forestsclearance.nic.inforestsclearance.nic.in/...0_511512512111img_0017.pdf · created date:...

1
gft*<_"ac,=o-*.., CO grs-tl-35 Name of the proiect - uto gwn-* u}qqr d cn-fl.fd wItlE ftEft traqro{ d r-- -r' ftqqq.lT ete frEft +t fq-orssrs qqr d cn-f,tfa aqr r-qfr de{ qFf + o-lqrlrd t eifu+rr.r& q-fl-iq no +eq qr.f or Mq o-rd I Iask Force Certificate (i) Lay out of the Land-be followed as far as possible' r ---r --r trr, . (ii) Heary cutting/filling be avoided-as far as possible. The technology of cut and 1i11 method is to be adopted. Steep hill slopes also to be avoided' (ii, Unstable/slide-prone areas to be avoided. For identifying such areas the advice of Geotechnical engineers and geologists to be taken during the survey for alignment. (iv) Comparison oi uu.i"ow possible alignmJnts with ieference to erosion potential be made and the alignment involving minimum erosion risks be preferred' Apaft from the stage of planning the road aligmnent, effective steps ale also required to be taken by ground engineer during the process of ro*ad construction for minimized ecoiogical disturbance to the hill roads Broadly the measures to be taken have been identified as :- (i) Cut and frU method to be adopted while excavating for road formation and heavy earth cutting is to be avoided Box cutting is to be avoided to the extent possible' (ii) Blasting by explosives is to be restricted to the minimum. Lay out of holes tobe drilled for blasting is to be planned keeping in view the line of least resistance and the existence ofjoints Controlled blasting should be repeated using low charge and care be taken to avoid activating slide zones or widening ilssures and cracks in road. Use of delay detonators in large scale basting work is to be made for anaoline dispersion of chock waves, so that minirtum disturbance is caused to the rock stratum as a result ofthe blasting Process. (iii) All cut slopes, orrluUt. hill side and slide prone erosion prone areas are to be provided with suitable correction measures by using one or the other of the techniques developed by cRRI' Several techniques have been sponsored by CRRI. like simple vegetative totttirg, bitumen muck treatment and slide treatment by jute netting coir netting of theie simple vegetative turninq seems to be the most appropriate p..u.riir" *.uroi. in many situations. This should be established in the denuded slopes immediately after the excavation is made' (iv) Adequate drainage measures and protective structures like intercepting catch water drains, longitudinal drains/culverls, fireast walis, retaining walls are to be provided for purpose of establishing the slips Growth vegetative cover is to be stimilated in the disturbed hill slops above the road level by planting suitable fast growing shrubs and plants' In (v) over the past few years the roads wing of the Minisry of Shipping and transport has issued instruction laying down broad guidelines and ctieck list of the preparation of road construction projects which provide an inbuilt mlechanism of tackling land slides/erosion control for the guidance and follow up action by engineers of state'pWD'Bordlr Roads organization and others engaged in consffuction of hill roads. these should be observed' qqfrrd frrur qror t fu qtq-rT 3ilqi''T -&T{r rrfr-d ers qH griT q-{ffi E-ffi ri{gffi or qffiNrqr d FrqflT d d16 Gqqrdq gftkdd frrqr urtqr d t A erq{ {{6r{fi/@'M3rFq<l ftffi1 rqrg,c\oftofro AEIT I 3{lqe]I+fr ftqlq e,-s, ZIE'T I q.3T

Upload: others

Post on 26-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: forestsclearance.nic.inforestsclearance.nic.in/...0_511512512111IMG_0017.pdf · Created Date: 5/4/2018 4:58:37 PM

gft*<_"ac,=o-*.., COgrs-tl-35

Name of the proiect - uto gwn-* u}qqr d cn-fl.fd wItlE ftEft traqro{ dr-- -r'

ftqqq.lT ete frEft +t fq-orssrs qqr d cn-f,tfa

aqr r-qfr de{ qFf + o-lqrlrd t eifu+rr.r&q-fl-iq no +eq qr.f or Mq o-rd I

Iask Force Certificate

(i) Lay out of the Land-be followed as far as possible' r ---r --r trr, .

(ii) Heary cutting/filling be avoided-as far as possible. The technology of cut and 1i11 method is to be

adopted. Steep hill slopes also to be avoided'

(ii, Unstable/slide-prone areas to be avoided. For identifying such areas the advice of Geotechnical

engineers and geologists to be taken during the survey for alignment.

(iv) Comparison oi uu.i"ow possible alignmJnts with ieference to erosion potential be made and the

alignment involving minimum erosion risks be preferred'

Apaft from the stage of planning the road aligmnent, effective steps ale also required to be taken by ground

engineer during the process of ro*ad construction for minimized ecoiogical disturbance to the hill roads Broadly

the measures to be taken have been identified as :-

(i) Cut and frU method to be adopted while excavating for road formation and heavy earth cutting is to be

avoided Box cutting is to be avoided to the extent possible'

(ii) Blasting by explosives is to be restricted to the minimum. Lay out of holes tobe drilled for blasting is

to be planned keeping in view the line of least resistance and the existence ofjoints Controlled blasting

should be repeated using low charge and care be taken to avoid activating slide zones or widening

ilssures and cracks in road. Use of delay detonators in large scale basting work is to be made for

anaoline dispersion of chock waves, so that minirtum disturbance is caused to the rock stratum as a

result ofthe blasting Process.(iii) All cut slopes, orrluUt. hill side and slide prone erosion prone areas are to be provided with suitable

correction measures by using one or the other of the techniques developed by cRRI' Several

techniques have been sponsored by CRRI. like simple vegetative totttirg, bitumen muck treatment and

slide treatment by jute netting coir netting of theie simple vegetative turninq seems to be the most

appropriate p..u.riir" *.uroi. in many situations. This should be established in the denuded slopes

immediately after the excavation is made'

(iv) Adequate drainage measures and protective structures like intercepting catch water drains, longitudinal

drains/culverls, fireast walis, retaining walls are to be provided for purpose of establishing the slips

Growth vegetative cover is to be stimilated in the disturbed hill slops above the road level by planting

suitable fast growing shrubs and plants' In(v) over the past few years the roads wing of the Minisry of Shipping and transport has issued instruction

laying down broad guidelines and ctieck list of the preparation of road construction projects which

provide an inbuilt mlechanism of tackling land slides/erosion control for the guidance and follow up

action by engineers of state'pWD'Bordlr Roads organization and others engaged in consffuction of

hill roads. these should be observed'

qqfrrd frrur qror t fu qtq-rT 3ilqi''T -&T{r rrfr-d ers qH griT q-{ffi E-ffi ri{gffi

or qffiNrqr d FrqflT d d16 Gqqrdq gftkdd frrqr urtqr d t

Aerq{ {{6r{fi/@'M3rFq<l

ftffi1 rqrg,c\oftofroAEIT I

3{lqe]I+fr

ftqlq e,-s,ZIE'T I

q.3T