usaidgems.org...a training workshop for usaid/kenya and east africa staff and partners naivasha,...

159
This document was produced for review by the United States Agency for International Development. It was prepared by The Cadmus Group, Inc. Participant Sourcebook Environmental Compliance + Environmentally Sound Design & Management (ESDM) in Project Implementation A Training Workshop for USAID/Kenya and East Africa Staff & Partners Naivasha, Kenya 13-17 June 2016

Upload: others

Post on 05-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

This document was produced for review by the United States Agency for International Development. It was prepared by The Cadmus Group, Inc.

Participant SourcebookEnvironmental Compliance + Environmentally Sound Design & Management (ESDM) in Project ImplementationA Training Workshop for USAID/Kenya and East Africa Staff & Partners

Naivasha, Kenya 13-17 June 2016

Page 2: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Participants’ Sourcebook: Life-of-Project Environmental Compliance and

Environmentally Sound Design and Management

A Training Workshop for USAID/Kenya and East Africa Staff and Partners

Naivasha, Kenya 13-17 June 2016

Host & Sponsor

USAID/KEA

Prepared under

The Global Environmental Management Support Project (GEMS II), Award Number AID-OAA-M-13-00018. GEMS II Activity AF43b

The Cadmus Group, Inc., prime contractor (www.cadmusgroup.com). Sun Mountain International, principal partner (www.smtn.org).

DISCLAIMER The views expressed in this document do not necessarily reflect the views of the

United States Agency for International Development or the United States Government.

Acknowledgement cover photos: N Sobecki, E. Onyiego, USAID/Kenya; Kenya

Earlier versions of some of the training materials in this sourcebook were produced by The Cadmus Group, Inc. under contract to International Resources Group for USAID/AFR/SD’s ENCAP program, EPP-I-00-03-00013-00 Task Order 11. Others were adapted from those developed (1)

under the Environmental Management Capacity-Building Program of USAID/ME/TS EPIQ Task Order EPP-I-00-03- 00014-00; and (2) for the March 2009 trainings on “Environmental Management of Socioeconomic Development Programs in Post-Conflict Sierra Leone” sponsored by

USAID/DCHA, USAID/Sierra Leone, and a number of implementing partners and facilitated by Sun Mountain International.

Page 3: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 4: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016 1

AGENDA (Version date: 18 May 2016)

USAID/Kenya & East Africa Environmental Compliance + Environmentally Sound Design & Management in Project Implementation Workshop

Simba Lodge—Lake Naivasha, Kenya 13 – 17 June 2016 Training Objective:

The overall goal of the workshop is to strengthen environmentally sound design and management of USAID-funded activities in Kenya and throughout East Africa by assuring that participants have the motivation, knowledge, and skills necessary to: (1) achieve environmental compliance in project implementation; and (2) otherwise integrate environmental considerations in activity design and management to improve overall project acceptance and sustainability.

Key Activities:

Day 1 Overview of Environmentally Sound Design and Management (ESDM) and skill-building in Environmental Impact Assessment (EIA), including field visit.

Day 2 Explain USAID Environmental Procedures and discuss mitigation and monitoring of project activities.

Day 3 Complete site visits and small-group collaboration for preparation of mitigation and monitoring plans.

Day 4 Small groups present field work results; address Special Topics in ESDM.

Day 5 Synthesize workshop proceedings and skill-building; consider professional and organizational next steps.

Day/Time Module Objective/Content Summary Presenter/Facilitator

Day 1 Overview of ESDM and skill-building in EIA

8:00 – 8:30 Participant Sign-In

8:30 – 8:45 Welcome and Opening Statements Highlight training objectives, workshop content, and expected results.

USAID/Kenya & East Africa

8:45 – 9:30 Session 1: Workshop Objectives and Logistics; Participant Introduction and Expectations

Establish workshop objectives; brief the agenda and learning approach. Review logistics.

Introduce participants; articulate expectations.

GEMS Facilitator

9:30 – 10:30 Session 2a: Environmentally Sound Design & Management (ESDM) as a Foundation for Environmental Compliance

Presentation and dialogue

Motivate the need to systematically address environmental considerations in development activities.

Understand linkage between ESDM and project success; view this process in the context of environmental compliance.

GEMS Facilitator

10:30 – 10:45 Break

Page 5: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016 2

Day/Time Module Objective/Content Summary Presenter/Facilitator

10:45 – 11:15 Session 2b: Environmentally Sound Design & Management (ESDM) in the Kenyan and East African Context

Technical presentation and dialogue

Review and discuss socio-cultural aspects of ESDM in Kenya and East Africa; consider real-world examples of ESDM successes and failures.

GEMS Facilitator

11:15 – 12:30 Session 3: Fundamental Skills of Environmental Impact Assessment (EIA)

Technical presentation and dialogue

Define key terms—baseline, impact, activity—and learn essential classroom theory for baseline characterization, impact identification & mitigation design and how they apply in the EIA framework; the EIA framework is the basis for USAID Environmental Procedures.

GEMS Facilitator

12:30 – 13:30 Lunch

13:30 – 14:00 Session 4a: EIA Skill-Building Exercise

Briefing

Receive instruction on the methodology and objectives of the EIA skill-building exercise.

Divide into small groups for the field-based exercise.

GEMS Facilitator

14:00 – 16:30

(includes return)

Session 4b: EIA Skill-Building Exercise

Field visit

Practice observation and assessment skills needed to characterize the baseline situation and identify impacts/issues of concern.

Small-group Exercise

from 16:00 Break

16:30 – 17:00 Session 4c: EIA Skill-Building Exercise

Group work and dialogue

Begin to synthesize field observations and prioritize impacts/issues of concern.

Discuss possible approaches for limiting adverse effects on the environment.

Small-group Exercise

Day 2 USAID Environmental Procedures and mitigation and monitoring of project activities

8:30 – 9:30 Session 4c, continued: EIA Skill-Building Exercise

Group work and dialogue, continued

See preceding description. Small-group Exercise

9:30 – 10:30 Session 4d: EIA Skill-Building Exercise

Presentation and discussion

Small groups present and discuss findings and recommendations based on field visit.

Small-group Exercise

10:30 – 10:45 Break

10:45 – 12:00 Session 5: Environmental Impact Assessment and “USAID Environmental Procedures”: the Initial Environmental Examination (IEE) and Beyond

Technical presentation and dialogue

Review USAID’s implementation of the EIA process and the preparation of project environmental compliance documents; understand how these documents establish environmental management criteria for USAID-funded activities.

GEMS Facilitator

12:00 – 13:00 Lunch

13:00 – 14:00 Session 6: Principles of Environmental Monitoring

Technical presentation and dialogue

Review key aspects of monitoring to ensure that project environmental compliance requirements are met and potential adverse impacts effectively mitigated; highlight the selection of clear and cost-effective monitoring indicators.

GEMS Facilitator

Page 6: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016 3

Day/Time Module Objective/Content Summary Presenter/Facilitator

14:00 – 15:00 Session 7: The Environmental Mitigation and Monitoring Plan (EMMP)

Technical presentation and dialogue

Understand the EMMP concept and formats: who develops EMMPs and their role in “operationalizing” key elements of USAID Environmental Procedures and establishing and maintaining project environmental compliance. Introduce key guidance: EMMP Factsheet.

GEMS Facilitator

15:00 – 15:15 Break

15:15 – 15:30 Session 8: Introduction to the USAID Sector Environmental Guidelines + Similar Resources

Presentation

Deepen familiarity with environmental resources and tools, particularly the Sector Environmental Guidelines.

GEMS Facilitator

15:30 – 17:00 Session 9a: EMMP Skill-Building Exercise

Briefing and classroom preparation

Technical Areas (to be confirmed):

1) Water supply/sanitation (WASH) 2) Natural resource mngt./conservation 3) Agricultural/livestock production 4) Health care waste management

Orientation of the case study sites that will be visited in the field. Organize participants by small group and distribute technical resources.

Discuss potential adverse impacts of the case study site activities. Review background and reference materials and discuss approach for EMMP development in small-group format.

GEMS Facilitators

Day 3 Field-based EMMP exercise and small-group collaboration

8:00 – 13:00

(includes return from field)

Session 9b: EMMP Skill-Building Exercise

Field visit

Build and apply the core EIA and environmental compliance skills briefed in Days 1 to 3 via a field visit and follow-up group work to:

1) synthesize field observations; and

2) develop specific mitigation and monitoring measures for the top two issues/impacts of concern at each site, with reference to the SEGs.

Group Participants

13:00 – 14:00 Lunch

14:00 – 17:00

(tea break taken at leisure)

Session 9c: EMMP Skill-Building Exercise

Small group work

Advance discussions and compilation of field visit results into an EMMP format and a group presentation.

Group Participants

from 16:00 Refreshments taken at leisure during small-group work

Day 4 Present EMMPs and address Special Topics

8:30 – 10:00 Session 9d: EMMP Skill-Building Exercise

Group presentations in plenary

Articulate field visit findings, analysis, and EMMP development.

Group Participants

10:00 – 10:30 Session 10: Environmental Compliance Reporting

Technical presentation and dialogue

Guidance on EMMP-related and other environmental compliance reporting, including integration with broader project M&E and other reporting requirements.

GEMS Facilitator

10:30 – 10:45 Break

10:45 – 11:30 Session 11: Special Topic—WASH & Water Supply Activities

Technical presentation and dialogue

Review the requirements and procedures involved with water quality assurance and the practical elements of water quality management in USAID-funded development programs.

GEMS Facilitator

Page 7: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016 4

Day/Time Module Objective/Content Summary Presenter/Facilitator

11:30 – 12:30 Session 12: Special Topic— Pesticide Use in USAID Activities

Technical presentation and dialogue

Brief the environmental, economic and human-health concerns related to pesticide use.

Achieve a common understanding of the special environmental compliance requirements that apply to pesticide use and procurement. Review key elements of safer pesticide use, including Integrated Pest Management (IPM) and the use of Personal Protective Equipment (PPE).

GEMS Facilitator

12:30 – 13:30 Lunch

13:30 – 14:15 Session 13: Special Topic—Environmental Compliance for sub-Projects and sub-Awards

Technical presentation and dialogue

Understand practical approaches to ensuring environmental compliance and ESDM for smaller sub-project or sub-award activities.

GEMS Facilitator

14:15 – 14:45 Session 14: ESDM for Construction Activities

Technical presentation and dialogue

Brief the compliance and ESDM challenges and best practices related to small-scale construction activities.

GEMS Facilitator

14:45 – 15:00 Break

15:00-16:30

Session 15: Environmental Compliance/ESDM Knowledge game

Small-group competition

Reinforce key “core session” content in a small-group competition.

GEMS Facilitators

16:30 – 17:00 Session 16: BEO/REA Informational Session

Brief presentation followed by Q&A session

Engage with Washington, D.C.-based Bureau Environmental Officer(s).

Understand perspectives from USAID headquarters and at the East Africa Regional level on environmental compliance and management issues of concern.

Bureau Environmental Officer (or Designee) and/or USAID/East Africa Regional Environmental Advisor

Day 5 Way Forward

8:30 – 9:15 Session 17: Roles, Responsibilities & Resources

Technical presentation and dialogue

Summarize the various responsibilities of USAID staff and Implementing Partners (IPs); introduce additional key resources available to support environmental compliance and ESDM.

GEMS Facilitator & USAID/Kenya & East Africa

9:15 – 10:00 Session 18: Parking Lot Session

Plenary session

Address unresolved questions or issues and summarize information presented throughout the training.

GEMS Facilitator

10:00– 10:15 Break

10:15 – 11:30 Session 19: Bringing Curricula to Reality

Group discussions followed by individual action planning

With the technical training now complete, participants will share perspectives on environmental priorities and challenges for USAID activities in Kenya and throughout East Africa.

Frame lessons-learned and identify practical actions that can be operationalized as part of project implementation.

GEMS Facilitator

11:30 -11:45 Workshop Final Evaluations Participants complete evaluation form

11:45 – 12:00 Closing Ceremony Conclude workshop and distribute certificates USAID/Kenya & East Africa

12:00 – 13:00 Lunch

Page 8: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Acronyms

ADS (USAID) Automated Directives System

AFR USAID Bureau for Africa

AFR/SD USAID Bureau for Africa, Office of Sustainable Development

AOR Agreement Officer’s Representative

AOTR Agreement Officer’s Technical Representative (now superseded by AOR)

Asia/ME USAID Bureaus for Asia and the Middle East

BEO Bureau Environmental Officer

BFS USAID Bureau for Food Security

BPR Environmental Procedures Best Practices Review

CFR Code of (US) Federal Regulations

COP Chief-of-Party

COR Contracting Officer’s Representative

COTR Contracting Officer’s Technical Representative (now superseded by COR)

DCHA USAID Bureau for Democracy, Conflict and Humanitarian Assistance

DO Development Objective

EA Environmental Assessment; Eastern Africa

ECL Environmental Compliance: Language for Solicitation and Awards (ADS 204 Help Document)

ECSR Environmental Compliance Status Report

EGSSAA (USAID/AFR’s) Environmental Guidelines for Small‐Scale Activities in Africa

EIA Environmental Impact Assessment

EMMP Environmental Mitigation & Monitoring Plan

EMPR Environmental Management Plan & Report

ENCAP Environmentally Sound Design and Management Capacity-Building Support for Africa (GEMS predecessor program supporting Africa Region under the EPIQ II IQC.)

ERF Environmental Review Form

ERR Environmental Review Report

ESDM Environmentally Sound Design & Management

FAA (US) Foreign Assistance Act

FO Functional Objective (under the Foreign Assistance Programming Framework)

FTF Feed the Future (President’s Feed the Future Global Health and Food Security Initiative)

GCC Global Climate Change

GHG Greenhouse gas

IEE Initial Environmental Examination

IQC Indefinite Quantity Contract

IRS (Anti-malarial) Indoor Residual Spraying

ITN Insecticide-Treated (bed) Net

IP USAID Implementing Partner

LOE Level of Effort

LOP Life-of-Project

M&E Monitoring & Evaluation

M&M (Environmental) Mitigation and Monitoring

MCC Millennium Challenge Corporation

ME USAID Bureau for the Middle East

MEO Mission Environmental Officer

NGO Non-Governmental Organization (see also PVO)

NRM Natural Resources Management-

OIG Office of the (USAID) Inspector General

OMEP USAID Office of Middle East Programs

PEA Programmatic Environmental Assessment

PEPFAR President’s Emergency Plan for AIDS Relief

PERSUAP Pesticide Evaluation Report and Safer Use Action Plan

PMP Performance Monitoring Plan

PMI Presidential Malaria Initiative

POC Point of Contact

ppb parts per billion

PVO Private Voluntary Organization

RCE Request for Categorical Exclusion

REA Regional Environmental Advisor

RUP Restricted Use Pesticide

Reg. 216 22 CFR 216

SO Strategic Objective

Title II Title II of US Public Law 480 (Agricultural Trade Development and Assistance Act of 1954); “Food for Peace” program.

USAID United States Agency for International Development

USG United States Government

Page 9: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 10: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 1. Workshop Objectives and Logistics; Participant Introductions and Expectations

Summary This session briefs the workshop and its agenda, introduces us to each other, and establishes expectations. Specific elements of the session are:

• Overview of training objectives, learning approach, agenda and materials • Participant and facilitator introductions • Solicit expectations • Address logistical considerations • Create a “Parking Lot”

This workshop will provide intensive training in: (1) compliance with USAID’s environmental procedures in project implementation, and (2) in the objectives of these procedures: environmentally sound design and management (ESDM) of USAID-funded activities.

Overall Goal: The overall goal of the workshop is to strengthen environmentally sound design and management of USAID-funded activities in Kenya and East Africa by assuring that participants have the motivation, knowledge and skills necessary to (1) achieve environmental compliance in project implementation, and (2) otherwise integrate environmental considerations in activity design and management to improve overall project acceptance and sustainability.

Approach to Learning: The workshop is intended to be highly participatory and field-based:

• Skills and processes briefed in the presentations will be built and practiced in hands-on exercises conducted in small working groups.

• The key, integrative exercises in environmental impact assessment (EIA) skill-building and environmental mitigation and monitoring are built around two field visits: an afternoon exercise to practice fundamental skills of EIA, and a half-day site exercise culminating in preparation of an Environmental Mitigation and Monitoring Plan (EMMP).

• Even presentation-centered sessions are intended to be interactive. Please ask questions and—as importantly—share and discuss your own experiences and perspectives relevant to the topic at hand.

Everyone’s active participation is encouraged and needed to make this workshop a success!

Teamwork Principles: Working groups are where we will practice and apply the key skills and ideas of the workshop. Working groups provide the opportunity for detailed discussions, and for learning from experiences and views of fellow development professionals. Working groups are also emphasized because environmental compliance and environmentally sound design and management are intrinsically team efforts.

Page 11: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Successful working groups require effective teamwork. Here are teamwork principles to consider:

Twelve Essentials of Teamwork

VALUING DIVERSITY

COMFORTABLE ATMOSPHERE

ACTIVE PARTICIPATION

OF ALL MEMBERS

SHARED GOALS AND OBJECTIVES

BALANCED APPROACH TO PROCESS AND

CONTENT WHAT

EFFECTIVE TEAMS NEED

EFFECTIVE COMMUNICATION

SHARED LEADERSHIP

CONSTRUCTIVE CONFLICT

MANAGEMENT

ACTION ACCOUNTABILITY RESPONSIBILITY

MUTUAL TRUST

CRITICAL ANALYSIS AND

PROBLEM-SOLVING

A PREFERENCE FOR CONSENSUS

(Adapted from Rees, "How to lead work teams in facilitation skills”)

Page 12: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Sessions 2a & 2b. Environmentally Sound Design & Management (ESDM) as a Foundation for Environmental Compliance Technical presentation and dialogue

Summary This session will explain ESDM and illustrate its vital role in achieving and maintaining environmental compliance in project implementation. In order to establish this important relationship, we will:

• Develop a common understanding of the term “environment”

• Highlight some of the “big picture” environmental trends affecting human health and livelihoods in East Africa, including Global Climate Change, and show that much of USAID’s portfolio in Kenya and East Africa is a direct response to—or directly affected by—these trends

• By example, demonstrate that “environment” and “development” are concepts further linked by the need to be:

o AWARE of the potential adverse impacts of development activities on ecosystems, environmental resources and environmental quality; and the need to

o PROACTIVELY seek to limit these adverse impacts, particularly where they affect health and livelihoods

This is Environmentally Sound Design & Management (ESDM)!

• Consider specific examples from Kenya and East Africa of the linkage between ESDM and successful project outcomes

This session will also highlight the most common root causes of ESDM failures or lapses and set out the basic rules or principles for achieving ESDM.

While the session will introduce the concept and practice of environmental compliance, specific USAID regulations and requirements will be addressed in finer detail in Session 5.

Objectives • Achieve a common understanding of “environment”

• Understand Environmentally Sound Design & Management as a necessary and explicit objective for effective development

• Establish the basic principles for achieving ESDM

• Consider real-world examples of ESDM successes and failures in Kenya and East Africa

Page 13: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 14: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61

Envi

ronm

enta

lly S

ound

Des

ign

& M

anag

emen

t: A

Fou

ndat

ion

for

Envi

ronm

enta

l Com

plia

nce

GEM

S En

viro

nmen

tal C

ompl

ianc

e-ES

DM

Tra

inin

g Se

ries

Keny

a Ju

ne, 2

016

•W

ebst

er’s

defin

es it

as “

The

tota

lity

of c

ircum

stan

ces

surr

ound

ing

an

orga

nism

or

grou

p of

org

anis

ms,

espe

cial

ly:

–T

he c

ompl

ex o

f phy

sica

l, ch

emic

al, a

nd b

ioti

c fa

ctor

s (e

.g.

clim

ate,

soi

l, an

d liv

ing

thin

gs) t

hat a

ffect

and

influ

ence

the

grow

th,

deve

lopm

ent,

and

surv

ival

of a

n or

gani

sm o

r an

eco

logi

cal

com

mun

ity

–T

he c

ompl

ex o

f soc

ial a

nd c

ultu

ral c

ondi

tion

saf

fect

ing

the

natu

re o

f an

indi

vidu

al o

r co

mm

unity

”.

USA

ID’s

envi

ronm

enta

l pro

cedu

res

are

conc

erne

d w

ith th

e “n

atur

al

and

phys

ical

env

ironm

ent,”

but

in p

ract

ice,

soc

ial a

nd c

ultu

ral i

ssue

s ar

e of

ten

not s

epar

able

5/23

/201

62

ENV

IRO

NM

ENT

–T

HE

BIG

PIC

TU

RE

WH

AT IS

EN

VIR

ON

MEN

T?

ofte

n no

t sep

arab

le

Wha

t ar

e so

me

“big

-pic

ture

” en

viro

nmen

tal t

rend

s af

fect

ing

hum

an h

ealth

and

liv

elih

oods

in E

ast A

fric

a? A

re t

hey

impo

rtan

t in

Ken

ya?

5/23

/201

63

1. P

OPU

LAT

ION

GRO

WT

H

2015

2050

% chan

geW

orld

**7.

35bn

9.67

bn+3

2%

Afri

ca**

1.17

bn2.

44bn

+109

%

E. A

frica

**39

5m

n86

3m

n+1

18%

Ken

ya46

.1m

n94

mn

+104

%

Less

-D

evel

oped

R

egio

ns**

6.03

bn7.

99bn

+32.

5%

LDC

s93

1m

n1.

73bn

+86%

* A

ll da

ta: “

med

ium

var

iant

” pr

ojec

tion.

U

N P

opul

atio

n D

ivis

ion

(htt

p://e

sa.u

n.or

g/w

pp/u

npp/

pane

l_po

pula

tion.

htm

)**

incl

udes

Ken

ya

Incr

ease

d de

man

ds fo

r w

ater

, lan

d,

timbe

r, en

ergy

, inf

rast

ruct

ure

& s

ocia

l ser

vice

s. In

crea

sed

was

te p

rodu

ctio

n.

LEA

DS

TO

Incr

easi

ng

Popu

latio

n in

Ke

nya

UN

Pop

ulat

ion

estim

ates

:*

5/23

/201

64

2. U

RBA

NIZ

ATIO

N

* U

N P

opul

atio

n D

ivis

ion

(htt

p://e

sa.u

n.or

g/un

pd/w

up/h

ighl

ight

s/w

up20

14-h

ighl

ight

s/w

up20

14/p

df**

incl

udes

Ken

ya

Incr

ease

d ur

ban

envi

ronm

enta

lhe

alth

haz

ards

(giv

en p

oor

or n

o m

unic

ipal

sa

nita

tion

& w

aste

man

agem

ent c

apac

ity).

LEA

DS

TO

Mos

t ur

ban

grow

th in

th

e ne

xt 3

5 ye

ars

in

deve

lopi

ng c

ount

ries

Urb

an p

op a

s %

of t

otal

Aver

age

annu

al

rate

of c

hang

e (2

010-

2015

)20

1520

50

Wor

ld**

54%

66%

0.9%

Afri

ca**

40%

56%

1.1%

Eas

tern

Afri

ca**

25%

44%

1.7%

Ken

ya**

25%

50%

0.4%

Less

-Dev

elop

ed

Reg

ions

**48

%63

%1.

2%

LDC

s**

31%

49%

1.7%

Urb

an p

opul

atio

n w

ill g

row

mor

e th

an 2

X a

s fa

st a

s ru

ral p

opul

atio

n fo

r th

e fo

rese

eabl

e fu

ture

UN

Pop

ulat

ion

estim

ates

:*

Page 15: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

6FO

OT

ER G

OES

HER

E5

Glo

bal c

hang

e +

popu

latio

n gr

owth

=IN

CR

EASE

D W

ATER

ST

RES

SG

reat

est i

mpa

cts

on p

oor,

subs

iste

nce

agri

cultu

re.

•M

uch

of U

SAID

’s po

rtfo

lio in

the

regi

on is

alre

ady

a di

rect

res

pons

e to

or

dire

ctly

affe

cted

by

thes

e en

viro

nmen

tal t

rend

s

•Bu

t goo

d de

velo

pmen

t doe

s no

t sim

ply

resp

ond

to e

xter

nal

envi

ronm

enta

l cha

lleng

es. G

ood

deve

lopm

ent …

–is

AW

AR

Eof

its

pote

ntia

l adv

erse

impa

cts

on e

cosy

stem

s, en

viro

nmen

tal r

esou

rces

and

env

iron

men

tal q

ualit

y an

d

–P

RO

AC

TIV

ELY

see

ks t

o lim

it th

ese

adve

rse

impa

cts,

part

icul

arly

whe

re t

hey

affe

ct h

ealt

h an

d liv

elih

oods

5/23

/201

66

ENV

IRO

NM

ENT

AN

D D

EVEL

OPM

ENT

AR

E N

OT

SE

PAR

ABL

E

Why

? To

avo

id M

ISTA

KES

5/23

/201

67

•So

met

imes

obv

ious

(pre

viou

s ex

ampl

es)

•Bu

t ofte

n di

fficu

lt to

fore

see,

pre

dict

WH

Y A

RE

“EN

VIR

ON

MEN

TAL

MIS

TAK

ES”

MA

DE?

Ofte

n ro

oted

in a

few

co

mm

on d

esig

n pr

oble

ms

!

Failu

re to

pla

n fo

r th

e ef

fect

s of

in

crea

sed

scal

e

Igno

ring

eco

nom

ic-e

nviro

nmen

tal

linka

ges

Failu

re to

und

erst

and

syst

em

com

plex

ity

Des

igni

ng fo

r av

erag

e co

nditi

ons

5/23

/201

68

•T

he e

nviro

nmen

tal e

ffect

s of

a

smal

l-sca

le a

nim

al h

usba

ndry

pr

ojec

t m

ay b

e m

inor

•BU

T if

the

proj

ect

is s

ucce

ssfu

l, an

d m

any

mor

e in

divi

dual

s be

gin

to h

old

larg

er n

umbe

rs o

f an

imal

s, se

riou

s pr

oble

ms

may

ar

ise.

. .

–H

ealth

haz

ards

from

ani

mal

w

aste

. .

–Fo

dder

sho

rtag

es (m

ay le

ad t

o ov

ergr

azin

g an

d er

osio

n an

d/or

land

con

flict

s)

CO

MM

ON

RO

OT

CA

USE

S #1

Fa

ilure

to

plan

for

the

effe

cts

of

incr

ease

d sc

ale

Or,

failu

re to

pla

n fo

r suc

cess

!

Page 16: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

69

Thi

s sc

hool

hous

e is

bei

ng r

ebui

lt in

m

akes

hift

fash

ion

with

pla

nk w

alls

an

d a

split

-bam

boo

roof

.

Why

?

Stro

ng w

inds

rip

ped

the

alum

inum

sh

eet

roof

ing

off t

he “p

erm

anen

t”

stru

ctur

e an

d to

pple

d th

e la

ndcr

ete

wal

ls.

In t

his

area

, one

or

two

stor

ms

ever

y 5

year

s ty

pica

lly h

ave

win

ds o

f thi

s st

reng

th.

CO

MM

ON

RO

OT

CA

USE

S #2

D

esig

ning

for

aver

age

cond

ition

s, no

t ex

pect

ed v

aria

bilit

y

Oth

er “a

vera

ge c

ondi

tions

” to

be

care

ful o

f:R

ainf

all, t

ides

, wat

er t

able

s. . .

Wha

t el

se?

Glo

bal c

hang

e w

ill a

ffect

bo

th a

vera

ge c

ondi

tions

&

expe

cted

var

iabi

lity

5/23

/201

610

•H

ouse

hold

con

sum

ptio

n de

pend

s on

inco

me

•Su

cces

s in

rai

sing

inco

me

in a

co

mm

unity

may

incr

ease

–de

man

d fo

r bu

ildin

g m

ater

ials

(b

rick

& t

imbe

r)

–th

e nu

mbe

r of

live

stoc

k

–de

man

d fo

r w

ater

–ge

nera

tion

of w

aste

, inc

ludi

ng

disp

osab

le p

acka

ging

CO

MM

ON

RO

OT

CA

USE

S #3

Ig

nori

ng e

cono

mic

-en

viro

nmen

tal l

inka

ges

All

can

have

sig

nific

ant a

dver

se

envi

ronm

enta

l im

pact

s!

Anot

herf

ailu

re to

pla

n fo

r suc

cess

!

5/23

/201

611

Pond

s ex

cava

ted

for

fill t

o bu

ild-u

p gr

ound

leve

l in

villa

ges

for

flood

pr

otec

tion

CO

MM

ON

RO

OT

CA

USE

S #4

Fa

ilure

to

unde

rsta

nd s

yste

m

com

plex

ity

Toda

y ~3

000

Bang

lade

shis

die

eac

h ye

ar o

f A

s-in

duce

d ca

ncer

; 2 m

nliv

e w

ith c

hron

ic A

spo

ison

ing

Pond

s pr

ovid

ed a

sou

rce

of o

rgan

ic

carb

on w

hich

set

tles

to b

otto

m o

f po

nd, s

eeps

und

ergr

ound

and

is

met

abol

ized

by

mic

robe

s

Cre

ates

che

mic

al c

ondi

tions

tha

t ca

use

natu

rally

occ

urri

ng a

rsen

ic t

o di

ssol

ve

out

of t

he s

edim

ents

and

soi

ls a

nd

mov

e in

to g

roun

dwat

er

Cre

ated

con

ditio

ns fo

r m

ass

arse

nic

pois

onin

g w

hen

villa

ges

switc

hed

from

su

rfac

e w

ater

to

“cle

aner

” tu

be w

ells

.

Phot

o: U

NES

CO

-IHE

In s

hort

, how

can

we

achi

eve

. . .

Envi

ronm

enta

lly S

ound

Des

ign

& M

anag

emen

t (E

SDM

)?

5/23

/201

612

HO

W C

AN

WE

AVO

ID T

HES

E EN

VIR

ON

MEN

TAL

MIS

TAK

ES (

AN

D

MA

XIM

IZE

ENV

IRO

NM

ENTA

L BE

NEF

ITS)

?

Page 17: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

1.Be

pre

vent

ion-

orie

nted

2.A

pply

bes

t de

velo

pmen

t pr

actic

es t

o en

viro

nmen

tal a

spec

ts o

f the

act

ivity

3.Be

sys

tem

atic

5/23

/201

613

HO

W D

O W

E A

CH

IEV

E ES

DM

?

3 BA

SIC

RU

LES:

•Pr

even

tion

occu

rs a

cros

s th

e pr

ojec

t lif

ecyc

le—

but

it st

arts

w

ith d

esig

n!

5/23

/201

614

HO

W D

O W

E A

CH

IEV

E ES

DM

?1.

Be

prev

entio

n-or

ient

ed

1.Im

plem

ent d

esig

n de

cisio

ns

2.Bu

ild c

apac

ity fo

r env

ironm

enta

lly s

ound

ope

ratio

n

Des

ign

Con

stru

ct/ i

mpl

emen

tO

pera

te(m

ay in

clude

han

dove

r)D

ecom

mis

sion

(in s

ome

case

s)

Mak

e de

cisio

ns a

bout

site

, tec

hniq

ue a

nd

oper

atin

g pr

actic

es to

min

imiz

e im

pact

s1.

Impl

emen

t & m

aint

ain

prop

er o

pera

tion

2.M

onito

r the

act

ivity

and

its

impa

cts

5/23

/201

615

•Pr

even

tion

star

ts w

ith D

ESIG

N

•D

ESIG

N s

tart

s w

ith th

e ch

oice

of m

eans

•En

viro

nmen

tal i

mpa

cts

are

1 fa

ctor

con

side

red

ESD

M IS

PR

EVEN

TIO

N-O

RIE

NT

ED

Obj

ecti

ve:

Impr

ove

agric

ultu

ral p

rodu

ctivi

ty

Poss

ible

mea

ns:

How

do

we

choo

se?

Cha

nge

use

of

agri

cult

ural

inpu

ts?

Intr

oduc

e im

prov

ed

crop

var

ieti

es?

Cha

nge

cult

ivat

ion

prac

tice

s?

App

ly g

ener

al b

est

deve

lopm

ent

prac

tices

HO

W D

O W

E A

CH

IEV

E ES

DM

?2.

APP

LY B

EST

PR

AC

TIC

ES

AN

D d

esig

n fo

r cl

imat

e ch

ange

…to

env

ironm

enta

l asp

ects

of t

he a

ctiv

ity

A t

echn

ical

ly

soun

d de

sign

To b

uild

ben

efic

iary

cap

acity

&

stak

ehol

der

com

mitm

ent

To d

esig

n fo

r th

e lo

cal

soci

al &

pol

icy

cont

ext

To a

djus

t w

hat

we

do a

s re

sults

com

e in

Page 18: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

617

•En

viro

nmen

tal a

pplic

atio

n:

–T

he d

esig

n m

ust b

e ap

prop

riat

e fo

r lo

cal

envi

ronm

enta

lcon

ditio

ns (r

ainf

all,

tem

pera

ture

, so

ils, f

lood

, dro

ught

and

ear

thqu

ake

pote

ntia

l, th

e bu

ilt e

nviro

nmen

t)ta

king

into

acc

ount

like

ly

clim

ate

chan

ge.

BP #

1: T

ECH

NIC

ALL

Y S

OU

ND

DES

IGN

For

exam

ple:

App

ropr

iate

cho

ice

of s

iting

?

For

exam

ple:

A

ppro

pria

te c

hoic

e of

cr

ops

or t

rees

?

Less

tha

n 10

m

Uns

cree

ned

sim

ple

pit

latr

ines

A n

ewly

co

nstr

ucte

d op

en-a

ir

kitc

hen

g

…R

ainf

all,

tem

pera

ture

, soi

ls,

flood

, dro

ught

, and

ear

thqu

ake

pote

ntia

l, th

e bu

ild e

nviro

nmen

t…

BP #

2: D

ESIG

N F

OR

TH

E PO

LIC

Y A

ND

SO

CIA

L C

ON

TEX

T

ENV

IRO

NM

ENTA

L A

PPLI

CAT

ION

S:

Com

plia

nce

with

nat

iona

l and

lo

cal e

nviro

nmen

tal

law

s an

d po

licie

s

Lang

uage

, lit

erac

yEn

viro

nmen

tal m

anag

emen

t m

easu

res

mus

t be

mat

ched

to

cap

abili

ties

NR

M a

nd la

nd t

enur

eA

ctiv

ities

util

izin

g la

nd a

nd

othe

r na

tura

l res

ourc

es m

ust

be c

ompa

tible

with

loca

l NR

M

and

land

ten

ure

Ew l

t

land

and

res

ourc

e ri

ghts

are

of

ten

gend

er-s

peci

fic

5/23

/201

619

•Lo

cal b

enef

icia

ries

nee

d to

be

tra

ined

and

com

mitt

ed

to: –

envi

ronm

enta

lly s

ound

op

erat

ion

–m

aint

ain

the

equi

pmen

t/ s

truc

ture

BP #

3: B

UIL

D S

TAK

EHO

LDER

C

OM

MIT

MEN

T &

CA

PAC

ITY

Who

will

mai

ntai

n it?

Who

will

ope

rate

it?

Envi

ronm

enta

l app

licat

ion:

Prop

er m

aint

enan

ce a

nd

oper

atio

n ar

e cr

itica

l to

cont

rolli

ng e

nviro

nmen

tal

impa

cts

5/23

/201

620

. . . A

ND

INVO

LVE

TH

E LO

CA

L C

OM

MU

NIT

Y

Ethi

cs r

equi

re it

(env

ironm

enta

l jus

tice)

Loca

l res

iden

ts m

ust

live

with

the

envi

ronm

enta

l im

pact

s of

act

iviti

es!

How

ofte

n do

es t

he r

iver

floo

d?

How

ofte

n ar

e cr

ops

rota

ted?

Is t

here

a la

nd t

enur

e pr

oble

m?

Wha

t do

peo

ple

valu

e an

d ne

ed?

LOC

AL

KN

OW

LED

GE

is c

ritic

al

LIST

EN t

o th

eco

mm

unity

TALK

to

both

men

and

wom

en

Page 19: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

621

BP #

4: A

DJU

ST W

HAT

WE

DO

AS

RES

ULT

S C

OM

E IN

A p

roje

ct b

udge

t th

at fu

nds

envi

ronm

enta

l mon

itori

ng

The

flex

ibili

ty t

o ad

apt

the

proj

ect

in r

espo

nse

to

unan

ticip

ated

adv

erse

im

pact

s

Adj

ustin

g im

plem

enta

tion

of

our

proj

ect

base

d on

the

ex

peri

ence

s of

oth

ers

Ada

ptiv

e en

viro

nmen

tal

man

agem

ent r

equi

res:

•Pr

actic

e A

dapt

ive

man

agem

ent

–ad

just

ing

impl

emen

tatio

n of

our

ac

tivity

bas

ed o

n re

sults

from

the

fie

ld

•If

our

activ

ity h

as u

nint

ende

d en

viro

nmen

tal c

onse

quen

ces,

we

need

to

DO

SO

ME

TH

ING

A

BO

UT

IT!

Com

mun

itie

s ar

e of

ten

esse

ntia

l to

mon

itor

ing

resu

lts

from

the

fiel

d

5/23

/201

622

BP #

5: D

ESIG

N F

OR

CLI

MAT

E C

HA

NG

E

•A

s pr

evio

usly

men

tione

d, c

limat

e ch

ange

will

affe

ct fu

ture

ba

selin

e co

nditi

ons—

proj

ects

mus

t be

des

igne

d to

be

ROBU

ST t

o th

ese

cond

ition

s

•W

hile

indi

vidu

al p

roje

cts

are

rare

ly s

igni

fican

t co

ntri

buto

rs

to G

CC

, clim

ate

chan

ge is

dri

ven

by t

he s

um o

f man

y sm

all

actio

ns

•Ev

en s

mal

l-sca

le p

roje

cts

shou

ld s

eek

to r

educ

e G

HG

em

issi

ons/

incr

ease

seq

uest

ratio

n an

d re

duce

clim

ate

vuln

erab

ility

in t

he lo

cal a

rea

in a

man

ner

cons

iste

nt w

ith

thei

r de

velo

pmen

t ob

ject

ives

-T

HIS

IS U

SAID

PO

LIC

Y!

5/23

/201

623

BEST

PR

AC

TIC

E: D

ESIG

N F

OR

C

LIM

ATE

CH

AN

GE

Use

alte

rnat

ive

ener

gy (

PV, w

indm

ill w

ater

pum

ping

, etc

)

Impr

ove

ther

mal

per

form

ance

in b

uild

ing

desi

gn

Buy

carb

on o

ffset

s fo

r in

t’l t

rave

l.

RED

UC

E G

HG

EM

ISSI

ON

S

EXA

MPL

E A

CT

ION

S IN

SM

ALL

-SC

ALE

PR

OJE

CT

S:

Prio

ritiz

e w

ater

effi

cien

cy t

o re

duce

a p

roje

ct’s

cont

ribu

tion

to t

he a

rea’s

futu

re w

ater

str

ess

RED

UC

E C

LIM

ATE

VU

LNER

ABI

LIT

Y IN

TH

E LO

CA

L A

REA

Tree

Pla

ntin

g

Land

man

agem

ent

(sus

tain

able

gra

zing

, cro

ppin

g)

INC

REA

SE S

EQU

EST

RAT

ION

Soil

carb

on m

easu

rem

ent b

y ha

nd in

Se

nega

l

1.Be

pre

vent

ion-

orie

nted

2.A

pply

bes

t de

velo

pmen

t pr

actic

es t

o en

viro

nmen

tal a

spec

ts o

f the

act

ivity

3.BE

SYS

TEM

ATIC

5/23

/201

624

NO

W, R

ULE

3 F

OR

AC

HIE

VIN

G E

SDM

:

Page 20: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

•Tak

e a

syst

emat

ic lo

ok a

t:

–th

e po

ssib

le a

dver

se

envi

ronm

enta

l im

pact

s of

an

activ

ity–

way

s to

red

uce

thes

e im

pact

s

HO

W D

O W

E A

CH

IEV

E ES

DM

?3.

BE

SYST

EMAT

IC

TH

E BE

ST W

AY T

O B

E SY

STEM

ATIC

: EN

VIR

ON

MEN

TAL

IMPA

CT

ASS

ESSM

ENT

(EI

A)!

KELLY RAMUNDO, USAID

5/23

/201

626

•W

ilkist

erM

agan

giU

SAID

/Ken

ya M

issi

on E

nviro

nmen

tal O

ffice

r (M

EO)

wm

agan

gi@

usai

d.go

v

•D

avid

Kin

yua,

USA

ID/E

ast A

fric

a R

egio

nal E

nviro

nmen

tal A

dvis

or (

REA

)dk

inyu

a@us

aid.

gov

•G

loba

l Env

ironm

enta

l Man

agem

ent

Supp

ort

(GEM

S) P

roje

ctG

EMSC

OR

ETea

m@

cadm

usgr

oup.

com

Page 21: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 22: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 2b PowerPoint Placeholder

Page 23: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 24: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 3. Fundamental Skills of Environmental Impact Assessment (EIA) Technical presentation and dialogue Summary This session will define Environmental Impact Assessment (EIA) as a formal process for identifying the likely effects of activities/projects on the environment, and on human health and welfare; and the means and measures to effectively mitigate these impacts.

Fundamental skills of the EIA process will also be introduced and explained, including:

1) characterizing the baseline situation;

2) identifying (and evaluating) the potential adverse impacts of planned development activities (issues of concern); and

3) developing a mitigation strategy to address these impacts.

The session will further illustrate how the EIA process aligns with ESDM and establish that this process is the internationally accepted standard framework for achieving ESDM in project-based development. The linkage between EIA and USAID environmental procedures will also be established.

Discussion of Fundamental EIA Skills

This session addresses the essential EIA skills of baseline characterization, impact identification and mitigation design. (A fourth “core” skill—monitoring—is addressed in a subsequent session). These skills will be put to practice in the workshop’s field-based activities.

Baseline Characterization & Identifying Impacts of Concern

This portion of the session explains the basic, logical process behind baseline characterization and identifying impacts (or issues) of concern. An example from a real and typical small-scale irrigation project will illustrate why the fundamental EIA skills of baseline characterization and issue identification are directly relevant to effective mitigation and achieving ESDM.

Depending on the size, complexity and context of the activity, sophisticated environmental models and other tools can be required to evaluate impacts in the context of a comprehensive EIA study. But for most small-scale activities and preliminary assessments (or USAID-mandated IEEs), the simple, logical process described here—supported by good judgment and the information contained in the Sector Environmental Guidelines or similar resources—is sufficient.

Mitigation Design

The purpose of the EIA process is not simply to identify and assess potential environmental impacts, but to change project design and implementation so that these impacts are mitigated—that is, avoided, reduced or offset.

As such, mitigation is a critical part of ESDM and the EIA process. Monitoring (addressed in a subsequent session) is its essential complement, required to verify whether the mitigation measures are sufficient, effective—and actually implemented.

Page 25: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

This portion of the session:

• Defines mitigation

• Provides examples of basic mitigation approaches

• Explains the principles behind good mitigation design and practice

Objectives

• Achieve a basic understanding of the EIA process and how it is implemented

• Become familiar with core EIA skills and the technical approach to EIA activities

• Promote the EIA framework as the internationally accepted standard process for achieving ESDM in project-based development

• Establish EIA as the basis of USAID Environmental Procedures

Key Resources • The “Underlying EIA concepts and skills” page on the GEMS project Web site (available

at: http://www.usaidgems.org/underlyingEIA.htm) provides additional background and context on the EIA process and includes links to other training and reference materials.

• The individual chapters of the Sector Environmental Guidelines are a key resource for: (1) identification of potential adverse environmental impacts; and (2) design of specific mitigation and monitoring measures.

Page 26: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61

Fund

amen

tal S

kills

of

Envi

ronm

enta

l Im

pact

Ass

essm

ent

(EIA

)

GEM

S En

viro

nmen

tal C

ompl

ianc

e-ES

DM

Tra

inin

g Se

ries

Keny

a Ju

ne, 2

016

•D

efin

e En

viro

nmen

tal I

mpa

ct A

sses

smen

t (E

IA)

•Ex

plai

n th

e EI

A p

roce

ss

•D

evel

op fu

ndam

enta

l EIA

ski

lls; l

earn

bas

ic a

ppro

ach

•Ill

ustr

ate

EIA

fram

ewor

k as

the

inte

rnat

iona

lly a

ccep

ted

stan

dard

pr

oces

s fo

r ac

hiev

ing

ESD

M

•Es

tabl

ish

EIA

as

the

basi

s of

USA

ID E

nviro

nmen

tal P

roce

dure

s

5/23

/201

62

SESS

ION

OBJ

ECT

IVES

:

5/23

/201

63

•A

form

al p

roce

ss fo

r id

entif

ying

:

–lik

ely

effe

cts

of a

ctiv

ities

or

proj

ects

on

the

envi

ronm

ent,

and

on

hum

an h

ealth

and

wel

fare

–m

eans

and

mea

sure

s to

m

itiga

te &

mon

itor

the

se

impa

cts

EIA

A SOURAVKARMAKAR

ENV

IRO

NM

ENTA

L IM

PAC

T

ASS

ESSM

ENT

IS

5/23

/201

64

WH

AT IS

AN

AC

TIV

ITY

?

A d

esire

d ac

com

plis

hmen

t or

out

put.

A p

roje

ct o

r pr

ogra

m m

ay

cons

ist o

f man

y ac

tiviti

es.

An

activ

ity is

:

AC

TIV

ITY:

incr

ease

ric

e pr

oduc

tion

AC

TIO

NS:

Prov

ide

inpu

ts (s

eed,

fe

rtili

zer,

pest

icid

es)

Des

ign

and

cons

truc

t ir

riga

tion

infr

astr

uctu

re

Incr

ease

d ac

cess

to

finan

ce, l

endi

ng

Roa

d re

habi

litat

ion

Cap

acity

bui

ldin

g an

d te

chni

cal a

ssis

tanc

e

Acc

ompl

ishi

ng a

n ac

tivity

req

uire

s a

set

of a

ctio

ns o

rin

terv

enti

ons

WH

AT A

RE

SOM

E O

F YO

UR

AC

TIV

ITIE

S?

TH

E EI

A P

ROC

ESS

EXA

MIN

ES T

HE

IMPA

CT

S O

F A

CT

IVIT

IES.

Page 27: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

65

TH

E EI

A P

ROC

ESS

Phas

e I:

Initi

al in

quir

ies

•U

nder

stan

d pr

opos

ed

activ

ities

•Sc

reen

act

iviti

es

•C

ondu

ct p

relim

inar

y as

sess

men

t (if

need

ed)

Phas

e II:

Full

EIA

stu

dy (i

f nee

ded)

•Sc

ope

•Ev

alua

te b

asel

ine

situ

atio

n•

Iden

tify

and

choo

se

alte

rnat

ives

•Id

entif

y an

d ch

arac

teri

ze

pote

ntia

l im

pact

s of

pr

opos

ed a

ctiv

ity a

nd e

ach

alte

rnat

ive

•D

evel

op m

itiga

tion

and

mon

itori

ng

•C

omm

unic

ate

and

docu

men

t th

roug

hout

Mos

t USA

ID a

ctivi

ties

do N

OT p

roce

ed to

a fu

ll EI

A st

udy

5/23

/201

66

PHA

SE I

OF

TH

E EI

A P

ROC

ESS

SCR

EEN

TH

E A

CT

IVIT

Y

Base

d on

the

N

ATU

RE

of t

he

activ

ity, w

hat

leve

l of

envi

ronm

enta

l an

alys

is is

in

dica

ted?

CO

ND

UC

T A

PR

ELIM

INA

RY

ASS

ESSM

ENT

A r

apid

, si

mpl

ified

EIA

st

udy

usin

g si

mpl

e to

ols

(e.g

. the

U

SAID

IEE)

AC

TIV

ITY

IS

OF

MO

DE

RA

TE

OR

UN

KN

OW

NR

ISK

SIG

NIF

ICA

NT

A

DV

ER

SE

IMPA

CT

S P

OSS

IBLE

SIG

NIF

ICA

NT

A

DV

ER

SE

IMPA

CT

S V

ERY

UN

LIK

ELY

AC

TIV

ITY

IS

LOW

RIS

K(O

f its

na

ture

, ver

y un

likel

y to

ha

ve s

igni

fican

t a

dver

se

impa

cts)

AC

TIV

ITY

IS

HIG

H R

ISK

(Of i

ts

natu

re, l

ikel

y to

hav

e sig

nific

ant

adve

rse

impa

cts)

Phas

e II

Phas

e I

UN

DER

STA

ND

PR

OPO

SED

A

CT

IVIT

Y

WH

Y is

the

ac

tivity

bei

ng

prop

osed

?

WH

ATis

bei

ng

prop

osed

?

BEG

IN

FULL

EI

A

STU

DY

*app

rova

l is

CO

ND

ITIO

NAL

on

any

miti

gatio

nsp

ecifi

ed b

y th

e pr

elim

inar

y as

sess

men

t bei

ng

impl

emen

ted

Doc

umen

t and

su

bmit

for

appr

oval

*

5/23

/201

67

PHA

SE I:

SC

REE

N T

HE

AC

TIV

ITY

Ans

wer

ing

thes

e qu

estio

ns

does

NO

T:

SCR

EEN

EA

CH

AC

TIV

ITY

SC

RE

EN

ING

ask

s a

very

bas

ic s

et o

f qu

estio

ns a

bout

the

activ

ity.

EX

AM

PLE

SC

RE

EN

ING

QU

ES

TIO

NS

:

•D

oes

the

activ

ity in

volv

e:

•P

enet

ratio

n ro

ad b

uild

ing?

•La

rge-

scal

e irr

igat

ion?

•In

trodu

ctio

n of

non

-nat

ive

crop

or

agro

fore

stry

spe

cies

?

•R

eset

tlem

ent?

Base

d on

the

NAT

UR

Eof

the

ac

tivity

, wha

t le

vel o

f en

viro

nmen

tal a

naly

sis

is

indi

cate

d?

•req

uire

ana

lysi

s

•req

uire

det

aile

d kn

owle

dge

of t

he p

ropo

sed

site

s, te

chni

ques

or

met

hods

5/23

/201

68

PHA

SE I:

PR

ELIM

INA

RY A

SSES

SMEN

T

CO

ND

UC

T A

PR

ELIM

INA

RY

ASS

ESSM

ENT

SCR

EEN

ING

DET

ERM

INES

W

HET

HER

TH

E PR

ELIM

INA

RY A

SSES

SMEN

T

IS N

ECES

SARY

Pur

pose

is to

pro

vide

do

cum

enta

tion

and

anal

ysis

that

:

•Al

low

the

prep

arer

to d

eter

min

e w

heth

er o

r not

sig

nific

ant a

dver

se

impa

cts

are

likel

y

•Al

low

s th

e re

view

erto

agr

ee o

r di

sagr

ee w

ith th

ese

dete

rmin

atio

ns

•Se

ts o

ut m

itiga

tion

and

mon

itorin

g fo

r adv

erse

impa

cts

A r

apid

, sim

plifi

ed E

IA s

tudy

us

ing

sim

ple

tool

s (s

uch

as

USA

ID’s

Initi

al E

nviro

nmen

tal

Exam

inat

ion

[IEE]

)

Page 28: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

69

PHA

SE I:

PR

ELIM

INA

RY A

SSES

SMEN

T FOR

EA

CH

AC

TIV

ITY

IT

CO

VER

S, A

PR

ELIM

INA

RY

ASS

ESSM

ENT

HA

S 3

POSS

IBLE

FI

ND

ING

S:

TY

PIC

AL

PREL

IMIN

ARY

ASS

ESSM

ENT

OU

TLI

NE:

1.Ba

ckgr

ound

(D

evel

opm

ent

obje

ctiv

e, li

st o

f ac

tiviti

es)

2.D

escr

iptio

n of

the

bas

elin

e si

tuat

ion

3.Ev

alua

tion

of p

oten

tial e

nviro

nmen

tal i

mpa

cts

4.M

ITIG

ATIO

N &

MO

NIT

OR

ING

5.R

ECO

MM

END

ED F

IND

ING

S

TH

E A

CT

IVIT

Y IS

. . .

very

unl

ikel

y to

hav

e si

gnifi

cant

adv

erse

impa

cts.

unlik

ely

to h

ave

sign

ifica

nt

adve

rse

impa

cts

with

sp

ecifi

ed m

itiga

tion

and

mon

itori

ng,

likel

yto

hav

e si

gnifi

cant

ad

vers

e im

pact

s (fu

ll EI

A

stud

y is

req

uire

d)

5/23

/201

610

We

only

pro

ceed

to

Phas

e II

of t

he E

IA

proc

ess

IFPh

ase

I ind

icat

es t

hat

a FU

LL E

IA S

TU

DY

is

req

uire

d

WH

EN T

O P

ROC

EED

ANGELA STEPHENS, USAID

5/23

/201

611

PHA

SE II

: FU

LL E

IA S

TU

DY

HO

WEV

ER, T

HE

FULL

EIA

ST

UD

Y D

IFFE

RS

IN IM

PORT

AN

T W

AYS:

•A

form

al S

CO

PIN

G P

ROC

ESS

prec

edes

the

stu

dy t

o ID

ENT

IFY

ISSU

ES T

O B

E A

DD

RES

SED

•A

NA

LYSI

Sof

env

ironm

enta

l im

pact

s is

muc

h M

OR

E D

ETA

ILED

•A

LTER

NAT

IVES

*m

ust

be fo

rmal

ly d

efin

ed. T

HE

IMPA

CT

S O

F EA

CH

ALT

ERN

ATIV

E M

UST

BE

IDEN

TIF

IED

& E

VALU

ATED

, AN

D T

HE

RES

ULT

S C

OM

PAR

ED

•PU

BLIC

PA

RTIC

IPAT

ION

is r

equi

red

•A

PRO

FESS

ION

AL

EIA

TEA

M is

usu

ally

req

uire

d

*inc

lude

s th

e pr

ojec

t as

prop

osed

, the

no-

actio

n al

tern

ative

, and

at l

east

one

oth

er re

al a

ltern

ative

The

full

EIA

stu

dy h

as v

ery

sim

ilar

obje

ctiv

es a

nd s

truc

ture

to

a pr

elim

inar

y as

sess

men

t.

5/23

/201

612

The

re a

re “

core

” sk

ills

that

ar

e ce

ntra

l to

envi

ronm

enta

l im

pact

ass

essm

ent:

•Ba

selin

e ch

arac

teri

zatio

n•

The

iden

tific

atio

n of

po

tent

ial a

dver

se im

pact

s (o

r im

pact

s of

con

cern

)•

Dev

elop

ing

a m

itiga

tion

stra

tegy

FUN

DA

MEN

TAL

EIA

SK

ILLS

USAIDKENYA

HO

W D

O I

APP

ROA

CH

TH

E EI

A P

ROC

ESS?

Page 29: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

613

FUN

DA

MEN

TAL

EIA

SK

ILLS

Key

skill

for

avoi

ding

adv

erse

im

pact

s an

d ac

hiev

ing

ESD

M

Use

d to

pre

pare

pre

limin

ary

asse

ssm

ent—

but

also

cri

tical

to

mak

ing

miti

gatio

n re

spon

sive

to

loca

l en

viro

nmen

tal c

ondi

tions

* M

onito

ring

is t

he e

ssen

tial c

ompl

emen

t to

miti

gatio

n; it

is r

equi

red

to v

erify

w

heth

er t

he m

itiga

tion

mea

sure

s ar

e su

ffici

ent,

effe

ctiv

e—an

d ac

tual

ly

impl

emen

ted.

Mon

itori

ng is

add

ress

ed in

a s

ubse

quen

t ses

sion

.

BASE

LIN

E C

HA

RA

CT

ERIZ

ATIO

NID

ENT

IFY

ING

IM

PAC

TS

OF

CO

NC

ERN

MIT

IGAT

ION

ST

RAT

EGY*

CH

AR

AC

TER

IZIN

G T

HE

BASE

LIN

E SI

TU

ATIO

N. .

.

•T

he e

nvir

onm

enta

l co

mpo

nent

s of

inte

rest

ar

e th

ose:

–lik

ely

to b

e af

fect

ed

by y

our

activ

ity

–up

on w

hich

you

r ac

tivity

dep

ends

for

its s

ucce

ss

Wat

er?

Qua

ntity

, qua

lity,

relia

bilit

y, ac

cess

ibilit

y

Soils

?Er

osio

n, cr

op p

rodu

ctivi

ty, f

allo

w

perio

ds, s

alin

ity, n

utrie

nt

conc

entra

tions

Flor

a?Co

mpo

sitio

n an

d de

nsity

of

natu

ral v

eget

atio

n, pr

oduc

tivity

, ke

y sp

ecie

s

Faun

a?Po

pula

tions

, hab

itat

Spec

ial

Key

spec

ies

ecos

yste

ms?

Env

Hea

lth?

Dise

ase

vect

ors,

path

ogen

s

5/23

/201

615

WH

ERE

DO

I O

BTA

IN IN

FOR

MAT

ION

ON

TH

E BA

SELI

NE

SIT

UAT

ION

?

AR

EN’T

WE

FOR

GET

TIN

G

SOM

ETH

ING

?

1.YO

UR

OR

GA

NIZ

ATIO

N:

•TA

LKto

sta

ff w

ho k

now

the

pro

ject

, and

kn

ow t

he s

ites.

•O

BTA

INpr

ojec

t do

cum

ents

and

info

rmat

ion

2.D

IREC

T O

BSER

VAT

ION

:

•G

o to

the

site

(s)!

Look

up

publ

icly

ava

ilabl

e sa

telli

te im

ager

y be

fore

you

go.

3.U

TIL

IZE

OT

HER

LO

CA

L T

ALE

NT

&

KN

OW

LED

GE:

•co

mm

uniti

es, g

over

nmen

t, co

unte

rpar

ts

Wha

t abo

ut r

epor

ts b

y do

nor

orga

niza

tions

and

inte

rnat

iona

l ag

encie

s? W

hat a

bout

go

vern

men

t sta

tistic

s? G

IS

data

base

s?

All

thes

e so

urce

s ca

n be

use

ful

(and

som

etim

es n

eces

sary

)

But

good

loca

l inf

orm

atio

n is

th

e m

ost i

mpo

rtan

t in

put

5/23

/201

616

IDEN

TIF

YIN

G IM

PAC

TS

OF

CO

NC

ERN

The

BA

SELI

NE

SIT

UAT

ION

is t

he e

xist

ing

envi

ronm

enta

l situ

atio

n or

co

nditi

on in

the

abs

ence

of

the

activ

ity.

Impo

rtan

t: Ba

selin

e sit

uatio

n is

not j

ust a

“s

naps

hot i

n tim

e”

The

impa

ct o

f an

activ

ity is

the

ch

ange

from

the

BASE

LIN

E SI

TU

ATIO

Nca

used

by

the

activ

ity.

WH

AT IS

AN

IMPA

CT

?

To m

easu

re a

n im

pact

, you

m

ust k

now

wha

t th

e ba

selin

e si

tuat

ion

is.

!

Page 30: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

617

TY

PES

OF

IMPA

CT

S &

TH

EIR

AT

TR

IBU

TES

The

EIA

pro

cess

is c

once

rned

with

all

type

s of

impa

cts

and

may

des

crib

e th

em in

a n

umbe

r of

way

s

•D

irect

& in

dire

ct im

pact

s

•Sh

ort-

term

& lo

ng-t

erm

impa

cts

•A

dver

se &

ben

efic

ial i

mpa

cts

•C

umul

ativ

e im

pact

s

•In

tens

ity

•D

irect

ion

•Sp

atia

l ext

ent

•D

urat

ion

•Fr

eque

ncy

•R

ever

sibi

lity

•Pr

obab

ility

Bu

t al

l im

pact

s ar

e N

OT

tr

eate

d eq

ually

.

5/23

/201

618

FOC

US!

USAID/KENYA

You

defin

itely

do

not

have

tim

e an

d re

sour

ces

to a

naly

ze a

nd d

iscu

ss in

de

tail

less

impo

rtan

t on

es.

ESSE

NT

IAL

to fo

cus

on t

he m

ost

sign

ifica

nt im

pact

s

5.

5/23

/201

619

IMPA

CT

EVA

LUAT

ION

PRO

CES

S: T

HEO

RY

1.U

nder

stan

dth

e ac

tiviti

es

bein

g pr

opos

ed

2.R

esea

rch

the

pote

ntia

l adv

erse

im

pact

s ty

pica

l of t

hese

act

iviti

es

& k

now

how

they

ari

se

3.Ba

sed

on th

e po

tent

ial i

mpa

cts,

iden

tify

whi

ch e

lem

ents

of t

he

base

line

situ

atio

n ar

e im

port

ant

4.C

hara

cter

ize

thes

e el

emen

ts

of t

he b

asel

ine

Giv

en:

1.th

e ba

selin

e co

nditi

ons,

2.th

e pr

ojec

t co

ncep

t/de

sign

, and

3.H

ow t

he a

dver

se

impa

cts

aris

e,

DEC

IDE

WH

ICH

IM

PAC

TS

AR

E O

F C

ON

CER

N

5/23

/201

620

IMPA

CT

EVA

LUAT

ION

PR

OC

ESS:

EXA

MPL

E

1.Pr

opos

ed in

terv

entio

n: ir

riga

tion

sche

me

(win

g da

m d

iver

sion

typ

e w

ater

-inte

nsiv

e cr

ops

high

fert

ilize

r us

e, u

nlin

ed c

anal

s &

ope

n-ch

anne

l ir

riga

tion)

2.Ke

y po

tent

ial i

mpa

cts:

–Ex

cess

ive

dive

rsio

n of

wat

er

–Sa

liniz

atio

n of

soi

ls

–C

onta

min

atio

n of

gro

undw

ater

& d

owns

trea

m

surf

ace

wat

er

3.Ke

y el

emen

ts o

f bas

elin

e:

–R

iver

flow

vol

ume,

var

iabi

lity

–So

il &

wat

er c

hara

cter

istic

s &

gro

undw

ater

de

pth

–D

owns

trea

m u

ses

Page 31: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

621

IMPA

CT

EVA

LUAT

ION

PRO

CES

S: EX

AM

PLE

4.Ba

selin

e ch

arac

teri

zatio

n

–Ri

ver f

low

vol

ume,

varia

bilit

y

•W

ill d

iver

t 3%

of n

orm

al fl

ow•

low

-yea

r flo

ws

are

50%

of n

orm

al•

Dow

nstr

eam

abs

trac

tion

is <

10%

of

tota

l flo

w v

olum

e.–

Soil

char

acte

ristic

s &

gro

undw

ater

dep

th

•So

ils a

re w

ell-d

rain

ed b

ut r

elat

ivel

y hi

gh

in s

alts

; gro

undw

ater

2m

dep

th–

Dow

nstre

am u

ses

•Ke

y w

ater

sou

rce

for

com

mun

ity

dom

estic

use

& li

vest

ock,

imm

edia

tely

do

wns

trea

m.

5.T

HER

EFO

RE:

IMPA

CT

SO

F C

ON

CER

N:

Salin

izat

ion

Dow

nstr

eam

cont

amin

atio

n

LIT

TLE

CO

NC

ERN

:

Exce

ssD

iver

sion

WH

Y T

HES

E C

ON

CLU

SIO

NS?

5/23

/201

622

MIT

IGAT

ION

DES

IGN

NENA TERRELL, USAID

MIT

IGAT

ION

IS. .

.T

he im

plem

enta

tion

of m

easu

res

desi

gned

to

elim

inat

e, r

educ

e or

of

fset

the

und

esir

able

effe

cts

of a

pr

opos

ed a

ctio

n on

the

en

viro

nmen

t.

A c

ritic

al p

art

of t

he E

IA

proc

ess—

and

of E

SDM

5/23

/201

623

HO

W D

OES

MIT

IGAT

ION

RED

UC

E A

DV

ERSE

IMPA

CT

S?

TY

PE O

F M

ITIG

ATIO

N

MEA

SUR

EH

OW

IT W

OR

KS

EXA

MPL

ES

PREV

ENT

ION

AN

D

CO

NT

ROL

MEA

SUR

ES

Fully

or

part

ially

pre

vent

an

impa

ct/r

educ

e a

risk

by:

Cha

ngin

g m

eans

or

tech

niqu

e

Cha

ngin

g or

add

ing

desi

gn

elem

ents

Cha

ngin

g th

e si

te

Spec

ifyin

g op

erat

ing

prac

tice

s

PREV

ENT

cont

amin

atio

n of

wel

ls, b

y SI

TIN

G w

ells

a s

afe

dist

ance

from

po

llutio

n so

urce

s

Add

was

tew

ater

trea

tmen

t sy

stem

to

the

DES

IGN

of a

cof

fee-

was

hing

sta

tion

and

trai

n in

pro

per

OPE

RAT

ION

S

CO

MPE

NSA

TORY

M

EASU

RES

Offs

et a

dver

se im

pact

s in

one

ar

ea w

ith im

prov

emen

ts

else

whe

re

Plan

t tr

ees

in a

new

loca

tion

to

CO

MPE

NSA

TE

for

clea

ring

a

cons

truc

tion

site

REM

EDIA

TIO

NM

EASU

RES

Rep

air

or r

esto

re t

he

envi

ronm

ent

afte

r da

mag

e is

do

ne

Re-

grad

e an

d re

plan

t a

borr

ow p

it af

ter

cons

truc

tion

is fi

nish

ed

… a

nd s

omet

imes

you

may

nee

d to

red

esig

n th

e pr

ojec

t to

mod

ify o

r el

imin

ate

prob

lem

com

pone

nts

MU

ST E

VE

RYIM

PAC

T B

E M

ITIG

ATED

?

POT

ENT

IALL

Y S

ERIO

US

IMPA

CT

S/IS

SUES

Envi

ronm

enta

l man

agem

ent c

rite

ria

ofte

nre

quire

judg

men

t in

desi

gnin

g sp

ecifi

c m

itiga

tions

. App

ly th

e fo

llow

ing

prin

cipl

e:

24

The

se m

ust

ALW

AY

Sbe

m

itiga

ted

to th

e po

int t

hat

the

impa

ct is

non

-sig

nific

ant

EASI

LY M

ITIG

ATED

IMPA

CT

S

The

n, t

here

may

be

othe

r im

pact

s fo

r w

hich

miti

gatio

n is

eas

y an

d lo

w-c

ost

PRIORITIZE!

Miti

gatio

n sp

ecifi

ed in

Pha

se I

or P

hase

II o

f EIA

pro

cess

mus

t be

im

plem

ente

d

Page 32: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

625

PREV

ENT

ION

IS B

EST

RICCARDO GANGALE, USAID

Whe

re p

ossi

ble,

PR

EVEN

T

impa

cts

by c

hang

es t

o si

te

or t

echn

ique

.

CO

NT

ROL

of im

pact

s w

ith

Ope

ratio

n &

Mai

nten

ance

(O&

M)

prac

tices

is m

ore

diffi

cult

to

mon

itor,

sust

ain.

1.Be

pre

vent

ion-

orie

nted

2.A

pply

bes

t de

velo

pmen

t pr

actic

es t

o en

viro

nmen

tal a

spec

ts o

f the

act

ivity

3.Be

sys

tem

atic

5/23

/201

626

TH

REE

RU

LES

FOR

EN

VIR

ON

MEN

TALL

Y

SOU

ND

DES

IGN

& M

AN

AG

EMEN

T (

ESD

M)

Prop

erly

impl

emen

ted,

the

EIA

pr

oces

s m

akes

the

m a

rea

lity.

•Fr

om it

s be

ginn

ings

in th

e 19

70 U

S N

atio

nal

Envi

ronm

enta

l Pol

icy

Act

•EI

A n

ow e

xten

ds b

eyon

d go

vern

men

t wor

ks

to

–In

frast

ruct

ure

and

econ

omic

deve

lopm

ent

proj

ects

fund

ed b

y th

e pr

ivate

sec

tor &

do

nors

–An

alys

is of

pol

icies

, not

just

pro

ject

s•

In m

any

deve

lopi

ng c

ount

ries

, EIA

is t

he

core

of n

atio

nal e

nviro

nmen

tal r

egul

atio

n

•M

ost

coun

trie

s &

alm

ost a

ll do

nors

(in

clud

ing

USA

ID) n

ow h

ave

EIA

re

quire

men

ts

5/23

/201

627

ENV

IRO

NM

ENTA

L IM

PAC

T A

SSES

SMEN

T:

A U

NIV

ERSA

L R

EQU

IREM

ENT

5/23

/201

628

ENV

IRO

NM

ENTA

L IM

PAC

T A

SSES

SMEN

T:

A U

NIV

ERSA

L R

EQU

IREM

ENT

Page 33: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

629

ENV

IRO

NM

ENTA

L IM

PAC

T A

SSES

SMEN

T:

TH

E W

OR

LD B

AN

K

“The

Ban

kre

quire

s en

viro

nmen

tal a

sses

smen

t (E

A) o

f pro

ject

s pr

opos

ed fo

r Ba

nk

finan

cing

to

help

ens

ure

that

the

y ar

e en

viro

nmen

tally

sou

nd a

nd s

usta

inab

le, a

nd t

hus

to

impr

ove

deci

sion

mak

ing.”

5/23

/201

630

KEN

YA

•ht

tp://

faol

ex.fa

o.or

g/do

cs/p

df/k

en14

7906

.pdf

5/23

/201

631

SUM

MA

RY

•EI

A is

an

esta

blis

hed

proc

ess

that

pro

mot

es s

usta

inab

le e

nviro

nmen

tal

man

agem

ent a

nd s

ucce

ssfu

l dev

elop

men

t out

com

es.

•C

ore

skill

s ar

e ne

eded

to

impl

emen

t the

EIA

pro

cess

and

to

help

ac

hiev

e ES

DM

; the

se a

re:

–Ba

selin

e ch

arac

teri

zatio

n–

Iden

tifyi

ng im

pact

s of

con

cern

–M

itiga

tion

desi

gn•

EIA

ena

bles

ESD

M-fo

cuse

d de

velo

pmen

t, an

d is

the

bas

is fo

r U

SAID

En

viro

nmen

tal P

roce

dure

s

AMOS GUMULIRA, FEED THE CHILDREN

5/23

/201

632

•W

ilkis

ter

Mag

angi

USA

ID/K

enya

Mis

sion

Env

ironm

enta

l Offi

cer

(MEO

)w

mag

angi

@us

aid.

gov

•D

avid

Kin

yua,

USA

ID/E

ast A

fric

a R

egio

nal E

nviro

nmen

tal

Adv

isor

(R

EA)

dkin

yua@

usai

d.go

v

•G

loba

l Env

ironm

enta

l Man

agem

ent

Supp

ort

(GEM

S) P

roje

ctG

EMSC

OR

ETea

m@

cadm

usgr

oup.

com

FOO

TER

GO

ES H

ERE

Page 34: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 4. Skill-Building in Environmental Impact Assessment (EIA) Field visit and practical exercise Summary This session consists of a small-group oriented exercise based on a shorter, focused field visit to a nearby project site. Participants will observe and assess activities underway and practice the EIA skills required to characterize baseline situations and identify potential impacts of concern. Through facilitator-led observation and discussion, participants are also prepared for the workshop’s more extensive field-based exercise.

Session 4a: EIA Skill-Building Exercise—Briefing and Classroom Preparation (30 min’s) During this pre-field visit session participants will receive instruction on the methodology and the objectives of the skill-building exercise. This classroom preparation will enable participants to understand the general project scenarios to be assessed, and it is during this time that they will be divided into small groups for the exercise.

Scenario and Instructions

• Listen carefully to the project scenarios presented by the facilitator(s). Understand the structure and objectives of the exercise.

• Observe the note card on your table with the project site to which your group has been assigned.

Session 4b: EIA Skill-Building Exercise—Field Visit (2.5 hrs., including return) Participants will use group transportation and proceed to the designated project site. Each group will be accompanied by at least one workshop trainer/facilitator. The field visit will enable participants to practice observation and EIA skills needed to characterize the baseline situation and identify impacts and issues of concern.

Scenario and Instructions

• At your project site observe the key elements of the baseline situation and identify potential environmental impacts. You should be on the lookout for health and safety issues as well as any socio-economic considerations that may not immediately strike one as ‘environmental’ in nature, but could nonetheless affect community health and safety.

• Discuss baseline situation and identify potential environmental impacts of the project scenarios as a small group in course of the field visit. Solicit stakeholder input, as appropriate.

• Take notes.

Page 35: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 4c: EIA Skill-Building Exercise—Group Work and Dialogue (1.5 hrs.) This component is designed to expand participants’ understanding of baseline characterization and environmental impact identification through small-group collaboration based on the preceding field visit. During this time, participants will work as part of their small group to synthesize field observations and prioritize impacts/issues of concern that were observed at the project site. The small groups will also discuss possible approaches for limiting the adverse effects of potential impacts of concern.

Scenario and Instructions

Using the observations and information gathered during the field visit, each small working group will:

• Review and characterize the most relevant aspects of the baseline situation, including ongoing environmental management efforts and measures (if any); and

• On this basis, decide which of the potential adverse impacts and other potential “ESDM failures” are real and present serious concerns.

Small groups should record their findings. Facilitators will serve as resources throughout the process.

Note that:

• This group work and dialogue is intended to practice basic EIA observation and impact identification skills—not to practice development of Reg. 216 environmental documentation.

• For participants who already know these terms, working group outputs are not expected to be in the form of an IEE outline or phrased in terms of “recommended determinations.”

Session 4d: EIA Skill-Building Exercise—Presentation and Discussion (approx. 1 hr.)

This component will provide an opportunity for each working group to present its finding (and recommendations, as applicable) based on the field visit and subsequent small-group synthesis and collaboration. Findings will be presented to the training group at large and key elements or aspects of the EIA process and outputs discussed in plenary form.

Key Lessons

At the conclusion of this exercise, participants will be equipped to:

• Characterize a project baseline situation

• Identify and/or prioritize environmental impacts of concern

• Develop an approach that will limit or mitigate impacts of concern, or that will promote ESDM in project implementation

Page 36: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 5. Environmental Impact Assessment and USAID Environmental Procedures: the Initial Environmental Examination (IEE) and Beyond Technical presentation and dialogue Important note: Note that in this workshop, the term “USAID Environmental Procedures” does not refer only to 22CFR 216 (Reg. 216), but collectively to Reg. 216, relevant FAA requirements, and to the mandatory procedures and directives contained in the USAID-internal ADS.

Summary The preceding workshop sessions have:

• Described ESDM as a key objective for the ethical and effective practice of development

• Explained the EIA process and the fundamental skills of baseline characterization, impact identification, and mitigation design

• Highlighted EIA as the framework for achieving ESDM in project-based development activities, and as the basis for USAID Environmental Procedures

• Provided an opportunity to test and apply fundamental EIA skills in a field-based exercise

USAID is required by both court settlement and US law to utilize an EIA-based process to “fully take into account” environmental sustainability in the design and implementation of its development programs. USAID Environmental Procedures represent the Agency’s unique implementation of the EIA process, and seek to assure that USAID-funded projects effectively identify and mitigate potential adverse environmental impacts. USAID Environmental Procedures also lay out an environmental compliance regime in which the Agency and Implementing Partners fulfill various environment-related requirements over the life of project.

Specifically, USAID Environmental Procedures dictate a process that must be applied to all activities before implementation. The output of this EIA process, defined by 22CFR216 (“Reg. 216”), is USAID-approved Reg. 216 environmental compliance documentation. This documentation includes:

• Requests for Categorical Exclusion (RCE)

• Initial Environmental Examinations (IEEs)—the USAID version of a preliminary assessment

• Environmental Assessments (EAs) and Programmatic Environmental Assessments (PEAs)

Most IEEs and all EAs/PEAs specify environmental management conditions, which are essentially mitigative measures. These measures—“IEE/EA conditions”—must be implemented and monitored over the life of the activity (or life of project, LOP). While implementation is the responsibility of the IP, USAID C/AORs are required to actively manage and monitor compliance with IEE/EA conditions. This process is the cornerstone of project environmental compliance. This session will introduce —but not go into detail regarding—the steps comprising this process and who is responsible for them: MEOs, CORs/AORs, Activity Managers, IPs, etc.

Page 37: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Although the pre-implementation, or “upstream compliance” aspect of USAID Environmental Procedures is well articulated via Reg. 216, specific requirements for the implementation of IEE/EA conditions and associated reporting—“downstream compliance”—are based primarily on Agency best practice, and vary somewhat by region. To strengthen downstream environmental compliance in Africa, IEEs and award documents are increasingly requiring IPs to develop, submit and implement environmental mitigation and monitoring plans (EMMPs) for their projects. The EMMP is a systematic vehicle to implement IEE and EA conditions.

More about Reg. 216 (22 CFR 216)

Reg. 216 is a US federal regulation that sets out USAID’s mandatory pre-obligation/ pre-implementation EIA process. The Regulation applies to all USAID programs or activities, including non-project assistance and substantive amendments or extensions to ongoing activities. No “irreversible commitment of resources” can occur to implement an activity unless the activity is covered by appropriate, approved Reg. 216 documentation.

When IEEs are approved with mitigation and monitoring conditions attached to one or more activities, those conditions become a required part of project design/implementation. (EAs always have such conditions.)

Across USAID programs, Reg. 216 documentation is developed both by Mission staff and Partners, depending on the situation. Title II Cooperating Sponsors, for example, are required to develop IEEs as part of their MYAPs, and other partners are often asked to develop Reg. 216 documentation for new project components. Reg. 216 documentation covering multiple projects at the sector program level is developed by Mission staff or 3rd-party contractors.

Reg. 216 is the best-known portion of USAID Environmental Procedures. However, Reg. 216 simply defines the pre-implementation EIA process. Unless the IEE and EA conditions that result from this process are actually implemented, (1) the activity is out of compliance; (2) the Reg. 216 process is largely meaningless; and (3) the objective of the environmental procedures (ESDM) is not achieved.

For this reason, the ADS requires C/AORs to REMEDY or HALT activities where IEE/EA conditions are not being implemented, or which are otherwise out of compliance.

Objectives • Understand the legal mandate of USAID Environmental Procedures, including 22CFR216

(“Reg. 216”).

• Link application of the EIA-based Environmental Procedures to the goals of ESDM and broader USAID development efforts.

• Gain familiarity with the environmental compliance requirements established by USAID Environmental Procedures, including IEEs and related documentation.

• Illustrate how the USAID IEE and related environmental compliance documents determine project environmental management requirements.

Key resource • The Environmental Procedures Briefing for Mission Staff is a succinct summary of LOP

environmental compliance. This training draws heavily from the Briefing. It is included in this Sourcebook and available at http://www.usaidgems.org/rolesRespons.htm.

Page 38: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61

EIA

and

“U

SAID

Env

iron

men

tal P

roce

dure

s”:

the

Initi

al E

nvir

onm

enta

l Exa

min

atio

n (IE

E)an

d Be

yond

GEM

S En

viro

nmen

tal C

ompl

ianc

e-ES

DM

Tra

inin

g Se

ries

Keny

a Ju

ne, 2

016

5/23

/201

62

SESS

ION

OBJ

ECT

IVES

:

•R

evie

w b

ackg

roun

d an

d pr

inci

ples

of E

nviro

nmen

tal I

mpa

ct A

sses

smen

t (E

IA)

•R

evie

w E

IA p

roce

ss a

nd fu

ndam

enta

l ski

lls:

–Ba

selin

e ch

arac

teriz

atio

n

–Id

entif

ying

impa

cts

of c

once

rn

–D

evel

opin

g a

miti

gatio

n st

rate

gy

•Ex

plai

n U

SAID

impl

emen

tatio

n of

the

EIA

pro

cess

•U

nder

stan

d pr

epar

atio

n of

USA

ID e

nviro

nmen

tal c

ompl

ianc

e do

cum

enta

tion

5/23

/201

63

USA

ID E

NV

IRO

NM

ENTA

L PR

OC

EDU

RES

•Sp

ecifi

es a

n A

genc

y-w

ide

appr

oach

to e

nviro

nmen

tal

man

agem

ent o

f USA

ID-fu

nded

act

iviti

es.

•“E

nviro

nmen

tal P

roce

dure

s” E

ncom

pass

:

–22

CFR

216

(“R

eg. 2

16”)

–Fo

reig

n A

ssis

tanc

e A

ct (F

AA

) Se

ctio

ns 1

17, 1

18 &

119

.

–U

SAID

-inte

rnal

Aut

omat

ed D

irect

ives

Sys

tem

(AD

S)

–R

egio

nal B

est

Prac

tices

“USA

ID E

nviro

nmen

tal

Proc

edur

es”

refe

rs

gene

rally

to

all r

elev

ant

law

s, A

genc

y gu

idan

ce, a

nd

prev

ailin

g be

st p

ract

ices

.

!

5/23

/201

64

APP

LYIN

G T

HE

EIA

PRO

CES

S

•T

he U

SAID

app

roac

h to

EIA

is e

stab

lishe

d in

Reg

. 216

•R

eg. 2

16 d

efin

es a

pre

-impl

emen

tatio

nEI

A p

roce

ss

•T

his

proc

ess

appl

ies

to:

–A

ll U

SAID

pro

gram

s or

act

iviti

es, (

incl

udin

g no

n-pr

ojec

t ass

ista

nce.

)

–N

ew a

ctiv

ities

–Su

bsta

ntiv

e am

endm

ents

or

exte

nsio

ns to

ong

oing

act

iviti

es

Reg

. 21

6 (2

2 C

FR 2

16)

is a

U

S FE

DER

AL

REG

ULA

TIO

N.

Com

plia

nce

is m

anda

tory

.

!

Page 39: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

555 5

Scre

en th

e ac

tivity

Base

d on

the

na

ture

of t

he

activ

ity, w

hat

leve

l of

envi

ronm

enta

l an

alys

is is

in

dica

ted?

Con

duct

a

Prel

imin

ary

Ass

essm

ent

A r

apid

, si

mpl

ified

EIA

st

udy

usin

g si

mpl

e to

ols

(e.g

. the

U

SAID

Initi

al

Env.

Exam

inat

ion)

AC

TIV

ITY

IS

OF

MO

DE

RA

TE

OR

UN

KN

OW

NR

ISK

SIG

NIF

ICA

NT

A

DV

ER

SE

IMPA

CT

S P

OSS

IBLE

SIG

NIF

ICA

NT

A

DV

ER

SE

IMPA

CT

S V

ERY

UN

LIK

ELY

AC

TIV

ITY

IS L

OW

R

ISK

(Bas

ed o

n it

s na

ture

, ver

y un

likel

y to

ha

ve s

igni

fican

t a

dver

se

impa

cts )

AC

TIV

ITY

ISH

IGH

R

ISK

(Bas

ed o

n it

s na

ture

, lik

ely

to h

ave

sign

ifica

nt a

dver

se

impa

cts)

Phas

e II

Phas

e I

Und

erst

and

prop

osed

ac

tivity

Why

is t

he

activ

ity b

eing

pr

opos

ed?

Wha

t is

bein

g pr

opos

ed?

BEG

IN

FULL

EI

A

STU

DY

Doc

umen

t and

su

bmit

for

appr

oval

REG

. 216

USA

ID’S

IMPL

EMEN

TAT

ION

OF

GEN

ERA

L EI

A P

ROC

ESS.

..

. .th

at b

egin

s th

e sa

me

way

as

any

EIA

pro

cess

. . .

5/23

/201

66

Allo

wed

by

Reg

. 216

But

not

usua

lly r

ecom

men

ded

TH

E U

SAID

SC

REE

NIN

G P

ROC

ESS

1. Is

the

act

ivity

EX

EMPT

? NO

2. Is

the

act

ivity

C

ATEG

OR

ICA

LLY

EX

CLU

DED

?

3. Is

the

act

ivity

H

IGH

RIS

K?

Prep

are

Initi

al E

nviro

nmen

tal E

xam

inat

ion

(IEE)

NO

NO

YES

YES

YES

star

tPl

ain-

lang

uage

mea

ning

& im

plic

atio

n

“Em

erge

ncy

Act

iviti

es”

(as

defin

ed b

y 22

CFR

216

)N

o en

viro

nmen

tal r

evie

w r

equi

red,

but

ant

icip

ated

adv

erse

im

pact

s sh

ould

be

miti

gate

d

Very

low

-ris

k; n

o U

SAID

kno

wle

dge

or c

ontr

ol

(with

in c

ateg

orie

s de

fined

by

22 C

FR 2

16)

No

furt

her

envi

ronm

enta

l rev

iew

is n

eces

sary

.

You

prob

ably

mus

t do

a fu

ll En

viro

nmen

tal

Ass

essm

ent

(EA

) or

revi

se t

he a

ctiv

ity

(or

not y

et c

lear

)

Prep

are

Envi

ronm

enta

l A

sses

smen

t (fu

ll EI

A s

tudy

)

reco

mm

ende

d

5/23

/201

67

SCR

EEN

ING

UN

DER

22

CFR

216

:EX

EMPT

ION

S

“Exe

mpt

” ac

tiviti

es o

ften

have

si

gnifi

cant

adv

erse

impa

cts.

Miti

gate

the

se im

pact

s w

here

po

ssib

le.

1.In

tern

atio

nal d

isas

ter

assi

stan

ce

2.O

ther

em

erge

ncy

situ

atio

ns

requ

ires A

dmin

istra

tor

(A/A

ID) o

r Ass

istan

t Ad

min

istra

tor

(AA/

AID

) for

mal

app

rova

l

3.C

ircum

stan

ces

with

“ex

cept

iona

l for

eign

po

licy

sens

itivi

ties”

requ

ires A

/AID

or A

A/AI

D fo

rmal

app

rova

l

Und

er R

eg. 2

16 E

XEM

PTIO

NS

are

ON

LY. .

.

1. Is

the

act

ivity

EX

EMPT

? NO

YES

star

t

!

5/23

/201

68

1. Is

the

act

ivity

EX

EMPT

? NO

2. Is

the

act

ivity

C

ATEG

OR

ICA

LLY

EX

CLU

DED

?

NO

YES

YES

star

t

SCR

EEN

ING

UN

DER

22

CFR

216

:C

ATEG

OR

ICA

L EX

CLU

SIO

NS

Educ

atio

n, te

chni

cal a

ssis

tanc

e, o

r tr

aini

ng p

rogr

ams

(as

long

as

no

activ

ities

dire

ctly

affe

ct t

he

envi

ronm

ent)

Doc

umen

ts o

r in

form

atio

n tr

ansf

ers

Ana

lyse

s, st

udie

s, ac

adem

ic o

r re

sear

ch

wor

ksho

ps a

nd m

eetin

gs

Nut

ritio

n, h

ealth

, fam

ily p

lann

ing

activ

ities

exc

ept w

here

med

ical w

aste

is

gene

rate

d

ON

LY a

ctiv

ities

fitt

ing

in a

set

of 1

5 sp

ecifi

c ca

tego

ries

MAY

qual

ify fo

r ca

tego

rica

l ex

clus

ions

, inc

ludi

ng. .

.

Page 40: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

69

1. Is

the

act

ivity

EX

EMPT

? NO

2. Is

the

act

ivity

C

ATEG

OR

ICA

LLY

EX

CLU

DED

?

NO

YES

YES

star

t

CAT

EGO

RIC

AL

EXC

LUSI

ON

S: LI

MIT

ATIO

NS

•A

tec

hnic

al a

dvis

or t

o th

e m

inis

try

of

envi

ronm

ent a

nd e

nerg

y w

ith c

o-si

gnat

ure

auth

ority

ove

r m

inin

g co

nces

sion

aw

ards

?

•M

idw

ife t

rain

ing

in m

anag

emen

t of

3rd

-sta

ge la

bor?

•C

redi

t sup

port

to la

rge-

scal

e ag

ro-

proc

essi

ng?

Why

wou

ld c

ateg

oric

al e

xclu

sion

s N

OT

app

ly if

USA

ID fu

nds.

. .

No

cate

gori

cal e

xclu

sion

s ar

e po

ssib

le w

hen

an a

ctiv

ity

invo

lves

pes

ticid

es.

(22

CFR

216

.2(e

))

An

activ

ity m

ay “

fit”

into

a c

ateg

oric

ally

ex

clud

ed c

lass

. . .

. . . b

ut if

adv

erse

impa

cts

are

reas

onab

ly fo

rese

eabl

e,

the

activ

ity w

ill N

OT

rec

eive

a c

ateg

oric

al e

xclu

sion

.

!

5/23

/201

610

1. Is

the

act

ivity

EX

EMPT

? NO

2. Is

the

act

ivity

C

ATEG

OR

ICA

LLY

EX

CLU

DED

?

3. Is

the

act

ivity

H

IGH

RIS

K?

NO

NO

YES

YES

YES

star

t“H

IGH

RIS

K”

= ac

tiviti

es “

for

whi

ch a

n EA

is

norm

ally

req

uire

d” p

er 2

2 C

FR 2

16

OR

othe

r ac

tiviti

es w

hich

cle

arly

pre

sent

hig

h en

viro

nmen

tal r

isks

Pene

trat

ion

road

bui

ldin

g or

impr

ovem

ent

Irri

gatio

n, w

ater

man

agem

ent,

or d

rain

age

proj

ects

Agr

icul

tura

l lan

d le

velin

g

New

land

dev

elop

men

t; pr

ogra

ms

of r

iver

bas

in

deve

lopm

ent

Larg

e sc

ale

agri

cultu

ral m

echa

niza

tion

Res

ettle

men

t

Pow

erpl

ants

& in

dust

rial

pla

nts

Pota

ble

wat

er &

sew

age,

“e

xcep

t sm

all-s

cale

SCR

EEN

ING

UN

DER

22C

FR21

6 “H

IGH

RIS

K”

(EA

LIK

ELY

REQ

UIR

ED)

5/23

/201

6Wha

t if

my

activ

ity is

“hi

gh r

isk”

? WH

Y a

pre

limin

ary

asse

ssm

ent?

An

IEE

will

:

•A

llow

you

to

dete

rmin

e if

impa

cts

can

be e

asily

con

trol

led

belo

w a

si

gnifi

cant

leve

l—if

so, a

n EA

is n

ot

nece

ssar

y

•G

athe

r in

form

atio

n ne

eded

to

jum

p-st

art

the

EA p

roce

ss

Can

pro

ceed

dire

ctly

to

an E

A

(USA

ID’s

full

EIA

stu

dy)

But

unle

ss t

he a

ctiv

ity is

VER

Y c

lear

ly

“hig

h ri

sk”,

do a

n IE

E (U

SAID

’s pr

elim

inar

y as

sess

men

t) in

stea

d

3. Is

the

act

ivity

H

IGH

RIS

K?

Prep

are

Initi

al E

nviro

nmen

tal E

xam

inat

ion

(IEE)

NO

YES

You

prob

ably

mus

t do

a fu

ll En

viro

nmen

tal

Ass

essm

ent

(EA

) or

revi

se t

he a

ctiv

ity

(or

not y

et c

lear

)

Prep

are

Envi

ronm

enta

l A

sses

smen

t (fu

ll EI

A s

tudy

)

Allo

wed

by

Reg

. 216

But

not

usua

lly r

ecom

men

ded

reco

mm

ende

d

5/23

/201

612

WH

AT IS

CLE

AR

LY “

HIG

H R

ISK

”?

EAD

EFIN

ITEL

Y R

EQU

IRED

•N

ew 5

00H

a ir

riga

tion

sche

me

•M

ajor

exp

ansi

on o

f a 1

00M

W th

erm

al p

ower

pla

nt

& c

onst

ruct

ion

of n

ew t

rans

mis

sion

line

s

•W

iden

ing

30km

of a

2-la

ne r

oad

to

6-la

ne t

ollw

ay t

hru

an u

rban

are

a

Sect

ions

118

& 1

19 o

f the

For

eign

Ass

ista

nce

Act

R

EQU

IRE

an E

A fo

r..

•A

ctiv

ities

invo

lvin

g pr

ocur

emen

t or

use

of lo

ggin

g eq

uipm

ent

•A

ctiv

ities

with

the

pote

ntia

l to

sign

ifica

ntly

deg

rade

na

tiona

l par

ks o

r si

mila

r pr

otec

ted

area

s or

in

trod

uce

exot

ic p

lant

s or

ani

mal

s in

to s

uch

area

s

NO

T C

LEA

R—

proc

eed

to IE

E

•R

ehab

ilita

tion

of 5

0Ha

irri

gatio

n sc

hem

e

•M

ini-h

ydro

inst

alla

tions

of 5

00 k

w t

otal

•R

ehab

ilita

tion

of m

ultip

le s

hort

seg

men

ts o

f ru

ral f

eede

r ro

ad

Page 41: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

613

ON

CE

EAC

H A

CT

IVIT

Y H

AS

BEEN

SC

REE

NED

AC

TIV

ITY

*EX

EMPT

CAT

EXIE

E R

EQ’D

EA R

EQ’D

1. S

mal

l clin

ic r

ehab

ilita

tion

X

2. B

oreh

ole

Inst

alla

tions

X

3. T

rain

ing

in p

atie

ntre

cord

-kee

ping

X

4. C

onst

ruct

prov

inci

al m

edic

al w

aste

di

spos

al fa

cilit

yX

*Use

a t

able

like

thi

s. It

help

s.

5/23

/201

614

DEV

ELO

P YO

UR

22

CFR

216

DO

CU

MEN

TAT

ION

. . .

OV

ERA

LL S

CR

EEN

ING

RES

ULT

S22

CFR

216

D

OC

UM

ENTA

TIO

N

REQ

UIR

ED

All

activ

ities

are

exe

mpt

Stat

emen

t of J

ustif

icat

ion

All

activ

ities

cate

gori

cally

ex

clud

edC

ateg

oric

alE

xclu

sion

R

eque

st +

FA

CES

HEE

T

All

activ

ities

req

uire

an

IEE

IEE

cove

ring

all

activ

ities

+

FAC

ESH

EET

Som

e ac

tiviti

es a

re

cate

gori

cally

exc

lude

d,

som

e re

quire

an

IEE

An

IEE

that

:C

over

s ac

tiviti

es fo

r w

hich

an

IEE

is r

equi

red

AN

DJu

stifi

es th

e ca

tego

rica

l ex

clus

ions

+ FA

CES

HEE

T

Hig

h-ri

sk a

ctiv

itie

sIn

itiat

e sc

opin

g an

d pr

epar

atio

n of

an

EA

CAT

EGO

RIC

AL

EXC

LUSI

ON

REQ

UES

T

Very

sim

ple;

1-2

pag

es.

Des

crib

es th

e ac

tiviti

es.

Cite

s 22

CFR

216

to ju

stify

th

e ca

tex.

Initi

al

Envi

ronm

enta

l Ex

amin

atio

n(U

SAID

’s pr

elim

inar

y as

sess

men

t)

. . .A

S D

ETER

MIN

ED B

Y T

HE

OU

TC

OM

E O

F YO

UR

SC

REE

NIN

G P

ROC

ESS

5/23

/201

615

Proj

ect

Des

ign

Proc

ess

-Ste

ps 1

-10

-Rev

iew

-App

rove

/Dis

appr

ove

-if y

es t

hen

Stag

e 2

CD

CS

Stag

e 1:

Con

cept

Pap

er

PRO

GR

AM

CY

CLE

Gen

der/

Env

/Sus

tA

naly

sis

7. A

nal.

& S

ust.

Con

side

ratio

nsA

nnex

b. L

og F

ram

eA

nnex

k. E

nvT

hres

h.

Dec

isio

nA

nnex

m. W

aive

rs (

AU

PCS)

Stag

e 2:

Ana

lytic

al (

PAD

)

AU

PCS

miti

gatin

g m

easu

res

in t

he P

AD

Stag

e 3:

Pro

ject

Aut

hori

zatio

n

TIM

ING

OF

22 C

FR 2

16 D

OC

UM

ENTA

TIO

N. .

.

USA

ID’s

proj

ect

desi

gn p

roce

ss

requ

ires

appr

oved

Reg

. 216

doc

umen

tatio

n as

ann

ex t

o th

e Pr

ojec

t A

ppra

isal

Doc

umen

t

Thr

esho

ld D

ecis

ion

Envi

ronm

enta

l Pl

anni

ng, F

AA

117

, 11

8, 1

19

5/23

/201

616

1.Ba

ckgr

ound

& A

ctiv

ity D

escr

iptio

nPu

rpos

e &

Sco

pe o

f IEE

Back

grou

ndD

escr

iptio

n of

act

iviti

es

2. C

ount

ry &

Env

ironm

enta

l inf

orm

atio

nLo

catio

ns a

ffect

edN

atio

nal e

nviro

nmen

tal p

olic

ies

and

proc

edur

es

3. E

valu

atio

n of

pot

entia

l env

ironm

enta

l im

pact

s

4. R

ecom

men

ded

thre

shol

d de

cisi

ons

and

miti

gatio

n ac

tions Rec

omm

ende

d th

resh

old

deci

sion

s an

d co

nditi

ons

Miti

gatio

n, m

onito

ring

& e

valu

atio

n

Wha

t do

es it

look

lik

e?

The

IEE

is v

ery

sim

ilar

to p

relim

inar

y as

sess

men

ts r

equi

red

by o

ther

don

ors

and

gove

rnm

ents

.

TH

E IE

E: U

SAID

’S P

REL

IMIN

ARY

ASS

ESSM

ENT

BASI

C IE

E O

UT

LIN

E

!

Page 42: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61717 17

PUR

POSE

OF

IEE

Prov

ides

doc

umen

tatio

n an

d an

alys

is th

at:

•Allo

ws

the

prep

arer

to

dete

rmin

e w

heth

er o

r no

t si

gnifi

cant

adv

erse

impa

cts

are

likel

y

•Allo

ws

the

revi

ewer

to a

gree

or

dis

agre

e w

ith t

he

prep

arer

’s de

term

inat

ions

•Set

s ou

t m

itiga

tion

and

mon

itori

ng fo

r ad

vers

e im

pact

s

5/23

/201

618

WH

AT D

ETER

MIN

ATIO

NS

RES

ULT

FRO

M A

N IE

E?FO

R E

AC

HA

CT

IVIT

Y A

DD

RES

SED

, TH

E IE

E M

AK

ES O

NE

OF

4 R

ECO

MM

END

ATIO

NS

REG

AR

DIN

G IT

S PO

SSIB

LE

IMPA

CT

S:If

the

IEE

anal

ysis

find

s. . .

The

IEE

reco

mm

ends

a. .

.Im

plic

atio

ns(if

IEE

is a

ppro

ved)

No

sign

ifica

nt a

dver

se

envi

ronm

enta

l im

pact

sN

EG

AT

IVE

DE

TE

RM

INA

TIO

NN

o co

nditi

ons.

Go

ahea

d.

With

spe

cifie

d m

itiga

tion

and

mon

itori

ng, n

o si

gnifi

cant

en

viro

nmen

tal i

mpa

cts

NE

GA

TIV

ED

ET

ER

MIN

AT

ION

WIT

H C

ON

DIT

ION

S

Spec

ified

miti

gatio

n an

d m

onito

ring

m

ust b

e im

plem

ente

d

Sign

ifica

nt a

dver

se

envi

ronm

enta

l im

pact

s ar

e po

ssib

leP

OSI

TIV

ED

ET

ER

MIN

AT

ION

Do

full

EA o

r re

desi

gn a

ctiv

ity.

Con

ditio

ns im

pose

d by

the

EA

mus

t be

impl

emen

ted.

Not

eno

ugh

info

rmat

ion

to e

valu

ate

impa

cts

DE

FER

RA

LYo

u ca

nnot

impl

emen

t the

act

ivity

un

til t

he IE

E is

am

ende

d

PLU

S, t

he IE

E w

ill a

ddre

ss a

ny C

AT

EG

OR

ICA

L E

XC

LUSI

ON

S ca

rrie

d ov

er fr

om t

he s

cree

ning

pr

oces

s.

5/23

/201

619

Cle

aran

ces:

CO

R/A

OR

or T

eam

lead

er

Mis

sion

Env

ironm

enta

l Offi

cer

(for

Mis

sion

s)

Reg

iona

l Env

ironm

enta

l Adv

isor

(d

epen

ding

on

mis

sion

)

Mis

sion

Dire

ctor

or

Was

hing

ton

equi

vale

nt*

Con

curr

ence

Bure

au E

nviro

nmen

tal O

ffice

r*

App

rova

l

Gen

eral

Cou

nsel

(ra

rely

)

WH

OSI

GN

S?IM

PORT

AN

CE:

N

o ac

tiviti

es m

ay b

e im

plem

ente

d w

ithou

t APP

ROV

ED R

eg. 2

16

envi

ronm

enta

l doc

umen

tatio

n in

han

d.

APP

ROV

ED =

•M

issi

on D

irec

tor

(or W

ashi

ngto

n eq

uiva

lent

) &

B

urea

u E

nvir

onm

enta

l Offi

cer

(BE

O)

sign

atur

es

•BE

O c

oncu

rren

ce n

ot a

utom

atic

or

guar

ante

ed

•D

ialo

gue

is s

omet

imes

req

uire

d

*req

uire

d by

Reg

216

REG

. 216

DO

CU

MEN

TAT

ION

& A

PPRO

VAL

5/23

/201

620

WH

EN T

HE

IEE

IS D

ULY

APP

ROV

ED. .

.

*www

.usaid

.gov/o

ur_w

ork/e

nviro

nmen

t/com

plian

ce/da

tabas

e.htm

l

Rec

omm

ende

dde

term

inat

ions

&

cate

gori

cal e

xclu

sion

s be

com

e T

HR

ESH

OLD

DE

CIS

ION

S

Con

diti

ons

beco

me

RE

QU

IRE

D

elem

ents

of p

roje

ct im

plem

enta

tion

&

mon

itor

ing

(AD

S 20

4.3.

4(b)

)

Con

diti

ons

are

wri

tten

into

or

refe

renc

ed in

sol

icit

atio

n &

aw

ard

docu

men

ts (A

DS

204.

3.4(

a)(6

))

AO

Rs/

CO

Rs

over

see

impl

emen

tati

on(A

DS

204.

3.4(

b))

IEE

cond

ition

s pr

ovid

e th

e be

droc

k on

whi

ch li

fe-o

f-pro

ject

miti

gatio

n an

d m

onito

ring

cri

teri

a ar

e es

tabl

ishe

d.

The

IEE

is p

oste

d to

USA

ID’s

envi

ronm

enta

l com

plia

nce

data

base

*

Page 43: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

621

WH

AT IF

I N

EED

TO

DO

AN

EN

VIR

ON

MEN

TAL

ASS

ESSM

ENT

*?

•Fi

rst

step

: a fo

rmal

sco

ping

pro

cess

(22

CFR

216

.3(a

)(4)

)

•Sc

opin

g St

atem

ent m

ust b

e ap

prov

ed b

y M

issi

on D

irect

or, B

urea

u En

viro

nmen

tal

Offi

cer.

•In

form

s th

e SO

W fo

r th

e En

viro

nmen

tal

Ass

essm

ent

itsel

f.

•EA

s ar

e fa

r m

ore

deta

iled

than

IEEs

. The

y m

ust a

ddre

ss a

ltern

ativ

es to

the

pro

pose

d ac

tiviti

es. P

ublic

con

sulta

tions

are

requ

ired.

*If a

pro

pose

d ac

tion

may

affe

ct t

he U

S en

viro

nmen

t or

the

glob

al c

omm

ons,

an E

IS is

req

uire

d, n

ot a

n EA

. (EI

S =

Env

iron

men

tal I

mpa

ct S

tate

men

t, pe

r th

e U

S N

atio

nal E

nviro

nmen

tal P

olic

y A

ct (N

EPA

)). T

his

is R

AR

E. (2

2 C

FR

216.

7.)

5/23

/201

622

WH

AT A

BOU

T H

OST

-CO

UN

TRY

EIA

PR

OC

EDU

RES

?•

Mos

t ho

st c

ount

ries

—Ke

nya

incl

uded

—ha

ve d

omes

tic E

IA

requ

irem

ents

;

•U

SAID

pro

ject

s m

ust

also

com

ply

with

the

se r

equi

rem

ents

;

•So

, dur

ing

scre

enin

g, al

so s

cree

n ag

ains

t ho

st-c

ount

ry c

ateg

orie

s or

cri

teri

a.

•If

a ho

st-c

ount

ry p

relim

inar

y as

sess

men

t or

full

EIA

is r

equi

red,

th

e ob

ject

ive

is t

o cr

eate

one

doc

umen

t th

at s

atis

fies

both

sy

stem

s.

5/23

/201

623

SUM

MA

RY

•R

eg. 2

16 e

stab

lishe

s th

e pr

e-im

plem

enta

tion

USA

ID

envi

ronm

enta

l rev

iew

pro

cess

•T

his

refle

cts

the

gene

ral E

IA m

etho

dolo

gy

•It

begi

ns w

ith a

sys

tem

atic

scr

eeni

ng a

nd d

ecis

ion-

mak

ing

proc

ess

with

mor

e de

taile

d re

view

, if n

eede

d

•U

SAID

doc

umen

tatio

n an

d ap

prov

al p

roce

sses

are

cle

ar

and

man

dato

ry

•R

eg. 2

16 d

ocum

ents

def

ine

proj

ect

envi

ronm

enta

l m

anag

emen

t cr

iteri

a, m

ost

freq

uent

ly a

s IE

E co

nditi

ons

5/23

/201

624

Wilk

ister

Mag

angi

USA

ID/K

enya

Mis

sion

Env

iron

men

tal O

ffice

r (M

EO)

wm

agan

gi@

usai

d.G

ov

Dav

id K

inyu

a,U

SAID

/Eas

t Afr

ica

Reg

iona

l Env

iron

men

tal A

dvis

or (

REA

)D

kiny

ua@

usai

d.G

ov

Glo

bal E

nvir

onm

enta

l Man

agem

ent

Supp

ort (

GEM

S) P

roje

ctG

EMSC

OR

ETea

m@

cadm

usgr

oup.

com

Page 44: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Version: 27 January 2009 download from www.encapafrica.org /meoEntry.htm.

USAID Environmental Procedures Briefing for USAID/XXX Staff

Contents Purpose ................................................................................................................................................ 1

Legal Authority for and Purpose of USAID’s Environmental Procedures .............................................. 2

Environmental Compliance Requirements over Life of Project ............................................................. 2

Responsibilities for Implementation ...................................................................................................... 3

Specific Further Directives ................................................................................................................... 5

Critical Non-Compliance Situations ...................................................................................................... 7

Environmental Compliance Resources & Key Contacts ........................................................................ 7

Attachments: 1. Environmental Compliance Language for Use in Solicitations and Awards 2. Annotated Environmental Mitigation and Monitoring Plan (EMMP) Template

Acronyms ADS Automated Directives System BEO Bureau Environmental Officer CFR Code of (US) Federal Regulations CTO Cognizant Technical Officer EA Environmental Assessment ECL Environmental Compliance Language for Use in

Solicitations and Awards (ADS 204 help document)

EIA Environmental Impact Assessment

EMMP Environmental Mitigation & Monitoring Plan

ESDM Environmentally Sound Design and Management

IEE Initial Environmental Examination LOP Life-of-Project MEO Mission Environmental Officer PMP Performance Monitoring Plan REA Regional Environmental Advisor Reg. 216 22 CFR 216

About this Briefing All USAID Missions and operating units are required to fully implement and comply with USAID’s mandatory environmental procedures. This briefing is intended to support short mission staff trainings in these procedures and to serve as a succinct post-training reference. Towards these ends, it:

summarizes the environmental procedures in plain language, and

sets out the roles and responsibilities of organizational units and functions in the Mission in achieving and assuring compliance.

This briefing is closely based on and fully compatible with the new model Environmental Compliance Mission Order adopted by Africa Bureau. The plain-language summary in this Briefing does not supercede the statutory, regulatory and ADS language that governs and constitutes these procedures. This language may be accessed via http://www.encapafrica.org/meoEntry.htm or provide internal server filelink.

Page 45: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID Environmental Procedures Briefing for Mission staff ver 27 January 2009 pg. 2/7

Legal Authority for and Purpose of USAID’s Environmental Procedures Section 117 of the Foreign Assistance Act of 1961, as amended, requires that USAID use an Environmental Impact Assessment (EIA) process to evaluate the potential impact of the Agency’s activities on the environment prior to implementation, and that USAID “fully take into account” environmental sustainability in designing and carrying out its development programs. This mandate is codified in Federal Regulations (22 CFR 216 or “Reg. 216”) and in USAID’s Automated Directives System (ADS), particularly Parts 201.3.12.2.b and 204.

These procedures are USAID’s principal mechanism to ensure environmentally sound design and management (ESDM) of development activities. Put another way, they are USAID’s principal mechanism to prevent USAID-funded activities from having significant, unforeseen, avoidable or mitigable adverse impacts on critical environmental resources, ecosystems, and the health and livelihoods of beneficiaries or other groups. They strengthen development outcomes and help safeguard the good name and reputation of the Agency.

Compliance with these procedures is mandatory. With limited exceptions for international disaster assistance, they apply to every program, project, activity, and amendment supported with USAID funds or managed by USAID. USAID/XXX is fully committed to their systematic and complete implementation.

Environmental Compliance Requirements over Life of Project In general, the procedures specify an EIA process that must be applied to all activities before implementation—including new activities introduced into an existing program or substantive changes to existing activities. This pre-implementation EIA process, defined by Reg. 216, frequently results in environmental management requirements (mitigative measures) that must be implemented and monitored over the life of the activity.

Specifically, EXCEPT for international disaster assistance activities verified as EXEMPT from the procedures, the procedures impose the following compliance requirements over life of project (LOP):

1. Environmental considerations must be taken into account in activity planning. (ADS 201.3.12.6 & 204.1).

2. No activity is implemented without approved Reg. 216 environmental documentation. This documentation must be approved PRIOR to any irreversible commitment of resources. (ADS 204.3.1).

This documentation is the output of the EIA process specified by Reg. 216 and takes one of three forms: Request for Categorical Exclusion, Initial Environmental Examination (IEE) or Environmental Assessment (EA).

Documentation is approved ONLY when it is signed by the Mission Environmental Officer, the Mission Director AND the Bureau Environmental Officer. As a condition of approval, most IEEs and all EAs contain environmental mitigation and monitoring requirements (“IEE or EA conditions”) for at least some of the activities they cover.

Note that Activity Approval Documents must summarize how environmental documentation requirements have been met. (ADS 201.3.12.15).

3. All IEE and EA conditions are incorporated in procurement instruments. (ADS 204.3.4.a.6; 303.3.6.3e).

4. All IEE and EA conditions are implemented, and this implementation is monitored and adjusted as necessary. (ADS 204.3.4; 303.2.f).

Page 46: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID Environmental Procedures Briefing for Mission staff ver 27 January 2009 pg. 3/7

Operationally, this requires that:

Conditions established in program- (“FO”-)level IEEs and EAs are mapped to the activity level;

Environmental Mitigation and Monitoring Plans (EMMPs) are developed at the project or activity level to implement these conditions. EMMPs set out the mitigation measures required by the IEE/EA; indicators or criteria for monitoring their implementation & effectiveness; and the parties responsible for implementation & monitoring;

Project workplans and budgets specifically provide for implementation of EMMPs; and

PMPs incorporate measures of EMMP implementation.

USAID/XXX mission policy is that each of these prerequisites for successful implementation of IEE and EA conditions will be executed in full.

An annotated EMMP template is attached to this Briefing and also available at www.encapafrica.org/meoEntry.htm and provide internal server filelink.

5. Environmental compliance is assessed in annual reports. (ADS 203.3.8.7; 204.3.3.a).

Annual reports must assess environmental compliance of existing activities, including whether all activities are covered by approved Reg. 216 environmental documentation, whether the mitigation measures specified in IEEs and EAs are being implemented, and whether these measures are adequate. If activities are discovered to be out of compliance, the report must specify actions to be taken to remedy the situation.

6. Environmental compliance documentation is maintained in Program area Team files. (ADS 202.3.4.6).

A more extensive discussion of LOP environmental compliance requirements is found in the Bureau for Africa’s Mission Environmental Officer Handbook, available via www.encapafrica.org/meoentry.htm and provide internal server filelink.A hardcopy of the handbook is available for loan from the Mission Environmental Officer.

Responsibilities for Implementation Primary responsibility: Team Leaders, CTOs, and Activity Managers. The ADS makes clear that primary responsibility and accountability for environmental compliance is shared by the USAID staff acting in the capacities of Team Leader and each CTO or Activity Manager. This includes assuring that Reg. 216 documentation is developed and in-place for activities under their purview.

Specific responsibilities established by the ADS and Mission policy for these positions are set out in the table below. All UAID/XXX staff are obliged to fulfill the enumerated environmental compliance responsibilities attendant to their position.

Final responsibility: Mission Director. Final responsibility for environmental compliance lies with the Mission Director. The Mission Director must approve all Reg. 216 documentation for Mission activities.

Field Implementation: Contractors and Implementing Partners. Environmental management must be an integral part of project implementation, and thus field implementation of environmental mitigation is the responsibility of contractors/IPs with oversight from USAID.

Advice & Gatekeeping: Mission Environmental Officer (MEO). The MEO (1) is a core member of each mission program team and serves the team as an environmental compliance advisor; (2) serves as a gatekeeper (quality and completeness reviewer) for Reg. 216 Documentation and must clear all

Page 47: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID Environmental Procedures Briefing for Mission staff ver 27 January 2009 pg. 4/7

documentation before submission to the Mission Director; and (3) is the primary point of Mission contact with the Bureau Environmental Officer and the Regional Environmental Advisor (see “Environmental Compliance Resources and Key Contacts,” below).

A more complete description of MEO roles and responsibilities is provided by the Bureau for Africa’s MEO Handbook, available via www.encapafrica.org/meoEntry.htm and provide internal server filelink.

Regional Environmental Advisors (REAs). REAs advise MEOs and program teams on environmental compliance, including development of Reg. 216 documentation and monitoring protocols, and can assist teams in obtaining additional environmental expertise when required. REAs also help to monitor the mission’s implementation of the Agency’s Environmental Procedures. The MEO is the liaison with the REA on behalf of program teams. The REA supporting XXXX is based in USAID/(EA/WA/SA), CITY.

Bureau Environmental Officers (BEOs). The BEOs, based in Washington, DC, must clear all Reg. 216 documentation for activities under the purview of their Bureau. USAID/XXXX activities are under the purview of the AFR, EGAT, GH and DCHA Bureaus.

Environmental Compliance Responsibilities of Team Leaders, CTOs, Activity Managers and the MEO

Compliance action Responsible parties

Prepare Reg 216 environmental documentation.

Reg 216 documentation includes:

Requests for Categorical Exclusions (RCEs)

Initial Environmental Examinations (IEEs)

Environmental Assessments (EAs)

Amendments to all of the above

CTO/Activity Manager (MEO reviews/provides advice).

EXCEPT:

Teams may engage partners or outside contractors to prepare IEEs under the supervision of the CTO/Activity Manager. The use of external expertise is RECOMMENDED for complex programs and activities.

EAs are almost always prepared by 3rd-party contractors.

Title II IEEs are prepared by Implementing Partners as part of their MYAP submissions.

Approve and Clear Reg. 216 Documentation. All of the following must clear:

CTO, Activity Manager or Team Leader

MEO

Mission Director

Bureau Environmental Officer

Clear sub-project/sub-grant Environmental Reviews.

Activity Manager AND MEO

(Activities identified by the sub-project/sub-grant screening process as “high risk” are forwarded for REA & BEO review and clearance.)

Incorporate environmental compliance requirements into procurement documents.

CTO/Activity manager (MEO assists.)

Ensure Reg. 216 documentation is current and covers all activities being implemented.

CTO/Activity Manager

Assure an EMMP addressing all relevant mitigation and monitoring conditions is

CTO/Activity Manager (MEO may review)

Page 48: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID Environmental Procedures Briefing for Mission staff ver 27 January 2009 pg. 5/7

Compliance action Responsible parties

developed, and reflected in workplan, budget, and PMP.

Contractors/IPs will in most cases develop EMMPs for CTO/Activity Manager review. If they do not, this responsibility falls directly on the CTO/Activity Manager.

Monitoring to ensure partner/contractor compliance with IEE/EA conditions.

CTO/Activity Manager

(MEO assists)

Ensure that environmental compliance lessons learned are incorporated in closure reports & environmental compliance issues are included in SOWs for evaluations.

MEO

Prepare environmental compliance section of Mission Annual Reports.

MEO, with support from CTOs and Activity Managers.

Maintain environmental compliance documentation.

Program Officer, CTO/Activity Manager/Team Leader, MEO

Additional Directives and Responsibilities to Assure LOP Compliance To assure that the LOP compliance elements listed in the table above are well-implemented, the following directives and responsibilities apply Mission-wide:

1. Awareness of Activity Determinations and Conditions. It is the responsibility of each CTO and Activity Manager to know the Reg. 216 Determination, including any conditions, assigned to the activities under their purview. These conditions are assigned in the Reg. 216 documentation that applies to the activity. The possible determinations are enumerated in the table below:

Categorical Exclusion The activity falls into one of the classes of activities enumerated by Reg, 216 as posing low risks of significant adverse environmental impacts, and no unusual circumstances exist to contradict this assumption. The activity has no attached environmental management conditions.

Negative Determination Per analysis set out in an IEE, the activity is found to pose very low risk of significant adverse environmental impact. The activity has no attached environmental management conditions.

Negative Determination with Conditions

Per analysis set out in an IEE, the activity is found to pose very low risk of significant adverse environmental impact if specified environmental mitigation and monitoring measures are implemented. The activity proceeds on the condition and requirement that these measures (“conditions”) are fully implemented.

Positive Determination Per analysis set out in an IEE, the activity is found to pose substantial risks of significant adverse environmental impacts. Therefore, the activity cannot proceed until an Environmental Assessment (EA) is developed and duly approved, and then on the condition that environmental mitigation and monitoring measures specified by the EA are fully implemented.

The only activities not assigned such determinations are international disaster assistance activities verified as exempt from the procedures. CTOs and Activity Managers must also be aware of any activities under their purview having exempt status, and when such exempt status will terminate.

2. Team-level Compliance Planning & Compliance Verification Systems. As specified by ADS 204.3.4, each program team must collaborate effectively with the MEO during all program designs and approvals to create a system and secure adequate resources to ensure LOP environmental compliance.

Page 49: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID Environmental Procedures Briefing for Mission staff ver 27 January 2009 pg. 6/7

This system must include: EMMP review and approval; assuring the budgets provide for EMMP implementation, and that PMPs integrate measures of EMMP implementation. Environmental compliance verification will be part of field visits/inspections.

Note that several general and sector-specific tools exist to support field and desk assessment and tracking of partner environmental compliance. Use of these tools is recommended and may be required in some circumstances. Examples include the “Environmental Mitigation and Monitoring Tracking System” (developed in the Southern Africa region for compliance monitoring of Indoor Residual Spraying activities and the general “Site Visit Guide and Report Template.” Both are available at www.encapafrica.org/meoentry.htm (Mitigation and Monitoring section) or provide internal server filelink. Contact the MEO for more information.

3. Functional specifications for Environmental Compliance Clauses in Procurement Instruments. The ADS states that CTOs and Activity Managers are responsible for ensuring that environmental conditions from IEEs and EAs are incorporated into solicitation and award documents (ADS 204.3.4.a.6; 303.3.6.3e). Beyond this, it is Mission policy that environmental compliance language in all solicitation and award instruments specifically requires that:

The partner verifies current and planned activities annually against the scope of the approved environmental documentation.

Where activities demand environmental management expertise, appropriate qualifications and proposed approaches to compliance are addressed in technical and cost proposals.

The partner develop an EMMP fully responsive to all IEE/EA conditions, unless this already exists in the Reg. 216 documentation or will be developed by Mission program staff.

Budgets and workplans integrate the EMMP.

PMPs measure EMMP implementation.

The ADS help document Environmental Compliance Language for Use in Solicitations and Awards (ECL) provides a combination of step-by-step guidance and standard text to assemble environmental compliance language meeting these requirements for any solicitation or award. Its use is strongly recommended.

The ECL and an annotated EMMP template are attached to this Order and also available at www.encapafrica.org/meoentry.htm and provide internal server filelink.

4. Confirming Reg. 216 documentation coverage in the course of project designs, amendments, extensions, and during the preparation of the Annual Reports. During these exercises, the Team should review planned/ongoing activities against the scope of existing, approved Reg. 216 documentation and either: (1) confirm that the activities are fully covered or (2) assure that such documentation is developed and approved prior to implementation. For activities begun under a disaster assistance exemption, the Team must confirm that their exempt status still applies.

Activities modified or added during project implementation may require new or amended Reg. 216 documentation. Maintaining Reg. 216 documentation coverage of all activities is critical, as the ADS requires that ongoing activities found to be outside the scope of approved Reg. 216 documentation be halted until an amendment to the documentation is approved by the Mission Director and the BEO.

Page 50: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID Environmental Procedures Briefing for Mission staff ver 27 January 2009 pg. 7/7

Critical Non-Compliance Situations If any USAID/XXX staff member believes that (1) failure to implement mitigation measures or (2) unforeseen environmental impacts of project implementation is creating a significant and imminent danger to human health or the integrity of critical environmental resources, IMMEDIATELY notify the CTO, MEO and Mission Management.

Environmental Compliance Resources and Key Contacts The on-line MEO Resource Center contains a wide range of environmental compliance and best practice materials, including step-by-step guidance for development of Reg. 216 documentation and sectoral guidance for design of environmental mitigation and monitoring measures. The Center is hosted on Africa Bureau’s ENCAP website (www.encapafrica.org/meoEntry.htm) and copied in full at insert internal server filelink.

Reg. 216 documentation for Mission programs is posted at insert internal server filelink.

Key contacts. As of INSERT DATE, key environmental compliance contacts for USAID/XXX are as follows. Up-to-date contacts are available via www.encapafrica.org/meoEntry.htm.

Mission Environmental Officer Insert name, email and extension

Regional Environmental Advisors (REAs)

East and Central Africa (USAID/EA, Nairobi) David Kinyua: [email protected]

Southern Africa R (USAID/SA, Pretoria) Camilien J.W. Saint-Cyr: [email protected]*

West Africa (USAID/WA, Accra) Bob Buzzard: [email protected]

Bureau Environmental Officers (BEOs; Washington, DC)

Bureau for Africa (AFR/SD) Brian Hirsch: [email protected]

Bureau for Economic Growth, Agriculture & Trade Bureau (EGAT): Joyce A. Jatko: [email protected]

Democracy, Conflict and Humanitarian Assistance (DCHA): Erika Clesceri: [email protected]

Global Health (GH/HIDN) Theresa Bernhard, [email protected]

Page 51: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 52: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 6. Principles of Environmental Monitoring Technical presentation and dialogue Summary Definition—Environmental monitoring is both:

A. Systematic observation of key environmental conditions.

B. Systematic verification of the implementation of mitigation measures.

Environmental monitoring is a necessary complement to mitigation. Its purpose is to tell us clearly and cost-effectively if mitigation is sufficient and effective. Throughout this session, we will see that environmental monitoring must be highly targeted.

A. Observing environmental conditions. The environmental conditions observed are those:

• That correspond to impacts and mitigation measures. For example, a key potential impact of an irrigation project is groundwater contamination. Therefore, groundwater quality is monitored.

• Upon which the project depends for its success. For example, a water supply project depends on clean source water. Therefore, source water quality is monitored.

We observe and measure environmental conditions by using environmental indicators, which are signals of or proxies for the stock and quality of key environmental resources, or of environmental health and ecosystem function.

Indicators can require complex equipment to measure (e.g., testing water for pesticide residues), but they can also be very simple—and often for small-scale activities simple indicators are best. (For example, groundwater levels can be measured in a shallow well using a rope and bucket.)

A key principle of monitoring is choosing the simplest indicator that meets your needs.

To distinguish the impacts of your activity from other factors, thought needs to go into the times and places that indicators are measured.

For example, consider an agricultural processing facility that draws water from a stream. The facility has potential to adversely impact surface water quality. A good monitoring approach would:

• Take water samples from the stream at the intake point and downstream from the seepage pits.

• Take samples from these different locations at the same time.

• Take samples during both high and low flow periods during the processing season.

Page 53: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

B. Verifying Implementation of Mitigation Measures. We can verify (and quantify!) implementation of mitigation measures in two ways: via paper reports and via field inspection. In each case, we use mitigation implementation indicators. For example, monitoring of medical waste management in a clinics activity could ask the beneficiary clinics to attach their waste management plan. A field inspection would spot-check that key elements of the plan were being implemented.

Good environmental monitoring is targeted and takes the simplest effective approach. It usually requires a combination of environmental conditions indicators and mitigation implementation indicators.

Objective Establish the objective of environmental monitoring (determining clearly and cost-effectively if mitigation is sufficient and effective); brief the two types of environmental monitoring indicators and achieve a common understanding of the principles of environmental monitoring design.

Key resource • The Sector Environmental Guidelines are a key resource for design of mitigation and monitoring

measures.

Page 54: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61

Prin

cipl

es o

f Env

ironm

enta

l Mon

itori

ng

GEM

S En

viro

nmen

tal C

ompl

ianc

e-ES

DM

Tra

inin

g Se

ries

Keny

a Ju

ne, 2

016

5/23

/201

62

ENV

IRO

NM

ENTA

L M

ON

ITO

RIN

G IS

BO

TH

. . .

1.Sy

stem

atic

obs

erva

tion

of k

ey

envi

ronm

enta

l con

ditio

ns

2.Sy

stem

atic

ver

ifica

tion

of

miti

gatio

n m

easu

re

impl

emen

tatio

n

DEF

INIT

ION

OF

MO

NIT

OR

ING

to t

ell y

ou c

lear

lyan

d co

st-e

ffect

ivel

y if

miti

gatio

n is

suf

ficie

nt

and

effe

ctiv

e

Env.

Mon

itori

ng s

houl

d be

a n

orm

al p

art o

f pr

ojec

t M&

E.

PUR

POSE

:

5/23

/201

63

MO

NIT

OR

ING

EN

VIR

ON

MEN

TAL

CO

ND

ITIO

NS

Syst

emat

ic o

bser

vatio

n of

key

en

viro

nmen

tal c

ondi

tions

.The

se a

reen

viro

nmen

tal c

ondi

tions

tha

t:•

corr

espo

nd t

o im

pact

s &

miti

gatio

n m

easu

res

•U

pon

whi

ch t

he p

roje

ct d

epen

ds

for

its s

ucce

ss

EXA

MPL

E: a

n ir

riga

tion

proj

ect

may

con

tam

inat

e gr

ound

wat

er.

Gro

und-

wat

er q

ualit

y is

m

onito

red.

EXA

MPL

E: A

wat

er s

uppl

y pr

ojec

t d

epen

ds o

n cl

ean

sour

ce

wat

er. S

ourc

e w

ater

qua

lity

is

mon

itore

d.

n m

s E p

5/23

/201

64

MO

NIT

OR

ING

EN

VIR

ON

MEN

TAL

CO

ND

ITIO

NS

1.SY

STEM

ATIC

OBS

ERVA

TIO

Nof

key

env

ironm

enta

l co

nditi

ons

mea

ns t

hat

envi

ronm

enta

l ind

icat

ors

are

chos

en a

nd a

sses

sed

syst

emat

ical

ly.

Sign

als

of

or p

roxi

es fo

r

Envi

ronm

enta

l hea

lth

Ecos

yste

m fu

nctio

n

IND

ICAT

OR

S A

RE

For

exam

ple.

. .

Page 55: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

65

EXA

MPL

E IN

DIC

ATO

R: C

OLI

FOR

M C

ON

TAM

INAT

ION

Wel

l use

d by

W

ell u

sed

by

hum

ans

& a

nim

als

Hum

anan-n-U

se O

nly

Hot

elelTa

ppW

ater

!

!Pu

rple

Col

or =

Fec

al C

olifo

rms

Pink

Col

or =

Non

-Fec

al C

olifo

rms

WAT

ER Q

UA

LIT

Y T

EST

S W

ITH

SIM

PLE,

INEX

PEN

SIV

E T

EST

KIT

. . .

5/23

/201

66

EXA

MPL

ES O

F IN

DIC

ATO

RS

Wat

erQ

uant

ity, q

ualit

y, re

liabi

lity,

acce

ssib

ility

ENV

IRO

NM

ENTA

L C

OM

PON

ENT

S T

HAT

MAY

BE

AD

VER

SELY

A

FFEC

TED

BY

SM

ALL

-SC

ALE

AC

TIV

ITIE

S

Soils

Eros

ion,

cro

p pr

oduc

tivity

, fa

llow

per

iods

, sal

inity

, nut

rien

t co

ncen

trat

ions

Flor

aC

ompo

sitio

n an

d de

nsity

of

natu

ral v

eget

atio

n, p

rodu

ctiv

ity,

key

spec

ies

Faun

aPo

pula

tions

, hab

itat

Spec

ial

Key

spec

ies

ecos

yste

ms

Env

Hea

lthD

isea

se v

ecto

rs, p

atho

gens

IND

ICAT

OR

S

5/23

/201

67

ENV

IRO

NM

ENTA

L IN

DIC

ATO

RS:

SOM

ETIM

ES C

OM

PLIC

ATED

, OFT

EN S

IMPL

E

•En

viro

nmen

tal I

ndic

ator

s M

AYre

quire

labo

rato

ry a

naly

sis

or

spec

ializ

ed e

quip

men

t &

tec

hniq

ues

–Te

stin

g w

ater

for

pest

icid

e re

sidu

es

–A

utom

atic

cam

eras

on

gam

e pa

ths

for

wild

life

cens

us

–Et

c.

•Bu

t in

dica

tors

are

ofte

n V

ERY

SIM

PLE.

. .

•. .

.esp

ecia

lly fo

r sm

all-s

cale

act

iviti

es

–Si

mpl

e in

dica

tors

can

be

mor

e us

eful

and

app

ropr

iate

than

mor

e co

mpl

icat

ed o

nes!

FOR

EX

AM

PLE.

. .

5/23

/201

68

EXA

MPL

ES O

F SI

MPL

E EN

VIR

ON

MEN

TAL

IND

ICAT

OR

STo

psoi

l los

s fr

om

slop

es u

pstr

eam

in

the

wat

ersh

ed (l

eft)

is

asse

ssed

with

a v

isua

l tu

rbid

ity m

onito

r (r

ight

).

ERO

SIO

N M

EASU

REM

ENT

WH

AT A

RE

TH

E LI

MIT

ATIO

NS

OF

TH

IS IN

DIC

ATO

R?

SUR

FAC

E SE

WA

GE

CO

NTA

MIN

ATIO

NV

isua

l ins

pect

ion

behi

nd t

he la

trin

e (le

ft) r

evea

ls a

leak

ing

sept

ic t

ank

(rig

ht).

Page 56: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

69

EXA

MPL

ES O

F SI

MPL

E EN

VIR

ON

MEN

TAL

IND

ICAT

OR

S

GRO

UN

DW

ATER

LE

VEL

SA

re m

easu

red

at s

hallo

w

wel

ls w

ith a

rop

e an

d bu

cket

.

SOIL

DEP

LET

ION

Vis

ual i

nspe

ctio

ns

show

fert

ility

gra

dien

ts

with

in t

erra

ces.

(Dar

k gr

een

cove

r in

dica

tes

heal

thy

soil;

yello

w c

over

in

dica

tes

depl

etio

n)

Cho

ose

the

sim

ples

t in

dica

tor

that

mee

ts

your

nee

ds!

5/23

/201

610

ASS

ESSI

NG

EN

VIR

ON

MEN

TAL

IND

ICAT

OR

S SY

STEM

ATIC

ALL

Y

Mon

itori

ng o

ften

requ

ires

SYST

EMAT

ICm

easu

rem

ent

of

indi

cato

rs t

o di

stin

guis

h th

e im

pact

s of

the

act

ivity

from

oth

er

fact

ors

FOR

EX

AM

PLE

Thi

s re

quire

s de

cisi

ons

abou

t:

1.Lo

catio

n of

mea

sure

men

t

2.T

imin

g &

freq

uenc

y of

mea

sure

men

tan

d of

ten…

3.O

ther

fact

ors

5/23

/201

611

1.LO

CAT

ION

-W

ater

sam

ples

sho

uld

be t

aken

at

the

inta

ke, a

nd

dow

nstr

eam

of s

eepa

ge p

its.

2.T

IMIN

G &

FR

EQU

ENC

Y -

Sam

ples

at

diffe

rent

loca

tions

sho

uld

be t

aken

at

the

sam

e tim

e. S

ampl

es s

houl

d be

tak

en a

t hi

gh &

low

flow

dur

ing

the

proc

essi

ng s

easo

n

3.W

HAT

ELS

E?

Dow

nstr

eam

Proc

essi

ng fa

cilit

yW

ater

inta

keSe

epag

e pi

t

ASS

ESSI

NG

EN

VIR

ON

MEN

TA

L IN

DIC

AT

OR

S SY

STEM

AT

ICA

LLY

EXA

MPL

E: W

ATER

QU

ALI

TY

IMPA

CT

S O

F A

GR

IC. P

ROC

ESSI

NG

5/23

/201

612

MEA

SUR

ING

WAT

ER Q

UA

LIT

Y IM

PAC

TS

FRO

M A

PO

INT

SO

UR

CE

OF

POLL

UT

ION

(TH

E PR

EVIO

US

EXA

MPL

E) IS

FA

IRLY

ST

RA

IGH

TFO

RWA

RD

All

are

inte

nded

to

help

di

stin

guis

h im

pact

s fr

om

NO

RM

AL

VAR

IABI

LIT

Y

and

othe

r fa

ctor

s

OFT

EN M

ON

ITO

RIN

G C

AN

BE

MO

RE

CO

MPL

ICAT

ED.

Som

e co

mm

on m

onito

ring

str

ateg

ies:

•M

onito

r th

e ac

tual

pro

ject

, plu

s a

sim

ilar

non-

proj

ect

area

(a “

cont

rol”

)

•M

onito

r at

mul

tiple

sta

tions

/sam

plin

g lo

catio

ns

•D

o re

sear

ch t

o ob

tain

goo

d ba

selin

e da

ta

ASS

ESSI

NG

EN

VIR

ON

MEN

TA

L IN

DIC

AT

OR

S SY

STEM

AT

ICA

LLY

Page 57: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

613

MO

NIT

OR

ING

: PA

RT 2

SYST

EMAT

IC V

ERIF

ICAT

ION

OF

MIT

IGAT

ION

MEA

SUR

E IM

PLEM

ENTA

TIO

N

Veri

fyin

gw

heth

er o

r no

t th

e m

itiga

tion

mea

sure

s sp

ecifi

ed b

y th

e EM

MP

have

bee

n im

plem

ente

d.

Thi

s in

clud

es q

uant

ifyin

g m

itiga

tion:

•H

ow m

ay s

taff

trai

ned?

•H

ow m

any

tree

s pl

ante

d?

Thi

s w

ill o

ften

not

show

w

heth

er t

he m

easu

res

are

effe

ctiv

e. T

his

is t

he r

ole

of

envi

ronm

enta

l ind

icat

ors.

FOR

EX

AM

PLE

The

re a

re t

wo

basi

c w

ays

to g

et t

he in

form

atio

n re

quire

d:

PAPE

R R

EPO

RTS

& F

IELD

INSP

ECT

ION

A

5/23

/201

614

WAY

S TO

QU

AN

TIF

Y IM

PLEM

ENTA

TIO

N O

F M

ITIG

ATIO

N

Fiel

d in

spec

tion

show

s w

aste

is s

egre

gate

d at

poi

nt A

, but

no

t in

cine

rate

d at

poi

nt B

.

MIT

IGAT

ION

MEA

SUR

E IS

:“C

linic

sta

ff sh

all b

e tr

aine

d to

and

sha

ll at

all

times

seg

rega

te a

nd p

rope

rly

inci

nera

te

infe

ctio

us w

aste

.”

B

DES

K A

SSES

SMEN

T:C

linic

s ar

e as

ked

to r

epor

t:

•Pe

rcen

tage

of s

taff

trai

ned?

•Sp

ot in

spec

tions

of w

aste

dis

posa

l loc

atio

ns c

arri

ed o

ut?

•T

he r

esul

t of

the

se in

spec

tions

?

Miti

gatio

n im

plem

enta

tion

indi

cato

rst?

5/23

/201

615

GO

OD

EN

VIR

ON

MEN

TAL

MO

NIT

OR

ING

TEL

LS Y

OU

C

LEA

RLY

AN

D C

OST

-EFF

ECT

IVEL

YIF

MIT

IGAT

ION

IS

SUFF

ICIE

NT

AN

D E

FFEC

TIV

E

•D

o no

mor

e th

an n

eede

d.

•Pr

iori

tize

the

mos

t se

riou

s im

pact

s &

issu

es.

•U

sual

ly r

equi

res

a co

mbi

natio

nof

: –

Envi

ronm

enta

l con

ditio

ns

indi

cato

rs–

Miti

gatio

n im

plem

enta

tion

indi

cato

rs

Exam

ple:

ENC

AP

visu

al fi

eld

guid

es

5/23

/201

616

MA

KIN

G M

ITIG

ATIO

N &

MO

NIT

OR

ING

EFF

ECT

IVE

FOR

MIT

IGAT

ION

AN

D M

ON

ITO

RIN

G T

O B

E EF

FEC

TIV

E,

IT M

UST

BE:

REA

LIST

IC.

M&

M m

ust b

e ac

hiev

able

with

in

time,

res

ourc

es &

ca

pabi

litie

s.

FUN

DED

.Fu

ndin

g fo

r M

&M

m

ust

be a

dequ

ate

over

the

life

of t

he

activ

ity

TAR

GET

ED.

Miti

gatio

n m

easu

res

& in

dica

tors

mus

t co

rres

pond

to

impa

cts.

CO

NSI

DER

ED E

AR

LY.

If M

&M

bud

gets

are

not

pr

ogra

mm

ed a

t th

e de

sign

sta

ge,

they

are

alm

ost

alw

ays

inad

equa

te!

CO

NSI

DER

ED E

AR

LY.

Pre

vent

ive

mit

igat

ion

is

usua

lly c

heap

est

and

mos

t ef

fect

ive.

Pre

vent

ion

mus

t be

built

in

at

the

desi

gn s

tage

.

Page 58: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

617

MIT

IGAT

ION

& M

ON

ITO

RIN

G IN

TH

E PR

OJE

CT

LIF

ECY

CLE

M

ITIG

ATIO

N A

ND

MO

NIT

OR

ING

IS A

PA

RT O

F EA

CH

STA

GE

OF

AN

Y

AC

TIV

ITY.

1.D

ecis

ions

mad

e re

gard

ing

site

an

d te

chni

que

to m

inim

ize

impa

cts

2.O

pera

ting

prac

tices

des

igne

d

1.O

pera

ting

prac

tices

impl

emen

ted

2.M

onito

ring

of:

Ope

ratin

g pr

actic

es

Envi

ronm

enta

l con

ditio

ns

1.Im

plem

enta

tion

of d

esig

n de

cisi

ons.

Mon

itori

ng o

f con

stru

ctio

n.

2.W

here

req

uire

d, c

apac

ity-

build

ing

for

prop

er o

pera

tion

Des

ign

Con

stru

ct/

Impl

emen

tO

pera

te(m

ay in

clud

e ha

ndov

er)

Dec

omm

issi

on(in

som

e ca

ses)

Sukhminder

5/23

/201

618

Wilk

ister

Mag

angi

USA

ID/K

enya

Mis

sion

Env

iron

men

tal O

ffice

r (M

EO)

wm

agan

gi@

usai

d.G

ov

Dav

id K

inyu

a,U

SAID

/Eas

t Afr

ica

Reg

iona

l Env

iron

men

tal A

dvis

or (

REA

)D

kiny

ua@

usai

d.G

ov

Glo

bal E

nvir

onm

enta

l Man

agem

ent

Supp

ort (

GEM

S) P

roje

ctG

EMSC

OR

ETea

m@

cadm

usgr

oup.

com

Page 59: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 60: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 7.

The Environmental Mitigation and Monitoring Plan (EMMP)

Technical presentation and dialogue Summary Environmental Mitigation and Monitoring Plans (EMMPs) provide a framework for specifying and organizing mitigation and monitoring, and assuring that it responds systematically to IEE/EA conditions. In its most basic form, the EMMP is a simple table that sets out:

• ALL the mitigation measures being implemented in response to IEE/EA conditions;

• The monitoring that will determine whether the mitigation is sufficient and effective; and

• Who is responsible for both mitigation and monitoring.

EMMPs may also include budgeting information for mitigation and monitoring and a monitoring log section where monitoring results can be recorded. We illustrate the EMMP concept at the end of the session with an extended example.

Note that EMMPs are also known as EMPs (Environmental Management Plans), EMPRs (Environmental Mitigation Plan and Report), and similar acronyms.

EMMP is the most widely used term. EMMP formats likewise vary. IEEs or awards sometimes specify an EMMP format, but more often the IP has flexibility in designing/adopting/adapting a format that meets the needs of the particular project. The formats discussed in this training are the most common and are acceptable in most contexts.

USAID Environmental Procedures require that environmental mitigation required by IEEs and EAs is implemented and monitored, but do not require EMMPs per se. However, most new IEEs do require that EMMPs be developed and implemented. This requirement can be operationalized either as technical direction from the COR/AOR, or as a provision of new contracts and agreements.

Title II Cooperating Sponsors are required to develop EMMPs by the Agency’s MYAP guidance.

EMMPs are being required because a key lesson learned from 40 years of EIA experience worldwide is that it is almost impossible to systematically carry out the mitigation measures that result from the EIA process unless an EMMP exists, and is incorporated into a project’s workplan and budget.

Environmental Compliance Language (ECL)

For new awards and significant modifications to existing awards, USAID Missions and Bureaus are increasingly requiring EMMPs in the language of award instruments. This is part of a broader trend within USAID to use “best practice” environmental compliance language in solicitations and awards.

Page 61: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

This language goes beyond the minimum requirement established by the ADS that mitigation measures be incorporated into “implementation instruments.” It requires that:

1. a complete EMMP be developed;

2. workplans and budgets integrate the EMMP; and

3. project reporting tracks EMMP implementation.

The source of this “best practice language” is the Environmental Compliance: Language for Use in Solicitations and Awards (ECL) tool. This tool is a non-mandatory part of the ADS, and combines step-by-step guidance and “boilerplate” language. The BEOs and REAs strongly encourage its use.

EMMP Submission and Approval

EMMPs should be approved by the COR/AOR; sometimes there is additional review by the MEO or REA. COR/AORs should require that EMMPs are submitted together with the project’s workplan or PMP.

Title II Partners sometimes submit them as part of the IEE, itself a part of the MYAP package.

Objectives • Brief the EMMP concept.

• Establish that EMMPs are critical to effective and systematic implementation of IEE/EA conditions.

• Explain the mechanisms by which USAID is requiring IPs to develop and implement EMMPs.

Key resources • Simple EMMP template

• EMMP Factsheet

• Environmental Compliance: Language for Use in Solicitation and Awards (ADS 204 Help Document)

Page 62: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61

Envi

ronm

enta

l Miti

gatio

n &

Mon

itori

ng P

lans

(E

MM

Ps) G

EMS

Envi

ronm

enta

l Com

plia

nce-

ESD

M T

rain

ing

Seri

es

Keny

a Ju

ne, 2

016

5/23

/201

62

SESS

ION

OBJ

ECT

IVES

•U

nder

stan

d th

e U

SAID

req

uire

men

t for

ong

oing

miti

gatio

n an

d m

onito

ring

of e

nviro

nmen

tal i

mpa

cts

•Le

arn

how

to

“ope

ratio

naliz

e” IE

E an

d EA

con

ditio

ns a

s pa

rt o

f pro

ject

im

plem

enta

tion

•D

iscu

ss a

dapt

ing

IEE/

EA c

ondi

tions

in r

espo

nse

to s

peci

fic fi

eld

activ

ities

and

env

ironm

ents

•R

evie

w fo

rmat

and

pre

para

tion

of t

he E

nviro

nmen

tal M

itiga

tion

and

Mon

itori

ng P

lan

(EM

MP)

via

cas

e st

udy

5/23

/201

63

CO

NG

RAT

ULA

TIO

NS…

WE

AR

E A

LL E

XPE

RTS

IN E

IA A

ND

USA

ID E

NV

IRO

NM

ENTA

L PR

OC

EDU

RES

!

•N

ow, w

e m

ust

appl

y ou

r kn

owle

dge

of im

pact

ass

essm

ent

and

miti

gatio

n in

a r

eal p

roje

ct s

ettin

g

–IE

Es (a

nd E

As) a

re u

sele

ss u

nles

s th

e co

nditi

ons—

envir

onm

enta

l man

agem

ent c

riter

ia—

they

est

ablis

h ar

e im

plem

ente

d!–

USA

ID E

nviro

nmen

tal P

roce

dure

s th

eref

ore

requ

ire

impl

emen

tatio

n

35/

23/2

016

4

USA

ID R

EQU

IREM

ENT

S A

RE

SPEC

IFIC

Wha

t do

es t

he A

DS

say?

Team

Lea

ders

and

Act

ivity

M

anag

ers

or C

OR

/AO

Rs

mus

t ac

tivel

y m

anag

e an

d m

onito

r co

mpl

ianc

e w

ith a

ny IE

E/EA

co

nditi

ons,

mod

ifyin

g or

end

ing

activ

ities

not

in c

ompl

ianc

e.

(AD

S 20

2.3.

6 , 2

04.3

.4 a

nd

303.

2.f

LOP

Envi

ronm

enta

l Com

plia

nce:

•En

viro

nmen

tal c

onsi

dera

tions

m

ust b

e ta

ken

into

acc

ount

in

activ

ity p

lann

ing.

•N

o ac

tiviti

es m

ay b

e im

plem

ente

d w

ithou

t app

rove

d R

eg. 2

16 e

nvir

onm

enta

l do

cum

enta

tion.

•A

ny r

esul

ting

miti

gatio

n an

d m

onito

ring

con

ditio

ns a

re:

1.w

ritt

en in

to c

ontr

act

inst

rum

ents

.

2.im

plem

ente

d, a

nd t

his

impl

emen

tatio

n is

mon

itore

d

USA

ID IS

RE

QU

IRE

D

TO

IMP

LEM

EN

T A

ND

M

ON

ITO

R IE

E/E

A

CO

ND

ITIO

NS.

Page 63: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

65

IMPL

EMEN

TAT

ION

OF

IEE/

EA C

ON

DIT

ION

S

Prac

tical

ly, im

plem

enta

tion

& m

onito

ring

of m

it. &

mon

. con

ditio

ns re

quire

s th

at:

1.U

SAID

com

mun

icat

es a

pplic

able

IE

E/EA

con

ditio

ns t

o th

e IP

*

2.A

Com

plet

e En

viro

nmen

tal

Miti

gatio

n an

d M

onito

ring

Pla

n (E

MM

P) e

xist

s

3.Pr

ojec

t w

orkp

lans

and

bud

gets

in

tegr

ate

the

EMM

P

4.Pr

ojec

t re

port

ing

trac

ks

impl

emen

tatio

n of

the

EM

MP

*Exc

ept T

itle

II pa

rtne

rs, w

ho w

rite

thei

r ow

n IE

Es.

EMM

PS a

re

criti

cal.

Wha

t ar

e th

ey?

5/23

/201

66

ALL

the

miti

gatio

n m

easu

res

requ

ired

by t

he

IEE

or E

A

Indi

cato

rs o

r cr

iteri

a fo

r m

onito

ring

the

ir

impl

emen

tatio

n &

effe

ctiv

enes

s

who

is

resp

onsi

ble

for

miti

gatio

n an

d m

onito

ring

AN

EM

MP

SET

S O

UT:

Activ

ityAd

vers

e Im

pact

sM

itiga

tion

Mea

sure

Mon

itorin

g In

dica

tors

/C

riter

ia

Mon

itorin

g & R

epor

ting

Sche

dule

Res

pons

ible

Pa

rty(

ies)

Car

ry o

ver

from

the

IEE

only

th

ose

activ

ities

with

con

ditio

ns

(e.g

., “ne

gativ

e de

term

inat

ion

with

co

nditi

ons”

)

To d

eter

min

e if

miti

gatio

n is

in p

lace

and

effe

ctiv

e

(e.g

., vi

sual

insp

ectio

n fo

r le

akag

e ar

ound

pit

latr

ine;

se

dim

enta

tion

at s

trea

m

cros

sing

, etc

.)

If w

ell s

peci

fied,

exc

erpt

di

rect

ly fr

om t

he IE

E;If

not

wel

l spe

cifie

d in

IEE,

de

fine

in b

ette

r de

tail

(e.g

., m

onito

r w

eekl

y, re

port

in q

uart

erly

re

port

s an

d m

ore

freq

uent

ly u

nder

sp

ecifi

ed c

ondi

tions

)

For

miti

gatio

n, a

nd f

or

mon

itori

ng a

nd

repo

rtin

g. (m

ay d

iffer

)

TH

E EM

MP:

A S

IMPL

E TO

OL

Basi

c EM

MP

tem

plat

e (s

ee E

MM

P

tem

plat

e pr

ovid

ed in

tra

inin

g m

ater

ials

)

5/23

/201

67

TH

E EM

MP:

A F

LEX

IBLE

TO

OL

Mor

e so

phist

icate

d EM

MP

form

ats

can

inclu

de:

1.Bu

dget

ing

info

rmat

ion

–H

ow m

uch

will

a m

itiga

tion

or

mon

itori

ng m

easu

re c

ost?

–W

hat i

s th

e LO

E in

volv

ed?

2.A

Mon

itori

ng L

og s

ectio

n

–W

here

miti

gatio

n im

plem

enta

tion

info

rmat

ion

or m

onito

ring

res

ults

are

re

cord

ed

3.O

ther

Sug

gest

ions

?

We

will

rev

iew

an

EMM

P fo

rmat

with

th

ese

feat

ures

5/23

/201

68

An

effe

ctiv

e EM

MP

is s

peci

fic

+ re

alis

tic

•T

he E

MM

P m

ust

spec

ify p

ract

ical

m

itiga

tion

mea

sure

s

•T

he E

MM

P of

ten

“tra

nsla

tes”

IEE

cond

ition

s th

at a

re w

ritt

en in

ver

y ge

nera

l ter

ms

•Im

plem

entin

g th

ese

cond

ition

s re

quire

s fir

st tr

ansl

atin

g th

em in

to

spec

ific

miti

gatio

n ac

tions

HO

W D

O W

E D

O T

HIS

?Fo

r ex

ampl

e, W

ASH

-rel

ated

IEE

cond

ition

s m

ight

sta

te:

“wel

ls s

hall

be s

ited

to m

inim

ize

the

poss

ibili

ty o

f con

tam

inat

ion.

Or e

ven

mor

e ge

nera

lly:

“wel

ls s

hall

be s

ited

cons

iste

nt w

ith

good

pra

ctic

es.”

Page 64: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

69

EMM

PS B

UIL

D O

N S

TA

ND

AR

DS

& B

EST

PR

AC

TIC

E

For o

ur w

ell s

iting

exa

mpl

e :Id

entif

y an

d ad

opt s

iting

cri

teri

a fr

om

rele

vant

res

ourc

es

•T

he s

peci

fic m

itiga

tion

actio

n/ m

easu

re in

th

e EM

MP

is:

–“C

ompl

ianc

e w

ith p

roje

ct w

ell-s

iting

cr

iteri

a”—

atta

ch t

his

crite

ria

to t

he

EMM

P an

d m

ake

a ch

eckl

ist f

or u

se

by

fiel

d te

ams

and

Mon

itori

ng &

Ev

alua

tion

(M&

E) s

taff

SPH

ERE

STA

ND

AR

DS

USA

ID S

ECTO

REN

VIRO

NM

ENTA

LG

UID

ELIN

ES

ETC

.

HO

ST-C

OU

NT

RY S

TAN

DA

RD

S

Det

erm

inin

g sp

ecifi

c m

itiga

tion

actio

ns

star

ts w

ith r

evie

w o

f app

ropr

iate

st

anda

rds

or b

est

prac

tice

guid

ance

5/23

/201

610

BEST

PR

AC

TIC

E G

UID

AN

CE:

WEL

L SI

TIN

G

CR

ITER

IAM

INIM

UM

dist

ance

s fr

om p

oten

tial s

ourc

es o

f co

ntam

inat

ion

for

wel

l siti

ng:

•45

m fr

om a

pre

para

tion

or s

tora

ge a

rea

for

agro

chem

ical

s, fu

els,

or

indu

stri

al c

hem

ical

s

•25

m fr

om c

essp

ools

, lea

chin

g pi

ts, a

nd d

ry

wel

ls

•15

m fr

om a

bur

ied

sew

er, s

eptic

tan

k,

subs

urfa

ce d

ispo

sal f

ield

, gra

ve a

nim

al o

r po

ultr

y ya

rd o

r bu

ildin

g, la

trin

e pi

t, or

oth

er

cont

amin

ants

tha

t m

ay d

rain

into

the

soi

l

•M

ore

than

45m

from

a s

eptic

tan

k le

ach

field

LET

’S D

ISC

USS

A

NO

TH

ER E

XA

MPL

E:

5/23

/201

611

HEA

LTH

SER

VIC

ES C

APA

CIT

Y &

PO

LIC

Y

IEE

stip

ulat

es t

hat:

“Cap

acity

bui

ldin

g an

d po

licy

deve

lopm

ent

supp

ort

to p

ublic

hea

lth d

eliv

ery

and

man

agem

ent

syst

ems

mus

t in

volv

e al

l fea

sibl

e ef

fort

s to

ass

ure

that

the

se s

yste

ms:

•ad

dres

s an

d su

ppor

t pro

per

was

te

man

agem

ent (

incl

udin

g ha

ndlin

g, la

belin

g, tr

eatm

ent,

stor

age,

tra

nspo

rt a

nd d

ispo

sal

of m

edic

al w

aste

);•

addr

ess

and

supp

ort t

he c

apac

ity o

f m

edic

al fa

cilit

ies

for

was

te m

anag

emen

t; •

prio

ritiz

e en

viro

nmen

tal h

ealth

co

nsid

erat

ions

.”

To “

tran

slat

e” th

ese

IEE

cond

ition

s, th

e EM

MP

will

nee

d to

:

•id

entif

y an

app

ropr

iate

w

aste

man

agem

ent

stan

dard

; and

•sp

ecify

wha

t is

rea

listic

, gi

ven

that

the

pro

ject

w

ill n

ot h

ave

dire

ct

cont

rol o

ver

thes

e sy

stem

s

5/23

/201

612

HO

W A

RE

EMM

PS B

EIN

G R

EQU

IRED

?

12

A k

ey “

less

on le

arne

d” fr

om 4

0 ye

ars

of w

orld

-wid

e EI

A e

xper

ienc

e …

impl

emen

tatio

n of

env

ironm

enta

l con

ditio

ns r

equi

res

EMM

Ps t

hat a

re

inco

rpor

ated

in w

orkp

lans

and

budg

ets

Thre

e m

echa

nism

s:

•T

echn

ical

dir

ectio

n fr

om C

OR

or

AO

R

•R

equi

red

by c

ontr

act/

agre

emen

t

•R

equi

red

by M

YA

P gu

idan

ce

(Titl

e II

only

)

MO

RE

ABO

UT

TH

IS…

Page 65: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

613

USA

ID R

EQU

IREM

ENT

S A

RE

SPEC

IFIC

PA

RT II

WH

AT D

OES

TH

E A

DS

SAY

?

AD

S re

quire

s“i

ncor

pora

ting.

. . m

itiga

tive

mea

sure

s id

entif

ied

in IE

Es

[and

] EA

s in

to im

plem

enta

tion

inst

rum

ents

for

prog

ram

s, pr

ojec

ts, a

ctiv

ities

or

amen

dmen

ts.”

(204

.3.4

.a.6

;also

303

.3.6

.3e)

LOP

Envi

ronm

enta

l Com

plia

nce:

•En

viro

nmen

tal c

onsi

dera

tions

mus

t be

take

n in

to a

ccou

nt in

act

ivity

pla

nnin

g.

•N

o ac

tiviti

es m

ay b

e im

plem

ente

d w

ithou

t app

rove

d R

eg. 2

16

envi

ronm

enta

l doc

umen

tatio

n.

•A

ny r

esul

ting

miti

gatio

n an

d m

onito

ring

con

ditio

ns a

re:

1.w

ritt

en in

to c

ontr

act

inst

rum

ents

.

2.im

plem

ente

d, a

nd t

his

impl

emen

tatio

n is

mon

itore

d

USA

ID IS

REQ

UIR

ED T

O

WR

ITE

IEE/

EA

CO

ND

ITIO

NS

INTO

AW

AR

DS.

5/23

/201

614

CU

RR

ENT

BES

T P

RA

CT

ICE

EXC

EED

S R

EQU

IREM

ENT

USA

ID is

incr

easi

ngly

usi

ng

best

-pra

ctic

e en

viro

nmen

tal

com

plia

nce

lang

uage

that

goe

s be

yond

the

AD

S m

inim

um

New

aw

ards

and

sig

nific

ant

mod

ifica

tions

are

req

uiri

ng

that

:

•Th

e pa

rtne

r ver

ifies

cur

rent

and

pl

anne

d ac

tiviti

es a

nnua

lly a

gain

st

the

scop

e of

the

RCE/

IEE/

EA

•Th

e ne

cess

ary

mec

hani

sms

and

budg

et fo

r par

tner

impl

emen

tatio

n of

IEE/

EA c

ondi

tions

are

in p

lace

To a

ssur

e th

at p

roje

cts

do n

ot “c

reep

” out

of

com

plia

nce

as a

ctivi

ties

are

mod

ified

and

add

ed

to o

ver t

heir

life

SPEC

IFIC

ALL

Y:

•Co

mpl

ete

EMM

P e

xist

s/is

deve

lope

d

•W

orkp

lans

and

budg

ets

inte

grat

e th

e EM

MP

•Pr

ojec

t rep

ortin

g tra

cks

EMM

P im

plem

enta

tion

And

new

sol

icit

atio

ns r

equi

re t

hat

Prop

osal

s ad

dres

s qu

alifi

catio

ns a

nd

prop

osed

app

roac

hes

to

com

plia

nce/

ESD

M fo

r en

viro

nmen

tally

com

plex

act

iviti

es.

5/23

/201

615

SOU

RC

E O

F BE

ST-P

RA

CT

ICE

LAN

GU

AG

E

•A

n A

DS

“Add

ition

al H

elp”

do

cum

ent

•Ea

sy s

tep-

by-s

tep

guid

ance

and

“b

oile

rpla

te”

lang

uage

•Fo

r R

FAs/

RFP

s/ a

gree

men

ts/

gran

ts/ c

ontr

acts

•O

ptio

nal…

bu

t its

use

is s

tron

gly

enco

urag

ed

15

Ava

ilabl

e fr

om:

ww

w.u

said

.gov

/pol

icy/

ads/

200/

204s

ac.p

df

Envir

onm

enta

l Com

plia

nce:

L a

ngua

ge fo

r Use

in S

olici

tatio

ns a

nd

Awar

ds (E

CL)

5/23

/201

616

ECL

PRO

MO

TES

CO

MPL

IAN

CE

+ ES

DM

, AN

D …

USA

ID M

ISSI

ON

STA

FFIM

PLEM

ENT

ING

PA

RTN

ERS

Prov

ides

cla

rity

reg

ardi

ng e

nviro

nmen

tal

com

plia

nce

resp

onsi

bilit

ies

Prev

ents

“unf

unde

d m

anda

tes”

—re

quire

men

ts t

o im

plem

ent

miti

gatio

n an

d m

onito

ring

afte

r ac

tivity

has

co

mm

ence

d an

d w

ithou

t ad

ditio

nal

budg

et.

Ass

ures

tha

t en

viro

nmen

tal m

onito

ring

an

d re

port

ing

is in

tegr

ated

into

rout

ine

activ

ity m

onito

ring

and

repo

rtin

g; re

duce

s th

e co

st a

nd e

ffort

of U

SAID

ve

rific

atio

n/ov

ersi

ght.

Avo

ids

the

effo

rt, c

osts

and

loss

of g

ood

will

tha

t co

me

from

impo

sing

“c

orre

ctiv

e co

mpl

ianc

e” m

easu

res

afte

r im

plem

enta

tion

has

star

ted.

Mis

sion

s an

d ce

ntra

lly fu

nded

pro

gram

s ar

e in

crea

sing

ly u

sing

the

EC

L. P

artn

ers

shou

ld e

xpec

t th

at fu

ture

sol

icita

tions

and

aw

ards

will

inco

rpor

ate

ECL-

base

d en

viro

nmen

tal c

ompl

ianc

e la

ngua

ge.

BEN

EFIT

S BO

TH

MIS

SIO

N S

TAFF

& P

ART

NER

S:

Page 66: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

6FO

OT

ER G

OES

HER

E17

HO

W A

RE

EMM

PS A

PPRO

VED

?

•EM

MP

mus

t be

app

rove

d by

the

pro

ject

CO

R o

r AO

R

•EM

MP

is u

sual

ly s

ubm

itted

and

app

rove

d w

ith t

he p

roje

ct

wor

kpla

n or

PM

P

•EM

MP

may

als

o be

sub

mitt

ed w

ith t

he p

roje

ct IE

E (t

ypic

al fo

r Titl

e II

part

ner

MYA

P IE

Es)

•So

met

imes

add

ition

al r

evie

w b

y th

e M

EO o

r R

EA

5/23

/201

618

Syst

em r

econ

stru

cted

in e

arly

19

80s

Abs

trac

ts w

ater

from

hig

h-le

vel

rive

r so

urce

and

irr

igat

es 1

40 H

a (2

par

cels

; val

ley

& h

illsi

de la

nds)

One

dam

is m

ade

of b

rush

, str

aw,

soil,

and

ston

e

Oth

er d

am is

mad

e of

sto

ne a

nd

soil

Wat

er s

ourc

e is

low

in s

alts

; ris

k of

so

il sa

liniz

atio

n is

min

imal

18

PRO

JEC

T B

RIE

FIN

G:

Div

ersi

on w

orks

at

the

head

of

the

syst

em

EMM

P EX

AM

PLE:

IR

RIG

ATIO

N R

EHA

BILI

TAT

ION

5/23

/201

619

Exis

ting

cana

ls u

sed

for

man

y pu

rpos

es: i

rrig

atio

n, b

athi

ng,

drin

king

wat

er, l

aund

ry. .

.

At

end

of t

he d

ry s

easo

n, n

ot

enou

gh w

ater

for

all p

lots

Dur

ing

heav

y ra

ins,

cana

ls fi

ll w

ith

sedi

men

t fr

om h

illsi

de e

rosi

on—

resu

lt: n

ot e

noug

h w

ater

for

all

plot

s

No

adja

cent

wet

land

nor

cri

tical

w

ildlif

e ha

bita

t

PRO

JEC

T B

RIE

FIN

G:

Doi

ng la

undr

y in

the

cana

l

EMM

P EX

AM

PLE:

IR

RIG

ATIO

N R

EHA

BILI

TAT

ION

5/23

/201

620

•C

anal

s ar

e ha

nd m

ade

and

car

ry

open

wat

er fr

om u

pstr

eam

•R

oads

are

in p

oor

cond

ition

—di

fficu

lt to

get

cro

ps o

ut

•Sy

stem

mai

nten

ance

com

mitt

ee is

no

t fu

nctio

nal

•A

lloca

tion:

land

reg

istr

atio

n to

re

ceiv

e ir

riga

tion

wat

er w

as d

one

in

earl

y 19

80s;

no n

ew p

lots

can

be

regi

ster

ed (b

ut t

heft

from

the

sys

tem

is

pos

sibl

e)

PRO

JEC

T B

RIE

FIN

G:

Surr

ound

ing

hills

ide

is c

ompl

etel

y de

fore

sted

TH

ERE

AR

E M

AN

Y B

ASE

LIN

E IS

SUES

TH

AT A

RE

NO

T IM

PAC

TS

OF

TH

E R

EHA

BILI

TAT

ION

, BU

T S

HO

ULD

BE

AD

DR

ESSE

D IN

TH

E EM

MP

EMM

P EX

AM

PLE:

IR

RIG

ATIO

N R

EHA

BILI

TAT

ION

Page 67: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

621

EXC

ERPT

OF

IMPA

CT

S/BA

SELI

NE

ISSU

ES A

ND

MIT

IGAT

ION

SEM

MP

EXA

MPL

E:

IRR

IGAT

ION

REH

ABI

LITA

TIO

NSU

B-A

CT

IVIT

Y

OR

C

OM

PON

ENT

DES

CR

IPTI

ON

OF

AD

VER

SE

IMPA

CT

/BA

SELI

NE

ISSU

EM

ITIG

ATIO

N M

EASU

RES

#

Dam

& p

rim

ary

cana

ls r

e-co

nstr

ucti

on

/rep

lace

men

t &

su

bseq

uent

op

erat

ion

Floo

ding

of i

rrig

ated

are

as/ d

amag

e to

sys

tem

dur

ing

high

-flow

ev

ents

Des

ign

so t

hat

exce

ss o

f wat

er w

on’t

dam

age

syst

ems

(exc

ess

flow

div

ersi

on, r

emov

able

dam

etc

….)

1

Soil

eros

ion

from

hill

sides

and

se

cond

ary/

tert

iary

can

als

Inst

all

& p

rope

rly

oper

ate

flow

reg

ulat

ion

stru

ctur

es fo

r se

cond

ary

cana

ls2

Prot

ect

uppe

r sl

ope

with

frui

t tr

ees

(man

goes

, citr

us,

avoc

ado)

and

nat

ive

fore

st t

rees

3

Wat

er lo

sses

(fr

om e

vapo

ratio

n an

d le

achi

ng b

ut a

lso

from

can

al b

lock

age

from

dir

t, de

bris

etc

….)

Line

pri

mar

y ca

nals

with

con

cret

e4

Trai

n w

ater

com

mitt

ee o

n he

avy

rain

afte

r-m

aint

enan

ce5

Hea

lth is

sue

(dri

nkin

g ir

riga

tion

wat

er b

ecau

se it

app

ears

cle

aner

)C

omm

unity

edu

catio

n on

wat

er q

ualit

y/us

e/m

anag

emen

tW

ater

com

mitt

ee t

o en

forc

e us

e re

stri

ctio

ns6

Wat

er c

onta

min

atio

n fr

om a

nim

als,

cons

truc

tion

Prov

ide

sepa

rate

wat

er p

oint

s fo

r co

nstr

uctio

n w

ashi

ng

stat

ions

and

ani

mal

wat

erin

g7

Soci

al im

pact

of i

nequ

ality

of w

ater

us

e in

crea

sing

# o

f peo

ple

usin

g th

e w

ater

-Exi

stin

g w

ater

com

mitt

ee r

einf

orce

men

t-L

and

Reg

istr

atio

n8

Road

re

habi

litat

ion:

br

idge

s &

dr

aina

ge w

orks

Incr

ease

d D

efor

esta

tion

(due

to

incr

ease

d ea

se o

f acc

ess)

Wor

k w

ith lo

cal o

ffici

als

to c

ontr

ol d

efor

esta

tion

9

Incr

ease

d se

dim

enta

tion

from

enh

ance

d ro

ad d

rain

age

Sedi

men

tatio

n co

ntro

l (sil

t sc

reen

and

hay

bai

ls-

loca

l wee

ds)

105/

23/2

016

FOO

TER

GO

ES H

ERE

225/

235/

25/

25/

235/

235/

25/

23335/

23335/

2333233333333/33

55/22//

/2///2/20122222010

/2012011111

/201

///202222/2011

/22/2020//2/20

///20

/2/22/2021

220666666666666666666666

FFOO

FFFFOO

FOFOOOOOO

OO

OO

OOOOOOOOOO

OOO

TTO

OT

OO

TTTTTTTTFOFO

OFFOOOOOOO

OO

OO

OOOOOOOO

OTTTTT

FOFOO

TFFFO

OT

FOOO

OOOOO

OOO

TTTTTTTTFOFO

OT

FFOFOOOOO

TFO

OT

FFOO

TFFO

OOO

OOFO

OFFO

OFFFO

OT

OOOO

TOOO

OO

OOOTTTT

FFFOOOOO

TO

TTFOFOFFFOOOO

OOOOTTTT

FFFFFOOOOO

OOOOOOOOO

TO

OTTTTTTT

OO

TFOFOFFOOOO

OT

OOOOOOOOOO

TTO

TO

OT

OTT

OT

OO

TFFFOOO

OOOOOOOT

OT

OO

TTTTFFFOO

OOOTTTTT

FFOFOOO

TTTTTTTTTEEEER

GERER

GRRRRRR

GGGGGGGEEEERRRRR

GGGGGEEERRRRRR

GR

GGGGGGR

GR

GGGR

GER

GERR

GGGGGGGGGGEER

GEEER

GR

GGER

GGGERERER

GEEER

GERRRR

GGEEEEEER

GRRR

GEEERERRR

GGGGEERRRRR

GGGGGOO

EOOOOOOOO

EEEEESESSSSSSSOOOOOOOOOO

ESEEEEEESSSSSOOOO

EO

EESESSESESSSO

EOO

EOOOOOOOOO

ESOO

EESEEESESESSSOOOO

EEEEO

EEOOOOOOOO

ESSOOOOOOOOOOO

EO

EEEESSSO

ESESOOOO

EEEO

ESO

EO

EO

EEO

ESO

ESOOOOOOOOO

EO

EO

ESOOO

EESO

EEEEESESSSOOOO

EEEEEEESSSH

EH

EH

EH

EHHHHHHHH

EH

EERRRRRRRRREEERE

HHHHHHHHEEEEERRRRRR

EHHHHHH

EERRRRE

HER

EH

ERE

HHHHHEERRRRR

EERE

HHHHHHHHHEERRRRR

HER

EHHHHHHHHHHH

EEEEEERRRRRH

EREE

HE

HHHHHHHHHHEERRRRER

EER

EER

EH

ERE

HHHHER

EH

ERE

ERE

EERRRRRHH

EEERRH

ERE

HHHHHHHHEEEEEERERR

EH

ERHHHH

ERH

EREEEE

HERR

HE

222222222222222222222222222222222

AN

D F

INA

LLY.

. .T

HE

EMM

P IT

SELF

(USE

S A

TITL

E II

FORM

AT T

HAT

INCL

UD

ES A

M

ON

ITO

RIN

G R

ESU

LTS

LOG

. )

Herve Jean-Charles

5/23

/201

623

MIT

IGA

TIO

NM

EASU

RE

RES

PON

SIBL

E PA

RT

Y

MO

NIT

OR

ING

SC

HEM

EES

T.

CO

STM

ON

ITO

RIN

G L

OG

IND

ICA

TO

RS

DA

TA

SO

UR

CE/

M

ETH

OD

HO

W

OFT

END

AT

ER

ESU

LTFO

LLO

W-

UP

2. In

stal

l &

pr

oper

ly

oper

ate

cana

l-le

vel f

low

re

gula

tion

stru

ctur

es

Proj

ect

agri

cultu

ral

tech

nici

an

# of

doo

rs a

nd o

ther

flow

-co

ntro

l str

uctu

res

inst

alle

d

% o

f Ha.

unde

r flo

w c

ontr

ol

% o

f se

cond

ary

& t

ertia

ry

cana

ls s

how

ing

signi

fican

t er

osio

n da

mag

e a

fter

each

gr

owin

g se

ason

Rep

orts

Fiel

d vi

sit

Qua

rter

ly

3. P

rote

ct

uppe

r sl

ope

with

frui

t (m

ango

es,

citr

us, a

voca

do)

and

fore

st t

rees

Proj

ect

agri

cultu

ral

tech

nici

an

# of

tre

es p

lant

ed a

nd

surv

ived

% o

f at

-ris

k up

per

slop

e la

nd p

rote

cted

tota

l m3

of s

edim

ent

rem

oved

from

can

als

over

ea

ch r

ainy

sea

son.

Rep

orts

Fiel

d vi

sit

Com

pari

son

with

bas

elin

e in

form

atio

n

Qua

rter

ly

/Ann

ual

4. L

ine

prim

ary

cana

ls w

ith

conc

rete

Engi

neer

ing

C

ontr

acto

r %

of p

rim

ary

cana

ls li

ned

with

co

ncre

te.

# of

add

ition

al h

ecta

res

irri

gate

d

Rep

orts

Fiel

d vi

sit

Com

pari

son

with

bas

elin

e in

form

atio

n

Qua

rter

ly

EXC

ERPT

OF

EMM

P A

ND

M

ON

ITO

RIN

G L

OG

EMM

P EX

AM

PLE:

IR

RIG

ATIO

N R

EHA

BILI

TAT

ION

Helen Ho/USAID

5/23

/201

624

Wilk

ister

Mag

angi

USA

ID/K

enya

Mis

sion

Env

iron

men

tal O

ffice

r (M

EO)

wm

agan

gi@

usai

d.G

ov

Dav

id K

inyu

a,U

SAID

/Eas

t Afr

ica

Reg

iona

l Env

iron

men

tal A

dvis

or (

REA

)D

kiny

ua@

usai

d.G

ov

Glo

bal E

nvir

onm

enta

l Man

agem

ent

Supp

ort (

GEM

S)

Proj

ect

GEM

SCO

RET

eam

@ca

dmus

grou

p.co

m

Page 68: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Review DRAFT: 22 July 2011

Download this factsheet at: www.encapafrica.org/meoentry.htm [see mitigation and monitoring topics]

To submit comments or for more information, email the ENCAP core team at: encapinfo@cadmusgroup com

ENCAP FACTSHEET

ENVIRONMENTAL MITIGATION & MONITORING PLANS (EMMPs) CONTENTS 1. Introduction 1 2. What is an EMMP? 1 3. Why EMMPs? 2 4. How are EMMPs Required? 2 5. EMMP Formats 2 6. Steps in EMMP Development 3 7. Pitfalls to Avoid  

ENCAP FACTSHEET: EMMPs 16 MAY 2011 PG 1/10 The factsheet was prepared by The Cadmus Group, Inc. for International Resources Group (IRG) under USAID Africa Bureau’s Environmental Compliance and Management Support (ENCAP) Program, Contract Number EPP-I-00-03-00013-00, Task Order No. 11. It is currently under review by the Africa Bureau Environmental Officer and USAID’s Africa-based Regional Environmental Advisors. It is not a statement of agency policy, and its contents do not necessarily reflect the views of USAID or the United States Government.

4

55

6

7

8. EMMPs & Compliance Reporting  5 29. EMMP Review and Approval  10. Implementing EMMPs  11. ENCAP Resources for

Mitigation and Monitoring Design  Acronyms  6 3ANNEX: EMMP Examples  

1. INTRODUCTION Environmental Mitigation and Monitoring Plans (EMMPs) are now required for most USAID-funded projects in Africa.

Specifically, EMMPS are required when the Reg. 216 documentation governing the project is either an IEE or an EA that imposes conditions on at least one project activity. (See box at right if these terms are unfamiliar.)

Responsibility for developing the EMMP usually lies with the implementing partner (IP), though it may be assigned to the C/AOTR. In either case, the responsible party can develop the EMMP directly, or engage a consultant. (The C/AOTR could also seek assistance from the Mission Environmental Officer (MEO).)

This factsheet describes the EMMP concept and its role in life-of-project environmental compliance for USAID-funded activities. It provides practical guidance and examples to inform EMMP development. It is intended for IPs, A/COTRs, MEOs, Monitoring and Evaluation

(M&E) Officers, and consultants who may be engaged to develop EMMPs for USAID projects in Africa.

2. WHAT IS AN EMMP? An EMMP is a document that sets out:

1. Mitigation actions. The EMMP specifies the actions that will be taken to satisfy the IEE or EA conditions.

. Monitoring actions. The EMMP sets out the indicators or criteria that will be used to monitor (1) whether the mitigation actions have been implemented, and (2) whether they are effective and sufficient.

. Responsibility and schedule for mitigation, monitoring, and reporting. The EMMP specifies the parties responsible for these actions and the schedule for these tasks.

USAID’s Environmental Procedures

USAID’s mandatory environmental procedures apply to all USAID-funded and USAID-managed activities. They consist of 22 CFR 216 (“Reg. 216”) and related mandatory provisions of USAID’s Automated Directives System (ADS)—especially, but not only, ADS 201.3.12.2.b and 204).

In summary, these procedures mandate (1) a pre-implementation environmental impact assessment (EIA) process, and (2) implementing and reporting on any environmental conditions (required mitigation measures) that result from this review.

The pre-implementation environmental review is documented in a Request for Categorical Exclusion (RCE), Initial Environmental Examination (IEE) or an Environmental Assessment (EA). Each of these Reg. 216 documents must be approved by both the Mission Director and Bureau Environmental Officer (BEO). Most IEEs and all EAs impose conditions on some or all of the activities they cover.

For more information see ENCAP’s USAID Environmental Procedures Briefing for Mission Staff.

Page 69: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

EMMPs may also include a log of monitoring results and budget estimates for mitigation and monitoring activities.

EMMPs may also be called Mitigation and Monitoring Plans and Environmental Management Plans.

3. WHY EMMPs? EMMPs provide a basis for systematic implementation of IEE and EA conditions: In addition to establishing responsibilities and schedules, EMMPs are a vehicle for translating IEE conditions (which are often very general) into specific, implementable, verifiable actions. For example:

An IEE for a water and sanitation project may require that wells and latrines be sited “consistent with good practices.”

The EMMP would specify the site-specific standards that the project must follow, e.g., wells must be located at least 50 meters from any pesticide or chemical store, and 25m from any cesspool, leaching pit, septic field, latrines, poultry yards, or livestock watering point..

EMMPS also provide a framework for environmental compliance reporting. (See section 5)

Without EMMPs, experience shows that IEE and EA conditions will not be implemented systematically, if at all. This defeats the purpose of the pre-implementation EIA process as documented by the IEE or EA, increasing the probability that well-intentioned activities will result in needless adverse impacts on beneficiaries, communities, environmental resources and ecosystems.

For USAID activities, failure to implement IEE or EA conditions puts the activity in non-compliance. The AOTR or COTR is REQUIRED to compel compliance or end the activity.

4. HOW ARE EMMPs REQUIRED? EMMPs are not specifically required by Reg. 216 or the ADS. However, they ARE required by (1) contract and award language, (2) the IEE and/or (3) A/COTR technical direction:

Increasingly, contracts and awards specifically require that an EMMP be developed and implemented. (This is part of a broader trend within USAID to use “best practice” environmental compliance language in solicitations and awards.)

Most recent and all new sector-level IEEs (e.g. an IEE covering a Mission’s health or economic growth portfolio) require that an EMMP will be developed for each individual project.

For new project-level IEEs, the BEO will typically require that an EMMP be submitted as part of the

IEE. If not, the IEE will require that the EMMP be submitted with the project workplan or performance management plan (PMP).

For projects conducted under older IEEs, A/COTRs can issue technical direction requiring EMMPs.

In addition, Title II Cooperating Sponsors are required to develop IEEs by the Agency’s MYAP guidance and these IEEs must include an EMMP.

5. EMMP FORMATS EMMPs are usually in table form. Critical elements of a basic EMMP are captured in the illustrative format below. For detail, see examples in the Annex to this Factsheet.

------------------

EMMP for Project XXX

Person Responsible for Overseeing EMMP: [name, contact information]

Activity 1: [name of activity] [briefly describe activity & summarize potential adverse environmental impacts]

IEE or EA Condition

(reproduced or summarized from the IEE or EA)

Mitigation Specific actions to be taken to comply with the condition.

(if an IEE or EA condition is already specific to the project/ activity and implementation actions self-evident, this “translation step” can be omitted)

Monitoring

How will the project verify that mitigation is being implemented and is both effective and sufficient?

Timing and Responsible Parties

Who is responsible for mitigation, monitoring, reporting?

Timing/frequency of these actions

[add rows for additional conditions] [ repeat table for additional activities] ----------------- If an EMMP will contain cost information, a separate column can added. An example of an EMMP with a monitoring log, where monitoring results can be recorded, is included in the Annex.

More advanced EMMP formats can serve as both a detailed monitoring log and a management/field guide to implementing mitigation. EMMP example #3 (Small Facilities Construction) in the Annex is an example of such an “advanced format.” Such advanced formats are not required, but in some circumstances they can make it easier for project management and field supervisors to oversee and implement mitigation.

ENCAP FACTSHEET: EMMPs REVIEW DRAFT 22 JULY 2011 PG 2/10

Page 70: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

ENCAP FACTSHEET: EMMPs REVIEW DRAFT 22 JULY 2011 PG 3/10

6. STEPS IN EMMP DEVELOPMENT EMMP development consists of 5 basic steps.

1. Review the governing IEE or EA to understand the conditions that apply to your project.

2. Translate IEE or EA conditions into specific mitigation actions.

3. Specify monitoring measures.

4. Specify timelines and responsible parties.

5. Determine who will have overall responsibility for EMMP implementation/environmental compliance.

Each is addressed below.

1. Review the governing IEE or EA to understand the conditions that apply to your project.

If the IEE governing your project is sector-level, the IEE usually describes activities in a high-level, general way without matching or “mapping” them to particular projects.

For example, your project might be working with agro-processors to improve product quality. In the IEE, this might be described as a “value chain strengthening” activity.

In this case, your first step in EMMP development is to match the activities in the project SOW to the general activity descriptions in the IEE, and on that basis determine which IEE conditions apply to your project activities

Even if you are developing a project-specific IEE with annexed EMMP as a package for submission (see Section 9), re-read the IEE conditions you have developed before beginning development of the EMMP.

2. Translate IEE conditions into specific mitigation actions.

(see resources for mitigation and monitoring design, at end.)

If an IEE condition is well-specified, the necessary actions to implement the condition may be self evident. However, often IEE/EA conditions are very general and they must be “translated” into well-specified, implementable, and verifiable mitigation actions.

This translation is a key purpose of the EMMP, and a key step in developing one.

Implementation, monitoring, and reporting on IEE conditions will be easier if mitigation measures are as specific as possible.

Factors to consider in translating conditions to actions include:

the specifics of the site or sites

the extent of project control

Site specifics. IEE conditions are often written without knowledge of the specific project site. You need to determine how and whether the conditions apply given the specifics of your site.

For example, an IEE might impose the following conditions on construction activities:

a. No construction permitted in protected areas or relatively undisturbed ecosystem areas.

b. Construction & facilities operation may not result in significant adverse impacts on ecosystem services

If your proposed site is in a peri-urban area already undergoing and zoned for development, condition (a) poses little concern.

But what if a seasonal stream draining several square kilometers traverses your site? In that case, a major “ecosystem service” provided by your site is drainage. So to comply with the IEE, your design must assure that there is no reduction in stream capacity or alteration to local drainage patterns.

Extent of Project Control. Often IEE conditions are phrased as “to the greatest extent practicable,” or “to the degree feasible the project shall. . .”

This language is used to accommodate different levels of control over on-the-ground activities.

For example, the IEE for an agricultural project may require that an IP “assure availability, and require use and maintenance of appropriate personal protective equipment specified by the pesticide label to the greatest degree feasible.”

What is “feasible” will depend on the level of project control over on-the-ground crop protection activities. For example:

On a project-run demonstration farm, that control is essentially complete.

By contrast, if a project is providing training to strengthen government extension services, the project has full control over content of the training, limited control over the recommendations made by Extension Agents, and no control over the farmers’ actions. (However, other components of the project may provide closer control over farmer’s actions).

The EMMP examples in the Annex illustrate this issue.

Retaining General Language in an EMMP. In some cases, it may not be possible to fully specify mitigation

Page 71: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

actions in an EMMP, and the EMMP may include language such as “if feasible,” “as practicable,” or “as necessary.”

For example, the EMMP for a health activity might read:

In all plans, strategies, and other relevant documents, the need for environmentally sound collection, management, and disposal of healthcare waste, will be incorporated, as appropriate; and a budget for implementation must be included.

However, if such language is used, the need for specificity does not disappear. It is simply transferred to the person responsible for overseeing EMMP implementation. In the above case, this party would review documents and report on inclusion of healthcare waste management in these documents— and on instances where the issue was not incorporated, and why.

3. Specify Monitoring Measures. (see resources for mitigation and monitoring design, at end.)

The EMMP should specify monitoring that will ascertain BOTH:

(1) whether mitigation was implemented.

(2) whether mitigation was sufficient and effective.

For example: To safeguard water quality, a water and sanitation IEE might require that water points be sited well away from sources of contamination and that livestock be physically excluded from the water points.

A visual inspection would show whether the mitigation was implemented. But showing that the mitigation was sufficient and the water safe to drink would require water quality testing.

The ENCAP training presentation “Principles of Environmental Monitoring” provides an introduction to environmental monitoring design. Examples of monitoring measures are found in the Annex to this factsheet.

Environmental compliance monitoring should be integrated into project M&E. See section 6.5, below & section 10, implementing EMMPs.

4. Specify timelines and responsible parties

EMMPs not only specify the mitigation and monitoring actions themselves, but who is responsible for them, and on what timeline or schedule.

This is not always possible for the EMMP preparer to do—s/he may be a consultant or specialist without detailed knowledge of project management and staffing. In this case, specifying timelines and responsible parties can be handed off to the individual responsible for

overseeing EMMP implementation. (See immediately below).

5. Determine who is responsible for overseeing EMMP implementation/environmental compliance.

Once the EMMP is drafted, the COP or responsible senior project manager must review it and determine who will be assigned responsibility for overseeing EMMP implementation.

Overseeing EMMP implementation means having overall responsibility for verifying that mitigation measures are being implemented and for other aspects of monitoring, as well as reporting (see Section 8 below). Note that while one individual is typically responsible for oversight, individual mitigation and monitoring actions must be integrated into the implementation of core project activities and M&E. As such, they will be carried out by a number of project staff.

If mitigation and monitoring are complex or extensive, a project may hire a dedicated environmental compliance manager. This would often be appropriate, for example, for road rehabilitation projects—which tend to involve complex, technical mitigation and monitoring—and for agricultural projects involving pesticides or encroachment issues.

If the EMMP is fairly simple, responsibility for overseeing EMMP implementation can be assigned to the M & E Specialist, or a training or technical specialist.

Regardless, EMMP implementation oversight must be included in the job description of the individual who is assigned this responsibility.

7. PITFALLS TO AVOID Good EMMPs avoid a set of common pitfalls. They do NOT:

Use unclear, ambiguous, non-actionable and/or non-verifiable mitigation measures. For example, Good EMMPs do NOT include mitigation measures that simply state “good practices will be implemented per Chapter X of the Environmental Guidelines for Small-Scale Activities in Africa (EGSSAA). They DO specify which practices and which guidance from the EGSSAA will be implemented.

Include “extra” mitigation. All mitigation measures must respond to a specific IEE or EA condition.

Use language like “as feasible,” “as appropriate,” etc. unless doing so is absolutely unavoidable. (See discussion of “retaining general language in an EMMP” at the top of this page.)

ENCAP FACTSHEET: EMMPs REVIEW DRAFT 22 JULY 2011 PG 4/10

Page 72: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

8. EMMPs & ENVIRONMENTAL COMPLIANCE REPORTING To enable C/AOTRs to fulfill their mandated responsibility to “actively manage and monitor” compliance with IEE/EA conditions, IP quarterly or semi-annual progress reports must provide an auditable record of environmental compliance—and especially of implementation of IEE/EA conditions. EMMPs provide the framework for this “environmental compliance reporting.”

Sometimes the governing IEE or the C/AOTR specifies compliance reporting requirements and formats. If so, these requirements must be met.

If the reporting requirements are not specified, follow the guidance in the table below:

ENCAP FACTSHEET: EMMPs REVIEW DRAFT 22 JULY 2011 PG 5/10

Situation Environmental Compliance Reporting Content and Format

EMMP is fairly simple & contains a monitoring log section

Update EMMP with most recent monitoring data & annex to quarterly or semi-annual progress report.

EMMP is fairly simple but does not contain a monitoring log section

Consider adding a monitoring log to the EMMP and proceed as above.

OR: Develop a simple table-based reporting format that lists activities, planned mitigation, and mitigation status/issues encountered.

EMMP is longer and more complex

Provide a text summary of EMMP implementation and issues encountered and resolved.

Maintain a full monitoring log on file and provide to USAID upon request.

9. EMMP REVIEW AND APPROVAL For project-specific IEEs (including IEE Amendments and Amendments with PERSUAPs), the EMMP will usually be developed with and submitted as an annex to the IEE. In this case, the EMMP is reviewed and approved as a part of the IEE. (Note that IEEs receive final clearance with the signature of the BEO.)

Otherwise, the EMMP will be developed together with the project workplan, budget, and performance management plan (PMP). In this case, the EMMP will be submitted together with the workplan and/or PMP to the C/AOTR, who is responsible for reviewing and approving it.

The C/AOTR may involve the MEO in this review, especially for environmentally sensitive activities. The IEE/EA will sometimes specify that the REA must review and approve the EMMP as well.

10. IMPLEMENTING EMMPS Experience shows that systematic EMMP implementation requires:

Establishing accountability. As noted in section 5.5, oversight responsibility for EMMP implementation must be assigned to an appropriate, qualified project staff member, and this responsibility must be part of their job description.

Workplan integration. Where the EMMP requires discrete actions, these must be entered into the project workplan. Examples of discrete actions include, e.g. “train staff and partners in environmental compliance,” “develop a PERSUAP,” “undertake pollution prevention/cleaner production assessments,” etc.

By contrast, some mitigations do not result in separate workplan actions per se. For example, an EMMP could require that “all plans, strategies, and other relevant documents address environmentally sound collection, management, and disposal of healthcare waste.”

Environmental compliance monitoring should be a workplan item.

Environmental Compliance and Project Core Performance Indicators

For new projects, Africa Bureau best practice is that at least one core project performance indicator should be “environmentalized”— that is measure the extent to which core project activities are being executed with attention to environmental soundness and compliance.

For example, in a water point provision project, the IP might use the indicator “number of protected water points established with zero fecal coliform after 6 months” rather than “number of water points established.”

In a road rehabilitation project, the IP might use the indicator “km or road rehabilitated under environmentally sound practices” rather than “km of road rehabilitated.”

It is NOT necessary or appropriate to “environmentalize” every core indicator, or to capture every mitigation measure in core project reporting.

Budget integration. Workplan items must be reflected in the project budget. However, even EMMP requirements that do not result in discrete actions can have cost implications. Continuing the example above, a consultant or home office technical support might be needed to assure that a plan or strategy properly addresses “environmentally sound collection, management, and disposal of healthcare waste.”

Page 73: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

ENCAP FACTSHEET: EMMPs REVIEW DRAFT 22 JULY 2011 PG 6/10

The best way to make sure that cost implications of the EMMP are captured is to develop mitigation and monitoring cost estimates as part of EMMP development.

If this is not possible, budget notes should be developed for mitigation items that have cost implications, and these notes passed on to the budgeting team.

Management commitment & staff awareness. Project management must communicate to all staff and partners its commitment to environmental compliance as a means to strengthen development outcomes.

All staff should be aware in general terms of the core environmental conditions that apply to the project, and of the existence of the project EMMP.

11. ENCAP RESOURCES FOR MITIGATION AND MONITORING DESIGN Per the table below, ENCAP has developed a set of resources to support mitigation and monitoring design.

Topic Recommended Resource

Mitigation and Monitoring Principles

Principles of Environmental Mitigation

Principles of Environmental Monitoring

ENCAP training presentations; convey key principles with multiple visual examples. Include slide notes www.encapafrica.org/meoentry.htm (access via mitigation & monitoring topic)

Sectoral mitigation and monitoring guidance

Environmental Guidelines for Small-Scale Activities in Africa. (EGSSAA)

Covers more than 20 common development sectors, and provides mitigation and monitoring guidance in table format.

On-line annotated bibliographies provide links to detailed resources.

www.encapafrica.org/egssaa.htm

Field Monitoring for non-specialists

ENCAP Visual Field Guides

A supplement to the EGSSAA, these photo-based field guides allow non-specialists to quickly identify key, common environmental management deficits in small-scale activities in the following sectors:

Water supply, sanitation, health care (waste), and roads.

www.encapafrica.org/egssaa.htm#Guides

ACRONYMS ADS Automated Directives System

A/COTR AOTR and/or COTR

AOTR Agreement Officer’s Technical Representative

AFR/SD USAID Bureau for Africa, Office of Sustainable Development

BEO Bureau Environmental Officer

CFR Code of (US) Federal Regulations

COP Chief of Party

COTR Contract Officer’s Technical Representative

EA Environmental Assessment

EGSSAA USAID Environmental Guidelines for Small-Scale Activities in Africa

ENCAP Environmental Compliance and Management Support for Africa (AFR/SD project)

EMMP Environmental Mitigation and Monitoring Plan

IEE Initial Environmental Examination

IP Implementing Partner

M&E Monitoring and Evaluation

MEO Mission Environmental Officer

PERSUAP Pesticide Evaluation Report & Safer Use Action Plan

PMP Performance Management Plan

REA Regional Environmental Advisor

USAID United States Agency for International Development

Page 74: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

ENCAP FACTSHEET: EMMPs REVIEW DRAFT 22 JULY 2011 PG 7/10

ANNEX: EMMP EXAMPLES This annex contains 3 EMMP examples for typical activities and IEE conditions in the health, agriculture, and construction sectors. The examples are real, though project names and some details have been changed for the purpose of this factsheet:

1. “The Health Improvement Program “ (THIP)

2. “Agricultural Services Project” (ASP)

3. “Small Facilities Construction Project” (SFC)

The first two examples use the general EMMP format presented in section 5. In each of these examples, a monitoring log column could be added to the far right of each table. The 3rd example is an alternate EMMP format.

Note that the examples are for a few REPRESENTATIVE ACTIVITIES within projects of this type. Most projects would have more activities, and the EMMPs would therefore be longer.

EXAMPLE 1: THE HEALTH IMPROVEMENT PROGRAM (THIP)

THIP Activity 1: Prepare strategies and action plans to increase the import and internal distribution of pharmaceuticals

Potential Environmental Impact: Strategies and action plans could indirectly result in larger and more widely distributed in-country stocks of pharmaceuticals. These may expire prior to being distributed and/or used, and will need to be disposed of. Unsafe disposal could affect aquatic and terrestrial resources and human health.

IEE Condition Specific mitigation actions to implement the condition

Person responsible for implementing mitigation

Timing

How implementation will be verified (monitoring indicator)

Responsible party & Timing

Contractor shall provide advice for safe storage and disposal of expired pharmaceuticals.

In all strategies and action plans for which THIP provides assistance, include measures for:

a) storage in accordance with labels;

b) disposal of expired and unused pharmaceuticals; and

c) a budget to implement these safeguards.

Responsible Party: THIP Policy Technical Advisors

Timing: During preparation phase of all strategies and action plans

Review of all strategies and action plans to ensure they include information about safe disposal of pharmaceuticals and a budget

Responsible Party: THIP Policy Director

Timing: During preparation of drafts and final documents

THIP Activity 2: Procure pharmaceuticals from US companies.

Potential Environmental Impact: Procurement of pharmaceuticals could generate unused/expired drugs that if not disposed of safely, could affect aquatic and terrestrial resources and human health.

IEE Condition Specific mitigation actions to implement the condition

Person responsible for implementing mitigation

Timing

How implementation will be verified (monitoring indicator)

Responsible party & Timing

Advise at MOH and district levels on the storage of the product according to the information provided on the manufacturer’s Materials Safety Data Sheet (MSDS)

Responsible Party: THIP Policy Technical Advisors

Timing: When meeting with appropriate MOH & district staff

Check storage practices are in compliance with MSDS

Responsible Party: THIP M & E Advisor

Timing: Semi-annually

Contractor shall provide advice for safe storage and disposal of expired pharmaceuticals.

Train MOH and local level health practitioners and management staff on aspects of medicine supply chain management, including estimating demand, distribution constraints, and storage issues of time and temperature.

Responsible Party: THIP Training Advisor

Timing: Two times/year

1) Training is implemented:

M & E Advisor; monitor semi-annually;

2) Supply chain has improved (constraints/bottlenecks have decreased)

THIP Policy Advisor; monitor annually

Page 75: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

THIP Activity 3: Train healthcare workers on use of new medical procedures.

Potential Environmental Impact: As an indirect result of training, healthcare waste (HCW) will be generated. If not collected and disposed of safely, aquatic and terrestrial resources and human health could be adversely affected

IEE Condition Specific mitigation actions to implement the condition

Person responsible for implementing mitigation

Timing

How implementation will be verified (monitoring indicator)

Responsible party & Timing

Training of healthcare workers should include best practices in disposal of HCW as described in the EGGSAA Healthcare Waste chapter:

Training courses should incorporate the following items, which should be included in all training on implementing new medical procedures:

How to Prepare an HCW Plan

Developing a Waste Segregation System

Minimize, Reuse, Recycling Procedures

Incorporating Good Hygiene Practices

Responsible Party: Training Advisor

Timing: When course material is being developed; when training is delivered

Course material includes these topics; when course material is developed; M & E Advisor

Trainings include these topics; when trainings are delivered; M & E Advisor

EXAMPLE 2: AGRICULTURAL SERVICES PROJECT (ASP)

ASP Activity 1: Training Ministry of Agriculture extension officers to provide sound crop production advice to ASP-supported farmers

Potential Environmental Impact: MOA extension officers could provide advice to farmers which results in expansion of agricultural land into natural areas; or that results in the unsafe use of pesticides.

IEE Condition Specific mitigation actions to implement the condition

Person responsible for implementing mitigation

Timing

How implementation will be verified (monitoring indicator)

Responsible party & Timing

Training shall not result in direct or indirect effects on the environment.

Training of MOA extension officers shall incorporate conservation agriculture; information on ecosystem services; and measures to minimize impacts to natural ecosystems.

Responsible Party: ASP Crop Production Specialist

Timing: Curriculum Development; During trainings

Review of curricula; attend various trainings

Responsible Party: ASP Training Officer

Timing: At time curricula are being developed; when trainings are provided

Trainings shall not recommend pesticides without first preparing a PERSUAP that is approved by the Bureau Environmental Officer.

Note: these mitigation measures are from the PERSUAP approved by the BEO on [xxx date]: 1) Only PERSUAP-approved pesticides shall be included in training for extension officers. 2) Trainings shall include safeguards for health and safety of workers, and measures to protect the environment (Annexes A and B of the PERSUAP). 3) Trainings shall include monitoring the efficacy of pesticides as described in Annex C of the PERSUAP.

ASP Crop Production Specialist

During trainings

Review of curricula; attend various trainings

Responsible Party: ASP Training Officer

Timing: At time curricula are being developed; when trainings are provided

ENCAP FACTSHEET: EMMPs REVIEW DRAFT 22 JULY 2011 PG 8/10

Page 76: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

ENCAP FACTSHEET: EMMPs REVIEW DRAFT 22 JULY 2011 PG 9/10

EXAMPLE 3: SMALL FACILITIES CONSTRUCTION PROJECT (SFC)

NOTE: This example uses an alternate EMMP format. In this case, a project-specific IEE existed with highly specific conditions regarding siting, design requirements, and construction management practices for the small facilities (training centers, community centers) to be constructed by the project. These conditions were translated into table form (below), and for each condition a compliance process was specified. This EMMP format serves both as a detailed monitoring log and a management tool and guide to implementing mitigation.

IEE Condition 1: Siting Requirements for New Construction

Compliance process. At the time of initial site selection, SFC must answer the questions below for each proposed site. If a proposed site meets one of the below-listed criteria, the site must be changed OR an Africa Bureau Environmental Review Form (www.encapafrica.org/documents/AFR-EnvReviewForm-20Dec2010.doc) must be completed and approved by USAID prior to the start of construction. SFC must then implement the environmental conditions specified by the ERF.

Note: completed ERFs include an EMMP. SFC will maintain the ERF EMMPs as an annex to this project EMMP and report on their implementation to USAID.

Compliance record. The table below documents the compliance process. Note: all table entries must be dated & initialed.

Is/Does the site. . .

Proposed Site

GPS Coordinates

Within 30m of a permanent or seasonal stream or water body?

Have existing settlement /inhabitants?

Have an average slope in excess of 5%?

Heavily forested?

If yes to any question, indicate ERF status or note site change; add additional row for new site.

Village A Village B (add sites as necessary)

--------------------------------- IEE Condition 2: Design Requirements for Small Facilities

Compliance process: (1) Design elements specified by the IEE will be incorporated into the final technical/contract specification that governs the general contractor’s work. SFC will verify this for each mandated design element. (2) SFC will verify via field inspection that the final works meet these specifications, requiring remedy or otherwise resolving any non-compliant elements.

Compliance record. The table below lists all design elements mandated by the IEE and serves to document compliance status.

Required Design Elements—Training and Community Centers

A. Latrine/septic tank design prevents in-and-out access for insects or other disease vectors from the pit or holding tank. B. Latrines are accompanied by handwash stations. C. All sources of gray water (kitchen sinks and handwash stations) discharge to either (1) a seepage pit or sump at least 15m from any

source of groundwater or surface water tapped for domestic use, or (2) to an impermeable pump-out tank. D. Latrines or the terminus of any septic leach field must be at least 30m from any source of shallow groundwater or surface water tapped

for domestic use, OR discharge to an impermeable pump-out tank. E. Siting, grading and/or drainage structures prevent runoff from the compound from creating standing water on the compound or adjacent

land during the rainy season (instances of generalized flooding excepted.) F. Septic pump-out point, if any, shall feature a concrete apron and drain with return to the septic tank. G. Concrete aprons with berms or gutters/sumps shall be placed under generators, fuel storage, and fuel pump-in point (if different) sufficient

in each case to capture at least a 20 liter spill.

Incorporated in Final Technical Specifications? (Y/N; reference to list above)

Built as-specified? (confirmed by field inspection) (Y/N; reference to list above) Site

A B C D E F G A B C D E F G

Notes (issues and resolution)

Page 77: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

ENCAP FACTSHEET: EMMPs REVIEW DRAFT 22 JULY 2011 PG 10/10

Village A

Date confirmed & initials

Date of inspection & initials

Village B

Date confirmed & initials

Date of inspection & initials

Add sites as needed Date confirmed

& initials Date of inspection & initials

---------------------------- IEE Condition 3: Construction Management

Compliance process: (1) Construction management practices specified by the IEE will be incorporated into the final technical/contract specification that governs the general contractor’s work. (2) SFC will verify that each construction management practices is being implemented via at least one field inspection during the construction process. (3) SFC will require remedy or otherwise resolve any deficits identified.

Compliance record. The table below lists all construction management practices mandated by the IEE and documents compliance status.

Required Construction Management Elements—Training and Community Centers

A. During construction, prevent sediment-heavy run-off from cleared site or material stockpiles to any surface waters or fields with berms, by covering sand/dirt piles, or by choice of location. (Only applies if construction occurs during rainy season.)

B. Construction must be managed so that no standing water on the site persists more than 4 days. C. SFC must require its general contractor to certify that it is not extracting fill, sand or gravel from waterways or ecologically sensitive areas,

nor is it knowingly purchasing these materials from vendors who do so. D. SFC must identify and implement any feasible measures to increase the probability that lumber is from legal, well-managed sources.*

Incorporated in Final Technical Specifications? (Y/N; reference to list above)

Implemented as-specified? (confirmed by field inspection) (Y/N; reference to list above) Site

A B C D A B C D

Notes (issues and resolution)

Village A

Date confirmed & initials

Date(s) of inspection & initials

Village B

Date confirmed & initials

Date of inspection & initials

Add sites as needed Date confirmed

& initials Date of inspection & initials

*MEASURES IDENTIFIED, IF ANY, REGARDING SUSTAINABLE SOURCING OF TIMBER: [FILL IN]

Page 78: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Basic EMMP Template (To use, fill in text in green highlight. Delete explanatory comments in yellow highlight. )

EMMP for Project XXX

Person Responsible for Overseeing EMMP: [name, contact information]

Activity 1: [name of activity] [briefly describe activity & summarize potential adverse environmental impacts—from IEE]

IEE or EA Condition

(reproduced from the IEE or EA)

Mitigation

Specific actions to be taken to comply with the condition.

(if an IEE or EA condition is already specific to the project/ activity and implementation actions self-evident, this “translation step” can be omitted)

Monitoring

How will the project verify that the mitigation action is being implemented and is both effective and sufficient?

Timing and Responsible Parties

Who is responsible for mitigation, monitoring, reporting?

Timing/frequency of these actions

A single IEE/EA condition may require multiple action to implement—add rows as necessary

[add rows for additional conditions] [ repeat table for additional activities]

Page 79: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

EMMP for Project

Person Responsible for Overseeing EMMP:

Activity 1:

IEE or EA Condition #1

Mitigation

Monitoring

Timing and Responsible Parties

IEE or EA Condition #2

Page 80: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

The factsheet was prepared by The Cadmus Group, Inc. for International Resources Group, Ltd. (IRG) under USAID Africa Bureau’s Environmental Compliance and Management Support (ENCAP) Program, Contract Number EPP-I-00-03-00013-00, Task Order No. 11. Its contents are the sole responsibility of the authors and do not necessarily reflect the views of USAID or the United States Government.

ENCAP FACTSHEET ENVIRONMENTAL COMPLIANCE: LANGUAGE FOR USE IN SOLICITATIONS AND AWARDS (ECL) ABOUT THE ECL AND THIS FACTSHEET

The ADS Help Document, “Environmental Compliance: Language for Use in Solicitations and Awards” is a combination of step-by-step guidance and boilerplate text to assemble appropriate, ADS-mandated environmental compliance language for all solicitations and awards. This factsheet is an orientation to the ECL, and particularly targets COs, CTOs, and Activity Managers. It is intended both as a training aid and as a succinct stand-alone reference.

BACKGROUND: USAID’S MANDATORY ENVIRONMENTAL PROCEDURES

Section 117 of the Foreign Assistance Act of 1961, as amended, requires that USAID use an Environmental Impact Assessment (EIA) process to evaluate the potential impact of the Agency’s activities on the environment prior to implementation, and that USAID “fully take into account” environmental sustainability in designing and carrying out its development programs. This mandate is codified in Federal Regulations (22 CFR 216 or “Reg. 216”) and in USAID’s Automated Directives System (ADS), particularly Parts 201.3.12.2.b and 204.

Compliance with the procedures is mandatory. With limited exceptions for international disaster assistance, they apply to every program, project, activity, and amendment supported with USAID funds or managed by USAID.

In general, the procedures specify an EIA process must be applied to all activities before implementation—including new activities introduced into an existing program or substantive changes to existing activities. The only exceptions are international disaster assistance activities verified as EXEMPT from the procedures.

The output of this EIA process is “Reg. 216 Environmental Documentation,” which takes one of three forms: a Request for Categorical Exclusion, an Initial Environmental Examination (IEE) or an Environmental Assessment (EA).

This documentation must be cleared by the Mission Environmental Officer (MEO) and the Mission Director AND approved by the Bureau Environmental Officer (BEO) PRIOR to any “irreversible commitment” of resources. Most IEEs and all EAs specify environmental mitigation and monitoring measures (IEE and EA “conditions”) that must be implemented and verified over life-of-project (LOP).1

PROCUREMENT LANGUAGE AND ENVIRONMENTAL COMPLIANCE

USAID oversees and monitors project/activity environmental compliance. Actual implementation of IEE and EA conditions, however, is the responsibility of the prime contractor/grantee (“partner”) responsible for project/activity implementation. The ADS therefore requires that all IEE and EA conditions (or a

1 For a more detailed discussion of USAID’s Environmental Procedures, see the “USAID Environmental Procedures Briefing for Mission Staff,” available at www.encapafrica.org/meoEntry.htm.

Version: 14 November 2008

Download the ECL at: www.usaid.gov/policy/ads/200/204sac.pdf

Download this factsheet at: www.encapafrica.org/meoEntry.htm

For more information, email the ENCAP core team at: [email protected]

Why the environmental procedures?

The procedures are USAID’s principal mechanism to ensure environmentally sound design and management (ESDM) of development activities— and thus to prevent significant adverse impacts on critical environmental resources and ecosystems and on the health and livelihoods of beneficiaries or other groups resulting from inadequate attention to environmental issues in design and operation.

In short, the procedures strengthen development outcomes and help safeguard the good name and reputation of the Agency.

To learn more about ESDM, view the presentation Environment, Development and Environmentally Sound Design and Management at www.encapafrica.org/tzWorkshop.htm.

Page 81: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

statement that requires compliance with them) are incorporated into procurement instruments (ADS 204.3.4.a.6; 303.3.6.3e).

Beyond this, however, LOP environmental compliance is best assured when solicitation and award instruments also incorporate the elements set out and justified in the table below:

Environmental compliance elements in solicitation/award instrument

Reason

No activity is implemented unless covered by approved Reg. 216 environmental documentation.

Establishes the importance of maintaining full environmental documentation coverage.

The partner must verify current and planned activities annually against the scope of the approved Reg. 216 environmental documentation.

Guards against a project “creeping” out of compliance due to the addition or modification of activities outside the scope of the approved Reg. 216 environmental documentation. This usually takes place during the annual work planning process.

Where activities demand environmental management expertise, appropriate qualifications and proposed approaches to compliance must be addressed in technical and cost proposals.

Helps ensure that the partner/team selected for the work is capable of implementing the required environmental management activities.

Also sends a clear message that environmental management is not an afterthought, but an integral part of the project, and a core qualification.

The partner must develop an Environmental Mitigation and Monitoring Plan (EMMP) fully responsive to all IEE/EA conditions, unless (1) the EMMP already exists in the approved Reg. 216 documentation, or (2) will be developed by USAID.

The EMMP translates the general mitigation directives in the IEE or EA into more specific measures, assigns responsibilities for their implementation, and sets out monitoring/reporting measures to verify their implementation and effectiveness. Without an EMMP, systematic & verifiable implementation of IEE/EA conditions is almost impossible.

Budgets and work plans integrate the EMMP. Unless the EMMP is integrated in the budget and work plan, it will not be implemented.

PMPs measure EMMP implementation. As the EMMP is an integral part of project implementation, it should be treated this way in project evaluation and reporting.

Collectively, incorporating these compliance elements in the solicitation and award (1) ensures that necessary compliance mechanisms are in place, (2) integrates monitoring and reporting on environmental compliance into routine project/activity monitoring and reporting, and (3) clearly communicates and establishes partner responsibility for LOP compliance. The result is improved compliance, improved project outcomes, and reduced demands on mission staff—particularly on activity managers and CTOs, who are required to actively manage and monitor compliance with any IEE/EA conditions per ADS 202.3.6 and 303.2.f.

WHY USE THE ECL?

The ECL is a non-mandatory help document. However, its use:

� Results in environmental compliance language that conforms to ADS requirements and best practice, as described in the table above, therefore realizing the compliance, outcomes, and manager workload benefits also noted above.

� Substantially reduces the time required to develop environmental compliance language.

� Improves consistency across the Agency in addressing environmental compliance. HOW TO USE THE ECL AND WHAT YOU NEED IN HAND

Use of the ECL is self-explanatory:

1. Follow the instructions on page 3 of the document to assemble the compliance language, then

2. Finalize the [text in brackets and blue highlight].

However, both steps require familiarity with the Reg. 216 documentation covering the activities involved in the solicitation/procurement. In some cases, an IEE specific to the procurement is prepared (in which case the compliance language should be assembled at the same time). In other cases, the solicitation/procurement is covered by a strategic- or program-level IEE of broader scope. In this case, the CTO and MEO should identify the IEE determinations and conditions that apply to the procurement. Once this is done, use of the ECL is straightforward.

Regardless, it is the responsibility of the CTO and Activity Manager, working with the CO, to assure that appropriate environmental compliance language is incorporated in solicitation and procurement instruments.

Page 82: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Environmental Compliance: Language for Use in Solicitations and Awards

An Additional Help for ADS Chapter 204

Revision Date: 05/19/2008 Responsible Office: EGAT File Name: 204sac_051908

Page 83: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

3

HOW TO ASSEMBLE COMPLIANCE LANGUAGE To assemble the compliance language for a particular solicitation or award, the following table should be used as guidance. Multiple situations can apply to a single procurement; if this is the case, use all indicated language. You may need to revise and/or renumber the language depending on which elements you select and where you place them in the award or solicitation. [Bracketed text] in the model language indicates that you must select the appropriate option or provide other input.

When the situation is that. . . Use these environmental compliance language paragraphs from the Model Language. . .

Approved Regulation 216 documentation2 exists and it contains. . .

Categorical Exclusions and Negative Determinations only

1a through 1c 4a through 4c

at least one Negative Determination with conditions

1a through 1c 2 4a through 4c 5a through 5d 8a through 8d (optional: to be used when project will involve environmental compliance expertise; collaborate with MEO, or BEO for projects originating out of AID/W, for guidance, as needed)

at least one Positive Determination 1a through 1c 3 4a through 4c 5a through 5d 8a through 8d

The contractor/recipient will be required to prepare Regulation 216 documentation (an EA or IEE)

1a through 1c 4a through 4c 5a through 5d 6a through 6c 8a through 8d 2 If there is also an existing IEE that contains a Negative Determination with conditions 3 If there is also an existing IEE that contains a Positive Determination

2 Note: “Approved Regulation 216 documentation” refers to a Request for Categorical Exclusion (RCE), Initial Environmental Examination (IEE), or Environmental Assessment (EA) duly signed by the Bureau Environmental Officer (BEO).

Page 84: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

4

The project includes a sub-grant fund To any of the above language/situations that apply, add: 7a and 7b 8a through 8d

(Paragraphs 7 and 8 are optional, based on the nature of the grant fund and potential environmental impacts; coordinate with MEO or BEO for projects originating out of AID/W for guidance, as needed)

Page 85: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5

MODEL LANGUAGE

1. Insert paragraphs 1a, 1b, and 1c in all solicitations and resulting awards:

• In RFAs, insert in the Program Description or in the RFA’s instructions regarding Technical Application Format

• In RFPs, insert in the appropriate section, often the “Special Contract Requirements” 1a) The Foreign Assistance Act of 1961, as amended, Section 117 requires that the impact of

USAID’s activities on the environment be considered and that USAID include environmental sustainability as a central consideration in designing and carrying out its development programs. This mandate is codified in Federal Regulations (22 CFR 216) and in USAID’s Automated Directives System (ADS) Parts 201.5.10g and 204 (http://www.usaid.gov/policy/ADS/200/), which, in part, require that the potential environmental impacts of USAID-financed activities are identified prior to a final decision to proceed and that appropriate environmental safeguards are adopted for all activities. [Offeror/respondent/contractor/recipient] environmental compliance obligations under these regulations and procedures are specified in the following paragraphs of this [RFP/RFA/contract/grant/cooperative agreement].

1b) In addition, the contractor/recipient must comply with host country environmental regulations unless otherwise directed in writing by USAID . In case of conflict between host country and USAID regulations, the latter shall govern .

1c) No activity funded under this [contract/grant/CA] will be implemented unless an environmental threshold determination, as defined by 22 CFR 216, has been reached for that activity, as documented in a Request for Categorical Exclusion (RCE), Initial Environmental Examination (IEE), or Environmental Assessment (EA) duly signed by the Bureau Environmental Officer (BEO). (Hereinafter, such documents are described as “approved Regulation 216 environmental documentation.”)

2. If the approved Regulation 216 documentation includes any Negative Determinations with conditions, insert 2.

This language stipulates that the activity(ies) must be implemented in compliance with the conditions specified in the Negative Determination.

2) An Initial Environmental Examination (IEE) [(insert IEE # and download reference here, if available)] has been approved for [the Program(s)/Project] funding this [RFA/RFP/contract/grant/cooperative agreement (CA)]. The IEE covers activities expected to be implemented under this [contract/grant/CA]. USAID has determined that a Negative Determination with conditions applies to one or more of the proposed activities. This indicates that if these activities are implemented subject to the specified conditions, they are expected to have no significant adverse effect on the environment. The [offeror/applicant/contractor/recipient] shall be responsible for implementing all IEE conditions pertaining to activities to be funded under this [solicitation/award].

Page 86: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

6

3. If the approved Regulation 216 documentation includes a Positive Determination, insert 3.

This language specifies that an approved Environmental Assessment (EA) must exist prior to implementation of the activity(ies), and that the activity(ies) must be implemented in compliance with the conditions in the approved EA.

3) An Initial Environmental Examination (IEE) has been approved for the [Program or project funding] this [RFA/RFP/contract/agreement] and for activities to be undertaken herein [(insert IEE # and download reference here, if available)]. The IEE contains a Positive Determination for the following proposed activities: [(specify)]. This indicates that these activities have the potential for significant adverse effects on the environment. Accordingly, the [contractor/recipient] is required to [comply with the terms of*/prepare and submit**] an Environmental Assessment (EA) addressing the environmental concerns raised by these activities. No activity identified under this Positive Determination can proceed until Scoping as described in §216.3(a)(4) and an EA as described in §216.6 are completed and approved by USAID (Note that the completed Scoping Statement is normally submitted by the MEO to the BEO when the project originates in a Mission. The Statement may be circulated outside the Agency by the BEO with a request for written comments within 30 days and approved by the BEO subsequently. Approval of the Scoping Statement must be provided by the BEO before the EA can be initiated.)

[*]If an EA already exists, and the contractor/recipient will not be required to prepare the EA, but will be required to comply with the terms of an existing EA.

[**]If contractor/recipient must prepare and submit an EA, also insert 6a through 6c.

Note: If the contractor is to prepare an EA, then this should be specified in the RFP/RFA instructions. The final negotiation of the EA will be incorporated into the award. Paragraphs 8a through d will always apply when the approved environmental documentation includes a Positive Determination, whether the contractor/recipient is preparing the EA or simply required to comply with an existing EA.

4. Insert for all solicitations and awards

The language requires that the contractor/recipient must ensure all activities, over the life of the project, are included in the approved Regulation 216 documentation.

4a) As part of its initial Work Plan, and all Annual Work Plans thereafter, the [contractor/recipient], in collaboration with the USAID Cognizant Technical Officer and Mission Environmental Officer or Bureau Environmental Officer, as appropriate, shall review all ongoing and planned activities under this [contract/grant/CA] to determine if they are within the scope of the approved Regulation 216 environmental documentation.

4b) If the [contractor/recipient] plans any new activities outside the scope of the approved Regulation 216 environmental documentation, it shall prepare an amendment to the documentation for USAID review and approval. No such new activities shall be undertaken prior to receiving written USAID approval of environmental documentation amendments.

4c) Any ongoing activities found to be outside the scope of the approved Regulation 216 environmental documentation shall be halted until an amendment to the documentation is submitted and written approval is received from USAID.

Page 87: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

7

5. If the approved Regulation 216 documentation contains one or more Negative Determinations with conditions and/or an EA, insert 5a through 5d. (These paragraphs should also always be used when the contractor/recipient is writing an IEE or EA.)

The language requires the contactor/recipient to integrate mitigation measures and monitoring into project work plans.

5 When the approved Regulation 216 documentation is (1) an IEE that contains one or more Negative Determinations with conditions and/or (2) an EA, the [contractor/recipient] shall:

5a) Unless the approved Regulation 216 documentation contains a complete environmental mitigation and monitoring plan (EMMP) or a project mitigation and monitoring (M&M) plan, the [contractor/recipient] shall prepare an EMMP or M&M Plan describing how the [contractor/recipient] will, in specific terms, implement all IEE and/or EA conditions that apply to proposed project activities within the scope of the award. The EMMP or M&M Plan shall include monitoring the implementation of the conditions and their effectiveness.

5b) Integrate a completed EMMP or M&M Plan into the initial work plan.

5c) Integrate an EMMP or M&M Plan into subsequent Annual Work Plans, making any necessary adjustments to activity implementation in order to minimize adverse impacts to the environment.

6. For solicitations, if the Proposal Instructions specifies that the [contractor/recipient] will be required to prepare Regulation 216 documentation (IEE or EA) for some or all activities, insert 6a through 6c.

6a) Cost and technical proposals must reflect IEE or EA preparation costs and approaches.

6b) [Contractor/recipient] will be expected to comply with all conditions specified in the approved IEE and/or EA.

6c) If an IEE, as developed by the [contractor/recipient] and approved by USAID, includes a Positive Determination for one or more activities, the contractor/recipient will be required to develop and submit an EA addressing these activities.

Note: In this case, always insert paragraphs 8a through 8d, as well.

7. For solicitations and awards when sub-grants are contemplated, and the IEE gives a Negative Determination with conditions that specifies use of a screening tool for sub-grants, insert 7a and 7b.

7a) A provision for sub-grants is included under this award; therefore, the [contractor/recipient] will be required to use an Environmental Review Form (ERF) or Environmental Review (ER) checklist using impact assessment tools to screen grant proposals to ensure the funded proposals will result in no adverse environmental impact, to develop mitigation measures, as necessary, and to specify monitoring and reporting. Use of the ERF or ER checklist is called for when the nature of the grant proposals to be funded is not well enough known to make an informed decision about their potential environmental impacts, yet due to the type and extent of activities to be funded, any adverse impacts are expected to be easily mitigated. Implementation of sub-grant activities cannot go forward until the ERF or ER checklist is completed and approved by USAID. [Contractor/Recipient] is responsible for ensuring that mitigation measures specified by the ERF or ER checklist process are implemented.

Page 88: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

8

7b) The [contractor/recipient] will be responsible for periodic reporting to the USAID Cognizant Technical Officer, as specified in the Schedule/Program Description of this solicitation/award.

8. For solicitations ONLY: Insert 8a through 8d when:

• the approved Regulation 216 documentation is a Positive Determination or an EA; or • when the contractor/recipient will be expected to prepare Regulation 216 documentation; or • when there is a sub-grant fund that requires use of an Environmental Review Form or

Environmental Review checklist; and/or • when there is a Negative Determination with conditions that will require environmental

compliance expertise to prepare and/or implement an EMMP or M&M Plan, as determined in collaboration with the MEO or BEO for projects originating out of AID/W.

8a) USAID anticipates that environmental compliance and achieving optimal development

outcomes for the proposed activities will require environmental management expertise. Respondents to the [RFA/RFP] should therefore include as part of their [application/proposal] their approach to achieving environmental compliance and management, to include:

8b) The respondent’s approach to developing and implementing an [IEE or EA or environmental review process for a grant fund and/or an EMMP or M&M Plan].

8c) The respondent’s approach to providing necessary environmental management expertise, including examples of past experience of environmental management of similar activities.

8d) The respondent’s illustrative budget for implementing the environmental compliance activities. For the purposes of this solicitation, [offerors/applicants] should reflect illustrative costs for environmental compliance implementation and monitoring in their cost proposal.

202sac_051908

Page 89: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 90: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 8. Introduction to the USAID Sector Environmental Guidelines (SEGs) and Related Resources Brief presentation + demonstration Summary This session will familiarize participants with the ESDM and environmental compliance resources available primarily through the GEMS project Web site: www.usaidgems.org

These resources include:

• The Sector Environmental Guidelines

• Visual Field Guides (VFGs)

• Training Materials

• MEO Resources

• Other sector-specific resources

The session also summarizes the environmental compliance and ESDM support services available to Missions and implementing partners via USAID’s GEMS program.

Objective Review the key ESDM and environmental compliance resources introduced during the workshop.

Key Resources • As referenced above

• GEMS Factsheet

Page 91: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 92: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

This factsheet was prepared by The Cadmus Group, Inc. for USAID under the USAID Global Environmental Management Support project (GEMS II), Award Number AID-OAA-M-13-00018. It was reviewed by the GEMS II COR.

IMPLEMENTING MECHANISM FACTSHEET

GLOBAL ENVIRONMENTAL MANAGEMENT SUPPORT (GEMS II) CONTENTS 1. GEMS Overview 2. Implementers 3. Period of Performance 4. Scope of Services 5. Accessing GEMS Services 6. Pricing 7. Award Details 8. Contacts

1. GEMS OVERVIEW GEMS II is a global program implemented under a USAID E3 Bureau contract that provides on-demand environmental compliance, management, and sound design support to USAID’s Environmental Officers, individual agency operating units and their projects and programs.

Subject to available ceiling, GEMS services are available to any bureau or operating unit that elects to incrementally fund the contract.

2. IMPLEMENTERS GEMS II was awarded in late September 2013 to The Cadmus Group, Inc. under the GSA Multiple Award Schedules (MAS) program.

The core team consists of Cadmus, Sun Mountain International and The Cloudburst Group, who together provide the primary USAID environmental compliance/environmentally sound design and management expertise. Other core team members are Eurasia Environmental Associates, Neptune and Company, Mott MacDonald, World Education and Battelle Memorial Institute. Cloudburst is a GSA Contractor Teaming Arrangement (CTA) partner. All other team members are subcontractors to Cadmus.

A number of on-call local partners may be engaged depending on the location of programmed activities.

3. PERIOD OF PERFORMANCE 30 September 2013–29 September 2018.

4. SCOPE OF SERVICES A broad range of environmental compliance, management, and sound design support services are available under GEMS II, including but not limited to:

A. TRAINING. Planning, design and delivery of general and sector-specific training in environmental compliance and/or environmentally sound and climate-smart design and management; development of training curricula and materials; and development and delivery of online/distance learning on these topics.

B. GUIDANCE, TOOLS AND SYSTEMS. Development and review of environmental best practice/compliance guidance for individual projects or sector programs. Development of software/IT and other tools and systems to support environmental compliance, management and M&E from mission portfolio to project level.

C. 22 CFR 216 DOCUMENTATION. Development and review of documentation prepared under USAID Environmental Procedures (22 CFR 216), including Initial Environmental Examinations (IEEs), scoping statements, and Environmental Assessments (EAs) and Programmatic Environmental Assessments (PEAs), including health and social impacts analyses.

D. COMPLIANCE ASSESSMENTS, FIELD MONITORING AND EVALUATION. Environmental compliance assessments, from mission portfolio to project and site-level. Field monitoring and evaluation of environmental compliance, management, and/or performance.

Version: 22 February 2016

Page 93: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

GEMS II FACTSHEET 22 FEB 2016 PG 2/2

E. EMMPs/EMPRs. Development and review of Environmental Mitigation and Monitoring Plans (EMMPs) and Environmental Mitigation Plans and Reports (EMPRs); technical assistance to support field implementation of such plans.

F. ENVIRONMENTAL MANAGEMENT IN DISASTER ASSISTANCE. Support to environmental management of disaster assistance, including rapid environmental assessments (REAs).

G. BEO, REA AND MEO SUPPORT & BACKSTOPPING. Screening and quality control of submitted 22 CFR 216 documentation; TA for IPs and USAID staff developing this documentation.

H. OTHER ENVIRONMENTAL ANALYSES. Scoping, development and review of: FAA 118/119 analyses, climate vulnerability assessments and climate risk screenings, health and social impact assessments; environmental reviews of multilateral development bank project proposals; among others.

I. HOST COUNTRY ENVIRONMENTAL MANAGEMENT CAPACITY. Capacity-building of host country environmental management systems and professionals.

J. KNOWLEDGE MANAGEMENT, LEARNING & COMMUNICATIONS. Web-based and hardcopy dissemination of environmental management guidance; strategic and high-impact environmental communications; environmental management community-of-practice development and support.

5. ACCESSING GEMS SERVICES Bureau Environmental Officers (BEOs) serve as Activity Managers for GEMS II activities within their region/sector. In this capacity, they are “gatekeepers” for the GEMS II work plan, in consultation with the COR.

Operating units interested in accessing GEMS II services, whether funded by the participating Bureaus or with their own buy-in funds, should first contact the relevant BEO/Activity Manager and the COR. See contact list at right.

Please request the GEMS II Pricing and Ordering Guide for more information.

6. PRICING GEMS II is a time and materials (T&M) contract. Categorical, fully burdened T&M labor rates are set by the award based on Cadmus’ and Cloudburst’s GSA price schedules. Travel, logistics and materials costs are treated on a reimbursable basis. Please request the GEMS II Pricing and Ordering Guide for more information.

7. AWARD & GLAAS DETAILS Award # AID-OAA-M-13-00018

Issued under GSA Multiple Award Schedule (Cadmus GSA Multiple Award Schedule Contract No.: GS-10F-0105J)

Period of Performance 30 Sept 2013–29 Sept 2018 No option years.

Ceiling $37.87mn (5-years)

Lead & Group Req. Contact COR for most current code

8. CONTACTS Contract Officer Kevin Sampson [email protected]

Contract Specialist Serapis Irby [email protected]

COR Teresa Bernhard, E3 [email protected]

Deputy COR Brian Hirsch, AFR [email protected]

Bureau Activity Managers (Bureau Environmental Officers)

AFR Brian Hirsch [email protected]

Asia Will Gibson [email protected]

DCHA Erika Clesceri [email protected]

Food Security Bill Thomas [email protected]

E3 Teresa Bernhard [email protected]

E&E Mark Kamiya [email protected]

GH Rachel Dagovitz [email protected]

Global Dev. Lab Dan Evans [email protected]

LAC Jessica Rosen [email protected]

Middle East John Wilson [email protected]

OAPA John Wilson (Afghan.) [email protected] Will Gibson (Pakistan) [email protected]

Chief of Party (Program Manager)

Mark Stoughton The Cadmus Group, Inc. [email protected]

USAID Environmental Compliance and Environmentally Sound

Design & Management Resources online: www.usaidgems.org.

Page 94: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 9. EMMP Skill-Building Exercise Field visit and practical exercise Objectives Through facilitated field visits participants will further develop and apply the practical EIA skills and environmental compliance approaches introduced and discussed up to this point of the workshop, with emphasis on the EMMP. This session also strengthens familiarity with the Sector Environmental Guidelines as a key resource in the preparation of EMMPs.

Summary This field-based exercise is not an isolated activity; it puts into practice the tools and methods presented in the classroom, and approximates our role as development professionals in achieving environmental compliance and ESDM. Once back from the field, participants will combine site- and activity-specific data and information with core EIA skills in a small-group format to prepare an EMMP.

Each group will present their EMMP and any related key findings to the larger training group for further discussion and observations.

This session is divided into four components:

• Session 9a: Briefing and classroom preparation

• Session 9b: Field visit

• Session 9c: Small-group work

• Session 9d: Group presentations in plenary

9a: EMMP Skill-Building Exercise—Briefing and classroom preparation (1.5 hrs.) During this pre-field visit session participants will receive instruction on the methodology and the objectives of the skill-building exercise. This classroom preparation will enable participants to understand the general project scenarios to be assessed. The four technical areas for the skill-building exercise include:

1. Water supply/sanitation (WASH)

2. Natural resource mngt./conservation

3. Agricultural/livestock production

4. Health care waste management

Participants will have already selected or been assigned to one of the above technical areas. Individual groups will form at this time; each group should listen carefully for additional detail on the project sites. Groups will then have some time to review relevant resources or documentation, consult with their accompanying trainer/facilitator, and to confer as a team on a general approach or issues related to the field visit. Questions and issue for discussion include:

Page 95: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

1) Use the Sector Environmental Guidelines and other resources—including your own experience—to identify the types of adverse environmental impacts typically associated with the site or activity you will be visiting (e.g., WASH, pesticide use, etc.).

2) Discuss any other aspects of the design or management of these types of activities that are not environmentally sound.

3) Drawing from the EIA skill-building exercise, consider the most relevant aspects of the baseline situation that should be observed and assessed in the field.

4) Discuss which mitigation measures could be employed to avoid, reduce, or offset potential adverse environmental impacts.

5) Review the structure/organization of the EMMP.

6) Consider what information to collect in the field and what questions to ask the field visit host, project beneficiaries, or other stakeholders. Assign roles, as appropriate, within the group for data collection and/or any interviews.

7) Identify the following roles within each group:

• Chairperson:

• Recorder:

• Spokesperson:

9b: EMMP Skill-Building Exercise—Field visit (approx. 5 hrs.) Participants will use group transportation and proceed to the designated project site. Each group will be accompanied by at least one workshop trainer/facilitator. Please bring to the field:

• Notepad/pen

• Camera (if possible)

• Walking shoes and a hat

• Sunscreen/sunglasses

• Water bottle

Use your eyes and ears to gather information that will enable preparation of the EMMP. Don’t forget to consider the opinions and concerns of beneficiaries and the local community, asking them about the project’s environmental, social and economic impacts and their recommendations.

Page 96: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

9c: EMMP Skill-Building Exercise—Small-group work (approx. 3 hrs.) Once back from the field, each small group will collaborate to prepare an EMMP based on the preceding field visits. During this time, participants will synthesize field observations and develop specific mitigation and monitoring criteria for presentation in the form of an EMMP.

9d: EMMP Skill-Building Exercise—Group presentations in plenary (1.5 hrs.) This component will provide an opportunity for each working group to present its EMMP as based on the field visit and subsequent small-group synthesis and collaboration.

Each group’s EMMP will be presented to the training group at large and key elements or aspects of the findings discussed in plenary form.

Page 97: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 98: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 10.

Environmental Compliance Reporting

Technical presentation and dialogue

Summary USAID CORs and AORs are required by ADS 204 to monitor and evaluate on an ongoing basis whether the environmental mitigation required by the governing IEE(s)/EA is being implemented and is effective.

In other words, COR and AOR oversight responsibilities extend to environmental compliance, just as they do to other elements of project implementation. Practically, this requires that IPs not only systematically comply with IEE/EA conditions by developing and implementing EMMPs, but that they report to USAID on this implementation.

Regional best practice for IP environmental compliance reporting consists of two elements:

1. Project reporting should provide an auditable record of environmental compliance.

Generally, IPs’ quarterly or semi-annual reports should contain a separate environmental compliance section. The section must provide sufficient information on the status of EMMP implementation for USAID to effectively fulfill its oversight and performance monitoring role.

If the EMMP contains a “monitoring log” section, then the EMMP itself—updated with current monitoring results—can simply be appended to the report.

For larger projects, or those with complicated EMMPs, a text summary/short analysis of EMMP implementation is needed. This should highlight key mitigation activities underway in the reporting period, any significant issues encountered, and corrective actions/adjustments made.

Any specific reporting requirements imposed by the IEE or EA must also be satisfied.

2. One or more key project performance indicator(s)—“project results framework”—should reflect overall environmental soundness/environmental compliance.

In other words, the most critical elements of environmental soundness/compliance should be integrated, or “mainstreamed” into the project results framework. For example:

• In a water point provision project, the IP might use the indicator “number of protected water points established with zero fecal coliform after six (6) months” rather than simply “number of water points established.”

• In a road rehabilitation project, the IP might use the indicator “km of road rehabilitated under environmentally sound practices” rather than simply “km of road rehabilitated.”

In both cases, the “environmentalized indicator” demonstrates that core project activities are being executed with attention to environmental soundness/compliance. However, it is NOT expected or appropriate to “environmentalize” every key indicator, or to capture every mitigation measure.

Page 99: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

(This best practice applies to new awards; where EMMPs are developed after the PMP is established, it may not be possible to change key performance indicators.)

Missions should not rely on IP progress reports alone to track environmental compliance. Field visits at minimum should include a quick check for significant environmental design/management problems (for certain activities, the Visual Field Guides [VFGs] may be used).

For environmentally complex activities, specific field visits should be made to verify EMMP implementation.

In summary, IP and USAID environmental compliance roles and responsibilities are as follows:

Project stage Implementing Partner USAID

Workplan & PMP Development

Develops EMMP

Integrates EMMP into budget and workplan

Determines environmental compliance reporting

Review and approval of:

1. the EMMP (for responsiveness to IEE/EA conditions and sufficiency of monitoring);

2. The budget/workplan (to verify that EMMP implementation is planned and funded); and

3. The reporting framework to assure that environmental reporting requirements are met.

Implementation Implementation of EMMP

Reporting on EMMP implementation

Ongoing review of partner progress reports to monitor EMMP implementation

Field visits—at a minimum, all visits should integrate a quick check for significant environmental design/management problems. For environmentally sensitive activities, specific visits should be made to verify EMMP implementation.

Objectives Achieve a common understanding of the two basic elements of IP environmental compliance reporting:

(1) providing USAID with an auditable record of IP environmental compliance; and

(2) "mainstreaming" critical elements of environmental soundness/compliance into one or more core program performance indicators.

Page 100: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61

Envi

ronm

enta

l Com

plia

nce

Rep

ortin

g

GEM

S En

viro

nmen

tal C

ompl

ianc

e-ES

DM

Tra

inin

g Se

ries

Keny

a Ju

ne, 2

016

•U

nder

stan

d U

SAID

cri

teri

a fo

r en

viro

nmen

tal c

ompl

ianc

e re

port

ing.

•R

evie

w r

ole

of E

MM

P in

the

rep

ortin

g pr

oces

s.

•D

iscu

ss “

mai

nstr

eam

ing”

of p

roje

ct e

nviro

nmen

tal

perf

orm

ance

for

repo

rtin

g pu

rpos

es.

•Le

arn

how

to

“env

ironm

enta

lize”

key

pro

ject

indi

cato

rs.

5/23

/201

62

SESS

ION

OBJ

ECT

IVES

:

5/23

/201

63

•N

ow t

hat E

MM

P is

bei

ng

impl

emen

ted,

USA

ID n

eeds

to

kno

w.

–Pr

ojec

t rep

ortin

g m

ust p

rovid

e an

aud

itabl

e re

cord

of

envir

onm

enta

l com

plia

nce.

–O

ne o

r mor

e ke

y pr

ojec

t pe

rform

ance

indi

cato

r(s)

(p

roje

ct re

sults

fram

ewor

k)

shou

ld r

efle

ct o

vera

ll en

viron

men

tal s

ound

ness

/ en

viron

men

tal c

ompl

ianc

e.

TH

E EM

MP

IS IN

PLA

CE

…N

OW

WH

AT?

Team

Lea

ders

and

Act

ivity

M

anag

ers

or C

/AO

Rs

mus

t ac

tivel

y m

anag

e an

d m

onito

r co

mpl

ianc

e w

ith a

ny IE

E/EA

con

ditio

ns,

mod

ifyin

g or

end

ing

activ

ities

not

in

com

plia

nce.

(A

DS

202.

3.6

, 204

.3.4

an

d 30

3.2.

f

WH

AT D

OES

TH

E A

DS

SAY

?

LET

’S L

OO

K A

T #

1 FI

RST

•En

viro

nmen

tal c

ompl

ianc

e re

port

ing

can

be in

tegr

ated

as

part

of

‘regu

lar’

pro

ject

rep

ortin

g.

–Q

uart

erly

or

sem

i-ann

ual p

roje

ct

repo

rts

shou

ld c

onta

in a

sep

arat

e se

ctio

n ad

dres

sing

en

viro

nmen

tal c

ompl

ianc

e.

–T

he s

ectio

n m

ust p

rovi

de s

uffic

ient

info

rmat

ion

on th

e st

atus

of

EMM

P im

plem

enta

tion

for U

SAID

to e

ffect

ively

fulfi

ll its

ove

rsig

ht a

nd

perfo

rman

ce m

onito

ring

role

.

5/23

/201

64

PREP

AR

ING

“A

N A

UD

ITA

BLE

REC

OR

D”

OF

CO

MPL

IAN

CE

Any

spe

cific

rep

ortin

g re

quire

men

ts c

onta

ined

in t

he IE

E m

ust

also

be

addr

esse

d

Titl

e II

CSs

mus

t su

bmit

an A

nnua

l En

viro

nmen

tal C

ompl

ianc

e St

atus

R

epor

t

Page 101: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

If th

e EM

MP

cont

ains

a “

mon

itori

ng r

ecor

d” s

ectio

n, a

ttac

h th

e EM

MP—

upda

ted

with

cur

rent

mon

itori

ng r

esul

ts—

to th

e re

port

.

5/23

/201

65

USE

EM

MP

TO S

TR

EAM

LIN

E R

EPO

RTIN

G

Exce

rpt

of E

MM

P w

ith m

onito

ring

rec

ord

for

med

ium

-sca

le c

onst

ruct

ion

proj

ect.

If th

e EM

MP

cont

ains

a “

mon

itori

ng r

ecor

d” s

ectio

n, s

impl

y at

tach

the

EMM

P to

the

qua

rter

ly o

r se

mi-a

nnua

l rep

ortin

g do

cum

ent.

5/23

/201

66

EMM

P M

ON

ITO

RIN

G L

OG

CA

N S

IMPL

IFY

R

EPO

RTIN

G

The

irri

gatio

n re

habi

litat

ion

EMM

P fr

om t

he s

essi

on o

n EM

MPs

5/23

/201

67

•La

rger

pro

ject

s, or

tho

se w

ith c

ompl

icat

ed

EMM

Ps m

ay r

equi

re m

ore

deta

iled

repo

rtin

g to

cre

ate

an a

udita

ble

reco

rd.

–A

tex

t su

mm

ary

or s

hort

ana

lysi

s of

EM

MP

impl

emen

tatio

n is

nee

ded.

–H

ighl

ight

key

miti

gatio

n ac

tiviti

es u

nder

way

in th

e re

port

ing

perio

d;

–An

y sig

nific

ant i

ssue

s en

coun

tere

d; an

d

–Co

rrec

tive

actio

ns/a

djus

tmen

ts m

ade.

–St

and-

alon

e En

viro

nmen

tal C

ompl

ianc

e re

port

s m

ay a

lso

be w

arra

nted

(e.g

., qu

arte

rly

or s

emi-a

nnua

l)

CO

MPL

EX E

MM

PS R

EQU

IRE

DET

AIL

ED R

EPO

RTIN

G

NO

W O

N T

O R

EQU

IREM

ENT

#2:

•En

viro

nmen

tal i

ssue

s ca

n be

in

tegr

ated

, or “

mai

nstr

eam

ed”

into

the

proj

ect r

esul

ts fr

amew

ork

for

repo

rtin

g pu

rpos

es.

•T

his

does

NOT

mea

n th

at:

–Ev

ery

miti

gatio

n m

easu

re m

ust

be c

aptu

red

in c

ore

indi

cato

rs.

–Ev

ery

core

pro

gram

indi

cato

r m

ust b

e “e

nviro

nmen

taliz

ed.”

•T

his

IS t

o sa

y th

at o

vera

ll, p

roje

ct

succ

ess

mus

t be

part

ly m

easu

red

on

the

mos

t cri

tical

ele

men

ts o

f en

viro

nmen

tal s

ound

ness

/ co

mpl

ianc

e.

5/23

/201

68

“MA

INST

REA

MIN

G”

ENV

IRO

NM

ENTA

L PE

RFO

RM

AN

CE

Wha

t is

Rep

ortin

g R

equi

rem

ent

#2 a

gain

? …

“One

or m

ore

key

proj

ect

perfo

rman

ce in

dica

tor(

s) (p

roje

ct

resu

lts fr

amew

ork)

sho

uld

refle

ct

over

all e

nviro

nmen

tal s

ound

ness

&

com

plia

nce.”

Thi

s ap

plie

s to

new

aw

ards

...

Whe

re E

MM

Ps a

re d

evel

oped

af

ter

the

PMP

is e

stab

lishe

d, i

t m

ay n

ot b

e po

ssib

le t

o ch

ange

key

pr

ogra

m in

dica

tors

.

Page 102: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

69

•Ke

y Pr

ogra

m In

dica

tors

:

–PR

OT

ECT

ED*

wat

er p

oint

s es

tabl

ishe

d.

–#

bene

ficia

ries

rec

eivi

ng

wat

er fr

om P

ROT

ECT

EDw

ater

poi

nts.

–%

of w

ater

poi

nts

with

no

feca

l col

iform

s pe

r 10

0 m

l.

–%

of w

ater

poi

nts

esta

blis

hed

that

are

cle

an a

fter

6 m

onth

s.

*Pro

tect

ed =

fenc

ed a

gain

stliv

esto

ck, d

rain

ed

BRIN

GIN

G E

NV.

ISSU

ES IN

TO

RES

ULT

S FR

AM

EWO

RK

Thi

s in

terv

entio

n w

ill N

OT

sho

w g

ood

perf

orm

ance

. . .

EXA

MPL

E: W

ATER

PO

INT

PR

OV

ISIO

N

5/23

/201

610

•H

ow m

uch

firew

ood

does

a t

ypic

al F

ood

for

Peac

e (F

FP)

prog

ram

use

?

–~1

kg

firew

ood/

pers

on/d

ay x

70,

000

bene

ficia

ries

x 3

65 d

~30,

000

MT

of f

irew

ood/

yr.

•M

itiga

tion:

–Im

prov

ed c

ook

stov

es a

nd c

ooki

ng

prac

tices

•A

dded

to

key

prog

ram

indi

cato

rs:

–A

mou

nt o

f fue

l sav

ed b

y im

prov

ed p

ract

ices

–A

mou

nt o

f tim

esa

ved

by im

prov

ed p

ract

ices

NOT

just

num

ber

of s

tove

s di

strib

uted

BRIN

GIN

G E

NV.

ISSU

ES IN

TO

RES

ULT

S FR

AM

EWO

RK

FUEL

WO

OD

&

DEF

OR

ESTA

TIO

N

EXA

MPL

E: F

OO

D F

OR

PEA

CE

5/23

/201

611

•Ty

pica

l Ind

icat

or:

–K

m o

f roa

d re

habi

litat

ed.

•St

reng

then

ed, “

Envi

ronm

enta

lized

” in

dica

tor:

–K

m o

f roa

d re

habi

litat

ed u

nder

en

viro

nmen

tally

sou

nd p

ract

ices

.*

*pro

vide

def

initi

on o

f env

ironm

enta

lly

soun

d pr

actic

es fr

om E

MM

P

“EN

VIR

ON

MEN

TALI

ZIN

G”

PRO

JEC

T IN

DIC

ATO

RS

EXA

MPL

E: R

OA

D R

EHA

BILI

TAT

ION

5/23

/201

612

USA

ID R

EVIE

W O

F EN

VIR

ON

MEN

TAL

REP

ORT

ING A

s w

ith a

ll ot

her

aspe

cts

of t

he p

roje

ct, t

he C

OR

or

AO

R is

the

pri

mar

y re

view

er.

But t

he M

EO a

nd M

&E

func

tion

may

als

o be

invo

lved

.

WH

O R

EVIE

WS

EMM

PS &

EN

VIR

ON

MEN

TAL

CO

MPL

IAN

CE

REP

ORT

ING

INSI

DE

USA

ID?

WIL

L EN

VIR

ON

MEN

TAL

CO

MPL

IAN

CE

CH

ECK

S BE

PA

RT O

F M

ISSI

ON

M&

E?

Page 103: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

6

1. P

rior

rev

iew

/app

rova

l of p

artn

er-d

evel

oped

:

–E

MM

Pen

sure

res

pons

ive

to IE

E/EA

con

ditio

ns.

–P

roje

ct b

udge

ts a

nd w

orkp

lans

ensu

re E

MM

P im

plem

enta

tion

plan

ned

and

fund

ed

–P

roje

ct R

epor

ting

Fra

mew

ork

ensu

re e

nviro

nmen

tal c

ompl

ianc

e re

port

ing

requ

irem

ents

are

met

.

2. O

ngoi

ng r

evie

w o

f par

tner

pro

gres

s re

port

sto

mon

itor

EMM

P im

plem

enta

tion.

3. F

ield

vis

its:

–at

a m

inim

um, a

ll vi

sits

inte

grat

e a

quic

k ch

eck

for

sign

ifica

nt e

nv.

desi

gn/m

anag

emen

t pr

oble

ms.

–Fo

r en

viro

nmen

tally

sen

sitiv

e ac

tiviti

es,

spec

ific

visi

t(s)

to

audi

t ag

ains

t EM

MP.

•P

rim

ary

resp

onsi

bilit

y fo

r en

suri

ng IP

com

plia

nce

lies

wit

h C

OR

/AO

R.

•M

EO w

ill a

lso

revi

ew/c

lear

whe

re

activ

ities

are

env

ironm

enta

lly

sens

itive

and

/or

IEE/

EA c

ondi

tions

ar

e co

mpl

ex.

•M

EO o

n di

stri

butio

n lis

t fo

r IP

’s qu

arte

rly/s

emi-a

nnua

l pro

ject

re

port

s.

•M

ost

field

vis

its a

re b

y C

OR

/AO

R

or M

&E

Offi

cer.

•M

EO s

houl

d vi

sit

the

mos

t en

viro

nmen

tally

sen

sitiv

e ac

tiviti

es

(REA

may

ass

ist)

.

13

USA

ID E

NV

IRO

NM

ENTA

L C

OM

PLIA

NC

E O

VER

SIG

HT

5/23

/201

614

Wilk

ister

Mag

angi

USA

ID/K

enya

Mis

sion

Env

iron

men

tal O

ffice

r (M

EO)

wm

agan

gi@

usai

d.G

ov

Dav

id K

inyu

a,U

SAID

/Eas

t Afr

ica

Reg

iona

l Env

iron

men

tal A

dvis

or (

REA

)D

kiny

ua@

usai

d.G

ov

Glo

bal E

nvir

onm

enta

l Man

agem

ent

Supp

ort (

GEM

S)

Proj

ect

GEM

SCO

RET

eam

@ca

dmus

grou

p.co

m

Page 104: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 11.

Special Topic: WASH & Water Supply Activities Technical presentation and dialogue Summary Access to safe drinking water is central to the recovery and/or development of any community. The increased use of water for agricultural irrigation can also accelerate economic growth and improve livelihoods. USAID supports a range of activities in the Water, Sanitation and Hygiene (WASH) and agricultural sectors, many of which entail the establishment of new water access points or the rehabilitation of existing structures or systems. In these scenarios USAID must assure that water supplies meet certain quality criteria for domestic and agricultural purposes. As such, water quality assurance, including testing and monitoring, is a key aspect of any water provision effort.

Specific water quality requirements will vary by activity, but generally must account for:

a) a baseline, or initial water quality assessment to determine if water is safe; and

b) a periodic testing or monitoring regime to determine if water source becomes contaminated.

The initial test will ideally provide information on the chemical, biological and physical qualities of the proposed water source (e.g., well, natural spring, stream or river, etc.). Initial water quality testing and monitoring requirements are typically contained in a Water Quality Assurance Plan (WQAP); many IEEs will require preparation of a WQAP in response to proposed water provision efforts (domestic or agricultural). The WQAP will also specify a Response Protocol that details the steps to be taken in the event that water quality test results exceed certain thresholds (e.g., if Arsenic or coliform levels are higher than allowed).

Water quality assurance often presents a practical challenge for project staff. This session will consider the logistical demands of initial testing and monitoring across many, potentially dispersed systems or water access points, in addition to the reality that certain tests may require refrigeration, incubation and laboratory analysis. There are a number of field-oriented tools and resources available to meet some of the most common water quality testing requirements. However, projects are often encouraged to explore multiple options based on their specific water quality assurance needs (e.g., bigger investment in field equipment, use of contract labs, etc.).

Objectives Review water quality assurance requirements and procedures for USAID-supported water provision activities, including WASH initiatives.

Understand practical approaches to water quality assurance and the types of challenges encountered and solutions developed.

Page 105: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 106: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61

Spec

ial T

opic

:W

ASH

and

Wat

er S

uppl

y A

ctiv

ities

GEM

S En

viro

nmen

tal C

ompl

ianc

e-ES

DM

Tra

inin

g Se

ries

Keny

a Ju

ne, 2

016

5/23

/201

62

SESS

ION

OBJ

ECT

IVES

:

•U

nder

stan

d im

port

ance

of W

ASH

and

w

ater

sup

ply

activ

ities

in U

SAID

pr

ogra

mm

ing

–H

uman

hea

lth

–Fo

od s

ecur

ity a

nd e

cono

mic

grow

th

•C

hara

cter

ize

pote

ntia

l adv

erse

impa

cts

of

wat

er p

rovi

sion

act

iviti

es.

•D

iscu

ss U

SAID

app

roac

h to

ass

essi

ng a

nd

miti

gatin

g im

pact

s +

prep

arat

ion

of

com

plia

nce

docu

men

tatio

n.

•U

nder

stan

d w

ater

qua

lity

man

agem

ent a

nd

assu

ranc

e “b

est

prac

tices

” fr

om p

artn

er

pers

pect

ive,

con

side

r ev

olvi

ng n

eeds

.

2222222222222222222222

5/23

/201

63

WAT

ER P

ROV

ISIO

N

•U

nder

pins

pub

lic h

ealth

+ s

usta

ined

eco

nom

ic g

row

th

•C

entr

al t

o m

any

deve

lopm

ent

obje

ctiv

es

•C

an a

dver

sely

impa

ct h

uman

, env

ironm

enta

l hea

lth

•U

SAID

obj

ectiv

e =

“Saf

e W

ater

•Lo

cal e

nviro

nmen

tal c

ondi

tions

, cap

acity

, and

hos

t-co

untr

y re

quire

men

ts c

an v

ary

wid

ely

•W

ater

Qua

lity

Ass

uran

ce P

lan

(WQ

AP)

acc

ount

s fo

r va

riat

ions

and

pro

vide

s fle

xibi

lity

5/23

/201

64

REC

ENT

WQ

AP

ASS

ESSM

ENT

•T

hree

-pha

se A

FR/S

D-c

omm

issi

oned

stu

dy t

o as

sess

ext

ent

and

effic

acy

of A

FR W

QA

P re

quire

men

t

•Ph

ase

I: D

esk

revi

ew u

sing

IEE

data

base

•Ph

ase

II: V

erify

WQ

AP

prep

arat

ion

(and

ext

ent

of

impl

emen

tatio

n) fo

r pr

ojec

ts fo

r w

hich

it is

req

uire

d

•Ph

ase

III: F

ield

wor

k to

ass

ess W

QA

P ef

ficac

y an

d at

trib

utes

(Gha

na, Z

imba

bwe,

Ken

ya +

Tan

zani

a)

•M

ultip

le r

epor

t-ou

ts t

o A

FR a

nd a

cros

s Age

ncy

and

USG

pa

rtne

rs

Page 107: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

65

CH

ALL

ENG

ES T

O IM

PLEM

ENTA

TIO

N

•W

QA

P no

t eve

nly

addr

esse

d or

re

quire

d in

IEEs

for

appl

icab

le

proj

ects

:

•W

ASH

•Ag

ricul

ture

(irr

igat

ion)

•Co

nstru

ctio

n/re

habi

litat

ion

of

scho

ols,

clini

cs, e

tc.

•W

here

req

uire

d by

IEE,

som

etim

es n

o re

cord

of W

QA

P be

ing

deve

lope

d or

im

plem

ente

d

•So

me

WQ

APs

not

res

pons

ive

to fu

ll ra

nge

of c

halle

nges

555555555555555555555555555555/

23/2

016

6

FAC

TOR

S FO

R S

UC

CES

SFU

L W

QA

PS

6

Veri

fied

thro

ugh

field

wor

k (P

hase

III):

•Cl

ear a

nd c

onsis

tent

hos

t cou

ntry

regu

latio

ns

•Co

ordi

natio

n w

ith h

ost c

ount

ry in

stitu

tions

•St

ruct

ured

com

mun

ity o

pera

tion

and

mai

nten

ance

of w

ater

poi

nts

•Q

ualit

y an

d ex

perie

nce

of IP

•Ac

cess

to w

ell-e

quip

ped

and

wel

l-sta

ffed

labo

rato

ries

•Ad

equa

te h

ost-c

ount

ry p

erso

nnel

and

exp

ertis

e

•Ef

fect

ive re

sour

ce m

anag

emen

t

•In

clusio

n of

wat

er q

ualit

y st

anda

rds

in c

ontra

cts

and

awar

ds

5/23

/201

67

REC

OM

MEN

DAT

ION

SR

ECO

MM

END

ATIO

NS

KEY

AC

TOR

S

Rec

onsi

der

the

impo

rtan

ce o

f und

erly

ing

IEE

cond

ition

s, w

hich

de

volv

e to

o m

uch

to a

WQ

AP

mec

hani

sm v

ersu

s a

trad

ition

al

EMM

P

Age

ncy

Envi

ronm

enta

l Cou

ncil;

Afr

ica

Bure

au E

nviro

nmen

tal O

ffice

r; A

fric

a Bu

reau

Wat

er A

dvis

or; R

egio

nal

Envi

ronm

enta

l Adv

isor

s; O

ffice

of W

ater

St

aff

Dev

elop

a t

empl

ate

and/

or e

xam

ple

of a

hig

h-qu

ality

WQ

AP

or

EMM

P ad

dres

sing

wat

er m

onito

ring

req

uire

men

ts fo

r us

e by

M

issi

on E

nviro

nmen

tal O

ffice

rs, A

gree

men

t O

ffice

r’s

Rep

rese

ntat

ive/

Con

trac

ting

Offi

cer’s

Rep

rese

ntat

ive,

and

IPs

Afr

ica

Bure

au E

nviro

nmen

tal O

ffice

r; A

fric

a Bu

reau

Wat

er A

dvis

or; O

ffice

of

Wat

er S

taff

Sele

ct IP

s w

ith w

ater

qua

lity

mon

itori

ng e

xper

ienc

e an

d a

good

tr

ack

reco

rd o

f ach

ievi

ng s

afe

wat

er in

the

hos

t co

untr

y by

st

reng

then

ing

sele

ctio

n cr

iteri

a

Polic

y, Pl

anni

ng, a

nd L

earn

ing;

Offi

ce o

f A

cqui

sitio

ns a

nd A

ssis

tanc

e

Prov

ide

tech

nica

l tra

inin

g to

all

Reg

iona

l Env

ironm

enta

l Adv

isor

s an

d M

issi

on E

nviro

nmen

tal O

ffice

rs o

n w

ater

qua

lity

mon

itori

ng

Afr

ica

Bure

au E

nviro

nmen

tal O

ffice

r; A

fric

a Bu

reau

Wat

er A

dvis

or; O

ffice

of

Wat

er S

taff

Impr

ove

com

mun

ity-b

ased

mon

itori

ng a

nd e

ngag

emen

t in

the

w

ater

qua

lity

proc

ess

to fo

ster

com

mun

ity o

wne

rshi

p of

wat

er

poin

ts a

nd im

prov

e th

e lik

elih

ood

of lo

ng-t

erm

mon

itori

ng

Offi

ce o

f Wat

er S

taff,

Mis

sion

En

viro

nmen

tal O

ffice

rs,

Rep

rese

ntat

ives

/Con

trac

ting

Offi

cer

Rep

rese

ntat

ives

Seek

opp

ortu

nitie

s to

pro

vide

low

-cos

t te

chni

cal s

uppo

rt t

o fa

cilit

ate

com

mun

ity-le

vel w

ater

qua

lity

anal

ysis

Offi

ce o

f Wat

er S

taff,

Mis

sion

En

viro

nmen

tal O

ffice

rs, A

gree

men

t O

ffice

r R

epre

sent

ativ

es/C

ontr

actin

g O

ffice

r R

epre

sent

ativ

es

5/23

/201

68

REC

OM

MEN

DAT

ION

#1:

R

EVIS

IT IE

E LA

NG

UA

GE

•IE

Es in

clud

e cl

eare

r, m

ore

pres

crip

tive

WQ

AP

requ

irem

ent

Prio

r to

drin

king

wat

er p

rovi

sion

, the

pro

ject

will

pre

pare

and

rece

ive

appr

oval

for a

Wat

er

Qua

lity

Ass

uran

ce P

lan

(WQ

AP)

. The

WQ

AP

will

be

prep

ared

in c

onsu

ltatio

n w

ith th

e co

gniz

ant A

OR

/CO

R a

nd/o

r Act

ivity

Man

ager

. Its

pur

pose

isto

ensu

re th

at a

ll ne

w a

nd

reha

bilit

ated

USA

ID-f

unde

d so

urce

s of d

rinki

ng w

ater

pro

vide

wat

er th

at is

safe

for h

uman

co

nsum

ptio

n.Th

e co

mpl

eted

WQ

AP

mus

t be

appr

oved

by:

the

AO

R/C

OR

and

/or A

ctiv

ity

Man

ager

; the

MEO

; and

the

REA

. O

nce

appr

oved

,the

WQ

AP

mus

t be

impl

emen

ted

in fu

ll, a

nd fo

r the

dur

atio

n of

drin

king

w

ater

act

iviti

es.I

mpl

emen

tatio

n m

ust i

nclu

de te

stin

g of

wat

er p

riort

o m

akin

g th

e su

pply

po

int a

vaila

ble

to b

enef

icia

ries.

The

WQ

AP

cons

titut

es a

key

ele

men

t of t

he p

roje

ct’s

EM

MP.

As w

ith a

ll ot

her e

lem

ents

of

the

EMM

P, p

roje

ct b

udge

ts, w

orkp

lans

, and

staf

fing

plan

s mus

t pro

vide

for i

ts fu

ll im

plem

enta

tion.

The

app

rove

d W

QA

P m

ust i

nclu

de a

t min

imum

the

follo

win

g se

ctio

ns:

oPr

ojec

t inf

orm

atio

n (n

ame

of p

roje

ct, n

ame

of IP

, per

iod

of p

erfo

rman

ce, c

onta

ct

info

rmat

ion,

nam

e of

CO

R/A

OR

)

Page 108: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

69

REC

OM

MEN

DAT

ION

#2:

W

QA

P T

EMPL

ATE

•M

ake

avai

labl

e a

high

-qua

lity W

QA

P te

mpl

ate

for

use

by M

EOs,

A/C

OR

s, an

d IP

s

USAID, Kasia McCormick

5/23

/201

610

•W

ilkist

erM

agan

giU

SAID

/Ken

ya M

issi

on E

nvir

onm

enta

l Offi

cer

(MEO

)w

mag

angi

@us

aid.

gov

•D

avid

Kin

yua,

USA

ID/E

ast A

fric

a R

egio

nal E

nvir

onm

enta

l Adv

isor

(R

EA)

dkin

yua@

usai

d.go

v

•G

loba

l Env

iron

men

tal M

anag

emen

t Su

ppor

t (G

EMS)

Pr

ojec

tG

EMSC

OR

ETea

m@

cadm

usgr

oup.

com

FOO

TER

GO

ES H

ERE

Page 109: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 110: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 12. Special Topic: Pesticide Use in USAID Activities Technical presentation and dialogue Summary This session summarizes the environmental and health concerns attendant to pesticide use, the key elements of safer pesticide use, and USAID’s procedures for environmental review of support to pesticide use and procurement.

These procedures define “use and procurement” broadly and add specific, additional requirements to the general pre-implementation environmental review process established by Reg. 216. These requirements are typically satisfied through preparation of a Pesticide Evaluation Report and Safer Use Action Plan (PERSUAP), which is formally an amendment to the project’s IEE. The requirements of the Safer Use Action Plan portion of the PERSUAP are thus IEE conditions, and their implementation is mandatory.

Although PERSUAPs are generally developed by specialists, workshop participants may be involved in the review and implementation of PERSUAPs or related Pest Management Plan.

USAID policy and procedures regarding pesticide use are described in 22 CFR 216.3(b).

Objective Brief the environmental, economic, and human health concerns attendant to pesticide use. Achieve a common understanding of the special environmental compliance requirements that apply to pesticide use and procurement, and of the key elements of safer pesticide use.

Understand the practical elements of achieving pesticide safer use and the implementation of USAID activities that involve pesticides.

Page 111: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 112: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61

Spec

ial T

opic

:Pe

stic

ide

Use

in U

SAID

Act

iviti

es

GEM

S En

viro

nmen

tal C

ompl

ianc

e-ES

DM

Tra

inin

g Se

ries

Keny

a Ju

ne, 2

016

5/23

/201

62

SESS

ION

OBJ

ECT

IVES

:

•U

nder

stan

d im

port

ance

of p

estic

ide

use

in U

SAID

pr

ogra

mm

ing

–Fo

od s

ecur

ity, e

cono

mic

gro

wth

–V

ecto

r co

ntro

l, pu

blic

hea

lth

•C

hara

cter

ize

adve

rse

impa

cts

of p

estic

ide

use

on h

uman

he

alth

and

the

env

iron

men

t.

•D

iscu

ss U

SAID

app

roac

h to

ass

essi

ng a

nd m

itiga

ting

impa

cts

+ pr

epar

atio

n of

com

plia

nce

docu

men

tatio

n.

•U

nder

stan

d “p

estic

ide

safe

r us

e” fr

om p

artn

er p

ersp

ectiv

e an

d di

scus

s pr

ojec

t-ba

sed

“bes

t pr

actic

es.”

5/23

/201

63

PEST

ICID

E U

SE•

Key

inpu

t for

incr

ease

d ag

ricu

ltura

l pr

oduc

tion,

can

pro

mot

e ec

onom

ic

grow

th

•U

sed

to p

rote

ct fo

od s

tock

s, im

port

ant a

spec

t of

food

aid

pr

ogra

mm

ing

(e.g

., FF

P)

•Ve

ctor

con

trol

effo

rts

can

impr

ove

publ

ic h

ealth

–PM

I, In

door

Res

idua

l Spr

ayin

g (IR

S)

3333333333333333333333333333333333333333333333333JESSICA SCRANTON

5/23

/201

64

PEST

ICID

E SA

FER

USE

+ C

OM

PLIA

NC

E

•Pe

stic

ides

are

esp

ecia

lly h

arm

ful t

o hu

man

and

env

ironm

enta

l he

alth

–Pe

stici

des

are

prod

uced

and

form

ulat

ed to

kill

–U

SAID

app

roac

hes

pest

icide

use

with

ext

rem

e ca

utio

n

•D

edic

ated

por

tion

of R

eg. 2

16

–22

CFR

216.

3(b)

—U

SAID

Pes

ticid

e Pr

oced

ures

•Pe

stic

ide

Eval

uatio

n R

epor

t an

d Sa

fer

Use

Act

ion

Plan

: PE

RSU

AP

Page 113: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

65

USA

ID P

EST

ICID

E PR

OC

EDU

RES

Whe

n a

proj

ect i

nclu

des

assi

stan

ce fo

r pr

ocur

emen

t or

use,

or

both

, of p

estic

ides

reg

iste

red

for

the

sam

e or

si

mila

r us

es b

y U

SEPA

with

out r

estr

ictio

n, th

e In

itial

Env

ironm

enta

l Exa

min

atio

n fo

r th

e pr

ojec

t sh

all i

nclu

de a

se

para

te s

ectio

n ev

alua

ting

the

econ

omic

, soc

ial a

nd e

nviro

nmen

tal r

isks

and

ben

efits

of t

he p

lann

ed p

estic

ide

use

to d

eter

min

e w

heth

er th

e us

e m

ay r

esul

t in

sign

ifica

nt e

nviro

nmen

tal i

mpa

ct. F

acto

rs to

be

cons

ider

ed in

suc

h an

ev

alua

tion

shal

l inc

lude

, but

not

be

limite

d to

the

follo

win

g:

(a) T

he U

SEPA

reg

istr

atio

n st

atus

of t

he r

eque

sted

pes

ticid

e;

(b) T

he b

asis

for

sele

ctio

n of

the

req

uest

ed p

estic

ide;

(c) T

he e

xten

t to

whi

ch t

he p

ropo

sed

pest

icid

e us

e is

par

t of

an

inte

grat

ed p

est m

anag

emen

t pro

gram

;

(d) T

he p

ropo

sed

met

hod

or m

etho

ds o

f app

licat

ion,

incl

udin

g av

aila

bilit

y of

app

ropr

iate

app

licat

ion

and

safe

ty e

quip

men

t;

(e) A

ny a

cute

and

long

term

toxi

colo

gica

l haz

ards

, eith

er h

uman

or

envi

ronm

enta

l, ass

ocia

ted

with

the

prop

osed

use

and

mea

sure

s av

aila

ble

to m

inim

ize

such

haz

ards

;

(f) T

he e

ffect

iven

ess

of t

he r

eque

sted

pes

ticid

e fo

r th

e pr

opos

ed u

se;

(g) C

ompa

tibili

ty o

f the

pro

pose

d pe

stic

ide

with

targ

et a

nd n

onta

rget

ecos

yste

ms;

(h) T

he c

ondi

tions

und

er w

hich

the

pes

ticid

e is

to

be u

sed,

incl

udin

g cl

imat

e, fl

ora,

faun

a, ge

ogra

phy,

hydr

olog

y, an

d so

ils;

(i) T

he a

vaila

bilit

y an

d ef

fect

iven

ess

of o

ther

pes

ticid

es o

r no

nche

mic

al c

ontr

ol m

etho

ds;

(j) T

he r

eque

stin

g co

untr

y's

abili

ty t

o re

gula

te o

r co

ntro

l the

dis

trib

utio

n, s

tora

ge, u

se a

nd d

ispo

sal o

f the

re

ques

ted

pest

icid

e;

(k) T

he p

rovi

sion

s m

ade

for

trai

ning

of u

sers

and

app

licat

ors;

and

(l) T

he p

rovi

sion

s m

ade

for

mon

itori

ng th

e us

e an

d ef

fect

iven

ess

of t

he p

estic

ide.

5/23

/201

66

•W

ilkist

erM

agan

giU

SAID

/Ken

ya M

issi

on E

nvir

onm

enta

l Offi

cer

(MEO

)w

mag

angi

@us

aid.

gov

•D

avid

Kin

yua,

USA

ID/E

ast A

fric

a R

egio

nal E

nvir

onm

enta

l Adv

isor

(R

EA)

dkin

yua@

usai

d.go

v

•G

loba

l Env

iron

men

tal M

anag

emen

t Su

ppor

t (G

EMS)

Pr

ojec

tG

EMSC

OR

ETea

m@

cadm

usgr

oup.

com

Page 114: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 13.

Special Topic: Environmental Compliance for Sub-Projects and Sub-Awards

Technical presentation and dialogue

Summary Many USAID programs and large projects include subprojects. These are small-scale activities that are: (1) carried out within—or “under the umbrella” of—a larger project; and (2) are not fully identified or designed when the larger project or program is approved.

Subprojects pose an environmental compliance challenge: Reg. 216 requires environmental review prior to activity implementation. However, subprojects typically are not yet clearly defined/designed when the overarching project IEE is written.

The standard solution is that the IEE contains a negative determination with conditions for the anticipated subproject activities. The “condition” in this scenario is that a simplified EIA process is established to review subprojects and determine mitigation and monitoring conditions. This is typically only allowable if:

• The general nature of subproject activities is known; and

• These activities generally have low or easily controllable potential adverse impacts.

The Africa Bureau Environmental Review Form (ERF) is the most common instrument for implementing these simplified environmental review procedures for subprojects. The form’s instructions guide the reviewer through a subproject screening, and then preliminary assessment process for subject activities.

The Africa Bureau ERF was updated in late 2010 to clarify appropriate use, and to reflect recent changes in AFR best practice. This session will highlight the recent changes and overall use/application of the ERF.

Under the ERF screening process, subproject activities are classified as either: (a) requiring no further environmental review; or (b) requiring at least an environmental review report. The environmental review report resembles a shorter, simplified IEE. Like the IEE, it is equivalent to a “preliminary assessment” in general EIA procedures.

Objectives Brief the subproject review concept and procedure and the updated Environmental Review Form (ERF). Outline the circumstances under which this process can be employed within AFR projects/programs.

Reference Documents

• Updated AFR Environmental Review Form (in this section of the Sourcebook)

Page 115: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 116: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61

Spec

ial T

opic

:En

viro

nmen

tal C

ompl

ianc

e fo

r Su

b-Pr

ojec

ts a

nd S

ub-A

war

ds

GEM

S En

viro

nmen

tal C

ompl

ianc

e-ES

DM

Tra

inin

g Se

ries

Keny

a Ju

ne, 2

016

5/23

/201

62

SESS

ION

OBJ

ECT

IVES

•U

nder

stan

d th

e su

bpro

ject

con

cept

and

the

en

viro

nmen

tal c

ompl

ianc

e ch

alle

nge

it pr

esen

ts

•D

iscu

ss u

se o

f the

Afr

ica

Bure

au

Envir

onm

enta

l Rev

iew

For

m(E

RF)

pro

cess

for

subp

roje

cts

•R

evie

w t

he E

RF

scre

enin

g pr

oces

s

•Ex

plai

n pr

epar

atio

n of

the

Env

ironm

enta

l Re

view

Rep

ort(

ERR

)

JONI BYKER

5/23

/201

63

Smal

ler

activ

ities

exe

cute

d un

der

a la

rger

pro

ject

or

prog

ram

e.g.

, a s

ubgr

antp

rogr

am, a

n “u

mbr

ella

pro

ject

SUBP

ROJE

CT

S A

RE.

. .

Subp

roje

cts

are

a pr

oble

m fo

r R

eg. 2

16.

!

WH

AT A

RE

SUBP

ROJE

CT

S?

WH

Y?

5/23

/201

644

1.Su

bpro

ject

s ar

eof

ten

not

defin

ed w

hen

the

proj

ect

is p

ropo

sed

and

the

IEE

wri

tten

2.Bu

t th

e fir

st s

tep

of a

ny E

IA

proc

ess

(incl

udin

g R

eg. 2

16)

is

unde

rsta

ndin

g th

e ac

tivity

!

3.R

eg. 2

16 r

equi

res

revi

ew o

f ac

tiviti

es B

EFO

RE

fund

s ar

e ob

ligat

ed

SCR

EEN

TH

E A

CT

IVIT

YU

ND

ERST

AN

D

TH

E PR

OPO

SED

A

CT

IVIT

Y

!WH

AT IS

TH

E PR

OBL

EM?

Why

is t

he

activ

ity b

eing

pr

opos

ed?

Wha

tis

bei

ng

prop

osed

?

Base

d on

the

na

ture

of t

he

activ

ity w

hat

leve

l of

envi

ronm

enta

l re

view

is

indi

cate

d?

Page 117: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

655

IFth

ese

cond

ition

s ar

e m

et,

subp

roje

ct a

ctiv

ities

can

be

appr

oved

co

nditi

onal

ly.

–Th

at is

, the

IEE

cont

ains

a

nega

tive

det

erm

inat

ion

wit

h co

ndit

ions

–Co

nditi

on is

that

eac

h su

bpro

ject

is

subj

ect t

o sim

plifi

ed e

nviro

nmen

tal

revie

w

HO

W D

O W

E R

ESO

LVE

“PR

IOR

REV

IEW

” IS

SUE?

1.G

ener

al n

atur

e of

su

bpro

ject

act

iviti

es

mus

t be

kno

wn.

2.T

hese

act

iviti

es m

ust

have

low

or

easi

ly

cont

rolla

ble

pote

ntia

l adv

erse

im

pact

s.

TW

O C

ON

DIT

ION

S M

UST

BE

MET

:

5/23

/201

66

WH

AT IS

A “

SIM

PLIF

IED

EN

VIR

ON

MEN

TAL

REV

IEW

PRO

CES

S”

•T

he E

nviro

nmen

tal R

evie

w F

orm

(E

RF)

is t

he m

ost

com

mon

ly u

sed

subp

roje

ct r

evie

w

inst

rum

ent/

proc

ess.

•T

he E

RF

is u

sual

ly c

ompl

eted

by

the

IP o

r th

eir

sub-

gran

tee.

•ER

F w

as r

ecen

tly u

pdat

ed—

incl

uded

in s

ourc

eboo

k

5/23

/201

67

SUBP

ROJE

CT

REV

IEW

STA

RTS

TH

E SA

ME

WAY

TH

AT A

LL E

IA

PRO

CES

SES

STA

RT. .

.

GET

TIN

G S

TART

ED W

ITH

TH

E ER

FA. Fleuret/USAID

5/23

/201

68

… U

ND

ERST

AN

D, T

HEN

SC

REE

N

888

SCR

EEN

TH

E A

CT

IVIT

Y

Base

d on

the

N

ATU

RE

of t

he

activ

ity w

hat

leve

l of

envi

ronm

enta

l an

alys

is is

in

dica

ted?

CO

ND

UC

T A

PR

ELIM

INA

RY

ASS

ESSM

ENT

A r

apid

, si

mpl

ified

EIA

st

udy

usin

g si

mpl

e to

ols

(e.g

. the

U

SAID

IEE)

AC

TIV

ITY

IS

OF

MO

DE

RA

TE

OR

UN

KN

OW

NR

ISK

SIG

NIF

ICA

NT

A

DV

ER

SE

IMPA

CT

S P

OSS

IBLE

SIG

NIF

ICA

NT

A

DV

ER

SE

IMPA

CT

S V

ERY

UN

LIK

ELY

AC

TIV

ITY

IS

LOW

RIS

K(O

f its

na

ture

, ver

y un

likel

y to

ha

ve s

igni

fican

t a

dver

se

impa

cts)

AC

TIV

ITY

IS

HIG

H R

ISK

(Of i

ts

natu

re, l

ikel

y to

hav

e sig

nific

ant

adve

rse

impa

cts)

Phas

e II

Phas

e I

UN

DER

STA

ND

PR

OPO

SED

A

CT

IVIT

Y

WH

Y is

the

ac

tivity

bei

ng

prop

osed

?

WH

ATis

bei

ng

prop

osed

?

BEG

IN

FULL

EI

A

STU

DY

STA

RT

IMPL

EMEN

TAT

ION

Page 118: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

69

1. Is

the

act

ivity

V

ERY

LO

W R

ISK

?

NO

2. Is

the

act

ivity

V

ERY

HIG

H R

ISK

?

3. Is

the

act

ivity

M

OD

ERAT

E O

R

UN

KN

OW

N R

ISK

?

Prep

are

Envi

ronm

enta

l Rev

iew

Rep

ort

NO

YES

YES

star

t

*Env

ironm

enta

l R

evie

w R

epor

t =

a “p

relim

inar

y as

sess

men

t”

IMPL

ICAT

ION

NO

FU

RTH

ER R

EVIE

W IS

NEC

ESSA

RY.

PREP

AR

E EN

VIR

ON

MEN

TAL

REV

IEW

REP

ORT

*Bu

t no

te t

hat

if de

sign

is n

ot c

hang

ed,

activ

ity w

ill li

kely

req

uire

full

EA, o

r no

t be

fund

ed.

SCR

EEN

ING

UN

DER

SU

BPRO

JEC

T P

ROC

EDU

RES

5/23

/201

610

1.LI

STea

ch a

ctiv

ity

2.C

HE

CK

EA

CH

ac

tivi

ty a

gain

st t

wo

lists

•A

list

of “

very

low

ris

k”

activ

ities

•A

list

of “

very

hig

h ri

sk”

activ

ities

3.R

EC

OR

Dth

e sc

reen

ing

resu

lt fo

r ea

chac

tivi

ty3

poss

ible

res

ults

: ve

ry lo

w r

isk,

ve

ry h

igh

risk

, m

oder

ate/

unkn

own

risk

TH

E EN

VIR

ON

MEN

TAL

REV

IEW

FO

RM

(ER

F) G

UID

ES T

HE

PRO

CES

S ST

EP-B

Y-ST

EP:

HO

W D

O W

E SC

REE

N?

5/23

/201

611

AC

TIV

ITY:

AC

TIO

NS:

a de

sire

d ac

com

plis

hmen

t or

outp

ut

(e.g

., a

road

, see

dlin

g pr

oduc

tion,

or

rive

r di

vers

ion

to ir

riga

te la

nd)

AN

AC

TIV

ITY

IS:

Acc

ompl

ishi

ng a

n ac

tivity

re

quire

s a

set

of a

ctio

ns

Scre

enin

g is

don

e at

the

act

ivity

le

vel,

NO

T t

he a

ctio

n le

vel.

!

WH

AT IS

AN

AC

TIV

ITY

?

mar

ket

acce

ss

road

re

habi

litat

ion

Surv

ey, g

radi

ng, c

ulve

rt

cons

truc

tion,

com

pact

ion,

et

c.

5/23

/201

612

•Ed

ucat

ion,

tec

hnic

al a

ssis

tanc

e or

tra

inin

g (e

xcep

t fo

r ac

tiviti

es

dire

ctly

affe

ctin

g th

e en

viro

nmen

t)

•C

omm

unity

aw

aren

ess

initi

ativ

es

•Te

chni

cal s

tudi

es n

ot in

volv

ing

intr

usiv

e sa

mpl

ing

of e

ndan

gere

d sp

ecie

s or

cri

tical

hab

itats

SOM

E “V

ERY

LO

W R

ISK

” A

CT

IVIT

IES

•R

iver

bas

in o

r ne

w la

nds

deve

lopm

ent

•Pl

anne

d re

sett

lem

ent

of

hum

an p

opul

atio

ns

•Pe

netr

atio

n ro

ad b

uild

ing

•D

rain

age

of w

etla

nds

or

othe

r pe

rman

ently

floo

ded

area

s

SOM

E “V

ERY

HIG

H R

ISK

” A

CT

IVIT

IES

EXA

MPL

ES: V

ERY

LO

W, H

IGH

RIS

K A

CT

IVIT

IES

Page 119: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

613

WH

AT A

BOU

T

“MO

DER

ATE

OR

UN

KN

OW

N R

ISK

” A

CT

IVIT

IES?

By d

efin

ition

, if a

n ac

tivity

is

–N

OT

“ver

y hi

gh r

isk”

–A

ND

NO

T“v

ery

low

ris

k,”

TH

ENit

IS“m

oder

ate

or u

nkno

wn

risk

The

form

list

s so

me

REP

RES

ENTA

TIV

E m

oder

ate-

risk

act

iviti

es

•Sm

all-s

cale

infr

astr

uctu

re

with

kno

wn

pote

ntia

l to

caus

e en

viro

nmen

tal h

arm

•Fi

eld

agri

cultu

ral

expe

rim

enta

tion

of M

OR

E th

an 4

ha.

MO

DER

ATE-

RIS

K

AC

TIV

ITIE

S IN

CLU

DE.

. .

TH

IS L

IST

IS N

OT

EX

HA

UST

IVE!

!5/

23/2

016

14

AFT

ER S

CR

EEN

ING

, WH

AT N

EXT

?

5/23

5/23

/201

/201

665/

23/2

016

1414141414

SCR

EEN

TH

E A

CT

IVIT

Y

Base

d on

the

N

ATU

RE

of t

he

activ

ity w

hat

leve

l of

envi

ronm

enta

l an

alys

is is

in

dica

ted?

CO

ND

UC

T A

PR

ELIM

INA

RY

ASS

ESSM

ENT

A r

apid

, si

mpl

ified

EIA

st

udy

usin

g si

mpl

e to

ols

(e.g

. the

U

SAID

IEE)

AC

TIV

ITY

IS

OF

MO

DE

RA

TE

OR

UN

KN

OW

NR

ISK

SIG

NIF

ICA

NT

A

DV

ER

SE

IMPA

CT

S P

OSS

IBLE

SIG

NIF

ICA

NT

A

DV

ER

SE

IMPA

CT

S V

ERY

UN

LIK

ELY

AC

TIV

ITY

IS

LOW

RIS

K(O

f its

na

ture

, ver

y un

likel

y to

ha

ve s

igni

fican

t a

dver

se

impa

cts)

AC

TIV

ITY

IS

HIG

H R

ISK

(Of i

ts

natu

re, l

ikel

y to

hav

e sig

nific

ant

adve

rse

impa

cts)

Phas

e II

Phas

e I

UN

DER

STA

ND

PR

OPO

SED

A

CT

IVIT

Y

WH

Y is

the

ac

tivity

bei

ng

prop

osed

?

WH

ATis

bei

ng

prop

osed

?

BEG

IN

FULL

EI

A

STU

DY

STA

RT

IMPL

EMEN

TAT

ION

5/23

/201

615

1.If

alla

ctiv

ities

are

“ver

y lo

w

risk

,” en

viro

nmen

tal r

evie

w

proc

ess

ends

sign

and

sub

mit!

2.If

any

activ

ities

are

:

–m

oder

ate/

unkn

own

ri

sk, o

r

–ve

ry h

igh

risk

an E

nviro

nmen

tal R

evie

w R

epor

t (E

RR

)mus

t be

com

plet

ed.

ENV

IRO

NM

ENTA

L R

EVIE

W R

EPO

RT (E

RR

):

AFT

ER S

CR

EEN

ING

, TW

O P

OSS

IBIL

ITIE

S …

1.Su

mm

ary

of P

ropo

sal

2.D

escr

iptio

n of

Act

iviti

es

3.Si

te-s

peci

fic e

nviro

nmen

tal S

ituat

ion

& H

ost

Cou

ntry

Req

uire

men

ts

4.En

viro

nmen

tal I

ssue

s, M

itiga

tion

Act

ions

, and

Fin

ding

s

5.EM

MP

6.O

ther

info

rmat

ion

(pho

tos,

refe

renc

es, i

ndiv

idua

ls c

onsu

lted)

5/23

/201

616

Prov

ide

docu

men

tatio

n an

d an

alys

is t

hat:

Allo

ws

the

prep

arer

to

reco

mm

end

whe

ther

or

not

sign

ifica

nt a

dver

se

impa

cts

are

likel

y

Allo

ws

the

revi

ewer

to

agre

e or

di

sagr

ee w

ith t

he p

repa

rer’s

re

com

men

datio

ns

Sets

out

miti

gatio

n an

d m

onito

ring

for

adve

rse

impa

cts

WH

AT R

ECO

MM

END

ATIO

NS

RES

ULT

FRO

M A

N E

RR

?

PUR

POSE

OF

ENV.

REV

IEW

REP

ORT

(ER

R)

LIK

E A

NY

PR

ELIM

INA

RY A

SSES

SMEN

T T

HE

PUR

POSE

OF

TH

E ER

R IS

TO

. . .

Page 120: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

617

For EA

CH

activ

ity o

f:

–M

oder

ate

or u

nkno

wn

risk

–Ve

ry h

igh

risk

The

pre

pare

r re

com

men

ds o

ne

of t

hree

find

ings

:

1.Si

gnifi

cant

adv

erse

im

pact

s ve

ry u

nlik

ely

2.W

ith s

peci

fied

miti

gatio

n an

d m

onito

ring,

sig

nific

ant

adve

rse

impa

cts

very

un

likel

y

3.Si

gnifi

cant

adv

erse

im

pact

s a

re p

ossi

ble

ERR

FIN

DIN

GS:

ERR

FIN

DIN

GS

5/23

/201

618

•R

ECO

RD

Sth

e fin

ding

s

•SI

GN

Sth

e ce

rtifi

catio

n

•SU

BMIT

Sth

e En

viro

nmen

tal R

evie

w

Form

& E

RR

to

the

CO

R

or A

OR

•W

AIT

Sfo

r ap

prov

al

befo

re e

xpen

ding

any

re

sour

ces

on t

he a

ctiv

ity

FIN

AL

STEP

S: T

HE

PREP

AR

ER …

5/23

/201

619

TH

E C

ERT

IFIC

ATIO

N:

–A

ffirm

sth

at t

he E

RF

and

ERR

are

co

rrec

t an

d co

mpl

ete

–C

omm

itsth

e IP

to

impl

emen

ting

the

miti

gatio

n an

d m

onito

ring

mea

sure

s sp

ecifi

ed in

the

ER

R

–C

omm

itsth

e IP

to

mak

ing

sure

tha

t fie

ld s

taff,

man

ager

s an

d pa

rtne

rs

unde

rsta

nd e

nviro

nmen

tally

sou

nd

prac

tices

for

the

activ

ities

in

ques

tion

C/A

OR

Alw

ays

MEO

REA

BEO

if an

y sc

reen

ing

resu

lts

are

“hig

h ri

sk”*

,or

if th

ere

are

any

findi

ngs

of “s

igni

fican

t ad

vers

e im

pact

s po

ssib

le”*

WH

O A

PPRO

VES

?

*sho

uld

be v

ery

rare

WH

AT A

BOU

T T

HE

SIG

NED

CER

TIF

ICAT

ION

?

5/23

/201

620

Prop

osed

activ

ity

appl

ySC

REE

NIN

Gcr

iteri

a

Do

ENV

IRO

NM

ENTA

LR

EVIE

W R

EPO

RT (

ERR

)

Obt

ain

scre

enin

g re

sults

:

Mak

e R

ecom

men

datio

n:

(Will

requ

ire a

full

EA, if

allo

wed

to p

roce

ed.)

No

furt

her

revi

ew n

eede

d:

sign

and

sub

mit

the

Envi

ronm

enta

l Rev

iew

For

m

(ER

F).

Sign

and

sub

mit.

OV

ERV

IEW

OF

TH

E ER

F A

ND

ER

R P

ROC

ESS

Very

low

ris

k

Hig

h ri

skM

oder

ate/

unkn

own

risk

No

sign

ifica

nt a

dver

se im

pact

With

ade

quat

e m

itiga

tion

and

mon

itori

ng, n

o si

gnifi

cant

ad

vers

e im

pact

Sign

ifica

nt a

dver

se im

pact

Page 121: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

621

The

ER

F is

a G

ENER

AL

form

. It s

houl

d be

ada

pted

each

tim

e it

is u

sed.

For

exam

ple:

to r

efle

ct s

peci

fic s

ubpr

ojec

t ac

tiviti

es,

and

spec

ific

loca

l env

ironm

enta

l iss

ues.

1.C

UST

OM

IZE

SCR

EEN

ING

LIS

TS

•St

anda

rd m

itiga

tion

or b

est

prac

tices

for

spec

ific

activ

ities

can

sav

e th

e ef

fort

of

draf

ting

repe

titiv

e ER

Rs

•Su

ch a

ctiv

ities

cou

ldfa

ll in

to a

four

th

scre

enin

g ca

tego

ry: “

mod

erat

e ri

sk w

ith

stan

dard

miti

gatio

n” …

Act

iviti

es in

thi

s fo

urth

cat

egor

y w

ould

no

t re

quire

an

ERR

, but

wou

ld b

e re

quire

d to

follo

w t

he s

tand

ard

miti

gatio

n m

easu

res

deve

lope

d by

the

proj

ect

2.C

REA

TE

“STA

ND

AR

D M

ITIG

ATIO

N”

(BES

T P

RA

CT

ICES

) FO

R S

PEC

IFIC

SU

BPRO

JEC

T A

CT

IVIT

IES

Proj

ect-

spec

ific

chec

klis

ts a

nd o

ther

ap

proa

ches

are

pos

sibl

e.

3.D

ON

’T U

SE T

HE

ERF

AT A

LL!

AD

APT

ING

ER

F PR

OC

ESS

TO P

ROJE

CT

NEE

DS

Julie Larsen Maher/Wildlife Conservation Society

5/23

/201

622

•W

ilkist

erM

agan

giU

SAID

/Ken

ya M

issi

on E

nvir

onm

enta

l Offi

cer

(MEO

)w

mag

angi

@us

aid.

gov

•D

avid

Kin

yua,

USA

ID/E

ast A

fric

a R

egio

nal E

nvir

onm

enta

l Adv

isor

(R

EA)

dkin

yua@

usai

d.go

v

•G

loba

l Env

iron

men

tal M

anag

emen

t Su

ppor

t (G

EMS)

Pr

ojec

tG

EMSC

OR

ETea

m@

cadm

usgr

oup.

com

FOO

TER

GO

ES H

ERE

Page 122: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Note to USAID Staff, Consultants & Partners Regarding the:

Africa Bureau ENVIRONMENTAL REVIEW FORM & INSTRUCTIONS

Appropriate use 1. The Environmental Review Form (ERF) can only be used when and as specifically authorized by the IEE or EA governing the

project or program in question. For IEEs, this authorization is made in the form of a negative determination with conditions. Authorized use of the ERF is limited to the specific class of activities enumerated in the determination.

2. The BEO will not clear an IEE or EA that authorizes use of the ERF unless ALL of the following are true:

a. the general nature or potential scope of the activities for which the ERF will be used are known at the time the IEE is written (e.g. small infrastructure rehabilitation, training and outreach for a specified purpose, etc.).

b. these activities will be executed under a grant or subproject component of a parent project/program. The ERF cannot be used in lieu of a request for categorical exclusion, IEE or IEE amendment when new activities/components are to be added to existing projects, programs or sector portfolios.

c. of their general nature, foreseeable adverse environmental impacts are small or easily controllable with BASIC MITIGATION TECHNIQUES that can BE SUCCESSFULLY IMPLEMEMENTED BY FIELD STAFF.

d. of their general nature, the activities are NOT large-scale.

There is no formal AFR standard for “small-scale activities.” Over time, AFR has developed some “rules of thumb” for activities that are BOTH small-scale AND pose very low risks of significant adverse impacts. These are used in the ERF itself: e.g. construction involving less than 10,000 sq ft total disturbed area and less than $200,000 total cost; road rehabilitation of less than 10km total length without change to alignment or right-of-way. Activities moderately larger than these “rules of thumb” are also small-scale, but are treated by the ERF as being of moderate/unknown risk, thus requiring an environmental review report.

What does “moderately larger” mean? What about activities for which there is no “rule of thumb” built into the ERF? Absolute physical scale and funding level, physical scale relative to the surrounding built environment, population affected, and number of locations affected are among the factors relevant to determining whether a class of activities is “small scale.” The IEE must provide enough information for the BEO to assess whether the activities proposed for subproject review will be indeed be small scale within their implementation context.

Adaptation of the form 1. Text in UNDERLINE & BLUE HIGHLIGHT MUST be customized to the particular project/mission.

2. Yellow highlighted text must be reviewed and then modified, deleted or retained, as appropriate.

3. Both the form AND instructions should be generally reviewed and modified to reflect the specific project/program and implementation context.

4. The adapted form and instructions must be appended to the Initial Environmental Examination for the overall project.

5. For NRM-oriented programs (especially those involving CBNRM, ecotourism, enterprises exploiting non-timber forest products, etc.) consider adaptation and use of the Supplemental Environmental Review Form for NRM sector activities.

Questions and Guidance General guidance on subproject review is available on the MEO Resource Center at www.encapafrica.org/meoEntry.htm. For specific questions, contact the Mission Environmental Officer or Regional Environmental Advisor. Good-practice examples of completed forms, environmental review reports and environmental management plans are available from USAID/AFR’s ENCAP project: [email protected]; www.encapafrica.org.

Revision history: Major update on 24 June 2010 to clarify appropriate use, revise Env Review Report structure, and update clearance requirements. Formatting and presentation revised 17 Jan 2005. Revised April 13, 2004, to include biosafety considerations and better reflect the Supplemental Environmental Review Form for NRM sector activities.

DELETE THIS PAGE BEFORE DISTRIBUTING THIS FORM

Download at http://www.encapafrica.org/documents/AFR-EnvReviewForm-20Dec2010.doc version 20 Dec 2010

Page 123: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

XXXX

Instructions for environmental review of XXX Program Subprojects/Sub-grants Note: These instructions accompany the attached “Environmental Review Form for USAID/XXX Program/Project Activities” (ERF). Follow, but DO NOT SUBMIT, these instructions.

Who must submit the Environmental Review Form (ERF)? ALL Implementing Partners seeking to implement [describe qualifying activities] under the XXX Program/Project must complete, sign and submit the ERF to [insert name & email of C/AOTR].

Authority: Use of the ERF for these activities is mandated by the governing Initial Environmental Examination (IEE) for the XXX Project/Program. The IEE can be downloaded at: [insert URL].

No implementation without an approved ERF The proposed activities cannot be implemented and no “irreversible commitment of resources” for these activities can be made until the ERF (including Environmental Review Report, if required, see Step 4, below) is cleared by the C/AOTR, the Mission Environmental Officer (MEO) and the Regional Environmental Advisor (REA).

NOTE: USAID may deny clearance to the ERF, or may require modification and re-submission for clearance.

Environmental management requirements resulting from the ERF If the ERF requires preparation of an Environmental Review Report (see Step 4, below), any environmental management measures specified in the approved Environmental Review Report MUST be implemented.

Situations in which additional environmental review is required. If the ERF finds that one of more of the proposed activities has the potential to cause significant adverse environmental impacts, the activities must be redesigned or an IEE or full Environmental Assessment must be conducted and approved prior to implementation.

If USAID determines that the proposed activities are outside the scope of activities for which use of this form is authorized, the activities must be redesigned or an IEE or IEE Amendment will be required.

In either situation, USAID will confer with the partner to determine next steps. Note: If an IEE or EA is required, all environmental management measures specified in the IEE or EA must then be implemented.

Step 1. Provide requested “Applicant information” (Section A of the ERF)

Step 2. List all proposed activities In Section B of the form, list all proposed activities.

Activities are a desired accomplishment or output: e.g. seedling production, road rehabilitation, school construction. Each activities has entailed actions—for example, road rehabilitation includes survey, grading, culvert construction, compaction, etc. Be aware of these entailed actions, but do NOT list them.

List activities DESCRIPTIVELY. For example, “training” is not a sufficient activity listing. The listing must specify WHO is being trained, and in WHAT.

AFR Environmental Review Form Instructions 20 Dec 2010

Page 124: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Africa Bureau Environmental Review Form 20 Dec 2010 2/12

Step 3a. Screening: Identify low-risk and high-risk activities For each activity you have listed in Section B of the form, refer to the list below to determine whether it is a listed low-risk or high-risk activity.

If an activity is specifically identified as “very low risk” or “high risk” in the list below, indicate this in the “screening result” column in Section B of the form.

Very low-risk activities (Activities with low potential for adverse biophysical or

health impacts; including §216.2(c)(2))

High-risk activities (Activities with high potential for adverse biophysical or

health impacts; including §216.2(d)(1))

Provision of education, technical assistance, or training. (Note that activities directly affecting the environment. do not qualify.)

Community awareness initiatives.

Controlled agricultural experimentation exclusively for the purpose of research and field evaluation confined to small areas (normally under 4 ha./10 acres). This must be carefully monitored and no protected or other sensitive environmental areas may be affected).

Technical studies and analyses and other information generation activities not involving intrusive sampling of endangered species or critical habitats.

Document or information transfers.

Nutrition, health care or family planning, EXCEPT when (a) some included activities could directly affect the environment (construction, water supply systems, etc.) or (b) biohazardous (esp. HIV/AIDS) waste is handled or blood is tested.

Small-scale construction. Construction or repair of facilities if total surface area to be disturbed is under 10,000 sq. ft. (approx. 1,000 sq. m.) (and when no protected or other sensitive environmental areas could be affected).

Intermediate credit. Support for intermediate credit arrangements (when no significant biophysical environmental impact can reasonably be expected).

Maternal and child feeding conducted under Title II of Public Law 480.

Title II Activities. Food for development programs under Title III of P.L. 480, when no on-the-ground biophysical interventions are likely.

Capacity for development. Studies or programs intended to develop the capability of recipients to engage in development planning. (Does NOT include activities directly affecting the environment)

Small-scale Natural Resource Management activities for which the answer to ALL SUPPLEMENTAL SCREENING QUESTIONS (see Natural Resources supplement) is “NO.”

River basin development

New lands development

Planned resettlement of human populations.

Penetration road building, or rehabilitation of roads (primary, secondary, some tertiary) over 10 km length, and any roads which may pass through or near relatively undegraded forest lands or other sensitive ecological areas

Substantial piped water supply and sewerage construction.

Major bore hole or water point construction.

Large-scale irrigation; Water management structures such as dams and impoundments

Drainage of wetlands or other permanently flooded areas.

Large-scale agricultural mechanization.

Agricultural land leveling.

Procurement or use of restricted use pesticides, or wide-area application in non-emergency conditions under non-supervised conditions. (Consult MEO.)

Light industrial plant production or processing (e.g., sawmill operation, agro-industrial processing of forestry products, tanneries, cloth-dying operations).

High-risk and typically not funded by USAID:

Actions affecting protected areas and species. Actions determined likely to significantly degrade protected areas, such as introduction of exotic plants or animals.

Actions determined likely to jeopardize threatened & endangered species or adversely modify their habitat (esp. wetlands, tropical forests)

Activities in forests, including:

Conversion of forest lands to rearing of livestock

Planned colonization of forest lands

Procurement or use of timber harvesting equipment

Commercial extraction of timber

Construction of dams or other water control structures that flood relatively undegraded forest lands

Construction, upgrading or maintenance of roads that pass through relatively non-degraded forest lands. (Includes temporary haul roads for logging or other extractive industries)

(This list of activities is taken from the text of 22 CFR 216 and other applicable laws, regulations and directives)

Page 125: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Africa Bureau Environmental Review Form 20 Dec 2010 3/12

Step 3b: Identifying activities of unknown or moderate risk. All activities NOT identified as “very low risk” or “very high risk” are considered to be of “unknown or moderate risk.” Common examples of moderate-risk activities are given in the table below.

Check “moderate or unknown risk” under screening results in Section B of the form for ALL such activities.

Common examples of moderate-risk activities CAUTION: If ANY of the activities listed in this table may adversely impact (1) protected areas, (2) other sensitive environmental areas, or (3) threatened and endangered species and their habitat, THEY ARE NOT MODERATE RISK. All such activities are HIGH RISK ACTIVITIES.

Small-scale agriculture, NRM, sanitation, etc. (You may wish to define what “small scale” means for each activity)

Agricultural experimentation. Controlled and carefully monitored agricultural experimentation exclusively for the purpose of research and field evaluation of MORE than 4 ha.

NOTE Biotechnology/GMOs: No biotechnology testing or release of any kind are to take place within an assisted country until the host countries involved have drafted and approved a regulatory framework governing biotechnology and biosafety.

All USAID-funded interventions which involve biotechnologies are to be informed by the ADS 211 series governing "Biosafety Procedures for Genetic Engineering Research". In particular this guidance details the required written approval procedures needed before transferring or releasing GE products to the field.

Medium-scale construction. Construction or rehabilitation of facilities or structures in which the surface area to be disturbed exceeds 10,000 sq. ft (1000 sq meters) but funding level is $200,000 or less. (E.g. small warehouses, farm packing sheds, agricultural trading posts, produce market centers, and community training centers.)

Rural roads. Construction or rehabilitation of rural roads meeting the following criteria:

Length of road work is less than ~10 km

No change in alignment or right of way

Ecologically sensitive areas are at least 100 m away fr om the road and not affected by construction or changes in drainage.

No protected areas or relatively undegraded forest are within 5 km of the road.

Title II & III Small-Scale Infrastructure. Food for Development programs under Title II or III, involving small-scale infrastructure with the known potential to cause environmental harm (e.g., roads, bore holes).

Quantity imports of commodities such as fertilizers

Sampling. Technical studies and analyses or similar activities that could involve intrusive sampling, of endangered species or critical habitats. (Includes aerial sampling.)

Water provision/storage. Construction or rehabilitation of small-scale water points or water storage devices for domestic or non-domestic use. Water points must be located where no protected or other sensitive environmental areas could be affected.

NOTE: USAID guidance on water quality requires testing for arsenic, nitrates, nitrites and coliform bacteria.

Support for intermediate credit institutions when indirect environmental harm conceivably could result.

Institutional support grants to NGOs/PVOs when the activities of the organizations are known and may reasonably have adverse environmental impact.

Pesticides. .Small-scale use of USEPA-registered, least-toxic general-use pesticides. Use must be limited to NGO-supervised use by farmers, demonstration, training and education, or emergency assistance.

NOTE: Environmental review (see step 5) must be carried out consistent with USAID Pesticide Procedures as required in Reg. 16 [22 CFR 216.3(b)(1)].

Nutrition, health care or family planning, if (a) some included activities could directly affect the environment (e.g., construction, supply systems, etc.) or (b) biohazardous healthcare waste (esp. HIV/AIDS) is produced, syringes are used, or blood is tested.

Step 4. Determine if you must write an Environmental Review Report Examine the “screening results” as you have entered them in Table 1 of the form.

i. If ALL the activities are “very low risk,” then no further review is necessary. In Section C of the form, check the box labeled “very low risk activities.” Skip to Step 8 of these instructions.

Page 126: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Africa Bureau Environmental Review Form 20 Dec 2010 4/12

ii. If ANY activities are “unknown or moderate risk,” you MUST complete an ENVIRONMENTAL REVIEW REPORT addressing these activities. Proceed to Step 5.

iii. If ANY activities are “high risk,” note that USAID’s regulations usually require a full environmental assessment study (EA). Because these activities are assumed to have a high probability of causing significant, adverse environmental impacts, they are closely scrutinized. Any proposed high-risk activity should be discussed in advance with USAID. Activity re-design is often indicated.

In some cases, it is possible that reasonable, achievable mitigation and monitoring can reduce or eliminate likely impacts so that a full EA will not be required. If the applicant believes this to be the case, the Environmental Review Report must argue this case clearly and thoroughly. Proceed to Step 5.

Step 5. Write the Environmental Review Report, if required The Environmental Review Report presents the environmental issues associated with the proposed activities. It also documents mitigation and monitoring commitments. Its purpose is to allow the applicant and USAID to evaluate the likely environmental impacts of the project.

For a single, moderate risk activity, the Environmental Review Report is typically a SHORT 4–5 page document. The Report will typically be longer for (1) multiple activities; (2) activities of high or unknown risk; and/or (3) when a number of impacts and mitigation measures are being identified and discussed.

The Environmental Review Report follows the outline below. Alternate outlines are acceptable, so long as all required information is covered.

A. Summary of Proposal. Very briefly summarize background, rationale and outputs/results expected. (Reference proposal, if appropriate).

B. Description of Activities. For all moderate and high-risk activities listed in Section B of the ERF, succinctly describe location, siting, surroundings (include a map, even a sketch map). Provide both quantitative and qualitative information about actions needed during all project phases and who will undertake them. (All of this information can be provided in a table). If various alternatives have been considered and rejected because the proposed activity is considered more environmentally sound, explain these.

C. Site-specific Environmental Situation & Host Country Requirements. Describe the environmental characteristics of the site(s) where the proposed activities will take place. Focus on site characteristics of concern—e.g., water supplies, animal habitat, steep slopes, etc. With regard to these critical characteristics, is the environmental situation at the site degrading, improving, or stable?

Also note applicable host country environmental regulations and/or policies. (For example, does the project require host country environmental review or permitting? Building approval? Etc.)

NOTE: provide site-specific information in this section, NOT country-level information. General information about country level conditions should already be contained in the IEE governing the XXX project/program.

D. Environmental Issues, Mitigation Actions, and Findings. For ALL proposed activities

i. Briefly note the potential environmental impacts or concerns presented by the proposed activities (if any). For guidance, refer to Africa Bureau’s Environmental Guidelines for Small-Scale Activities; available at www.encapafrica.org/egssaa.htm.

As per the Small-Scale Guidelines, consider direct, indirect and cumulative impacts across the activity lifecycle (i.e. impacts of site selection, construction, and operation, as well as any problems that might arise with abandoning, restoring or reusing the site at the end of the anticipated life of the

Page 127: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Africa Bureau Environmental Review Form 20 Dec 2010 5/12

facility or activity). Note that “environment” includes air, water, geology, soils, vegetation, wildlife, aquatic resources, historic, archaeological or other cultural resources, people and their communities, land use, traffic, waste disposal, water supply, energy, etc.)

ii. Assess the extent to which these potential impacts and concerns are significant in the context of the specific activity design and site.

iii. Set out the mitigation actions to be employed to address these issues.

Mitigation actions are means taken to avoid, reduce or compensate for impacts. Mitigation measures must be reasonable and implementable by field staff. They should be consistent with the good practice guidance provided in Africa Bureau’s Environmental Guidelines for Small-Scale Activities; (www.encapafrica.org/egssaa.htm.) Cite this or other guidance used for mitigation design.

iv. Reach one of three findings regarding the potential impacts:

a. Significant adverse impacts are very unlikely. Of its nature, the activity in question is very unlikely to result in significant, adverse environmental impacts. Special mitigation or monitoring is not required. Note: this conclusion is rarely appropriate for high-risk activities.

b. With implementation of the specified mitigation and monitoring, significant adverse impacts are very unlikely.

c. Significant adverse impacts are possible. That is, it is not possible to rule out significant adverse environmental impacts even given reasonable, attainable mitigation and monitoring.

In this case, USAID and the partner will consult regarding next steps. If the activity is to go forward in its current form, additional analysis in the form of an IEE or EA will be required.

Format and structure of this section. Choose a format and structure that presents the necessary information clearly and succinctly.

Table formats can be used. In the example below, the proposed activity was construction of an institutional facility on a 7500m3 plot bisected by a seasonal stream providing drainage to the local area. One potential impact of the activity was reduction of or alteration to the drainage eco-service provided by the seasonal stream.

Issue or cause for concern

Analysis Finding and conditions/mitigation actions

The seasonal stream running through the plot drains an area of at least 2 km2 to the WNW.

Diminution or alteration to this drainage “service” could result in increased upstream pooling & flooding during the rainy season, with associated property damage and increased breeding habitat for disease vectors.

As indicated at left, this impact only arises if the drainage “service “ provided by the seasonal stream is diminished or altered in some adverse manner.

So long as compound design maintains the existing service level and construction is managed without disruption to stream flow, actual adverse impact will be negligible or zero.

Per analysis at left, this potential impact is not significant, so long as the following mitigations are implemented:

1. Total stream capacity cannot be diminished by the development of the compound. (Stream channel on average is 3m x 1m.)

2. The stream must remain substantially in the same channel and cannot, e.g., be re-routed around the property.

3. If construction will result in an interruption to stream flow, provision must be made to provide a temporary bypass. Temporary damming of stream flow is not permissible.

4. Post-construction, the stream bed within the property, including point-of-entry (e.g. via culvert under perimeter wall) must be maintained free of obstructions to flow.

Page 128: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Africa Bureau Environmental Review Form 20 Dec 2010 6/12

E. Environmental Mitigation and Monitoring Plan (EMMP). Set out how compliance with mitigation actions will be monitored/verified. This includes specifying WHO will be responsible for the various mitigation actions, and HOW implementation of the mitigation actions will be tracked/verified.

Also specify how you will report to USAID on the implementation of mitigation actions. (You are REQUIRED to provide your C/AOTR with sufficient information on the status of mitigation implementation for USAID to effectively fulfill its oversight and performance monitoring role.)

Again, choose a format and structure that presents the necessary information clearly and succinctly. EMMPs are typically in table format, and often include a compliance log or “monitoring record” section that records implementation status of the various mitigation actions. The EMMP with current monitoring log can then simply be submitted to the C/AOTR with the quarterly or 6-month project report, satisfying the environmental compliance reporting requirement. .

The most basic EMMP format is

Mitigation action Responsible Party Monitoring/Verification Method Monitoring Record (date, result, corrective actions taken, if any)

For additional EMMP formats and examples, see the ENCAP EMMP factsheet, available via www.encapafrica.org/meoEntry.htm

F. Other Information. Where possible and as appropriate, include photos of the site and surroundings; maps; and list the names of any reference materials or individuals consulted.

(Pictures and maps of the site can substantially reduce the written description required in parts B & C)

Step 6. Transcribe findings from the Environmental Review Report to the ERF For each high-risk or unknown/moderate-risk activity, transcribe your finding from the environmental review report to the last column of Section B of the ERF.

Step 7. Sign certifications (Section C of former.)

Step 8. Submit form to USAID C/AOTR. Be sure to attach the Environmental Review Report, if any.

Page 129: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

XXXX

Environmental Review Form for XXX Program subprojects/subgrants Follow, but do not submit, the attached instructions.

A. Applicant information Organization Parent grant or

project

Individual contact and title

Address, phone & email (if available)

Proposed subproject /subgrant (brief description)

Amount of funding requested

Period of performance

Location(s) of proposed activities

B. Activities, screening results, and findings Screening result

(Step 3 of instructions)

Findings (Step 6 of instructions. Complete for all moderate/unknown and high-risk

activities ONLY)

Proposed activities (Provide DESCRIPTIVE listing. Continue on additional page if necessary)

Ver

y Lo

w R

isk

Hig

h-R

isk*

Mod

erat

e or

un

know

n ris

k*

sign

ifica

nt a

dver

se

impa

cts

are

ver

y un

likel

y

With

spe

cifie

d m

itiga

tion,

si

gnifi

cant

adv

erse

im

pact

s ar

e ve

ry

ulik

ely

Sig

nific

ant

Adv

erse

im

pact

s ar

e po

ssib

le

1.

2.

3.

4.

5.

6.

7.

8.

*These screening results require completion of an Environmental Review Report

AFR Environmental Review Form 20 Dec 2010

Page 130: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Africa Bureau Environmental Review Form 20 Dec 2010 2/12

C. Certification: I, the undersigned, certify that:

1. The information on this form and accompanying environmental review report (if any) is correct and complete.

2. Implementation of these activities will not go forward until specific approval is received from the C/AOTR.

3. All mitigation and monitoring measures specified in the Environmental Review Report will be implemented in their entirety, and that staff charged with this implementation will have the authority, capacity and knowledge for successful implementation.

(Signature) (Date) (Print name) (Title)

Note: if screening results for any activity are “high risk” or “moderate or unknown risk,” this form is not complete unless accompanied by an environmental review report.

BELOW THIS LINE FOR USAID USE ONLY Notes: 1. For clearance to be granted, the activity MUST be within the scope of the activities for which use of the ERF is authorized in the governing IEE. Review IEE before signature. If activities are outside this scope, deny clearance and provide explanation in comments section. The Partner, C/AOTR, MEO and REA must then confer regarding next steps: activity re-design, an IEE or EA.

2. Clearing an ERF containing one or more findings that significant adverse impacts are possible indicates agreement with the analysis and findings. It does NOT authorize activities for which “significant adverse impacts are possible” to go forward. It DOES authorize other activities to go forward. The Partner, C/AOTR, MEO and REA must then confer regarding next steps: activity re-design, an IEE or EA.

Clearance record C/AOTR Clearance given Clearance denied

(print name) (signature) (date)

USAID/XXXX MEO Clearance given Clearance denied

(print name) (signature) (date)

Regional Env. Advisor (REA) Clearance given Clearance denied

(print name) (signature) (date)

Bureau Env. Officer (BEO)* Clearance given Clearance denied

(print name) (signature) (date)

C/AOTR, MEO and REA clearance is required. BEO clearance is required for all “high risk” screening results and for findings of “significant adverse impacts possible. The BEO may review ”

Note: if clearance is denied, comments must be provided to applicant (use space below & attach sheets if necessary)

Page 131: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Note to individuals adapting the:

* Supplemental Environmental Review Form for NRM Activies

for use on a particular program/activity: This supplement is oriented around major resource/issue clusters and asks “leading questions” about

the actual potential for unintended harmful impacts, especially of CBNRM/ ecotourism activities.

Underlined & blue highlighted text MUST be modified to reflect project and mission name

Questions should be modified to respond to the needs of individual projects. This is intended to be a “living” document subject to adaptation.

DELETE THIS PAGE BEFORE MODIFYING/DISTRIBUTING THIS FORM

Page 132: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Supplement to the Environmental Review Form for Natural Resources Activities Additional Screening Criteria for Natural Resource Activities under XXX Progam

Purpose This is a supplement to the “Instructions for environmental review of XXX Program/Project activities.” It is to be used for natural resources-based activities, including:

Community-Based Natural Resource Management (CBNRM)

Ecotourism

Natural resources-based enterprise development with micro- and small enterprises

This supplement provides additional questions to ascertain whether these proposed activities should be categorized as “very low risk:”

If the answers to ALL the questions that follow are “NO,” then the proposed natural resource-based activity is considered “very low risk.”

If the answer to ANY question is “YES,” the activity CANNOT be considered “very low risk.”

Screening criteria

Will the activities… YES NO

Natural Resources

Accelerate erosion by water or wind?

Reduce soil fertility and/or permeability?

Alter existing stream flow, reduce seasonal availability of water resources?

Potentially contaminate surface water and groundwater supplies?

Involve the extraction of renewable natural resources?

Lead to unsustainable use of renewable natural resources such as forest products?

Involve the extraction of non-renewable natural resources?

Restrict customary access to natural resources?

Reduce local air quality through generating dust, burning of wastes or using fossil fuels and other materials in improperly ventilated areas?

Affect dry-season grazing areas and/or lead to restricted access to a common resource?

Lead to unsustainable or unnecessarily high water extraction and/or wasteful use?

Ecosystems and Biodiversity

Drain wetlands, or be sited on floodplains?

Harvest wetland plant materials or utilize sediments of bodies of water?

Lead to the clearing of forestlands for agriculture, the over-harvesting of valuable forest species?

Promote in-forest bee keeping?

Lead to increased hunting, or the collection of animals or plant materials?

Increase the risks to endangered or threatened species?

Introduce new exotic species of plants or animals to the area?

Lead to road construction or rehabilitation, or otherwise facilitate access to fragile areas (natural woodlands, wetlands, erosion-prone areas)?

17 Jan 2005

Page 133: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

Africa Bureau Environmental Review Form 20 Dec 2010 2/12

Will the activities… YES NO

Cause disruption of wildlife migratory routes?

Agricultural and Forestry Production

Have an impact on existing or traditional agricultural production systems by reducing seed availability or reallocating land for other purposes?

Lead to forest plantation harvesting without replanting, the burning of pastureland, or a reduction in fallow periods?

Affect existing food storage capacities by reducing food inventories or encouraging the incidence of pests?

Affect domestic livestock by reducing grazing areas, or creating conditions where livestock disease problems could be exacerbated?

Involve the use of insecticides, herbicides and/or other pesticides?

Community and Social Issues

Have a negative impact on potable water supplies?

Encourage domestic animal migration through natural areas?

Change the existing land tenure system?

Have a negative impact on culturally important sites in the community?

Increase in-migration to the area?

Create conditions that lead to a reduction in community health standards?

Lead to the generation of non-biodegradable waste?

Involve the relocation of the local community?

Potentially cause or aggravate land-use conflicts?

Page 134: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 14.

Special Topic: ESDM for Construction Activities

Technical presentation and dialogue

Summary Many types of development projects — housing, sanitation, water supply, roads, schools, community centers, storage silos healthcare, energy — involve some form of small-scale construction. This session will address these types of activities and any similar small-scale construction particularly relevant to the implementation of USAID programs in Kenya and East Africa.

Construction encompasses one or more of a set of diverse activities: demolition; site-clearing; grading, leveling, and compacting soil; excavating; laying pipe; installing equipment; or erecting structures. The development benefits of construction come not from the construction itself, but from the buildings and infrastructure that are its result. The details of the construction carried out in support of any particular development activity or site will have a number of specific characteristics. Construction activities in general, however, share a set of common features and potential adverse environmental impacts. This session addresses a number of these common elements.

Construction activities may cause both direct and indirect adverse environmental impacts. An example of a direct impact is the filling of a wetland to use as a project site. Indirect impacts are induced changes in the environment, population, and use of land and environmental resources. Examples of indirect impacts include:

• In-migration of population to take advantage of new infrastructure such as schools or health posts;

• Effects on fish spawning associated with siltation of streams from soil erosion at a construction site;

• The spread of disease from insect vectors breeding in flooded and abandoned quarries and borrow pits (areas from which construction materials were excavated, or “borrowed”).

USAID funded facilities, buildings, and infrastructure must be designed and constructed to appropriate engineering standards to minimize risk to humans and the natural environment. This briefing is intended to identify key issues and illustrate potential mitigation measures associated with the construction activities.

Objectives Brief the environmental, economic, and human health concerns attendant to construction activities, and review requirements and procedures for USAID-supported construction activities.

Page 135: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Reference Documents

• USAID Small-Scale Construction Sector Environmental Guidelines (http://usaidgems.org/Documents/SectorGuidelines/SectorEnvironmentalGuidelines_Construction_2014.pdf)

• USAID Construction Visual Field Guide (http://usaidgems.org/Documents/VisualFieldGuides/ENCAP_VslFldGuide--Construction_22Dec2011.pdf)

Page 136: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 14 PowerPoint Placeholder

Page 137: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 138: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 15.

Environmental Compliance/ESDM Knowledge Game Facilitated Team Competition

Summary

We have now examined, discussed, and/or practiced the following workshop topics:

1. The objectives of Environmentally Sound Design and Management (ESDM); the Environmental Impact Assessment (EIA) process and the development and application of fundamental EIA skills.

2. The implementation of USAID Environmental Procedures and purpose and structure of EMMPs.

3. The importance of environmental indicators and monitoring for environmental compliance.

These components constitute the portion of the workshop dealing with core technical skills and knowledge. We will now play an environmental compliance/ESDM knowledge game to review key concepts related to core technical skills and knowledge. The game will take the form of a competition among small teams.

Further discussion of core content will occur in our “Parking Lot” session, in which outstanding technical issues will be resolved.

Game Briefing

Teams Four (4) or five (5) teams with 6-8 persons/team; each team includes one non-participant recorder. “Performance Assessment aligns with Programming Framework”: Three (3) rounds of five (5) multiple-choice/fill-in-the-blank questions each; questions in each round correspond to core agenda topics and assess the objectives of that component. Questions increase in difficulty as the rounds progress. Democracy and Governance Teams must operate by consensus, reaching unanimous agreement on each answer. Monitoring and Evaluation The recorder for each team will verify consensus for each answer by show of hands and record the answer on the answer sheet. Recorders will verify that no books, notes, laptop computers or other electronic devices are employed to assist in answering questions.

Each team’s scores will be tabulated by an independent party (e.g., Assistant Emcee) at the conclusion of each around. Scoring by the independent party is final.

Page 139: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

“Results Framework”

• First team to complete all questions in a round receives the most bonus points. Each subsequent team: 2 points less; last team receives no bonus. Any team working when time is called receives no bonus.

• Each correct answer: 5 points. [NOTE: some questions have more than one element/choice. EACH correct element/response is worth 5 points.]

• Each incorrect answer: 3-point DEBIT. [NOTE: multiple wrong answers on a question result in multiple debits.]

• No answer: 0 points.

• All answers in a round correct: 10-point bonus.

• Each round is time-limited at 12 minutes.

• Team scores will be posted to the front and updated after each round.

Implementation Procedures

1. MC briefs the game (contents of this session summary). Time pressure is part of the exercise!

2. Assistant MC assigns teams and recorders. Members of each team cluster together.

3. Deputize recorders.

4. Teams can briefly discuss strategy and elect captains.

5. MC asks recorders to confirm that all training materials and electronic aids are closed/off.

6. Distribute Round 1 questions to team recorders.

7. MC starts the 1st round; recorders open the envelopes and distribute questions. Teams begin.

8. Recorders blow their whistle/noisemaker when their team finishes.

9. Assistant MC records order in which teams finish.

10. Round concludes after 12 minutes, or when all teams are finished, whichever is first.

11. Assistant MC tabulates scores for each team; they are posted at the front.

12. Repeat steps 6-11 for the subsequent two rounds.

13. After three rounds, grand winner is declared and prizes are awarded.

In the event of a tie, a “sudden death” round of “special topic” questions will follow.

Page 140: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 16 Placeholder

Page 141: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 142: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 17. Roles, Responsibilities and Resources Technical presentation and dialogue Summary Now that we understand the importance of ESDM and environmental compliance in project implementation, we may wonder how our job or position fits into this process. This session explains key roles and responsibilities of USAID staff and IPs, and summarizes a number of important concepts introduced throughout the workshop. All concern the processes, roles and responsibilities for environmental compliance in missions and operating units.

Key topics are:

• How environmental compliance is mainstreamed (integrated throughout) Agency operations by the Automated Directives System (ADS).

• The roles and responsibilities of USAID staff and IPs with respect to the environmental compliance of USAID projects.

• The importance of incorporating best-practice Environmental Compliance Language (ECL) in solicitations and awards and the benefits of using the ECL tool for this purpose.

• Resources available to support environmental compliance and ESDM.

IP and USAID environmental compliance roles and responsibilities post-award are summarized in the following table:

Project stage Implementing Partner USAID

Workplan & PMP Development

Develops EMMP

Integrates EMMP into budget and workplan

Determines environmental compliance reporting

Review and approval of:

1. the EMMP (for responsiveness to IEE/EA conditions and sufficiency of monitoring);

2. the budget/workplan (to verify that EMMP implementation is planned and funded); and

3. the reporting framework to assure that environmental reporting requirements are met.

Implementation Implementation of EMMP

Reporting on EMMP implementation

Ongoing review of partner progress reports to monitor EMMP implementation

Field visits—at a minimum, all visits should integrate a quick check for significant environmental design/ management problems. For environmentally sensitive activities, specific visits should be made to verify EMMP implementation.

Objective Understand environmental compliance roles and responsibilities of USAID staff and IPs and the tools and resources available to facilitate environmental compliance.

Page 143: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 144: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

61

Rol

es, R

espo

nsib

ilitie

s &

R

esou

rces GEM

S En

viro

nmen

tal C

ompl

ianc

e-ES

DM

Tra

inin

g Se

ries

Keny

a Ju

ne, 2

016

5/23

/201

62

•U

SAID

’s A

utom

ated

Dire

ctiv

es

Syst

em (A

DS)

set

s ou

t m

anda

tory

pro

cedu

res,

role

s &

re

spon

sibi

litie

s fo

r:

–“U

pstr

eam

com

plia

nce:

” D

esig

n &

22

CFR

216

pr

oces

s.

–“D

owns

trea

m c

ompl

ianc

e:”

impl

emen

ting

IEE

& E

A

cond

ition

s.

ENV

IRO

NM

ENTA

L C

OM

PLIA

NC

E &

TH

E A

UTO

MAT

ED D

IREC

TIV

ES

SYST

EM (A

DS)

5/23

/201

63

ENV

IRO

NM

ENTA

L C

OM

PLIA

NC

E &

TH

E A

DS

CO

MPL

IAN

CE

REQ

UIR

EMEN

TR

ESPO

NSI

BLE

PART

IES

AD

S R

EFER

ENC

E

Envi

ronm

enta

l co

nsid

erat

ions

in

activ

ity p

lann

ing

Team

Lea

ders

, A

ctiv

ity M

anag

ers

201.

3.16

.3.b

204

.3.3

No

activ

ity im

plem

ente

dw

ithou

t ap

prov

ed R

eg. 2

16 e

nviro

nmen

tal

docu

men

tatio

n

CO

R/A

OR

/A

ctiv

ity M

anag

er20

1.3.

16.1

6.4.

i 20

4.3.

120

4.3.

3.b

303.

3.2.

e

IEE

& E

A c

ondi

tions

in

corp

orat

ed in

to p

rocu

rem

ent

inst

rum

ents

CO

R/A

OR

/A

ctiv

ity M

anag

er;

Agr

eem

ent O

ffice

r

204.

3.4.

a.6

303.

3.6.

2e

IEE

& E

A c

ondi

tions

are

im

plem

ente

d, a

nd

impl

emen

tatio

n is

mon

itore

d &

ad

just

ed a

s ne

cess

ary

CO

R/A

OR

202.

3.6;

204.

3.4.

b30

3.2.

f

Envi

ronm

enta

l com

plia

nce

docu

men

tatio

n is

mai

ntai

ned

PO, C

OR

/AO

R, T

eam

Le

ader

, MEO

202.

3.4.

6

Ove

rarc

hing

re

quir

emen

t:O

pera

ting

units

m

ust

have

sys

tem

s in

pla

ce fo

r en

viro

nmen

tal

com

plia

nce

over

lif

e of

pro

ject

&

mus

t m

ake

suffi

cien

t re

sour

ces

avai

labl

e fo

r th

is p

urpo

se

(204

.3.4

)

AD

S 20

4 (“

ENV

IRO

NM

ENTA

L PR

OC

EDU

RES

”) IS

TH

E C

OR

E A

DS

REF

EREN

CE.

BU

T

ENV

IRO

NM

ENTA

L C

OM

PLIA

NC

E IS

MA

INST

REA

MED

TH

ROU

GH

OU

T T

HE

AD

S.

5/23

/201

64

•A

ppro

ved

22 C

FR 2

16

docu

men

ts a

re k

ept

in t

wo

plac

es

–in

offi

cial

pro

ject

file

s m

aint

aine

d by

C/A

OR

–in

offi

cial

BEO

file

s

•22

CFR

216

.10

mak

es a

ll of

th

ese

avai

labl

e to

the

pub

lic

–A

genc

y-w

ide

sear

chab

le

data

base

of a

ll R

eg. 2

16 d

ocs

appr

oved

sin

ce

2000

: ht

tp://

gem

ini.i

nfo.

usai

d.go

v/eg

at/

envc

omp/

•A

nnua

l rep

ortin

g is

req

uire

d

A N

OT

E A

BOU

T

REC

OR

D K

EEPI

NG

Page 145: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

•A

t ea

ch U

SAID

Mis

sion

–U

SAID

/Ken

ya =

Wilk

ister

Mag

angi

•Q

ualit

y A

ssur

ance

/Qua

lity

Con

trol

rev

iew

er fo

r R

eg. 2

16

docs

•C

lear

s R

eg. 2

16 d

ocs

befo

re t

hey

go t

o M

issi

on D

irect

or

•M

issi

on c

ompl

ianc

e ad

viso

r an

d co

ordi

nato

r; as

sist

s in

co

mpl

ianc

e m

onito

ring

•M

issi

on p

oint

of c

onta

ct t

o R

egio

nal E

nv. A

dvis

or a

nd

Bure

au E

nviro

nmen

tal O

ffice

r

5/23

/201

65

MIS

SIO

N E

NV

IRO

NM

ENTA

L O

FFIC

ER

•Ba

sed

in r

egio

nal M

issi

ons

–U

SAID

/Eas

t Afr

ica =

Dav

id K

inyu

a

•En

viro

nmen

tal c

ompl

ianc

e te

chni

cal a

ssis

tanc

e to

Mis

sion

s

•Pr

ovid

es q

ualit

y as

sura

nce

and

qual

ity c

ontr

ol o

f Reg

. 216

do

cum

enta

tion

befo

re it

goe

s to

the

Bur

eau

Envi

ronm

enta

l O

ffice

r

5/23

/201

66

REG

ION

AL

ENV

IRO

NM

ENTA

L A

DV

ISO

R

•Ba

sed

in W

ashi

ngto

n, D

.C.

–U

SAID

/AFR

= B

rian

Hirs

ch

•O

vers

ee e

nviro

nmen

tal c

ompl

ianc

e in

the

ir B

urea

u

•Pr

imar

y de

cisi

on m

aker

s on

22

CFR

216

thr

esho

ld

deci

sion

s fo

r ac

tiviti

es u

nder

the

pur

view

of t

heir

Bur

eau

5/23

/201

67

BUR

EAU

EN

VIR

ON

MEN

TAL

OFF

ICER

S

5/23

/201

68

SEC

TOR

TEA

MS

& M

ISSI

ON

MA

NA

GEM

ENT

The

MEO

is a

m

embe

r of

eve

ry

sect

or t

eam

(A

DS

204.

3.5)

CO

RS/

AO

RS

& A

CT

IVIT

Y M

AN

AG

ERS

Ensu

re R

eg. 2

16 d

ocum

enta

tion

in p

lace

. En

sure

IEE/

EA c

ondi

tions

& c

ompl

ianc

e re

quire

men

ts in

corp

orat

ed in

to p

rocu

rem

ent

inst

rum

ents

. M

onito

r co

mpl

ianc

e w

ith IE

E/EA

co

nditi

ons

& m

odify

or

end

activ

ities

not

in

com

plia

nce .

TEA

M L

EAD

ERS

Ove

rsee

C

OR

s/A

OR

s.

Ensu

re t

hat

thei

r te

ams

have

en

viro

nmen

tal

com

plia

nce

syst

em in

pla

ce.

MIS

SIO

N D

IREC

TOR

Ulti

mat

ely

resp

onsi

ble

for

envi

ronm

enta

l co

mpl

ianc

e.

Man

dato

ry c

lear

ance

on

all

Reg

. 216

en

viro

nmen

tal

docu

men

tatio

n.

Prim

ary

Res

pons

ibili

ty fo

r En

viro

nmen

tal C

ompl

ianc

e

Page 146: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

5/23

/201

69

Age

ncy

Envi

ronm

enta

l Coo

rdin

ator

, O

ffice

of t

he G

ener

al C

ouns

el

Whe

n th

e BE

Oan

d M

D c

anno

t ag

ree

rega

rdin

g a

thre

shol

d de

cisi

on, t

he

issu

e go

es t

o th

e A

ssis

tant

A

dmin

istr

ator

(A

A)

with

AEC

co

nsul

tatio

n

AG

ENC

Y E

NV

IRO

NM

ENTA

L C

OO

RD

INAT

OR

(A

EC)

Coo

rdin

ates

22

CFR

216

impl

emen

tatio

n &

adv

ises

re

gard

ing

the

appl

icat

ion

of R

eg. 2

16 in

new

situ

atio

ns.

Con

curs

in A

A’s

appo

intm

ents

of B

EOs.

Coo

rdin

ates

EIS

pro

cess

for

USA

ID (r

are)

.

REG

ION

AL

LEG

AL

AD

VIS

OR

S (R

LAS)

prov

ide

lega

l adv

ice

on

envi

ronm

enta

l com

plia

nce

to fi

eld

staf

f. So

me

regi

ons

requ

ire R

LA c

lear

ance

on

Reg

. 216

doc

umen

ts.

ASS

ISTA

NT

GEN

ERA

L C

OU

NSE

LS (

AG

CS)

prov

ide

lega

l adv

ice

to

BEO

s &

RLA

s on

en

viro

nmen

tal

com

plia

nce

in t

heir

re

gion

s.

•W

ho w

rite

s?

–A

OR

/CO

R r

espo

nsib

le fo

r en

suri

ng t

hat

Reg

. 216

doc

umen

tatio

n in

pla

ce.

–C

an e

ngag

e a

cons

ulta

nt/c

ontr

acto

r to

dev

elop

—En

viro

nmen

tal A

sses

smen

ts

alm

ost

alw

ays

deve

lope

d by

3rd

par

ty c

onsu

ltant

s.

–U

SAID

is r

espo

nsib

le fo

r co

nten

ts/d

eter

min

atio

ns

NO

MAT

TER

WH

O D

EVEL

OPS

IT!

•W

ho c

lear

s?

–C

OR

/AO

R, A

ctiv

ity M

anag

er o

r Tea

m L

eade

r

–M

EO (f

or M

issi

on)

–R

EA (d

epen

ding

on

Mis

sion

/reg

iona

l pol

icy)

–M

issi

on D

irec

tor

or

Was

hing

ton

equi

vale

nt c

lear

s

–B

urea

u E

nvir

onm

enta

l Offi

cer

conc

urs.

Res

pons

ibili

ty/a

utho

rity

can

not

be d

eleg

ated

.

5/23

/201

610

REG

. 216

DO

CS:

WH

O W

RIT

ES?

WH

O C

LEA

RS?

Req

uire

d by

R

eg. 2

16

5/23

/201

611

WH

O IS

RES

PON

SIBL

E?

Fund

amen

tal r

espo

nsib

ility

&

acco

unta

bilit

y:

Sect

or T

eam

Lea

der

Act

ivity

Man

ager

s &

CO

R/A

OR

s

ultim

atel

y w

ith t

he M

issi

on D

irect

or

MEO

: qua

lity

and

com

plet

enes

s re

view

er fo

r R

eg. 2

16 d

ocum

enta

tion;

co

mpl

ianc

e ad

viso

r an

d co

ordi

nato

r; as

sist

s in

com

plia

nce

mon

itori

ng.

IN T

HE

MIS

SIO

N

USA

ID

Ensu

res

Reg

. 216

doc

umen

tatio

n in

pl

ace.

Est

ablis

hes/

appr

oves

en

viro

nmen

tal m

itiga

tion

and

mon

itori

ng

cond

ition

s. Ve

rifie

s co

mpl

ianc

e.

IMPL

EMEN

TIN

G P

ART

NER

S

ALW

AYS

Impl

emen

t m

itiga

tion

and

mon

itori

ng c

ondi

tions

tha

t ap

ply

to t

heir

pr

ojec

t ac

tiviti

es &

rep

ort

to U

SAID

.

ALW

AYS

resp

onsi

ble

for

desi

gn o

f de

taile

d en

viro

nmen

tal m

itiga

tion

and

mon

itori

ng p

lan

(EM

MP)

in r

espo

nse

to

miti

gatio

n an

d m

onito

ring

con

ditio

ns

esta

blis

hed

by t

he R

eg. 2

16

docu

men

tatio

n.

SOM

ETIM

ESde

velo

p R

eg. 2

16

docu

men

tatio

n (IE

Es, E

As)

* fo

r ne

w

proj

ect

com

pone

nts;

deve

lop

subp

roje

ct

env.

revi

ew r

epor

ts (f

or

subg

rant

s/su

bpro

ject

s).

*Titl

e II

CSs

dev

elop

IEEs

as

part

of t

heir

MYA

Ps.

5/23

/201

612

ENV

IRO

NM

ENTA

L C

OM

PLIA

NC

E V

ERIF

ICAT

ION

/OV

ERSI

GH

T B

Y U

SAID

1. P

rior

rev

iew

/app

rova

l of p

artn

er-d

evel

oped

:

–E

MM

Pen

sure

res

pons

ive

to IE

E/EA

con

ditio

ns

–P

roje

ct b

udge

ts a

nd w

orkp

lans

ensu

re E

MM

P im

plem

enta

tion

plan

ned

and

fund

ed

–P

roje

ct R

epor

ting

Fra

mew

ork

ensu

re e

nviro

nmen

tal c

ompl

ianc

e re

port

ing

requ

irem

ents

are

met

2. O

ngoi

ng r

evie

w o

f par

tner

pro

gres

s re

port

sto

mon

itor

EMM

P im

plem

enta

tion

3. F

ield

vis

its:

–at

a m

inim

um, a

ll vi

sits

inte

grat

e a

quic

k ch

eck

for

sign

ifica

nt e

nv. d

esig

n/m

anag

emen

t pr

oble

ms

–Fo

r en

viro

nmen

tally

sen

sitiv

e ac

tiviti

es,

spec

ific

visi

t(s)

to a

udit

agai

nst E

MM

P

•P

rim

ary

resp

onsi

bilit

y fo

r en

suri

ng

com

plia

nce

lies

wit

h C

OR

/AO

R

•M

EO w

ill a

lso

revi

ew/c

lear

whe

re

activ

ities

are

env

ironm

enta

lly s

ensi

tive

and/

or IE

E/EA

con

ditio

ns a

re c

ompl

ex.

•M

EO o

n di

stri

butio

n lis

t fo

r IP

’s qu

arte

rly/s

emi-a

nnua

l pro

ject

rep

orts

•M

ost

field

vis

its a

re b

y C

OR

/AO

R o

r M

&E

Offi

cer

•M

EO s

houl

d vi

sit

the

mos

t en

viro

nmen

tally

sen

sitiv

e ac

tiviti

es

(REA

may

ass

ist)

Page 147: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

•C

riti

cal t

o IP

com

plia

nce

wit

h IE

E/E

A c

ondi

tion

s

•B

UT

: his

tori

cally

, pro

blem

s in

impl

emen

tati

on:

–M

any

USA

ID p

rocu

rem

ent

inst

rum

ents

hav

e N

OT

ad

equa

tely

add

ress

ed

envi

ronm

enta

l com

plia

nce

–La

ck o

f gui

danc

e re

quire

d A

/CO

Rs,

CO

s to

rep

eate

dly

“rei

nven

t th

e w

heel

–Pa

rtne

rs/c

ontr

acto

rs fa

il to

bu

dget

for

envi

ronm

enta

l re

quire

men

ts

5/23

/201

613

ENV

IRO

NM

ENTA

L C

OM

PLIA

NC

E &

PR

OC

UR

EMEN

T IN

STRU

MEN

TS

TH

E SO

LUT

ION

. . .

AD

S R

equi

res.

. .

“Inc

orpo

ratin

g en

viro

nmen

tal

fact

ors

and

miti

gativ

em

easu

res

iden

tifie

d in

IEEs

, EA

s, an

d EI

Ss, a

s ap

prop

riat

e,

in t

he d

esig

n an

d th

e im

plem

enta

tion

inst

rum

ents

fo

r pr

ogra

ms,

proj

ects

, ac

tiviti

es o

r am

endm

ents

.”

(204

.3.4

(a)(

6)

5/23

/201

614

•St

ep-b

y-st

ep g

uida

nce

and

boile

rpla

te la

ngua

ge.

–Fo

r R

FAs/

RFP

s/ a

gree

men

ts/

gran

ts/ c

ontr

acts

–O

ptio

nal,

not

requ

ired

–A

DS

Hel

p D

ocum

ent.

–A

ppro

ved

by G

ener

al

Cou

nsel

.

ENV

IRO

NM

ENTA

L C

OM

PLIA

NC

E:

LAN

GU

AG

E FO

R U

SE IN

SO

LIC

ITAT

ION

S A

ND

AW

AR

DS

(EC

L)

Ava

ilabl

e fr

om w

ww

.usa

id.g

ov/p

olic

y/ad

s/20

0/20

4sac

.pdf

5/23

/201

615

TH

E EC

L G

ENER

ATES

. . .

Requ

iring

that

:

Prop

osal

s ad

dres

s qu

alifi

cati

ons

and

prop

osed

ap

proa

ches

to

com

plia

nce/

E

SDM

for

envi

ronm

enta

lly

com

plex

act

iviti

es.

Requ

iring

that

:

IP v

erifi

es c

urre

nt &

pl

anne

d ac

tiviti

es a

nnua

lly

agai

nst t

he s

cope

of t

he

RC

E/IE

E/EA

.

The

nec

essa

ry

mec

hani

sms

and

budg

etfo

r IP

im

plem

enta

tion

of IE

E/EA

co

nditi

ons

are

in p

lace

.

To a

ssur

e th

at p

roje

cts

do n

ot

“cre

ep”

out

of c

ompl

ianc

e as

ac

tiviti

es a

re m

odifi

ed a

nd a

dded

ov

er t

heir

life

.

Spec

ifica

lly:

1. C

ompl

ete

EM

MP

exis

ts o

r is

de

velo

ped

2. W

orkp

lans

& b

udge

ts in

tegr

ate

the

EMM

P3.

Pro

ject

rep

ortin

g tr

acks

EM

MP

impl

emen

tatio

n

Best

pr

actic

eso

licita

tion

lang

uage

Best

pr

actic

eaw

ard

lang

uage

•Pr

ovid

es c

ost

& e

ffici

ency

ben

efits

to

both

Mis

sion

Sta

ff &

Im

plem

entin

g P

artn

ers.

5/23

/201

616

TH

E EC

L ST

REN

GT

HEN

S EN

VIR

ON

MEN

TALL

Y S

OU

ND

DES

IGN

& M

AN

AG

EMEN

T, A

ND

. . .

USA

ID S

TAFF

Avo

ids

the

effo

rt, c

osts

and

loss

of g

ood

will

tha

t co

me

from

impo

sing

“c

orre

ctiv

e co

mpl

ianc

e” m

easu

res

on

IPs

afte

r im

plem

enta

tion

has

star

ted.

Red

uces

USA

ID c

ost

and

effo

rt o

f env

. co

mpl

ianc

e ve

rific

atio

n/ov

ersi

ght b

y as

suri

ng t

hat

IPs

inte

grat

e en

viro

nmen

tal

com

plia

nce

repo

rtin

g in

to r

outin

e pr

ojec

t pe

rfor

man

ce r

epor

ting.

IMPL

EMEN

TIN

G P

ART

NER

S

Prov

ides

cla

rity

reg

ardi

ng e

nviro

nmen

tal

com

plia

nce

resp

onsi

bilit

ies

Prev

ents

“unf

unde

d m

anda

tes”

–U

SAID

re

quire

men

ts t

o im

plem

ent

M&

M a

fter

impl

emen

tatio

n ha

s st

arte

d &

with

out

addi

tiona

l bud

get.

Page 148: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

•M

EOs

in e

very

bila

tera

l Mis

sion

AN

D t

he B

EOs

and

REA

s:

5/23

/201

617

WH

O C

AN

HEL

P

617

AFR

: Bri

an H

irsc

h(W

alte

r K

naus

enbe

rger

/Ale

xis

Erw

in);

Asi

a &

ME

: Will

Gib

son;

BFS

:B

ill T

hom

as; D

CH

A:E

rika

Cle

scer

i; E

&E

:Mar

k K

amiy

a; E

3:Te

resa

Ber

nhar

d; G

H:

Rac

hel D

agov

itz;

LA

C: J

essi

ca R

osen

(in

teri

m);

M/O

DP

: Den

nis

Dur

bin;

OA

PA: G

ordo

n W

eyna

nd; G

DL :

Dan

Eva

ns.

Joe

Torr

es C

entr

al

Joe

Torr

es C

enA

mer

ica

(E

l A

mer

ica

(E

Salv

ador

)H

enry

H

enry

A

ryee

tey

Ary

eet

Wes

t te

yee

tstst

AFR

Wess

t AFR

A(A

ccra

)

Dia

na S

hann

onD

iana

Sha

nnon

Judi

th M

land

a Z

vika

ram

badi

th M

land

a Z

dith

Mla

nda

Zvi

kSo

uthe

rn ka

ram

baka

ram

baZ

vik

Zvi

knn

AFR

So

uthe

rnn A

FRA

(Pre

tori

a)

Dav

id dK

inyu

aD

avidd

Kin

yuK

Eas

t AFR

E

ast A

FR

(Nai

robi

)P

aul

Pau

l Sc

hmit

dke

Schm

Sout

h it

dke

hm hhA

mer

ica

uth (

Am

erA

thh A

(((Per

u)

Rob

Cla

usen

Rob

Cla

usen

Car

ibbe

an sen

nn(D

omin

ican

Joe

To

Car

ibbe

ann

Rep

ublic

)AAa

ron

Bro

wne

ll

AAaro

n B

row

neR

DM

A

RD

MA

(B

angk

ok)

WD

C

WD

C

BE

Os

Ale

xand

ra H

adzi

-Vid

anov

icA

lexa

ME

an

dra

HHex

aE

E

(Cai

ro)A

ndre

i Bar

anni

k A

ndre

iC

AR

B

ara

drei

R

R

(DCBar

aCC

-an

nik

aar

aCC

--bas

ed)

Cam

ilienn

Sain

tnt-t-C

yrC

amili

enC

nSa

inS

Abd

oura

hman

e nntt

yrCC

Sain

eN

'dia

yeA

bdou

rahm

ane

Abd

oura

hmman

em

ane e

Ndi

aN

ddia

NNSa

hel (

Dak

ar)

5/23

/201

618

•U

SAID

Env

ironm

enta

l Com

plia

nce

&

Rel

ated

Lin

ks

ww

w.u

said

.gov

/our

_wor

k/en

viro

nmen

t/co

mpl

ianc

e

•22

CFR

216

w

ww

.usa

id.g

ov/o

ur_w

ork/

envi

ronm

ent/

com

plia

nce/

22cf

r216

•A

DS

Seri

es 2

00 (w

ith li

nk t

o C

hapt

er

204)

ww

w.u

said

.gov

/pol

icy/

ads/

200

•Pl

ain-

lang

uage

ove

rvie

w o

f USA

ID’s

envi

ronm

enta

l pro

cedu

res

& t

he E

IA

proc

ess

•Se

ctor

Env

ironm

enta

l Gui

delin

es

+ m

any

othe

r re

sour

ces

w

ww

.usa

idge

ms.

org

REF

EREN

CES

&

USE

FUL

INFO

RM

ATIO

N

USAID KasiaMcCormick

5/23

/201

619

•W

ilkist

erM

agan

giU

SAID

/Ken

ya M

issi

on E

nvir

onm

enta

l Offi

cer

(MEO

)w

mag

angi

@us

aid.

gov

•D

avid

Kin

yua,

USA

ID/E

ast A

fric

a R

egio

nal E

nvir

onm

enta

l Adv

isor

(R

EA)

dkin

yua@

usai

d.go

v

•G

loba

l Env

iron

men

tal M

anag

emen

t Su

ppor

t (G

EMS)

Pr

ojec

tG

EMSC

OR

ETea

m@

cadm

usgr

oup.

com

FOO

TER

GO

ES H

ERE

Page 149: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 150: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 18. Resolving the “Parking Lot”: Final General Q&A Session Facilitated Discussion Summary Through the technical presentations, group work and discussions we have identified a number of “parking lot” items—questions and issues that could not be easily addressed at the time they arose, but which are important to answer and resolve before the end of the workshop.

As we prepare to conclude the workshop, we will use this session to discuss—and hopefully resolve—these parking lot issues in a facilitated discussion that draws on assembled expertise of USAID staff, the consultant trainers, and participants.

Objective Conclude the “core technical skills and knowledge” portion of the workshop by resolving parking lot issues.

Key Resource

• List of “parking lot” issues compiled during the workshop.

Page 151: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Page 152: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Session 19. Environmental Priorities for USAID Activities in Kenya & East Africa + Bringing Curricula to Reality Group discussion and individual action planning Summary The first approximately one-half of this session will be comprised of group discussion addressing environmental priorities and challenges for USAID/Kenya and East Africa and its partners.

Group discussion will be followed by an Action Planning exercise in which participants synthesize key elements of the technical instruction and skill building activities to identify specific ways in which they can advance environmental compliance objectives and the principles of ESDM.

Taking Stock: the State of Environmental Compliance in USAID Mission & Projects

This workshop has set out environmental compliance requirements, and how the responsibilities for fulfilling these requirements are allocated among USAID, including A/CORs, and IPs. In practice, significant compliance gaps and shortfalls exist. Many of these gaps and shortfalls are rooted in inadequate compliance systems and processes.

That is, for compliance to be achieved in practice, it is not enough that individual USAID and IP staff understand their roles and responsibilities and master key skills; internal mission/team and project processes must be in place that support (and require) the exercise of these responsibilities.

In this first part of the session, we will examine the AFR Best Practice Standard to better understand the mission processes and capacities required for environmental compliance in project implementation. (While developed by Africa Bureau, there is nothing about these standards that are region-specific.) This session will consist of discussions and individual planning on “ways forward”—i.e., how to strengthen mission/team and IP/project compliance processes and capacities to improve environmental compliance and better achieve ESDM.

Focus Groups and Individual Action Plans.

Having taken stock of where we are, we are ready to begin to discuss ways forward: how can we and our mission and projects strengthen mission and team compliance processes and capacities to improve environmental compliance and better achieve ESDM?

We will divide into two focus groups: (1) Mission Staff and (2) IPs. (Note: depending on balance of participant numbers in these two groups, a different grouping may be decided.) Each group will engage in a facilitated discussion.

Focus Group Questions:

• What elements of environmental compliance are well implemented by your team/project? Why?

• Have you/your team/the mission/your project implemented compliance strengthening measures you would like to share? Are they working well?

• Key environmental compliance gaps within your team/project? What are the causes of these gaps?

Page 153: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

• Do you see feasible remedies? What are they?

• What do the USAID sector teams (and A/CORs specifically) need to do differently? Do they or the projects need additional resources, support or training to implement these changes?

Plenary “Way Forward” Discussion and Individual Action Plans.

Following the focus groups, we will reconvene in plenary:

• We will begin the plenary session with a short report-out from each group.

• Then, we will have a facilitated discussion to try to reach agreement, as a group, on the following questions:

Assuming that each of us have the opportunity to deliver post-workshop briefings to Mission Management /Sector Team leaders or COPs, what are the key points to convey to prioritize and strengthen environmental compliance? Key recommendations to make?

(Not all points will be applicable to all everyone, but we want to agree on a set of core messages.)

• The last portion of this session will be reserved for development of individual workshop follow-up plans, using the template on the following page. We will ask for volunteers to share some of their follow-up items.

Objective Survey the Mission and Project processes and capacities required for environmental compliance. Identify key messages to communicate to mission management/sector team leaders (USAID staff) and COPs (IP staff) to prioritize and strengthen environmental compliance in project implementation.

Develop an individual plan for workshop follow-up to strengthen environmental compliance in your project, team, or mission/operating unit.

Key resources • USAID/AFR Environmental Compliance Best Practice Standard

• Environmental Compliance Action Plan template (both provided on the following pages.)

Page 154: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

USAID/AFR Environmental Compliance Best Practice Standard (draft—revised March 2015)

A. Directive environmental documents are in place and accessible to and utilized by Mission staff 1) Environmental Compliance Mission Order is in place and generally consistent with AFR good-practice model.1 2) Mission tracking system exists for Regulation 216 and host-country documentation status, and coverage at the

contract/award level is accessible to all staff and utilized and contributed to by staff, including use by A/CORs to track EMMPs.

3) MEO, A/COR, and AM have copies of their current IEEs and host-country environmental documentation on file (electronic or hard copy, including Programmatic IEEs and central mechanisms).

4) Up-to-date ETOA or FAA 118/119 as part of the CDCS, prepared with MEO involvement or review. 5) Mission’s Performance and Monitoring Plan (PMP) reflects attention to environmental compliance. 6) Current Regulation 216 documentation (RCEs, IEEs, and PERSUAPs) at the appropriate Mission or central level

are: a) in place, covering all Mission-funded and –managed activities; and b) f l d l ff d ff d l 7) A/CORs have EMMPs and quarterly or bi-annual reports on file for each project that includes activities that have

a Negative Determination with Conditions

B. USAID staff environmental compliance responsibilities and reporting lines are formally established 1) MEO/dMEO Appointment Memo(s) are in place and generally consistent with the AFR good-practice model.1 2) A deputy or alternate MEO is appointed to assist when the MEO is unavailable. 3) In the execution of her/his MEO duties, MEO is directly accountable to the Senior Program Officer or senior

Mission management.

4) MEO has limited or no duties as an A/COR on projects. 5) Environmental compliance responsibilities of A/CORs and Alternate A/CORs are specified in their Appointment

Letters and position description, consistent with good-practice AFR environmental responsibilities and they understand and carry out their responsibilities.

6) Environmental compliance responsibilities of AMs are specified in their position description and they have discussed allocation of environmental compliance responsibilities with their A/COR.

7) Point of contact has been established for each office to facilitate interaction with the MEO and to assist other staff with environmental compliance questions.

C. Mission staff and implementing partners are trained in environmental compliance and ESDM 1) Mission staff have been trained and demonstrate competency in USAID and host-country environmental

compliance and ESDM. 2) Refresher training opportunities are provided annually to staff and implementing partners.

3) MEO has received formal training in environmental management and/or environmental impact assessment well beyond the level of a one-week workshop and has a strong working knowledge of host-country environmental requirements and processes.

4) Implementing partners have been trained and demonstrate competency in environmental compliance and ESDM.

D. Environmental compliance is integrated in Mission processes, which includes not only Mission-funded projects but all grants, mechanisms, and transactions that the Mission is responsible for overseeing down to the activity level

Design and Award Processes

1) Per ADS 201.3.16.2d and 201.3.16.3b, concept notes and PADs include environmental analyses. The MEO is consulted during the development process including reviewing RFA/Ps, and participating in kick-off meetings.

1 Example Mission Orders and MEO Appointment Memos can be found at: http://www.usaidgems.org/rolesRespons.htm.

Page 155: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

2) IEE conditions are incorporated into solicitations RFA/Ps, PIO and G2G agreements, and transaction support applying the Environmental Compliance Language for Solicitations and Awards Help Document2, or a process exists for ensuring activity-level IEE will be undertaken by the implementing partner (and included as a task in the

/ 3) MEO is notified in advance when new awards, agreements, and/or contracts are being issued, or when ceilings are raised, and is requested to comment.

4) Mission checklists for new awards, agreements, and/or contracts include confirmation of current and relevant Regulation 216 documentation.

5) Implementing partners have copies of their IEEs and EMMPs and environmental compliance is part of award briefings.

Oversight of partners and sub-partners* *including project implementers operating under a central mechanism but within the Mission’s area of jurisdiction

6) Process exists for ensuring Mission or implementing partner develops and implements an EMP/EMMP.

7) Mission field visit checklists include environmental compliance and incorporate an environmental site visit form in project M&E, where feasible, and processes exist to ensure regular monitoring.

8) Implementing partner project performance reporting (i.e., quarterly, semi-annual or annual reports) includes a section on environmental compliance based on EMMP implementation. If the Mission has standardized reporting templates, they include environmental compliance.

9) Process exists for incorporating IEE conditions into award documents and agreements; and including mitigation and monitoring costs in project budgets.

10) A/CORs review program activities annually with the implementing partner and the MEO to determine if activities have been changed or added and whether they are included in the existing IEE, or whether an amendment is necessary.

11) Compliance documents are reviewed one-year prior to project closeout to ensure partners focus on environmental sustainability of the project after termination.

Overall

12) MEO, A/CORs and AMs have process for collaborating on activities with potential environmental impacts (from design to closure).

13) Environmental compliance is integrated in Annual Portfolio Reviews.

14) Environmental compliance/ESDM “lessons learned” are integrated in closure reports, the Development Experience Clearinghouse (DEC), and Mission external communications (e.g., Web sites or social media), where

15) MEO reviews and considers host-country environmental standards for all USAID activities, including working through host-country permitting processes.

16) Process exists between the A/COR and AMs for centrally managed programs to track and report to USAID in Washington, D.C. on development of the EMMP, implementation of mitigation measures, and continued assessment of potential environmental impacts.

E. Internal environmental compliance resources are adequate 1) Adequate financial resources are available to support Mission environmental compliance, including training and

analytical support.

2) The MEO function is adequately resourced, both in terms of LOE available for the MEO and support staff, as well as funding for the MEO to undertake field monitoring.

3) Funds are available, if needed, for independent monitoring of EMMP implementation for environmentally consequential/complex activities, or for difficult to access sites.

2 http://www.usaid.gov/sites/default/files/documents/1865/204sac.pdf

Page 156: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

F. Appropriate progress has been made on previous BPR Action Plans and OIG Audit concerns3

1) Mission has developed and implemented the Action Plan as an outcome of the previous BPR; best processes and practices are still in place.

2) If applicable, items proposed in the OIG Audit of July 2011 have been corrected and are still in place.

3 Audit of Selected USAID Missions’ Efforts to Mitigation Environmental Impact in their Project Portfolios (No. 9-000-11-002-P).

http://oig.usaid.gov/sites/default/files/audit-reports/9-000-11-002-p.pdf

Page 157: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Environmental Compliance + Environmentally Sound Design & Management in Project Implementation A Training Workshop for USAID/Kenya & East Africa Staff & Partners

INDIVIDUAL WORKSHOP FOLLOW-UP PLAN With reference to previous discussions in this session, please identify 3-5 follow-up actions that you plan to take after this workshop to strengthen environmental compliance on your project, in your team, or in your mission/operating unit. For each, state a proposed timeline and immediate next step.

Example actions. Actions might include (but are not limited to):

Mission Staff: Brief mission management on key messages identified in this session ▪ Brief contracts team on ECL and inclusion of environmental responsibilities clauses in A/COR letters▪ Require EMMPs for projects for which you are an A/COR ▪ Deliver a short Environmental Compliance Briefing for mission staff ▪ Work with M&E specialist to better assess env compliance in field visits.

IPs: Brief your COP and M&E lead on key environmental compliance requirements as conveyed by the workshop ▪ Lead an environmental compliance session ion an upcoming staff training ▪ Developing a first-draft EMMP for internal review ▪ Developing a TOR for an external consultant or requesting TA from your home office to assist with EMMP development

Action item Proposed timeline Immediate step

Ex. Lead Environmental Compliance Session in upcoming staff training. (Develop short presentation using slides from this workshop.)

2nd week of August Contact training coordinator.

1.

2.

3.

4.

Page 158: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Workshop Evaluation Environmental Compliance + Environmentally Sound Design & Management in Project Implementation A Workshop for USAID/Kenya & East Africa Staff and Implementing Partners Naivasha, Kenya June 2016 Your frank and honest feedback will help strengthen future trainings and help prioritize ESDM and environmental compliance support to USAID programs and missions in Africa and globally. Thank you for your time!

Learning approach For each issue, please check or circle the assessment you most agree with.

Issue Assessment Comments Balance of time in classroom to time in field

Much more time in field needed

A bit more time in field needed About right

A bit more time in classroom needed

Much more time in classroom needed

In the classroom, balance of presentations to exercises, group work & discussions

Much more emphasis on presentations needed

A bit more emphasis on presentations needed

About right

A bit more emphasis on exercises/ discussions needed

Much more emphasis on exercises/ discussions needed

Technical level & pace Much too heavy

A little too heavy About right A bit too light Much too light

Opportunities for peer exchange & learning

Needed to hear and learn much more directly from facilitators

Needed to hear and learn more directly from facilitators

About right

Some more opportunities for peer learning/ exchange are needed

Many more opportunities for peer learning/exchange are needed

Highest/Lowest-rated sessions Please identify the 1 or 2 sessions that you rate most highly (for content, usefulness, approach or for other reasons). Please also identify the 1 or 2 sessions that you found least engaging/useful/relevant. Please briefly indicate the reasons for your choice. (You may wish to refer to the agenda to refresh your memory.)

Session Comment (Please explain why you made this choice.) HIGH-RATED HIGH-RATED LOW-RATED LOW-RATED

Page 159: usaidgems.org...A Training Workshop for USAID/Kenya and East Africa Staff and Partners Naivasha, Kenya 13-17 June 2016 Host & Sponsor USAID/KEA Prepared under The …

USAID/KEA Environmental Compliance & ESDM Training Workshop Naivasha, Kenya June 2016

Overall evaluations Please check the assessment you most agree with.

Issue Assessment Comments Very poor Poor Acceptable Good Excellent Technical quality (Program & Content)

Facilitation

Logistics

Venue

Field Visits

Impact Please circle the characterization you most agree with.

Question Characterization Comments Baseline Knowledge In light of what you have learned in this workshop, how would you rate your understanding of ESDM and USAID’s Environmental Procedures BEFORE this workshop?

Had poor or limited understanding

Understood the basics, lacked some details

Had a strong and detailed understanding

Empowerment To what extent has this workshop increased your knowledge and capabilities to address environmental compliance requirements in the context of your job function/professional responsibilities?

Not at all Moderately Strongly

Motivation To what extent has this workshop increased your motivation to proactively address environmental compliance and ESDM in the context of your job function/professional responsibilities?

Not at all Moderately Strongly

Key topics not covered Were there any topics of key important to you that were not covered/given very limited attention?

Support needs Are there particular environmental compliance/ESDM support needs or resources that you require?

Additional comments welcome on any topic.