siemens nederland n.v. 2001 get a bit more. siemens. 1 datum mbo telecom/ict veldmetingen in mobiele...

26
Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Upload: godelieve-smeets

Post on 08-Jun-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

Get a bit more. Siemens.

1 datum

MBO Telecom/ICT

Veldmetingen in

Mobiele Netwerken

Page 2: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

2 datum

Agenda

• Introductie

• Model Tuning

* Waarom is dit noodzakelijk ?* Equipment* Uitvoering

• Performance metingen

Page 3: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

3 datum

Model Tuning

RadioplanDef

Network Performance

InstallationCommisioning

NI/AccTesting

Nominal Cell Plan

PreOptimalisatie

Definieren zoekgebieden

ZoekgebiedenVastgelegd

In werking stellen

Integratie en acceptatie testen

Prestatie analyse

Optimalisatie

Page 4: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

4 datum

Model Tuning

* Waarom is dit noodzakelijk ?

* Requirements

* Equipment

* Uitvoering

Page 5: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

5 datum

Waarom model tuning ?

• Gebruikte model is een bepalend voor netwerk design.

1Db kan leiden tot 10% > # BTS

Page 6: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

6 datum

Requirements

• Requirements

* Test BTS* Voldoende hoogte

• Omgeving met homogene clutter types

• Stroomvoorziening• Ruimte voor antenne montage

Page 7: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

7 datum

Zenden van Radio signalen

• Afhankelijk van plaatselijke gemeente(=Beleid)

* signaal modulatie* power restricties* minimale hoogte* tijdsduur

• Toegang op site

Page 8: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

8 datum

Bruikbare spectrum voor meting

• Voor start meting weten of er stoorbronnen aanwezig zijn(=Interferentie!)

• Handelingen:

* apparatuur instellen* gebruik maken van een “guard” channel* Dekkings meting uitvoeren

Page 9: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

9 datum

Transmitter Systeem

* Signaal generator

* Power amplifier

* Power meter

* Antenne buis

* Antenne

* Kabels

Page 10: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

10 datum

Transmitter configuratie

• Signal generator (Rohde&Schwarz SME03E)

* CW signaal

* Frequency modulated (FM)

Page 11: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

11 datum

Transmitter configuratie (II)

• Signaal

* Om versreiding van het signaal en voor verbreden van het spectrum wordt frequency modulatie gebruikt.

– shift: 2kHz– deviation: 1kHz

fT

2kHz 1kHz

B = 6kHz

Page 12: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

12 datum

Transmitter configuratie

* Rohde & Schwarz

* Regelt de output power

* Power kan aangepast worden met signaal generator

* Aanbevolen output power 50W 47dBm

Poutput

Pinput

50W

Page 13: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

13 datum

Antenne configuratie

• Antenne buis* Aangeraden wordt een buis van rond 5m.

* Stabiele ondergrond

• Antenne (Kathrein K7515641 - GSM900 Celwave AO1803 - GSM1800)

* omni-directional antenna patroon

* low gain antenna G = 5..8dBi

• Attentie: Antenne moet horizontaal gemonteerd zijn

Page 14: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

14 datum

Antenne configuratie

• Voorkomen van blokeren van signaal

* Geen disturbing van hoofd beam

Page 15: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

15 datum

Antenne’s

DiversityScheme

Antenna FrequencyRange

Half-Power BeamWidth

Gain Isolation

azimuth elevation

AntennaDiversity

KathreinK 730 691 (v)

870 - 960MHz

65° 8° 17 dBi -

PolarizationDiversity

KathreinK 737 654 (v/h)

824 - 960MHz

65° 9° 2 17 dBi > 36 dB

PolarizationDiversity

KathreinK 739 160 ( 45°)

824 - 960MHz

65° 9° 2 17 dBi > 32 dB

AntennaDiversity

CelwaveAP 186516 (v)

1710 - 1990MHz

65° 7° 18.1 dBi -

PolarizationDiversity

KathreinK 738 672 (v/h)

1710 - 1880MHz

65° 6.5° 2 18 dBi > 30 dB

PolarizationDiversity

KathreinK 739 494 ( 45°)

1710 - 1880MHz

65° 6.5° 2 18 dBi > 30 dB

DiversityScheme

Antenna FrequencyRange

Half-Power BeamWidth

Gain Isolation

azimuth elevation

AntennaDiversity

KathreinK 730 691 (v)

870 - 960MHz

65° 8° 17 dBi -

PolarizationDiversity

KathreinK 737 654 (v/h)

824 - 960MHz

65° 9° 2 17 dBi > 36 dB

PolarizationDiversity

KathreinK 739 160 ( 45°)

824 - 960MHz

65° 9° 2 17 dBi > 32 dB

AntennaDiversity

CelwaveAP 186516 (v)

1710 - 1990MHz

65° 7° 18.1 dBi -

PolarizationDiversity

KathreinK 738 672 (v/h)

1710 - 1880MHz

65° 6.5° 2 18 dBi > 30 dB

PolarizationDiversity

KathreinK 739 494 ( 45°)

1710 - 1880MHz

65° 6.5° 2 18 dBi > 30 dB

Page 16: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

16 datum

Configuratie settings

• EIRP

* EIRP = POutput - aCable + GAntenna

• Cable Loss

• aCable = Poutgoing - Pincoming

* Met power meter

Page 17: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

17 datum

Measurement Requirements (II)

• Routes

* Metingen moeten verricht worden rondom site.

* Metingen moeten worden verricht in relatie tot afstand van de site

----> In acht te nemen:

* De receiver gevoeligheid .

* Routes moeten gelijkwaardig verdeeld worden over de area.

* Overlapping is niet kritiek echter iedere route moet slechts een keer gereden worden.

Page 18: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

18 datum

Measurement Requirements (II)

• Veel data vereist per clutter type

• Uitvoering:

* 1 Site = 1 dag

Personeel

* 1 bestuurder

* 1 installateur en/of apparatuur bewaker

* 1 engineer

Page 19: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

19 datum

Model Tuning

• Laden van site data.

• Aanpassen van restricties.

• Volledige analyse van data.

• Consideration of the mean error and standard deviation of each individual file related to a site and notification of probably corrupted measurement files “out of range”

(mean error >15dB; deviation > 20dB depending on the accuracy of the used standard model)

Page 20: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

20 datum

Performance Measurements

• Key Performance Indicators.

• BSS Counters

• Netwerk Analyse

• Optimalisatie voorbeeld

Page 21: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

21 datum

Key Performance Indicators

• Dropped Call Rate

• No TCH Assignment

• Kwaliteit

• HO Succes Rate

• Congestie

• Call Setup Time

Page 22: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

22 datum

BSS Counters

• Counters :

* Beschrijving van netwerk events.

* Relatie tot verkeersgedragingen van MS

* Relatie met KPI’s

Page 23: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

23 datum

Netwerk Analyse

• Netwerk Analyse = Continue Analyse en oplossingsgericht werken.

Frequency Plan

Radioparameter

Routing

Trunk Load

Analysis

Report

Modificaties van

Page 24: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

24 datum

Netwerk Analyse vs Optimalisatie(I)

0.0%

0.5%

1.0%

1.5%

2.0%

2.5%

No AssignmentTCH Rate

Dropped Call Rate Lost before answerRate

Call Drop Rate(TCH)

Rat

e [%

]

Non HoppingHopping

Page 25: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

25 datum

Netwerk Analyse vs Optimalisatie(I)

Impact van Optimalisatie

Before Optimization

6%

16%

78%

SETUP FAILURECALL_DROPCALL_SUCCESSFUL

2%

97%

1%

After Optimization

Page 26: Siemens Nederland N.V. 2001 Get a bit more. Siemens. 1 datum MBO Telecom/ICT Veldmetingen in Mobiele Netwerken

Siemens Nederland N.V. 2001

MBO Telecom/ICT naam presentatie

Get a bit more. Siemens.

26 datum

Vragen ???

• Ian Redan• SIEMENS The Netherlands• Information and Communication Networks• Mobile Networks / Network Design &

Engineering• Teamleader Radioplanning GSM• Phone: +31 70 333 3262• mobile: +31 653 766 101• fax : +31 70 333 3705• mailto: [email protected]