forestsclearance.nic.inforestsclearance.nic.in/writereaddata/0_0_23_mar_2015_230349373... ·...

13

Upload: nguyenduong

Post on 09-Aug-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

3/22/2015 Report Part 2

http://forestsclearance.nic.in/Admin/processing_report.aspx?pid=FP%2fUK%2fROAD%2f9801%2f2015 1/2

State Serial No. of proposal : UK-0145/2015

1. Location  of the project/Scheme : Uttarakhand

 (i) State / Union  Territory : Uttarakhand

 (ii) District : Rudraprayag

 (iii) Forest Division  : Rudraprayag

 (iv) Area of forest land  proposed  for  diversion  (in  ha.) : 2.7825

 (v) Category : Road

2. Legal status of forest land  proposed  for  diversion  :

Division 1. : Rudraprayag

3. District wise area to be diverted  in  the division  :

4. Details of Vegetation  available in  the forest land  proposed  for  diversion  :

 (ii) Density of vegetation

5. Working plan  prescription  for  the forest land  proposed  for  diversion  : No Data

6. Brief note on  vulnerability of the forest area to erosion  : no erosion prozone

7. Approximate distance of the proposed  site for  diversion  from boundary of forest(in  km.) : 2.00

8. Significance of the forest land  proposed  for  diversion  from wildlife point of view :

(i). Details of wildlife present in and around the forest land proposed for  diversion : No wildlifepresent in the surrounding areas of i 

(ii). Whether  forms par t of national park, wildlife sanctuary, biosphere reserve,tiger  reserve, elephant cor r idor , wildlife migration cor r idor  etc. :No 

(iii).Whether  the forest land proposed for  diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified underWildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the ProtectedArea should be treated as ESZ): No

 

(iv). Whether  any national park, wildlife sanctuary, biosphere reserve, tiger  reserve, elephant cor r idor , wildlife migration cor r idor  etc., is locatedwithin 1 Km. from boundary of the forest land proposed for  diversion : No 

(v). Whether  any rare/endangered/unique species of flora and fauna found in the area : No 

9. Details of any protected  archaeological/heritage site/defence establishment or  any other  important monument located  in  the area, if any :

(i). Whether  any protected archaeological/her itage site/defence establishment or  any otherimpor tant monument is located in the area : No 

10. Comment as to the reasonability of the extent of the forest land  proposed  for  diversion  :

(i). Whether  the requirement of forest land as proposed by the user  agency is unavoidable and 

S. No. Distr ict Area(ha.)

1 Rudraprayag 2.7825

S. No. Area(in ha.) Density Eco-Class

1 2.7825 0.2 Eco 5

S. No. Scientific Name Local Name (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.

1 Juglan Regia Akharot 1 0 0 0 0

2 Celtis australis Kharik 2 0 0 1 0

3 Pinus roxburghii Chir 36 79 71 49 16

4 Toona ciliata Tun 0 0 0 0 1

5 Rhododendron arboreum Buransh 0 3 2 0 0

6 Myrica esculenta Kafal 0 3 1 0 0

7 Quercus leucotricophora Banj 0 0 1 0 0

8 Misc. Species Khinna 1 1 0 0 1

S. No. Division Forest Land(ha.) Legal Status

1 Rudraprayag 2.6425 Reserved Forest

2 Rudraprayag 0.14 Civil Soyam land

PART-II

(To be filled by the concerned Deputy Conservator of Forest)

3/22/2015 Report Part 2

http://forestsclearance.nic.in/Admin/processing_report.aspx?pid=FP%2fUK%2fROAD%2f9801%2f2015 2/2

bare minimum for  the project : Yes

11. Details of violation(s), if any ,committed  :

(i). Whether  any work in violation of the Act or  guidelines issued under  the Act has beencar r ied out : No 

12. Whether  work  in  violation  is still in  progres(Yes/No) : No Data

13. Details of compensatory afforestation  scheme :

(ii). Total Financial Outlay for  C.A: 723450

(iii). Whether  the land  identified  by User  Agency is suitable for  CA and  from managementpoint of view?: Yes

(iv). Copy of certificate regarding suitability of land  identified  for  CA and  from management point of view: Annexure regarding suitabilityof land

(v). Copy of detailed  CA scheme including species to be planted,implementing agency,time schedule,cost structure etc.: Annexure CAscheme including species to be planted

14. District Profile :

15. Site inspection  report of the DFO/CCF/Nodal Officer  highlighting important facts pertaining to the forest land  :

(Specific recommendation of the DFO/CCF/Nodal Officer  with(Par t II,III & Par t IV))

16. Specific recommendation  of the DFO/CCF/Nodal Officer  for  acceptance or  otherwise of the proposal with  reason  :

S.no Distr ictName

Geographicalarea of thedistr ict (in

ha.)

Forestarea of thedistr ict (in

ha.)

Total forestarea diver tedsince 1980 (in

ha.)

No. ofApprovedCases

Forest Landincludingpenal C.A.(in ha.)

Progress ofcompensatoryafforestation as

on(date)

A)Forestland(inha.)

B) Non-forestland (inha.)

1 Rudraprayag 198400.00 179099.50 580.852 145 9.64 26/02/2015 0.00 727.29

DivisionName Circle

Siteinspected

By

Whethersite

inspected

No. oftimessite

visited

Site inspection repor t Date ofvisit

Rudraprayag Garhwal DFO Yes One Site Inspection Report 31/01/2015

Division Circle RecommendationBy Recommendation Reason Letter

WhetherCF

agreed

Rudraprayag Garhwal DFO Recommended The proposalis relatedwith

development.

Recommendation letter

Garhwal CF Recommended The projectis requiredfor providingconnectivityto the localpeople.

Recommendation letter Yes

Print page

3/22/2015 Report Part 1

http://forestsclearance.nic.in/Admin/Useragencyreport.aspx?pid=FP%2fUK%2fROAD%2f9801%2f2015 1/3

General DetailsA.

Project DetailsA-1.

  (i). Proposal No. : FP/UK/ROAD/9801/2015

  (ii). Name of Project for  which  Forest Land  is required  : Const. of Jasoli Latu Devta to Bhunka MotorRoad under State sector

  (iii). Short narrative of the proposal and  Project/scheme for  which  the forest land  is required  : This road is started from Km 26 of Nagrasu-Dhanpur-Dandakhal Motor and end point of Jasoli Kanda Motorroad and connect village Bhunka

  (iv). State : Uttarakhand

  (v). Category of the Project : Road

  (vi). Shape of forest land  proposed  to be diverted  : Linear

  (vii). Estimated  cost of the Project(Rupees in  lacs) : 110.25

  (viii). Total Area of Forest Land  proposed  for  diversion(in  ha.): 2.7825

  (ix). Total Area of Non-Forest Land  proposed  for  diversion(in  ha.): 0.7175

  (x). Total period  for  which  the forest land  is proposed  to be diverted(in  years): NIL

Details of User AgencyA-2.

  (i). Name : PUBLIC WORK DEPARTMENT

  (ii). Address1 : PWD PROVINCIAL DIVISION RUDRAPRAYAG

  (iii). Address2 : UTTARAKHAND

  (iv). State : Uttarakhand

  (v). District : Rudraprayag

  (vi). Pin  : 246171

  (vii). Landmark  : NIL

  (viii). Email address : [email protected]

  (ix). Landline Telephone No. : 233204

  (x). Fax No. : NIL

  (xi). Mobile No. : 7500217670

  (xii). Website (if any) : NIL

  (xiii). Details of Proposals seeking prior  approval of Central Government under  the Act fordiversion  of forest land  submitted  by the User  Agency in  the past : No

  (xiv). Legal status of User  Agency : State Government

Details of Person Making ApplicationA-3.

  (i). First Name: EXECUTIVE ENGINEER

  (ii). Middle Name: NIL

  (iii). Last Name: RUDRAPRAYAG

  (iv). Gender: Male

  (v). Designation: EXEUTIVE ENGINEER

  (vi). Address 1: PWD RUDRAPRAYAG PROVINCIAL DIVISION

  (vii). Address 2: NIL

  (viii). State: Uttarakhand

  (ix). District: Rudraprayag

  (x). Tehsil: Rudraprayag

  (xi). Pin: 246171

  (xii). Landmark: NIL

  (xiii). Email Address: [email protected]

  (xiv). Landline Telephone No.: 233204

  (xv). Fax No.: NIL

  (xvi). Mobile No.: 7500217670

  (xvii). Copy of documents in  support of the competence/authority of the person  making thisapplication  to make application  on  behalf of the User  Agency: Annexure U.A Document

Details of land required for the ProjectB.

Details of proposal seeking prior approval of Central Government under the Act fordiversion of forest land for the Project already submitted in the pastB-1.

  (i). Whether  any proposal seeking prior  approval of Central Government under  the Act fordiversion  of forest land  required  for  the project has been  submitted  in  the past?. : No

Details of forest land proposed to be divertedB-2.

FORM - A

Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 forDiversion of fresh forest area

PART - I(To be filled up by User Agency)

3/22/2015 Report Part 1

http://forestsclearance.nic.in/Admin/Useragencyreport.aspx?pid=FP%2fUK%2fROAD%2f9801%2f2015 2/3

Details of Divisions involvedB-2.1

Deta ils  of Divis ions  involved

S.no Divis ion Name Forest  Land(ha.) Non-Forest  Land(ha.)

1. Rudraprayag 2.7825 0.7175

Details of Districts involvedB-2.2

Dist r ict  w ise  breakup

S.no Dist r ict  Name Forest  Land(ha.) Non-Forest  Land(ha.)

1. Rudraprayag 2.7825 0.7175

Village wise breakupB-2.3

Villages  w ise  breakup

S.no Village Forest  Land(ha.) Non-Forest  Land(ha.)

1 Bhunka 2.7825 0.7175

Component wise breakupB-2.4

Component  w ise  breakup

S.no Component Forest  Land(ha.) Non-Forest  Land(ha.)

1 Road 2.7825 0.7175

Maps of forest land proposed to be divertedC.

Division 1. : Rudraprayag

  (i). Area of forest land  proposed  to be diverted(in  ha.) : 2.7825

  (ii). : Linear

 

(b). No. of Segments : One

Segment  w ise  deta ils

Segments Segment  Area(in ha.) Kml File  of Segments

1. 2.7825 Annexure Segment1

 

(iii). Copy of Survey of India Toposheet indicating boundary of forest landproposed  to be diverted: Annexure Survey of India Toposheet

 

(iv). Scanned  copy of the Geo-referenced  map  of the forest land  proposed  to be diverted  prepared  by using GPS or  Total Station: Annexure scanned copy of theGeo-referenced map

Justification for locating the Project in forest land and details of alternativesexamined:D.

 

(i). Copy of note containing justification  for  locating the Project in  forest land  : AnnexureJustification

 

(ii). Whether  a copy of map  indicating location  of alternative examine is required  to be provided:Yes

 

(a). Copy of map  indicating location  of alternative examined: Annexure alternative examined

Employment likely to be generatedE.

  (i). Whether  the Project is likely to generate employment ?: Yes

  (ii). Permanent/Regular  Employment(Number  of persons): NIL

  (iii). Temporary Employment(Number  of person-days): 100

Displacement of People due to the Project, if anyF.

  (i). Whether  Project involves displacement?: No

Details of Cost-Benefit analysis for the ProjectG.

  (i). Whether  the Project requires Cost-Benefit analysis?: No

Status of Environmental ClearanceH.

  (i). Whether  the Project requires Clearance under  the Environment (Protection) Act 1986 ? : No

Status of Wildelife ClearanceI.

  (i). Whether  the Project or  a part thereof is located  in  any Protected  Area or  their  Eco sensitivezone? : No

3/22/2015 Report Part 1

http://forestsclearance.nic.in/Admin/Useragencyreport.aspx?pid=FP%2fUK%2fROAD%2f9801%2f2015 3/3

Applicability of special provisions governing Scheduled AreasJ.

  (i).Whether  the Project or  a part thereof is located  in  a Scheduled  Area? : No

Status of settlement of rights under the Forest Rights Act,2006 on the forestland proposed to be divertedK.

  (i). Whether  the process for  settlement of Rights under  the Forest Rights Acts 2006 on  the forestland  proposed  to be diverted  has been  completed? : Yes

 

(a). Copy of documentry evidence in  support of settlement of rights under  the Forest RightsAct,2006 on  the forest land  proposed  to be diverted: Annexure Documentry Evidence

Details of land identified for Compensatory AfforestationL.

  (i). Whether  non-forest or  Revenue forest land  is required  to be provided  by User  Agency?: Yes

  (ii). Whether  the area of non-forest land  or  Revenue forest land  required  to be provided  by User  Agency for  raising Compensatory Afforestation  is less than  area of forest land  proposed  to be diverted?: No

  (iii). No. of districts involved  for  raising Compensatory Afforestation: 1

  (iv). No. of patches: One

District 1. : Rudraprayag

 

(a). Village: bhunaka

 

(b). Area(in  ha.): 5.565

 

(c). Copy of KML file of the patch: Annexure Patch

 

(d). Khasra details: -

 

(e). Present owner: Others

 

(f). Copy of ownership  proof: Annexure Copy of Ownership proof

 

(g). Copy of Mou/agreement executed  between  the Present owner  and  the UserAgency: Annexure Mou/Agreement/Letter of intent executed/issued

 

(h). Copy of non  encumberence certificate for  the forest land: Annexure nonencumberence certificate

 

(v). Scanned  copy of the map  of the land  identified  for  creation  of Compensatory Afforestationprepared  by using GPS ot Total Station: Annexure GPS or Total Station

 

(vi). Copy of Survey of India Toposheet in  1:50,000 scale indicating location  of the land  identifiedfor  creation  of Compensatory Afforestation: Annexure Survey of India Toposheet

Additional information Details

Documents

S.No DocumentsRemarks

1 Additional Info.

2 Additional Info.

3 Additional Info.

4 Additional Info.

5 Additional Info.

Print page