approvals.

NO - currentlyUnknown on how the County BOCC considers this project, but approval required from County, and Town of Telluride for water and sewer.

YESProject development at this site is supported by the TMV town council

Public Transportation

YESOn bus route, and schedule could possibly be changed to every half hour for patients and employees but could be difficult to implement due to lack of RTA. Bus routes currently do not run year-round.

YESOn bus route, and schedule could possibly be changed to every half hour for patients and employees but could be difficult to implement due to lack of RTA. Bus routes currently do not run year-round.

YES Bus route availability right at the parking lot at Town Hall, and the free gondola that provides transportation between TMV and Telluride is near the site.

Pedestrian Access

NO Provides pedestrian access for 6 % of the population and thus does not meet the overall project purpose. Only 6% of the regional community population would have walking access to the facility. Would be less accessable to visitors and locals without cars, which is a signficant percentage of the population base.

NO Provides pedestrian access for 6 % of the population and thus does not meet the overall project purpose. Only 6% of the regional community population would have walking access to the facility. Would be less accessable to visitors and locals without cars, which is a signficant percentage of the population base.

YES Facility would be located adjacent to the gondola and close to a higher population density. Would be highly accessable to visitors and locals without cars due to its proximity to the gondola and bus routes.

Location Accessible to General Population

YES - but limitedLocation is situated between Telluride and Mountain Village in area that supports 6% of the region's population

YES - but limitedLocation is situated between Telluride and Mountain Village in area that supports 6% of the region's population

YESLocation is near high population density

Zoned for Medical Center

NOCurrently zoned for commercial uses. Potential to changed zoning designation but uncertain as to whether this would be approved by the County

YESRe-zoning not required

YESRe-zoning not required

Zoned for Helicopter PadNOAs with development of the medical center, the parcel would require rezoning. Uncertain approvals.

YESRe-zoning not required

YESRe-zoning not required

Current Parking and Space for Expansion of Parking

NOWould require re-location of existing use of parking for County overflow parking lot, which may not be approved by County. Space for future expansion of parking is not available.

NONew building size of 40,000 sf would require a minimum of 120 stalls (3 stalls/1,000 sf of building), on-site capacity limits parking stalls to 49. Would need to build an underground parking structure. Space for future expansion of parking is not available.

YESParking available in adjacent existing parking lot with space for expansion of parking capacity/stalls

Existing Site Conditions Feasible for Construction of Project

YESNo issues with topography, soils, or other major impediments

YESNo issues with topography, soils, or other major impediments

YESNo issues with topography, soils, or other major impediments

Facility Could be Constructed or Renovated to Meet Current Hospital and Medical Center Codes

YES YES YES

Acquisition and Construction Cost Reasonable and Feasible

NOCosts for acquisition are $3.95 million, and construction costs are estimated between $17.3 and $22.2 million. $3.95 million is within market value but for a non-profit special district the cost is significant.

NO$2.5 million for acquisition, and the cost of construction is between $20.4 and $23.8 million. An additional $3.24 million would be required for construction of the below ground parking structure. As with Big Dog Parcel, costs exceed $3 million more for acquisition/construction as compared to Town Hall Site

YESSite will be provided to TMC free of charge to encourage a non-profit Special District. Costs for construction are similar to the Lawson Hill sites (Alt 1 and 2), estimated at $17.9 and $20.9 million. No additional cost required for parking structure.

Permitting and Approvals Costs Reasonable and Feasible

NOHigh costs associated with re-zoning and other approvals from County to move the overflow parking lot.

YESLocal approvals required (Town of Telluride - water and sewer), and by the Lawson Hill Property Owners Company (LHPOC), but major rezoining not requried

YESApprovals received from the Town of Mountain Village and they have waived $800,000 of municipal approvals

Long Term Operations Costs Reasonable and Feasible

YESExtra funding would be required for addition of bus routes to facility

YESExtra funding would be required for public transportation schedule

YES

ALTERNATIVE SITESPracticability Category Factor

Logistics

Cost

Existing Technology

Attachment 6

Page 7: 0 20' 30'10' 50' Attachment 2 - Sacramento District...Claffey Ecological Consulting, Inc. Scale - 1:3,600 1 Inch = 300 Feet at Letter Layout Source: ESRI World Imagery 2011 Alternative

ISS

UE

6.23

.14

DR

AW

N B

YBd

A

TE

LLU

RID

E H

OS

PIT

AL

DIS

TR

ICT

LAW

SON

HIL

L LO

T-H

ISI

TE E

VALU

ATIO

N

AV

LAE

D, L

LC97

0.72

8.36

70bi

ll@de

alva

.net

Sheet-2

ISS

UE

6.23

.14

DR

AW

NB

YBd

A

TE

LLU

RID

EH

OS

PIT

AL

DIS

TR

ICT

LAW

SON

HIL

LLO

T-H

ISI

TEEV

ALU

ATIO

N

AV

LAE

D,L

LC97

0.72

8.36

70bi

ll@de

alva

.net

Sheet-1

Mas

sM

odel

&Pa

rkin

gSi

tePl

an

SOCIETY DRIVE

SAN MIGUEL RIVER DRIVE

LOT-G

LOT-G / LOT-HIPROPERTY LINE

BALL

FIEL

D A

CC

ESS

RO

AD

BUILDING MASS MODEL:18,150 SF GROUND FLOOR

7,000 SF 2ND FLOOR

AMBULANCE ACCESS

ALL OTHER ACCESS

SERVICE AREA

49 (TOTAL) PARKING SPACES SHOWN

OPEN SPACE TRACT

OPEN SPACE

OPEN SPACE

LOT LINE

H

MOUNTAIN SCHOOL

OPTION FOR GROUND LEVEL HELIPADREQUIRES LOT LINE ADJUSTMENT TOSWAP WEST PORTION OF LOT-HI (BEIGE)FOR OPEN SPACE. NO ASSURANCE THAT LHPOC OR COUNTY WILL APPROVE THIS OPTION

BUILDING AREA: 40,000 SF20,000 SF MAIN LEVEL20,000 SF UPPER LEVEL

120 (TOTAL) PARKING SPACES REQ'DZONING REQ 3 STALLS : 1,000 SF AREAINSUFFICIENT SITE CAPACITY: 49 SPACES

Attachment 7

pbauser
Text Box
Insufficient On-Site Parking Capacity 120 Parking Stalls Required (3 stalls/1,000sf of building) On-Site Capacity = 49 Stalls
pbauser
Text Box
Building Area: 40,000 sf 20,000 sf Main Level 20,000 sf Upper Level
Page 8: 0 20' 30'10' 50' Attachment 2 - Sacramento District...Claffey Ecological Consulting, Inc. Scale - 1:3,600 1 Inch = 300 Feet at Letter Layout Source: ESRI World Imagery 2011 Alternative

SP05

SP11

SP09

SP08

SP07

SP10

SP04

SP02

TESTPITTESTPIT

January 2015

TELLURIDE MEDICAL CENTER

Project and Mitigation Site Locations

MOUNTAIN VILLAGE, CO

1,200 0 1,200600 Feet

Datum: NAD_1983_UTM_Zone_13N Figure 1GIS Prepared by Esa Crumb

Claffey Ecological Consulting, Inc.

Scale - 1:14,4001 Inch = 1,200 Feet at Letter Layout

Source: ESRI World Imagery 2011

Mitigation Site 2:Benchmark Site

Mitigation Site 1:Entrance Site

Telluride Medical CenterProject Impact Site

145

Attachment 8