3/4/2014 MTA - Eye on the Future http://wp1.mtahq.org/mta/capital/eotf.htm 1/1 Welcome to the latest MTA "Eye on the Future," in which we present capital projects that are planned to be advertised from March 2014 – September 2014. The "Eye" is hosted on our MTA Capital Program web site, which assembles key information and resources about the Capital Program in one convenient location. It is another part of how we are changing the way we do business and we hope that you find it to be useful. The MTA Capital Program is not only very important for the safety and reliability of the MTA transportation system; it is also vital to the regional economy. As described in this issue of the "Eye," the MTA is preparing to undertake approximately $4 billion in capital work that spans many areas, including civil, structural, and electrical, as well as new technologies. Based on the October 2009 APTA publication on the Economic Impact of Public Transportation Investments, this amount of investment is projected to create more than 98 thousand jobs and generate close to $17 billion in economic activity for the New York region. These projects are vital to the reliability, growth and resiliency of the system and contribute to the regional economy. We look forward to your participation. Contractors and suppliers have a critical stake in the success of the Capital Program. We appreciate your interest in and support of the projects included in this issue of the "Eye." Yours truly, Thomas F. Prendergast Chairman and Chief Executive Officer Click here for Eye on the Future Download a Printable PDF File

Upload: others

Post on 02-Mar-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotfhtm 11

Welcome to the latest MTA Eye on the Future in which we present capital projects that are planned to be advertised

from March 2014 ndash September 2014 The Eye is hosted on our MTA Capital Program web site which assembles

key information and resources about the Capital Program in one convenient location It is another part of how we are

changing the way we do business and we hope that you find it to be useful

The MTA Capital Program is not only very important for the safety and reliability of the MTA transportation system it is

also vital to the regional economy As described in this issue of the Eye the MTA is preparing to undertake

approximately $4 billion in capital work that spans many areas including civil structural and electrical as well as new

technologies Based on the October 2009 APTA publication on the Economic Impact of Public Transportation

Investments this amount of investment is projected to create more than 98 thousand jobs and generate close to $17

billion in economic activity for the New York region These projects are vital to the reliability growth and resiliency of the system and

contribute to the regional economy We look forward to your participation

Contractors and suppliers have a critical stake in the success of the Capital Program We appreciate your interest in and support of the

projects included in this issue of the Eye

Yours truly

Thomas F Prendergast

Chairman and Chief Executive Officer

Click here for Eye on the Future

Download a Printable PDF File

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 14

Information About Contracts that Will Be Advertised for

Professional Services Construction and Equipment Procurement

MARCH 2014 ndash SEPTEMBER 2014

Letter from the Chairman

Information About Contracts

Overview

Contacts

Selected Contract Provisions

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Overview

This edition of An Eye on the Future contains information for prospective contractors engineers architects and vendors about contracts that are expected

to be advertised for bids between March 2014 ndash September 2014 by the Metropolitan Transportation Authoritys operating agencies

MTA New York City Transit (NYC Transit)

MTA Staten Island Railway (SIRTOA)

MTA Long Island Rail Road (LIRR)

MTA Metro-North Railroad (MNR)

MTA Bridges and Tunnels (BampT)

MTA Capital Construction (MTACC)

MTA Bus Company (MTA Bus)

In 1993 the MTA board approved a new service identity program for the MTA family of agencies The identity program provides for the use of the above

popular names to make clear to our customers that the various MTA affiliates and subsidiaries constitute an integrated regional transportation network

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 24

Security amp Consulting Service for NEW YORK CITY

TRANSIT ONLY

Mr Joseph Paldino

Assistant Chief Procurement Officer

Materiel Division

MTA New York City Transit

2 Broadway

New York NY 10004

Telephone (646) 252-6330

Fax(646) 252-6099

Email josephpaldinonyctcom

For all other contracts

Mr Robert Eskenazi

Senior Director Materiel Division

MTA New York City Transit

2 Broadway

New York NY 10004

Telephone (646) 252-6258

Fax (646) 252-6144

Email roberteskenazinyctcom

MTA NEW YORK CITY TRANSIT MTA STATEN ISLAND RAILWAY MTA BUS COMPANY

However for all procurement documents and official transactions the agencies retain their legal names New York City Transit Authority Staten Island

Rapid Transit Operating Authority the Long Island Rail Road Company Metro-North Commuter Railroad Company Triborough Bridge and Tunnel Authority

Capital Construction and Bus Company

With respect to the contract descriptions and other data included in this volume readers should note that they are for general information only and are not

to be construed as final The exact description of the work and other pertinent information concerning an individual contract will be found in the contract

specifications and drawings or solicitation documents which may be obtained by prospective bidders when solicitation begins Most contracts for

construction procurement of capital equipment and professional services are awarded after a competitive process including sealed bids for construction

and procurements and competitive requests for proposals for professional services

Some aspects of contracting are common to all the MTA agencies

1 MTA agencies are not subject to the Wicks Law for their construction projects

2 MTA agencies seek the best contractors suppliers and professional services firms in the business including firms owned by women and minorities for

which special efforts are made to ensure appropriate participation We pledge to do our part to make all projects successful for the agencies and

contractors alike

3 Projects already funded by Federal grants are noted in the solicitation schedule with an asterisk Some of the other projects may become eligible for

Federal funding in future grant applications

Public notices of solicitations are normally published in advance of the availability of contract documents or requests for proposals in the New York State

Contract Reporter and in one or more of the following publications

New York Post

El Diario

The Daily Challenge

Amsterdam News

Minority Commerce Weekly

Engineering News Record

Contacts

Further information about contracts adverstised here can be obtained by contacting respective agency representatives

MTA METRO-NORTH RAILROAD

Mr Charles F Hansen

Deputy Director - Capital Procurement

MTA Metro-North Railroad

347 Madison Avenue 14th Floor

New York New York 10017-3706

Telephone (212) 340-3262

Fax (212) 340-4034

E-mail hansenmnrorg

MTA LONG ISLAND RAIL ROAD

Ms Carla Butler

Contract Research Clerk

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 34

Planning amp Construction

MTA Long Island Rail Road

90-27 Sutphin Boulevard (0335)

Jamaica New York 11435

Telephone (718) 725-2622

Fax (718) 725-2676

E-mail cbutlerlirrorg

MTA BRIDGES amp TUNNELS

Ms Victoria Warren

Procurement and Materials

MTA Bridges and Tunnels

2 Broadway 24th Floor

New York New York 10004

Telephone (646) 252-7092

Fax (646) 252-7077

E-mail vprocuremtabtorg

MTA CAPITAL CONSTRUCTION

Mr David K Cannon

Senior Director and Chief Procurement Officer

Procurement and Law Department

MTA Capital Construction

2 Broadway - A899

New York New York 10004

Telephone (646) 252-2321

E-mail dcannonmtaccinfo

Selected Provisions of Capital Program Contracts

This is a summary of several provisions which are generally applicable to MTA agency projects Complete requirements for a given contract can only be

obtained from the documents for that contract Naturally all construction is performed under the laws and regulations of New York State This is not

intended to be a full summary of General Provisions

1 MTA New York City Transit the two commuter railroads and MTA Capital Construction base progress payments on the contractors monthly

submissions of cost-loaded schedules The use of CPM network diagrams is required for complex projects while simpler bar charts are required for

less complex projects

2 All the agencies contract documents contain a value engineering change proposal clause Contractors are encouraged to submit cost saving proposals

during construction and upon acceptance of the proposal would be able to share in the actual cost savings

3 Another effort to improve the management of capital projects is the use of contractor evaluation files that are kept on all ongoing work All the MTA

agencies use identical criteria to evaluate contractors and share the information with the other MTA agencies

4 The period between advertisement for bids and bid opening will vary from approximately four to eight weeks depending on size of the contract

5 Unless specifically noted in the bid document the transit facilities will be in continuous operation during the performance of the work for the majority of

contracts The contracting agency will provide the necessary maintainers flagmen diversions of service and work trains

6 Bidders will be required to submit prior to the award of the contract a program of affirmative action to provide for equal employment opportunity

Submittals will be described in the contract documents Goals for the participation of minority-owned and women-owned firms may be specified for

each contract

Minority business enterprises and women business enterprises will be afforded full opportunity to submit bids andor proposals and will not be

subjected to discrimination on the basis of race religion color sex or national origin in consideration for awarding contracts

7 A bid bond or a certified check in the amount of five to ten percent is normally required at the time of delivery of the bid The contractor must furnish a

performance bond and payment bond in amounts equal to 100 percent of the contract price

8 In addition to other requirements specifically provided in the contract each bidder must be prepared to prove to the satisfaction of the contracting

agency that he has the qualifications including but not limited to skill and experience and the necessary facilities and financial resources to complete

the work in a satisfactory manner within the time specified

9 Contracts generally require a guarantee of all apparatuses devices workmanship and materials for at least one year A security in the form of a bond

in the sum of a predetermined percentage of the amount of the contract may be required prior to the final payment Contracts may have additional

requirements which must be reviewed

10 The contractor shall also maintain at a minimum Workers Compensation Commercial General Liability and Commercial Automobile Insurance

Additional coverage may be required and will be indicated in the contract The MTA and the contracting agency shall be named as an additional insured

on the policy In general coverage requirements range from $1000000 to $5000000 combined single limit for injuries to persons (including death) and

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 44

for damage to property The limits of liability will vary depending on the size and type of projects In addition the contractor will be required to hold the

governmental agencies and contracting agency harmless Evidence of the required insurance shall be delivered to the contracting agency on an MTA

approved Certificate of Insurance prior to execution of the contract

Each insurance policy or Certificate of Insurance shall contain an agreement by the insurance company issuing the policy that the policy will not be

canceled terminated or modified without 30 days prior notice to the contracting agency At least two weeks prior to the expiration of each policy the

contractor shall endeavor to provide an updated Certificate of Insurance evidencing renewal coverage to the contract agency

The MTA has in place Owner Controlled Insurance Programs (OCIP) for the East Side Access (ESA) project the Second Avenue Subway and selected

projects in the Capital Plan Under traditional OCIPs the MTA covers the construction phase of work and provides general liability excess liability

workers compensation railroad protective and builders risk coverage to all participating contractors The ESA OCIP adds environmental liability

coverage for related engineering and environmental work

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 14

Forecast of Contracts to be Advertised and Proposals to be Solicited

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

MARCH 2014 ndash SEPTEMBER 2014

Type of

ContractSolic Month Reference Number Contract Description Agency Range

Bridges and Tunnels

Constr Mgmt MAR 2014 HH-88A Construction Management Services for HH-88A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-23A Construction Management Services for RK-23A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-44 Construction Management Services for RK-44 Painting

Contract

BampT $1M - $5M

Constr MAR 2014 RK-44 Cleaning and Painting of RFK Main Cables Suspender

Ropes and Tower Interior and Exterior

BampT $5M - $10M

Constr APR 2014 MP-21 (DB) DesignBuild Rehabilitation of the Rockaway Point

Boulevard Overpass and Jacob Riis Park Pedestrian

Bridge)

BampT $5M - $10M

Special

Services

APR 2014 RK-65B Conceptual Design and Feasibility Study for

Reconstruction of the Manhattan Plaza at the RFK Bridge

BampT $1M - $5M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 24

Constr MAY 2014 RK-65A Reconstruction of the Bronx Plaza at the RFK Bridge BampT OVER $50M

Constr JUN 2014 BB-28 (Sandy)BB-2 Rehabilitation of walls roadway fire lines ceiling

Mechanical Electrical and Communication systems

inside the tunnel Replacement of Brooklyn Plaza

structural slab and Environmental Remediation at Hugh L

Carey Tunnel

BampT OVER $50M

Constr JUN 2014 HH-88A Reconstruction of Upper and Lower Plaza and Southbound

Approach

BampT $10M - $50M

Constr JUN 2014 RK-23A Reconstruction and Rehabilitation of Manhattan Approach

Ramps to and from 124th 125th St

BampT OVER $50M

Constr JUL 2014 RK-76 Misc Structural Repair at RFK Bridge BampT $10M - $50M

Long Island Rail Road

Constr APR 2014 E01848 [Sandy] NY Western Rail Yards Fire Alarm System [Design-Build] LIRR $500K - $1M

Constr JUN 2014 E01817 [Sandy] Design-Build for Long Beach Branch Signal System LIRR $5M - $10M

Constr JUN 2014 L10001 Ellison Avenue Bridge Replacement LIRR $10M - $50M

Constr JUL 2014 L09986 Hicksville North Track Siding LIRR $10M - $50M

Metro-North Railroad

Constr MAR 2014 M08817 Rehabilitate - 2 Elevators (SE12) - Grand Central Terminal MNR $1M - $5M

Constr JUN 2014 M08793 Construction - GCT TrainshedStructure MNR $10M - $50M

Constr JUN 2014 M09198 Construction of Culvert located at MP JS5100 - Salisbury

Mills

MNR $1M - $5M

Constr JUN 2014 M09403E01881 Construction 4 Substations MNR $10M - $50M

MTA Bus

Constr MAR 2014 SF04-7408 DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp

BAISLEY PARK DEPOTS

MTA BUS $1M - $5M

Constr MAR 2014 SF07-7411 JFK APRON MTA BUS $5M - $10M

Constr APR 2014 SF01-7407 SECURITY IMPROVEMENTS FAR ROCKAWAY amp

BAISLEY PARK

MTA BUS $5M - $10M

Constr APR 2014 SF07-7314 FAR ROCKAWAY ROOF DECK REPLACEMENT MTA BUS $1M - $5M

New York City Transit

Constr MAR 2014 A36151 ACCESS IMPROVEMENTS AT GRAND CENTRAL

STATION

NYCT $10M - $50M

Constr MAR 2014 A36906A36908 STATION COMPONENT REPAIRS AT 5 LOCATIONS NYCT $5M - $10M

Constr MAR 2014 C33840 STRUCTURE OVERCOATING BROADWAY JUNCTION - NYCT $10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 34

NEW LOTS AVENUE

Purchase MAR 2014 C34915 LINE STRUCTURE OVERCOATING ABUTMENT TO

KINGS HWY

NYCT $10M - $50M

Constr MAR 2014 C34916 LINE STRUCTURE OVERCOATING KINGS HWY TO

WEST 8 ST

NYCT $10M - $50M

Constr MAR 2014 P36444(SANDY) SANDY REPAIRS RESTORATION OF CRANBERRY

AND RUTGERS TUBE

NYCT OVER $50M

Constr MAR 2014 S32765 INTERLOCKING MODERNIZATION WEST 4TH ST NYCT OVER $50M

Constr APR 2014 A36891 STATION COMPONENT REPAIRS 2 LOCATIONS NYCT $5M - $10M

Constr APR 2014 A36909 COMPONENT REPAIRS AT 5 STATIONS - CANARSIE NYCT $10M - $50M

Constr APR 2014 A37547 STRUCTURAL STEEL REPAIR 9TH AVENUE STATION NYCT $5M - $10M

Constr APR 2014 A37593(SANDY) SANDY REPAIRS SOUTH FERRY NYCT OVER $50M

Constr APR 2014 A46010 STATION RENEWAL AND COMPONENT REPAIRS 9

STATIONS

NYCT OVER $50M

Constr APR 2014 C33848 PERIMETER HARDENING RCC amp 130 LIVINGSTON NYCT $5M - $10M

Constr APR 2014 C43046 HYDROGEN GAS VENTILATION 19 COMMUNICATION

ROOMS

NYCT $5M - $10M

Constr APR 2014 C43749 REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE

ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL

SECURITY BOLLARDS REMOVE amp REPLACE WWII

MEMORIAL

NYCT $10M - $50M

Constr APR 2014 E31114 REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22

LOCATIONS

NYCT $10M - $50M

Constr APR 2014 E40805 REHABILITATE PUMP ROOMS 4 LOCATIONS NYCT $5M - $10M

Constr APR 2014 T80276(SANDY) SANDY REPAIRS ST GEORGE INTERLOCKING NYCT OVER $50M

Constr APR 2014 W32366 REPLACE BUS RADIO SYSTEM NYCT OVER $50M

Constr MAY 2014 C43753 CONSTRUCT BUS COMMAND CENTER NYCT $10M - $50M

Constr JUN 2014 A36905 STATION COMPONENT REPAIRS 3 STATIONS NYCT $5M - $10M

Constr JUN 2014 A36921 STATION COMPONENT REPAIRS 4 LOCATIONS NYCT $5M - $10M

Purchase JUN 2014 B40660 PURCHASE 256 ARTICULATED BUSES NYCT OVER $50M

Constr JUN 2014 P36415 REHABILITATION OF CIRCUIT BREAKER HOUSE

PEARL STREET

NYCT $5M - $10M

Constr JUN 2014 P36446(SANDY) SANDY REPAIRS RESTORATION OF CLARK STREET

TUBE

NYCT $10M - $50M

Constr JUN 2014 SF07-7346 SLIDING GATE REPLACEMENT AT JACKIE GLEASON

BUS DEPOT

NYCT $1M - $5M

Constr JUN 2014 W32372 PASSENGER STATION LAN AT 20 STATIONS NYCT $10M - $50M

Constr JUL 2014 A36890 STATION COMPONENT REPAIRS 49TH STREET NYCT $5M - $10M

Constr JUL 2014 C34914 SHOP REPAIRS AND UPGRADE NYCT $10M - $50M

Constr JUL 2014 D37467 PBX UPGRADE PHASE 1 NYCT $10M - $50M

Constr JUL 2014 P80275 NEW POWER SUBSTATION PRINCES BAY NYCT $10M - $50M

Constr JUL 2014 ST12-0139 INTEGRATED SERVICE INFORMATION amp

MANAGEMENT B DIVISION MODULE 1

NYCT $10M - $50M

Constr JUL 2014 W32697 INSTALL PUBLIC ADDRESS AND CUSTOMER

INFORMATION SCREENS AT 87 LOCATIONS

NYCT $10M - $50M

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 44

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

Constr AUG 2014 A36916 STATION COMPONENTS EASTCHESTER - DYRE

AVENUE

NYCT $5M - $10M

Constr AUG 2014 C33076 EMERGENCY GENERATOR REPLACEMENT AT

CASEY STENGEL DEPOT

NYCT $1M - $5M

Constr AUG 2014 C34829 RTO FACILITIES HARDENING PH 2 NYCT $10M - $50M

Constr AUG 2014 C34913 CAR WASHER REPAIRS AT 3 YARDS NYCT $10M - $50M

Constr AUG 2014 E31380 THREE BUS WASHERS AT M J QILL BUS DEPOT NYCT $5M - $10M

Constr SEP 2014 A36150 ADA AT 57 STREET PHASE 2 NYCT $10M - $50M

Constr SEP 2014 A36865 STATION COMPONENT REPAIRS AT 4 STATIONS NYCT $10M - $50M

Constr SEP 2014 A36871 STATION COMPONENT REPAIRS AT TWO STATIONS NYCT $5M - $10M

Constr SEP 2014 A36884 STATION COMPONENT REPAIRS 103 STREET NYCT $5M - $10M

Constr SEP 2014 C34912 CAR WASHER REPAIRS AT CONEY ISLAND YARD NYCT $1M - $5M

Constr SEP 2014 E34022 7 HYDRAULIC ELEVATOR NYCT $10M - $50M

Constr SEP 2014 P36447(SANDY) SANDY REPAIRS RESTORATION OF 53RD ST TUBE NYCT OVER $50M

Capital Construction

Constr MAR 2014 CM014B GCT Concourse and Facilities Fit-Out MTACC Over $100M

Constr MAR 2014 CS084 Systems Package 2 Traction Power Systems MTACC $50M - $100M

Constr APR 2014 C-52123-1 Architectural Electrical and Fire Protection Upgrades for

the 34th St Penn Station Complex

MTACC $1M - $5M

Constr APR 2014 CH057 Harold Structures Part 3 48th St Bridge D Approach

Phase I and Eastbound Re-Route Approach

MTACC $50M - $100M

Partially Funded by Federal grant(s)

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 120

Brief Descriptions of Work to be Advertised

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Bridges and Tunnels

Brief Description of Work

MAR 2014

HH-88A

CONSTRUCTION MANAGEMENT SERVICES FOR HH-88A CONSTRUCTION CONTRACT

$1M - $5M

The consultant will provide construction administration inspection and support service for HH-88A Construction project The Consultant shall provide all on-

site inspection and ensure that the materials furnished and the works performed are in accordance with the contract documents Construction schedule

requires multiple shifts Following is a representative list of the primary duties and responsibilities of the Consultant

Inspect the work of the Contract notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records of

the progress of the Contract

Provide Lead Abatement services which may include on-site inspections Air-monitoring and sampling and testing

Provide the Engineer with the necessary data for the processing of partial payments final payment extra work orders material approvals

subcontractor approvals and all other required reports and correspondence

Conduct progress meetings and special meetings as required Assist the Engineer in the project close-out procedure

Review contractorrsquos CPM or Bar Chart schedule

Assist in the resolution of disputes among the contractors Make recommendations to the Engineer for such changes in the work as the Consultant

may consider necessary or desirable Provide an analysis of the validity and need for proposed change orders and assist the Authority in the

subsequent negotiations

Duration of Contract 27 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 2: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 14

Information About Contracts that Will Be Advertised for

Professional Services Construction and Equipment Procurement

MARCH 2014 ndash SEPTEMBER 2014

Letter from the Chairman

Information About Contracts

Overview

Contacts

Selected Contract Provisions

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Overview

This edition of An Eye on the Future contains information for prospective contractors engineers architects and vendors about contracts that are expected

to be advertised for bids between March 2014 ndash September 2014 by the Metropolitan Transportation Authoritys operating agencies

MTA New York City Transit (NYC Transit)

MTA Staten Island Railway (SIRTOA)

MTA Long Island Rail Road (LIRR)

MTA Metro-North Railroad (MNR)

MTA Bridges and Tunnels (BampT)

MTA Capital Construction (MTACC)

MTA Bus Company (MTA Bus)

In 1993 the MTA board approved a new service identity program for the MTA family of agencies The identity program provides for the use of the above

popular names to make clear to our customers that the various MTA affiliates and subsidiaries constitute an integrated regional transportation network

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 24

Security amp Consulting Service for NEW YORK CITY

TRANSIT ONLY

Mr Joseph Paldino

Assistant Chief Procurement Officer

Materiel Division

MTA New York City Transit

2 Broadway

New York NY 10004

Telephone (646) 252-6330

Fax(646) 252-6099

Email josephpaldinonyctcom

For all other contracts

Mr Robert Eskenazi

Senior Director Materiel Division

MTA New York City Transit

2 Broadway

New York NY 10004

Telephone (646) 252-6258

Fax (646) 252-6144

Email roberteskenazinyctcom

MTA NEW YORK CITY TRANSIT MTA STATEN ISLAND RAILWAY MTA BUS COMPANY

However for all procurement documents and official transactions the agencies retain their legal names New York City Transit Authority Staten Island

Rapid Transit Operating Authority the Long Island Rail Road Company Metro-North Commuter Railroad Company Triborough Bridge and Tunnel Authority

Capital Construction and Bus Company

With respect to the contract descriptions and other data included in this volume readers should note that they are for general information only and are not

to be construed as final The exact description of the work and other pertinent information concerning an individual contract will be found in the contract

specifications and drawings or solicitation documents which may be obtained by prospective bidders when solicitation begins Most contracts for

construction procurement of capital equipment and professional services are awarded after a competitive process including sealed bids for construction

and procurements and competitive requests for proposals for professional services

Some aspects of contracting are common to all the MTA agencies

1 MTA agencies are not subject to the Wicks Law for their construction projects

2 MTA agencies seek the best contractors suppliers and professional services firms in the business including firms owned by women and minorities for

which special efforts are made to ensure appropriate participation We pledge to do our part to make all projects successful for the agencies and

contractors alike

3 Projects already funded by Federal grants are noted in the solicitation schedule with an asterisk Some of the other projects may become eligible for

Federal funding in future grant applications

Public notices of solicitations are normally published in advance of the availability of contract documents or requests for proposals in the New York State

Contract Reporter and in one or more of the following publications

New York Post

El Diario

The Daily Challenge

Amsterdam News

Minority Commerce Weekly

Engineering News Record

Contacts

Further information about contracts adverstised here can be obtained by contacting respective agency representatives

MTA METRO-NORTH RAILROAD

Mr Charles F Hansen

Deputy Director - Capital Procurement

MTA Metro-North Railroad

347 Madison Avenue 14th Floor

New York New York 10017-3706

Telephone (212) 340-3262

Fax (212) 340-4034

E-mail hansenmnrorg

MTA LONG ISLAND RAIL ROAD

Ms Carla Butler

Contract Research Clerk

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 34

Planning amp Construction

MTA Long Island Rail Road

90-27 Sutphin Boulevard (0335)

Jamaica New York 11435

Telephone (718) 725-2622

Fax (718) 725-2676

E-mail cbutlerlirrorg

MTA BRIDGES amp TUNNELS

Ms Victoria Warren

Procurement and Materials

MTA Bridges and Tunnels

2 Broadway 24th Floor

New York New York 10004

Telephone (646) 252-7092

Fax (646) 252-7077

E-mail vprocuremtabtorg

MTA CAPITAL CONSTRUCTION

Mr David K Cannon

Senior Director and Chief Procurement Officer

Procurement and Law Department

MTA Capital Construction

2 Broadway - A899

New York New York 10004

Telephone (646) 252-2321

E-mail dcannonmtaccinfo

Selected Provisions of Capital Program Contracts

This is a summary of several provisions which are generally applicable to MTA agency projects Complete requirements for a given contract can only be

obtained from the documents for that contract Naturally all construction is performed under the laws and regulations of New York State This is not

intended to be a full summary of General Provisions

1 MTA New York City Transit the two commuter railroads and MTA Capital Construction base progress payments on the contractors monthly

submissions of cost-loaded schedules The use of CPM network diagrams is required for complex projects while simpler bar charts are required for

less complex projects

2 All the agencies contract documents contain a value engineering change proposal clause Contractors are encouraged to submit cost saving proposals

during construction and upon acceptance of the proposal would be able to share in the actual cost savings

3 Another effort to improve the management of capital projects is the use of contractor evaluation files that are kept on all ongoing work All the MTA

agencies use identical criteria to evaluate contractors and share the information with the other MTA agencies

4 The period between advertisement for bids and bid opening will vary from approximately four to eight weeks depending on size of the contract

5 Unless specifically noted in the bid document the transit facilities will be in continuous operation during the performance of the work for the majority of

contracts The contracting agency will provide the necessary maintainers flagmen diversions of service and work trains

6 Bidders will be required to submit prior to the award of the contract a program of affirmative action to provide for equal employment opportunity

Submittals will be described in the contract documents Goals for the participation of minority-owned and women-owned firms may be specified for

each contract

Minority business enterprises and women business enterprises will be afforded full opportunity to submit bids andor proposals and will not be

subjected to discrimination on the basis of race religion color sex or national origin in consideration for awarding contracts

7 A bid bond or a certified check in the amount of five to ten percent is normally required at the time of delivery of the bid The contractor must furnish a

performance bond and payment bond in amounts equal to 100 percent of the contract price

8 In addition to other requirements specifically provided in the contract each bidder must be prepared to prove to the satisfaction of the contracting

agency that he has the qualifications including but not limited to skill and experience and the necessary facilities and financial resources to complete

the work in a satisfactory manner within the time specified

9 Contracts generally require a guarantee of all apparatuses devices workmanship and materials for at least one year A security in the form of a bond

in the sum of a predetermined percentage of the amount of the contract may be required prior to the final payment Contracts may have additional

requirements which must be reviewed

10 The contractor shall also maintain at a minimum Workers Compensation Commercial General Liability and Commercial Automobile Insurance

Additional coverage may be required and will be indicated in the contract The MTA and the contracting agency shall be named as an additional insured

on the policy In general coverage requirements range from $1000000 to $5000000 combined single limit for injuries to persons (including death) and

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 44

for damage to property The limits of liability will vary depending on the size and type of projects In addition the contractor will be required to hold the

governmental agencies and contracting agency harmless Evidence of the required insurance shall be delivered to the contracting agency on an MTA

approved Certificate of Insurance prior to execution of the contract

Each insurance policy or Certificate of Insurance shall contain an agreement by the insurance company issuing the policy that the policy will not be

canceled terminated or modified without 30 days prior notice to the contracting agency At least two weeks prior to the expiration of each policy the

contractor shall endeavor to provide an updated Certificate of Insurance evidencing renewal coverage to the contract agency

The MTA has in place Owner Controlled Insurance Programs (OCIP) for the East Side Access (ESA) project the Second Avenue Subway and selected

projects in the Capital Plan Under traditional OCIPs the MTA covers the construction phase of work and provides general liability excess liability

workers compensation railroad protective and builders risk coverage to all participating contractors The ESA OCIP adds environmental liability

coverage for related engineering and environmental work

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 14

Forecast of Contracts to be Advertised and Proposals to be Solicited

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

MARCH 2014 ndash SEPTEMBER 2014

Type of

ContractSolic Month Reference Number Contract Description Agency Range

Bridges and Tunnels

Constr Mgmt MAR 2014 HH-88A Construction Management Services for HH-88A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-23A Construction Management Services for RK-23A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-44 Construction Management Services for RK-44 Painting

Contract

BampT $1M - $5M

Constr MAR 2014 RK-44 Cleaning and Painting of RFK Main Cables Suspender

Ropes and Tower Interior and Exterior

BampT $5M - $10M

Constr APR 2014 MP-21 (DB) DesignBuild Rehabilitation of the Rockaway Point

Boulevard Overpass and Jacob Riis Park Pedestrian

Bridge)

BampT $5M - $10M

Special

Services

APR 2014 RK-65B Conceptual Design and Feasibility Study for

Reconstruction of the Manhattan Plaza at the RFK Bridge

BampT $1M - $5M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 24

Constr MAY 2014 RK-65A Reconstruction of the Bronx Plaza at the RFK Bridge BampT OVER $50M

Constr JUN 2014 BB-28 (Sandy)BB-2 Rehabilitation of walls roadway fire lines ceiling

Mechanical Electrical and Communication systems

inside the tunnel Replacement of Brooklyn Plaza

structural slab and Environmental Remediation at Hugh L

Carey Tunnel

BampT OVER $50M

Constr JUN 2014 HH-88A Reconstruction of Upper and Lower Plaza and Southbound

Approach

BampT $10M - $50M

Constr JUN 2014 RK-23A Reconstruction and Rehabilitation of Manhattan Approach

Ramps to and from 124th 125th St

BampT OVER $50M

Constr JUL 2014 RK-76 Misc Structural Repair at RFK Bridge BampT $10M - $50M

Long Island Rail Road

Constr APR 2014 E01848 [Sandy] NY Western Rail Yards Fire Alarm System [Design-Build] LIRR $500K - $1M

Constr JUN 2014 E01817 [Sandy] Design-Build for Long Beach Branch Signal System LIRR $5M - $10M

Constr JUN 2014 L10001 Ellison Avenue Bridge Replacement LIRR $10M - $50M

Constr JUL 2014 L09986 Hicksville North Track Siding LIRR $10M - $50M

Metro-North Railroad

Constr MAR 2014 M08817 Rehabilitate - 2 Elevators (SE12) - Grand Central Terminal MNR $1M - $5M

Constr JUN 2014 M08793 Construction - GCT TrainshedStructure MNR $10M - $50M

Constr JUN 2014 M09198 Construction of Culvert located at MP JS5100 - Salisbury

Mills

MNR $1M - $5M

Constr JUN 2014 M09403E01881 Construction 4 Substations MNR $10M - $50M

MTA Bus

Constr MAR 2014 SF04-7408 DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp

BAISLEY PARK DEPOTS

MTA BUS $1M - $5M

Constr MAR 2014 SF07-7411 JFK APRON MTA BUS $5M - $10M

Constr APR 2014 SF01-7407 SECURITY IMPROVEMENTS FAR ROCKAWAY amp

BAISLEY PARK

MTA BUS $5M - $10M

Constr APR 2014 SF07-7314 FAR ROCKAWAY ROOF DECK REPLACEMENT MTA BUS $1M - $5M

New York City Transit

Constr MAR 2014 A36151 ACCESS IMPROVEMENTS AT GRAND CENTRAL

STATION

NYCT $10M - $50M

Constr MAR 2014 A36906A36908 STATION COMPONENT REPAIRS AT 5 LOCATIONS NYCT $5M - $10M

Constr MAR 2014 C33840 STRUCTURE OVERCOATING BROADWAY JUNCTION - NYCT $10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 34

NEW LOTS AVENUE

Purchase MAR 2014 C34915 LINE STRUCTURE OVERCOATING ABUTMENT TO

KINGS HWY

NYCT $10M - $50M

Constr MAR 2014 C34916 LINE STRUCTURE OVERCOATING KINGS HWY TO

WEST 8 ST

NYCT $10M - $50M

Constr MAR 2014 P36444(SANDY) SANDY REPAIRS RESTORATION OF CRANBERRY

AND RUTGERS TUBE

NYCT OVER $50M

Constr MAR 2014 S32765 INTERLOCKING MODERNIZATION WEST 4TH ST NYCT OVER $50M

Constr APR 2014 A36891 STATION COMPONENT REPAIRS 2 LOCATIONS NYCT $5M - $10M

Constr APR 2014 A36909 COMPONENT REPAIRS AT 5 STATIONS - CANARSIE NYCT $10M - $50M

Constr APR 2014 A37547 STRUCTURAL STEEL REPAIR 9TH AVENUE STATION NYCT $5M - $10M

Constr APR 2014 A37593(SANDY) SANDY REPAIRS SOUTH FERRY NYCT OVER $50M

Constr APR 2014 A46010 STATION RENEWAL AND COMPONENT REPAIRS 9

STATIONS

NYCT OVER $50M

Constr APR 2014 C33848 PERIMETER HARDENING RCC amp 130 LIVINGSTON NYCT $5M - $10M

Constr APR 2014 C43046 HYDROGEN GAS VENTILATION 19 COMMUNICATION

ROOMS

NYCT $5M - $10M

Constr APR 2014 C43749 REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE

ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL

SECURITY BOLLARDS REMOVE amp REPLACE WWII

MEMORIAL

NYCT $10M - $50M

Constr APR 2014 E31114 REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22

LOCATIONS

NYCT $10M - $50M

Constr APR 2014 E40805 REHABILITATE PUMP ROOMS 4 LOCATIONS NYCT $5M - $10M

Constr APR 2014 T80276(SANDY) SANDY REPAIRS ST GEORGE INTERLOCKING NYCT OVER $50M

Constr APR 2014 W32366 REPLACE BUS RADIO SYSTEM NYCT OVER $50M

Constr MAY 2014 C43753 CONSTRUCT BUS COMMAND CENTER NYCT $10M - $50M

Constr JUN 2014 A36905 STATION COMPONENT REPAIRS 3 STATIONS NYCT $5M - $10M

Constr JUN 2014 A36921 STATION COMPONENT REPAIRS 4 LOCATIONS NYCT $5M - $10M

Purchase JUN 2014 B40660 PURCHASE 256 ARTICULATED BUSES NYCT OVER $50M

Constr JUN 2014 P36415 REHABILITATION OF CIRCUIT BREAKER HOUSE

PEARL STREET

NYCT $5M - $10M

Constr JUN 2014 P36446(SANDY) SANDY REPAIRS RESTORATION OF CLARK STREET

TUBE

NYCT $10M - $50M

Constr JUN 2014 SF07-7346 SLIDING GATE REPLACEMENT AT JACKIE GLEASON

BUS DEPOT

NYCT $1M - $5M

Constr JUN 2014 W32372 PASSENGER STATION LAN AT 20 STATIONS NYCT $10M - $50M

Constr JUL 2014 A36890 STATION COMPONENT REPAIRS 49TH STREET NYCT $5M - $10M

Constr JUL 2014 C34914 SHOP REPAIRS AND UPGRADE NYCT $10M - $50M

Constr JUL 2014 D37467 PBX UPGRADE PHASE 1 NYCT $10M - $50M

Constr JUL 2014 P80275 NEW POWER SUBSTATION PRINCES BAY NYCT $10M - $50M

Constr JUL 2014 ST12-0139 INTEGRATED SERVICE INFORMATION amp

MANAGEMENT B DIVISION MODULE 1

NYCT $10M - $50M

Constr JUL 2014 W32697 INSTALL PUBLIC ADDRESS AND CUSTOMER

INFORMATION SCREENS AT 87 LOCATIONS

NYCT $10M - $50M

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 44

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

Constr AUG 2014 A36916 STATION COMPONENTS EASTCHESTER - DYRE

AVENUE

NYCT $5M - $10M

Constr AUG 2014 C33076 EMERGENCY GENERATOR REPLACEMENT AT

CASEY STENGEL DEPOT

NYCT $1M - $5M

Constr AUG 2014 C34829 RTO FACILITIES HARDENING PH 2 NYCT $10M - $50M

Constr AUG 2014 C34913 CAR WASHER REPAIRS AT 3 YARDS NYCT $10M - $50M

Constr AUG 2014 E31380 THREE BUS WASHERS AT M J QILL BUS DEPOT NYCT $5M - $10M

Constr SEP 2014 A36150 ADA AT 57 STREET PHASE 2 NYCT $10M - $50M

Constr SEP 2014 A36865 STATION COMPONENT REPAIRS AT 4 STATIONS NYCT $10M - $50M

Constr SEP 2014 A36871 STATION COMPONENT REPAIRS AT TWO STATIONS NYCT $5M - $10M

Constr SEP 2014 A36884 STATION COMPONENT REPAIRS 103 STREET NYCT $5M - $10M

Constr SEP 2014 C34912 CAR WASHER REPAIRS AT CONEY ISLAND YARD NYCT $1M - $5M

Constr SEP 2014 E34022 7 HYDRAULIC ELEVATOR NYCT $10M - $50M

Constr SEP 2014 P36447(SANDY) SANDY REPAIRS RESTORATION OF 53RD ST TUBE NYCT OVER $50M

Capital Construction

Constr MAR 2014 CM014B GCT Concourse and Facilities Fit-Out MTACC Over $100M

Constr MAR 2014 CS084 Systems Package 2 Traction Power Systems MTACC $50M - $100M

Constr APR 2014 C-52123-1 Architectural Electrical and Fire Protection Upgrades for

the 34th St Penn Station Complex

MTACC $1M - $5M

Constr APR 2014 CH057 Harold Structures Part 3 48th St Bridge D Approach

Phase I and Eastbound Re-Route Approach

MTACC $50M - $100M

Partially Funded by Federal grant(s)

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 120

Brief Descriptions of Work to be Advertised

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Bridges and Tunnels

Brief Description of Work

MAR 2014

HH-88A

CONSTRUCTION MANAGEMENT SERVICES FOR HH-88A CONSTRUCTION CONTRACT

$1M - $5M

The consultant will provide construction administration inspection and support service for HH-88A Construction project The Consultant shall provide all on-

site inspection and ensure that the materials furnished and the works performed are in accordance with the contract documents Construction schedule

requires multiple shifts Following is a representative list of the primary duties and responsibilities of the Consultant

Inspect the work of the Contract notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records of

the progress of the Contract

Provide Lead Abatement services which may include on-site inspections Air-monitoring and sampling and testing

Provide the Engineer with the necessary data for the processing of partial payments final payment extra work orders material approvals

subcontractor approvals and all other required reports and correspondence

Conduct progress meetings and special meetings as required Assist the Engineer in the project close-out procedure

Review contractorrsquos CPM or Bar Chart schedule

Assist in the resolution of disputes among the contractors Make recommendations to the Engineer for such changes in the work as the Consultant

may consider necessary or desirable Provide an analysis of the validity and need for proposed change orders and assist the Authority in the

subsequent negotiations

Duration of Contract 27 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 3: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 24

Security amp Consulting Service for NEW YORK CITY

TRANSIT ONLY

Mr Joseph Paldino

Assistant Chief Procurement Officer

Materiel Division

MTA New York City Transit

2 Broadway

New York NY 10004

Telephone (646) 252-6330

Fax(646) 252-6099

Email josephpaldinonyctcom

For all other contracts

Mr Robert Eskenazi

Senior Director Materiel Division

MTA New York City Transit

2 Broadway

New York NY 10004

Telephone (646) 252-6258

Fax (646) 252-6144

Email roberteskenazinyctcom

MTA NEW YORK CITY TRANSIT MTA STATEN ISLAND RAILWAY MTA BUS COMPANY

However for all procurement documents and official transactions the agencies retain their legal names New York City Transit Authority Staten Island

Rapid Transit Operating Authority the Long Island Rail Road Company Metro-North Commuter Railroad Company Triborough Bridge and Tunnel Authority

Capital Construction and Bus Company

With respect to the contract descriptions and other data included in this volume readers should note that they are for general information only and are not

to be construed as final The exact description of the work and other pertinent information concerning an individual contract will be found in the contract

specifications and drawings or solicitation documents which may be obtained by prospective bidders when solicitation begins Most contracts for

construction procurement of capital equipment and professional services are awarded after a competitive process including sealed bids for construction

and procurements and competitive requests for proposals for professional services

Some aspects of contracting are common to all the MTA agencies

1 MTA agencies are not subject to the Wicks Law for their construction projects

2 MTA agencies seek the best contractors suppliers and professional services firms in the business including firms owned by women and minorities for

which special efforts are made to ensure appropriate participation We pledge to do our part to make all projects successful for the agencies and

contractors alike

3 Projects already funded by Federal grants are noted in the solicitation schedule with an asterisk Some of the other projects may become eligible for

Federal funding in future grant applications

Public notices of solicitations are normally published in advance of the availability of contract documents or requests for proposals in the New York State

Contract Reporter and in one or more of the following publications

New York Post

El Diario

The Daily Challenge

Amsterdam News

Minority Commerce Weekly

Engineering News Record

Contacts

Further information about contracts adverstised here can be obtained by contacting respective agency representatives

MTA METRO-NORTH RAILROAD

Mr Charles F Hansen

Deputy Director - Capital Procurement

MTA Metro-North Railroad

347 Madison Avenue 14th Floor

New York New York 10017-3706

Telephone (212) 340-3262

Fax (212) 340-4034

E-mail hansenmnrorg

MTA LONG ISLAND RAIL ROAD

Ms Carla Butler

Contract Research Clerk

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 34

Planning amp Construction

MTA Long Island Rail Road

90-27 Sutphin Boulevard (0335)

Jamaica New York 11435

Telephone (718) 725-2622

Fax (718) 725-2676

E-mail cbutlerlirrorg

MTA BRIDGES amp TUNNELS

Ms Victoria Warren

Procurement and Materials

MTA Bridges and Tunnels

2 Broadway 24th Floor

New York New York 10004

Telephone (646) 252-7092

Fax (646) 252-7077

E-mail vprocuremtabtorg

MTA CAPITAL CONSTRUCTION

Mr David K Cannon

Senior Director and Chief Procurement Officer

Procurement and Law Department

MTA Capital Construction

2 Broadway - A899

New York New York 10004

Telephone (646) 252-2321

E-mail dcannonmtaccinfo

Selected Provisions of Capital Program Contracts

This is a summary of several provisions which are generally applicable to MTA agency projects Complete requirements for a given contract can only be

obtained from the documents for that contract Naturally all construction is performed under the laws and regulations of New York State This is not

intended to be a full summary of General Provisions

1 MTA New York City Transit the two commuter railroads and MTA Capital Construction base progress payments on the contractors monthly

submissions of cost-loaded schedules The use of CPM network diagrams is required for complex projects while simpler bar charts are required for

less complex projects

2 All the agencies contract documents contain a value engineering change proposal clause Contractors are encouraged to submit cost saving proposals

during construction and upon acceptance of the proposal would be able to share in the actual cost savings

3 Another effort to improve the management of capital projects is the use of contractor evaluation files that are kept on all ongoing work All the MTA

agencies use identical criteria to evaluate contractors and share the information with the other MTA agencies

4 The period between advertisement for bids and bid opening will vary from approximately four to eight weeks depending on size of the contract

5 Unless specifically noted in the bid document the transit facilities will be in continuous operation during the performance of the work for the majority of

contracts The contracting agency will provide the necessary maintainers flagmen diversions of service and work trains

6 Bidders will be required to submit prior to the award of the contract a program of affirmative action to provide for equal employment opportunity

Submittals will be described in the contract documents Goals for the participation of minority-owned and women-owned firms may be specified for

each contract

Minority business enterprises and women business enterprises will be afforded full opportunity to submit bids andor proposals and will not be

subjected to discrimination on the basis of race religion color sex or national origin in consideration for awarding contracts

7 A bid bond or a certified check in the amount of five to ten percent is normally required at the time of delivery of the bid The contractor must furnish a

performance bond and payment bond in amounts equal to 100 percent of the contract price

8 In addition to other requirements specifically provided in the contract each bidder must be prepared to prove to the satisfaction of the contracting

agency that he has the qualifications including but not limited to skill and experience and the necessary facilities and financial resources to complete

the work in a satisfactory manner within the time specified

9 Contracts generally require a guarantee of all apparatuses devices workmanship and materials for at least one year A security in the form of a bond

in the sum of a predetermined percentage of the amount of the contract may be required prior to the final payment Contracts may have additional

requirements which must be reviewed

10 The contractor shall also maintain at a minimum Workers Compensation Commercial General Liability and Commercial Automobile Insurance

Additional coverage may be required and will be indicated in the contract The MTA and the contracting agency shall be named as an additional insured

on the policy In general coverage requirements range from $1000000 to $5000000 combined single limit for injuries to persons (including death) and

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 44

for damage to property The limits of liability will vary depending on the size and type of projects In addition the contractor will be required to hold the

governmental agencies and contracting agency harmless Evidence of the required insurance shall be delivered to the contracting agency on an MTA

approved Certificate of Insurance prior to execution of the contract

Each insurance policy or Certificate of Insurance shall contain an agreement by the insurance company issuing the policy that the policy will not be

canceled terminated or modified without 30 days prior notice to the contracting agency At least two weeks prior to the expiration of each policy the

contractor shall endeavor to provide an updated Certificate of Insurance evidencing renewal coverage to the contract agency

The MTA has in place Owner Controlled Insurance Programs (OCIP) for the East Side Access (ESA) project the Second Avenue Subway and selected

projects in the Capital Plan Under traditional OCIPs the MTA covers the construction phase of work and provides general liability excess liability

workers compensation railroad protective and builders risk coverage to all participating contractors The ESA OCIP adds environmental liability

coverage for related engineering and environmental work

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 14

Forecast of Contracts to be Advertised and Proposals to be Solicited

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

MARCH 2014 ndash SEPTEMBER 2014

Type of

ContractSolic Month Reference Number Contract Description Agency Range

Bridges and Tunnels

Constr Mgmt MAR 2014 HH-88A Construction Management Services for HH-88A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-23A Construction Management Services for RK-23A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-44 Construction Management Services for RK-44 Painting

Contract

BampT $1M - $5M

Constr MAR 2014 RK-44 Cleaning and Painting of RFK Main Cables Suspender

Ropes and Tower Interior and Exterior

BampT $5M - $10M

Constr APR 2014 MP-21 (DB) DesignBuild Rehabilitation of the Rockaway Point

Boulevard Overpass and Jacob Riis Park Pedestrian

Bridge)

BampT $5M - $10M

Special

Services

APR 2014 RK-65B Conceptual Design and Feasibility Study for

Reconstruction of the Manhattan Plaza at the RFK Bridge

BampT $1M - $5M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 24

Constr MAY 2014 RK-65A Reconstruction of the Bronx Plaza at the RFK Bridge BampT OVER $50M

Constr JUN 2014 BB-28 (Sandy)BB-2 Rehabilitation of walls roadway fire lines ceiling

Mechanical Electrical and Communication systems

inside the tunnel Replacement of Brooklyn Plaza

structural slab and Environmental Remediation at Hugh L

Carey Tunnel

BampT OVER $50M

Constr JUN 2014 HH-88A Reconstruction of Upper and Lower Plaza and Southbound

Approach

BampT $10M - $50M

Constr JUN 2014 RK-23A Reconstruction and Rehabilitation of Manhattan Approach

Ramps to and from 124th 125th St

BampT OVER $50M

Constr JUL 2014 RK-76 Misc Structural Repair at RFK Bridge BampT $10M - $50M

Long Island Rail Road

Constr APR 2014 E01848 [Sandy] NY Western Rail Yards Fire Alarm System [Design-Build] LIRR $500K - $1M

Constr JUN 2014 E01817 [Sandy] Design-Build for Long Beach Branch Signal System LIRR $5M - $10M

Constr JUN 2014 L10001 Ellison Avenue Bridge Replacement LIRR $10M - $50M

Constr JUL 2014 L09986 Hicksville North Track Siding LIRR $10M - $50M

Metro-North Railroad

Constr MAR 2014 M08817 Rehabilitate - 2 Elevators (SE12) - Grand Central Terminal MNR $1M - $5M

Constr JUN 2014 M08793 Construction - GCT TrainshedStructure MNR $10M - $50M

Constr JUN 2014 M09198 Construction of Culvert located at MP JS5100 - Salisbury

Mills

MNR $1M - $5M

Constr JUN 2014 M09403E01881 Construction 4 Substations MNR $10M - $50M

MTA Bus

Constr MAR 2014 SF04-7408 DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp

BAISLEY PARK DEPOTS

MTA BUS $1M - $5M

Constr MAR 2014 SF07-7411 JFK APRON MTA BUS $5M - $10M

Constr APR 2014 SF01-7407 SECURITY IMPROVEMENTS FAR ROCKAWAY amp

BAISLEY PARK

MTA BUS $5M - $10M

Constr APR 2014 SF07-7314 FAR ROCKAWAY ROOF DECK REPLACEMENT MTA BUS $1M - $5M

New York City Transit

Constr MAR 2014 A36151 ACCESS IMPROVEMENTS AT GRAND CENTRAL

STATION

NYCT $10M - $50M

Constr MAR 2014 A36906A36908 STATION COMPONENT REPAIRS AT 5 LOCATIONS NYCT $5M - $10M

Constr MAR 2014 C33840 STRUCTURE OVERCOATING BROADWAY JUNCTION - NYCT $10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 34

NEW LOTS AVENUE

Purchase MAR 2014 C34915 LINE STRUCTURE OVERCOATING ABUTMENT TO

KINGS HWY

NYCT $10M - $50M

Constr MAR 2014 C34916 LINE STRUCTURE OVERCOATING KINGS HWY TO

WEST 8 ST

NYCT $10M - $50M

Constr MAR 2014 P36444(SANDY) SANDY REPAIRS RESTORATION OF CRANBERRY

AND RUTGERS TUBE

NYCT OVER $50M

Constr MAR 2014 S32765 INTERLOCKING MODERNIZATION WEST 4TH ST NYCT OVER $50M

Constr APR 2014 A36891 STATION COMPONENT REPAIRS 2 LOCATIONS NYCT $5M - $10M

Constr APR 2014 A36909 COMPONENT REPAIRS AT 5 STATIONS - CANARSIE NYCT $10M - $50M

Constr APR 2014 A37547 STRUCTURAL STEEL REPAIR 9TH AVENUE STATION NYCT $5M - $10M

Constr APR 2014 A37593(SANDY) SANDY REPAIRS SOUTH FERRY NYCT OVER $50M

Constr APR 2014 A46010 STATION RENEWAL AND COMPONENT REPAIRS 9

STATIONS

NYCT OVER $50M

Constr APR 2014 C33848 PERIMETER HARDENING RCC amp 130 LIVINGSTON NYCT $5M - $10M

Constr APR 2014 C43046 HYDROGEN GAS VENTILATION 19 COMMUNICATION

ROOMS

NYCT $5M - $10M

Constr APR 2014 C43749 REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE

ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL

SECURITY BOLLARDS REMOVE amp REPLACE WWII

MEMORIAL

NYCT $10M - $50M

Constr APR 2014 E31114 REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22

LOCATIONS

NYCT $10M - $50M

Constr APR 2014 E40805 REHABILITATE PUMP ROOMS 4 LOCATIONS NYCT $5M - $10M

Constr APR 2014 T80276(SANDY) SANDY REPAIRS ST GEORGE INTERLOCKING NYCT OVER $50M

Constr APR 2014 W32366 REPLACE BUS RADIO SYSTEM NYCT OVER $50M

Constr MAY 2014 C43753 CONSTRUCT BUS COMMAND CENTER NYCT $10M - $50M

Constr JUN 2014 A36905 STATION COMPONENT REPAIRS 3 STATIONS NYCT $5M - $10M

Constr JUN 2014 A36921 STATION COMPONENT REPAIRS 4 LOCATIONS NYCT $5M - $10M

Purchase JUN 2014 B40660 PURCHASE 256 ARTICULATED BUSES NYCT OVER $50M

Constr JUN 2014 P36415 REHABILITATION OF CIRCUIT BREAKER HOUSE

PEARL STREET

NYCT $5M - $10M

Constr JUN 2014 P36446(SANDY) SANDY REPAIRS RESTORATION OF CLARK STREET

TUBE

NYCT $10M - $50M

Constr JUN 2014 SF07-7346 SLIDING GATE REPLACEMENT AT JACKIE GLEASON

BUS DEPOT

NYCT $1M - $5M

Constr JUN 2014 W32372 PASSENGER STATION LAN AT 20 STATIONS NYCT $10M - $50M

Constr JUL 2014 A36890 STATION COMPONENT REPAIRS 49TH STREET NYCT $5M - $10M

Constr JUL 2014 C34914 SHOP REPAIRS AND UPGRADE NYCT $10M - $50M

Constr JUL 2014 D37467 PBX UPGRADE PHASE 1 NYCT $10M - $50M

Constr JUL 2014 P80275 NEW POWER SUBSTATION PRINCES BAY NYCT $10M - $50M

Constr JUL 2014 ST12-0139 INTEGRATED SERVICE INFORMATION amp

MANAGEMENT B DIVISION MODULE 1

NYCT $10M - $50M

Constr JUL 2014 W32697 INSTALL PUBLIC ADDRESS AND CUSTOMER

INFORMATION SCREENS AT 87 LOCATIONS

NYCT $10M - $50M

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 44

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

Constr AUG 2014 A36916 STATION COMPONENTS EASTCHESTER - DYRE

AVENUE

NYCT $5M - $10M

Constr AUG 2014 C33076 EMERGENCY GENERATOR REPLACEMENT AT

CASEY STENGEL DEPOT

NYCT $1M - $5M

Constr AUG 2014 C34829 RTO FACILITIES HARDENING PH 2 NYCT $10M - $50M

Constr AUG 2014 C34913 CAR WASHER REPAIRS AT 3 YARDS NYCT $10M - $50M

Constr AUG 2014 E31380 THREE BUS WASHERS AT M J QILL BUS DEPOT NYCT $5M - $10M

Constr SEP 2014 A36150 ADA AT 57 STREET PHASE 2 NYCT $10M - $50M

Constr SEP 2014 A36865 STATION COMPONENT REPAIRS AT 4 STATIONS NYCT $10M - $50M

Constr SEP 2014 A36871 STATION COMPONENT REPAIRS AT TWO STATIONS NYCT $5M - $10M

Constr SEP 2014 A36884 STATION COMPONENT REPAIRS 103 STREET NYCT $5M - $10M

Constr SEP 2014 C34912 CAR WASHER REPAIRS AT CONEY ISLAND YARD NYCT $1M - $5M

Constr SEP 2014 E34022 7 HYDRAULIC ELEVATOR NYCT $10M - $50M

Constr SEP 2014 P36447(SANDY) SANDY REPAIRS RESTORATION OF 53RD ST TUBE NYCT OVER $50M

Capital Construction

Constr MAR 2014 CM014B GCT Concourse and Facilities Fit-Out MTACC Over $100M

Constr MAR 2014 CS084 Systems Package 2 Traction Power Systems MTACC $50M - $100M

Constr APR 2014 C-52123-1 Architectural Electrical and Fire Protection Upgrades for

the 34th St Penn Station Complex

MTACC $1M - $5M

Constr APR 2014 CH057 Harold Structures Part 3 48th St Bridge D Approach

Phase I and Eastbound Re-Route Approach

MTACC $50M - $100M

Partially Funded by Federal grant(s)

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 120

Brief Descriptions of Work to be Advertised

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Bridges and Tunnels

Brief Description of Work

MAR 2014

HH-88A

CONSTRUCTION MANAGEMENT SERVICES FOR HH-88A CONSTRUCTION CONTRACT

$1M - $5M

The consultant will provide construction administration inspection and support service for HH-88A Construction project The Consultant shall provide all on-

site inspection and ensure that the materials furnished and the works performed are in accordance with the contract documents Construction schedule

requires multiple shifts Following is a representative list of the primary duties and responsibilities of the Consultant

Inspect the work of the Contract notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records of

the progress of the Contract

Provide Lead Abatement services which may include on-site inspections Air-monitoring and sampling and testing

Provide the Engineer with the necessary data for the processing of partial payments final payment extra work orders material approvals

subcontractor approvals and all other required reports and correspondence

Conduct progress meetings and special meetings as required Assist the Engineer in the project close-out procedure

Review contractorrsquos CPM or Bar Chart schedule

Assist in the resolution of disputes among the contractors Make recommendations to the Engineer for such changes in the work as the Consultant

may consider necessary or desirable Provide an analysis of the validity and need for proposed change orders and assist the Authority in the

subsequent negotiations

Duration of Contract 27 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 4: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 34

Planning amp Construction

MTA Long Island Rail Road

90-27 Sutphin Boulevard (0335)

Jamaica New York 11435

Telephone (718) 725-2622

Fax (718) 725-2676

E-mail cbutlerlirrorg

MTA BRIDGES amp TUNNELS

Ms Victoria Warren

Procurement and Materials

MTA Bridges and Tunnels

2 Broadway 24th Floor

New York New York 10004

Telephone (646) 252-7092

Fax (646) 252-7077

E-mail vprocuremtabtorg

MTA CAPITAL CONSTRUCTION

Mr David K Cannon

Senior Director and Chief Procurement Officer

Procurement and Law Department

MTA Capital Construction

2 Broadway - A899

New York New York 10004

Telephone (646) 252-2321

E-mail dcannonmtaccinfo

Selected Provisions of Capital Program Contracts

This is a summary of several provisions which are generally applicable to MTA agency projects Complete requirements for a given contract can only be

obtained from the documents for that contract Naturally all construction is performed under the laws and regulations of New York State This is not

intended to be a full summary of General Provisions

1 MTA New York City Transit the two commuter railroads and MTA Capital Construction base progress payments on the contractors monthly

submissions of cost-loaded schedules The use of CPM network diagrams is required for complex projects while simpler bar charts are required for

less complex projects

2 All the agencies contract documents contain a value engineering change proposal clause Contractors are encouraged to submit cost saving proposals

during construction and upon acceptance of the proposal would be able to share in the actual cost savings

3 Another effort to improve the management of capital projects is the use of contractor evaluation files that are kept on all ongoing work All the MTA

agencies use identical criteria to evaluate contractors and share the information with the other MTA agencies

4 The period between advertisement for bids and bid opening will vary from approximately four to eight weeks depending on size of the contract

5 Unless specifically noted in the bid document the transit facilities will be in continuous operation during the performance of the work for the majority of

contracts The contracting agency will provide the necessary maintainers flagmen diversions of service and work trains

6 Bidders will be required to submit prior to the award of the contract a program of affirmative action to provide for equal employment opportunity

Submittals will be described in the contract documents Goals for the participation of minority-owned and women-owned firms may be specified for

each contract

Minority business enterprises and women business enterprises will be afforded full opportunity to submit bids andor proposals and will not be

subjected to discrimination on the basis of race religion color sex or national origin in consideration for awarding contracts

7 A bid bond or a certified check in the amount of five to ten percent is normally required at the time of delivery of the bid The contractor must furnish a

performance bond and payment bond in amounts equal to 100 percent of the contract price

8 In addition to other requirements specifically provided in the contract each bidder must be prepared to prove to the satisfaction of the contracting

agency that he has the qualifications including but not limited to skill and experience and the necessary facilities and financial resources to complete

the work in a satisfactory manner within the time specified

9 Contracts generally require a guarantee of all apparatuses devices workmanship and materials for at least one year A security in the form of a bond

in the sum of a predetermined percentage of the amount of the contract may be required prior to the final payment Contracts may have additional

requirements which must be reviewed

10 The contractor shall also maintain at a minimum Workers Compensation Commercial General Liability and Commercial Automobile Insurance

Additional coverage may be required and will be indicated in the contract The MTA and the contracting agency shall be named as an additional insured

on the policy In general coverage requirements range from $1000000 to $5000000 combined single limit for injuries to persons (including death) and

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 44

for damage to property The limits of liability will vary depending on the size and type of projects In addition the contractor will be required to hold the

governmental agencies and contracting agency harmless Evidence of the required insurance shall be delivered to the contracting agency on an MTA

approved Certificate of Insurance prior to execution of the contract

Each insurance policy or Certificate of Insurance shall contain an agreement by the insurance company issuing the policy that the policy will not be

canceled terminated or modified without 30 days prior notice to the contracting agency At least two weeks prior to the expiration of each policy the

contractor shall endeavor to provide an updated Certificate of Insurance evidencing renewal coverage to the contract agency

The MTA has in place Owner Controlled Insurance Programs (OCIP) for the East Side Access (ESA) project the Second Avenue Subway and selected

projects in the Capital Plan Under traditional OCIPs the MTA covers the construction phase of work and provides general liability excess liability

workers compensation railroad protective and builders risk coverage to all participating contractors The ESA OCIP adds environmental liability

coverage for related engineering and environmental work

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 14

Forecast of Contracts to be Advertised and Proposals to be Solicited

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

MARCH 2014 ndash SEPTEMBER 2014

Type of

ContractSolic Month Reference Number Contract Description Agency Range

Bridges and Tunnels

Constr Mgmt MAR 2014 HH-88A Construction Management Services for HH-88A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-23A Construction Management Services for RK-23A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-44 Construction Management Services for RK-44 Painting

Contract

BampT $1M - $5M

Constr MAR 2014 RK-44 Cleaning and Painting of RFK Main Cables Suspender

Ropes and Tower Interior and Exterior

BampT $5M - $10M

Constr APR 2014 MP-21 (DB) DesignBuild Rehabilitation of the Rockaway Point

Boulevard Overpass and Jacob Riis Park Pedestrian

Bridge)

BampT $5M - $10M

Special

Services

APR 2014 RK-65B Conceptual Design and Feasibility Study for

Reconstruction of the Manhattan Plaza at the RFK Bridge

BampT $1M - $5M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 24

Constr MAY 2014 RK-65A Reconstruction of the Bronx Plaza at the RFK Bridge BampT OVER $50M

Constr JUN 2014 BB-28 (Sandy)BB-2 Rehabilitation of walls roadway fire lines ceiling

Mechanical Electrical and Communication systems

inside the tunnel Replacement of Brooklyn Plaza

structural slab and Environmental Remediation at Hugh L

Carey Tunnel

BampT OVER $50M

Constr JUN 2014 HH-88A Reconstruction of Upper and Lower Plaza and Southbound

Approach

BampT $10M - $50M

Constr JUN 2014 RK-23A Reconstruction and Rehabilitation of Manhattan Approach

Ramps to and from 124th 125th St

BampT OVER $50M

Constr JUL 2014 RK-76 Misc Structural Repair at RFK Bridge BampT $10M - $50M

Long Island Rail Road

Constr APR 2014 E01848 [Sandy] NY Western Rail Yards Fire Alarm System [Design-Build] LIRR $500K - $1M

Constr JUN 2014 E01817 [Sandy] Design-Build for Long Beach Branch Signal System LIRR $5M - $10M

Constr JUN 2014 L10001 Ellison Avenue Bridge Replacement LIRR $10M - $50M

Constr JUL 2014 L09986 Hicksville North Track Siding LIRR $10M - $50M

Metro-North Railroad

Constr MAR 2014 M08817 Rehabilitate - 2 Elevators (SE12) - Grand Central Terminal MNR $1M - $5M

Constr JUN 2014 M08793 Construction - GCT TrainshedStructure MNR $10M - $50M

Constr JUN 2014 M09198 Construction of Culvert located at MP JS5100 - Salisbury

Mills

MNR $1M - $5M

Constr JUN 2014 M09403E01881 Construction 4 Substations MNR $10M - $50M

MTA Bus

Constr MAR 2014 SF04-7408 DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp

BAISLEY PARK DEPOTS

MTA BUS $1M - $5M

Constr MAR 2014 SF07-7411 JFK APRON MTA BUS $5M - $10M

Constr APR 2014 SF01-7407 SECURITY IMPROVEMENTS FAR ROCKAWAY amp

BAISLEY PARK

MTA BUS $5M - $10M

Constr APR 2014 SF07-7314 FAR ROCKAWAY ROOF DECK REPLACEMENT MTA BUS $1M - $5M

New York City Transit

Constr MAR 2014 A36151 ACCESS IMPROVEMENTS AT GRAND CENTRAL

STATION

NYCT $10M - $50M

Constr MAR 2014 A36906A36908 STATION COMPONENT REPAIRS AT 5 LOCATIONS NYCT $5M - $10M

Constr MAR 2014 C33840 STRUCTURE OVERCOATING BROADWAY JUNCTION - NYCT $10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 34

NEW LOTS AVENUE

Purchase MAR 2014 C34915 LINE STRUCTURE OVERCOATING ABUTMENT TO

KINGS HWY

NYCT $10M - $50M

Constr MAR 2014 C34916 LINE STRUCTURE OVERCOATING KINGS HWY TO

WEST 8 ST

NYCT $10M - $50M

Constr MAR 2014 P36444(SANDY) SANDY REPAIRS RESTORATION OF CRANBERRY

AND RUTGERS TUBE

NYCT OVER $50M

Constr MAR 2014 S32765 INTERLOCKING MODERNIZATION WEST 4TH ST NYCT OVER $50M

Constr APR 2014 A36891 STATION COMPONENT REPAIRS 2 LOCATIONS NYCT $5M - $10M

Constr APR 2014 A36909 COMPONENT REPAIRS AT 5 STATIONS - CANARSIE NYCT $10M - $50M

Constr APR 2014 A37547 STRUCTURAL STEEL REPAIR 9TH AVENUE STATION NYCT $5M - $10M

Constr APR 2014 A37593(SANDY) SANDY REPAIRS SOUTH FERRY NYCT OVER $50M

Constr APR 2014 A46010 STATION RENEWAL AND COMPONENT REPAIRS 9

STATIONS

NYCT OVER $50M

Constr APR 2014 C33848 PERIMETER HARDENING RCC amp 130 LIVINGSTON NYCT $5M - $10M

Constr APR 2014 C43046 HYDROGEN GAS VENTILATION 19 COMMUNICATION

ROOMS

NYCT $5M - $10M

Constr APR 2014 C43749 REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE

ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL

SECURITY BOLLARDS REMOVE amp REPLACE WWII

MEMORIAL

NYCT $10M - $50M

Constr APR 2014 E31114 REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22

LOCATIONS

NYCT $10M - $50M

Constr APR 2014 E40805 REHABILITATE PUMP ROOMS 4 LOCATIONS NYCT $5M - $10M

Constr APR 2014 T80276(SANDY) SANDY REPAIRS ST GEORGE INTERLOCKING NYCT OVER $50M

Constr APR 2014 W32366 REPLACE BUS RADIO SYSTEM NYCT OVER $50M

Constr MAY 2014 C43753 CONSTRUCT BUS COMMAND CENTER NYCT $10M - $50M

Constr JUN 2014 A36905 STATION COMPONENT REPAIRS 3 STATIONS NYCT $5M - $10M

Constr JUN 2014 A36921 STATION COMPONENT REPAIRS 4 LOCATIONS NYCT $5M - $10M

Purchase JUN 2014 B40660 PURCHASE 256 ARTICULATED BUSES NYCT OVER $50M

Constr JUN 2014 P36415 REHABILITATION OF CIRCUIT BREAKER HOUSE

PEARL STREET

NYCT $5M - $10M

Constr JUN 2014 P36446(SANDY) SANDY REPAIRS RESTORATION OF CLARK STREET

TUBE

NYCT $10M - $50M

Constr JUN 2014 SF07-7346 SLIDING GATE REPLACEMENT AT JACKIE GLEASON

BUS DEPOT

NYCT $1M - $5M

Constr JUN 2014 W32372 PASSENGER STATION LAN AT 20 STATIONS NYCT $10M - $50M

Constr JUL 2014 A36890 STATION COMPONENT REPAIRS 49TH STREET NYCT $5M - $10M

Constr JUL 2014 C34914 SHOP REPAIRS AND UPGRADE NYCT $10M - $50M

Constr JUL 2014 D37467 PBX UPGRADE PHASE 1 NYCT $10M - $50M

Constr JUL 2014 P80275 NEW POWER SUBSTATION PRINCES BAY NYCT $10M - $50M

Constr JUL 2014 ST12-0139 INTEGRATED SERVICE INFORMATION amp

MANAGEMENT B DIVISION MODULE 1

NYCT $10M - $50M

Constr JUL 2014 W32697 INSTALL PUBLIC ADDRESS AND CUSTOMER

INFORMATION SCREENS AT 87 LOCATIONS

NYCT $10M - $50M

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 44

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

Constr AUG 2014 A36916 STATION COMPONENTS EASTCHESTER - DYRE

AVENUE

NYCT $5M - $10M

Constr AUG 2014 C33076 EMERGENCY GENERATOR REPLACEMENT AT

CASEY STENGEL DEPOT

NYCT $1M - $5M

Constr AUG 2014 C34829 RTO FACILITIES HARDENING PH 2 NYCT $10M - $50M

Constr AUG 2014 C34913 CAR WASHER REPAIRS AT 3 YARDS NYCT $10M - $50M

Constr AUG 2014 E31380 THREE BUS WASHERS AT M J QILL BUS DEPOT NYCT $5M - $10M

Constr SEP 2014 A36150 ADA AT 57 STREET PHASE 2 NYCT $10M - $50M

Constr SEP 2014 A36865 STATION COMPONENT REPAIRS AT 4 STATIONS NYCT $10M - $50M

Constr SEP 2014 A36871 STATION COMPONENT REPAIRS AT TWO STATIONS NYCT $5M - $10M

Constr SEP 2014 A36884 STATION COMPONENT REPAIRS 103 STREET NYCT $5M - $10M

Constr SEP 2014 C34912 CAR WASHER REPAIRS AT CONEY ISLAND YARD NYCT $1M - $5M

Constr SEP 2014 E34022 7 HYDRAULIC ELEVATOR NYCT $10M - $50M

Constr SEP 2014 P36447(SANDY) SANDY REPAIRS RESTORATION OF 53RD ST TUBE NYCT OVER $50M

Capital Construction

Constr MAR 2014 CM014B GCT Concourse and Facilities Fit-Out MTACC Over $100M

Constr MAR 2014 CS084 Systems Package 2 Traction Power Systems MTACC $50M - $100M

Constr APR 2014 C-52123-1 Architectural Electrical and Fire Protection Upgrades for

the 34th St Penn Station Complex

MTACC $1M - $5M

Constr APR 2014 CH057 Harold Structures Part 3 48th St Bridge D Approach

Phase I and Eastbound Re-Route Approach

MTACC $50M - $100M

Partially Funded by Federal grant(s)

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 120

Brief Descriptions of Work to be Advertised

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Bridges and Tunnels

Brief Description of Work

MAR 2014

HH-88A

CONSTRUCTION MANAGEMENT SERVICES FOR HH-88A CONSTRUCTION CONTRACT

$1M - $5M

The consultant will provide construction administration inspection and support service for HH-88A Construction project The Consultant shall provide all on-

site inspection and ensure that the materials furnished and the works performed are in accordance with the contract documents Construction schedule

requires multiple shifts Following is a representative list of the primary duties and responsibilities of the Consultant

Inspect the work of the Contract notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records of

the progress of the Contract

Provide Lead Abatement services which may include on-site inspections Air-monitoring and sampling and testing

Provide the Engineer with the necessary data for the processing of partial payments final payment extra work orders material approvals

subcontractor approvals and all other required reports and correspondence

Conduct progress meetings and special meetings as required Assist the Engineer in the project close-out procedure

Review contractorrsquos CPM or Bar Chart schedule

Assist in the resolution of disputes among the contractors Make recommendations to the Engineer for such changes in the work as the Consultant

may consider necessary or desirable Provide an analysis of the validity and need for proposed change orders and assist the Authority in the

subsequent negotiations

Duration of Contract 27 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 5: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

342014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf_introhtm 44

for damage to property The limits of liability will vary depending on the size and type of projects In addition the contractor will be required to hold the

governmental agencies and contracting agency harmless Evidence of the required insurance shall be delivered to the contracting agency on an MTA

approved Certificate of Insurance prior to execution of the contract

Each insurance policy or Certificate of Insurance shall contain an agreement by the insurance company issuing the policy that the policy will not be

canceled terminated or modified without 30 days prior notice to the contracting agency At least two weeks prior to the expiration of each policy the

contractor shall endeavor to provide an updated Certificate of Insurance evidencing renewal coverage to the contract agency

The MTA has in place Owner Controlled Insurance Programs (OCIP) for the East Side Access (ESA) project the Second Avenue Subway and selected

projects in the Capital Plan Under traditional OCIPs the MTA covers the construction phase of work and provides general liability excess liability

workers compensation railroad protective and builders risk coverage to all participating contractors The ESA OCIP adds environmental liability

coverage for related engineering and environmental work

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 14

Forecast of Contracts to be Advertised and Proposals to be Solicited

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

MARCH 2014 ndash SEPTEMBER 2014

Type of

ContractSolic Month Reference Number Contract Description Agency Range

Bridges and Tunnels

Constr Mgmt MAR 2014 HH-88A Construction Management Services for HH-88A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-23A Construction Management Services for RK-23A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-44 Construction Management Services for RK-44 Painting

Contract

BampT $1M - $5M

Constr MAR 2014 RK-44 Cleaning and Painting of RFK Main Cables Suspender

Ropes and Tower Interior and Exterior

BampT $5M - $10M

Constr APR 2014 MP-21 (DB) DesignBuild Rehabilitation of the Rockaway Point

Boulevard Overpass and Jacob Riis Park Pedestrian

Bridge)

BampT $5M - $10M

Special

Services

APR 2014 RK-65B Conceptual Design and Feasibility Study for

Reconstruction of the Manhattan Plaza at the RFK Bridge

BampT $1M - $5M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 24

Constr MAY 2014 RK-65A Reconstruction of the Bronx Plaza at the RFK Bridge BampT OVER $50M

Constr JUN 2014 BB-28 (Sandy)BB-2 Rehabilitation of walls roadway fire lines ceiling

Mechanical Electrical and Communication systems

inside the tunnel Replacement of Brooklyn Plaza

structural slab and Environmental Remediation at Hugh L

Carey Tunnel

BampT OVER $50M

Constr JUN 2014 HH-88A Reconstruction of Upper and Lower Plaza and Southbound

Approach

BampT $10M - $50M

Constr JUN 2014 RK-23A Reconstruction and Rehabilitation of Manhattan Approach

Ramps to and from 124th 125th St

BampT OVER $50M

Constr JUL 2014 RK-76 Misc Structural Repair at RFK Bridge BampT $10M - $50M

Long Island Rail Road

Constr APR 2014 E01848 [Sandy] NY Western Rail Yards Fire Alarm System [Design-Build] LIRR $500K - $1M

Constr JUN 2014 E01817 [Sandy] Design-Build for Long Beach Branch Signal System LIRR $5M - $10M

Constr JUN 2014 L10001 Ellison Avenue Bridge Replacement LIRR $10M - $50M

Constr JUL 2014 L09986 Hicksville North Track Siding LIRR $10M - $50M

Metro-North Railroad

Constr MAR 2014 M08817 Rehabilitate - 2 Elevators (SE12) - Grand Central Terminal MNR $1M - $5M

Constr JUN 2014 M08793 Construction - GCT TrainshedStructure MNR $10M - $50M

Constr JUN 2014 M09198 Construction of Culvert located at MP JS5100 - Salisbury

Mills

MNR $1M - $5M

Constr JUN 2014 M09403E01881 Construction 4 Substations MNR $10M - $50M

MTA Bus

Constr MAR 2014 SF04-7408 DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp

BAISLEY PARK DEPOTS

MTA BUS $1M - $5M

Constr MAR 2014 SF07-7411 JFK APRON MTA BUS $5M - $10M

Constr APR 2014 SF01-7407 SECURITY IMPROVEMENTS FAR ROCKAWAY amp

BAISLEY PARK

MTA BUS $5M - $10M

Constr APR 2014 SF07-7314 FAR ROCKAWAY ROOF DECK REPLACEMENT MTA BUS $1M - $5M

New York City Transit

Constr MAR 2014 A36151 ACCESS IMPROVEMENTS AT GRAND CENTRAL

STATION

NYCT $10M - $50M

Constr MAR 2014 A36906A36908 STATION COMPONENT REPAIRS AT 5 LOCATIONS NYCT $5M - $10M

Constr MAR 2014 C33840 STRUCTURE OVERCOATING BROADWAY JUNCTION - NYCT $10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 34

NEW LOTS AVENUE

Purchase MAR 2014 C34915 LINE STRUCTURE OVERCOATING ABUTMENT TO

KINGS HWY

NYCT $10M - $50M

Constr MAR 2014 C34916 LINE STRUCTURE OVERCOATING KINGS HWY TO

WEST 8 ST

NYCT $10M - $50M

Constr MAR 2014 P36444(SANDY) SANDY REPAIRS RESTORATION OF CRANBERRY

AND RUTGERS TUBE

NYCT OVER $50M

Constr MAR 2014 S32765 INTERLOCKING MODERNIZATION WEST 4TH ST NYCT OVER $50M

Constr APR 2014 A36891 STATION COMPONENT REPAIRS 2 LOCATIONS NYCT $5M - $10M

Constr APR 2014 A36909 COMPONENT REPAIRS AT 5 STATIONS - CANARSIE NYCT $10M - $50M

Constr APR 2014 A37547 STRUCTURAL STEEL REPAIR 9TH AVENUE STATION NYCT $5M - $10M

Constr APR 2014 A37593(SANDY) SANDY REPAIRS SOUTH FERRY NYCT OVER $50M

Constr APR 2014 A46010 STATION RENEWAL AND COMPONENT REPAIRS 9

STATIONS

NYCT OVER $50M

Constr APR 2014 C33848 PERIMETER HARDENING RCC amp 130 LIVINGSTON NYCT $5M - $10M

Constr APR 2014 C43046 HYDROGEN GAS VENTILATION 19 COMMUNICATION

ROOMS

NYCT $5M - $10M

Constr APR 2014 C43749 REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE

ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL

SECURITY BOLLARDS REMOVE amp REPLACE WWII

MEMORIAL

NYCT $10M - $50M

Constr APR 2014 E31114 REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22

LOCATIONS

NYCT $10M - $50M

Constr APR 2014 E40805 REHABILITATE PUMP ROOMS 4 LOCATIONS NYCT $5M - $10M

Constr APR 2014 T80276(SANDY) SANDY REPAIRS ST GEORGE INTERLOCKING NYCT OVER $50M

Constr APR 2014 W32366 REPLACE BUS RADIO SYSTEM NYCT OVER $50M

Constr MAY 2014 C43753 CONSTRUCT BUS COMMAND CENTER NYCT $10M - $50M

Constr JUN 2014 A36905 STATION COMPONENT REPAIRS 3 STATIONS NYCT $5M - $10M

Constr JUN 2014 A36921 STATION COMPONENT REPAIRS 4 LOCATIONS NYCT $5M - $10M

Purchase JUN 2014 B40660 PURCHASE 256 ARTICULATED BUSES NYCT OVER $50M

Constr JUN 2014 P36415 REHABILITATION OF CIRCUIT BREAKER HOUSE

PEARL STREET

NYCT $5M - $10M

Constr JUN 2014 P36446(SANDY) SANDY REPAIRS RESTORATION OF CLARK STREET

TUBE

NYCT $10M - $50M

Constr JUN 2014 SF07-7346 SLIDING GATE REPLACEMENT AT JACKIE GLEASON

BUS DEPOT

NYCT $1M - $5M

Constr JUN 2014 W32372 PASSENGER STATION LAN AT 20 STATIONS NYCT $10M - $50M

Constr JUL 2014 A36890 STATION COMPONENT REPAIRS 49TH STREET NYCT $5M - $10M

Constr JUL 2014 C34914 SHOP REPAIRS AND UPGRADE NYCT $10M - $50M

Constr JUL 2014 D37467 PBX UPGRADE PHASE 1 NYCT $10M - $50M

Constr JUL 2014 P80275 NEW POWER SUBSTATION PRINCES BAY NYCT $10M - $50M

Constr JUL 2014 ST12-0139 INTEGRATED SERVICE INFORMATION amp

MANAGEMENT B DIVISION MODULE 1

NYCT $10M - $50M

Constr JUL 2014 W32697 INSTALL PUBLIC ADDRESS AND CUSTOMER

INFORMATION SCREENS AT 87 LOCATIONS

NYCT $10M - $50M

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 44

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

Constr AUG 2014 A36916 STATION COMPONENTS EASTCHESTER - DYRE

AVENUE

NYCT $5M - $10M

Constr AUG 2014 C33076 EMERGENCY GENERATOR REPLACEMENT AT

CASEY STENGEL DEPOT

NYCT $1M - $5M

Constr AUG 2014 C34829 RTO FACILITIES HARDENING PH 2 NYCT $10M - $50M

Constr AUG 2014 C34913 CAR WASHER REPAIRS AT 3 YARDS NYCT $10M - $50M

Constr AUG 2014 E31380 THREE BUS WASHERS AT M J QILL BUS DEPOT NYCT $5M - $10M

Constr SEP 2014 A36150 ADA AT 57 STREET PHASE 2 NYCT $10M - $50M

Constr SEP 2014 A36865 STATION COMPONENT REPAIRS AT 4 STATIONS NYCT $10M - $50M

Constr SEP 2014 A36871 STATION COMPONENT REPAIRS AT TWO STATIONS NYCT $5M - $10M

Constr SEP 2014 A36884 STATION COMPONENT REPAIRS 103 STREET NYCT $5M - $10M

Constr SEP 2014 C34912 CAR WASHER REPAIRS AT CONEY ISLAND YARD NYCT $1M - $5M

Constr SEP 2014 E34022 7 HYDRAULIC ELEVATOR NYCT $10M - $50M

Constr SEP 2014 P36447(SANDY) SANDY REPAIRS RESTORATION OF 53RD ST TUBE NYCT OVER $50M

Capital Construction

Constr MAR 2014 CM014B GCT Concourse and Facilities Fit-Out MTACC Over $100M

Constr MAR 2014 CS084 Systems Package 2 Traction Power Systems MTACC $50M - $100M

Constr APR 2014 C-52123-1 Architectural Electrical and Fire Protection Upgrades for

the 34th St Penn Station Complex

MTACC $1M - $5M

Constr APR 2014 CH057 Harold Structures Part 3 48th St Bridge D Approach

Phase I and Eastbound Re-Route Approach

MTACC $50M - $100M

Partially Funded by Federal grant(s)

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 120

Brief Descriptions of Work to be Advertised

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Bridges and Tunnels

Brief Description of Work

MAR 2014

HH-88A

CONSTRUCTION MANAGEMENT SERVICES FOR HH-88A CONSTRUCTION CONTRACT

$1M - $5M

The consultant will provide construction administration inspection and support service for HH-88A Construction project The Consultant shall provide all on-

site inspection and ensure that the materials furnished and the works performed are in accordance with the contract documents Construction schedule

requires multiple shifts Following is a representative list of the primary duties and responsibilities of the Consultant

Inspect the work of the Contract notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records of

the progress of the Contract

Provide Lead Abatement services which may include on-site inspections Air-monitoring and sampling and testing

Provide the Engineer with the necessary data for the processing of partial payments final payment extra work orders material approvals

subcontractor approvals and all other required reports and correspondence

Conduct progress meetings and special meetings as required Assist the Engineer in the project close-out procedure

Review contractorrsquos CPM or Bar Chart schedule

Assist in the resolution of disputes among the contractors Make recommendations to the Engineer for such changes in the work as the Consultant

may consider necessary or desirable Provide an analysis of the validity and need for proposed change orders and assist the Authority in the

subsequent negotiations

Duration of Contract 27 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 6: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 14

Forecast of Contracts to be Advertised and Proposals to be Solicited

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

MARCH 2014 ndash SEPTEMBER 2014

Type of

ContractSolic Month Reference Number Contract Description Agency Range

Bridges and Tunnels

Constr Mgmt MAR 2014 HH-88A Construction Management Services for HH-88A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-23A Construction Management Services for RK-23A

Construction Contract

BampT $1M - $5M

Constr Mgmt MAR 2014 RK-44 Construction Management Services for RK-44 Painting

Contract

BampT $1M - $5M

Constr MAR 2014 RK-44 Cleaning and Painting of RFK Main Cables Suspender

Ropes and Tower Interior and Exterior

BampT $5M - $10M

Constr APR 2014 MP-21 (DB) DesignBuild Rehabilitation of the Rockaway Point

Boulevard Overpass and Jacob Riis Park Pedestrian

Bridge)

BampT $5M - $10M

Special

Services

APR 2014 RK-65B Conceptual Design and Feasibility Study for

Reconstruction of the Manhattan Plaza at the RFK Bridge

BampT $1M - $5M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 24

Constr MAY 2014 RK-65A Reconstruction of the Bronx Plaza at the RFK Bridge BampT OVER $50M

Constr JUN 2014 BB-28 (Sandy)BB-2 Rehabilitation of walls roadway fire lines ceiling

Mechanical Electrical and Communication systems

inside the tunnel Replacement of Brooklyn Plaza

structural slab and Environmental Remediation at Hugh L

Carey Tunnel

BampT OVER $50M

Constr JUN 2014 HH-88A Reconstruction of Upper and Lower Plaza and Southbound

Approach

BampT $10M - $50M

Constr JUN 2014 RK-23A Reconstruction and Rehabilitation of Manhattan Approach

Ramps to and from 124th 125th St

BampT OVER $50M

Constr JUL 2014 RK-76 Misc Structural Repair at RFK Bridge BampT $10M - $50M

Long Island Rail Road

Constr APR 2014 E01848 [Sandy] NY Western Rail Yards Fire Alarm System [Design-Build] LIRR $500K - $1M

Constr JUN 2014 E01817 [Sandy] Design-Build for Long Beach Branch Signal System LIRR $5M - $10M

Constr JUN 2014 L10001 Ellison Avenue Bridge Replacement LIRR $10M - $50M

Constr JUL 2014 L09986 Hicksville North Track Siding LIRR $10M - $50M

Metro-North Railroad

Constr MAR 2014 M08817 Rehabilitate - 2 Elevators (SE12) - Grand Central Terminal MNR $1M - $5M

Constr JUN 2014 M08793 Construction - GCT TrainshedStructure MNR $10M - $50M

Constr JUN 2014 M09198 Construction of Culvert located at MP JS5100 - Salisbury

Mills

MNR $1M - $5M

Constr JUN 2014 M09403E01881 Construction 4 Substations MNR $10M - $50M

MTA Bus

Constr MAR 2014 SF04-7408 DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp

BAISLEY PARK DEPOTS

MTA BUS $1M - $5M

Constr MAR 2014 SF07-7411 JFK APRON MTA BUS $5M - $10M

Constr APR 2014 SF01-7407 SECURITY IMPROVEMENTS FAR ROCKAWAY amp

BAISLEY PARK

MTA BUS $5M - $10M

Constr APR 2014 SF07-7314 FAR ROCKAWAY ROOF DECK REPLACEMENT MTA BUS $1M - $5M

New York City Transit

Constr MAR 2014 A36151 ACCESS IMPROVEMENTS AT GRAND CENTRAL

STATION

NYCT $10M - $50M

Constr MAR 2014 A36906A36908 STATION COMPONENT REPAIRS AT 5 LOCATIONS NYCT $5M - $10M

Constr MAR 2014 C33840 STRUCTURE OVERCOATING BROADWAY JUNCTION - NYCT $10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 34

NEW LOTS AVENUE

Purchase MAR 2014 C34915 LINE STRUCTURE OVERCOATING ABUTMENT TO

KINGS HWY

NYCT $10M - $50M

Constr MAR 2014 C34916 LINE STRUCTURE OVERCOATING KINGS HWY TO

WEST 8 ST

NYCT $10M - $50M

Constr MAR 2014 P36444(SANDY) SANDY REPAIRS RESTORATION OF CRANBERRY

AND RUTGERS TUBE

NYCT OVER $50M

Constr MAR 2014 S32765 INTERLOCKING MODERNIZATION WEST 4TH ST NYCT OVER $50M

Constr APR 2014 A36891 STATION COMPONENT REPAIRS 2 LOCATIONS NYCT $5M - $10M

Constr APR 2014 A36909 COMPONENT REPAIRS AT 5 STATIONS - CANARSIE NYCT $10M - $50M

Constr APR 2014 A37547 STRUCTURAL STEEL REPAIR 9TH AVENUE STATION NYCT $5M - $10M

Constr APR 2014 A37593(SANDY) SANDY REPAIRS SOUTH FERRY NYCT OVER $50M

Constr APR 2014 A46010 STATION RENEWAL AND COMPONENT REPAIRS 9

STATIONS

NYCT OVER $50M

Constr APR 2014 C33848 PERIMETER HARDENING RCC amp 130 LIVINGSTON NYCT $5M - $10M

Constr APR 2014 C43046 HYDROGEN GAS VENTILATION 19 COMMUNICATION

ROOMS

NYCT $5M - $10M

Constr APR 2014 C43749 REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE

ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL

SECURITY BOLLARDS REMOVE amp REPLACE WWII

MEMORIAL

NYCT $10M - $50M

Constr APR 2014 E31114 REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22

LOCATIONS

NYCT $10M - $50M

Constr APR 2014 E40805 REHABILITATE PUMP ROOMS 4 LOCATIONS NYCT $5M - $10M

Constr APR 2014 T80276(SANDY) SANDY REPAIRS ST GEORGE INTERLOCKING NYCT OVER $50M

Constr APR 2014 W32366 REPLACE BUS RADIO SYSTEM NYCT OVER $50M

Constr MAY 2014 C43753 CONSTRUCT BUS COMMAND CENTER NYCT $10M - $50M

Constr JUN 2014 A36905 STATION COMPONENT REPAIRS 3 STATIONS NYCT $5M - $10M

Constr JUN 2014 A36921 STATION COMPONENT REPAIRS 4 LOCATIONS NYCT $5M - $10M

Purchase JUN 2014 B40660 PURCHASE 256 ARTICULATED BUSES NYCT OVER $50M

Constr JUN 2014 P36415 REHABILITATION OF CIRCUIT BREAKER HOUSE

PEARL STREET

NYCT $5M - $10M

Constr JUN 2014 P36446(SANDY) SANDY REPAIRS RESTORATION OF CLARK STREET

TUBE

NYCT $10M - $50M

Constr JUN 2014 SF07-7346 SLIDING GATE REPLACEMENT AT JACKIE GLEASON

BUS DEPOT

NYCT $1M - $5M

Constr JUN 2014 W32372 PASSENGER STATION LAN AT 20 STATIONS NYCT $10M - $50M

Constr JUL 2014 A36890 STATION COMPONENT REPAIRS 49TH STREET NYCT $5M - $10M

Constr JUL 2014 C34914 SHOP REPAIRS AND UPGRADE NYCT $10M - $50M

Constr JUL 2014 D37467 PBX UPGRADE PHASE 1 NYCT $10M - $50M

Constr JUL 2014 P80275 NEW POWER SUBSTATION PRINCES BAY NYCT $10M - $50M

Constr JUL 2014 ST12-0139 INTEGRATED SERVICE INFORMATION amp

MANAGEMENT B DIVISION MODULE 1

NYCT $10M - $50M

Constr JUL 2014 W32697 INSTALL PUBLIC ADDRESS AND CUSTOMER

INFORMATION SCREENS AT 87 LOCATIONS

NYCT $10M - $50M

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 44

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

Constr AUG 2014 A36916 STATION COMPONENTS EASTCHESTER - DYRE

AVENUE

NYCT $5M - $10M

Constr AUG 2014 C33076 EMERGENCY GENERATOR REPLACEMENT AT

CASEY STENGEL DEPOT

NYCT $1M - $5M

Constr AUG 2014 C34829 RTO FACILITIES HARDENING PH 2 NYCT $10M - $50M

Constr AUG 2014 C34913 CAR WASHER REPAIRS AT 3 YARDS NYCT $10M - $50M

Constr AUG 2014 E31380 THREE BUS WASHERS AT M J QILL BUS DEPOT NYCT $5M - $10M

Constr SEP 2014 A36150 ADA AT 57 STREET PHASE 2 NYCT $10M - $50M

Constr SEP 2014 A36865 STATION COMPONENT REPAIRS AT 4 STATIONS NYCT $10M - $50M

Constr SEP 2014 A36871 STATION COMPONENT REPAIRS AT TWO STATIONS NYCT $5M - $10M

Constr SEP 2014 A36884 STATION COMPONENT REPAIRS 103 STREET NYCT $5M - $10M

Constr SEP 2014 C34912 CAR WASHER REPAIRS AT CONEY ISLAND YARD NYCT $1M - $5M

Constr SEP 2014 E34022 7 HYDRAULIC ELEVATOR NYCT $10M - $50M

Constr SEP 2014 P36447(SANDY) SANDY REPAIRS RESTORATION OF 53RD ST TUBE NYCT OVER $50M

Capital Construction

Constr MAR 2014 CM014B GCT Concourse and Facilities Fit-Out MTACC Over $100M

Constr MAR 2014 CS084 Systems Package 2 Traction Power Systems MTACC $50M - $100M

Constr APR 2014 C-52123-1 Architectural Electrical and Fire Protection Upgrades for

the 34th St Penn Station Complex

MTACC $1M - $5M

Constr APR 2014 CH057 Harold Structures Part 3 48th St Bridge D Approach

Phase I and Eastbound Re-Route Approach

MTACC $50M - $100M

Partially Funded by Federal grant(s)

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 120

Brief Descriptions of Work to be Advertised

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Bridges and Tunnels

Brief Description of Work

MAR 2014

HH-88A

CONSTRUCTION MANAGEMENT SERVICES FOR HH-88A CONSTRUCTION CONTRACT

$1M - $5M

The consultant will provide construction administration inspection and support service for HH-88A Construction project The Consultant shall provide all on-

site inspection and ensure that the materials furnished and the works performed are in accordance with the contract documents Construction schedule

requires multiple shifts Following is a representative list of the primary duties and responsibilities of the Consultant

Inspect the work of the Contract notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records of

the progress of the Contract

Provide Lead Abatement services which may include on-site inspections Air-monitoring and sampling and testing

Provide the Engineer with the necessary data for the processing of partial payments final payment extra work orders material approvals

subcontractor approvals and all other required reports and correspondence

Conduct progress meetings and special meetings as required Assist the Engineer in the project close-out procedure

Review contractorrsquos CPM or Bar Chart schedule

Assist in the resolution of disputes among the contractors Make recommendations to the Engineer for such changes in the work as the Consultant

may consider necessary or desirable Provide an analysis of the validity and need for proposed change orders and assist the Authority in the

subsequent negotiations

Duration of Contract 27 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 7: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 24

Constr MAY 2014 RK-65A Reconstruction of the Bronx Plaza at the RFK Bridge BampT OVER $50M

Constr JUN 2014 BB-28 (Sandy)BB-2 Rehabilitation of walls roadway fire lines ceiling

Mechanical Electrical and Communication systems

inside the tunnel Replacement of Brooklyn Plaza

structural slab and Environmental Remediation at Hugh L

Carey Tunnel

BampT OVER $50M

Constr JUN 2014 HH-88A Reconstruction of Upper and Lower Plaza and Southbound

Approach

BampT $10M - $50M

Constr JUN 2014 RK-23A Reconstruction and Rehabilitation of Manhattan Approach

Ramps to and from 124th 125th St

BampT OVER $50M

Constr JUL 2014 RK-76 Misc Structural Repair at RFK Bridge BampT $10M - $50M

Long Island Rail Road

Constr APR 2014 E01848 [Sandy] NY Western Rail Yards Fire Alarm System [Design-Build] LIRR $500K - $1M

Constr JUN 2014 E01817 [Sandy] Design-Build for Long Beach Branch Signal System LIRR $5M - $10M

Constr JUN 2014 L10001 Ellison Avenue Bridge Replacement LIRR $10M - $50M

Constr JUL 2014 L09986 Hicksville North Track Siding LIRR $10M - $50M

Metro-North Railroad

Constr MAR 2014 M08817 Rehabilitate - 2 Elevators (SE12) - Grand Central Terminal MNR $1M - $5M

Constr JUN 2014 M08793 Construction - GCT TrainshedStructure MNR $10M - $50M

Constr JUN 2014 M09198 Construction of Culvert located at MP JS5100 - Salisbury

Mills

MNR $1M - $5M

Constr JUN 2014 M09403E01881 Construction 4 Substations MNR $10M - $50M

MTA Bus

Constr MAR 2014 SF04-7408 DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp

BAISLEY PARK DEPOTS

MTA BUS $1M - $5M

Constr MAR 2014 SF07-7411 JFK APRON MTA BUS $5M - $10M

Constr APR 2014 SF01-7407 SECURITY IMPROVEMENTS FAR ROCKAWAY amp

BAISLEY PARK

MTA BUS $5M - $10M

Constr APR 2014 SF07-7314 FAR ROCKAWAY ROOF DECK REPLACEMENT MTA BUS $1M - $5M

New York City Transit

Constr MAR 2014 A36151 ACCESS IMPROVEMENTS AT GRAND CENTRAL

STATION

NYCT $10M - $50M

Constr MAR 2014 A36906A36908 STATION COMPONENT REPAIRS AT 5 LOCATIONS NYCT $5M - $10M

Constr MAR 2014 C33840 STRUCTURE OVERCOATING BROADWAY JUNCTION - NYCT $10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 34

NEW LOTS AVENUE

Purchase MAR 2014 C34915 LINE STRUCTURE OVERCOATING ABUTMENT TO

KINGS HWY

NYCT $10M - $50M

Constr MAR 2014 C34916 LINE STRUCTURE OVERCOATING KINGS HWY TO

WEST 8 ST

NYCT $10M - $50M

Constr MAR 2014 P36444(SANDY) SANDY REPAIRS RESTORATION OF CRANBERRY

AND RUTGERS TUBE

NYCT OVER $50M

Constr MAR 2014 S32765 INTERLOCKING MODERNIZATION WEST 4TH ST NYCT OVER $50M

Constr APR 2014 A36891 STATION COMPONENT REPAIRS 2 LOCATIONS NYCT $5M - $10M

Constr APR 2014 A36909 COMPONENT REPAIRS AT 5 STATIONS - CANARSIE NYCT $10M - $50M

Constr APR 2014 A37547 STRUCTURAL STEEL REPAIR 9TH AVENUE STATION NYCT $5M - $10M

Constr APR 2014 A37593(SANDY) SANDY REPAIRS SOUTH FERRY NYCT OVER $50M

Constr APR 2014 A46010 STATION RENEWAL AND COMPONENT REPAIRS 9

STATIONS

NYCT OVER $50M

Constr APR 2014 C33848 PERIMETER HARDENING RCC amp 130 LIVINGSTON NYCT $5M - $10M

Constr APR 2014 C43046 HYDROGEN GAS VENTILATION 19 COMMUNICATION

ROOMS

NYCT $5M - $10M

Constr APR 2014 C43749 REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE

ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL

SECURITY BOLLARDS REMOVE amp REPLACE WWII

MEMORIAL

NYCT $10M - $50M

Constr APR 2014 E31114 REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22

LOCATIONS

NYCT $10M - $50M

Constr APR 2014 E40805 REHABILITATE PUMP ROOMS 4 LOCATIONS NYCT $5M - $10M

Constr APR 2014 T80276(SANDY) SANDY REPAIRS ST GEORGE INTERLOCKING NYCT OVER $50M

Constr APR 2014 W32366 REPLACE BUS RADIO SYSTEM NYCT OVER $50M

Constr MAY 2014 C43753 CONSTRUCT BUS COMMAND CENTER NYCT $10M - $50M

Constr JUN 2014 A36905 STATION COMPONENT REPAIRS 3 STATIONS NYCT $5M - $10M

Constr JUN 2014 A36921 STATION COMPONENT REPAIRS 4 LOCATIONS NYCT $5M - $10M

Purchase JUN 2014 B40660 PURCHASE 256 ARTICULATED BUSES NYCT OVER $50M

Constr JUN 2014 P36415 REHABILITATION OF CIRCUIT BREAKER HOUSE

PEARL STREET

NYCT $5M - $10M

Constr JUN 2014 P36446(SANDY) SANDY REPAIRS RESTORATION OF CLARK STREET

TUBE

NYCT $10M - $50M

Constr JUN 2014 SF07-7346 SLIDING GATE REPLACEMENT AT JACKIE GLEASON

BUS DEPOT

NYCT $1M - $5M

Constr JUN 2014 W32372 PASSENGER STATION LAN AT 20 STATIONS NYCT $10M - $50M

Constr JUL 2014 A36890 STATION COMPONENT REPAIRS 49TH STREET NYCT $5M - $10M

Constr JUL 2014 C34914 SHOP REPAIRS AND UPGRADE NYCT $10M - $50M

Constr JUL 2014 D37467 PBX UPGRADE PHASE 1 NYCT $10M - $50M

Constr JUL 2014 P80275 NEW POWER SUBSTATION PRINCES BAY NYCT $10M - $50M

Constr JUL 2014 ST12-0139 INTEGRATED SERVICE INFORMATION amp

MANAGEMENT B DIVISION MODULE 1

NYCT $10M - $50M

Constr JUL 2014 W32697 INSTALL PUBLIC ADDRESS AND CUSTOMER

INFORMATION SCREENS AT 87 LOCATIONS

NYCT $10M - $50M

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 44

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

Constr AUG 2014 A36916 STATION COMPONENTS EASTCHESTER - DYRE

AVENUE

NYCT $5M - $10M

Constr AUG 2014 C33076 EMERGENCY GENERATOR REPLACEMENT AT

CASEY STENGEL DEPOT

NYCT $1M - $5M

Constr AUG 2014 C34829 RTO FACILITIES HARDENING PH 2 NYCT $10M - $50M

Constr AUG 2014 C34913 CAR WASHER REPAIRS AT 3 YARDS NYCT $10M - $50M

Constr AUG 2014 E31380 THREE BUS WASHERS AT M J QILL BUS DEPOT NYCT $5M - $10M

Constr SEP 2014 A36150 ADA AT 57 STREET PHASE 2 NYCT $10M - $50M

Constr SEP 2014 A36865 STATION COMPONENT REPAIRS AT 4 STATIONS NYCT $10M - $50M

Constr SEP 2014 A36871 STATION COMPONENT REPAIRS AT TWO STATIONS NYCT $5M - $10M

Constr SEP 2014 A36884 STATION COMPONENT REPAIRS 103 STREET NYCT $5M - $10M

Constr SEP 2014 C34912 CAR WASHER REPAIRS AT CONEY ISLAND YARD NYCT $1M - $5M

Constr SEP 2014 E34022 7 HYDRAULIC ELEVATOR NYCT $10M - $50M

Constr SEP 2014 P36447(SANDY) SANDY REPAIRS RESTORATION OF 53RD ST TUBE NYCT OVER $50M

Capital Construction

Constr MAR 2014 CM014B GCT Concourse and Facilities Fit-Out MTACC Over $100M

Constr MAR 2014 CS084 Systems Package 2 Traction Power Systems MTACC $50M - $100M

Constr APR 2014 C-52123-1 Architectural Electrical and Fire Protection Upgrades for

the 34th St Penn Station Complex

MTACC $1M - $5M

Constr APR 2014 CH057 Harold Structures Part 3 48th St Bridge D Approach

Phase I and Eastbound Re-Route Approach

MTACC $50M - $100M

Partially Funded by Federal grant(s)

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 120

Brief Descriptions of Work to be Advertised

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Bridges and Tunnels

Brief Description of Work

MAR 2014

HH-88A

CONSTRUCTION MANAGEMENT SERVICES FOR HH-88A CONSTRUCTION CONTRACT

$1M - $5M

The consultant will provide construction administration inspection and support service for HH-88A Construction project The Consultant shall provide all on-

site inspection and ensure that the materials furnished and the works performed are in accordance with the contract documents Construction schedule

requires multiple shifts Following is a representative list of the primary duties and responsibilities of the Consultant

Inspect the work of the Contract notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records of

the progress of the Contract

Provide Lead Abatement services which may include on-site inspections Air-monitoring and sampling and testing

Provide the Engineer with the necessary data for the processing of partial payments final payment extra work orders material approvals

subcontractor approvals and all other required reports and correspondence

Conduct progress meetings and special meetings as required Assist the Engineer in the project close-out procedure

Review contractorrsquos CPM or Bar Chart schedule

Assist in the resolution of disputes among the contractors Make recommendations to the Engineer for such changes in the work as the Consultant

may consider necessary or desirable Provide an analysis of the validity and need for proposed change orders and assist the Authority in the

subsequent negotiations

Duration of Contract 27 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 8: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 34

NEW LOTS AVENUE

Purchase MAR 2014 C34915 LINE STRUCTURE OVERCOATING ABUTMENT TO

KINGS HWY

NYCT $10M - $50M

Constr MAR 2014 C34916 LINE STRUCTURE OVERCOATING KINGS HWY TO

WEST 8 ST

NYCT $10M - $50M

Constr MAR 2014 P36444(SANDY) SANDY REPAIRS RESTORATION OF CRANBERRY

AND RUTGERS TUBE

NYCT OVER $50M

Constr MAR 2014 S32765 INTERLOCKING MODERNIZATION WEST 4TH ST NYCT OVER $50M

Constr APR 2014 A36891 STATION COMPONENT REPAIRS 2 LOCATIONS NYCT $5M - $10M

Constr APR 2014 A36909 COMPONENT REPAIRS AT 5 STATIONS - CANARSIE NYCT $10M - $50M

Constr APR 2014 A37547 STRUCTURAL STEEL REPAIR 9TH AVENUE STATION NYCT $5M - $10M

Constr APR 2014 A37593(SANDY) SANDY REPAIRS SOUTH FERRY NYCT OVER $50M

Constr APR 2014 A46010 STATION RENEWAL AND COMPONENT REPAIRS 9

STATIONS

NYCT OVER $50M

Constr APR 2014 C33848 PERIMETER HARDENING RCC amp 130 LIVINGSTON NYCT $5M - $10M

Constr APR 2014 C43046 HYDROGEN GAS VENTILATION 19 COMMUNICATION

ROOMS

NYCT $5M - $10M

Constr APR 2014 C43749 REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE

ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL

SECURITY BOLLARDS REMOVE amp REPLACE WWII

MEMORIAL

NYCT $10M - $50M

Constr APR 2014 E31114 REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22

LOCATIONS

NYCT $10M - $50M

Constr APR 2014 E40805 REHABILITATE PUMP ROOMS 4 LOCATIONS NYCT $5M - $10M

Constr APR 2014 T80276(SANDY) SANDY REPAIRS ST GEORGE INTERLOCKING NYCT OVER $50M

Constr APR 2014 W32366 REPLACE BUS RADIO SYSTEM NYCT OVER $50M

Constr MAY 2014 C43753 CONSTRUCT BUS COMMAND CENTER NYCT $10M - $50M

Constr JUN 2014 A36905 STATION COMPONENT REPAIRS 3 STATIONS NYCT $5M - $10M

Constr JUN 2014 A36921 STATION COMPONENT REPAIRS 4 LOCATIONS NYCT $5M - $10M

Purchase JUN 2014 B40660 PURCHASE 256 ARTICULATED BUSES NYCT OVER $50M

Constr JUN 2014 P36415 REHABILITATION OF CIRCUIT BREAKER HOUSE

PEARL STREET

NYCT $5M - $10M

Constr JUN 2014 P36446(SANDY) SANDY REPAIRS RESTORATION OF CLARK STREET

TUBE

NYCT $10M - $50M

Constr JUN 2014 SF07-7346 SLIDING GATE REPLACEMENT AT JACKIE GLEASON

BUS DEPOT

NYCT $1M - $5M

Constr JUN 2014 W32372 PASSENGER STATION LAN AT 20 STATIONS NYCT $10M - $50M

Constr JUL 2014 A36890 STATION COMPONENT REPAIRS 49TH STREET NYCT $5M - $10M

Constr JUL 2014 C34914 SHOP REPAIRS AND UPGRADE NYCT $10M - $50M

Constr JUL 2014 D37467 PBX UPGRADE PHASE 1 NYCT $10M - $50M

Constr JUL 2014 P80275 NEW POWER SUBSTATION PRINCES BAY NYCT $10M - $50M

Constr JUL 2014 ST12-0139 INTEGRATED SERVICE INFORMATION amp

MANAGEMENT B DIVISION MODULE 1

NYCT $10M - $50M

Constr JUL 2014 W32697 INSTALL PUBLIC ADDRESS AND CUSTOMER

INFORMATION SCREENS AT 87 LOCATIONS

NYCT $10M - $50M

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 44

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

Constr AUG 2014 A36916 STATION COMPONENTS EASTCHESTER - DYRE

AVENUE

NYCT $5M - $10M

Constr AUG 2014 C33076 EMERGENCY GENERATOR REPLACEMENT AT

CASEY STENGEL DEPOT

NYCT $1M - $5M

Constr AUG 2014 C34829 RTO FACILITIES HARDENING PH 2 NYCT $10M - $50M

Constr AUG 2014 C34913 CAR WASHER REPAIRS AT 3 YARDS NYCT $10M - $50M

Constr AUG 2014 E31380 THREE BUS WASHERS AT M J QILL BUS DEPOT NYCT $5M - $10M

Constr SEP 2014 A36150 ADA AT 57 STREET PHASE 2 NYCT $10M - $50M

Constr SEP 2014 A36865 STATION COMPONENT REPAIRS AT 4 STATIONS NYCT $10M - $50M

Constr SEP 2014 A36871 STATION COMPONENT REPAIRS AT TWO STATIONS NYCT $5M - $10M

Constr SEP 2014 A36884 STATION COMPONENT REPAIRS 103 STREET NYCT $5M - $10M

Constr SEP 2014 C34912 CAR WASHER REPAIRS AT CONEY ISLAND YARD NYCT $1M - $5M

Constr SEP 2014 E34022 7 HYDRAULIC ELEVATOR NYCT $10M - $50M

Constr SEP 2014 P36447(SANDY) SANDY REPAIRS RESTORATION OF 53RD ST TUBE NYCT OVER $50M

Capital Construction

Constr MAR 2014 CM014B GCT Concourse and Facilities Fit-Out MTACC Over $100M

Constr MAR 2014 CS084 Systems Package 2 Traction Power Systems MTACC $50M - $100M

Constr APR 2014 C-52123-1 Architectural Electrical and Fire Protection Upgrades for

the 34th St Penn Station Complex

MTACC $1M - $5M

Constr APR 2014 CH057 Harold Structures Part 3 48th St Bridge D Approach

Phase I and Eastbound Re-Route Approach

MTACC $50M - $100M

Partially Funded by Federal grant(s)

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 120

Brief Descriptions of Work to be Advertised

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Bridges and Tunnels

Brief Description of Work

MAR 2014

HH-88A

CONSTRUCTION MANAGEMENT SERVICES FOR HH-88A CONSTRUCTION CONTRACT

$1M - $5M

The consultant will provide construction administration inspection and support service for HH-88A Construction project The Consultant shall provide all on-

site inspection and ensure that the materials furnished and the works performed are in accordance with the contract documents Construction schedule

requires multiple shifts Following is a representative list of the primary duties and responsibilities of the Consultant

Inspect the work of the Contract notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records of

the progress of the Contract

Provide Lead Abatement services which may include on-site inspections Air-monitoring and sampling and testing

Provide the Engineer with the necessary data for the processing of partial payments final payment extra work orders material approvals

subcontractor approvals and all other required reports and correspondence

Conduct progress meetings and special meetings as required Assist the Engineer in the project close-out procedure

Review contractorrsquos CPM or Bar Chart schedule

Assist in the resolution of disputes among the contractors Make recommendations to the Engineer for such changes in the work as the Consultant

may consider necessary or desirable Provide an analysis of the validity and need for proposed change orders and assist the Authority in the

subsequent negotiations

Duration of Contract 27 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 9: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-allagency_newhtm 44

Constr AUG 2014 A36090 STATION RENEWALS OF 9 STATIONS NYCT OVER $50M

Constr AUG 2014 A36916 STATION COMPONENTS EASTCHESTER - DYRE

AVENUE

NYCT $5M - $10M

Constr AUG 2014 C33076 EMERGENCY GENERATOR REPLACEMENT AT

CASEY STENGEL DEPOT

NYCT $1M - $5M

Constr AUG 2014 C34829 RTO FACILITIES HARDENING PH 2 NYCT $10M - $50M

Constr AUG 2014 C34913 CAR WASHER REPAIRS AT 3 YARDS NYCT $10M - $50M

Constr AUG 2014 E31380 THREE BUS WASHERS AT M J QILL BUS DEPOT NYCT $5M - $10M

Constr SEP 2014 A36150 ADA AT 57 STREET PHASE 2 NYCT $10M - $50M

Constr SEP 2014 A36865 STATION COMPONENT REPAIRS AT 4 STATIONS NYCT $10M - $50M

Constr SEP 2014 A36871 STATION COMPONENT REPAIRS AT TWO STATIONS NYCT $5M - $10M

Constr SEP 2014 A36884 STATION COMPONENT REPAIRS 103 STREET NYCT $5M - $10M

Constr SEP 2014 C34912 CAR WASHER REPAIRS AT CONEY ISLAND YARD NYCT $1M - $5M

Constr SEP 2014 E34022 7 HYDRAULIC ELEVATOR NYCT $10M - $50M

Constr SEP 2014 P36447(SANDY) SANDY REPAIRS RESTORATION OF 53RD ST TUBE NYCT OVER $50M

Capital Construction

Constr MAR 2014 CM014B GCT Concourse and Facilities Fit-Out MTACC Over $100M

Constr MAR 2014 CS084 Systems Package 2 Traction Power Systems MTACC $50M - $100M

Constr APR 2014 C-52123-1 Architectural Electrical and Fire Protection Upgrades for

the 34th St Penn Station Complex

MTACC $1M - $5M

Constr APR 2014 CH057 Harold Structures Part 3 48th St Bridge D Approach

Phase I and Eastbound Re-Route Approach

MTACC $50M - $100M

Partially Funded by Federal grant(s)

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 120

Brief Descriptions of Work to be Advertised

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Bridges and Tunnels

Brief Description of Work

MAR 2014

HH-88A

CONSTRUCTION MANAGEMENT SERVICES FOR HH-88A CONSTRUCTION CONTRACT

$1M - $5M

The consultant will provide construction administration inspection and support service for HH-88A Construction project The Consultant shall provide all on-

site inspection and ensure that the materials furnished and the works performed are in accordance with the contract documents Construction schedule

requires multiple shifts Following is a representative list of the primary duties and responsibilities of the Consultant

Inspect the work of the Contract notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records of

the progress of the Contract

Provide Lead Abatement services which may include on-site inspections Air-monitoring and sampling and testing

Provide the Engineer with the necessary data for the processing of partial payments final payment extra work orders material approvals

subcontractor approvals and all other required reports and correspondence

Conduct progress meetings and special meetings as required Assist the Engineer in the project close-out procedure

Review contractorrsquos CPM or Bar Chart schedule

Assist in the resolution of disputes among the contractors Make recommendations to the Engineer for such changes in the work as the Consultant

may consider necessary or desirable Provide an analysis of the validity and need for proposed change orders and assist the Authority in the

subsequent negotiations

Duration of Contract 27 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 10: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 120

Brief Descriptions of Work to be Advertised

Letter from the Chairman

Information About Contracts

Forecast of Contracts and Proposals

Brief Descriptions of Work to be Advertised

MTA New York City Transit

MTA Long Island Rail Road

MTA Metro-North Railroad

MTA Bridges amp Tunnels

MTA Capital Construction

MTA Bus Company

Bridges and Tunnels

Brief Description of Work

MAR 2014

HH-88A

CONSTRUCTION MANAGEMENT SERVICES FOR HH-88A CONSTRUCTION CONTRACT

$1M - $5M

The consultant will provide construction administration inspection and support service for HH-88A Construction project The Consultant shall provide all on-

site inspection and ensure that the materials furnished and the works performed are in accordance with the contract documents Construction schedule

requires multiple shifts Following is a representative list of the primary duties and responsibilities of the Consultant

Inspect the work of the Contract notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records of

the progress of the Contract

Provide Lead Abatement services which may include on-site inspections Air-monitoring and sampling and testing

Provide the Engineer with the necessary data for the processing of partial payments final payment extra work orders material approvals

subcontractor approvals and all other required reports and correspondence

Conduct progress meetings and special meetings as required Assist the Engineer in the project close-out procedure

Review contractorrsquos CPM or Bar Chart schedule

Assist in the resolution of disputes among the contractors Make recommendations to the Engineer for such changes in the work as the Consultant

may consider necessary or desirable Provide an analysis of the validity and need for proposed change orders and assist the Authority in the

subsequent negotiations

Duration of Contract 27 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 11: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 220

RK-23A

CONSTRUCTION MANAGEMENT SERVICES FOR RK-23A CONSTRUCTION CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-23A construction contract

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 43 Months

RK-44

CONSTRUCTION MANAGEMENT SERVICES FOR RK-44 PAINTING CONTRACT

$1M - $5M

Under this contract the consultant will provide construction management services for RK-44 paint project

Inspect the work of the contractor notify the contractor in writing of any and all unacceptable work and maintain accurate and detailed written records

of the progress of the Contract

Ensure that all required permits have been obtained prior to the start of work Make recommendations as to the capabilities of contractors

subcontractors and sources of materials and equipment proposed by them Review contractorrsquos schedule

Establish and implement the procedures to be followed for the expediting and processing of shop drawings catalog cuts and submittals

Conduct progress meetings and special meetings as required Assist in the resolution of disputes among the contractors

Make recommendations to the Engineer for such changes in the work as the consultant may consider necessary or desirable Provide an analysis of

the validity and need for proposed change orders and assist the Authority in the subsequent negotiations

Assist the Engineer in the project close-out process

Duration of Contract 39 Months

RK-44

CLEANING AND PAINTING OF RFK MAIN CABLES SUSPENDER ROPES AND TOWER INTERIOR AND EXTERIOR

$5M - $10M

Under this Project the contractor shall perform cleaning and painting of various bridge elements at RFK bridge It also includes annual washingspot

painting of the Authority-wide toll plazas

Provide as-needed Maintenance and Protection of Traffic (MPT) to allow for construction activities

Coordinate the work of this project with other contractors working on the RFK Bridge

Blast clean RFK tower interior to SSPC SP-10 (Bare Metal) and coat with a high performance epoxy coating system

Over coat painting of main cables and suspender ropes

Over coat painting of the tower exterior below roadway

Wash and spot paint Authority-wide toll plazas

Duration of Contract 36 Months

Bridges and Tunnels

Brief Description of Work

APR 2014

MP-21 (DB)

DESIGNBUILD REHABILITATION OF THE ROCKAWAY POINT BOULEVARD OVERPASS AND JACOB RIIS PARK PEDESTRIAN BRIDGE)

$5M - $10M

Under this design-build contract the contractor will replace the Rockaway Point Boulevard Bridge amp rehabilitate the Jacob Riis Park Pedestrian Bridge

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 12: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 320

Investigate the existing conditions and review available documentation

Develop design documents at different established milestone for the Authoritys review and approval Prepare complete design

Install new bearings stringer and deck to current loading and seismic standards

Comply with all design criteria phasing approach environmental permits and approvals schedule fire and security requirements

Provide Maintenance and Protection of Traffic (MPT) as needed

Prepare as-built documentation

Duration of Contract 24 Months

RK-65B

CONCEPTUAL DESIGN AND FEASIBILITY STUDY FOR RECONSTRUCTION OF THE MANHATTAN PLAZA AT THE RFK BRIDGE

$1M - $5M

Provide conceptual design and feasibility study for the reconstruction of the Manhattan Plaza Structure associated ramps and toll collection system

Meet with the Authority Personnel to review the scope of work

Research available documentation perform all necessary investigations and surveys and meeting with Authority personnel

Review available documents and traffic studies to determine the optimum recommended alternatives for reconstruction of the Manhattan Plaza and

upgrades to associated ramps

Perform a feasibility studyDesign Brief equivalent to 10 design discussing alternatives make recommendations for final design Once final alternative

is selected produce the conceptual design

Duration of Contract 48 Months

Bridges and Tunnels

Brief Description of Work

MAY 2014

RK-65A

RECONSTRUCTION OF THE BRONX PLAZA AT THE RFK BRIDGE

OVER $50M

The scope of this Project includes staged replacement of the Bronx Plaza concrete deck along with portions of the supporting steel seismic upgrades

substructure repairs construction of several new piers and complete replacement of the toll plaza

Concrete repairs to piers and cap beams and steel repairs

Construction of new piers as well as extension of pier caps to support new deck between the mainline and the Manhattan-Queens ramp

Construction of an overhead walkwaytoll canopy and staged replacement of the Toll Plaza and concrete deck as well as significant portions of the

supporting steel and installation of seismic isolation bearings

Replacement of the Bronx Service Building Substation along with all utilities serving the plaza all deck lighting and plaza high mast lighting within

project limits

Modifications to the Bronx Crossing Truss spans to remove the median barrier and install temporary concrete barrier

Coordination with E-Zpass equipment provider to ensure access for installation and testing of toll collection equipment

Duration of Contract 56 Months

Bridges and Tunnels

Brief Description of Work

JUN 2014

BB-28 (Sandy)BB-28BB-54BB-12

REHABILITATION OF WALLS ROADWAY FIRE LINES CEILING MECHANICAL ELECTRICAL AND COMMUNICATION SYSTEMS INSIDE THE

TUNNEL REPLACEMENT OF BROOKLYN PLAZA STRUCTURAL SLAB AND ENVIRONMENTAL REMEDIATION AT HUGH L CAREY TUNNEL

OVER $50M

Under this contract the contractor will repair or replace various tunnel structural elements roadway ventilation and utility elements including mechanical

electrical and communication system Also under this contract the Brooklyn Plaza structural slab will be replaced This is a Sandy project and as this

project will contain FEMA funding it is subjected to relevant federal regulations

Repair concrete liner replace tunnel ceiling panel and wall tile system

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 13: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 420

Replace communicationtraffic control systems

Replace interior and transition lighting systems and other associated items

Replace tunnel pump system low tension duct system including catwalk and associated components

Rehabilitate Brooklyn Plaza roadway surface and drainage from portal to Gowanus Express way approach

Provide Maintenance and Protection of Traffic (MPT) as required and prepare as-built documentation

Duration of Contract 60 Months

HH-88A

RECONSTRUCTION OF UPPER AND LOWER PLAZA AND SOUTHBOUND APPROACH

$10M - $50M

Construction of a new mechanical space on the rooftop of the facility building relocation of utilities from the lower maintenance garage including a water

line HVAC boilers chillers pumps and electrical distribution equipment A new emergency generator needs to be installed Underground fuel tanks are to

be removed including associated environmental remediation Underground sewage holding tanks and oilwater separator will be replacedrehabilitated under

this contract Roofing of the facility building is to be replaced

Staged removal of HVAC equipment in the lower level maintenance garage removal of electrical distribution equipment fire sprinkler system and

heating units and underground fuel tanks

Construction of a new space in the rooftop of the facility building for housing the HVAC system Replace roofing of the facility building

Staged installation of new boilers chillers air handlers domestic HW heater fire protection and vent stacks in the facility building

Construction of a new electrical enclosure and emergency generator in the facility lot

Relocate city water main to facility building

Rehabreplace sewage holding tanks and oilwater separators in facility lot

Duration of Contract 18 Months

RK-23A

RECONSTRUCTION AND REHABILITATION OF MANHATTAN APPROACH RAMPS TO AND FROM 124TH 125TH ST

OVER $50M

This project includes staged replacement of the On and Off Ramps from 124th Street 125th Street concrete deck along with portions of the supporting

steel seismic upgrades substructure repairs

Remove existing concrete bridge deck and steel crossbeams and replace with new concrete bridge deck and steel stringers and existing steel

roadway edge barriers and replace with F-shaped concrete barriers at 125th Street On and Off-Ramps ndash Steel girder supported spans 1st Avenue to

Pier 58

Remove existing concrete cellular structures and replace with expanded polystyrene fill structure and existing concrete approach slab and replace with

new approach slab at 125th Street On and Off-Ramps ndash 2nd Avenue to 1st Avenue

Remove existing structure drainage system and install new drainage system

Install new seismic isolation bearings and sliding bearings Install new micro-pile supported concrete piers Install new steel bent cap Install new steel

girders

Miscellaneous electrical and utility relocation and reconstruction

Provide as-needed maintenance and protection of traffic

Duration of Contract 34 Months

Bridges and Tunnels

Brief Description of Work

JUL 2014

RK-76

MISC STRUCTURAL REPAIR AT RFK BRIDGE

$10M - $50M

This Project includes Miscellaneous steel and concrete repairs at various sections of RFK Bridge

Concrete repairs to piers cap beams pedestals stem walls and parapets

Steel repairs for Floor-beams Stringers Diaphragm and Truss Chords

Misc Drainage pipe Repairs

Provide as-needed maintenance and protection of traffic

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 14: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 520

Provide as-built drawings

Duration of Contract 18 Months

Long Island Rail Road

Brief Description of Work

APR 2014

E01848 [Sandy]

NY WESTERN RAIL YARDS FIRE ALARM SYSTEM [DESIGN-BUILD]

$500K - $1M

Design-Build for replacement of the Fire Alarm System at West Side Yard with a new Fire Alarm and Detection System Phase 1 includes 3 Maintenance

of Equipment buildings and 1 Facility Pump Building Contractor shall provide As-Built drawings training basic warranty and technical support for the new

system that will interface with support other data sources at LIRR and will have local monitoring

Remove and demolish existing Fire Alarm System and all devices components

Provide non-proprietary fire alarm system hardware and software

Provide visual alarm strobe lights and supervised wiring

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUN 2014

E01817 [Sandy]

DESIGN-BUILD FOR LONG BEACH BRANCH SIGNAL SYSTEM

$5M - $10M

Design-Build project for replacement of the bi-directional signal system along LIRRs Long Beach Branch with operation boundaries between Valley Tower

and Long Beach StationTerminal

Design Submittals for 90 Design Package and 100 Design Package

Manufacturer assembly and delivery of Central Instrument Location [CIL] houses huts and cases

Construction Submittals including CILs grade crossing huts master locations transmitters and battery

Detailed work plans for all work on Right of Way including delivery staging and installation of CILs and grade crossing huts

Conduct integrated factory testing of signal equipment including hardware and software

Conduct comprehnsive onsite testing to support signal system cutover

Duration of Contract 22 Months

L10001

ELLISON AVENUE BRIDGE REPLACEMENT

$10M - $50M

Design-Build for replacement of of the Ellison Avenue Roadway Bridge crossing the LIRR Main Line between Carle Place and Westbury Stations

Complete Final Design for Bridge Replacement

Demolition of existing Roadway Bridge

Construction of new Roadway Bridge including abutments side spans wing walls superstructure deck and assorted finishes including fencing

Duration of Contract 24 Months

Long Island Rail Road

Brief Description of Work

JUL 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 15: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 620

L09986

HICKSVILLE NORTH TRACK SIDING

$10M - $50M

Utility relocations retaining wall construction signal bridge removal and new signal bridge installation

Relocate existing utilities to new ductbanks to provide space for new retaining wall and tracks

Construct new retaining wall to support new North Track Siding extension

Remove existing signal bridge to construct retaining wall

Install new portal signal bridge to support new North Track Siding extension

Duration of Contract 8 Months

Metro-North Railroad

Brief Description of Work

MAR 2014

M08817

REHABILITATE - 2 ELEVATORS (SE12) - GRAND CENTRAL TERMINAL

$1M - $5M

This contract is for the rehabilitation and increased capacity of (2) Grand Central Terminal Elevator Cars SE1 and SE2 serving the lower level track 100

track 14 and the loading dock at Depew Place This work includes

Demolition and installation of new elevator cars with new piston hydraulic systems

Installation of new hydraulic and HVAC systems in elevator machine room

Installation of new elevator management systems with integration into existing building management system

Duration of Contract 24 Months

Metro-North Railroad

Brief Description of Work

JUN 2014

M08793

CONSTRUCTION - GCT TRAINSHEDSTRUCTURE

$10M - $50M

This contract will provide for the construction of the rehabilitation of portions of the upper and lower levels of the train shed in Grand Central Terminal The

rehabilitation will consist of repairs to deteriorated steel and concrete at various locations in the roof above the upper level tracks and at locations above the

lower level tracks Work will be required to be performed on week nights and over weekends to minimize disruption to the train service This work will

include

Repair of deteriorated reinforced concrete roof slabs including demolition placement of formwork and reinforcement casting of concrete and placement

of waterproofing

Repair of deteriorated structural steel components including deleading and removal of the existing elements and replacement with new steel plate and

angles to restore the integrity of the components All restored components will then be painted

Removal and replacement of a deteriorated reinforced concrete platform slab in the terminal

Removal and replacement of a deteriorated concrete roof slab over an electrical substation All work will be performed from scaffolding erected above

the substation components

Duration of Contract 27 Months

M09198

CONSTRUCTION OF CULVERT LOCATED AT MP JS5100 - SALISBURY MILLS

$1M - $5M

This contract is for the rehabilitation of the culvert located at MP JS5100 in Woodbury New York It consists of a 95 feet long arched concrete culvert with a

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 16: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 720

3 feet wide by 4 feet 10 inches high opening The unreinforced culvert is located under a single track and a service road It exhibits three major cracks

located along the culvert Cracks 1 and 2 which are minor are located 85 and 265 feet north of the centerline of the track respectively Crack 3 which is

located 42 feet north of the track centerline exhibit a 12 inches settlement of the remaining outlet This portion of the outlet is undermined This Work

includes

Mobilization and access road improvements

Removal of the undermined portion following excavation support of the service road located north of the track

Installation of a cast in place concrete outlet portion

Slope remediation

Pressure grout and crack repairs

Inlet protection

Duration of Contract 12 Months

M09403E01881

CONSTRUCTION 4 SUBSTATIONS

$10M - $50M

This contract calls for the construction of three (3) specific DC traction power substation on the Hudson Line The Hudson Line substations included in this

contract are A-13 (Riverdale) A-25 (Tarrytown) and A-33 (Harmon Yard) In addition the 4th substation designated as B-52 (Brewster) is located on the

Harlem line This Work includes

Fabrication will utilize a prefabricated (modular) structure(s)

New Substation construction to incorporate conservative safe elevations from flooding

Each substation will be rated 2 x 2000kw at 750 VDC output

New cables insulated and rated for 2kv service between each feeder breaker and third rail as between the negative bus and running rails

The incoming utility feeders are from either Con-Edison or NYSEG

AC switchgear A33 includes an additional (4) AC feeds for the Harmon Yard facilities

Duration of Contract 24 Months

MTA Bus

Brief Description of Work

MAR 2014

SF04-7408

DEPOT EQUIPMENT CHASSIS WASH - LAGUARDIA amp BAISLEY PARK DEPOTS

$1M - $5M

This project will consist of new depot equipment for maintenance and facilities operations a new chassis wash at both the LaGuardia Depot and the

Baisley Park Depot located in the borough of Queens

Duration of Contract 6 Months

SF07-7411

JFK APRON

$5M - $10M

This project is for facility renovation that will consist of replacing the deteriorated apron and select exterior bus parking at the JFK Depot located in the

borough of Queens

Duration of Contract 10 Months

MTA Bus

Brief Description of Work

APR 2014

SF01-7407

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 17: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 820

SECURITY IMPROVEMENTS FAR ROCKAWAY amp BAISLEY PARK

$5M - $10M

This project will consist of security improvement to protect critical MTA infastructures to ensure the secure continuation of MTA operations at the Far

Rockaway and Baisley Park depots located in the borough of Queens

Duration of Contract 15 Months

SF07-7314

FAR ROCKAWAY ROOF DECK REPLACEMENT

$1M - $5M

This project is for facility renovation that will consist of replacing the deteriorated roof deck of the main building at the Far Rockaway Depot located in the

borough of Queens

Duration of Contract 8 Months

New York City Transit

Brief Description of Work

MAR 2014

A36151

ACCESS IMPROVEMENTS AT GRAND CENTRAL STATION

$10M - $50M

This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan Work will include the installation

of an additional stair on the west side of the 42nd Street entrance platform improvements and improvements to fare control areas

Duration of Contract 36 Months

A36906A36908

STATION COMPONENT REPAIRS AT 5 LOCATIONS

$5M - $10M

This project will repair station components at 3 locations on the Lexington Avenue Line in the borough of Manhattan and 2 locations on the Queens

Boulevard Line in the borough of Manhattan Work will include the repair of columns and column bases repair of drip pans repair of underpass walls and

ceilings and platform edge repairs with new ADA warning strips The locations are

59 Street LEX

51 Street LEX

Astor Place LEX

5th Avenue QBL

7th Avenue QBL

Duration of Contract 13 Months

C33840

STRUCTURE OVERCOATING BROADWAY JUNCTION - NEW LOTS AVENUE

$10M - $50M

This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the

borough of Brooklyn This project also includes steel repairs Work will include

Surface preparation and structural steel painting

Removal of all loose lead based paint dirt grease and grime from the elevated structure

Use of SSPC containment system to capture all lead paint and debris

Limited repairs of steel member and columns

Duration of Contract 26 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 18: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 920

C34915

LINE STRUCTURE OVERCOATING ABUTMENT TO KINGS HWY

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Abutment to Kings Highway on the Culver Line in the borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

C34916

LINE STRUCTURE OVERCOATING KINGS HWY TO WEST 8 ST

$10M - $50M

This project is for the overcoat painting of the elevated street structure from Kings Highway to West 8th Street Culver Line in the Borough of Brooklyn The

work for this project will include

Surface preparation and structural steel painting

Removal of all loose lead based paint (to refusal dirt grease and grime) from elevated steel structure

Application of three (3) coats of alkyd paint to all steel surfaces

All lead paint chips and debris are to be captured using SSPC containment system and will be disposed of as hazardous waste

Repair of selected structural steel components

Duration of Contract 24 Months

P36444(SANDY)

SANDY REPAIRS RESTORATION OF CRANBERRY AND RUTGERS TUBE

OVER $50M

This project is for the restoration of the Rutgers Tube and the Cranberry Tube These tubes experienced extensive damage due to salt water intrusion during

Super storm Sandy Work will include

Replacement of communication and power cables within both tubes

Replacement of tunnel lighting and signals within both tubes

Restoration of 2 pump rooms within the Rutgers Tube

Restoration of 2 pump rooms within the Cranberry Tube

Restoration of CBH 596 in the Rutgers Tube

Restoration of CBH 502 in the Cranberry tube

Restoration of 3 fan plants

Restoration of substation equipment

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

S32765

INTERLOCKING MODERNIZATION WEST 4TH ST

OVER $50M

This project will modernize and improve the reliability of the West 4th Street Interlocking located on the 6 Avenue Line in the borough of Manhattan Work

will include replacement with a new Solid State (SSI) interlocking and the construction of new relay rooms to house all associated equipment This project

is necessary for the future implementation of Communications Based Train Control (CBTC) Work will include

Construction of new signal relay room Reporting facility Fire Suppression HVAC Rooms

Replacement of all interlocking wayside signal equipment such as but not limited to stops signs switches and signal heads

Installation of a new messenger system and new cables as required for vital traffic circuits

All signal power and signal power distribution necessary for the installation

Provisions for LED Starting Lights and Holding Lights

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 19: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1020

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

APR 2014

A36891

STATION COMPONENT REPAIRS 2 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at two stations on the 4th Avenue Line in the borough of Brooklyn The tasks include

At 9th Street Station Platform column and beam repairs at selected locations Trackwall structural crack repairs Trackwall tile replacement in areas

impacted by structural crack repairs At 59th Street Station Platform edge replacement Platform tactile warning strip installation Platform slab crack

repair Platform modification to create an ADA-compliant boarding zone Platform beam repair at selected locations Mezzanine partial floor slab

replacement Mezzanine floor inlet drain line replacement

Duration of Contract 12 Months

A36909

COMPONENT REPAIRS AT 5 STATIONS - CANARSIE

$10M - $50M

This project is for station component repairs at 5 Stations on the Canarsie Line in the borough of Brooklyn The work for this project include the repair of

sidewalk roof structures facades platforms and structural steel This project is located at

Graham Ave

Wilson Avenue

Atlantic Avenue

Grand Street

Montrose Ave

Duration of Contract 24 Months

A37547

STRUCTURAL STEEL REPAIR 9TH AVENUE STATION

$5M - $10M

This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line in the borough of Brooklyn which also connects to NYCTs

38th St Yard Work will include

Repairreplacement of corroded structural steel (columns and beams) concrete and west Portal

Surface preparation and structural steel painting

Duration of Contract 18 Months

A37593(SANDY)

SANDY REPAIRS SOUTH FERRY

OVER $50M

This project is for the restoration of South Ferry Station Complex located in the borough of Manhattan South Ferry Station Complex was extensively

damaged due to salt water intrusion during Super storm Sandy

Replacement of tunnel lighting

Replacement fo damaged mainline track switches

Restoration of South Ferry Fan Plant

Restoration of South Ferry Pump Room

Restoration of South Ferry Interlocking

Restoration of employee facilities

Installation of new electrical and mechanical systems

Water leak mitigation

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 20: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1120

Restoration of station HVAC system

Restoration of signal relays

Duration of Contract 24 Months

A46010

STATION RENEWAL AND COMPONENT REPAIRS 9 STATIONS

OVER $50M

This project will perform station renewal at 7 stations and repair of station components at 2 stations on the Culver Line in the borough of Brooklyn Work will

include the repair of structural deficiencies throughout the station and improvements to architectural treatments The locations for this project are

Avenue X Station

Avenue U Station

Avenue P Station

Bay Parkway Station

Avenue I Station

18 Avenue Station

Ditmas Avenue Station

Kings Highway Station

Avenue N Station

Duration of Contract 40 Months

C33848

PERIMETER HARDENING RCC amp 130 LIVINGSTON

$5M - $10M

This project will enhance the security of NYC Transits Rail Control Center (RCC) in the borough of Manhattan and 130 Livingston Plaza in the borough of

Brooklyn Work for this project includes

Installation of planters bollards

Installation of bollards both fixed and retractable as appropriate

Installation of Delta Barriers

Site exploration and any necessary modifications

Installation of any necessary lighting CCTV alarms or other equipment necessary for the control and monitoring of the retractable bollards and Delta

Barriers

Duration of Contract 12 Months

C43046

HYDROGEN GAS VENTILATION 19 COMMUNICATION ROOMS

$5M - $10M

This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn Queens Manhattan and the Bronx to meet NYS Uniform

Fire Prevention and Building Codes prescriptive requirement for hydrogen gas concentration thresholds The following are the locations 1 MR 35 59th

Street 2 MR 120 Bedford Ave 3 MR 259 Union Tpk 4 MR 390 149th Street Grand Concourse 5 MR 322 14th St 7th Avenue 6 MR 406 14th St Lexington

7 MR 102 Essex Street 8 MR 469 Grand Central 9 MR 11 Times Square 10 MR 98 Flushing Ave 11 MR 174C Jay Street 12 MR237 Carroll Street 13

MR 345 Utica Avenue 14 MR 408 Bleecker Street 15 MR 461 Queens Borough Plaza 16 MR 159 81 Street 17 MR 105 Chambers Street 18 MR 148

168 Street 19 MR 161 59 Street Columbus Circle

Duration of Contract 17 Months

C43749

REPAIR LIVINGSTON PLAZA FACcedilADE REPLACE ROOF UPGRADE amp MAINTAIN ELEVATORS INSTALL SECURITY BOLLARDS REMOVE amp

REPLACE WWII MEMORIAL

$10M - $50M

This project will upgrade amp maintain elevators repair the exterior facade install security bollards replace the Jay Street WW II Memorial and re-roof NYC

Transits Livingston Plaza facility in Brooklyn Work will include

Obtain accurate field information data measurements Verify in-situ conditions circuitry and terminations replace elevator controllers motors hoist

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 21: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1220

ropes traveler cables cab door operator assemblies and install new rope grippers while maintaining the remaining elevators

Coordinate with the existing pedestrian shed installer design and secure approval of all temporary work platforms

Rake repoint all exterior block joints remove lintel block re-flash and re-seal all window openings replace damaged block

Remove replace sidewalk sections and install foundations amp bollards

Remove the WWII Memorial from the Jay Street building and re-install in the Livingston Plaza Lobby and

Replace the existing multi-level roofing system while maintaining waterproof integrity

Duration of Contract 31 Months

E31114

REPLACE PROGRAMMABLE LOGIC CONTROLS AT 22 LOCATIONS

$10M - $50M

This project will replace the obsolete Programmable Logic Controller (PLC) components of the fan control system with new PLCs at 22 vent plant locations

Work will include

Secure A amp P to obtain accurate field information for the production of all hardware [racks wiring harnesses etc]

Verify in-situ conditions and circuitry terminations

Upon receipt of all components De-Commission facility [only 3 at a time]

Remove amp replace all internal wiring from the field termination boards to the PLC

Replacement of PLC control equipment and Human-Machine Interface [HMI] hardware wiring software and programming of Rail Control Center lsquohead-

inrsquo equipment

Re-direct remote control to the RCC via an existing Fiber Optic network at 15 of the 22 locations

Assist NYCT CPM in verifying the new wiring and de-bugging the programs if warranted

Test to verify PLC performance remote operation and indication

Re-Commission facility

Duration of Contract 40 Months

E40805

REHABILITATE PUMP ROOMS 4 LOCATIONS

$5M - $10M

This project will rehabilitate pump rooms at four locations systemwide Pumps at each location perform the essential service of removing water from the

system and they are past their useful lives Along with replacement of all obsolete equipment this project will include replacement of discharge lines new

power feeds and improvement of the automatic alarm system that alerts the Hydraulics Control Center of any problems that develop as well as

modifications to the physical enclosures to help protect the investment Locations for this project include

Walton Ave Bronx

Brook Avenue Bronx

146th Street Manhattan

148th Street Manhattan

Duration of Contract 27 Months

T80276(SANDY)

SANDY REPAIRS ST GEORGE INTERLOCKING

OVER $50M

Severe storm damage left the Staten Island Railroad system inoperable at St George Terminal Flooding in the interlocking irreparably damaged vital signal

systems Switches Power cables and all other cables and wiring were submerged in flood water This project is the flood repairs for St George yard and

interlocking Work for this project is expected to include track and switch replacement replacement of third rails provision of rail lubrication system signal

modernization and drainage improvements The work proposed under this project is as follows approximately East Portal of the Tunnel to the west end of

the station platforms on Track 1 through 12 and Tracks 10A 11 and 12 through the Ballpark station and track NS2 (Substation) The project consists of

replacing all the tracks ties contact rail and switches within the limits of the project The VA dwarf signals will be refurbished and the lighting will be

rehabilitated

Duration of Contract 24 Months

W32366

REPLACE BUS RADIO SYSTEM

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 22: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1320

OVER $50M

The objective this project is to replace old outdated analog radio equipment including base stations mobile and portable radios with a new digital radio

system The project will improve two way communications with buses support vehicles in the field and critical to day-to-day bus operations

bullFurnish and install a new radio base station network that can support both voice and data transmission for all NYC Transit bus operations The new

system shall be scalable with the capacity to accommodate up to 12000 radio devices and ensure adequate radio frequency coverage in NYC

bullRetrofit all NYC Transit buses revenue and non-revenue vehicles with new digital radios all associated hardware and software and provide

portablehandheld radios to dispatchers

Duration of Contract 50 Months

New York City Transit

Brief Description of Work

MAY 2014

C43753

CONSTRUCT BUS COMMAND CENTER

$10M - $50M

This project will construct a modernized Bus Command Center that will serve MTA buses and NYCT DOB buses The new command center will be built

across from the East New York Bus Depot in the vicinity of Fanchon Place and Jamaica Avenue The command center shall include bus dispatch consoles

radios telephones and equipment hardware and software necessary for a fully functional bus command operating center It shall also include the

modernized operating theater with video walls acoustic speakers modernized computer monitors and displays

Duration of Contract 24 Months

New York City Transit

Brief Description of Work

JUN 2014

A36905

STATION COMPONENT REPAIRS 3 STATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at three stations on the Fulton Street Line in the borough of Brooklyn The tasks

include Platform repairs at Kingston-Throop Avenue Ralph Avenue and Liberty Avenue Stations At Kingston- Throop Avenue and Ralph Avenue Stations

Platform edge rubbing board replacement Platform tactile warning strip installation Platform slab crack repair and associated concrete topping slab

replacement Platform modification to create an ADA-compliant boarding zone Replacement of water pipe insulation on hanging pipe beneath platform

edge At Liberty Avenue Station Platform slab crack repair and associated concrete topping slab replacement

Duration of Contract 12 Months

A36921

STATION COMPONENT REPAIRS 4 LOCATIONS

$5M - $10M

This project is for component repairs to eliminate deficient conditions at four stations on the Brooklyn-Queens Crosstown Line in the borough of Brooklyn

Locations for this project include Broadway Station Myrtle - Willoughby Avenue Station Clinton - Washington Avenue Station and 21st Street ndash Van Alst

Avenue Station Platform repairs include Platform edge replacement Platform tactile warning strip installation Platform slab crack repair Platform

modification to create an ADA-compliant boarding zone At 21st Street ndash Van Alst Avenue Station Trackwall tile replacement at the southbound platform

Trackwall tile repair at selected locations at the southbound platform At Broadway Station and Myrtle - Willoughby Avenue Station Station Painting

Duration of Contract 12 Months

B40660

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 23: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1420

PURCHASE 256 ARTICULATED BUSES

OVER $50M

This project will purchase 256 60-FT low floor articulated buses which provide service on identified high capacity bus routes These buses shall be designed

to operate in Authority revenue service for a minimum of 12 years or 500000 miles These buses will meet Enviornmental Protection Administration (EPA)

emission standards as well as Americans with Disabilities Act (ADA) Standards

Duration of Contract 22 Months

P36415

REHABILITATION OF CIRCUIT BREAKER HOUSE PEARL STREET

$5M - $10M

This project will rehabilitate Circuit Breaker House (CBH) 275 on the IRT Clark Street Line in the Borough of Manhattan Work will include the removal of

existing breakers and install new equalizer breakers telephone lighting and cable from the Pearl Street Substation to the tracks and from CBH 275 to the

tracks Restore remote control to the CBH

Duration of Contract 20 Months

P36446(SANDY)

SANDY REPAIRS RESTORATION OF CLARK STREET TUBE

$10M - $50M

This project is for the restoration of the Clark Street Tube The Clark Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of 4 circuit breaker houses (229 278 301 284)

Restoration of mainline track

Replacement of substation equipment

Duration of Contract 24 Months

SF07-7346

SLIDING GATE REPLACEMENT AT JACKIE GLEASON BUS DEPOT

$1M - $5M

This project will replace the existing defective concrete slabs and sliding gates as well as adjacent chain link fences at the entrance of the Jackie Gleason

Depot in the borough of Brooklyn The work includes but is not limited to civil electrical and mechanical work It will provide all labor materials tools and

equipment necessary for installing testing and putting into operation the sliding gates

Duration of Contract 8 Months

W32372

PASSENGER STATION LAN AT 20 STATIONS

$10M - $50M

Passenger Station LAN is a fiber-based network infrastructure deployed in a ring configuration (originating from the main Comm Room passing around the

station areas and back to the Comm Room) with strategically-placed access nodes throughout (enclosures housing Ethernet switches for future IP

connectivity) used specifically for local transport of all current and near future applications This project will install Passenger Station LAN at 20 stations

throughout the system The network will provide a communications infrastructure to support the following applications

New Fare Payment System

Help Point Intercom (HP0

Next Train Arrival Information

Station Advisory Information Displays (SAID)

Passenger Identification CCTV (PID)

Wireless Access for Wayside to Train Data Communications Transit Employee Mobile Applications and Passenger mobile device access

Duration of Contract 17 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 24: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1520

New York City Transit

Brief Description of Work

JUL 2014

A36890

STATION COMPONENT REPAIRS 49TH STREET

$5M - $10M

This project will eliminate deficient conditions at 49th Street Station on the Broadway Line in the borough of Manhattan Work will include

Repair of street stairs

Repair of platform edge

Repair of stair ceiling concrete and steel beams

Duration of Contract 18 Months

C34914

SHOP REPAIRS AND UPGRADE

$10M - $50M

This project will replace and repair high-priority deficient components at the Pitkin Shop in the borough of Brooklyn and the Concourse Shop in the borough

of the Bronx in order to bring the listed facilities to a State of Good Repair and to provide the existing facilities with adequate service needed to maintain and

prolong the useful life of the subway fleet Work will include At Pitkin Maintenance Shop Partial replacement of roofing systems at Pitkin Maintenance

Shop and new roofing system at Pitkin Oil House Install new overhead crane Replace 2 DC Power Stinger Systems with new ones At Concourse

Maintenance Facility Replace 3 DC Power Stinger System with new ones Install new duct work within the yard and positive and negative cables

Duration of Contract 18 Months

D37467

PBX UPGRADE PHASE 1

$10M - $50M

This project will replace and upgrade obsolete or incompatible sub-systems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for

voice and data communications routing Locations include

333 W 53 Street Manhattan

East New York Depot Brooklyn

Coney Island Yard Brooklyn

Roosevelt Avenue Station Queens

East 180 Street Shop Bronx

Livingstong Plaza Brooklyn

207 Street Yard Manhattan

Duration of Contract 33 Months

P80275

NEW POWER SUBSTATION PRINCES BAY

$10M - $50M

This project will install a new power substation at Princes Bay in the borough of Staten Island Work will include furnishing and installing the high tension

switchgear power transformer rectifier DC feeder breakers positive and negative cables ventilation system etc

Duration of Contract 28 Months

ST12-0139

INTEGRATED SERVICE INFORMATION amp MANAGEMENT B DIVISION MODULE 1

$10M - $50M

This project will provide consistent and timely information about the current state of B Division service to staff and customers moving the organization

toward centralized monitoring and control The successful delivery of integrated service information and management will lead to improved service safety

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 25: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1620

and security This project will provide coverage for all stations within the entire B Division The design furnish and testing of signal data acquisition

equipment at the first 8 Tower and Communication rooms has started This includes collecting the data in the field and routing it to the Rail Control Center

Duration of Contract 26 Months

W32697

INSTALL PUBLIC ADDRESS AND CUSTOMER INFORMATION SCREENS AT 87 LOCATIONS

$10M - $50M

This project will install PACIS cabinet at 87 stations systemwide These are among the only remaining stations without any form of PACIS system The

system to be Installed under the project will feature audio and text messaging capabilities and will be connected to the NYCT communication network

Duration of Contract 33 Months

New York City Transit

Brief Description of Work

AUG 2014

A36090

STATION RENEWALS OF 9 STATIONS

OVER $50M

This project will repair 9 stations on the Sea Beach Line in the borough of Brooklyn All station elements will be repaired during this project The 9 stations

are 20th Avenue 8th Avenue Fort Hamilton Parkway 18th Avenue Kings Highway New Utrecht Avenue Bay Parkway Avenue U and 86th Street Work

will include

Repair of street-level control houses

Repair of tunnel structures supporting the control houses

Replacement of passageway enclosures

Replacement of platform metal stairs and canopies

Repair of platform

Additionally station aesthetics will be remedied and artwork will be installed

Duration of Contract 46 Months

A36916

STATION COMPONENTS EASTCHESTER - DYRE AVENUE

$5M - $10M

This project is for component repairs to eliminate deficient conditions at the Dyre Avenue Station on the Dyre Avenue Line in the borough of the Bronx

Work will include

Provide new platform piles and platform

Repair control house roof

Provide new thruspan at tracks over control house

Minor electrical work that is affected by component repairs

Repair track girders

Provide new canopy roofing

Duration of Contract 48 Months

C33076

EMERGENCY GENERATOR REPLACEMENT AT CASEY STENGEL DEPOT

$1M - $5M

This project is for the replacement of an emergency generator at the Casey Stengel Depot in the borough of Queens Work for this project includes civil

mechanical and electrical work to replace the existing emergency generator with automatic transfer switch (ATS) The scope of this project includes

Replacement of generator Installation of new panels transformer and ATS Upgrade of the emergency loads (ie increase loads to emergency generator)

Duration of Contract 18 Months

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 26: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1720

C34829

RTO FACILITIES HARDENING PH 2

$10M - $50M

This project will install equipment that will enhance security and access control at 17 NYC RTO facilities throughout the system as part of the agencys

security initiatives Work will involves

Installation of CCTVs and video recording equipment

A new fiber optics network to connect the employee facility with the communication room as required

New door hardware and swipe card system

Electrical circuits to support communication work

Duration of Contract 24 Months

C34913

CAR WASHER REPAIRS AT 3 YARDS

$10M - $50M

This project will replace existing car washer components and perform first priority repairs at 239th Street Yard Concourse Yard and Pelham Yard in the

borough of the Bronx This work is required to bring the listed facilities to a State of Good Repairs and to provide the existing facilities with adequate service

needed to maintain and prolong the useful life of the subway fleet

Removal and disposal of the selected existing car washer components including piping brushes motors and pumps

Upgrade to the structures and utilities

Miscellaneous architectural repairreplacement work at car washers and control rooms

Additional structural supports

Duration of Contract 19 Months

E31380

THREE BUS WASHERS AT M J QILL BUS DEPOT

$5M - $10M

This project consists of providing one new bus washer and upgrading 2 existing bus washers in the wash area of the Michael J Quill Bus Depot in the

borough of Manhattan Work includes

Install one new bus washer and integrate the new bus washing system with the existing water reclamation and drainage systems

Provide associated electrical power lines new breakers and disconnect switches and controls to operate new equipment

Rerouting existing fire alarm system and electrical conduits that interfere with new work

Provide insulation and heat tracing for the outdoor piping in the vicinity of the detergent fill box

Replace worn out components at the two existing bus washers and install two new splash panels and resurface the bus washer floor

Duration of Contract 16 Months

New York City Transit

Brief Description of Work

SEP 2014

A36150

ADA AT 57 STREET PHASE 2

$10M - $50M

This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in

the borough of Manhattan The station has been identified as an ADA Key Station Work will include

Construction of two ADA-compliant elevators

Construction of a new extension to the station mezzanine with a new structure under 7th Avenue

Construction of new ADA-compliant facilities

Construction of two mezzanine to platform stairs

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 27: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1820

Relocation of utility and transit duct banks

Duration of Contract 38 Months

A36865

STATION COMPONENT REPAIRS AT 4 STATIONS

$10M - $50M

This project will repair station components at 4 stations on the Jamaica Line in the boroughs of Brooklyn and Queens The stations to be addressed are 121

Street 111 Street 104 Street and Myrtle Avenue Stations Work for this project will include

Replacement of platform slabs

Replacement of all platform stairs

Repairs of platform girders and wind screens

Replacement of platform lights beyond canopy

Painting and 18 Feet of canopy extension at platform stairs

Duration of Contract 25 Months

A36871

STATION COMPONENT REPAIRS AT TWO STATIONS

$5M - $10M

This project will repair station components at the Beverly Road Station and Newkirk Avenue Station on the Nostrand Line in the borough of Brooklyn Work

will include repair and replacement of the platform edge

Duration of Contract 18 Months

A36884

STATION COMPONENT REPAIRS 103 STREET

$5M - $10M

This project will repair station components at the 103 Street Station on the Lexington Line in the borough of Manhattan Work will include

Repair of street and platform stairs

Installation of new concrete platform finishes platform edges

Repair of ventilator structure ceiling and walls

Repair of mezzanine ceioling walls floors

Painting of the entire station

Duration of Contract 24 Months

C34912

CAR WASHER REPAIRS AT CONEY ISLAND YARD

$1M - $5M

This project will bring the car washer at Coney Island Yard in the borough of Brooklyn to a State of Good Repair by doing proper component replacement

Work will include

Component replacement of existing car washer including associated electrical IampC and enviornmental work

Replacement of lower roof system

Replacement of existing water storage tank with four new 1250 gallon tanks

Installation of new compressed air system

Replacement of existing ejector pumps with new portable hoist equipment

Duration of Contract 14 Months

E34022

7 HYDRAULIC ELEVATOR

$10M - $50M

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 28: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 1920

This project will replace seven hydraulic elevators systemwide in order to achieve more reliable and efficient operations Locations include three at Brooklyn

Bridge Station two at 125 St and two at 51 St Station All are located on the IRT Lexington Avenue Line in the borough of Manhattan Work will include the

replacement of elevator cabs and equipment within the elevator cabs shaftways pits and machinery rooms Shaftways pits and machinery rooms are to

remain but will be modified as required for new equipment All elevators are to meet ADAAG requirements

Duration of Contract 24 Months

P36447(SANDY)

SANDY REPAIRS RESTORATION OF 53RD ST TUBE

OVER $50M

This project is for the restoration of the 53rd Street Tube The 53rd Street Tube experienced extensive damage due to salt water intrusion during Super

storm Sandy Work will include

Replacement of communication and power cables within the tube

Replacement of signals and signal equipment

Restoration of Circuit Breaker House 565

Electrical and lighting work

Installation of Emergency Alarm systems

Duration of Contract 24 Months

Capital Construction

Brief Description of Work

MAR 2014

CM014B

GCT CONCOURSE AND FACILITIES FIT-OUT

Over $100M

The work under this contract covers the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility Work elements includes

foundations underground utilities CMU walls structural steel framing mechanical electrical plumbing fire protection and architectural finishes This

contract also provides for the construction for the fit-out of 44th Street and 50th St Ventilation Facilities The scope of work includes but is not limited to

Construction of the new LIRR GCT Concourse

Intermodal Connections and Interfaces with MNRrsquos GCT including dining concourse 45th street cross passageway and the 47th St cross

passageway

44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out

Installation of elevators and escalators using the designated Contract VM014 Contractor

Perform the local station testing of GCT concourse and caverns

Duration of Contract 48 Months

CS084

SYSTEMS PACKAGE 2 TRACTION POWER SYSTEMS

$50M - $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project The work shall include but is not limited to the

following

Fabricate install test and commission all traction power substations and wayside equipmnet for the East Side Access Project

Plan and execute inegrated system tests to ensure proper integration of elements in this contract package with related elements installed under other

contract packages

Provide on-site and office support for owner-directed system verification tests Railroad-directed pre-revenue tests and other system activation activities

Duration of Contract 46 Months

Capital Construction

Brief Description of Work

APR 2014

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months

Page 29: , which assembles - MTAweb.mta.info/mta/capital/pdf/eotf_0314_0914.pdf · 2014. 3. 5. · MTA Long Island Rail Road 90-27 Sutphin Boulevard (0335) Jamaica, New York 11435 Telephone:

352014 MTA - Eye on the Future

httpwp1mtahqorgmtacapitaleotf-descriphtm 2020

C-52123-1

ARCHITECTURAL ELECTRICAL AND FIRE PROTECTION UPGRADES FOR THE 34TH ST PENN STATION COMPLEX

$1M - $5M

This Contract is for architectural electrical and fire protection upgrades for the 34th Street Penn Station Complex The work shall include but is not limited

to providing all labor material and equipment deemed necessary and incidental to perform the following

Installation of photoluminescence strips at various stairs walls and columns

Installation of downstands at various stairways and exit gates

Installation of photoluminescence signage

Installation of detectable warning strips integrated with photoluminescence as various platforms

Install new exit gates and integrate them into the existing electromagnetic gate system

Duration of Contract 20 Months

CH057

HAROLD STRUCTURES PART 3 48TH ST BRIDGE D APPROACH PHASE I AND EASTBOUND RE-ROUTE APPROACH

$50M - $100M

This Contract is for earth and site work utility relocations track realignment drainage hazardous material abatement demolition of existing structures and

construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens The work ncludes but is not limited to providing all labor

material and equipment deemed necessary and incidental to perform the following

Construction of the new Mainline 48th Street Bridge

Construction of the Tunnel D Pit and Approach Structure

Construction of the loop box structure extension

Installation of Retaining Walls

Construct Catenary Structures

Installation of monitoring devices for existing structures and ground conditions

Duration of Contract 24 Months