昌骅 ppr001 样箱试验报告-140806
TRANSCRIPT
格式PPR001
Form中 国 船 级 社CHINA CLASSIFICATION SOCIETY
集装箱试验报告 TEST REPORT FOR CONTAINER
编号QH13S3014
No.
制造厂名称Name of Manufacturer
河北昌骅专用汽车有限公司箱主名称Owner's name种类Type
液化石油气罐箱/LPG TANK ISO代码ISO Code
22T8
型号Model
J090 制造厂编号Manufacturer No.
2013-078
最大总质量Max. gross mass
18080 kg 箱体质量Tare mass
10080 kg
最大货载Max. payload
8000 kg 内部容积Internal volume
24m3
外部尺寸External dimensions
6058×2438×2591 总布置图号General arrangement No.
J090-00
技术说明书号Specification No.
-- 允许堆码重量Allowable stacking weight
192000 kg
端壁试验载荷End wall test load
- 侧壁试验载荷Side wall test load
-
横向刚性试验载荷Transverse racking test load
15240kg 纵向刚性试验载荷Longitudinal racking test load
7260kg
漏热率Heat leakage rate
- 最大允许工作压力Max. allowable working pressure
1.8MPa
下面署名的验船师根据本社规范的要求,见证了上述集装箱的有关试验,试验项目见试验报告项目表。 According to the Rules of this Society, the undersigned surveyor did witness the testing of the Above-mentioned container, the test items listed on the “Check list of test report”
发证日期Date of issue 2014-5-16
验船师 WANGZHONGXING Surveyor
试验地点Place of issue
天津/黄骅TIANJIN/HUANGHUA
CTR-1格式 PPR001
Form
中 国 船 级 社CHINA CLASSIFICATION SOCIETY试验报告项目表
CHECK LIST OF TEST REPORT
×尺寸检查 (Dimensional check) CTR-3
×堆码试验 (Stacking test) CTR-4a
堆码试验 (Stacking test)(one door off) CTR-4b
×吊顶试验 (Lifting test—form top corner fittings) CTR-5
×吊底试验 (Lifting test—form bottom corner fittings) CTR-6
叉举试验 (Lifting form fork lift pockets) CTR-14
箱底试验 (Floor strength test) CTR-7
×纵向栓固试验(Restraint test) CTR-8
端壁试验(End wall strength test) CTR-9
端壁试验(End wall strength test)(one door off) CTR-9
侧壁试验(Side wall strength test) CTR-10
箱顶试验(Roof strength test) CTR-11
×横向刚性试验(Transverse racking test) CTR-13
横向刚性试验(Transverse racking test)(one door off) CTR-13
×纵向刚性试验(Longitudinal racking test) CTR-12
风雨密试验(Weather tightness test) CTR-17
底结构变形控制检查 (Control check of base deflections) CTR-15
底纵珩变形控制检查 (Deflections of bottom rails and cross members) CTR-16
×气密性试验(Air tightness test) CTR-18
漏热试验 (Heat leakage test) CTR-19
纵向内部栓固试验(longitudinal Internal restraint test) CTR-20
×横向内部栓固试验(Transverse Internal restraint test) CTR-20
×压力试验 (Pressure test) CTR-21
×撞击试验/Impact test
发证日期Date of issue:
2014-5-16 验船师Surveyor
WANGZHONGXING
×――适用/Applicable ―――不适用/Non-applicable
CTR-2格式
PPR001Form
尺 寸 检 查CHECK IF DIMENSIONS
设计尺寸/ Design dimension (mm) ±△
长度/Length 6058+0-6
宽度/Width 2438+0-5
高度/Height 2591+0-5
位 置Position
附注Ref.
对角线/Diagonals 位 置Position
附注Ref.
试验前Before test
试验后After test
±△试验前Before test
试验后After test
±△
门 端Door end
A2A1 2589 2588.5
门 端Door end
A2B1 3556 3553 B2B1 2591 2589A1B2 3558 3558 A2B2 2437 2437 K2 2 5 A1B1 2437 2437
前 端Front end
C2D1 3556.5 3556前 端Front end
D2D1 2589 2589.5C1D2 3556 3556 C2C1 2589 2588 K2 0.5 0 C2D2 2437 2437
侧 壁 Side wall
A2C1 6585 6585 C1D1 2438 2438C2A1 6588 6588
侧 壁Side wall
A2C2 6055 6055 K1 3 3 A1C1 6055 6055B2D1 6587 6587 B2D2 6055 6055D2B1 6584 6584 B1D1 6057 6057 K1 3 3
箱 底 Floor
B1C1 6526 6525 型号 Container Type
1AA/1A 1CC/1CA1D1 6530 6530
箱 顶 Roof
A2D2 6532 6532 K1max 19 13B2C2 6529 6529 K2max 10 10
结论
Comments: SATISFACTORY
验船师 Surveyor
CTR-3a格式 PPR001Form堆 码 试 验
STACKING TEST每一个顶角件的垂向压力: Vertical force over each top corner: 86400KG
试验负荷Test load
试验时角柱变形 Summary of corner structures deflections During test A1A2 B1B2C1C2D1D2
角柱长度变化 Changes in length of Corner structures
a b c d e f g h A1A2 B1B2 C1C2 D1D2 第一次试验 偏置方向 1st test Offset direction
Before test 0 0 0 0 0 0 0 0 0 0 0 0
During test 0 1 1.5 1 1 0.5 1.5 1 0.5 0.5 1 1
After test 0 0 0 0 0 0 0 0 0 0 0 0
第二次试验 偏置方向 2nd test Offset direction
Before test 0 0 0 0 0 0 0 0 0 0 0 0
During test 0 1 1.5 1 1.5 1.5 1.5 1 1 1 1.5 1.5
After test 0 0 0 0 0 0.5 0 0 0 0 0 0
Permanent set 0 0 0 0 0 0.5 0 0 0 0 0 0
结论 验船师 Comments: SATISFACTORY Surveyor
CTR-4
格式 PPR001Form吊 顶 试 验
LIFTING TEST BY TOP CORNER FITTING
箱内载荷: 2R-T Load in container:
测 点 位 置 Position of points at which deflections are measured
试 验 时 变 形 记 录 表Summary of deflections during test
测 点 Measuring points
状况 Condition
1 2 3 4 5 6 7
空 箱 Empty
0 0 0 0 0 0 0
加栽后的变形(在垫块上) Deflections measured after loading (on pad)
1 1 1.5 0 1 1 0
吊起时的变形 Deflections measured after lifting
1 1 1.5 0 1 1 0
放下后的变形(在垫块上) Deflections measured after lifting (on pad)
1 1 1.5 0 1 1 0
试验后空箱变形 Deflections measured of the empty after test
结论 Comments: SATISFACTORY 验船师 Surveyor
CTR-5
格式 PPR001Form吊 底 试 验
LIFTING TEST BY BOTTOM CORNER FITTING
箱内载荷: 2R-T Load in container:
测 点 位 置 Position of points at which deflections are measured
试 验 时 变 形 记 录 表Summary of deflections during test
测 点 Measuring points
状况 Condition
1 2 3 4 5 6 7
空 箱 Empty
加栽后的变形(在垫块上) Deflections measured after loading (on pad)
0 0 1.5 0 0 0 0
吊起时的变形 Deflections measured after lifting
1 1 1.5 0 1 1 0
放下后的变形(在垫块上) Deflections measured after lifting (on pad)
1 1 1.5 0 1 1 0
试验后空箱变形 Deflections measured of the empty after test
0 0 0 0 0 0 0
结论 Comments: SATISFACTORY 验船师 Surveyor
CTR-6格式 PPR001Form纵 向 栓 固 试 验
RESTRAINT TEST (STATIC)
箱内载荷: R-TLoad in container:每侧纵向压缩或拉伸力:Force of compression or tension per side: R(Longitudinal)
纵向构件的纵向变形记录表Summary of longitudinal deformation of longitudinal members
加 载Loading
试 验 前 Before test
试 验 时 During test
试 验 后 After test
纵向变形Longitudinaldeformation
压缩Compression
1 A1 C1 6055 6054 6055 0 B1 D1 6055 6054 6055 0
2 A1 C1
B1 D1
拉伸Tension
1 A1 C1 6055 6057 6055 0 B1 D1 6057 6058 6057 0
2 A1 C1
B1 D1
结论
Comments: SATISFACTORY
验船师 Surveyor
CRT-8
格式 PPR001Form纵 向 刚 性 试 验
LONGITUDINAL RACKING TEST
侧 壁: 对 称﹡ 不对称
Side Wall : symmetrical﹡ asymmetrical
75kN 75kN
力 Kg Force
上珩材相对位移 Deflection of D
极限值 Limit
力 Kg Force
上珩材相对位移 Deflection of D
极限值 Limit
推 -------- pushing 推 -------- pushing
75kN 2.5 75kN 30 拉 --------- pulling 拉 --------- pulling
75kN 4 75kN 4
试验后 ------- After test0.5 0
结论 Comments: SATISFACTORY
验船师 Surveyor
*不适用者划去 *Delete as necessary CTR-12
格式PPR001
Form横 向 刚 性 试 验TRANSVERSE RACKING TEST
150kN 150kN
端 壁: 对 称﹡ 不对称 不对称
End Wall : symmetrical﹡ asymmetrical asymmetrical
前 端 门 端 Front end Door end
力 KN Force
对角线长度变化Diagonal length variations 力 KN
Force
对角线长度变化Diagonal length variations
△d △d1 △d1+△d极限值 Limit △d △d1 △d1+△d
极限值 Limit
推--------Pushing 推--------Pushing
150kN 11 11 22 150kN 11 12 23
拉--------Pulling 拉--------Pulling
150kN 11 11 22 150kN 13 11 24
试验后 ------- After test
0 0 1 0
结论 Comments: SATISFACTORY 验船师 Surveyor *不适用者划去 *Delete as necessary
CTR-13
格式:PPR001
Form:
气 密 试 验AIRTIGHTNESS TEST
试验温度(外部):7Test temperature (Outside):7
试验温度(内部) :Test temperature (Inside)
内部气压:1.8MPaAir pressure, internel: 1.8MPa
漏气率::无Air leakage rate: NO
结论 Comments: SATISFACTORY
日期: 2013-11-18 验船师 Date: Surveyor
CTR-18
格式:PPR001
Form: 压 力 试 验PRESSURE TEST
最大允许工作压力: 1.8MPa Maximun allowable working pressure:
试验压力: 2.34MPa Liquid capacity:
结论: Comments: SATISFACTORY
日期: 2013-11-17 验船师 Date: Surveyor 步 道 试 验
WALKWAY TEST
载荷/Load:
结论/Comments:
日期: 验船师 Date: Surveyor 步 道 试 验
WALKWAY TEST
载荷/Load:
结论/Comments:
日期: 验船师 Date: Surveyor
CTR-21
格式:PPR001
Form: 内 部 栓 固 试 验
INTERNAL RESTRAINT TEST
纵向/Longitudinal:
结论/Comments:
验船师/Surveyor:
横向/lateral
结论/Comments: SATISFACTORY
验船师/Surveyor:
日期/Date:2013-11-18 CTR-20