· preservation-. maintenance-. sea fasetning. ... · moon pool equipment(winch/trolley) ......
TRANSCRIPT
www.etoms.co.kr
www.etoms.co.kr
Emergency Exit
Layout
T.302
T.503
T.303
T.303
C3
C2
C1
C4
D/W
Toilet
Kitchen
Repre. Rm
Repre. Rm
C5
T.50
2T.
301
T.201 T.501
Refr.2
Refr.1
Sink Table
Panel
HA
T.305
T.305
T.304
T.304
T.205
T.504
T.202
T.204
T.206
T.203
D2
D1 MeetingRm1
MeetingRm2
Down
복사기
복사기
D/W
02
www.etoms.co.kr
Safety Training
TRAINING
EQUIPMENT TRAINING
NEW EMPLYEES ALL EMPLYEES WORKING PARTS
TOOLCRANEFORK LIFT
03
www.etoms.co.kr
We give many thanks to your management for inviting us to participate the presentation meeting.
We are a total solution company that providing all needs of our client in the shipyard.
Such as Manpower, Material Management, Construction Execution, Quality Control, Commissioning, Punch List Completion, Equipment
Maintenance, Change order, Equipment Store and Transportation, and Offshore Hook Up & Commissioning Specialized Company.
In majority, including of our management and leaders are either former or experienced specialists in deferent fields in DSME and SHI for over
15~30 years, and are ready enough to benefit to your projects. We will be pouring of our utmost for our client in Safety, Quality, Delivery time,
and Cost wise, rather than the benefits to the shipyard.
A. SAFETY FIELD :
· We will be reaching of the ‘Safety Zero Point (Accident free, Injury free)’ by our experiences in various on/offshore.
· We will prevent all potential accident and injury by making of the manual and setting of the ‘Risk Element 30 points’.
· We will prevent all potential accident and injury by tightening up the daily local safety patrol activity.
· Danger predication training, JSA, Tool Box Talk, PTW and execute ‘Areal Safety Person In Charge’ System.
B. QUALITY FIELD : We are planning to be achieved of “zero defect project” by our past quality management experience.
· We are planning to execute quality control by using in actively ‘Pre-qualification system’ focusing proactive quality management system.
· We are planning to minimize quality defects by using in actively ‘Project control system(PCS)’.
· We are planning to secure ‘Quality Basis’ by using in actively DSME Offshore Quality Standard.
· We are planning to minimize ‘Receiving inspection punch’ and ‘FAT Punch’ in advance.
· We are planning to secure best quality by having close relation with ABS, Lloyd, BV Class society.
Greetings
04
www.etoms.co.kr
C. DELIVERY FIELD :
· Drawing review in Engineering relates and manages drawing delivery schedule.
· Control PND in shipyard tightly and in case of delaying of equipments make up emergency plan to do in the future.
· Keep & maintain daily production control & commissioning schedule according to shipyard production schedule.
D. COST FIELD :
· As you know very well nowadays offshore field is overload. This means that it is difficult to find our proper people. And then TOMS will mobilize the manpower from ship
yard people who have much more experienced that present.
· If you don’t mind, we hope to get “lump sum contract” and “long term contract” so that we may lower the cost as total solution company like “No mark up except special service work”
· Remain competitive price by maintaining a family company system with our current family companies. Such as Hi-Air Kservice Korea, E-Tec, Sung-Il SIM, Jung-Woo
Enterprise, Raon Enterprise, ISSAC, JH Co., Ltd. Dong-Bang Ship Machinery, Panapina, Young-Heung Enterprise, Sung-Ha Enterprise, Seoul Inspection Co., DSEC, Ocean
ENG, Prime Tech, Hae-Myung Co., and so on
In addition to, we are going to work harder and harder for maintaining our client’s benefit against the shipyard because two party are being same boat.
Johan Park from TOMS Co., Ltd.
05
www.etoms.co.kr
Top Offshore
Marine ServiceContents
Core Value · · · · · · · · · · · · · · · · ·
Organization Chart · · · · · · · · · ·
Manpower Service Works · · · · · · · · · ·
Commissioning Works
Job Descriptions · · · · · · · · · · · ·
Work Procedure · · · · · · · · · · · ·
Relationship · · · · · · · · · · · · · · · ·
FMS · · · · · · · · · · · · · · · · · · · · · · ·
Experience · · · · · · · · · · · · · · · · ·
Certification · · · · · · · · · · · · · · · ·
Assisting Company · · · · · · · · · ·
Vendor Registration Status · · ·
Factory & Logistic · · · · · · · · · · ·
CEO Profile · · · · · · · · · · · · · · · ·
07
08
09
10
15
16
20
21
22
24
25
26
27
06
www.etoms.co.kr
Think about something pleasant
with TOMS..
PASSION TRUST VALUE
Work with Passion Trust Each OtherCreate
Value Together
SAFETY ON TIME DELIVERY
HIGH QUALITY
CLIENT SATISFACTION
CORE VALUES
07
www.etoms.co.kr
Organization Chart
Company Leader Johan, Park 010-5223-9207
Safety Coordinator Young-Jong, Lee 010-9689-4661
Project Coordinator Mr. Daniel Cho 010-7259-7478
Manpower Service- Structur & Welding- Piping & Machinery- Painting & PFP- HVAC Inspector- Administrator
Material Suply Part-. Spare Parts-. Order Material-. Preservation-. Maintenance-. Sea fasetning
Punch Killing Works-. Job Card Order-. Change Order-. Vendor punches-. OFE punch works
Pre-Commissioning-. Loop Check-. D.Precomm Check-. RFCC confirmation-. Machinery check-. Electric Check
Commissioning-. Menhatan Sky Line-. PCS System Control-. "A" punch close out-. C & E Test-. Black out Test
08
www.etoms.co.kr
MANPOWER SERVICE WORKS
ManpowerService Inquiry
Fixed manpower
- Structure & Welding
- Painting & PFP
- Piping & machinery
- HSE inspectors
- Insulation & HVAC
- Administration part
TOMS
Mobilization
- CVs’ Review
- List up CVs’
- I nterview internal
for Candidates
CLIENT
Submit CVs’ to Client
COMMISSIONING WORKS
CommissioningSchedule
ManhattanSky Line
MechanicalCompletionCertificates
MC Stage
Loop Test,Electric Test,Mechanical
Pre-com Test,Completion
Ready for commissioning
Certificate
Close “A”Punches
Pre-Com Stage
a. Cause & Effects Test
b. Black Out & Sequence Test
a. Operation & Test Procedures
b. Commissioning Test Record
Commissioning
09
www.etoms.co.kr
JobDescriptions
MC & PUNCH CLEARANCE
2010.01.01 – 12.31MC & Pre-Commissioning, Cable pulling, Dressing & Connection work in SHI yard.
2010.01.01 – 02.30Punch works of DR Turbine Gen & Comp.for BP Skarv Project in SHI Yard
2009.11.01 – 12.31Punch works of Flengco Ningbo for BP Skarv Project in TOMS Yard
10
www.etoms.co.kr
PRE-COMMG’ & COMMISSIONING
MC external test, Calibration, Function test, Troubleshooting, Loop test
· Fire & Gas System· All sorts of instrument and Packages
within HVAC System· Fire Water System Open Drain System· Lighting System Pre- MC & Commissioning· LV ESD System MC & Commissioning
· M/C Check & Pipe hydro leak test
· D/G System/ Fire Fighting System/Cooling System
· Bilge System Commissioning
· Hoisting/Pedestal Crane Commissioning
· Provision Crane/Davit Commissioning
· Hydro System : Ring Line Commissioning
· Drilling System(Drawwork & PRS &Top Drive & R/T)
· Commissioning
· Moon Pool Equipment(Winch/Trolley) Commissioning
· Deck Crane Commissioning
· Mud System & Pump Commissioning
· Ballast System Commissioning
11
www.etoms.co.kr
JobDescriptions
MODIFICATION WORKS
PRESERVATION & MAINTENANCE
General Service · Grease Filling in Accordance with Procedure · Equipment Package Cleaning · Remove a Rust & Rust Prevent Work · Self Check in Accordance with Preservation Action Card
DOO SUNG RIG in 2008 on offshore
Dust Collector Install & Bulk system modification Shall Shaker Remodeling Mud Dryer Install with Conveyor
PROTECTION(BEFORE WORKING)
INSTALLATION(DURING WORKING)
PROTECTION(AFTER WORKING) PROTECTION
CONDITIONFOR MECHANICAL PACKAGE
PRESERVATION ACTION CARD
12
www.etoms.co.kr
FLANGE MANAGEMENT
Management Procedure· Pre-Engineering· Work Preparation· Construction & Inspection· Documentation
CLIENT
1. Verify the FM data from TOMS Engineering
2. Commence the Pre-engineerign as per Priority Order of Piping Works or Schedules.
3. Create Joint Data Sheet and Disrtibute to FM Work Groups.
TOMS
Production
/ CM
1. TP list with Line List Review ans Verification
2. Provide Subsystem Base or Area Base Piping Work Completion Schedule (Priority Order)
TOMS
Quality
1. TP List with Line List Review and Verification2. Co-ordination & Support for Pre-engineering
TOMSPiping
Engineering
1. Provide TP with Line List (Excel format) with Relevant Organization
1.1 QM 1.2 Client 1.3 FPSO/Rig/Drillship Production 1.4 CM2. Provide Piping Test Pack to
CLIENT 2.1 Hard Copy 2.2 PDF Format (If Applicable)
Input the Piping Data into FM
System Creat Work Package
Provide Work Schedule
Co-ordination & Support
Provide Piping Data and Test Pack
Nobody wants to see leak!!
13
www.etoms.co.kr
JobDescriptions
PROCUREMENT SERVICE
BOX
BOX
NITROZEN RACK PLATFORM MOVING PLATFORM
BOTTLE RACK
CONTAINER
OIL TANK
OFFSHORE BASKET TANK
BOTTLE RACK
VERTICAL LADDER HAND RAIL DERRICK RACK
· Customised materials can be made· Offshore containers, baskets and tanks are certified by DNV 2.7-1 / EN 12079
14
www.etoms.co.kr
WORK PROCEDURE
· FLANGES(FF, RF, RJF, LTG, STG), FITTINGS(ELBOW, REDUCER, TEE, COUPLING, UNION, CAP, CROSS, STUB-END), VALVES(GATE, BALL, GLOBE, BUTTERFLY, DIAPHRAGM, CHECK, TRUNNION) PIPES, STEEL PLATES
· Customised materials can be made
FLANGES
VALVES
FITTINGS
PIPES
COMMUNICATION
REQUESTINQUIRY
OFFERQUOTATION
SUPPLY
easy going
15
www.etoms.co.kr
Report
Royalty/Order Keep/Criteria
Prevent
RelationshipRELATIONSHIP WITH BOTH PARTIES
Contract Auditing Tool Production
CLIENT TOMS DSME
Specification
Drawings
HSE Plan
Quality Plan
HSE, JSA, PTW, TBT
QA/QC / OJT
Project Control Sys
Daily Conference
Hull Side
Top Side
Accommodation
Hel-Deck
16
www.etoms.co.kr
JobDescriptions
STRUCTURE & PAINTING FIELD
PIPING & MECHANICS FIELD
· WE can mobilize them who have 10 - 30 years experience of offshore
division in DSME and SHI.
· Mr. D.S Ahn has many experience of structure & painting field in DSME &
SHI as supervisor.
· Mr. J.H. Lim has many experience of structure & painting field in DSME &
SHI as supervisor.
· Mr. S.I. Lim has many experience of structure & painting field in DSME &
SHI as supervisor.
· Mobilize supervisors who have 10 - 30 years experience of offshore division
in DSME and SHI.
(Please refer to the attached TOMS Keymembers herinwith)
· TOMS has worked Flange Management System of Gorgon for Chevron in
HHI as Supervisors.
· Design & drawing to review ; mandatory requirements, interfaces
· Specification to review for building up quality procedures/standard &
ITP
· Establishment of quality management system for project
· Preparation of WPS ; WPQT & WPQR
· Welder qualification, NDE Plan ; to define vital points
· Paint schedule to review & monitor, Material tracibility
· ITP for structual steel work & painting
· Demension control procedure ; to define vital point to hold
· Detailed assembly process ; to define holding point for attention for
safety & material tracing purposes
· Heavy lifts handling procedure and In-line quality control
· Drawing review & Preparation how to build & construct the said project
· Make-up FMS inspection package & preparation of Inspection
procedures from Hydratight
· Preparation of wleder’s PQ & NDE Map review
· Material tracabilities, PMS and documentation control
· WPS Preparation & approval works
· FAT and test results folow up
· Hydro test and leak test preparation
· Offshore DSQS review and application of it onboard
· Maintenance & preservation procedure for equipments
· FAT & Receiving inspection punch killing & control
1. Supervisors & Inspectors 1. Supervisors & Inspectors
2. Work activities
2. Work activities
17
www.etoms.co.kr
ELECTRIC &INSTRUMENT FIELD
PIPING & MECHANICS FIELD QUALITY CONTROL
· Mobilize supervisors who have 10 - 30 years experience
of offshore division in DSME and SHI. (Please refer to the
attached TOMS Keymembers herinwith)
· Joined the contruction works of COE & AD project for
ExxonMobil in DSME as Supervisors.
· Mobilize supervisors who have 10 - 30 years experience
of offshore division in DSME and SHI.
(Please refer to the attached TOMS Keymembers herinwith)
· TOMS has worked Flange Management System of
Gorgon for Chevron in HHI as Supervisors.
· Drawing review & Preparation how to build & construct
the said project.
· Cable pulling schedule, connection diagram, single line
diagram, Equpment layout review
· Loop diagram(P& ID), Loop folder, Logic diagram review
· Mechanical completion list(Project control system)
· Cable bending radius check(6-10D) and Cable tray
overfilling check
· Power & control cable segregation check
· Maintenance & preservation procedure for equipments
· FAT & Receiving inspection punch killing & control with
PCS
· High voltage “Hi-po test” procedures review & confirm
· Cause & effects test procedure review & confirm
· Drawing review & Preparation how to build & construct
the said project
· Make-up FMS inspection package & preparation of
Inspection procedures from Hydratight
· Preparation of wleder’s PQ & NDE Map review
· Material tracabilities, PMS and documentation control
· WPS Preparation & approval works
· FAT and test results folow up
· Hydro test and leak test preparation
· Offshore DSQS review and application of it onboard
· Maintenance & preservation procedure for equipments
· FAT & Receiving inspection punch killing & control
1. Supervisors & Inspectors 1. Supervisors & Inspectors
2. Work activities 2. Work activities
· Mobilize supervisors who have 10 - 30 years experience
of offshore division in DSME and SHI. (Please refer to the
attached TOMS Keymembers hereinwith)
· Joined the contruction works of COE & AD project for
ExxonMobil in DSME as Supervisors.
· Shipyard’s quality plan review & confrim
· Welding process sequence(WPS) check
· Welder list control & NDE Map Check
· Hydro tech procedure & Leak test check
· FAT and test results folow up
· All test results and documentation control
· Daily inspection & weekly inspection control
· PCS(Project control system) Control
· FAT & Receiving inspection punch killing & control
1. Supervisors & Inspectors
2. Work activities
18
www.etoms.co.kr
HSE FIELD HVAC FIELDFLANGE MANAGEMENT SYSTEM(FMS) FIELD
· Mobilize supervisors who have 5 - 10 years experience
of offshore division in shipyards.
(Please refer to the attached High Air Service Korea
Co., keymembers hereinwith)
· Joined the contruction works of COE & AD project for
ExxonMobil in DSME as Supervisors.
· Please refr to the attached MOU between TOMS and
Hi-Air Service Korea hreinwith.
· Mobilize supervisors who have 10 - 30 years experience of offshore in HHI,
DSME and SHI. (Please refer to the attached FMS Keymembers herinwith)
· TOMS has worked Flange Management System of Gorgon for
Chevron in HHI as Supervisors.
· Vendor drawing review & confirm
· HVAC work package review & confirm
· MC check sheet confirm
· Balancing test procedure review & confirm
· Volume test procedure review & check
· Temperature shut down test procedure reviw & confirm
· Cause & effects test procedure review & confirm
· Check that the installed lines are in accordance with the latest ISO
& P & ID drawings.
· All welding inspection, stress reliese and NDT are to be completed
and recorded it on sheet.
· Check that all materials on flange joints are installed properly as per
drawing & specification.
· Check all pipe supports are installed in place as per design.
· Check that all pipe work flushing & hyrostatic test shall be
completed and recorded on sheet.
· Check that all pipe works shabe installed & reinstalled in
accordance with the current P & ID.
· Check all dimension of gap, sag and distance as per drawing & specification.
· Face of flanges & gaskets shall be controlled & cleaned and not
damaged during installation face.
· Hydrailic & hand torque tools shall be calibrated by the concerned
institues as per auditing term.
· Check that bolts length of flange joints shall be correct.
· Bolt tensioning to be torqued according to the value of procedure.
· All data shall be recorded on FMS certificate as attached hereinwith
1. Supervisors & Inspectors
2. Work activities
1. Supervisors & Inspectors
2. Work activities
· Mobilize supervisors who have 10 - 30 years experience
of offshore division in shipyards. (Please refer to the
attached TOMS Keymembers hereinwith)
· Joined the contruction works of COE & AD project for
ExxonMobil in DSME as Supervisors.
· Shipyard’s HSE Plan review & confrim
· HSE basic items training procedure(4 hrs) review & confirm
· Confined space safety training procedures review & confirm
· Harness safety training procedure review & confirm.
· PTW(Permit to work) safety procedure review & confirm
· JSA safety procedure & TBTalk safety procedure review &
confirm
· Block lifting up safety procedure review & confirm
· Argon gas welding safety procedure review & confirm
· Scafollding safety working procedure review & confirm
1. Supervisors & Inspectors
2. Work activities
19
www.etoms.co.kr
FMS(Flange
Management System)
FMS(Flange Management System)
FLANGE CERTIFICATE for NO.
Bolt Torque Tightening Record-Flange Test Pack No:
Isomatric No.Bolted
Joint No.Piping Class
Flange Size (inch)
Bolt ∮ (Q’ty)
Bolt Length (mm)
Flange Type
Torque Value(Nm)
Verified by Worked by Date
ISO Dwg NO. Line No.
Executed by Construction QC Client QACompanySignature
Print NameDate
DO Action Stage Confirming StagePreparation Stage
Check Drawing Check Support as per Drawing Check Bolts Tightening
FMS Plan & Procedures Check In-Line (Gap/Sag/Distance) Record All Data on FMS Cert.
Lecture Plan for DSME Tech Check Flange & Gasket Material Apply Flushing and Hyd. Test
Check NDE & Welding Check Face Cleaning/Damage Apply N2 & He Leak Test
20
www.etoms.co.kr
ExperienceExxon Mobil Feb. 2012 - PresentSakhalin-1 Project (COE, Arkutun-Dagi)
Human Resource Service
Petroserv Feb. 2012 - Jan. 2013SSV CATARINA Drilling Rig Project
Procurement & Installation Service
QGOG Mar. 2012 - Oct. 2012Amaralina and Laguna Star Drillship Project
Procurement & Installation Service
Swire Pacific May. 2012 - Oct. 2012Pacific Orca Project
Procurement Service
Chevron Jan. 2012 - PresentGorgon Project
Human Resource Service
OOG Sep. 2011 - Apr. 2012ODN I, II Project
Procurement Sevice
ETESCO Jul. 2011 - Nov. 2011ETESCO VIII Drillship Project
Procurement Service
BP Jun. 2009 - Feb. 2011Skarv Project
Human Resource & Procurement Service
Odfjell Mar. 2009 - Feb. 2010 GVA 7500 Project
Human Resource & Procurement Service
Seadrill Jul. 2008 - Nov. 2008East Aquarius Project
Human Resource Service
21
www.etoms.co.kr
Certifications
HI-Air Korea MOU The Contract with Exxon Mobil
22
www.etoms.co.kr
Recommendation Letter The Contract with BP
The Contract with HYDRATIGHT Safety Award from BP
23
www.etoms.co.kr
AssistingCompany
No. Company Name Major Work Address Tel
1 Hae-Myoung Enterprise Piping 1198-2, Jangpyeon-Dong, Geoje-Si, Gyeongnam +82-(0)10-8506-8183
2 Mi Rae Electric 45-5, Jangpyeong-Dong, Geoje-Si, Gyeongnam +82-(0)10-3269-1148
3 Geum Yeong ENG Electric 30-1, Hwangseong-Dong, Nam-Gu, Ulsan +82-(0)52-227-7817
4 Jeong Woo Steel Outfitting 530, Jangpyeon-Dong, Geoje-Si, Gyeongnam +82-(0)55-630-3758
5 CT Korea Painting 1862, Sinyong-Ri, Georyu-Myeon,, Goseong-Gun, Gyeongnam +82-(0)55-638-4775
6 E-TEC Heat Tracing2F, Dreamfactory Bldg, 134-2, Jangpyeong-Dong, Geoje-Si, Gyeongnam
+82-(0)55-632-8422
7 Dae IL Insulation 890, Aju-Dong, Geoje-Si, Gyeongnam +82-(0)10-9655-1838
8 Tae Jeong Scaffolding 530, Jangpyeon-Dong, Geoje-Si, Gyeongnam +82-(0)55-630-4007
9 Dae Gwang TEC Hull Structure 655, Gangju-Ri, Beopsu-Myeon, Haman-Gun, Gyeongnam +82-(0)55-582-5816
10 Ocean Engineering Engineering5F, Ja Young Bldg., 967-26, Gohyeon-Dong, Geoje-Si, Gyeongnam
+82-(0)55-363-8015
11 Prime TECH Engineering 991-24, Gohyeon-Ri, Sinhyeon-Eup, Geoje-Si, Gyeongsnam +82-(0)55-635-2821
12 DB Holdings Hyd Test 2F, 1101-21, Jukto-Ri, Yeoncho-Myeon, Geoje-Si, Gyeongnam +82-(0)55-633-6574
13 Sung IL SIM Piping 1027, Yuhyoun-Ri, Gunbuk-Myeon, Haman-Gun, Gyeongnam +82-(0)55-583-0307
14 Hi-Air Korea HVAC 1432-1, Damahn-Ri, Jinrae-Myeon, Kimhae-Si, Gyeongnam +82-(0)10-6436-5007
15 Raon Enterprise Steel Outfitting #928, Cheongok-Ri, Juchon-Myeon, Gimhae Si, Gyeongnam +82-(0)10-3561-5023
16 Panapina Forwarding 459-3, Jangpyeong-Dong, Geoje-Si, Gyeongnam +82-(0)51-603-3215
17 Sin Ho Business Procurement 722-14, Hakjang-Dong, Sasang-Gu, Busan +82-(0)10-8010-3522
18 Withus Commissioning #15, Jangpyeon-Dong, Geoje-Si, Gyeongnam +82-(0)10-7468-0117
24
www.etoms.co.kr
VendorRegistration
Status
Eni Saipem
Maersk Drilling
Rowan Companies
Hydra Tight Exxon Mobil QGOG OOG
Pacific Drilling
Halliburton
Registration Date and Code : Aug. 2011 / S01630045
Registration Date and Code : Aug. 2012 / 43706
Registration Date and Code : Jan. 2013 / 2014572
Registration Date : Mar. 2012
Registration Date : Sep. 2011
OURCLIENT
Petroserv Ocean Rig ETESCO ENSCO MI SWACO
25
www.etoms.co.kr
Factory& Logistic FACTORY #1
FACTORY #2
LOGISTIC
• Total Area : 1,500㎡ • Facility : 450㎡
• Total Area : 26,520㎡ • Facility : 1,890㎡
• Total Area : 37,775㎡ • Facility : 19,599㎡
26
www.etoms.co.kr
CEOProfile
TOMS CO., LTD TOMSName : Johan Park (Young-youn Park)
Phone : +82 (0)10-5223-9207
E-mail : [email protected]
Name : Gil-Ho Choi (Philip Choi)
Phone : +82 (0)10-4920-0175
E-mail : [email protected]
After graduating Korea Merchant Marine University, joined STX Pan Ocean shipping company for 6
years as a marine engineer and worked at DSME for 25 years as supervisor, engineer and manager.
Subsequently, applied supervising of piping system for BP Skarv project as supervisor from Jun.
2009 to Feb. 2011.
Have been in charge of commissioning, punch clearance, modification and outfitting work of Drill ships,
Rigs, FPSO and Platforms in the part of mechanical part during last 11 years. Experience with the
entire life cycle of a product, starting from specification analysis and conception, to design, prototyping,
development and feature implementation, to testing, verification, deployment and user support.
Jan. 2012 - Present : Has prepared Flange Management of Gorgon Project for Chevron as project manager.
Jun. 2009 - Feb. 2011 : Worked for BP SKARV project in SHI as Supervisor
Oct. 2008 - Jun. 2009 : Worked for several kind of vendors in SHI & Jacob yard as supervisor
Mar. 2008 - Dec. 2008 : Worked for Sung-jin GO Tech Co. as supervisor
Oct. 2002 - Feb 2008 : Worked for Offshore division in DSME as Junior Director
1) Trial team leader of Drillship project for “Transocean”
2) Trial team leader of Drilling rig project for “Sea Drill”
3) Trial team leader of FPSO project “AGBAMI” for “Chevron”
4) Trial team leader of LPG Tanker project for commercial company
5) Trial team leader of Fixed platform “Sable” project for “Exxon mobile”
6) Trial team leader of Fixed platform “BB” project for “Chevron”
7) Trial team leader of Fixed platform “Kizomba B” project for “Exxon Mobile”
8) Trial team leader of FPSO project “DALIA” for “TOTAL”
9) Trial team leader of Drilling rig “Atlantis” project for “BP America”
10) Quality Manager of Drilling rig “Thunder Horse” project for “BP America”
Oct. 2001 - Oct. 2002 : Worked for Special Ship Division in DSME as General Manager
Jan. 1996 - Sep. 2001 : Worked for Special Ship Division in DSME as Deputy Manager
Aug. 1988 - Sep. 1992 : Joined the supervising team of 209 Class Submarine project for Korean Navy in HDW Germany
Oct. 1984 - May. 1988 : Worked for Commercial Ship Division in DSME for 4 years
Feb. 1979 - Sep. 1984 : Worked as Marine Engineer for 6 years in STX Pan Ocean Shipping
Mar. 2011 - Present : Worked for ETESCO, EXXON MOBIL, QGOG, OOG and PETROSERV as TOMS CEO.
Aug. 2009 - Feb.2011 : Worked for OCEAN RIG, VANTAGE and BP SKARV project in SHI as Managing Director
1) ROV(A-Frame Assembly, Cursor Rail Fabrication) 2) All carry over works3) Punch list clearance 4) Drilling system commissioning5) Deck machinery commissioning
Dec. 2008 - Aug. 2009 : Worked for Transocean Drillship project in DSME as TOMS CEO
Sep. 2007 - Dec. 2008 : Worked for Doosung Rig(Performance Improvement Work) as SAMJIN Co. Commissioning Team Leader
1) Convention and modification for winterization and annual maintenance2) Commissioning for production equipment 3) Under deck platform installation4) Derrick air tubing modification 5) Mud convey system (shaker module)6) Pipe installation work 7) Deck expansion installation
Feb. 2006 - Aug. 2007 : Worked for Agbami & Dalia FPSO project in DSME as SAMJIN Co. Commissioning Team Leader
Jan. 2005 - Jan. 2006 : Worked for Amethyst 1, 2 in DSME as SAMJIN Co. Commissioning Team Member
Jan. 2003 - Oct. 2004 : Worked for BP Thunder Horse PDQ project as SAMJIN Co. Commissioning Team Member
Mar. 2002 - Dec. 2002 : Worked for Exxon Mobil Kizomba-BTLP project in DSME as SAMJIN Co. Commissioning Team Member
1) Drilling system mechanical completion and testing2) Marine utility system pre-comg’ and commissioning(Bilge system, Deck machinery)3) Receiving inspection 4) Equipment alignment inspection5) Punch clearance
Summary Summary
Experience Experience
27