· pdf file · 2007-07-02** warning ** warning ** warning ** warning ** this...

229
** WARNING ** WARNING ** WARNING ** WARNING ** This document is intended for informational purposes only. Users are cautioned that California Department of Transportation (Department) does not assume any liability or responsibility based on these electronic files or for any defective or incomplete copying, exerpting, scanning, faxing or downloading of the contract documents. As always, for the official paper versions of the bidders packages and non-bidder packages, including addenda write to the California Department of Transportation, Plans and Bid Documents, Room 0200, P.O. Box 942874, Sacramento, CA 94272-0001, telephone (916) 654-4490 or fax (916) 654-7028. Office hours are 7:30 a.m. to 4:15 p.m. When ordering bidder or non-bidder packages it is important that you include a telephone number and fax number, P.O. Box and street address so that you can receive addenda.

Upload: buituyen

Post on 14-Mar-2018

269 views

Category:

Documents


2 download

TRANSCRIPT

  • ** WARNING ** WARNING ** WARNING ** WARNING ** This document is intended for informational purposes only.

    Users are cautioned that California Department of Transportation (Department) does not assume any liability or

    responsibility based on these electronic files or for any defective or incomplete copying, exerpting, scanning, faxing or downloading of the contract documents. As always, for the official paper versions of the bidders packages and non-bidder packages, including addenda write to the California Department of Transportation, Plans and Bid Documents, Room 0200, P.O. Box 942874, Sacramento, CA 94272-0001, telephone (916) 654-4490 or fax (916) 654-7028. Office hours are 7:30 a.m. to 4:15 p.m. When ordering bidder or non-bidder packages it is important that you include a telephone number and fax number, P.O. Box and street address so that you can receive addenda.

  • etric

    Caltrans

    STATE OF CALIFORNIA

    DEPARTMENT OF TRANSPORTATION __________________________________________________________

    NOTICE TO CONTRACTORS AND

    SPECIAL PROVISIONS FOR CONSTRUCTION ON STATE HIGHWAY IN

    IMPERIAL COUNTY AT ANDRADE

    FROM MEXICO BORDER TO 0.6 KM NORTH OF MEXICO BORDER

    DISTRICT 11, ROUTE 186

    __________________________________________________________

    For Use in Connection with Standard Specifications Dated JULY 1999, Standard Plans Dated JULY 2004 and Labor Surcharge and Equipment Rental Rates.

    __________________________________________________________

    CONTRACT NO. 11-267504

    11-Imp-186-0.0/0.6

    Federal Aid Project

    HPD-P186(003)E

    Bids Open: August 2, 2007 Dated: July 2, 2007

  • *************************************************************************************************

    IMPORTANT SPECIAL NOTICES

    *************************************************************************************************

    Attention is directed to Section 3, "Award and Execution of Contract," of these special provisions regarding submittal of the documents identified in Section 3-1.025, "Insurance Policies," of the Standard Specifications.

  • Contract No. 11-267504 i

    TABLE OF CONTENTS

    NOTICE TO CONTRACTORS ...........................................................................................................................................1 COPY OF ENGINEER'S ESTIMATE .................................................................................................................................4 SPECIAL PROVISIONS......................................................................................................................................................6 SECTION 1. SPECIFICATIONS AND PLANS.................................................................................................................6 AMENDMENTS TO JULY 1999 STANDARD SPECIFICATIONS .................................................................................6 SECTION 2. PROPOSAL REQUIREMENTS AND CONDITIONS.............................................................................106

    2-1.01 GENERAL ....................................................................................................................................................106 2-1.015 FEDERAL LOBBYING RESTRICTIONS ................................................................................................107 2-1.02 DISADVANTAGED BUSINESS ENTERPRISE (DBE).............................................................................107 2-1.03 TRIBAL EMPLOYMENT RIGHTS ORDINANCE (TERO) ......................................................................108

    SECTION 3. AWARD AND EXECUTION OF CONTRACT.......................................................................................109 SECTION 4. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES ......................109 SECTION 5. GENERAL.................................................................................................................................................109 SECTION 5-1. MISCELLANEOUS...............................................................................................................................109

    5-1.01 PLANS AND WORKING DRAWINGS......................................................................................................109 5-1.013 LINES AND GRADES ...............................................................................................................................109 5-1.017 CONTRACT BONDS.................................................................................................................................110 5-1.018 GUARANTEE ............................................................................................................................................110 5-1.019 COST REDUCTION INCENTIVE.............................................................................................................111 5-1.02 LABOR NONDISCRIMINATION...............................................................................................................111 5-1.022 EXCLUSION OF RETENTION.................................................................................................................111 5-1.023 UNSATISFACTORY PROGRESS ............................................................................................................111 5-1.03 INTEREST ON PAYMENTS.......................................................................................................................111 5-1.04 PUBLIC SAFETY.........................................................................................................................................112 5-1.05 TESTING ......................................................................................................................................................113 5-1.06 REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCES...........................................................113 5-1.065 SOLID WASTE DISPOSAL AND RECYCLING REPORT.....................................................................113 5-1.07 (BLANK) ......................................................................................................................................................114 5-1.075 BUY AMERICA REQUIREMENTS .........................................................................................................114 5-1.08 SUBCONTRACTOR AND DBE RECORDS ..............................................................................................114 5-1.083 DBE CERTIFICATION STATUS..............................................................................................................114 5-1.086 PERFORMANCE OF SUBCONTRACTORS............................................................................................114 5-1.09 SUBCONTRACTING...................................................................................................................................115 5-1.10 PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS..................................................................115 5-1.103 RECORDS ..................................................................................................................................................115 5-1.104 INTERNET DAILY EXTRA WORK REPORT ........................................................................................115 5-1.105 ARCHAEOLOGICAL DISCOVERIES .....................................................................................................116 5-1.11 COMPENSATION ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS .........................................117 5-1.12 AREAS FOR CONTRACTOR'S USE..........................................................................................................118 5-1.13 PAYMENTS .................................................................................................................................................118 5-1.14 PROJECT INFORMATION .........................................................................................................................118 5-1.15 RELATIONS WITH CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD...................118

    WITHHOLDS ....................................................................................................................................................119 5-1.16 ENVIRONMENTALLY SENSITIVE AREA ..............................................................................................119 5-1.17 PRESERVATION OF PROPERTY..............................................................................................................119

    SECTION 6. (BLANK) ...................................................................................................................................................120 SECTION 7. (BLANK) ...................................................................................................................................................120 SECTION 8. MATERIALS.............................................................................................................................................120 SECTION 8-1. MISCELLANEOUS...............................................................................................................................120

    8-1.01 SUBSTITUTION OF NON-METRIC MATERIALS AND PRODUCTS ...................................................120 8-1.02 PREQUALIFIED AND TESTED SIGNING AND DELINEATION MATERIALS...................................127 8-1.03 STATE-FURNISHED MATERIALS ...........................................................................................................132 8-1.04 SLAG AGGREGATE ............................................................................................