    Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 2009

    Co-operation

    betweenAREVA NP, TVEL and MSZ Elektrostal

    in the field of manufacturing

    and supply of nuclear fuelfor Western commercial reactorsbased on

    Enriched Reprocesses Uranium (ERU)

    Ingo Koban AREVA NP GmbH

    Evgeny Sannikov OAO MSZElektrostal

  • 8/6/2019 Areva NP

    3/17

    Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 20093 3

    ERU fuel supply - Story of success

    May 20th 2009, MSZElektrostal,

    Hand Over of the 2000thERU Fuel Assembly to

    AREVA NPin the presence of the final

    customer

  • 8/6/2019 Areva NP

    4/17Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 20094 4

    Introduction

    AREVA NP has more than 10 years experience with the supplyof fuel assemblies made from (re-)Enriched ReprocessedUranium (ERU) in co-operation with OAO MSZ Elektrostal(MSZ) and TVEL Corporation (TVEL)

    AREVA NP supplies today 7 European customers with fuelassemblies made from ERU via the co-operation with MSZElektrostal and TVEL

    Up to now manufactured more than 2000 Fuel Assemblies andadditional delivered about 185 tU ERU Fuel Pellets

    Today the yearly delivery volume is between 80 and 130 tU

    Some of the customers signed with AREVA NP long-termcontracts till end of next decade

    The main reasons for the use of re-enriched Uranium are:

    Obligation to use the material coming from Reprocessing

    Economical advantages: price due to use of own feed material,access to alternative supply chains

  • 8/6/2019 Areva NP

    5/17

  • 8/6/2019 Areva NP

    6/17Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 20096 6

    Qualification of MSZ:A Must on the way to a long-term co-operation

    An enormous volume of qualification was made successfully:

    Verification of analytical inspection methods used for themeasuring of the key parameters of powders and fuel pellets.

    Qualification of key process and inspection operations at MSZand re-inspection of powders, fuel pellets and rods by AREVANP

    In-pile testing of lead fuel rods manufactured by MSZ and

    inserted in the fuel assemblies of AREVA NP which weredelivered to Western NPPs.

    Qualification of fabrication and inspection processes used forthe manufacture of lead fuel assembly batches of 1414, 1515,

    1616, 18x18 PWR and 1010 BWR fuel assembly designs andin-pile testing in commercial reactors.

    Qualification of fabrication and inspection processes for anynew AREVA NP fuel assembly design to be delivered for

    Western customers.

  • 8/6/2019 Areva NP

    7/17Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 20097 7

    CertificationThe other Must

    MSZ is now fully certified under ISO 9001 and ISO 14001

    THE ENVIRONMENT MANAGEMENT

    SYSTEM IS CERTIFIED BY TV CERT FOR

    COMPLIANCE WITH THE ISO 14001:2005

    REQUIREMENTS

    THE ISO 9001:2000 CERTIFICATE IS ANNUALLY

    VALIDATED BY THE SUPERVISORY AUDITS CARRIED OUT

    BY TV CERT

    since 1995

    IN 2004

  • 8/6/2019 Areva NP

    8/17Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 20098 8

    Continuous improvementImportant to have

    New fuel designs

    from AREVA NP

    New manufacturing

    technologies from MSZ

  • 8/6/2019 Areva NP

    9/17Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 20099 9

    RepU is usually provided by the customer

    ERU in this co-operation scheme is produced by dry or wet

    blending of RepU coming from Western commercial reactors with

    RepU coming from different sources with different enrichments

    The ERU fuel is used in the standard AREVA NP fuel assemblydesign, components supplied by AREVA NP

    ERU Business Model:

    ERU fuel supply Business model andprinciples/1

    Manufacturing

    Service

    Enrichment

    Service

    REPU

    Material

    U308/UO3

    Logistics,

    Warranty &

    Sales

    Design &

    Components,

    TAKE OVER/PROVISION OF

    REPU MATERIAL AND MEU

    PROVISION

    BLENDING & CONVERSION

    ERU PELLETS

    ERU FUEL RODS &

    ASSEMBLY

    Utility

    MSZ

    AREVA

  • 8/6/2019 Areva NP

    10/17Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 200910 10

    ERU fuel supply Business model andprinciples/2

    Co-operation with MSZ Elektrostal Fuel Plant/Russia is nowbased on long-term co-operation contract valid till 2020

    AREVA NP can order ERU fuel deliveries in form of:Fuel Assemblies or Fuel Rods with provision of all

    components by AREVA NP to be delivered to the respectiveNPP

    Fuel Pellets to be delivered to AREVA NP plants All design documentation is issued by AREVA NP

    All manufacturing documentation issued by MSY has to beapproved by AREVA NP

    All intellectual property rights regarding the fuel designremains with AREVA NP

    Transportation of the manufactured fuel with the certifiedtransport containers of AREVA NP

  • 8/6/2019 Areva NP

    11/17Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 200911 11

    Experiences in Western Europe

    For 3 German, 2 Swiss, 1 British and 1 Dutch utility regularly

    ERU reloads were delivered via blending route

    One Swedish utility ordered in 2002/03 ERU reloads via

    blending route to spent its RepU stocks.

    Some customers ordered ERU fuel deliveries without provision

    of own RepU.

    In February 2005 the 1000th ERU fuel assembly was delivered,in May 2009 the 2000th ERU fuel assembly was handed over.

    Several reactors have 100% ERU fuel cores or cores with

    significant portions of ERU fuel. Delivery contracts until 2020

    were signed.

    About 286.000 fuel rods are up to now inserted in reactors, the

    failure rate in the first cycle is less than 10-5

    AREVA NP G bH f l bli

  • 8/6/2019 Areva NP

    12/17Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 200912 12

    AREVA NP GmbH fuel assembliesdelivered by MSZ (status 12/2008)

    Plant FA-TypeFirst

    insertion

    Total Number of Fuel

    Assemblies

    Maximum FA Burnup

    (MWd/kgU)

    D38 14x14 1996 76 46

    D37 15x15 2003 68 51

    D08 15x15 2006 96 37

    D24 15x15 1997 220 60

    D10 16x16 2000 148 47

    D35 16x16 1999 100 56

    D18 18x18 2001 184 58

    D44 14x14 2002 112 58

    D36 14x14 2002 96 57

    C04/15 ATRIUM10 2002 528 58

    AREVA NP f l bli

  • 8/6/2019 Areva NP

    13/17Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 200913 13

    AREVA NP fuel assembliesusing ERU fuel (status 12/2008)

    Number of Fuel Assemblies

    Assembly Burnup [MWd/kgU]

    0

    50

    100

    150

    200

    250

    5 10 15 20 25 30 35 40 45 50 55 60 65 70 75

    Total Number of Fuel Assemblies: 1.628

    5 10 15 20 50 4540353025 757060550 65

    P t f f t ti

  • 8/6/2019 Areva NP

    14/17

    Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 200914 14

    Prospects of future co-operationbetween AREVA NP, TVEL and MSZ

    Order volume of ERU fuel in the time period 2008-2019

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    110

    120

    130

    tU

    2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

    Year

    And we see more opportunities for ERU deliveries!

    C l i

  • 8/6/2019 Areva NP

    15/17

    Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 200915 15

    Conclusions

    The co-operation between AREVA NP, TVEL and MSZ is a goodexample of successful establishment of alternative fuel supplychains

    The basis of this success are:

    Clear vision why to do so

    Strong support of management and administration

    High technical and logistical competencies of the partners

    Successful qualification, certification of all processes andprocedures

    Clear business model with responsibilities, obligations andrights

    Continuous improvement process

  • 8/6/2019 Areva NP

    16/17

    Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 2009

    Co-operationbetweenAREVA NP, TVEL and MSZ Elektrostal

    in the field of manufacturing and supply of nuclear fuelfor Western commercial reactors

    based on Enriched Reprocesses Uranium (ERU)

    Ingo Koban AREVA NP GmbH

    Evgeny Sannikov OAO MSZ Elektrostal

    Thank you for your

    attention!

  • 8/6/2019 Areva NP

    17/17

    Ingo Koban, May 27 2009, ATOMEXPO 2009 AREVA NP Proprietary - AREVA NP May 2009

    Any reproduction, alteration, transmission to any

    third party or publication in whole or in part of this

    document and/or its content is prohibited unless

    AREVA NP has provided its prior and written

    consent. This document and any information it

    contains shall not be used for any other purpose

    than the one for which they were provided. Legal

    action may be taken against any infringer and/or

    any person breaching the aforementioned

    obligations.