Attachment K
Project Cost Plans
The New Museum in Western Sydney
R LB 1 Rider Levett Bucknall
Rider Levett Bucknall NSW Pty Ltd ABN 94 003 234 026
Level 19, 141 Walker Street North Sydney NSW 2060 PO Box 531
North Sydney NSW 2059 Australia
Tel: +61 2 9922 2277 Fax: +61 2 9957 4197 Email: sydnevaau.rib.Com
facsimile
To
Company From
CC
Subject
Fax No Date
No of Pages Including this sheet
CC Fax No Job Ref
Eugenie Finn
By e-mail
Johnstaff
24.10.2017
Ray Berger
Anna Cuthbertson
Western Sydney Museum Options 1-3 Preliminary Budget Estimates & Cash Flows
16131-10
Hi Eugenie
Further to your emails dated 23.10.2017 and as instructed, attached please find copy of the preliminary budget estimate update for the Options 1-3.
A summary of the results is as follows: (refer attached work sheet. excl. GST)
Option 1: Option 2: Option 3:
Please notemese estimates are oasea n the target and grossed up areas as detailed in the schedule of areas in the FKM endorsed options report dated 20.09.2017 and attached to JS email dated 20.10.2017.
Due to the limited and preliminary information available, we have based the preliminary high level order of cost budget estimates on the information provided and our understanding of the required scope of work. No fully detailed design architectural, structural or civil detailed information was available for this exercise.
Mechanical, electrical & communications, lighting, lifts, fire services and hydraulic services budgets have been incorporated as advised by Steensen Varming and Warren Smith & Partners respectively. An allowance for security has been incorporated by RLB. We draw your attention to the item details, notes and exclusions. Please advise should you require any amendments.
As instructed, client transition costs and digitisation, non-exhibition back of house removals and Museum MAAS staff operating costs are excluded.
We recommend that this preliminary budget estimate is proven up as the design develops and more information is available.
Consultant fees, council fees, preliminaries, builder's margin, contingency and escalation to completion in 2023 is included. GST is excluded
We are available to sit with you and review after you have had the opportunity to go through. We trust this is in accordance with your requirements and please let me know should you require any additional information.
Thank You
Please contact us if any part of this transmission Is Incomplete, illegible or was received in error. Information In this facsimile may be privileged and / or confidential and must not be used In any unauthorised way.
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT
Estimated rates
Cost/m2 of Gross Floor Area
MAAS Riverbank Option 1
m2
Cost
Cost/m2
10RiverBank Building
110External Works, Demolition & Civils
120Exhibition Infrastructure & Fitout
130Provisional Allowance FF&E
140Client Direct Costs
180Contingency, Fees & Escalation
Grand Total
EB16131-12
PRINTED 24 OCT 2017 11:14amPAGE GS.1Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT
Estimated rates
Cost/m2 of Gross Floor Area
(Cost/m2) (Cost)MAAS Riverbank Option 2
10RiverBank Building
110External Works, Demolition & Civils
120Exhibition Infrastructure & Fitout
130Provisional Allowance FF&E
140Client Direct Costs
180Contingency, Fees & Escalation
Grand Total
EB16131-12
PRINTED 24 OCT 2017 11:14amPAGE GS.1
Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT
Estimated rates
Cost/m2 of Gross Floor Area
(CostCost/m2
)MAAS Riverbank Option
05MAAS Riverbank Building
110External Works, Demolition & Civils
120Exhibition Infrastructure & Fitout
130Provisional Allowance FF&E
140Client Direct Costs
180Contingency, Fees & Escalation
Grand Total
EB16131-12
PRINTED 24 OCT 2017 11:15amPAGE GS.1
Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
BASIS OF Budget Estimates Update Options 1-3
Due to the limited and preliminary information available, we have prepared this high level order of cost budget estimate based on the information provided and our understanding of the required scope of work.
The estimates have been derived using a combination of measure quantites and applied rates, and composite rates applied to functional areas to arrive at a total project cost.
As instructed, we have based our estimates on the following documentation: Architectural:
Fender Kastalides Mirams - Options 1-3, and Schedule of Functional Areas dated 20.09.2017 attached to Johnstaff emails dated 20.09.2017 and 26.09.2017.
Finishes have been incorporated as previously advised during our involvement
and FKM advice during 2016.
Structural:
Taylor Thomson & Whiting - Preliminary Information as emails dated
25.09.2017 and 26.09.2017. This works with the existing levels and provides an
undercroft to maintain flood contours.
Engineering services budget estimates have been incorporated as follows:
Steensen Varming - email dated 06.10.2017.(Electical, Mechanical & Lifts)
Warren Smith & Partners - email dated 06.10.2017.(Fire & Hydraulics)
Museum Staff budget estimates have been incorporated as follows:
CIPMO Staff - $18,263,671 as Johnstaff email dated 23.10.2017
MAAS Staff - $1,086,481 as Johnstaff email dated 23.10.2017
In order to arrive at an all up project cost, where information has not been available due to the early stages of the project design, it has been essential for us to make numerous assumptions based on our experience in relation to, building fabric, structure, finishes, engineering services, fitout and infrastructure.
The benchmark target for the project is for a best practice international museum quality building with a sustainable design.
As instructed, digitisation, logistics & relocations have been excluded. We understand these are to be advised by other consultants and treated as operating costs.
We recommend that this preliminary high level order of cost budget estimate is proven up as the design develops and more information is available.
We have assumed that the project will be tendered on a fixed lump sum competitive basis to a mix between three and five tier 1 and tier 2 contractors. As Johnstaff email dated 23.06.2017 we understand that the programme timing for a museum opening is now during 2023.
ITEMS SPECIFICALLY EXCLUDED
In compiling this Preliminary Budget Estimate, no allowance has been made for the following cost items. Allowances for these items should be added as appropriate to establish the total project cost. If required, we can provide assistance to assess these allowances.
EB16131-12
PRINTED 24 OCT 2017 11:18amPAGE iiRider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ITEMS SPECIFICALLY EXCLUDED (Cont'd)
Any costs and fees as a result of any development approval resubmissions
Any special or additional contributions sought by authorities for public
or other facilities as a condition of development approval
Artworks content
Exhibition or Sculpture content
Cost increases beyond December 2023
Site services and diversions in excess of notional, allowances
Finance costs and interest charges
Goods and Services Tax
Land and legal costs
Loose furniture, fittings and equipment in excess of notional allowances
Promotion/Marketing costs
Public utilities' charges, contributions and levies, in excess of headworks
allowance
Real Estate Agent's fees and leasing cost
Removal of asbestos and other hazardous materials
Site decontamination, remediation
Occupant incentive and/or relocation contributions
Off site rental or storage for alternate accommodation, we have assumed that
the Ultimo site is used for decanting and storage and there is sufficient
accommodation at the Castle Hill and Parramatta sites.
Underpinning works to adjoining buildings / structures, if required
Work outside site boundaries in excess of notional allowances for roadworks
ie bus drop zone, egress turning
Strengthening or futureproofing structures for additional levels, ie
commercial offices, residential
Commercial offices or Residential buildings
Off site parking, pedestrian links, pedestrian overpass bridge
Work to Harwood and Powerhouse Ultimo sites, (note some demolition included)
Work in connection with archaeological and indigenous people investigations
Special ESD inititives, such as Co-Generation, Tri-Generation, Blackwater
Electromagnetic shielding
Relocation or modification to powerlines on or offsite
Offsite wayfinding signage i.e. within the Parramatta CBD
Off site rental / accommodation for relocated Harwood workshop
Staging / phasing costs
Transport infrastructure Levies
Large objects store - off site, if required
Collection digitisation, treatment / assessment, logistics, transport
Project Delivery museum operating costs
BOH non exhibition removal transition costs
Project delivery museum capex staff in excess of JS email dated 23.10.2017
EB16131-12
PRINTED 24 OCT 2017 11:18amPAGE iii
Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT
Estimated rates
Cost/m2 of Gross Floor Area
MAAS Riverbank Option
10FOH Foyer Ticketing
20Commercial
30Touring Gallery A
50Children's Gallery
90Main Galleries
70Ideas Lab / Educational Spaces
60Auditoriums and Studios
103BOH Storage and Offices
104Circulation & Amenities
109Plant and equipment
110External Works, Demolition & Civils
120Exhibition Infrastructure & Fitout
130Provisional Allowance FF&E
140Client Direct Costs
180Contingency, Fees & Escalation
CostCost/m2
Grand Total
EB16131-12
PRINTED 24 OCT 2017 12:02pmPAGE GS.1
Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT
Estimated rates
MAAS Riverbank Option 1: External Works, Demolition & Civils
(Value)RefDescription
SUBSTRUCTURE
10allowance for piled foundations
11allowance for podium columns to create
undercroft
INTERNAL SCREENS AND BORROWED LIGHTS
261allowance for special balustrading FLOOR FINISHES
292allowance for timber decking / granite to outdoor public
CEILING FINISHES
319allowance for finishes to soffits metal
timber / off form tba
HYDRAULIC SERVICES
221allowance for external hydraulic services
as Warren Smith email dated 06.10.2017 rainwater tank, sewer drainage, domestic cold water and natural gas
222allowance for hydraulic services
deviations as Warren Smith email dated 06.10.2017 sewer main
FIRE PROTECTION
218allowance for external fire services as
Warren Smith email dated 06.10.2017 combined fire and hydrant tank, pumps and connections
ELECTRIC LIGHT AND POWER
17allowance for external electrical and substation as Steensen Varming email dated and 06.10.2017
323allowance for standby generator as
Steeensen Varming email 06.10.2017
Carried Forward $
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 1
Rider Levett Bucknall
(Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT) (Estimated ratesMAAS Riverbank Option 1: External Works, Demolition & Civils) (RefDescription) (Value) (ELECTRIC LIGHT AND POWER (Continued) Brought Forward $324allowance for solar panels as Steensen Varming email dated 06.10.2017) (325allowance for electrical diversions as Steensen Varming email dated 06.10.2017 and updated as email dated 19.10.2017 as instructed JS email 23.10.2017) (326allowance for new lead in & NBN as Steensen Varming email dated 06.10.2017) (327allowance for lighting as Steensen Varming email dated 06:10.2017SITE PREPARATION6allowance to strip site, paving) (38allowance for civil excavation works tosite to formation level circa lm, (note: refer to separate allowance for removal of general solid waste, if required)) (331allowance for removal of general solid waste, if required (assumed excluded existing car park area and buildings, to be confirmed), where site stripped to formation levels) (ROADS, FOOTPATHS AND PAVED AREAS) (18allowance to upgrade roads and footpathsoutside the site boundary, if required) (121allowance for on site roads, bus, coachparking, paving) (128 al-lovranoe-for-off-si-tetraffic signals upgrading / installation) (Carried Forward $) (EB16131-12PRINTED 24 OCT 2017 11:16am) (Rider Levett Bucknall) (PAGE 2)
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT
Estimated rates
MAAS Riverbank Option 1: External Works, Demolition & Civils
(Qty
RateValue
) (Unitm2m3m2No m2mNo No)RefDescription
LANDSCAPING AND IMPROVEMENTS
Brought Forward $
16allowance for public domain works, landscaping and fencing, if required
328allowance for imported fill to landscaped areas (excludes riverbank)
EXTERNAL STORMWATER DRAINAGE
19allowance for possible future overland flow path including shaping ground levels and building line for on site stormwater
117allowance for stormwater connection
127allowance for stormwater drainage to roads and parking
329allowance for stormwater diversions
330allowance to remove existing stormwater pipework
EXTERNAL SPECIAL SERVICES
8allowance to disconnect existing services
15allowances for site servicesamplification, if required
ALTERATIONS AND RENOVATIONS TO EXISTING EXTERNAL WORKS
(m2m2No)5demolish and remove existing car parking,
other on site buildings
9
allowance to demolish and remove existing heritage buildings including salvaging valuable items , if required
SPECIAL PROVISIONS
14allowance for flood mitigation - reduced
allowance as building generally above the flood plane - if required
Carried Forward $
EB16131-12
(Rider Levett Bucknall)PRINTED 24 OCT 2017 11:16amPAGE 3
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT
Estimated rates
MAAS Riverbank Option 1: External Works, Demolition & Civils
(RateValue) (RefDescription) (Qty)
(UnitNo)PRELIMINARIES
Brought Forward $
210allowance for builders preliminaries, margins and builders works in connection with services included within the individual rates
MAAS Riverbank Option 1 110 Total $
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 4
Rider Levett Bucknall
(Rider Levett Bucknall) (EB16131-12PRINTED 24 OCT 2017 11:16amPAGE 5) (Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT) (Estimated ratesMAAS Riverbank Option 1: Exhibition Infrastructure & Fitout) (RefDescription) (EXHIBITION INFRASTRUCTURE & FITOUT) (1allowance for exhibition infrastructureto Major Touring Hall, $/m2 rate to beproven up on discussion with MAAS) (2allowance for exhibition infrastructureto Temporary Galleries as follows, $/m2rate to be proven up on discussion withMAASScienceDesign) (3allowance for exhibition infrastructure &fitout to Permanent Galleries as follows, $/m2 rate to be proven up on discussion with MAASLong Term Gallery) (145allowance for exhibition infrastructure &fitout to Permanent Galleries as follows, reduced $/m2 rate due to lower fitout requirement be proven up on discussion with MAASChildren's GalleryLearning Labs) (146allowance for exhibition infrastructureto circulation areas, say 15% of exhibition area, equates to circa 40-50% of circulation, $/m2 rate applied to be proven up on discussion with MAAS) (147allowance for visible collection storage,if required) (Value) (Unit) (Qty
) (Rate) (m2) (m2) (m2) (m2) (m2) (m2) (MAAS Riverbank Option 1 120 Total $)
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT
Estimated rates
MAAS Riverbank Option 1: Provisional Allowance FF&E
RefDescription
Unit
Qty
Rate
Value
FURNITURE FITTINGS AND EQUIPMENT
4provisional allowance for Furniture, Fittings and Equipment
No
MAAS Riverbank Option 1 130 Total $
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 6Rider Levett Bucknall
(m) (358special hoardings, existing PHM site asRPA email dated 30.09.2016) (Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT) (Estimated ratesMAAS Riverbank Option 1: Client Direct Costs) (RefDescription) (SPECIAL SERVICES 74allowance for IT ALTERATIONS AND RENOVATIONS) (98allowance to demolish and dismantle of existing exhibit surrounds and showcasing existing PHM site as RPA email dated 30.09.2016) (141allow to demolish and remove mezzaninefloor, decking existing PHM site as RMA email dated 30.09.2016) (142allowance to demolish and remove entry awning for large object removal existing PHM site as RPA email dated 30.09.2016) (143allowance to demolish and remove externalwall and reinstate, to create break through zone existing PHM site as RPA email dated 30.09.2016) (144allowance to demolish and remove concrete/ brick plinth, existing PHM site as RPA email dated 30.09.2016) (354allowance to demolish and remove courtyard cafe, existing PHM site as RPM email dated 30,09.2016) (355allowance to demolish stairs levels 1-2 transport, existing PHM site as RPA email dated 30.09.2016) (356allowance for removable steel plates andbackpropping to distribute load during removal, existing PHM site as RPA email 30.09.2016) (357allowance for concrete pad for relocationduring removal, existing PHM site as RPA email 30.09.2016) (Carried Forward $) (Qty
) (Rate) (Value) (Unit) (No) (m2) (m2) (m2) (m2) (m2) (m2) (No) (m2) (m2)
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 7
Rider Levett Bucknall
(Rate) (Value) (Qty
) (Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT) (Estimated ratesMAAS Riverbank Option 1: Client Direct Costs) (RefDescription) (ALTERATIONS AND RENOVATIONS (Continued) ) (Brought Forward $) (359allowance for structural works to suit setting up and removal of small crane, existing PHM site as RPA email 30.09.2016) (360allowance for dust sheeting / preotectionduring the works to suit sequential object removal existing PHM site as RPA email 30.09.2016) (SITE PREPARATION) (375allowance to relocate existing workshopHarwood site as RPA email 30.09.2016) (376allowance for temporary demountable wallsand doors existing Harwood site as RPA email 30.09.2016) (377allowance for temporary ceilings existingHarwood site as RPA email 30.09.2016) (378allowance for lab benches existing Harwood site as RPA email 30.09.2016) (379allowance for perimeter storage shelvingexisting Harwood site as RPA email 30.09.2016) (380allowance to create materials storeexisting Harwood site as RPA email 30.09.2016) (381allowance for hydraulic services reconfiguration existing harwood site as RPA email 30.09.2016) (382allowance for electrical services reconfiguration existing harwood site as RPA email 30.09.2016) (Carried Forward $) (EB16131-12PRINTED 24 OCT 2017 11:16amPAGE 8) (Rider Levett Bucknall) (Unit) (m2) (m2) (m2m2m2Nom) (m2) (m2) (m2)
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT
Estimated rates
MAAS Riverbank Option 1: Client Direct Costs
RefDescription
Unit
Qty
Rate
Value
CLIENT DIRECT COSTS
No
No
No
No
Brought Forward $
415allowance CIPMO Project delivery staff - as Johnstaff email dated 23.10.2017
416allowance MAAS staff - as Johnstaff email dated 23.10.2017
CLIENT MISCELLANEOUS DIRECT COSTS
400collection and logistics - digitisation
equipment as Johnstaff email dated 11.01.2017
CONSULTANT FEES
399professional fees for the site
acquisition works as Johnstaff email
dated 11.01.2017(note: fixed lump sum not subject to escalation), Excluded for current schemes as JS email 30.05.2017
MAAS Riverbank Option 1 140 Total $
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 9Rider
Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 1 REPORT
Estimated rates
MAAS Riverbank Option 1: Contingency, Fees & Escalation
RefDescription
Unit
Qty
Rate
Value
CONSTRUCTION CONTINGENCY
Sum
Sum
Sum
Sum
Sum
Sum Sum
Sum
22allowance for 10% construction design development contingency
23allowance for 10% construction contingency EXHIBITION FITOUT AND INFRASTRUCTURE CONTINGENCY
26allowance for 15% exhibition
infrastructure, fitout and FFE contingency
SITE AGREEMENT
36allowance for construction site allowance
AUTHORITY FEES
27allowance of 1.50% for construction authority fees
CONSULTANT FEES
24allowance for building consultants fees
25allowance for 20% exhibition
infrastructure, fitout and FFE design fees
FUTURE COST INCREASES
28allowance for future cost increases up to construction and during construction
2017 - 4.25% pa
2018 - 4.0% pa
2019 to 2020 - 3.5% pa
2021 to 2023 - 4.0% pa
MAAS Riverbank Option 1 180 Total $
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 10Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT
Estimated rates
Cost/m2 of Gross Floor Area
MAAS Riverbank Option 2
m2Cost $
% ICost/m2
(20) (10)FOH Foyer Ticketing
(30)Commercial
(50)Touring Gallery A
(90)Children's Gallery
(70)Main Galleries
(60)Ideas Lab / Educational Spaces
(103)Auditoriums and Studios
(104)SOH Storage and Offices
(109)Circulation & Amenities
Plant and equipment
(120) (110)External Works, Demolition & Civils
(130)Exhibition Infrastructure & Fitout
(140)Provisional Allowance FF&E
(180)Client Direct Costs
Contingency, Fees & Escalation
Grand Total
EB16131-12
PRINTED 24 OCT 2017 12:02pmPAGE GS.1
Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT
Estimated rates
MAAS Riverbank Option 2: External Works, Demolition & Civils
(Value)RefDescription
SUBSTRUCTURE
10allowance for piled foundations
11allowance for podium columns to create
undercroft
INTERNAL SCREENS AND BORROWED LIGHTS
261allowance for special balustrading FLOOR FINISHES
292allowance for timber decking / granite to outdoor public
CEILING FINISHES
319allowance for finishes to soffits metal
timber / off form tba
HYDRAULIC SERVICES
221allowance for external hydraulic services
as Warren Smith email dated 06.10.2017 rainwater tank, sewer drainage, domestic cold water and natural gas
222allowance for hydraulic services
deviations as Warren Smith email dated 06.10.2017 sewer main
FIRE PROTECTION
218allowance for external fire services as
Warren Smith email dated 06.10.2017 combined fire and hydrant tank, pumps and connections
ELECTRIC LIGHT AND POWER
17allowance for external electrical and substation as Steensen Varming email dated and 06.10.2017
323allowance for standby generator as
Steeensen Varming email 06.10.2017
Carried Forward $
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 1
Rider Levett Bucknall
(Rider Levett Bucknall) (EB16131-12PRINTED 24 OCT 2017 11:16amPAGE 2) (Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT) (Estimated ratesMAAS Riverbank Option 2: External Works, Demolition & Civils) (Qty
) (Rate) (Value) (RefDescription) (ELECTRIC LIGHT AND POWER (Continued) Brought Forward $324allowance for solar panels as Steensen Varming email dated 06.10.2017) (325allowance for electrical diversions as Steensen Varming email dated 06.10.2017 and updated as email dated 19.10.2017 as instructed JS email 23.10.2017) (326allowance for new lead in & NBN as Steensen Varming email dated 06.10.2017) (327allowance for lighting as Steensen Varming email dated 06.10.2017SITE PREPARATION6allowance to strip site, paving) (38allowance for civil excavation works tosite to formation level circa lm, (note: refer to separate allowance for removal of general solid waste, if required)) (331allowance for removal of general solid waste, if required (assumed excluded existing car park area and buildings, to be confirmed), where site stripped to formation levels) (ROADS, FOOTPATHS AND PAVED AREAS) (18allowance to upgrade roads and footpathsoutside the site boundary, if required) (121allowance for on site roads, bus, coachparking, paving) (128allowance for off site traffic signalsupgrading / installation) (Carried Forward $) ('Unit) (NoNoNoSumm2m3) (m3) (No) (m2) (No)
(m2) (16allowance for public domain works, landscaping and fencing, if required) (m3) (328allowance for imported fill to landscapedareas (excludes riverbank)) (9) (allowance to demolish and remove existing heritage buildings including salvaging valuable items , if required) (Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT) (Estimated ratesMAAS Riverbank Option 2: External Works, Demolition & Civils) (RefDescription) (LANDSCAPING AND IMPROVEMENTS) (Unit) (Rate) (Qty
) (Value) (Brought Forward $) (EXTERNAL STORMWATER DRAINAGE) (19allowance for possible future overland flow path including shaping ground levels and building line for on site stormwater) (117allowance for stormwater connection) (127allowance for atormwater drainage to roads and parking329allowance for stormwater diversions330allowance to remove existing stormwater pipework) (EXTERNAL SPECIAL SERVICES 8allowance to disconnect existing services15allowances for site services amplification, if required) (ALTERATIONS AND RENOVATIONS TO EXISTING EXTERNAL W) (5demolish and remove existing car parking, m2other on site buildings) (SPECIAL PROVISIONS) (m2) (14allowance for flood mitigation - reduced Noallowance as building generally above the flood plane - if required) (Carried Forward $) (m2) (No) (m2) (m) (m) (No) (No) (ORES) (EB16131-12PRINTED 24 OCT 2017 11:16amPAGE 3) (Rider Levett Bucknall)
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT
Estimated rates
MAAS Riverbank Option 2: External Works, Demolition & Civils
RefDescription
Unit
Qty
Rate
Value
PRELIMINARIES
No
Brought Forward $
210allowance for builders preliminaries, margins and builders works in connection with services included within the individual rates
MAAS Riverbank Option 2 110 Total $
Levett Bucknall
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 4Rider
(m2) (2allowance for exhibition infrastructureto Temporary Galleries as follows, $/m2rate to be proven up on discussion withMAASScienceDesign) (Rider Levett Bucknall) (EB16131-12PRINTED 24 OCT 2017 11:16amPAGE 5) (Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT) (Estimated ratesMAAS Riverbank Option 2: Exhibition Infrastructure & Fitout) (RefDescription) (EXHIBITION INFRASTRUCTURE & FITOUT) (1allowance for exhibition infrastructureto Major Touring Hall, $/m2 rate to beproven up on discussion with MAAS) (3allowance for exhibition infrastructure &fitout to Permanent Galleries as follows, $/m2 rate to be proven up on discussion with MAASLong Term Gallery) (145allowance for exhibition infrastructure &fitout to Permanent Galleries as follows, reduced $/m2 rate due to lower fitout requirement be proven up on discussion with MAASChildren's GalleryLearning Labs) (146allowance for exhibition infrastructureto circulation areas, say 15% of exhibition area, equates to circa 40-50% of circulation, $/m2 rate applied to be proven up on discussion with MAAS) (147allowance for visible collection storage,if required) (MAAS Riverbank Option 2 120 Total $) (Unit) (Rate) (Value) (m2) (m2) (m2) (m2) (m2) (Qty)
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT
Estimated rates
MAAS Riverbank Option 2: Provisional Allowance FF&E
RefDescription
Unit
Qty
Rate
Value
FURNITURE FITTINGS AND EQUIPMENT
No
4provisional allowance for Furniture, Fittings and Equipment
MAAS Riverbank Option 2 130 Total $
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 6Rider Levett Bucknall
(Rate) (Qty
) (m2) (98allowance to demolish and dismantle of existing exhibit surrounds and showcasing existing PHM site as RPA email dated 30.09.2016) (m) (358special hoardings, existing PHM site asRPA email dated 30.09.2016) (Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT) (Estimated ratesMAAS Riverbank Option 2: Client Direct Costs) (RefDescription) (SPECIAL SERVICES 74allowance for IT ALTERATIONS AND RENOVATIONS) (141allow to demolish and remove mezzaninefloor, decking existing PHM site as RMA email dated 30.09.2016) (142allowance to demolish and remove entry awning for large object removal existing PHM site as RPA email dated 30.09.2016) (143allowance to demolish and remove externalwall and reinstate, to create break through zone existing PHM site as RPA email dated 30.09.2016) (144allowance to demolish and remove concrete/ brick plinth, existing PHM site as RPA email dated 30.09.2016) (354allowance to demolish and remove courtyard cafe, existing PHM site as RPM email dated 30.09.2016) (355allowance to demolish stairs levels 1-2 transport, existing PHM site as RPA email dated 30.09.2016) (356allowance for removable steel plates andbackpropping to distribute load during removal, existing PHM site as RPA email 30.09.2016) (357allowance for concrete pad for relocationduring removal, existing PHM site as RPA email 30.09.2016) (Carried Forward $) (Value) (m2) (m2) (m2) (m2) (m2) (No) (m2) (m2) (Unit) (No)
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 7
Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT
Estimated rates
MAAS Riverbank Option 2: Client Direct Costs
RefDescription
Unit
Qty
Rate
Value
ALTERATIONS AND RENOVATIONS (Continued)
m2
m2
m2
m2
m2
No
m
m2
m2
m2
Brought Forward $
359allowance for structural works to suit setting up and removal of small crane, existing PHM site as RPA email 30.09.2016
360allowance for dust sheeting / preotection during the works to suit sequential object removal existing PHM site as RPA email 30.09.2016
SITE PREPARATION
375allowance to relocate existing workshop Harwood site as RPA email 30.09.2016
376allowance for temporary demountable walls and doors existing Harwood site as RPA email 30.09.2016
377allowance for temporary ceilings existing Harwood site as RPA email 30.09.2016
378allowance for lab benches existing Harwood site as RPA email 30.09.2016
379allowance for perimeter storage shelving
existing Harwood site as RPA email 30.09.2016
380allowance to create materials store
existing Harwood site as RPA email 30.09.2016
381allowance for hydraulic services reconfiguration existing harwood site as RPA email 30.09.2016
382allowance for electrical services reconfiguration existing harwood site as RPA email 30.09.2016
Carried Forward $
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 8Rider Lovett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 2 REPORT
Estimated rates
MAAS Riverbank Option 2: Client Direct Costs
(Rate) (Value) (Qty
) (UnitNoNoNoNo)RefDescription
CLIENT DIRECT COSTS
Brought Forward $
415allowance CIPMO Project delivery staff -
as Johnstaff email dated 23.10.2017
416allowance MAAS staff - as Johnstaff email dated 23.10.2017
CLIENT MISCELLANEOUS DIRECT COSTS
400collection and logistics - digitisation
equipment as Johnstaff email dated 11.01.2017
CONSULTANT FEES
399professional fees for the site
acquisition works as Johnstaff email dated 11.01.2017 (note: fixed lump sum not subject to escalation), Excluded for current schemes as JS email 30.05.2017
MAAS Riverbank Option 2 140 Total $
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 9
Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 2
Estimated rates
MAAS Riverbank Option 2: Contingency, Fees & Escalation
REPORT
RefDescription
Unit
Qty
RateValue
CONSTRUCTION CONTINGENCY
Sum
Sum
Sum
Sum
Sum
Sum Sum
Sum
22allowance for 10% construction design development contingency
23allowance for 10% construction contingency EXHIBITION FITOUT AND INFRASTRUCTURE CONTINGENCY
26allowance for 15% exhibition
infrastructure, fitout and FFE contingency
SITE AGREEMENT
36allowance for construction site allowance
AUTHORITY FEES
27allowance of 1.50% for construction authority fees
CONSULTANT FEES
24allowance for building consultants fees
25allowance for 20% exhibition
infrastructure, fitout and FFE design fees
FUTURE COST INCREASES
28allowance for future coat increases up to construction and during construction
2017 - 4.25% pa
2018 - 4.0% pa
2019 to 2020 - 3.5% pa
2021 to 2023 - 4.0% pa
MAAS Riverbank Option 2 180 Total $
EB16131-12
PRINTED 24 OCT 2017 11:16amPAGE 10
Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT
Estimated rates
Cost/m2 of Gross Floor Area
MAAS Riverbank Option 3
10FOH Foyer Ticketing
20Commercial
30Touring Gallery A
50Children's Gallery
90Main Galleries
70Ideas Lab / Educational Spaces
60Auditoriums and Studios
103BOH Storage and Offices
104Circulation & Amenities
109Plant and equipment
110External Works, Demolition & Civils
120Exhibition Infrastructure & Fitout
130Provisional Allowance FF&E
140Client Direct Costs
150Contingency, fees & Escalation
Grand Total
EB16131-12
PRINTED 24 OCT 2017 12:02pmPAGE GS.1
Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT
Estimated rates
MAAS Riverbank Option 3: External Works, Demolition & Civils
(Unit) (Qty
RateValue
)RefDescription SUBSTRUCTURE
10allowance for piled foundationsm2
11allowance for podium columns to createm2
undercroft
INTERNAL SCREENS AND BORROWED LIGHTS
261allowance for special balustrading FLOOR FINISHES
292allowance for timber decking / granite to m2 outdoor public
CEILING FINISHES
319allowance for finishes to soffits metal / m2 timber / off form tba
(NoNoNoNoNo)HYDRAULIC SERVICES
221allowance for external hydraulic services as Warren Smith email dated 06.10.2017 rainwater tank, sewer drainage, domestic cold water and natural gas
222allowance for hydraulic services deviations as Warren Smith email dated 06.10.2017 sewer main
FIRE PROTECTION
(Rider Levett Bucknall)218allowance for external fire services as Warren Smith email dated 06.10.2017 combined fire and hydrant tank, pumps and connections
ELECTRIC LIGHT AND POWER
17allowance for external electrical and substation as Steensen Varming email dated and 06.10.2017
323allowance for standby generator as Steeensen Varming email 06.10.2017
Carried Forward $
EB16131-12
PRINTED 24 OCT 2017 11:17amPAGE 1
(Rate) (Qty
) (Value) (Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT) (Estimated ratesMAAS Riverbank Option 3: External Works, Demolition & Civils) (RefDescription) (ELECTRIC LIGHT AND POWER (Continued) Brought Forward $324allowance for solar panels as Steensen Varming email dated 06.10.2017) (325allowance for electrical diversions as Steensen Varming email dated 06.10.2017 and updated as email dated 19.10.2017 as instructed JS email 23.10.2017) (326allowance for new lead in & NBN as Steensen Varming email dated 06.10.2017) (327allowance for lighting as Steensen Varming email dated 06.10.2017SITE PREPARATION6allowance to strip site, paving) (38allowance for civil excavation works tosite to formation level circa lm, (note: refer to separate allowance for removal of general solid waste, if required)) (331allowance for removal of general solid waste, if required (assumed excluded existing car park area and buildings, to be confirmed), where site stripped to formation levels) (ROADS, FOOTPATHS AND PAVED AREAS) (18allowance to upgrade roads and footpathsoutside the site boundary, if required) (121allowance for on site roads, bus, coachparking, paving) (128allowance for off site traffic signalsupgrading / installation) (Carried Forward $) (EB16131-12PRINTED 24 OCT 2017 11:17amPAGE 2) (Rider Levett Bucknall) (Unit) (NoNoNoSumm2m3) (m3) (No) (m2) (No)
(Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT) (Estimated ratesMAAS Riverbank Option 3: External Works, Demolition & Civils) (RefDescription) (Value) (LANDSCAPING AND IMPROVEMENTS) (Brought Forward) (16allowance for public domain works, landscaping and fencing, if required) (328allowance for imported fill to landscapedareas (excludes riverbank)) (EXTERNAL STORMWATER DRAINAGE) (19allowance for possible future overland flow path including shaping ground levels and building line for on site stormwater) (117allowance for stormwater connection) (127allowance for stormwater drainage to roads and parking329allowance for stormwater diversions330allowance to remove existing stormwater pipework) (EXTERNAL SPECIAL SERVICES 8allowance to disconnect existing services15allowances for site services amplification, if required) (ALTERATIONS AND RENOVATIONS TO EXISTING EXTERNAL WORKS) (demolish and remove existing car parking, other on site buildings) (SPECIAL PROVISIONS) (14allowance for flood mitigation - reducedallowance as building generally above the flood plane - if required) (Carried Forward) (EB16131-12PRINTED 24 OCT 2017 11:17amPAGE 3)
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT
Estimated rates
MAAS Riverbank Option 3: External Works, Demolition & Civils
(RateValue) (Qty
) (Unit) (RefDescription) (No) (PRELIMINARIESBrought Forward $210allowance for builders preliminaries, margins and builders works in connection with services included within the individual rates)
MAAS Riverbank Option 3 110 Total $
EB16131-12
PRINTED 24 OCT 2017 11:17amPAGE 4Rider Levett Bucknall
(Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT) (Estimated ratesMAAS Riverbank Option 3: Exhibition Infrastructure & Fitout) (RefDescription) (EXHIBITION INFRASTRUCTURE & FITOUT) (1allowance for exhibition infrastructureto Major Touring Hall, $/m2 rate to beproven up on discussion with MAAS) (2allowance for exhibition infrastructureto Temporary Galleries as follows, $/m2rate to be proven up on discussion withMAASScienceDesign) (3allowancefitout to $/m2 rate with MAAS Long Term) (for exhibition infrastructure & Permanent Galleries as follows, to be proven up on discussion) (Gallery) (145allowance for exhibition infrastructure &fitout to Permanent Galleries as follows, reduced $/m2 rate due to lower fitout requirement be proven up on discussion with MAASChildren's GalleryLearning Labs) (146allowance for exhibition infrastructureto circulation areas, say 15% of exhibition area, equates to circa 40-50% of circulation, $/m2 rate applied to be proven up on discussion with MAAS) (147allowance for visible collection storage,if required) (Unit) (MAAS Riverbank Option 3 120 Total $) (EB16131-12PRINTED 24 OCT 2017 11:17amPAGE 5) (Rider Levett Bucknall) (Qty
) (Rate) (Value) (m2) (m2) (m2) (m2) (m2) (m2)
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT
Estimated rates
MAAS Riverbank Option 3: Provisional Allowance FF&E
RefDescription
Unit
Qty
Rate
Value
FURNITURE FITTINGS AND EQUIPMENT
No
4provisional allowance for Furniture, Fittings and Equipment
MAAS Riverbank Option 3 130 Total $
EB16131-12PRINTED
24 OCT 2017 11:17amPAGE 6Rider Levett Bucknall
(Unit) (Value) (Rate) (Qty
) (No) (SPECIAL SERVICES 74allowance for IT ALTERATIONS AND RENOVATIONS) (m2) (98allowance to demolish and dismantle of existing exhibit surrounds and showcasing existing PHM mite as RPA email dated 30.09.2016) (Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT) (Estimated ratesMAAS Riverbank Option 3: Client Direct Costs) (RefDescription) (141allow to demolish and remove mezzaninefloor, decking existing PHM site as RMA email dated 30.09.2016) (142allowance to demolish and remove entry awning for large object removal existing PHM site as RPA email dated 30.09.2016) (143allowance to demolish and remove externalwall and reinstate, to create break through zone existing PHM site as RPA email dated 30.09.2016) (144allowance to demolish and remove concrete/ brick plinth, existing PHM site as RPA email dated 30.09.2016) (354allowance to demolish and remove courtyard cafe, existing PHM site as RPM email dated 30.09.2016) (355allowance to demolish stairs levels 1-2 transport, existing PHM site as RPA email dated 30.09.2016) (356allowance for removable steel plates andbackpropping to distribute load during removal, existing PHM site as RPA email 30.09.2016) (357allowance for concrete pad for relocationduring removal, existing PHM site as RPA email 30.09.2016) (358special hoardings, existing PHM site asRPA email dated 30.09.2016) (Carried Forward $) (m2) (m2) (m2) (m2) (m2) (No) (m2) (m2)
EB16131-12
PRINTED 24 OCT 2017 11:17amPAGE 7
Rider Levett Bucknall
(Western Sydney Museum - Options 1-3 Update) (ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT) (Estimated ratesMAAS Riverbank Option 3: Client Direct Costs) (RefDescription ALTERATIONS AND RENOVATIONS (Continued) Brought Forward $) (Value) (359allowance for structural works to suit setting up and removal of small crane, existing PHM site as RPA email 30.09.2016) (360allowance for dust sheeting / preotectionduring the works to suit sequential object removal existing PHM site as RPA email 30.09.2016) (SITE PREPARATION) (375allowance to relocate existing workshopHarwood site as RPA email 30.09.2016) (376allowance for temporary demountable wallsand doors existing Harwood site as RPA email 30.09.2016) (377378379) (allowance for temporary ceilings existing Harwood site as RPA email 30.09.2016) (allowance for lab benches existing Harwood site as RPA email 30.09.2016) (allowance for perimeter storage shelving existing Harwood site as RPA email 30.09.2016) (380allowance to create materials storeexisting Harwood site as RPA email 30.09.2016) (381allowance for hydraulic services reconfiguration existing harwood site as RPA email 30.09.2016) (382allowance for electrical services reconfiguration existing harwood site as RPA email 30.09.2016) (Carried Forward $) (EB16131-12PRINTED 24 OCT 2017 11:17am) (Rider Levett Bucknall) (PAGE 8)
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT
Estimated rates
MAAS Riverbank Option 3: Client Direct Costs
RefDescription
Unit
ty
Rate
Value
CLIENT DIRECT COSTS
No
No
No
No
Brought Forward $
415allowance CIPMO Project delivery staff - as Johnstaff email dated 23.10.2017
416allowance MAAS staff - as Johnstaff email dated 23.10.2017
CLIENT MISCELLANEOUS DIRECT COSTS
400collection and logistics - digitisation
equipment as Johnstaff email dated 11.01.2017
CONSULTANT FEES
399professional fees for the site acquisition works as Johnstaff email
dated 11.01.2017(note: fixed lump sum not subject to escalation), Excluded for current schemes as JS email 30.05.2017
MAAS Riverbank Option 3 140 Total $
EB16131-12
PRINTED 24 OCT 2017 11:17amPAGE 9Rider Levett Bucknall
Western Sydney Museum - Options 1-3 Update
ELEMENTAL MAAS RIVERBANK OPTION 3 REPORT
Estimated rates
MAAS Riverbank Option 3: Contingency, fees & Escalation
RefDescription
Unit
Qty
Rate
Value
CONSTRUCTION CONTINGENCY
Sum
Sum
Sum
Sum
Sum
Sum Sum
Sum
22allowance for 10% construction design development contingency
23allowance for 10% construction contingency EXHIBITION FITOUT AND INFRASTRUCTURE CONTINGENCY
26allowance for 15% exhibition
infrastructure, fitout and FFE contingency
SITE AGREEMENT
36allowance for construction site allowance
AUTHORITY FEES
27allowance of 1.50% for construction authority fees
CONSULTANT FEES
24allowance for building consultants fees
25allowance for 20% exhibition
infrastructure, fitout and FFE design fees
FUTURE COST INCREASES
28allowance for future cost increases up to construction and during construction
2017 - 4.25% pa
2018 - 4.0% pa
2019 to 2020 - 3.5% pa
2021 to 2023 - 4.0% pa
MAAS Riverbank Option 3 150 Total $
EB16131-12
PRINTED 24 OCT 2017 11:17amPAGE 10Rider Levett Bucknall
MAAS 2020
Western
Sydney
Museum
CASH FLOW
FORECAST
OPTION 1
Financial Year
Year
2017-18
2018-19
2019-20
2020-21
2021-22
2022-23
2023-24
Total
$
$
$
$
$
$
$
$
$
OPTION 1
0
0
0
0
0
0
0
0
0
Rider Levett Bucknall24/10/2017
MAAS 2020
Western
Sydney
Museum
CASH FLOW
FORECAST
OPTION 2 & OPTION 3
Financial Year
_
Year
2017-18
2018-19,
2019-20
2020-21
2021-22
2022-23
2023-24
Total
$
$
$
$
$
$
$
$
$
OPTION 2
OPTION 3
Rider Levett Bucknall24/10/2017
From:Ivan Mira
To:Raymond Berner' Warren Smith (W3S1; David Bolt
Cc:Anna Cuthbertson (anna.cuthbertsonPiohnstaff.com.au),; Eugenie Finn; Michael Harrold; Elizabeth Rev
Subject:167132 - RE: The New Museum In Western Sydney - Concept Options RLB Areas Level by Level Options 1-
3: SERVICES BUDGt iS please!
Date:Friday, 6 October 2017 5:46:38 PM
Attachments:imaae003.onq imaae004.ono jmaoe005.onq Imacie006.pnq imaoe007.onq 167132 BUD E01 Option 1 Order of cost estimate Electrical & Vert Trans MAAS Parramatta (3).Pdf
167132 BUD E02 Option 2 Order of cost estimate Electrical & Vert Trans MAAS Parramatta (3).odf
167132 BUD E03 Option 3 Order of cost estimate Electrical & Vert Trans MAAS Parramatta (3).odf
167132 BUD LO1 Ootion 1 Order of cost estimate Liohtiria MAAS Parramatta (31.pdf
167132 BUD L02 Option 2 Order of cost estimate Liatitino MAAS Parramatta (3).odf
167132 BUD L03 Option 3 Order of cost estimate Liohtirtg MAAS Parramatta (31 pdf
167132 BUD M01 Option 1 Order of cost estimate Mechanical MAAS Parramatta (3).odf
167132 BUD M02 Option 2 Order of cost estimate Mechanical MAAS Parramatta (3).odf
167132 BUD M03 Ootion 3 Order of cost estimate Mechanical MAAS Parramatta (3).pdf
167132 BUD VT0123 Options 1 2 3 Order of cost estimate Vert Trans MAAS Parramatta (3).pdf
Good Afternoon Ray,
As requested please find attached our updated mechanical, electrical, lighting and vertical transport budgets based on the layouts and area schedule provided in the email from you below.
Rates used for each type of space are listed at the bottom of each sheet. The estimates have been arranged in the same fashion as the area schedule provided providing a fitout cost for each area type and main infrastructure/base build services have been broken out and are listed at the bottom.
Any questions please don't hesitate to ask.Regards,
Ivan Mira
Associate
STEENSEN VARMING
steensenvarming.corn
CD10
Copenhagen: Vesterbrogade 39, 1st Floor, 1620 Copenhagen V +45 50 99 10 10 / London: 4th Floor, Noland House, 12-13 Poland Street, London W1F 8QB +44 20 7734 1255 / Sydney: Level 8, 9 Castlereagh Street, Sydney NSW 2000 +61 2 9967 2200 / Canberra: Ground Floor, 218 Northbourne Avenue, Braddon ACT 2612 +61 2 6230 0502 / Hong Kong: 13/F, Qualipak Tower, 122 Connaught Road West, Hong Kong +852 8193 2992 / New York: 20th Floor, 100 Wall Street, New York 10005
This email and any attachments are confidential and may contain privileged information and/or copyright material of Steensen Varming or third parties. You should only re-transmit, distribute or commercialise the material if you are authorised to do so.
From: Raymond Berger [mailto:[email protected]]
Sent: Friday, 29 September 2017 3:52 PM
To: Warren Smith (WJS) ; Michael Harrold
; Ivan Mira ; David
Bolt
Cc: Anna Cuthbertson ([email protected])
If a building becomes architecture, then 11
Mechanical Engineering
Copenhagen
Level 8, 9 Castlereagh Sire&
art. Clearly. if a building is not functanally
LighIng Design
London
Sydney, NSW, 2000, Australia
and technically in order, then II isn't
Sustainable Design
Sydney
A8N SO 001 109 037
architecture either -lust a building
Electrical Engineering
Hong Hong
I : 06t / 02 9967 2200
Arno Jacobsen
New York
a :.nfoCasleensenvarrning.corn
VERTICAL TRANSPORTATIONSTEENSEN VARMING
MAAS - Paramatta
Protect No:167132 Stage: Preliminary Costs Date: 06.10.2017 Author. MH Checked: MH Revision: 03
Description
fly
Costcost ($)Notes
New Building - Option 1
Lift - Art/ Good Lift
1
1,000,000
$1,000,000
Lift - Passenger Lifts
4
320,000
$1,280,000
Public Escalators on One Side
3
600,000
$1,800,000
Stairs on the other side
yes
cost excluded.
Dock Hoists
$100,000
Total
4,100,000
New Building - Option 2
Lift - Art/ Good Lift
1,200,000
$1,200,000
Lift - Passenger Lifts
4
360,000
51.440.000
Public Escalators on One Side
4
600,000
$2,400,000
Stairs on the other side
yes
cost excluded.
Dock Hoists
$100,000
Total
5,140.000
New Building - Option 3
Lift - Art/ Good Lift
I
1,200,000
$1,200,000
Lift - Passenger Lifts
4
380,000
$1,440,000
Public Escalators on One Side
4
600,000
$2,400,000
Stairs on the other side
yes
cosi excluded.
Dock Hoists
$100,000
Total
5,140,000
Exclusions
Authority fees, charges, CST, Carbon Tax both directly and indirectly applied to the Services.
Latent Conditions
Shielding and Acoustic Treatment
General Builders work (Penetrations, plant enclosures sealed plenums etc.)
Special Architectural Treatment to Exposed Building Services within 'line of sight'.
Works impacted as a result of changes in structure or other services
Reels of Calculations
Design FeesContingencies and profitsSite preliminary'sStatutory fees and charges
This opinion of probable cost was calculated based on the following:
Latest version of Rawlinsons Construction Handbook
Steensen Varming rates for recent projects
Based on architectural package and area schedule received 29.09.17 from RLB
Disclaimer
The order of costs provided are based on historical data. Contingencies should be allowed for changes inlabour and equipment costs, such as the volatile copper and steel prices.
The figures are order of cost estimates only and are provided to assist in cost planning. The client needs tomake their own judgement and employ a professional cost planner to ascertain actual costs.
The casts presented are based on the information available at the time. Unless we are commissionedseparately to complete a detailed site survey of the existing services then we rely only on the clientinformation provided and thus latent conditions may exist.
Note: Prices and Costs for building services installations can be dramatically influenced by market conditionsand volatile material/ labour costs, therefore allowance for these Issues needs to be agreed between theclient and a professional cost planner. The budgets provided by Steensen Varming are derived from historicpublished industry costs and our database that do not pre-empt future fluctuations.
M16-14101
(Total New Building Cost Lighting) (7,129,830) (New ($/m2)) (Rates $ / m2) (Contingencies and profitsSite preliminary'sStatutory fees and chargesPABX, lCT Equipment and AV equipmentWorks impacted as a result of changes in structure or other services) (Plinths Design Fees) (Authority fees, charges, CST, Carbon Tax both directly and indirectly applied to the Services.Latent ConditionsShielding and Acoustic TreatmentGeneral Builders work (Penetrations, plant enclosures sealed plenums etc.)Special Architectural Treatment to Exposed Building Services within 'line of sight'.Fire Detection and EWISCo-generation/Tri.generation) (Basis of Calculations) (If a budding becomes architecture. then it is ad. Clearly, if a budding is not functionally and technically in order, then itarchitedure either -lust a building. Arne Jacob .en) (Mechanical Engineering Lighting Design Sustainable Design Eleanor, Engineering) (Copenhagen London Sydney Hong Kong New York) (Level 8, 9 Costlereegh StreetSydney, NSW, 2000, AustraliaABN 90 001189 03711 01 /02 9907 2900
e , inforrasteensenvarming.com
) (STEENSEN VARMING) (Project No: 167132 Stage: Preliminary Costs Date: 0610.2017Author. ERChecked: 1MRevision: 03) (Description
Cost ($)NotesFront of House
760,000Gallery Spaces$4,237,500Education Spaces
160,000Auditoria$222,000Back of House
565,000Plant
188,060Circulation$747,250Total Internal Building Lighting
6,879,830External Lighting
250,000) (Plant Room
$80Store
$100Office
$200Workshop
$200Gallery
$750Conservation
$300Cafe/restaurant/Function
$400Kitchen
$150Theatres
$400Entrance / Lobby
$400Circulation
$250Toilets
$200Education
$200Shop
$400Car Park
$150) (Exclusions) (This opinion of probable cost was calculated based on the following:Latest version of Rawlinsons Construction HandbookSteensen Varming rates for recent projectsBased on architectural package and area schedule received 29.09.17 from RLB) (Disclaimer) (The order of costs provided are based on historical data. Contingencies should be allowed for changes in labour and equipment costs, such as the volatile copper and steel prices.) (LIGHTING OPINION OF PROBABLE COST) (MAAS - Paramatta - Option 1)
The figures are order of cost estimates only and are provided to assist in cost planning. The client needs to make their own iudgement and employ a professional cost planner to ascertain actual costs.
The costs presented are based on the information available at the time. Unless we are commissioned separately to complete a detailed site survey of the existing services then we rely only on the client information provided and thus latent conditions may exist.
Note: Prices and Costs for building services installations can be dramatically influenced by market conditions and volatile material/ tabour costs, therefore allowance for these issues needs to be agreed between the client and a professional cost planner. The budgets provided by Steensen Varming are derived from historic published industry costs and our database that do not pre-empt future fluctuations.
(If a budding becomes architecture, then it is art. Clearly, if a budding is not functional', and technically in order, then it isn't architecture either - it's lust building. Arne JacobeanMechanical Engineering Lighling Design Sustainable Design Electrical Engineenng) (LIGHTING OPINION OF PROBABLE COSTMAAS - Paramatta - Option 2)GopenhegenLondonSydneyHong KongNew York
(Description)Cost ($)
Level 8, 9 Caellaireagh Street
Sydney. NSW, 2000, Australia
Agla 50 001 189 033
t .81 / 02 9987 2200
e. infoesteensenverrning.corr
STEENSEN VARMING
Project No: 167132
Stage: Preliminary Costs
Date: 06.10.2017
Author. ERChecked: IMRevision: 03
Notes
Front of House
Gallery Spaces
Education Spaces
Auditoria
Back of House
Plant
Circulation
Total Internal Building Lighting
External Lighting
760,000 8,625,000 160,000 222,000 565,000 355,360 1,099,600
11,786,860
250,000
Total New Building Cost Lighting12,038,880
Rates $ / m2
New ($1m2)
Plant Room
$
80
Store
$
100
Office
$
200
Workshop
$
200
Gallery
$
750
Conservation
S
300
Caf / restaurant / Function
$
400
Kitchen
$
150
Theatres
$
400
Entrance / Lobby
$
400
Circulation
$
250
Toilets
$
200
Education
$
200
Shop
$
400
Car Park
$
150
Exclusions
Authority fees, charges, OST, Carbon Tax both directly and indirectly applied to the Services.
Latent Conditions
Shielding and Acoustic Treatment
General Builders work (Penetrations, plant enclosures sealed plenums etc.)
Special Architectural Treatment to Exposed Building Services within line of sight'.
Fire Detection and EWIS
Co-generation/Tri.generat ion
Basis of Calculations
PlinthsDesign Fees
Contingencies and profits
Site preliminary's
Statutory fees and charges
PABX, ICT Equipment and AV equipment
Works impacted as a result of changes in structure or other services
This opinion of probable cost was calculated based on the following:
Latest version of Rawlinsons Construction Handbook
Steensen Varming rates for recent projects
Based on architectural package and area schedule received 29.09.17 from RLB
Disclaimer
The order of costs provided are based on historical data. Contingencies should be allowed for changes in labour and equipment costs, such as the volatile copper and steel prices.
The figures are order of cost estimates only and are provided to assist in cost planning. The client needs to make their own iudgement and employ a professional cost planner to ascertain actual costs.
The costs presented are based on the information available at the time. Unless we are commissioned separately In complete a detailed site survey of the existing services then we rely only on the client information provided and thus latent conditions may exist.
Note: Prices and Costs for building services installations can be dramatically influenced by market conditions and volatile material/ labour costs, therefore allowance for these issues needs to be agreed between the client and a professional cost planner. The budgets provided by Steensen Varming are derived from historic published industry costs and our database that do not pre-empt future fluctuations.
If a budding becomes architecture, then it isMechanical EngineenngCopenhagenLevel II, 9 Cestlereagh Street
art. Clearly, if buildings not functionalhLighting DesignLondonSydney. NSW, 2000, Australia
and technically in order, then it isn'tSustainabk DesignSydneyMIN 50 001 189 037
architecture either - it's lust a building.Electrical EngineeringHong Kong1:.81 / 02 9967 2200
Arne JecobeenNew York : infoOsteensenyarnsing.corr
LIGHTING OPINION OF PROBABLE COSTSTEENSEN VARMING
MAAS - Paramatta - Option 3
Project No: 167132Stage: Preliminary CostsDate: 06.10.2017
Author. ERChecked: IMRevision: 03
Description
Cost ($)Notes
Front of House
$
1,160,000
Gallery Spaces
$
8,625,000
Education Spaces
$
430,000
Auditoria
$
497,500
Back of House
$
565,000
Plant
$
292,240
Circulation
930,000
Total Internal Building Lighting
12,499,740
External Lighting
250,000
Total New Building Cost Lighting
12,749,740
Rates $ / m2
New ($/m2)
Plant Room
$
80
Store
$
100
Office
$
200
Workshop
$
200
Gallery
$
750
Conservation
$
300
Cafe / restaurant / Function
$
400
Kitchen
$
150
Theatres
$
400
Entrance / Lobby
$
400
Circulation
$
250
Toilets
$
200
Education
$
200
Shop
$
400
Car Park
$
150
EKcluslons
Authority fees, charges, GST. Carbon Tax both directly and indirectly applied to the Services.Plinths
Latent ConditionsDesign FeesShielding and Acoustic Treatment
General Builders work (Penetrations, plant enclosures sealed plenums etc.)Contingencies and profits
Special Architectural Treatment to Exposed Building Services within 'line of sight'.Site preliminary's
Fire Detection and EWISStatutory fees and charges
Co-generation/Tri-generationPABX, ICT Equipment and AV equipment
Works impacted as a result of changes in structure or other services
Basis of Calculations
This opinion of probable cost was calculated based on the following:
Latest version of Rawlinsons Construction Handbook
Steensen Varrning rates for recent projects .
Based on architectural package and area schedule received 29.09.17 from RLB
Disclaimer
The order of costs provided are based on historical data. Contingencies should be allowed for changes in labour and equipment costs, such as the volatile copper and steel prices
The figures are order of cost estimates only and are provided to assist in cost planning. The client needs to make their own judgement and employ a professional cost planner to ascertain actual costs.
The costs presented are based on the information available at the lime. Unless we are commissioned separately to complete a detailed site survey of the existing services then we rely only on the client information provided and thus latent conditions may exist.
Note: Prices and Costs for building services installations can be dramatically influenced by market conditions and volatile material/ labour costs, therefore allowance for these issues needs to be agreed between the dient and a professional cost planner. The budgets provided by Steensen Varming are derived from historic published industry costs and our database that do not preempt future fluctuations.
il a building becomes architecture, than it 11Mechanical EngineeringCopenhagenLevel A 9 Castlereagh Street
arr. Clearly, if a buddMg is not functionallyLightng DesignLondonSydney. NSW. 2000, Australia
and technically in order. then it isn'tSusta{nable DesignSydneyABS SO 001 180 037
architecture either - it's lust a buildingElectrical EngineeringHong KongI :.61 /02 5967 2200
Ame JacobsenNew York : infoeisteenaenvarcningtorn
MECHANICAL SERVICES OPINION OF PROBABLE COSTSTEENSEN VAR MING
MAAS - Parramatta - Option 1
Protect No: 167132Stage: Preliminary CostsDate: 06.10.2017Author: ER
Checked: CP/1M
Revision: 03
Description
Cost ($)Notes
Front of HouseGallery SpacesEducation Spaces
Auditoria
Back of HousePlant
Circulation
NEW BUILDING - Central Plant Items Not Included In Fltout Rates
Chilled Water PlantHeating Hot Water Plant
Steam Plant
RO Plant
Smoke Hazard Management
Cooling Towers
Total of Miscellaneous Services
1,390,000 8,757,500 630,000 414,000 1,722,500 1,057,950 1,046,150
15,018,100
810,000 250,000 eloopoo 600,000 500,000 450,000
3,210,000
(Total New Building Coat18,229,100
Rates $ / m2
New ($/m2)
Plant Room
$
450
Store
$
350
Office
$
600
Workshop
$
600
Gallery
$
1,550
Conservation
$
900
Caf / restaurant / Function
$
i
800
Kitchen
$
1,000
Theatres
$
800
Entrance / Lobby
$
700
Circulation
$
350
Toilets
$
350
Education
$
800
Shop
$
700
Car Park
$
450
Exclusions
CST
Authority fees, charges, OST, Carbon Tax both directly and indirectly applied to the Services.Plinths
Latent ConditionsMasonry riser shafts
General Builders work (Penetrations, plant enclosures sealed plenums etc.)FIP signal, power supply to MCC's, duct smoke detectors
External louvres, exhaust plenumsContingencies and profits
Special Architectural Treatment to Exposed Building Services within 'line of sight'.Site preliminary's
Works Impacted as a result of change in structure other servicesStatutory fees and charges
Attenuators (Pending advice from Acoustic consultant)
Design Fees
Basis of Calculations
This opinion of probable cost was calculated based on the following:
Latest version of Rawlinsons Construction Handbook
Steensen Varming rates for recent protects
Based on architectural package and area schedule received 29.09.17 from RLB
DisclaImer
The order of costs provided are based on historical data. Contingencies should be allowed for changes in labour and equipment costs, such as the volatile copper and steel prices.
The figures are order of cost estimates only and are provided to assist in cost planning. The client needs to make their own judgement and employ a professional cost planner to ascertain actual costs.
The costs presented are based on the information available at the time. Unless we are commissioned separately In complete a detailed site survey of the existing services then we rely only on the client information provided and thus latent conditions may exist.
Note: Prices and Costs for building services installations can be dramatically influenced by market conditions and volatile material/ labour costs, therefor. allowance for these issues needs to be agreed between the client and a professional cost planner, The budgets provided by Steensen Varming are derived from historic published industry costs and our database that do not pre-empt future fluctuations.
It a building baronies architecture, then it 1,art. Clearly. if a building is not functionally
Mechanical Engineering Lighlkig Design
CopenhagenLondon
Level 8, 9 Castlereagh StreetSydney, NSW, 2000, Australia
and technically in order, then n isn't
Sustainable Design
Sydney
ABN SO 001 189 037
architecture either -lust a building
Electrical Engmeaning
Hong Kong
:.61 / 02 gee] 2200
Arne Jacobsen
New 'fork
inforbsteensenvarrning.con,
MECHANICAL SERVICES OPINION OF PROBABLE COST
MAAS - Parramatta - Option 2
STEENSEN VARMING
Protect No: 167132Stage: Preliminary Costs
Date: 06.10.2017Author: ER
Checked: CP/IMRevision: 03
Description
Cost ($1
Notes
Front of House
$
1,390,000
Gallery Spaces
$
17,625,000
Education Spaces
830,000
Auditoria
414,000
Back of House
1,722,500
Plant
1,998,900
Circulation
$
1,539,300
25,519,700
NEW BUILDING - Central Plant Sterna Not Included in Fitout Rates
Chilled Water Plant
1,215,000
Heating Hot Water Plant
320,000
Steam Plant
600,000
RO Plant
600,00o
Smoke Hazard Management
500,000
Cooling Towers
550,000
Total of Miscelioneous Services
3,785,000
Total New Building Cost
29,304,700
Rates $ / m2
New ($/m2)
Plant Room
$
450
Store
$
350
Office
$
600
Workshop
$
600
Gallery
$
1,550
Conservation
$
900
Caf6 / restaurant / Function
$
800
Kitchen
$
1,000
Theatres
$
800
Entrance / Lobby
$
700
Circulation
$
350
Toilets
$
350
Education
$
800
Shop
$
700
Car Park
$
450
Exclusions
CST
Authority fees, charges, GST, Carbon Tao both directly and indirectly applied to the Services.
Latent Conditions
General Builders work (Penetrations, plant enclosures sealed plenums etc.)
External louvres, exhaust plenums
Special Architectural Treatment to Uposed Building Services within 'line of sight'.
Works impacted as a result of change in structure or other services
Basle of Calculations
Plinths
Masonry nser shafts
FIP signal, power supply to MCC's, duct smoke detectors
Contingencies and profits
Site preliminary's
Statutory teas and charges
Attenuators (Pending advice from Acoustic consultant)
Design Fees
This opinion of probable cost was calculated based on the following:
Latest version of Rawlinsons Construction Handbook
Steensen Varming rates for recent projects
Based on architectural package and area schedule received 29.09.17 from RLB
Disclaimer
The order of costs provided are based on historical data. Contingencies should be allowed for changes in labour and equipment costs, such as the volatile copper and steel prices.
The figures are order of cost estimates only and are provided to assist in cost planning. The client needs to make their own judgement and employ a professional cost planner to ascertain actual costs.
The costs presented are based on the information available at the time. Unless we are commissioned separately to complete a detailed site survey of the existing services then we rely only on the client information provided and thus latent conditions may exist.
Note: Prices and Costs for building services installations can be dramatically influenced by market conditions and volatile material/ labour costs, therefore allowance for these issues needs to be agreed between the client and a professional cost planner. The budgets provided by Steensen Varming are derived from historic published industry costs and our database that do not pre-empt future fluctuations.
(New ($/m2)) (Rates $ / m2) (PlinthsMasonry riser shaftsFIP signal, power supply to MCC's, duct smoke detectorsContingencies and profitsSite preliminary'sStatutory fees and chargesAttenuators (Pending advice from Acoustic consultant)Design Fees) (CSTAuthority fees, charges, CST, Carbon Tax both directly and indirectly applied to the Services.Latent ConditionsGeneral Builders work (Penetrations, plant enclosures sealed plenums etc.)External louvres. exhaust plenumsSpecial Architectural Treatment to Exposed Building Services within 'line of sight'.Works impacted as a result of change in structure or other services) (Basle Of Calculations) (If a building becomes architecture, then it it art. Clearly. if a building is not functionally and technically in cud, then it isn't architecture either - it's just a building Arne Jecolamin) (Mechanical Engineering LightMg Design Sustainable Design Electrical Engineering) (Level B. g Castlereagh Street Sydney, NSW, 2000. Australia ABN SO 001 10 9 03161103 0067 2200infoesteensenvairning.com
) (STEEN SEN VAR MING) (Project No:167132 Stage: Preliminary Costs Date: 06.10.2017 Author: ERChecked: CP/IM Revision: 03) (Copenhagen London Sydney Hong Kong New York) (MECHANICAL SERVICES OPINION OF PROBABLE COST) (MAAS - Parramatta - Option 3) (Description
Cost ($)NotesFront of HouseS2,190,000
Gallery Spaces$17,825,000
Education Spaces
1,890,000
Auditoria
912,500
Back of House
1,722,600
Plant
1,643,850
CirculationS1,302,000
27,2 85,850
NEW BUILDING Central Plant Noma Not Included in Fitout Rates
Chilled Water Plant
1,350,000
Heating Hot Water Plant
300,000
Steam Plant
1300,000
RC Plant
eoo,000
Smoke Hazard Management
500,000
Cooling Towers
550,000
Total of Miscellaneous Services
3,900,000
Total New Building Cost
31,165,850) (Plant Room
$450Store
$350Office
$600Workshop
$600Gallery
$1,550Conservation
$900Caf / restaurant I Function
$800Kitchen
$1,000Theatres
$800Entrance / Lobby
$700Circulation
$350Toilets
$350Education
$800Shop
$700Car Park
$450) (Exclusions) (This opinion of probable cost was calculated based on the following:Latest version of Rawlinsons Construction HandbookSteensen Varming rates for recent projectsBased on architectural package and area schedule received 29.09.17 from RLB)
Disclaimer
The order of costs provided are based on historical data. Contingencies should be allowed for changes in labour and equipment costs, such as the volatile copper and steel prices.
The figures are order of cost estimates only and are provided to assist in cost planning. The client needs to make their own ludgement and employ a professional cost planner to ascertain actual costs.
The costs presented are based on the information available at the time. Unless we are commissioned separately to complete a detailed site survey of the existing services then we rely only on the client information provided and thus latent conditions may exist.
Note: Prices snd Costs for building services installations can be dramatically influenced by market conditions and volatile material/ labour costs, therefore allowance for these issues needs to be agreed between the client and a professional cost planner. The budgets provided by Steensen Varming are derived from historic published industry costs and our database that do not pre-empt future fluctuations.
From:Michael Harrold
To:Euaenie Finn
Cc:Anna Cuthbertson; Raymond Berner
Subject:RE: 167132 - RE: The New Museum In Western Sydney - additional Information
Date:Thursday, 19 October 2017 12:40:54 PM
Attachments:imaoe002.onq
Imaae003.onq tmacte004.onq imacie005.onq jmacie006 onq 167132 BUD E02 Option 2 Order of cost estimate Electrical & Vert Trans MAAS Parramatta (4).odf
167132 BUD 03 Option 3 Order of cost estimate Electrical & Vert Trans MAAS Parramatta (41.odf
167132 BUD E01 Option 1 Order of cost estimate Electrical & Vert Trans MAAS Parramatta (4).odf
Eugenie,
See attached
Extra $600,000 added for diversions
Generator $1M cost confirmed as an option.
Regards
Michael Harrold
Associate Director
STEENSEN VARMING
steensenvarming.com
CD0 C) 0
Copenhagen: Vesterbrogade 39, 1st Floor, 1620 Copenhagen V +45 50 99 10 10 / London: 4th Floor, Noland House, 12-13 Poland Street, London W1F 8QB +44 20 7734 1255 / Sydney: Level 8, 9 Castlereagh Street, Sydney NSW 2000 +61 2 9967 2200 / Canberra: Ground Floor, 218 Northbourne Avenue, Braddon ACT 2612 +61 2 6230 0502 / Hong Kong: 13/F, Qualipak Tower, 122 Connaught Road West, Hong Kong +852 8193 2992 / New York: 20th Floor, 100 Wall Street, New York 10005
This email and any attachments are confidential and may contain privileged information and/or copyright material of Steensen Varming or third parties. You should only re-transmit, distribute or commercialise the material if you are authorised to do so.
From: Eugenie Finn [mailto:[email protected]]
Sent: Thursday, 19 October 2017 12:28 PM
To: Michael Harrold
Cc: Anna Cuthbertson ;'Raymond Berger'
Subject: RE: 167132 - RE: The New Museum in Western Sydney - additional Information
Mike,
Thanks for the attached reports they are very useful.
Can you please confirm that all items mentioned within the attached documents are covered off in your services estimate, in particular the site infrastructure and augmentations works specifically electrical and NBN connection. If not we will need to make an allowance, or at least
Arne JacobsonNew Yorke : infoeksteensenvkomno.rom
ELECTRICAL & ICT SERVICES OPINION OF PROBABLE COSTSTEENSEN VARMING
MAAS - Paramatta - Option 1
Project No: 167132Stage: Preliminary CostsDater 19.10.2017Author. ER
Checked, IM/MHRevision: 04
DescriptionCost(S)
Notes
Front of HouseGallery SpacesEducation SpacesAuditoriaBack of HousePlant
Circulation
1,050,000 4,520,000 435,000 401,000 1,257,500 352,850 1,494,500
9,510,650
NEW BUILDING - Miscellaneous Base Building Electrical Services Items Not Included In Fitout Rates
(1,000,000 200,000 500,000 350,000 800,000 650,000 250,000 750,000)New Building - Standby Generator - Optional$
New - Distributed Antenna System for mobile phone coverageS
New Building - Solar Panel
New Building - New Lead In Sr. NBN$New Main Switch Board
New Building - New SubstationS
External worksS
Diversions and modificationsS
Total of Miscellaneous Services
$
4,500,000
Total New Building CostS14,010,620
Rates / m2
New ($/m2)
Plant Room
$
150
Store
$
300
Office
$
450
Workshop
$
450
Gallery
$
800
Conservation
$
700
Caf / restaurant/Function
$
600
Kitchen
$
600
Theatres
$
700
Entrance / Lobby
$
500
Circulation
$
500
Toilets
$
300
Education
$
550
Shop
$
600
Car Park
$
200
Exclusions
Authority fees, charges, GST, Carbon Tax both directly and indirectly applied to the Services.Plinths
Latent ConditionsDesign FeesShielding and Acoustic Treatment
General Builders work (Penetrations, plant enclosures sealed plenums etc.)Contingencies and profits
Special Architectural Treatment to Exposed Building Services within 'line of sight'.Site preliminary's
Fire Detection and EWISStatutory fees and charges
Co-genera tionffri.generationPABX, ICT Equipment and AV equipment
Works impacted as a result of changes in structure or other services
Basis of Calculations
This opinion of probable cost was calculated based on the following:
Latest version of Rawlinsons Construction Handbook
Steensen Varrning rates for recent projects
Based on architectural package and area schedule received 29.09.17 from RLB
DIxleimer
The order of costs provided are based on historical data. Contingencies should be allowed for changes in labour and equipment costs, such as the volatile copper and steel prices.
The figures are order of cost estimates only and are provided to assist in cost planning. The client needs to make their own judgement and employ a professional cost planner to ascertain actual costs.
The costs presented are based on the information available at the time. Unless we are commissioned separately to complete a detailed site survey of the existing services then we rely only on the client information provided and thus latent conditions may exist.
Note: Prices and Costs for building services installations can be dramatically influenced by market conditions and volatile material/ labour costs, therefore allowance for these issues needs to be agreed between the client and a professional cost planner. The budgets provided by Steensen Varming are derived from historic published industry costs and our database that do not pre-empt future fluctuations.
If a building becomes architecture. than hisMechanical EngineeringCopenhagenLevel A 9 Castlereagh Street
art. Clearly, If a building is not functionallyLighting DesignLondonSydney. NSW. 2000, Ausfralla
and technically in order, then it isn'tSustainable DesignSydneyABM 50 001 189 037
ardhitacture either- it's just a building.Electrical EngineeringHong Kong1 t 561 /02 9967 2200
Ama JacobsenNew Yorka : infogasteensenvenning.com
ELECTRICAL & ICT SERVICES OPINION OF PROBABLE COSTSTEENSEN VARMING
(Project No: 167132Stage: Preliminary CostsDate: 19.10.2017Author. ERChecked: IM /MHRevision: 04Notes)
MAAS - Paramatta - Option 2
Description
Cost ($)
Front of House$
1,050,000
Gallery Spaces$
9.200,000
Education Spaces$
435,000
Auditoria
401,000
Back of House
1,257,500
Plant$
666,300
Circulation
2,199,000
$
15,208,800
NEW BUILDING - Miscellaneous Base Building Electrical Services Items Not Included in Fitout Rates
New BuildingStandby GeneratorOptional
1,000,000
New - Distributed Antenna System for mobile phone coverage
200,000
New Building - Solar Panel
500,000
New Building - New Lead In & NBN
350,000
New Main Switch Board
800,000
New Building - New SubstationS
650,000
External works
250,000
Diversions and modifications
750,000
Total of Miscellaneous Servkes
4,500,000
Total New Building Cost
19,708,800
Rates $ / m2New ($1m2)
Plant Room
$
150
Store
$
300
Office
$
450
Workshop
$
450
Gallery
$
800
Conservation
$
700
Cafe / restaurant / Function
$
600
Kitchen
$
600
Theatres
$
700
Entrance/Lobby
$
500
Circulation
$
500
Toilets
$
300
Education
$
550
Shop
$
600
Car Park
$
200
Exclusions
Authority fees, charges, CST, Carbon Tax both directly and indirectly applied to the Services.Plinths
Latent ConditionsDesign FeesShielding and Acoustic Treatment
General Builders work (Penetrations, plant enclosures sealed plenums etc.)Contingencies and profits
Special Architectural Treatment to Exposed Building Services within 'line of sight'.Site preliminary's
Fire Detection and EWISStatutory fees and charges
Co-generation/Tri.generationPABX, ICT Equipment and AV equipment
Works Impacted as a result of changes in structure or other services
Basis of Calculations
This opinion of probable cost was calculated based on the following:
Latest version of Rawlinsons Construction Handbook
Steensen Vermin rates for recent projects
Based on architectural package end area schedule received 29.09.17 from RLB
D isclairner
The order of costs provided are based on historical data. Contingencies should be allowed for changes in labour and equipment costs, such as the volatile copper and steel prices.
The figures are order of cost estimates only and are provided to assist in cost planning. The client needs to make their own judgement and employ a professional cost planner to ascertain actual costs.
The costs presented are based on the information available at the time. Unless we are commissioned separately to complete a detailed site survey of the existing services then we rely only on the client information provided and thus latent conditions may exist.
Note: Prices and Costs for building services Installations can be dramatically influenced by market conditions and volatile meterial/ labour costs, therefore allowance for these issues needs lo be agreed between the client and a professional cost planner. The budgets provided by Steensen Varming are derived from historic published industry costs and our database that do not pre-empt future fluctuations.
If a building becomes architecture, then iI is art, Clearly, If a building is not functionally and technically in order, then it isn't architecture either - it. just a building. Anne Jacobsen
Mechanical EngineeringCopenhagenLovell,. 9 Casrlareagh Street
Lighting DesignLondonSydney, NSW. 0000. Auslralla
Sustainable DesignSydneyABN 50 001 189 037
Electrical EngineeringHong KongI : .61 103 9967 2300
New Yorka : infoesteensenrarrning.com
ELECTRICAL & ICT SERVICES OPINION OF PROBABLE COSTSTEENSEN VAR MING
410 MAAS - Paramatta - Option 3
Project No: 187132Stage: Preliminary CostsDate: 19.10.2017Author: ER
Checked: IM/MHRevision: 04
Description
Cost ($)Notes
Front of House$
1,650,000
Gallery Spaces$
9,200,000
Education Spaces
1,187,500
Auditoria
905,000
Back of House$
1,257,500
Plant$
547,950
Circulation$
1,860.000
18,587.950
NEW BUILDING - Miscellaneous Base Building Electrical Services Items Not Included In Fitout Rates
New Building - Standby Generator - Optional$
1,000,000
New - Distributed Antenna System for mobile phone coverage
200,000
New Building - Solar Panel
500,000
New Building - New Lead In & NBN
350,000
New Main Switch Board
800,000
New Building - New Substation
650,000
External works
250,000
Diversions and modifications
750,000
Total of Miscellaneous Services
4,500,000
Total New Building Cost
21,087,950
Rates $ / m2New (5/m2)
Plant Room
$
150
Store
$
300
Office
$
450
Workshop
$
450
Gallery
$
800
Conservation
$
700
Caf / restaurant / Function
$
600
Kitchen
$
600
Theatres
$
700
Entrance/Lobby
$
500
Circulation
$
500
Toilets
$
300
Education
$
550
Shop
$
600
Car Park
$
200
Exclusions
Authority fees, charges, CST, Carbon Tax both directly and indirectly applied to the Services.Plinths
Latent ConditionsDesign FeesShielding end Acoustic Treatment
General Builders work (Penetrations, plant enclosures sealed plenums etc.)Contingencies and profits
Special Architectural Treatment to Exposed Building