Гъвкави методологии за - iiba sofia · 2016-06-22 · 21-century company pains...

20
Zornitsa Nikolova Leanify Ltd. http://leanify.com T: +359 888 980 909 E: [email protected]

Upload: others

Post on 10-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Zornitsa Nikolova

Leanify Ltd.

http://leanify.com

T: +359 888 980 909

E: [email protected]

Page 2: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Toyota Production System

Page 3: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Drawing on the knowledge and creativity of individual workers

Shrinking of batch sizes

Just-in-time production

An acceleration of cycle times

Inventory control

Page 4: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

21-century company

Pains• VUCA: Volatility,

Uncertainty, Complexity, Ambiguity

• Fast-paced competition landscape

• New responsibilities (triple bottomline)

Gains• Flexibility• Adaptability • Utilize collective intelligence • Need for learning

organization

Page 5: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Eliminate waste

Amplify learning

Decide as late as possible

Deliver as fast as possible

Empower the team

Build integrity in

See the whole http://www.poppendieck.com/

Page 6: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Goals:

1. Increased throughput of value 2. Shortened lead times3. Reduced cost for deliveries

Input:• Ideas and

requirements• Materials• People

System Constraints

Output:• Value (to customer

=> to company)

Page 7: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

JIT 5S

Andon Kanban

A3 5 Whys

Standardization

Page 8: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

1. Identify Value

2. Map the Value Stream

3. Create Flow

4. Establish

Pull

5. Seek Perfection

Customer Needs

Key Concepts

• Value and waste• Optimizing the whole• Managing flow• Continuous improvement• People and leadership

Page 9: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Scope

De

tail

LEAN, KANBAN

AGILE

SCRUM

XPTDD…

Page 10: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition
Page 11: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Definition : As a principle, it means doing 'first things first;' as a process, it means evaluating a group of items and ranking them in their order of importance or urgency.

Source: Mike Cohn

Page 12: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Financial value Net present value (NPV) Return on investment (ROI) Payback period Discounted payback period

Desirability/Customer Satisfaction

Kano model

Important but hard to apply on feature level

Can be used on any granularity level

Page 13: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Expected features; adding more of

them does not raise satisfaction beyond

a certain point

The more, the better

Will buy the product without

those, but having them will

differentiate the product

Page 14: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Mandatory: Has bathroom Clean

Linear: Fresh towels Aroma candles Flowers Cosmetics

Exciters: Jacuzzi Champagne

compliment

Page 15: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

2 Types of Questions

Functional: How would you feel if Jacuzzi was

available?

Dysfunctional: How would you feel if Jacuzzi was

not available?

Answers:I like it that way

I expect it to be that wayI am neutral

I can live with it that wayI dislike it that way

Page 16: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition
Page 17: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Priority on must-have itemsNot necessarily developed in the first iteration but must be

available before releasePareto principle might apply (not fully implemented)

Example: multi-language support at http://strikingly.com

As many linear features as possible

Example: Pictochart.com adds a possibility to create different formats of an infographic (online presentation, brochure, etc.); yet, their page editing tools are far less comprehensive as compared to MS Powerpoint.

Add at least a few delighters to differentiate

Page 18: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition
Page 19: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition
Page 20: Гъвкави методологии за - IIBA Sofia · 2016-06-22 · 21-century company Pains • VUCA: Volatility, Uncertainty, Complexity, Ambiguity • Fast-paced competition

Thank You!

http://leanify.com

@Leanify

https://goo.gl/iAA6VG

https://goo.gl/OAyq9T

FOLLOW US AT: