© copyright 2012 osisoft , llc....note: future dates are subject to change. last updated: 04-2012...

76
© Copyright 2012 OSIsoft, LLC.

Upload: others

Post on 21-Mar-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Page 2: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

Presented by

© Copyr i gh t 2012 OSIso f t , LLC.

PI System 2012 Now and Beyond

Chris Ong OSIsoft

2

Page 3: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 3

PI System Overview

Data Access Services SQL-Based OPC Web Services SDKs

Real-time Interfaces

IT Data

Custom Data APIs / SDKs

Relational Data OLEDB / ODBC SQL SERVER /

ORACLE

Batch Data BATCH EXECUTION

SYSTEMS

Real-Time Data DCS / PLC / SCADA / OPC

HISTORIANS / INTERFACES

High Availability (option)

Windows Security PI Data Archive

PI Notifications PI Analytics

PI Asset Framework

Health Monitoring

Page 4: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 4

Disclaimer

This story is not yet rated

No animals were harmed in the process of this story. All characters and entities portrayed in this story are fictitious. Any resemblance to real persons, living or dead is purely coincidental.

Page 5: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 5

Agenda

• Full-page photo: Use “Photo – full-page” layout. Image must be high resolution.

• With caption - “Photo – full-page w/ caption” • Uncropped/irregular images: Use “Blank” or

“Title only” layout

Petrolux

5 Refinery

Chemical Plant

Pipelines and Storage

Headquarters

Oil Production

Page 6: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 6

Anacortes

6 Refinery

Chemical Plant

Headquarters

Pipelines and Storage

Oil Production

Page 7: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 7

Page 8: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 8

Page 9: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 9

Page 10: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 10

Anacortes over time..

10 Refinery

Chemical Plant

Headquarters

Pipelines and Storage

Oil Production

Page 11: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 11

Page 12: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 12

Page 13: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 13

Page 14: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 14

Page 15: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 15

Baton Rouge

15 Refinery

Chemical Plant

Headquarters

Pipelines and Storage

Oil Production

Page 16: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 16

Page 17: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 17

Page 18: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 18

Page 19: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 19

Page 20: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 20

Page 21: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 21

Page 22: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 22

Page 23: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 23

Page 24: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 24

Page 25: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 25

Page 26: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 26

26 Refinery

Chemical Plant

Headquarters

Remaining Refineries

Pipelines and Storage

Oil Production

Page 27: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 27

27

PI Event Frames is a core capability of the PI Server to record important process or business events and help you find the related data.

Event Attribute Value

Name Ex 20121215-0002

Start 15-Dec-2012 10:35:02

End 15-Dec-2012 10:47:26

Duration 12 min, 24 sec

Asset Boiler-352

Excursion Type High Violation

Fuel Gas Flow.Avg 37.12 k sft3/h

Fuel.Start 823.48 k sft3/ton

myPIKPI.Max 47.19 bbl/d

Excursions (4) Downtime (3) Product XYZ (1)

Page 28: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 28

Page 29: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

PI Notifications

• Define key events

• Customize message content

• Send to people and systems

• Acknowledge and escalate

• Simplify deployment with templates

29

No ACK? Escalate

T

Page 30: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 30

Page 31: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 31

Page 32: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 32

Page 33: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 33

Page 34: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 34

Page 35: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 35

Page 36: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 36

36 Refinery

Chemical Plant

Headquarters

Corporate PI System

PI to PI

Pipelines and Storage

Oil Production

Page 37: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 40

Refinery

Chemical Plant

Headquarters

PI to PI

Rollout, Part 2

Pipelines and Storage

Oil Production

Page 38: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 41

2010 R3 Max Point Count 2M+ tags

Point Changes <10 pt/sec

Startup Time >20 minutes

Real-time Updates 200K signups

Max Data Rate <100K ev/sec

Query Throughput <1M ev/sec

Online Archives <10K files

2012 Max Point Count 10M tags

Point Changes >1,000 pt/sec

Startup Time <4 minutes

Real-time Updates >1M signups

Max Data Rate 500K ev/sec

Query Throughput >5M ev/sec

Online Archives >50K files

Page 39: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

PI Server 2012 is More Resilient

42

PI DataLink

PI WebParts

PI ProcessBook

PI Interface PI Server

PI Coresight

Page 40: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Resilient During: Restarting from Hard Power Stop

43

PI Interface PI Server

PI DataLink

PI WebParts

PI ProcessBook

PI Coresight

Page 41: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Resilient During: Heavy Backfilling

44

PI Interface PI Server

PI DataLink

PI WebParts

PI ProcessBook

PI Coresight

Page 42: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Resilient During: Large Point Building Operations

45

PI Interface PI Server

PI DataLink

PI WebParts

PI ProcessBook

PI Coresight

Page 43: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Resilient During: Large PI OLEDB Queries

46

PI Interface PI Server

PI DataLink

PI WebParts

PI ProcessBook

PI Coresight

Page 44: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Resilient During: Network Disruption, Reconnection

47

PI Interface PI Server

PI DataLink

PI WebParts

PI ProcessBook

PI Coresight

Page 45: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Resilient During: Backup Operations

48

PI Interface PI Server

PI DataLink

PI WebParts

PI ProcessBook

PI Coresight

Page 46: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Resilient During: Several Events at the Same Time

49

PI Interface PI Server

PI DataLink

PI WebParts

PI ProcessBook

PI Coresight

Page 47: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

DATA BACKFILLING

50

Historical Data in

Legacy System

PI Interface PI Server

Page 48: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

DATA BACKFILLING

51 51

2010 R3 1 Create PI Points Minutes

2 Delete Pt. Created Minutes

3 Check Disk Space Minutes

4 Reprocess Archives Days/Weeks

5 Create Archives Minutes

6 Backfill Data Hours/Days

2012 1 Create PI Points 5x Faster

2 Delete Pt. Created Zero

3 Check Disk Space Minutes

4 Reprocess Archives Zero

5 Create Archives Minutes

6 Backfill Data 5x Faster

Page 49: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Petrolux Value from PI Server 2012

• Simplified Installation, Automatic Backfilling

• Very high Scale for growth

• Faster queries and response

• More Resilient during atypical scenarios

52

Page 50: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 53

OSISOFT NOC

Page 51: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 54

OSISOFT IT SYSTEMS 20 OSIsoft Office Locations Servers

• CPU, Memory, Disk Space, etc. Network

• Ping Time, Bandwidth, Errors Facilities

• Building Power Usage • Rack Load • UPC Battery Status • Cooling (HVAC, temperature)

More…

Page 52: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 55

Project Abacus Configured and Programmed

Calculations for PI AF

Page 53: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Project Abacus Use Case

56

Efficiency

Extruding Process

Boiler1 Flow Out Fuel Flow Rate

Boiler2 Flow Out Fuel Flow Rate

Efficiency

Boiler3 Flow Out Fuel Flow Rate Efficiency

Boiler Template

Boiler Efficiency = AVG(B1..Bn)

Efficiency = (Flow Out / Fuel Flow Rate * 3.14)

Or myProgrammedCalc (Flow Out, Fuel Flow Rate)

Page 54: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 57

Discover Event Interrelationships

Perform Asset Comparisons

Perform Event Comparisons

Simplify Data Analysis

myEvent

Event Overlay Trend (Temp) Name

Temp.Max

EF1 122.47

EF2 109.34

EF3 112.73

EF4 98.61

EF5 125.24

Downtime Product XYZ (1)

Downtime Events for Product XYZ

(2)

Page 55: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 58

PI Event Frames is a core capability of the PI Server to record important process or business events and help you find the related data.

Event Attribute

Value

Name Ex 20121215-0002

Start 15-Dec-2012 10:35:02

End 15-Dec-2012 10:47:26

Duration 12 min, 24 sec

Asset Boiler-459

Excursion Type High Violation

Fuel Gas Flow.Avg 37.12 k sft3/h

Fuel.Start 823.48 k sft3/ton

myPIKPI.Max 47.19 bbl/d

Excursions (4) Downtime (3) Product XYZ (1)

Page 56: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Event Generation in Abacus

59

|Efficiency

|Efficiency

“Abacus” Efficiency

Efficiency = (Flow Out / Fuel Flow Rate * 3.14)

myEF

myEF.Start = (Efficiency > LIMIT) myEF.End = (Efficiency < LIMIT) AND (Fuel Flow Rate > 80)

|Fuel Flow Rate |Flow Out

Page 57: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 60

2013 FUTURE 2011 2012

1H 2H 1H 2H 4Q

NOTE: Future dates are subject to change. Last Updated: 04-2012

Wave 2 – Event Frames for the Mainstream

Wave 3 – Batch Moves to

Event Frames

End-to-End Event Frames Experience • Ability to generate Event Frames automatically • Several event frame visualization options G

oal

Move PI Batch Customers Forward

• Batch to EF Migration • Functional

Equivalency with existing Batch Clients

Goa

l

Wave 1 – Partner

and Early Adopters

Page 58: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Find - PI System Search

• Optimized Search Engine for the whole PI System – And perhaps related systems

• Indexed for high performance • Weighted / Ranked Results

– Helps you find things more easily • Can crawl many PI System machines • Includes client artifacts

– PI ProcessBook Displays, PI Coresight Displays • Common User Experience

61

Page 59: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Data

Load Curve (Actual) Load Forecast (Predicted)

time

Future Data Coming – Next PI Server

Just works with the PI System: • Interfaces • Analytics • Data Access • Visualization

62

Page 60: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

PI Coresight with Mobile Clients

63

PI Server(s) (PI Data Archive & PI AF)

PI Coresight Application Server

Browser Clients

iPad Windows8 Android Smart Phones

Page 61: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

PI WebParts 2012

• Support for SharePoint 2010 and SharePoint “15” • Become a better SharePoint corporate citizen • Become a more “IT” friendly product • Replace obsolete technology • Set the stage for OS and Browser independence,

Mobile

• Remote Data Services • WSP Installs • Can leverage Adobe SVG Viewer if

needed • Support for IE 8

• Remote Data Services • WSP Installs • Visualization using Web

Standards • Support for IE9, IE10, Firefox, and

Chrome 64

Page 62: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 65

What’s the difference? • Coresight

1. Lightweight 2. No Sharepoint required 3. Only PI data 4. Limited sharing & collaboration capabilities

• Webparts

1. Requires Sharepoint 2. Variety of sharing features 3. Display data from different sources 4. Display data in different formats

Page 63: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

• PI System Management • PI Data Exchange • PI Coresight Service • Data, Visualization and

other services for Partner and Custom Apps

PI Cloud Initiatives

Add to existing PI System installations

Full PI System Deployment in the Cloud

• Simplified Deployment and Management

• Take advantage of the Windows Azure Platform (PaaS)

• Functionality you know in the PI System today plus much more

• Highly efficient and elastic

66

Page 64: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

PI System Data Exchange Service

PI Data Exchange Service

On-Premise Customer 1 AD

Secure WAN/LAN Connection

Customer 2 AD Customer n AD

Secure WAN/LAN Connection Secure WAN/LAN Connection

PI System Customer Portal

67

Page 65: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

PI Coresight Service

PI Coresight Service with Mobility

On-Premise Customer 1

AD

Customer 2 AD

Customer n AD

Secure WAN/LAN Connection Secure WAN/LAN Connection

Secure Internet (3G/4G/Wifi) Connection

Remote / Mobile Users

PI Customer Portal

68

Secure WAN/LAN Connection

Page 66: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

PI Interfaces

Collect and store the data from all your sensors and systems

69

Page 67: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

UFL Designer: better for XML files

• Coming soon

70

Page 68: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

PI Interfaces and PI Server 2012

• Easier backfilling for any PI Interface • PI Interface for IEEE C37.118

– High-speed phasor data • PI Interfaces for AMI

– Collect data from many meters • PI Interfaces for batch and manufacturing

execution systems – Population of Assets and Event Frames

71

Page 69: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

New PI Interfaces on the Horizon

• Continuous improvements to many • PI Interface for OPC UA • PI Interface for Emerson DeltaV (OPC .Net) • PI Interface for Bachmann Controller • PI Interface for IEC 61850 (substations, wind, …) • PI Interface for OpenPDC • PI Interface for OnRamp CIMA (wireless T&D) • PI Interface for Aker Decoder (oil and gas: drilling)

72

Page 70: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Our Demonstrations

• PI Server 2012

• PI Asset Framework 2012

• PI Notifications 2010

• PI OLEDB Enterprise 2012

• Event Frame Gen

Interface

• PI ProcessBook 2012

• PI Coresight 2012

• PI DataLink 2012

• PI Web Parts 2010

Beta

Beta

Released

Alpha

Alpha

Released

Beta

Beta

Released

73

Page 71: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Our Demonstrations

• PI Server 2012

• PI Asset Framework 2012

• PI Notifications 2010

• PI OLEDB Enterprise 2012

• Event Frame Gen

Interface

• PI ProcessBook 2012

• PI Coresight 2012

• PI DataLink 2012

• PI Web Parts 2010

Release in Q3

Release in Q3

Released

Release in Q3

Release in Q3

Released

Release in Q2

Release in Q3

Released

74

Page 72: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC.

Stay Up-To-Date on the Web

75

• PI System Roadmap on OSIsoft Technical Support Site

http://techsupport.osisoft.com/techsupport/NonTemplates/roadmap.aspx

Page 73: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. © Copyr i gh t 2012 OSIso f t , LLC. INDIA REGIONAL SEMINAR 2012

THANK YOU

Page 74: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. © Copyr i gh t 2012 OSIso f t , LLC. INDIA REGIONAL SEMINAR 2012

THANK YOU Silver Sponsors

Page 75: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 78

Page 76: © Copyright 2012 OSIsoft , LLC....NOTE: Future dates are subject to change. Last Updated: 04-2012 Wave 2 – Event Frames for the Mainstream Wave 3 – Batch Moves to• Simplified

© Copyr i gh t 2012 OSIso f t , LLC. 79

Ex02

Ex03 Ex04

Ex01

DT47 DT45

XYZ146

DT46

Name Start End Duration

Element Category Template Reason Code Temp.Ma

x

Ex01 16-Dec-2011 23:05:48

17-Dec-2011 00:25:24

01:19:36

B-459 Excursions Boiler KPI Excursion

High Temp 91.2

Ex02 17-Dec-2011 02:37:19

17-Dec-2011 04:12:07

01:34:48

B-459 Excursions Boiler KPI Excursion

Low Pressure 54.1

DT45 17-Dec-2011 04:31:22

17-Dec-2011 05:20:34

00:49:12

B-459 Downtime Boiler Downtime Broken Thermo

32.4

DT46 17-Dec-2011 07:56:58

17-Dec-2011 08:19:46

00:22:48

B-459 Downtime Boiler Downtime Broken Thermo

31.7

DT47 17-Dec-2011 09:41:22

17-Dec-2011 10:52:58

01:11:36

B-459 Downtime Boiler Downtime Safety Shutdown

87.2

XYZ146

17-Dec-2011 13:12:34

17-Dec-2011 16:29:22

03:16:48

B-459 Product XYZ

PIUnitBatch n/a 48.9

Ex03 17-Dec-2011 19:28:58

17-Dec-2011 20:41:22

01:12:24

B-459 Excursions Boiler KPI Excursion

High Temp 95.3

Ex04 17-Dec-2011 21:44:58

17-Dec-2011 22:45:46

01:00:48

B-459 Excursions Boiler KPI Excursion

Low Temp 20.4

All None

EVENT FILTERS Duration Longer Shorter Than Than 0 m 200 m

Category Excursions (4) Downtime (3) Product XYZ (1)

Template Boiler Downtime (3) Boiler KPI

Excursion (4) PIUnitBatch (1) Temp.Max Greater Less Than Than 0 C 100 C

All None

Highlight Events