review need for change provide an overview of the big 5 generator respond to questions share...
TRANSCRIPT
![Page 1: Review need for change Provide an overview of the Big 5 Generator Respond to questions Share implementation plan](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc30b5/html5/thumbnails/1.jpg)
Introduction to:The Big 5 Generator
![Page 2: Review need for change Provide an overview of the Big 5 Generator Respond to questions Share implementation plan](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc30b5/html5/thumbnails/2.jpg)
Agenda Review need for
change
Provide an overview of the Big 5 Generator
Respond to questions
Share implementation plan
![Page 4: Review need for change Provide an overview of the Big 5 Generator Respond to questions Share implementation plan](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc30b5/html5/thumbnails/4.jpg)
Developed by the University of Southern Mississippi as part of the PBIS initiative in the State of Mississippi.
Electronic format uses Excel on a PC
Adopted by schools throughout, including RESD
Designed to assist schools in organizing ODR data, track progress, identify challenges, and develop school-wide interventions to address these challenges
Background: The Big 5 Generator
![Page 5: Review need for change Provide an overview of the Big 5 Generator Respond to questions Share implementation plan](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc30b5/html5/thumbnails/5.jpg)
Big 5 Generator PBIS Committee has
reviewed different options for WSD
Big 5 Generator is used at Hugh John
Data collection program is easy to use and free
![Page 6: Review need for change Provide an overview of the Big 5 Generator Respond to questions Share implementation plan](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ebb5503460f94bc30b5/html5/thumbnails/6.jpg)
Implementation Plan Pilot year September 2013
Session for staff responsible for data entry: September 17, 10:00-12:00 noon
Division-wide implementation: September 2014
Coach Training: Oct. 2,3, 2013