1-�/ ���������� ��������� ���� �/ � 2��!�� �6 - #����5�� 1- ��5/ 8��//2 -��� 2� �� ��//����3 ���/� -�/ �6 "'9/ '���2 �6 "�����/: �������: �� /�66: ��2 ��3 # ���������3 �� ��!�� ;� �������� ��3 ��!��3 ������� �� /���3: 6�������� ��3 �����: �� #3 ��.��� ��3 2/������� �6 �� �6��� � � �����!��� �����3 �� ������-�� ��� �� -�/ 2��!��: - /��� "������ '��. 2�/ �� ���2 � ��. ��3 �!2���/ �/ � - ���� �� �-� /�!/ �6 ��3 �����3 �� ����
Greater Dhaka Sustainable Urban Transport Project ADB Loan No’s 2862/2863/2864-BAN
Bus Rapid Transit (BRT), Airport-Gazipur
Package 2, Engineering, Procurement and Construction
Management (EPCM)
SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT No.3: JULY - DECEMBER 2017
www.smec.com
In Association with: SYSTRA SA, France Brisbane City Enterprises, Australia ACE Consultants, Bangladesh
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 1 Jul - Dec 2017
EXECUTIVE SUMMARY Project Scope The Bus Rapid Transit (BRT) Airport-Gazipur, EPCM Package 2 of the Greater Dhaka Sustainable Urban Transport Project (GDSUTP), being funded by ADB is a priority project under the Bangladesh Government’s Strategic Transport Plan approved in 2008. The Project will contribute to developing a sustainable urban transport system (UTS), within the Dhaka North City Corporation (DNCC) and Gazipur City Corporation (GCC) areas which forms part of North Greater Dhaka, through the delivery of a 20-km bus rapid transit (BRT) corridor. This pilot project provides a solution for integrated urban mobility and will have a demonstration effect, as no modern mass transit system exists in Bangladesh. Project Status The detailed designs of the various components commenced in 2013 and were progressively completed by the end of 2015. The five major Contract Packages are: C01: Upgrading and widening of pavement with provision of BRT lanes and construction of flyovers and
BRT stations including access to stations (Km 0+000 to Km 2+600 and Km 7+100 to Km 20+200); C02: Upgrading and widening of pavement, construction of elevated BRT lanes including Tongi Bridge and
BRT stations (Km 2+600 to Km 7+100); C03: Construction of Pavement, Drains, Pedestrian Facilities and Local markets on Both Sides of the BRT
Corridor. C04: Construction and Completion of BRT Bus Depot at Gazipur. C05: Supply and Installation of Energy Efficient Highway Lighting along the BRT corridor including the
provision of Solar Panels at Bus Stations The At-Grade Section Contract (C01) was signed on 01 December 2016 with the Contractor, China Gezhouba Group Co. Ltd (CGGC). The Notice to Commence for the Works was issued on 13 Apr 2017 following the Ground-Breaking Ceremony presided over by the Minister of Road Transport and Bridges and attended by Local Representatives on 31 Mar 2017 at the site of the U-Turn Flyover at Km 8+500. The Contractor commenced mobilisation involving survey works and made submissions of the Draft Construction Programme, Traffic Management Plan, Environmental Management System and other methodologies for review and approval. Initial activities on site involved the establishment of the Contractor’s own plant yard, preparation for construction of the Engineer’s Office building, clearing of the area for the Gazipur Terminal Station and for the drainage near the U-turn Flyover at Ch 8+200 and the preparation for subsoil investigations and pilot piles for the Gazipur Interchange. The progress achieved on the various activities up to the end of 31 December 2017 is summarised in Table I.5. The Contractor conducted the Baseline Monitoring of Environmental Parameters in August 2017 and the first Environmental Sampling as per the EMP of EIA report on November 2017. A Draft Environmental Management System (EMS), Site Safety Manual, Site Personnel Health and Epidemic Prevention Program were submitted along with plans to survey and measure the trees of Ch 0+000 to Ch 0+260. The consultant already reviewed the draft documents and requested the comments to be addressed in a final version without delay. Overall Progress of the Project at 31st December 2017 was assessed as 0.48% against a revised target of 4.5% indicating a lag of 4.02%. The achieved progress of the Contractor was based on the completed quantities of physical works executed under the above Items.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 2 Jul - Dec 2017
The Elevated Section Contract (C02) was awarded to Jiangsu Provincial Transportation Engineering Group Co. Ltd (JTEG) on 13 Sep 2017. The Contract was signed on 19 Oct 2017 on receipt of the Performance Guarantee and following the Pre-Award Meeting held on 17 Oct 2017. The Notice to commence was issued on 15 Dec 2017. The Local Roads and Markets Contract (C03) was awarded to Weihai International Economic & Technical Cooperative Co. Ltd (WIETC), China on 13 Sep 2017. The Contract was signed on 28 Sep 2017 on receipt of the Performance Guarantee and following the Pre-Award Meeting held on 27 Sep 2017. The Notice to commence was issued on 10 Dec 2017. The Bus Depot Contract (C04), the first to be awarded signed on 08 February 2016 with the Contractor SEL-UDC commencing site activities on 23 February 2016 after the site was formally handed over by the Employer LGED. The progress achieved on the various activities up to the end of 31 December 2017 is summarised in Table I.6. Overall Progress of the Project at 31st December 2017 was assessed as 45.23% against a revised target of 89.82% indicating a lag of 44.59%. The achieved progress of the Contractor was based on the completed quantities of physical works executed under the above Items. Progress has been constrained by slow mobilisation and with many activities then unable to proceed due to the wet conditions during July to September 2017. Activities continued in several areas including the drainage system, embankment works in the main depot parking area and on the access road involving the preparation of subgrade layers and subbase works. Concrete works continued for the Admin & Maintenance Building, the Boundary Wall and the BTCL Complaints Centre, Main Entry Gate & Guardhouse, the Electrical Sub-Station and the Drainage System including the manufacture of pipes and their installation with approx. 1,249 m3 of concrete supplied and placed. Environmental Monitoring The implementation status of the mitigation measures to be addressed during the construction stage of the Project is shown in the tables below for comparison with the designed mitigation measures stated in the EMP. In summary the mitigation measures during this stage involve ensuring that the Contractor develops and presents his various method statements, plans, etc. accordingly for review and approval before commencing the works, that relevant actions required to be implemented by the Contractor in the execution of the works are addressed and that the measures have all been addressed effectively. The Baseline Monitoring Sampling and first environmental monitoring of Environmental Parameters (air quality, noise & vibration level, surface water and groundwater quality, soil quality) on the At-Grade Section (C01) Contract was carried out from 27 to 30 August 2017 and subsequently at the end of November 2017 as required and the results have been analysed and included in the main report. The routine sampling of Environmental Parameters (air quality, noise & vibration level, surface water and groundwater quality, soil quality) on the Bus Depot Contract (C04) was carried out in early December 2017 as required and the results have been analysed and included in the main report. No information was provided regarding fisheries resources and wildlife. However, in the construction site, there is only a small ditch. The data from other environmental quality sampling showed that the construction work appeared to have very few longer-term impacts on the biophysical environment.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 3 Jul - Dec 2017
Compliance with Safeguards Requirements At Grade Section including Flyovers (C01)
The Contractor for C01 has fully complied with Environmental monitoring and mitigation program as per the EMP of the EIA. The baseline environmental monitoring and the first environmental quality monitoring have been conducted during the monitoring period. The Contractor submitted the draft Environmental Management System (EMS) after incorporating the comments from the Consultant. The Contractor has been notified several times to submit the final HSMP, Site Safety Manual, Site Personnel Health and Epidemic Prevention Program for approval from consultant. The Contractor yet not deployed their Environmental Management Officers (EMOs) despite repeated reminders regarding the issue. Mitigation measures regarding surface water, ground water, air quality, noise and dust pollution were fully complied. Results of the noise level monitoring during day and night time and the ambient air quality monitoring along the project corridor shows that the values were higher than the national standard. The reason for this high ambient noise reading may be a result of the high traffic volume and the large number of industrial and commercial activities along the project influenced area and not construction activities. Elevated Section including Tongi Bridge (C02)
Since C02 started on 15 December 2017 and they have not yet started any major works thus there was no scope for environmental monitoring. The Contractor has yet not submitted their Environmental Management System (EMS)/Construction Environmental Management Plan (CEMP) for approval from Consultant. The Contractor has also not yet complied with the Baseline Monitoring of Environmental Parameters and not yet deployed the Environmental Management Officers (EMOs). Local Roads and Kitchen Markets (C03)
Since C03 started on 10 December 2017 and they have not yet started any major works thus there was no scope for environmental monitoring. However, the Contractor has submitted their Draft Environmental Protection Plan, and the HIV-AIDS Awareness Program for approval from Consultant. The Contractor has not yet complied with the Baseline Monitoring of Environmental Parameters. Gazipur Bus Depot (C04)
The Contractor for C04 has fully complied with Environmental monitoring and mitigation program for filling up of water logged area, fisheries, occupational health and safety and community health and safety issues. Mitigation measures regarding surface water, ground water, air quality, and noise and dust pollution were partially complied. The latest result of the noise level monitored during day time at the construction site (49.01 dBA) was within the ambient standard (Leq 55 dBA) whereas the noise level was higher than the standard during the previous period monitoring. Soil quality sampling was conducted during this monitoring period for the first time. There is a risk of contamination of soils at the camp and work sites due to accidental spillage of noxious chemical, petroleum derivatives and bituminous material. Therefore, mitigation and monitoring measures for preventing soil pollution were stressed to the Contractor. Conclusions There have been no key Environmental Safeguard issues identified to date at Gazipur Bus Depot (C04) site and the At-Grade Section Contract (C01) site. The C01 Contractor has mobilised staff, prepared the required management plans as per EMP implementation and initiated the environmental quality monitoring. The C01 Contractor has submitted his Environmental Management System, Safety Manuals and Health Programme which have been reviewed by the Consultant environmental specialist and returned for correction and further improvements. The monthly environmental monitoring report up to August 2017 also submitted by the contractor for approval from Consultant.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 4 Jul - Dec 2017
The relevant Environmental Safeguards identified through the EIA and the IEE have been addressed in the EMPs that have been included in the bidding documents for each of the civil works contracts with both their implementation and monitoring to proceed once the major activities will be start.
It is expected however that there will be a requirement for extensive awareness training workshops to be carried out once these major activities have Further Action Required The next semi-annual Environmental Monitoring Report will cover the period from January to June 2018 during which all the Civil Works Contracts will have commenced and the procedures for implementation of the EMPs on each contract will have been established with updated base line information recorded. The focus of this report will be to identify if the Contractors have adequately understood their Environmental obligations as set out in the EMP and other relevant provisions of their Contracts, have been able to submit their EMPs and other related documents and have initiated the relevant procedures on site to ensure compliance with these requirements.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 5 Jul - Dec 2017
Table of Contents
EXECUTIVE SUMMARY ............................................................................................................................... 1 ABBREVIATIONS AND ACRONYMS ............................................................................................................. 8 I. INTRODUCTION ............................................................................................................................... 10 A. REPORT PURPOSE AND RATIONALE ..................................................................................................................... 10
Sector Objective .......................................................................................................................................... 10 Project Inception ......................................................................................................................................... 11 Project Objective ......................................................................................................................................... 11 Project Implementation .............................................................................................................................. 12
B. PROJECT LOCATION AND COMPONENTS............................................................................................................... 13 Project Location .......................................................................................................................................... 13 Project Components.................................................................................................................................... 13
C. ENVIRONMENTAL CLASSIFICATION AND RESPONSIBILITIES ....................................................................................... 16 Environmental Category ............................................................................................................................. 16 Environmental Clearances .......................................................................................................................... 16 Institutional Setup and Responsibilities ...................................................................................................... 16 Key Findings in IEE Report ........................................................................................................................... 17
D. CHANGE IN PROJECT SCOPE ............................................................................................................................... 17 Revised DPP ................................................................................................................................................. 18
E. PROJECT STATUS ............................................................................................................................................. 19 Project Status at 31 December 2017 .......................................................................................................... 19
F. ENVIRONMENTAL MITIGATION AND MONITORING REQUIREMENTS.......................................................................... 22 Environmental Management Plan .............................................................................................................. 22 Environmental Management System .......................................................................................................... 22 Sampling Program ....................................................................................................................................... 22 EMP Related Activities ................................................................................................................................ 25
II. ENVIRONMENTAL MONITORING ...................................................................................................... 26 A. PRE-CONSTRUCTION STAGE............................................................................................................................... 26 B. CONSTRUCTION STAGE ..................................................................................................................................... 28
Baseline and Sampling Program Results and Analysis ................................................................................ 46 C. OVERALL ASSESSMENT OF SAMPLING PROGRAM................................................................................................... 65
At-Grade Section including 6 Flyovers (C01) ............................................................................................... 65 Gazipur Bus Depot Contract (C04) .............................................................................................................. 66
D. CONTRACTOR COMPLIANCE ............................................................................................................................... 66 At Grade Section including Flyovers (C01) .................................................................................................. 66 Elevated Section including Tongi Bridge (C02) ............................................................................................ 66 Local Roads and Kitchen Markets (C03) ...................................................................................................... 66 Gazipur Bus Depot (C04) ............................................................................................................................. 67
III. ENVIRONMENTAL MANAGEMENT ................................................................................................ 68 A. KEY ENVIRONMENTAL ISSUES IDENTIFIED ............................................................................................................. 68 B. COMPLIANCE WITH ENVIRONMENT RELATED PROJECT COVENANTS ......................................................................... 68
Compliance with National Environmental Laws ......................................................................................... 68 Compliance with ADB Guidelines ................................................................................................................ 68 Compliance with Loan Agreement .............................................................................................................. 69
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 6 Jul - Dec 2017
C. SITE INSPECTIONS AND AUDITS .......................................................................................................................... 70 D. CONSULTATIONS AND COMPLAINTS .................................................................................................................... 70 E. NON-COMPLIANCE NOTICES .............................................................................................................................. 70 IV. CONCLUSION AND RECOMMENDATIONS ...................................................................................... 72 A. KEY ISSUES ..................................................................................................................................................... 72 B. ADJUSTMENTS TO MONITORING REQUIREMENTS .................................................................................................. 72 C. NEXT REPORT ................................................................................................................................................. 72 APPENDIX 1: PROJECT WORKS SCHEDULES ............................................................................................... 73 APPENDIX 2: ENVIRONMENTAL CLEARANCE CERTIFICATES ....................................................................... 74 APPENDIX 3: CONTRACT ENVIRONMENTAL CLAUSES ................................................................................ 79 APPENDIX 4: ENVIRONMENTAL MANAGEMENT PLAN .............................................................................. 84 APPENDIX 5: ENVIRONMENTAL MANAGEMENT IMPLEMENTATION WORKS SCHEDULES .......................... 136 APPENDIX 6: SAMPLING PROGRAM ........................................................................................................ 137 APPENDIX 7: COMPLIANCE MONITORING CHECKLIST – AT GRADE SECTION INCLUDING FLYOVERS (C01) .. 141 APPENDIX 8: COMPLIANCE MONITORING CHECKLIST – GAZIPUR BUS DEPOT CONTRACT (C04) ................. 144 APPENDIX 8: PHOTOGRAPHS .................................................................................................................. 147 APPENDIX 9: THE LABORATORY TEST REPORT ......................................................................................... 149
FIGURES
FIGURE I.1: PROJECT ORGANISATION CHART ..................................................................................................... 12 FIGURE 2: PROJECT LOCATION MAP ................................................................................................................... 15 FIGURE II.1: SURFACE WATER SAMPLE COLLECTION .......................................................................................... 46 FIGURE II.2: GROUNDWATER SAMPLE COLLECTION ........................................................................................... 47 FIGURE II.3: AIR QUALITY MONITORING AT PROJECT SITE ................................................................................. 50 FIGURE II.4: NOISE LEVEL MONITORING AT DAY AND NIGHT TIME IN THE PROJECT AREA ............................... 53 FIGURE II.5: VIBRATION LEVEL MEASUREMENT ................................................................................................. 54 FIGURE II.6: SOIL SAMPLING AT PROJECT SITE .................................................................................................... 56 FIGURE II.7: SURFACE WATER SAMPLE COLLECTION .......................................................................................... 58 FIGURE II.8: GROUNDWATER SAMPLE COLLECTION ........................................................................................... 60 FIGURE II.9: AIR QUALITY MONITORING AT PROJECT SITE ................................................................................. 61 FIGURE II.10: NOISE LEVEL MONITORING AT DAY TIME IN THE PROJECT AREA ................................................. 63 FIGURE II.11: VIBRATION LEVEL MEASUREMENT AT PROJECT SITE .................................................................... 64 FIGURE II.12: SOIL SAMPLING AT PROJECT SITE .................................................................................................. 65
TABLES
TABLE I.1: CONTRACT PACKAGES ........................................................................................................................ 14 TABLE I.2: ENVIRONMENTAL RESPONSIBILITY MATRIX ...................................................................................... 16 TABLE I.3: COMPARISON OF ORIGINAL AND REVISED PROJECT SCOPE. ............................................................. 18 TABLE I.4: STATUS OF PROCUREMENT OF CONTRACT PACKAGES AT 30 DECEMBER 2017 ............................... 19 TABLE I.5: SUMMARY OF PROGRESS STATUS – C01 ............................................................................................ 20 TABLE I.6: SUMMARY OF PROGRESS STATUS – C04 ............................................................................................ 21 TABLE I.7: SAMPLING PROGRAM SUMMARY FOR AT GRADE SECTION AND FLYOVERS*................................... 22
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 7 Jul - Dec 2017
TABLE I.8: SAMPLING PROGRAM SUMMARY FOR ELEVATED SECTION INCLUDING TONGI BRIDGE* ................ 23 TABLE I.9: SAMPLING PROGRAM SUMMARY FOR BUS DEPOT, LOCAL ROADS AND KITCHEN MARKETS* ........ 24 TABLE II.1 MITIGATION MEASURES IMPLEMENTED IN AT GRADE SECTION INCLUDING FLYOVERS CONSTRUCTION SITE ........................................................................................................................................... 26 TABLE II.1 MITIGATION MEASURES IMPLEMENTED IN BUS DEPOT CONSTRUCTION SITE ................................. 28 TABLE II.2 MITIGATION MEASURES IMPLEMENTED IN BUS DEPOT CONSTRUCTION SITE .......................... 42 TABLE II.3: RESULTS FOR SURFACE WATER QUALITY .......................................................................................... 46 TABLE II.4: TEST RESULT OF GROUNDWATER SAMPLING ANALYSIS .................................................................. 49 TABLE II.5: TEST RESULT OF AMBIENT AIR QUALITY ANALYSIS ........................................................................... 51 TABLE II.6: TEST RESULT OF AMBIENT AIR QUALITY ANALYSIS (WEATHER DATA) ............................................. 52 TABLE II.7: NOISE LEVEL AT THE PROJECT LOCATION ......................................................................................... 53 TABLE II.8: TEST RESULTS FOR VIBRATION LEVEL MEASUREMENT ..................................................................... 55 TABLE II.9: TEST RESULTS FOR SOIL QUALITY ...................................................................................................... 57 TABLE II.10: RESULTS FOR SURFACE WATER QUALITY ........................................................................................ 58 TABLE II.11: RESULTS FOR GROUNDWATER QUALITY ......................................................................................... 60 TABLE II.12: TEST RESULT OF AMBIENT AIR QUALITY ANALYSIS ......................................................................... 62 TABLE II.13: NOISE LEVEL AT THE PROJECT LOCATION ....................................................................................... 63 TABLE II.14: VIBRATION LEVEL AT THE PROJECT LOCATION ............................................................................... 64 TABLE II.15: TEST RESULT OF SOIL QUALITY ANALYSIS ....................................................................................... 65 TABLE III.1: COMPLIANCE WITH NATIONAL LAWS .............................................................................................. 68 TABLE III.2: COMPLIANCE WITH ENVIRONMENTAL CONSIDERATIONS OF LOAN AGREEMENTS ....................... 69 TABLE III.1: COMPLIANCE WITH NATIONAL LAWS .............................................................................................. 68 TABLE III.2: COMPLIANCE WITH ENVIRONMENTAL CONSIDERATIONS OF LOAN AGREEMENTS ....................... 69
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 8 Jul - Dec 2017
ABBREVIATIONS AND ACRONYMS
ADB Asian Development Bank ADF Asian Development Fund AFD Agence Française de Développment (French Development Agency) AP Affected Person BBA Bangladesh Bridge Authority BIWTA Bangladesh Inland Water Transport Authority BOQ Bill of Quantities BR Bangladesh Railway BRM Bangladesh Resident Mission (of the ADB) BRT Bus Rapid Transit BUET Bangladesh University of Engineering & Technology CAR Contractor’s All Risk CBR California Bearing Ratio CCDB Christian Commission for Development Bangladesh CGGC China Gezhouba Group Co. Ltd – Contractor for At-Grade Section Contract C04 CPM Contractor’s Plant and Machinery DESCO Dhaka Electric Supply Company DOE Department of Environment DPHE Department of Public Health and Engineering DU University of Dhaka ECC Environmental Clearance Certificate EIA Environmental Impact Assessment EMP Environmental Management Plan EPCM Engineering, Procurement and Construction Management EOT Extension of Time EP Entitled Person FOB Foot Over Bridge GCC General Conditions of Contract GDSUTP Greater Dhaka Sustainable Urban Transport Project GEF Global Environmental Facility GOB Government of Bangladesh IEE Initial Environmental Examination IPC Interim Payment Certificate ITP Inspection and Testing Plan LA Land Acquisition LGED Local Government Engineering Department MoRTB Ministry of Road Transport and Bridges MPR Monthly Progress Report NGO Non-Government Organisation NMT Non-Motorised Transport NTC Notice to Commence OCR Ordinary Capital Resources OFC Optical Fibre Cable ODBM Operational Design and Business Model
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 9 Jul - Dec 2017
PCC Particular Conditions of Contract PMCCB Project Management, Coordination and Capacity Building PMU Project Management Unit PPTA Project Preparation Technical Assistance PSC Prestressed Concrete REB Rural Electrification Board RHD Road and Highways Department ROW Right of Way RTHD Road Transport and Highways Division SEL-UDC SEL-UDC Joint Venture - Contractor for Gazipur Bus Depot Contract C01 SMEC SMEC International Pty Ltd & Associates SPO Special Project Organisation TOR Terms of Reference VO Variation Order WB World Bank
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 10 Jul - Dec 2017
I. INTRODUCTION
A. REPORT PURPOSE AND RATIONALE
1. As defined in the Initial Environmental Examination (IEE)1 the Bus Rapid Transit (BRT) Corridor from Airport to Gazipur is the component of the Greater Dhaka Sustainable Urban Transport Corridor Project under ADB Loan for which an environmental assessment was completed. As part of the borrower’s commitment, Semi-Annual Environmental Monitoring reports (EMR) are to be prepared in order to report on the Contractors’ progress with implementing the requirements of the Environmental Management Plan (EMP), as well as the borrower’s responses to non-compliance issues. 2. The purpose of this third EMR is to document the environmental management activities and compliance with the approved EMP of this Project and provides details of project activities during the period from July to December 2017. This report is prepared in accordance with the environmental monitoring program as part of the EMP. As the third EMR, it will only cover the construction phase as the compliance with the EMP for the design, bidding, and construction preparation stages was addressed in the previous report. In line with targets aimed at reducing the negative environmental impacts of the Project and in accordance with all the relevant specifications and standards of the Government of Bangladesh (GOB), as well as the policies of the Asian Development Bank (ADB), this report will emphasize: (i) progress made in implementing the EMP, (ii) implementation of mitigation measures, (iii) environmental compliance and (iv) problems that have occurred and corrective actions taken. 3. This report is prepared by SMEC International and Associates (SMEC) as the project implementation consultant for the Engineering, Procurement and Construction Management (EPCM) Component (Package 2) of the Project. Sector Objective 4. Dhaka is the most densely populated city in the world with limited inhabitable land due to the city’s topography, limited infrastructure and low levels of public services that result in tremendous congestion and constrain the ability of the urban transport system to provide mobility for all people. With the growing middle class, the registration of private cars and other motorised vehicles has been rapidly increasing and with an annual growth rate of about 8% there could be up to half a million cars in 2025, significantly impacting the increase of Greenhouse Gas (GHG) emissions from the transport sector. To ensure a sustainable future for Dhaka, public transport focused on people’s mobility needs and accessibility has to be improved and given priority over simple road projects. 5. At the Government’s request the 6 main corridors in Greater Dhaka’s fringes were analysed with the north corridor recommended as the one with the best potential to organize urban development and support a mass-transit infrastructure. A Bus Rapid Transit (BRT) system was also recommended as the best mass-transit mode for the selected corridor, with 20% of its length located within the Dhaka North City Corporation (DNCC) and 80% located within the Gazipur City Corporation (GCC). 6. The GCC with an estimated population of 1 million is a garment hub with around 300 garment factories in the immediate vicinity of the corridor employing approximately 1 million workers adding to the floating population. With rapid motorisation the situation in road-based traffic collisions deteriorates, mostly affecting pedestrians who represent up to 50% of road accident fatalities in the GCC streets. The safety issues become even more acute when looked at from a gender perspective where 80% of the workers are women and a large portion of them commute on foot.
1Asian Development Bank. 2012. INITIAL ENVIRONMENTAL EXAMINATION. Supplementary Appendix of the Report and Recommendation of the President to the Board of Directors (RRP) for the GDSUTP.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 11 Jul - Dec 2017
7. Public transport in Greater Dhaka is inadequate and of poor quality with an estimated total of over 5000 large and mini buses operated by 45 companies, mostly private, running through the selected corridor. The bus fleet is in poor condition, there are few equipped stops, information on itinerary or connections is not provided, the ticketing system is not developed and the operators aggressively compete for passengers worsening congestion and impairing safety. 8. The Project complies with Dhaka’s urban transport sector priorities by following some of the recommendations of the Strategic Transport Plan approved by the Government in 2008. The corridor selected will connect with the BRT corridor to be undertaken by the World Bank from the airport terminal south to Dhaka, ultimately providing a 40 km mass-transit corridor from Gazipur to Dhaka city centre and will be integrated with the MRT system routes also being implemented through JICA support. Project Inception 9. The Government of Bangladesh (GOB) has requested a loan in the amount of US$ 100 million from ADB’s Ordinary Capital Resources (OCR), a loan in various currencies in Special Drawing Rights (SDR) equivalent in value to US$ 45 million for ADB’s Special Funds, and a loan in various currencies in Special Drawing Rights (SDR) equivalent in value to US$ 15 million from ADB’s Hard Special Funds to help finance the Greater Dhaka Sustainable Urban Transport Project. 10. The Project is also co-financed by the Agence Française de Développement (AFD) with an additional loan of US$ 45 million and the Global Environmental Fund (GEF) with a grant not exceeding US$ 4.6 million. Both AFD and GEF’s co-financing are being administered by ADB with the closing date of the loans and the grant being 31 Dec 2019 for AFD and 30 Jun 2020 for ADB. Project Objective 11. The Project will improve the quality of life within the Gazipur City Corporation (GCC), which forms part of Greater Dhaka, through the delivery of a more efficient and sustainable Urban Transport System (UTS), including a 20 kilometre Bus Rapid Transit (BRT) corridor. 12. The ADB loans in the amount of US$160 million, or 62.7% of the total project investment cost of US$ 255 million will be used to finance:
i) The large civil works packages for the BRT corridor restructuring, vehicles and equipment; ii) Consulting services including surveys and capacity building; iii) Compensation fund for private bus operators and fleet scrapping program; iv) SPO’s recurrent administrative costs during the 4-year construction period; v) Advocacy; and vi) Interest charges during implementation.
13. The GOB financing of US$ 45 million or about 17.6% of the total project cost will be used for land acquisition and resettlement, taxes and duties and a small part of the civil works and recurrent administration costs. 14. Consulting services to be provided under the Project are: � Package 1 Project Management, Coordination and Capacity Building (PMCCB) � Package 2 Engineering, Procurement and Construction Management (EPCM) � Package 3 Operations Design and Business Model (ODBM) � Package 4 Resettlement Plan Implementation (RPI)
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 12 Jul - Dec 2017
Project Implementation 15. The Project Organisation established to ensure the requirements of all stakeholders are adequately addressed is shown in the following diagram.
Figure I.1: Project Organisation Chart
16. The Executing Agency (EA) for the Project is the Road Transport and Highways Division of the Ministry of Road Transport and Bridges (MoRTB) and the Implementing Agencies (IA) for the various components of the Project are as follows:
i) The Roads and Highways Department (RHD) will implement the main corridor restructuring, excluding the elevated section;
ii) The Bangladesh Bridge Authority (BBA) will implement the elevated section (also including the at-grade area beneath, integrating the new Tongi Bridge over the Turag River and the Abdullahpur intersection flyover; and
iii) The Local Government Engineering Department (LGED) will implement the BRT Bus Depot at Gazipur, improvements in Local Roads and Local Markets and Highway Lighting.
17. A Project Management Unit (PMU) established within the RHD and headed by its Project Coordinator will oversee the operations of the individual Project Implementation Units (PIU) established within each of the IAs and which are responsible for their respective component. The PIUs will each be headed by a Project Director with the EPCM consultancy services being overseen by the Project Director from the RHD PIU who will coordinate with the other Project Directors. 18. An International Tender was called for Consultancy Services Package 2 for the Engineering, Procurement and Construction Management (EPCM) of the BRT Project. SMEC International Pty Ltd, Australia in association with Systra SA, France, Brisbane City Enterprises Pty Ltd (BCE), Australia and ACE
Government Agencies
Consulting Packages
Special Project Organisation
(SPO)
Package 1 - PMCCB
SMEC & Associates
Dhaka Transport Coordination
Authority (DTCA)
Package 4 - RP Implementation
CCDB
Package 2 - EPCM
SMEC & Associates
Package 3 - ODBM
ALG
Project Implementation
Unit (IA)
Project Implementation
Unit (IA)
Project Implementation
Unit (IA)
B'desh Bridge Authority (BBA)
Roads & Hwys Dept (RHD)
Local Govt Eng Dept LGED)
Bridges Division (MoRTB)
Local Government Engineering
Dept (MoLGRDC)
Roads Division (MoRTB)
Interministerial Project Steering
Committee
Project Management Unit
(EA)
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 13 Jul - Dec 2017
Consultants Ltd (Bangladesh) was the successful tenderer and a consultancy contract was signed on 13 May 2013. 19. During the design stage the Consultant’s team included an International and National Environmental Specialist who provided inputs for the preparation of the Environmental Impact Assessment (EIA) to seek Government Clearance for the project and updating the Initial Environmental Examination (IEE) for ADB clearance.
B. PROJECT LOCATION AND COMPONENTS
Project Location 20. The proposed BRT corridor will follow National Highway 3 (N3) starting at the proposed airport terminal station and continue north for nearly 16 km to the Joydevpur Chowrasta roundabout. From this point the alignment will proceed east for 4 km to the Gazipur Terminal station just south of the Gazipur bazaar. From the airport station on the southern end to about Km 3 the level is generally at grade (ground level). The section from Km 2+600 to Km 7+100 will be elevated over the Sonargaon Jonopoth Road, Ashulia Road and Station Road Intersections and the Turag River. There are also 6 flyovers for the BRT over major intersections. 21. The corridor from the Airport Station to the Gazipur Station is administratively located in 2 districts: Dhaka North City Corporation and the Gazipur City Corporation. The rainy season in this area starts between April and July and ends between September and November. The route passes through low, flat and alluvial land, much of which is reclaimed and crosses the Turag River. Land use in the corridor is primarily commercial, institutional, and industrial thereby making it a major employment zone. Project Components 22. The scope of the BRT Airport-Gazipur and the major project activities are summarised as follows: i) At-grade, centrally located BRT lanes for 16.0 km with one segregated lane per direction between
the Airport station and Gazipur Station with additional lanes for passing at designated stations;
ii) 4.5 km long elevated section of BRT between House Building and Cherag Ali Market (Km 2+600 to Km 7+100) includes the reconstruction of the bridge over the Turag River incorporating the interchange with the Ashulia Road at Abdullahpur.
iii) 6 additional flyovers at main junctions including a major interchange at Chowrastra with the Mymensingh road.
iv) At grade BRT lanes will use flexible pavement construction with reinforced concrete pavement provided through the station areas where braking and acceleration forces are high.
v) 25 island type or staggered island type closed stations with pedestrian footover bridges for access at 14 stations including escalators and lifts for passengers, entry/exit sliding doors for control at edges of platforms.
vi) 1 bus depot at Gazipur with parking for 94 buses and including a maintenance and administration
building, electrical sub-station, fuel storage and filling station, bus chassis/outer washing station, waste materials store, effluent treatment plan, water reservoir, boundary wall with gate/guard house and access road.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 14 Jul - Dec 2017
vii) Two mixed traffic lanes and one NMT lane per direction and sidewalks along either side of the BRT
viii) High Capacity Drainage system along the restructured corridor
ix) 113 access feeder roads improved in favour of NMT for a distance of 100 metres from the corridor totalling 49 km;
x) Highway lighting with 1000 energy efficient lights along the corridor with power provided using
solar panels located at each of the station buildings.
xi) Improvements to 8 local markets, local drainage and Local Roads
xii) Installation of BRT priority traffic lights and closed-circuit cameras (CCTV) at main junctions
xiii) Environmental Safeguards
xiv) Social Safeguards involving monitoring of Land Acquisition and the Implementation of the Resettlement Plan.
23. The implementation of the civil works under the responsibility of each of the designated IAs is formalised through a number of Contract packages as shown in Table 1.
Table I.1: Contract Packages
Package No.
Component Implementing
Agency Contract Period
C01 Upgrading and Widening of Pavement with provision of BRT Lanes and Construction of Flyovers and BRT stations including access to Stations.
RHD 30 months
C02 Upgrading and Widening of Pavement, Construction of Elevated BRT Lanes including Tongi Bridge and BRT Stations. BBA 30 months
C03 Construction of Pavement, Drains, Pedestrian facilities and Local Markets on Both Sides of BRT Corridor. LGED 18 months
C04 Construction and Completion of BRT Bus Depot at Gazipur. LGED 18 months
C05 Supply and Installation of Energy Efficient Highway Lighting along the BRT corridor including the provision of Solar Panels at Bus Stations.
LGED 12 months
24. The overall physical construction period of the Project is estimated as 52 months based on the Contract Completion Date of the last of the Contracts (C02) being 18 June 2020.
25. A Location Map of the site showing the key features of the Project is presented in Figure 2.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 15 Jul - Dec 2017
Figure 2: Project Location Map
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 16 Jul - Dec 2017
C. ENVIRONMENTAL CLASSIFICATION AND RESPONSIBILITIES
Environmental Category 26. The potential impacts of this project are expected to be site-specific, low-scale adverse and mostly reversible. The Project therefore is classified as category B in accordance with the Safeguard Policy Statement (SPS), 2009 of the Asian Development Bank (ADB). Accordingly, an Initial Environmental Examination (IEE) is sufficient to meet the environmental requirements as no significant impacts are envisioned. An IEE conducted in 2012 and approved by ADB was updated in 2015/16 by SMEC Consultant and is broadly consistent with the recommendations of that study. The IEE examined the environmental impacts of the project comprehensively, presented an in-depth analysis of the impacts, and proposes mitigation measures with more details than the IEE conducted in 2012. 27. However, the project is classified as a Red Category project under the Government of Bangladesh regulations requiring the preparation of a full Environmental Impact Assessment (EIA) that was subsequently prepared to enable the Environmental Clearance Certificate (ECC) to be issued as required under the Environmental Conservation Rules (ECR 1997) of Department of Environment (DoE). Environmental Clearances 28. The initial environmental clearance certificate for the project, valid for one year, was obtained from the DOE on 22nd May 2016 which was valid up to 01 May 2017, according to their memo DOE/Clearance/5252/2013/175 following submission of the Environmental Impact Assessment to the DOE in December 2015 and a presentation made to the Environment Report Committee on 28th Jan 2016. The renewal of the Environmental Clearance Certificate was issued on 16th May 2017 which is valid up to 01 May 2018. As per their memo 22.02.0000.131.72.007.17/Renewal-01 the ECC needs to be renewed again no later than 01 May 2018. Institutional Setup and Responsibilities 29. The Project Organisation Chart and Implementation arrangements are described in Figure I.1 of this Report. The Contractors engaged for each Contract Package will each be represented by a Contractor’s Representative in Dhaka. The EPCM Consultant is SMEC and Associates represented by the Team Leader who will be delegated some of the authority of “The Engineer” under the Contracts. The responsibilities of each organisation during the various Phases of the Project are shown in Table I.2 below.
Table I.2: Environmental Responsibility Matrix
Phase Agency Contact Responsibility Deliverables
Design/ Pre-construction
Executing Agency: (RHD) Chief Engineer
Implementing Agencies: (RHD, BBA, LGED)
Project Director Preparation of EIA, EMP. Incorporation of EMP clauses into bidding documents. Reporting to ADB.
IEE, EIA, EMP, Bidding Documents
EPCM Consultant: SMEC & Associates Design Team Leader
Construction
Executing Agency: (RHD) Chief Engineer
Implementing Agencies: (RHD, BBA, LGED)
Project Director Monitoring of EMP Implementation, Audit and Reporting to ADB.
Monthly, Quarterly Reports. Bi-annual Reports to ADB. EPCM Consultant:
SMEC & Associates Construction Team Leader
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 17 Jul - Dec 2017
Phase Agency Contact Responsibility Deliverables
Contractor: Contractor’s Representative(s)
Implementation of Mitigative Measures and internal monitoring & reporting
Monthly and bi-annual Reports
INGO: CCDB CCDB Team Leader Execution of RP Monthly Reports
NGO: tbn Team Leader – tbn Delivery of HIV/AIDS Awareness Program Monthly Reports
Independent 3rd Party RP monitor: tbn tbn
Monitoring of execution & Compliance of RP
Inception Report, Bi-Annual Report, Final Report.
Operation / Post Construction BRT Operator: (SPO) Managing Director
Operation and Maintenance of BRT Corridor. Implementation of EMP Monitoring during Operation.
Annual Reports, Annual Accounts.
Key Findings in IEE Report 30. The conclusions and recommendations of the updated IEE of 2015/16 pertinent to this Environmental Monitoring report are as follows:
“596. This initial environmental examination (IEE) concludes that the project is expected to have impacts on water quality, air quality and noise & vibration level, loss of trees, waste/spoil disposal, hydrology/drainage, soil contamination, traffic congestion, occupational health and safety, community health and safety, socio-economic environment of PAPs and Risk of high impact accidents. 597. The probable negative impacts are expected to be faced mostly during the construction phase. On the other hand, impacts on air quality and noise level of the project are expected to significantly decrease during the operation phase which are, at present, above the DoE specified levels. Other beneficial impacts are availability of temporary employment opportunities during construction. 598. However, most of the impacts that are significant and adverse can be mitigated with the proposed mitigation measures with no residual impacts on the environment. 599. Therefore, the EMP of IEE/EIA provides the specific guidelines which have been put in place to prevent or mitigate these effects. The implementing agencies (RHD, BBA and LGED) are committed to implementing these measures and have fully endorsed the IEE which is the basis for the EMP. They will also ensure that the work is carried out in an environmentally acceptable manner and the monitoring and reporting are completed in a compliant and timely fashion, acceptable to both DoE and ADB.
D. CHANGE IN PROJECT SCOPE 31. The original scope of the project envisaged in the feasibility study and as presented in the TOR for the EPCM Consultancy Services and the revised scope as presented in the Design Report and subsequently approved for incorporation in the Bidding Documents for the various contract packages are compared in Table I.3.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 18 Jul - Dec 2017
Table I.3: Comparison of Original and Revised Project Scope.
Item Original Scope Revised Scope
1 Four dedicated BRT lanes (2+2) for the full length of the At-grade BRT corridor.
Two dedicated BRT lanes (1+1) for the length of the corridor with passing lanes at each Bus Station
2. Two mixed traffic lanes in each direction (2+2) for full length of corridor.
Two mixed traffic lanes in each direction (2+2) for full length of corridor.
3. Four dedicated BRT lanes (2+2) for the 4.5 km elevated section (Km 3+500 – Km 8+000)
Two dedicated BRT lanes (1+1) for the 4.5 km elevated section (Km 2+600 – Km 7+100) with passing lanes at each elevated Bus Station.
4. Four dedicated BRT lanes (2+2) and four mixed traffic lanes (2+2) on the Tongi Bridge.
Four dedicated BRT lanes (2+2) and minimum four mixed traffic (2+2) lanes on the Tongi Bridge for through and turning traffic.
5. On-ramp for traffic from Ashulia to Gazipur (W-N) at Tongi Bridge
On-ramp for traffic from Ashulia to Gazipur (W-N) at Tongi Bridge
6. No provision for traffic from Gazipur to Ashulia (N-W) at Tongi Bridge.
Off-ramp for traffic from Gazipur to Ashulia (N-W) at Tongi Bridge with U-turn provision under elevated section.
7. No provision for NMT or pedestrians on the Tongi Bridge.
Two lanes provided (1+1) for NMT and pedestrians on the Tongi bridge
8. Separate Flyover at Sonargaon Road before the start of Elevated Section.
Elevated section extended to incorporate Flyover at Sonargaon Road to avoid “roller-coaster” effect.
9. Bus Stations at either side of Turag River. One Bus Station provided at Abdullahpur where demand has been identified.
10. 31 Stations and 2 Terminals 23 Station and 2 Terminals
11. Underpass access to Bus Stations
Access to At-grade Bus Stations by Pedestrian Foot Overbridges (14 no.) and at-grade (4 no.). Access to Elevated Bus Station at-grade to central median area (7 no.)
12. Bus Depot provided adjacent to Gazipur Terminal Station.
Bus Depot not provided at Gazipur Terminal, but in BTCL land near Km 17+450.
13. Airport Terminal located between the existing ROW and the Airport Railway Station on elevated level with elevated approach from ROW.
Airport Terminal located at-grade in central median area between two flyovers provided for through traffic at the Airport Intersection.
32. These changes were evaluated and agreed after extensive consultations with the Client and EPCM consultant including discussions with the operational design and business model (ODBM) consultant using information provided from the Operational Plan for the BRT. 33. Revised Costs and Estimates were prepared with quantities included in the BOQs for the Bidding Documents. 34. A Request for additional financing of US$129.94 million was made to the ADB on 6th April 2016. Revised DPP The cost for the implementation of the EMP was included in the Contract and the proposed Revised Development Project Proforma/Proposal (RDPP).
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 19 Jul - Dec 2017
E. PROJECT STATUS Project Status at 31 December 2017 Design 35. The following activities were carried out during the Design Stage enabling the detailed design of four of the contract packages incorporating the various components of the Project to be completed in 2015.
� Topographic Surveys, Geotechnical Investigations � Traffic Counts and Surveys � Axle Load Surveys � Pavement Condition Surveys � Hydrological Investigations � Bridge Condition Surveys � Land Acquisition Plans � Utility Surveys and Relocation Requirements � Resettlement Plan � Baseline Environmental and Social Surveys � EIA and IEE preparation � Stakeholders Meetings, Public Consultations, Design Framework and Final Design Workshops
Procurement 36. Based on the completed designs, tender documents were prepared and issued to contractors and the status of the Procurement process up to the end of December 2017 is summarised in Table I.4.
Table I.4: Status of Procurement of Contract Packages at 31 December 2017
Component
C01 C02 C03 C04 C05
At Grade Section and
Flyovers
Elevated Section incl
Tongi Bridge
Local Roads and Markets
Gazipur Bus Depot
Highway Lighting
Implementing Agency RHD BBA LGED LGED LGED
Bid Documents Approved 18 Nov 15 15 May 16 07 Apr 16 03 Oct 14
Invitation to Bid 19 Nov 15 19 May 16 10 Apr 16 25 Feb 15
Prebid Meeting 08 Dec 15 14 Jun 16 03 May 16 30 Mar 15
Bid Closing 18 Jan 16 04 Aug 16 05 Jun 16 30 Apr 15
Financial Opening 18 Jul 16 29 Mar 17 14 Feb 17 27 Sep 15
Letter of Acceptance 10 Nov 16 13 Sep 17 13 Sep 17 25 Jan 16
Contract Award 01 Dec 16 19 Oct 17 28 Sep 17 08 Feb 16
Engineer’s Estimate (BDT Mill) 9,149.923 12,878.624 1,196.901 300.243
Agreed Contract Price (BDT Mill) 8,553.750 9,351.298 1,583.183 325.572
Notice to Commence 13 Apr 17 15 Dec 17 10 Dec 17 23 Feb 16
Contract Time for Completion 30 months 30 months 18 months 18 months
Original Completion Date 17 Oct 19 18 Jun 20 01 Jun 19 21 Aug 17
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 20 Jul - Dec 2017
Component
C01 C02 C03 C04 C05
At Grade Section and
Flyovers
Elevated Section incl
Tongi Bridge
Local Roads and Markets
Gazipur Bus Depot
Highway Lighting
Extension of Time 154 days
Current Completion Date 22 Jan 18
Construction a) Construction of At-grade section including 6 Flyovers. – C01 37. The At-Grade Section Contract (C01) was signed on 01 December 2016 with the Contractor, China Gezhouba Group Co. Ltd (CGGC). The Notice to Commence for the Works was issued on 13 Apr 2017 following the Ground-Breaking Ceremony presided over by the Minister of Road Transport and Bridges and attended by Local Representatives on 31 Mar 2017 at the site of the U-Turn Flyover at Km 8+500. 38. The Contractor commenced mobilisation involving survey works and made submissions of the Draft Construction Programme, Traffic Management Plan, Environmental Management System and other methodologies for review and approval. Initial activities on site involved the establishment of the Contractor’s own plant yard, preparation for construction of the Engineer’s Office building, clearing of the area for the Gazipur Terminal Station and for the drainage near the U-turn Flyover at Ch 8+200 and the preparation for subsoil investigations and pilot piles for the Gazipur Interchange. The progress achieved on the various activities up to the end of 31 December 2017 is summarised in Table I.5.
Table I.5: Summary of Progress Status – C01 Notice to Commence: 13 Apr 2017 Contract Period: 917 days
Elapsed Time 263 days Completion Status (Time) 28.7%
No. Activity Physical Status At 31 Dec 2017
1 Pavement Widening and Rehabilitation 0.0% 2 Drainage System and Culverts 0.21% 3 Bus Lanes 0.0% 4 Airport Flyovers 0.0% 5 Jasimuddin Flyover 0.0% 6 U-turn Flyover #1 0.03% 7 U-turn Flyover #2 0.03% 8 Vogra Flyover 0.0% 9 Joydepur Chowratsta Interchange 0.21%
10 Airport Terminal Station 0.0% 11 Gazipur Terminal Station 0.0% 12 Bus Stations 0.0% 13 Pedestrian Foot Over Bridges 0.0% 14 Medians, Kerbs, Footpaths, Kerbing & Grassing 0.0%
39. Overall Progress of the Project at 31st December 2017 was assessed as 0.48% against a revised target of 4.5% indicating a lag of 4.02%. The achieved progress of the Contractor was based on the completed quantities of physical works executed under the above Items.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 21 Jul - Dec 2017
b) Construction of Elevated BRT Lanes including Tongi Bridge and BRT Stations. – C02 40. The Elevated Section Contract (C02) was awarded to Jiangsu Provincial Transportation Engineering Group Co. Ltd (JTEG) on 13 Sep 2017. 41. The Contract was signed on 19 Oct 2017 on receipt of the Performance Guarantee and following the Pre-Award Meeting held on 17 Oct 2017. The Notice to commence was issued on 15 Dec 2017. c) Construction of Pavement, Drains, Pedestrian facilities and Local Markets on Both Sides of BRT Corridor. – C03 42. The Local Roads and Markets Contract (C03) was awarded to Weihai International Economic & Technical Cooperative Co. Ltd (WIETC), China on 13 Sep 2017. 43. The Contract was signed on 28 Sep 2017 on receipt of the Performance Guarantee and following the Pre-Award Meeting held on 27 Sep 2017. The Notice to commence was issued on 10 Dec 2017. d) Construction of Bus Depot at Gazipur – C04 44. The Bus Depot Contract (C04) was signed on 08 February 2016 with the Contractor SEL-UDC commencing site activities on 23 February 2016 after the site was formally handed over by the Employer LGED. The progress achieved on the various activities up to the end of 31 December 2017 is summarised in Table I.6.
Table I.6: Summary of Progress Status – C04 Notice to Commence: 23 Feb 2016 Contract Period: 700 days
Elapsed Time 677 days Completion Status (Time) 96.7%
No. Activity Physical Status
At 30 Jun 2017 At 31 Dec2017
1 Site Earthworks and Drain Relocation 93.7% 97.9%
2 Boundary Wall 25.4% 43.1%
3 Main Entry Gate and Guard House 28.3% 48.9%
4 Administration and Maintenance Building 33.6% 45.7%
5 Bus Parking Area and Footpaths 9.3% 12.8%
6 Fuel Filling Station and Storage Tanks --- 0.0%
7 Bus Washing Area --- 5.9%
8 Effluent Treatment Plant 2.0% 9.8%
9 Electrical Room and Substation 26.3% 38.5%
10 Waste Materials Building 73.1% 75.4%
11 Drainage System 21.1% 75.2%
12 Access Road to Depot 36.0% 43.8%
13 Water Reservoir and Fire System 3.5% 48.3%
14 BTCL Complaints Centre and Guard House 50.4% 64.7%
45. Overall Progress of the Project at 31st December 2017 was assessed as 45.23% against a revised target of 89.82% indicating a lag of 44.59%. The achieved progress of the Contractor was based on the completed quantities of physical works executed under the above Items.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 22 Jul - Dec 2017
46. Progress has been constrained by slow mobilisation and with many activities then unable to proceed due to the wet conditions during July to September 2017. 47. Activities continued in several areas including drainage system, embankment works in the main depot parking area and on the access road involving the preparation of subgrade layers and subbase works. Concrete works continued for the Admin & Maintenance Building, the Boundary Wall and the BTCL Complaints Centre, Main Entry Gate & Guardhouse, the Electrical Sub-Station and the Drainage System including the manufacture of pipes and their installation with approx. 1,249 m3 of concrete supplied and placed during the period. F. ENVIRONMENTAL MITIGATION AND MONITORING REQUIREMENTS Environmental Management Plan 48. In the both the EIA and the IEE separate EMPs were prepared for the At-grade section, the Elevated section, the Bus Depot and the Local Roads components. The recommendations of the EMPs were incorporated into the detailed design and the tender documents and have then became a part of the civil works contracts. 49. The EMP for all the Contracts was included in the Bidding Documents and was subsequently included Contract Documents. 50. The Construction Contracts also contain a number of specific environmental and occupational health and safety clauses that the Contractors must also comply with (given that they have signed the contract which included these clauses). Environmental Management System 51. In Section 1 of the Technical Specifications for each of the Contracts the Contractors are required to prepare an Environmental Management System (EMS), that will set out the means by which the Environmental Management provisions will be supervised, monitored and audited to ensure compliance with the principles and objectives of the Environmental Management Plan (EMP) at all times. Sampling Program 52. The extent of the impacts of environmental pollution related to surface water, ground water, soil quality, air quality, noise measurement and vibration level will be determined in quantitative terms by sampling a range of related parameters. Based on these results the mitigative measures provided for in the EMP can be adjusted accordingly. The field sampling work has been specified for the construction and operating period. 53. The sampling program for the At Grade Section and Flyovers, Elevated Section including Tongi Bridge, Local Roads and Kitchen Markets and the Bus Depot is presented in Appendix 6 and is summarised in Table I.7, I.8 and I.9 respectively in below
Table I.7: Sampling Program Summary for At Grade Section and Flyovers*
Sl. Impact Construction Operating Period Parameter
Frequency Dur’n Frequency Dur’n
1 Air Quality Twice/yr 2.5 yrs Twice/yr 3 yrs H2S, SOx, NOx, CO, O3, O2, CO2, TVOC, SPM, PM10, Humidity, Wind direction,
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 23 Jul - Dec 2017
Sl. Impact Construction Operating Period Parameter
Frequency Dur’n Frequency Dur’n
Wind speed, Temperature
2 Dust Regularly --- --- Dust Control
3 Noise Level Twice/yr 2.5 yrs Twice/yr 3 yrs dB(A)
4 Vibration Level Twice/yr 2.5 yrs Twice/yr 3 yrs Acceleration, velocity and displacement
5 Surface Water Quarterly 2.5 yrs Twice/yr 3 yrs
Temperature, Turbidity, pH, TDS, EC, TSS, Fe, NH3–N, As, Fe, Mn, DO, COD, BOD5, TC, FC, Total N, Total P and Oil & Grease
6 Ground Water Twice/yr 2.5 yrs Twice/yr 3 yrs Temperature, Turbidity, pH, TDS, EC, TSS, Fe, NH3–N, As, Fe, Mn, DO, COD, BOD5, TC, FC, Total N, Total P
7 Traffic Safety ------- ------- Full Operation Period Accident number
8 Soil Pollution Twice/yr 2.5 yrs Once/yr --- pH, As, Pb, Hg, Cd, Cr, Zn
9 Soil Erosion Monthly --- --- Visual Check
10 Drainage Congestion Weekly during monsoon --- --- Regular Inspection. Visual check of
plan and actual implementation.
11 Wildlife Quarterly Quarterly --- Wildlife habitat and movement
12 Fisheries Annually End of first
year of operation
--- Impact of Fish productivity, breeding and spawning.
13 Waste Management Weekly --- --- Storage, transportation, disposal, handling of hazardous waste.
14 Health & Safety Regularly --- --- Food and accommodation, Water supply and effluent, First Aid Kit.
* The sampling follows the methodology provided in the Bangladesh national standard methods for monitoring pollutants. Other associated standards are national environmental quality standards and pollutant emission standards.
Table I.8: Sampling Program Summary for Elevated Section including Tongi Bridge*
Sl. Impact Construction Operating Period Parameter
Frequency Dur’n Frequency Dur’n
1 Air Quality Twice/yr 2.5 yrs Once/yr 3 yrs H2S, SOx, NOx, CO, O3, O2, CO2, TVOC, SPM, PM10, Humidity, Wind direction, Wind speed, Temperature
2 Dust Regularly --- --- Dust Control
3 Noise Level Twice/yr 2.5 yrs Once/yr 3 yrs dB(A)
4 Vibration Level Twice/yr 2.5 yrs Twice/yr 3 yrs Acceleration, velocity and displacement
5 Surface Water Quarterly 2.5 yrs Once/yr 3 yrs
Temperature, Turbidity, pH, TDS, EC, TSS, Fe, NH3–N, As, Fe, Mn, DO, COD, BOD5, TC, FC, Total N, Total P and Oil & Grease.
6 Ground Water Twice/yr 2.5 yrs Once/yr 3 yrs Temperature, Turbidity, pH, TDS, EC,
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 24 Jul - Dec 2017
Sl. Impact Construction Operating Period Parameter
Frequency Dur’n Frequency Dur’n
TSS, Fe, NH3–N, As, Fe, Mn, DO, COD, BOD5, TC, FC, Total N, Total P
7 Riverbed Material Twice/yr 2.5 yrs As, Pb, Cd, Cr, Hg, Fe, pH 8 Traffic Safety ------- ------- Full Operation Period Accident number
9 Soil Erosion Monthly --- --- Visual Check
10 Drainage Congestion Weekly during monsoon --- --- Regular Inspection. Visual check of
plan and actual implementation.
11 Wildlife Quarterly Quarterly --- Wildlife habitat and movement
12 Fisheries Annually
At the beginning and end of first year
of operation
---
Impact of Fish productivity, breeding and spawning.
13 Waste Management Weekly --- --- Storage, transportation, disposal, handling of hazardous waste.
14 Health & Safety Regularly --- --- Food and accommodation, Water supply and effluent, First Aid Kit.
* The sampling follows the methodology provided in the Bangladesh national standard methods for monitoring pollutants. Other associated standards are national environmental quality standards and pollutant emission standards.
Table I.9: Sampling Program Summary for Bus Depot, Local Roads and Kitchen Markets*
Sl. Impact Construction Operating Period Parameter
Frequency Dur’n Frequency Dur’n
1 Air Quality Twice 1.5 yrs Monthly H2S, SOx, NOx, CO, O3, O2, CO2, TVOC, SPM, PM10, Humidity, Wind direction, Wind speed, Temperature
2 Dust Regularly --- --- Dust Control
3 Noise Level Twice/yr 1.5 yrs Monthly --- dB(A)
4 Vibration Level Twice/yr 1.5 yrs Twice/yr 3 yrs Acceleration, velocity and displacement
5 Surface Water Twice/yr 1.5 yrs Twice/yr 3 yrs Temperature, Turbidity, pH, TDS, EC, TSS, Fe, NH3–N, As, Fe, Mn, DO, COD, BOD5, TC, FC, Total N, Total P
6 Ground Water Twice/yr 1.5 yrs Twice/yr 3 yrs Temperature, Turbidity, pH, TDS, EC, TSS, Fe, NH3–N, As, Fe, Mn, DO, COD, BOD5, TC, FC, Total N, Total P
7 Soil Pollution Twice/yr 1.5 yrs --- --- pH, As, Pb, Hg, Cd, Cr, Zn
8 Soil Erosion Once during rainy season --- --- Visual Check
9 Drainage Congestion Weekly during monsoon --- --- Regular Inspection. Visual check of
plan and actual implementation.
10 Wildlife Quarterly --- Wildlife habitat and movement
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 25 Jul - Dec 2017
Sl. Impact Construction Operating Period Parameter
Frequency Dur’n Frequency Dur’n
11 Fisheries Annually --- Impact of Fish productivity, breeding and spawning.
12 Waste Management Weekly --- --- Storage, transportation, disposal, handling of hazardous waste.
13 Health & Safety Regularly --- --- Food and accommodation, Water supply and effluent, First Aid Kit.
* The sampling follows the methodology provided in the Bangladesh national standard methods for monitoring pollutants. Other associated standards are national environmental quality standards and pollutant emission standards.
EMP Related Activities 54. The Donor Missions related to the Project and the EMP related issues are summarized as:
ADB Consultation Mission on 18 July and 09 November 2017. During the mission site inspections were carried out by the Social and Environmental Safeguards Teams of the proposed work sites and of works in progress on the At Grade Section & Flyovers, and Gazipur Bus Depot. Discussions on various issues were held at the meetings with ADB and the Client prior to site visit.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 26 Jul - Dec 2017
II. ENVIRONMENTAL MONITORING
A. PRE-CONSTRUCTION STAGE
55. The implementation status of the mitigation measures to be addressed during the pre-construction stage of the project is shown in the table below for comparison with the designed mitigation measures stated in the EMP. In summary the mitigation measures during this stage involved ensuring that the contract documentation addressed all relevant actions subsequently required to be implemented by the Contractor in the execution of the works and that the Contractor developed and presented his various method statements, plans, etc. accordingly for review and approval before commencing the works. These measures have all been addressed effectively and further monitoring and reporting is not required as the Contract is now into the Construction Stage.
Table II.1 Mitigation Measures Implemented in At Grade Section including Flyovers Construction Site
Environmental Parameters Potential Impacts Mitigation Measures
Mitigation Measures Undertaken during
period
IMPLEMENTATION PHASE: PRE-CONSTRUCTION Provision of Early Training
Awareness and Training on environmental protection aspects relevant to good construction practices may avoid construction period impacts.
EPCM Consultant and RHD to provide training as part of the overall awareness and training programs to be delivered before construction begin.
Climate Change Changes in climate and long-term impacts on the environment.
Consider potential impacts from extreme climate change scenario in designing bridge and culverts.
Complied
Topography � Change in topography due to construction-related structures such as bridges, flyovers, stations etc.; and
� Visual changes to topography.
� Tree planting for street beautification as per the Tree Cutting and Replantation Plan (TCRP) developed by RHD.
Contractor assures the future afforestation as compensation
Land Acquisition � Acquisition of 2.25 ha land; � Resettlement of Affected Persons
(APs).
� All efforts have been made in BRT design to reduce land acquisition;
� Careful alignment and route selection by the design team to minimize resettlement;
� Developing proper and adequate compensation package for affected persons;
� Prior to site works, payment of compensation to affected people based on the Resettlement Plan.
Complied
Loss of Structures (Dwellings, Commercial Buildings and Industrial Structures)
A total 2,482 of structures will be affected through strip-taking along the project corridor where widening is required.
� Compensation for the loss of land, house, trees, structures, crops, wage/income to be included in the Resettlement Plan.
� In case of relocation provision of similar or better living conditions for project affected persons (PAPs).
Construction activities near Educational Institutions, Religious and, Culturally Sensitive Structures
� Educational, religious, and cultural institutions in the project area will be directly and indirectly affected from the project activities.
� The monument “Jagroto Chowrongi’ will have to be relocated or protected.
� The project implementation should take in to consideration construction of the alignment or making provision of allocating financial resources for rehabilitation of the Madrassa, Mosque and the educational institution.
� Provision should be made for two rows of trees between RoW of the alignment and the sensitive
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 27 Jul - Dec 2017
Environmental Parameters Potential Impacts Mitigation Measures
Mitigation Measures Undertaken during
period structures, and suitable noise barriers to absorb the noise.
� The sculpture should be dismantled with care and installed in an appropriate location selected by DC, Gazipur or protected during construction.
Damage to Public Utilities
Utility lines will have to be moved disrupting services
� Provision in the design and budget for the relocation of the existing utility infrastructures, wherever required;
� All public utilities (e.g. water/gas pipes, power/telephone lines, mobile tower likely to be affected by the proposed project road expansion will be relocated before the actual commencement of the construction work.
� Informing all hospitals, schools, places of worship, and affected communities well in advance;
� Utilities will only be removed and relocated with proper agency approvals and permission;
� If utilities are damaged during construction, it will be reported to the Consultants and utility authority and repairs will be arranged immediately at the contractor’s expense.
� Reconnection of utilities will be completed at the shortest practicable time before construction commences.
Complied
2Tree Cutting
� Around 4728 trees including 230 large, 1909 medium, 1904 small trees and 685 saplings will be cut along the RoW and within the bus depot site for site preparation.
� Minimize the tree cutting by selecting road widening option based on technical
� Trees should not be cut prior the permission from Forest Department.
� Afforestation will be done at the ratio of 1 (cut):2(new planting).
� A total of 9456 sapling trees will be planted as per TCRP developed by RHD.
� For social forestry, afforestation ratio will be as per the consultation with tree owner.
� Indigenous trees most suited to the tract will be planted;
� An awareness campaign targeted on the neighborhood affected persons will be carried to popularize tree planting and saplings should be provided to interested parties;
Contractor assures the future afforestation as compensation
2 Size of the trees refer here to circumference of the trees which are: Large=5' and Above; Medium= 2'7''-5'; Small= 7''-2'7''; Saplings= <6''
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 28 Jul - Dec 2017
Table II.1 Mitigation Measures Implemented in Bus Depot Construction Site
Environmental Parameters Potential Impacts Mitigation Measures
Mitigation Measures Undertaken during
period
IMPLEMENTATION PHASE: PRE-CONSTRUCTION Provision of Early Training
Awareness and Training on environmental protection aspects relevant to good construction practices may avoid construction period impacts.
EPCM Consultant and LGED to provide training as part of the overall awareness and training programs to be delivered before construction begin.
3Tree Cutting
� Around 586 trees including 6 large, 57 medium, 260 small and 263 saplings will be cut down within bus depot site due to site preparation and construction activities resulting in potential ecological and economic loss.
� Prohibit cutting of trees for firewood and for use in project. Gas cylinders to be used for fuel at the camp for cooking purposes. Cutting of trees/bushes for fuel not to be allowed.
� Invasive species will not be introduced into new environment.
� When construction work is completed, trees and understory vegetation must be planted, in order to help the cleared areas in an effort to attract some wildlife such as birds.
Plant at least two trees for every one tree cut.
Contractor assures the future afforestation as compensation
Loss of Structures and Public Utility
� The house within proposed bus depot site will be relocated.
� Inconvenience caused by disruption of public utility (Power/ Telephone lines).
� The householders will be included in the RAP for compensation and relocation;
� Provision in the design and budget for the relocation of the existing utility infrastructures wherever required.
Complied
B. CONSTRUCTION STAGE 56. The implementation status of the mitigation measures to be addressed during the construction stage of the project is shown in the tables below for comparison with the designed mitigation measures stated in the EMP. In summary the mitigation measures during this stage involve ensuring that the Contractor develops and presents his various method statements, plans, etc. accordingly for review and approval before commencing the works, that relevant actions required to be implemented by the Contractor in the execution of the works are addressed and that the measures have all been addressed effectively. 57. Those activities related to the Implementation/Operations stage of the Project, whilst included in the table are not applicable at this stage. 3 Size of the trees refer here to circumference of the trees which are: Large=5' and Above; Medium= 2'7''-5'; Small= 7''-2'7''; Saplings= <6''
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 29 Jul - Dec 2017
At Grade Section including Flyovers (C01)
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
IMPLEMENTATION PHASE: CONSTRUCTION STAGE Changes to Hydrologic Regime
� Temporary drainage blockage, especially at bridge, culverts, service areas, and construction sites.
�
� Provision of drains of sufficient sizes to take design flows.
� Wastes and dredged spoils should not be disposed near any water body. All waste depending on its characteristics, should be disposed of in a controlled and following local requirements.
� Minimize alterations in the surface drainage pattern as much as possible.
Fully complied
Drainage changes � Drainage congestion due to waste/sediment disposal and construction of road corridor.
� Regular cleaning of channels to avoid choking.
� Adequate cross drainage structures will be provided to easily drain off water to canals and other lowland areas;
� Ensure that storm water drains and highway drainage systems are periodically cleared to maintain storm water flows during construction.
� All irrigation canals along the alignment will be clearly marked on the ground to prevent accidental dumping of fill materials into these canals.
Partially complied
Soil Erosion and Siltation
� Soil erosion due to construction activities, earthworks, cut and fill operations and from stockpiles.
� Erosion and subsequent deposition in the adjacent land.
� Adopt good construction practices. � Adjusting construction schedule for
bridge during non-monsoon season.
� Turfing of road shoulders to protect slopes.
� Earth stockpiles to be provided with gentle slopes.
� Ensuring vegetation on road embankments and road cuttings with fast growing crop and a native seed mix immediately after fill placement to prevent scour and to encourage stabilization.
� Using stone pitching or riprap at appropriate places especially around overpasses, bridge, culverts.
Fully complied
Soil Compaction and Contamination
� Compaction of soil due to movement of vehicles and equipment
� Contamination of soil due to leakage/spillage of oil, bituminous and non-bituminous debris
� Construction vehicles, machinery, and equipment to be stationed in the designated RoW to avoid compaction.
� Haulage routes to be designated along fallow and consolidated soil areas to reduce compaction of arable land.
� Fuel storage and filling to be undertaken in areas with concrete surfacing and bunds and interceptor traps
� Oil interceptors to be provided at
Fully complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 30 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
wash down and refuelling sites � Oil and grease spill and oil-soaked
materials will be sold off to authorized recyclers.
Riverbed Sediment � Disturbance of riverbed sediments due to dredging activities;
� Contamination of bottom sediments by accidental spilling of bituminous materials and other petro-chemicals.
� Prevent construction debris from entering drainage or irrigation canals;
� Construction work close to river to be minimized especially during monsoon season;
� Conduct regular riverbed sediment quality monitoring according to the determined sampling schedule.
� Train construction workers on safe handling of petro-chemicals to prevent spillage or leakage to the river or other water bodies;
� Restrict disposal of any construction waste into the river or nearby water bodies;
Fully complied
Topsoil removal � Removal of top soil for construction outside the RoW.
� Compaction of topsoil. � Loss of top soil by wind and
water erosion. � Covering of top soil by project
works.
� The stockpile slope to be no steeper than 2 (H):1 (V) to reduce surface runoff and enhance percolation through the mass of stored soil.
� Locate topsoil stockpiles outside drainage lines and protect stockpiles from erosion.
� Construct diversion channels and silt fences around the topsoil stockpiles to prevent erosion and loss of topsoil.
� Use stripped topsoil to cover all disturbed areas and along the proposed tree plantation sites.
� Rip ground surface prior to the spreading of topsoil,
� Limit equipment and vehicular movements to within the approved construction zone.
� Remove unwanted materials from topsoil such as roots of trees, rubble and waste etc.
Fully complied
Air Quality changes � Dust generation due to construction activities and transport of construction materials.
� Emissions from vehicles, equipment and machinery.
� Vehicles transporting construction material to be covered;
� Construction equipment to be maintained to a good standard and discouraging idling of engines.
� Machinery emitting visible smoke to be banned from construction sites;
� Contractor to prepare a dust suppression program detailing action to be taken to minimize dust generation (e.g. spraying of roads with water), and the equipment to be used.
� Equipping asphalt hot mix and batching plants with fabric filters or wet scrubbers to reduce dust emissions;
Partially complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 31 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
� Locate asphalt and crushing plants away from residential areas and social infrastructure such as hospitals, mosques, schools and madrasas. (Refer to Annex 2 for locations of these). Clearance should be at least 500 m and take into account the prevailing wind direction.
� Dust masks to be provided to workers where dust hazards exist;
� Proper dust collection and control systems to be installed at crushers;
� Air quality monitoring to be carried out as per the schedule in the environmental monitoring plan.
Noise and Vibration � Noise from construction vehicles, equipment and machinery.
� Vibration caused by construction activities.
� Use of modern plant and equipment with appropriate muffling devices.
� All powered mechanical equipment and machinery to be fitted with noise abating gear such as mufflers for effective noise control, in compliance with DoE regulations.
� Construction operations to be restricted to 0700 to 1800 hours.
� Locate rock crushing, concrete mixing and material shipment yards away from residential areas, schools, colleges and hospitals.
� Install temporary noise barriers near sensitive locations such as schools, religious places and hospitals (Refer to Annex 2 for locations)
� Providing the construction workers with suitable hearing protection as ear cap, or earmuffs etc.
� Surround the piers during construction with an air bubble curtain system or coffer dam.
� Use a smaller hammer to reduce the sound pressure. The sound produced in pile driving has a direct relationship to the force used to drive the pile. A smaller hammer will have less force on the pile therefore, producing less sound.
� Noise and vibration level monitoring to be carried out as per the schedule in the environmental monitoring plan.
Partially complied
Changes to Topography and Landscape
� Visual intrusion from large piles of embankment and construction materials obstructing views;
� Land degradation due to excavation in borrow area.
� Material stockpiles will be removed as soon as work is completed and the area re-landscaped
� Top soil to be preserved for rehabilitation of borrow pits
� Borrow pits to be either closed or converted to ponds at the completion of work;
� Construction wastes to be used in construction activities;
Fully complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 32 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
Siting of Construction and Labour camps, plans and equipment and Workshops
� Loss of plantation and vegetation;
� Permanent physical and visual impact on the area;
� Health risk of the workers. � Social disturbance to nearby
community.
� Construction camps, plant and equipment and workshops to be located away from sensitive areas and not within 500 m of existing settlements (Refer to Annex 2 for chainage km) unless agreed to after consultation with local people;
� Provide adequate housing for all workers at the construction camps and establish clean canteen/eating and cooking areas;
� Camp site will be cleaned up to the satisfaction of the local community after use;
� Standing water will not be allowed to accumulate in the temporary drainage facilities or along the roadside to prevent proliferation of mosquitoes.
� Briefing and/or on-site training for the contractor’s workers on the environmental requirement of the project and the implementation of mitigation measures;
� Minimize vegetation loss while making site arrangements for construction camps and other facilities;
� Good sanitation facilities to be provided for the camps;
� Wastewater from contractors’ workshops and equipment washing yards will be passed through gravel/sand beds, and all oil/grease contaminants will be removed, before discharging. Oil and grease residues will be stored in drums awaiting disposal in line with the agreed waste management plan, and consistent with national and local regulations;
� Solid waste must not be dumped, buried or burned at or near the project site, but will be disposed of at the nearest sanitary landfill or site having and complying with the necessary permits;
� The sites for camps and associated facilities will be rehabilitated after completion of the project.
� HIV/AIDS awareness and prevention program will be implemented in line with social plans under the project.
� Construction workers should be under instruction not to be involved/ interfere in social issues of neighbourhood communities.
Fully complied
River protection and bridge construction
� Movement of barges and other construction vessels and bridge construction activities within the river will interfere with local
� In bridge repair and demolition, the bridge structure will not be dropped into the river, but alternative means will be used to
Fully complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 33 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
navigation and interrupt the river traffic;
� Silt and Contaminated runoff reaching river water
� Underwater noise impacts on fisheries and other aquatic life.
avoid "dropping the bridge" into rivers/streams. This will be done by "sawing" appropriate sections of the bridge and using cranes to lift these sections away, or alternatively, by construction of a platform onto which the bridge could be lowered.
� Rocks and stones will be disposed of so as not to block rivers and streams
� Cofferdams, silt fences, sediment barriers, or other devices will be used as appropriate based on the design to prevent spreading of silt during excavation and boring operations within streams. If cofferdams are used, these will be dewatered and cleaned to prevent siltation by pumping from cofferdams to a settling basin or a containment unit.
� Other runoff control measures such as covering open surfaces with grasses and creepers to reduce runoff will be implemented as early as possible in construction.
� If hydraulic hammer are to be used the impact of pile driving cannot be avoided. However, the force of the hammer blow can be controlled with hydraulic hammers, and reducing the impact force will reduce the intensity of the resulting sound.
Surface Water Bodies
� Loss of surface water bodies and impact on fish.
� Avoid or minimize damage to water channels;
� Avoid or minimize use of the riverbed materials.
� No bituminous or hazardous materials to be used for filling of water bodies;
� In case of accidental obstruction or damage, drainage ditches and ponds will be cleaned or repaired immediately.
Fully complied
Surface Water Quality
� Contamination of surface water by disposal of construction waste.
� Pollution of domestic water supplies.
� The workforce to be trained in proper methods for storage and handling of materials and chemicals;
� Work camps and work sites to be provided with toilets and septic tanks;
� Proper drainage system with sedimentation ponds and oil separators to be provided to cope with the rain water and oil spills;
� Stockpiled materials will be covered to reduce silt in runoff;
� No stockpiling or borrow sites less than100 m from a water body;
� Washing of machinery and vehicles
Fully complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 34 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
in surface waters to be prohibited; � Sealed washing areas will be
provided and wastewater will be collected in a sedimentation/ retention pond for treatment prior to release;
� Work in rivers will be scheduled during dry season, and work duration will be as short as possible;
� Conduct regular water quality monitoring according to the recommended sampling schedule;
� Prevent construction debris from entering drainage or irrigation canals;
� Construction work close to ponds or other water bodies to be minimized especially during monsoon season;
� Wastes to be collected, stored and taken to approve disposal sites.
Groundwater Quality
� Depletion of groundwater table due to excessive withdrawal.
� Contamination of underground water table from leachate of construction waste.
� Assess availability of water and evaluate impact on use of local water resources to ensure that water utilization for project will not deplete local village supplies.
� Arrangements for safe drinking water to be made prior to start work.
� Water for consumption to be supplied only after adequate analysis and requisite treatment.
� Train workers on the need for judicious use of freshwater resources;
� Water reserves to be protected from contamination such as construction and oily waste.
� Maintain close liaison with local communities to ensure that any potential conflicts related to common resource utilization for project purposes are resolved quickly.
Partially complied
Materials Exploitation and Management of Quarry and Borrow areas (source of soils)
� Land use change due to borrowing of earth.
� Loss of productive top soil. � Chronic erosion and siltation � Deterioration of air quality as
well as visual and aesthetic intrusion.
� Update draft materials management plan or MMP (which will also include a mass haulage chart) prepared by EPCM CONSULTANT during detailed design phase. Updated plan to be approved by EPCM Consultant 1 month prior to commencement of works. Contractor to agree and implement MMP provisions.
� Balance cut-and-fill requirements to minimization impacts from extraction of aggregates.
� Procure materials only from DoE authorized quarries and borrow sites.
� If the contractor will operate the
Partially complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 35 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
quarry site, required environmental permits will be secured prior to operation of quarry/borrow areas.
� Use quarry with highest ratio between extractive capacity (both in terms of quality) and loss of natural state.
� Use borrow areas in fallow and non-agricultural land.
� Do not use quarries in areas of natural woodland or near rivers which provide food and shelter for birds and other animals.
� Quarry sites for collection of soils (sand) for fill materials will be located in Tongi River at minimum 50 m downstram of the Tongi Bridge where quality of river bed materials (heavy metals such as Zn, Cd, Cr, As, Hg etc.) has been tested & found within standard of USEPA (see page 239, Annex—3). done during design stage in 2014 . Once quantity of required soils is very small (about 9000m3), so sands should be collected by mini dredger from the river bed and transport to the filling site by pipes. Distance from the river bank and dredging area should not be less than 20m and depth of dredging from the river bed should not be exceeded 2m.
� Ensure borrow pits are left in a tidy state with stable side slopes and proper drainage in order to avoid creation of water bodies favorable for mosquito breeding.
� Upon completion of extraction activities, quarry and borrow pits will be stabilized and rehabilitated. Before stabilization these will be dewatered and fences will be installed, as appropriate, to minimize health and safety risks.
Waste generation: General Construction Waste Disposal, Spoil Disposal and Hazardous Waste Disposal
� Unhygienic conditions, health risk to workforce and general public at and around the camp site;
� Visual intrusion from large piles of spoil disposal obstructing views;
� Drainage congestion due to waste disposal;
� Contamination by Oil and lubricants from vehicle maintenance areas;
� Update the draft Waste Management and Spoil Disposal Plan (WMSDP) prepared by the EPCM consultant one month before construction to cover all aspects of waste storage, disposal, and accidental spills to be approved by EPCM Consultant 1 month prior to commencement of works. Contractor to implement WMSDP provisions.
� Areas for disposal should be finalized through a mutual agreement in between landowner and DoE;
� Disposal areas to be rehabilitated monitored, catalogued, and
Partially complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 36 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
marked. � Segregation of wastes will be
observed. � Recyclables will be recovered and
sold to recyclers. � Solid and liquid wastes will not be
disposed of in rivers and streams or other natural drainage path; on fragile slopes, flood ways, farmland, forest, religious or other culturally sensitive areas, or areas where a livelihood is evolved.
� Spoils will be disposed of in disused quarries and abandoned borrow pits where practicable;
� Disposed spoils will be spread in 15 cm layers and compacted to optimum moisture content, covered with topsoil, landscaped, and provided with drainage and vegetation to prevent runoff in line with best practices;
� Waste disposal should not cause sedimentation and obstruction of regular drainage, or damage to agricultural land and densely vegetated areas.
� Waste disposal sites will be located at least 50 m from surface watercourses and will be protected from runoff by ensuring mild slopes and grassing.
� Sanitary wastes generating from staff and labour camps to be disposed of in an environmentally friendly manner, i.e. provision of septic tank etc. for toilet wastes.
� There will be no site-specific landfills established by the contractors. All solid waste will be collected and removed from the work camps and disposed in local waste disposal sites.
� Hazardous waste to be transported to nearby incineration facility;
� It should be ensured that all storage containers are in good condition with proper labeling;
� Containers should be checked for leakage and necessary repairs undertaken or replaced.
� Equipment/vehicle maintenance and refueling areas will be confined to areas in construction sites designed to contain spilled lubricants and fuels. Such areas will be provided with drainage leading to an oil-water separator that will be regularly skimmed of oil and maintained to ensure efficiency.
� All areas intended for storage of hazardous materials will be
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 37 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
quarantined and provided with adequate facilities to combat emergency situations complying with all the applicable statutory stipulation.
� The contractor will identify named personnel in the management plan/CEMP in charge of the sites, and ensure they are properly trained to control access to these areas; entry will be allowed only under authorization.
Operation of Asphalt plant Rock crushers, and use of Bitumen
� Air pollution and dust generation.
� Spills from Bitumen plants may contaminate surface water quality.
� Undertake precautionary measures for reducing dust emissions from diesel generator sets, hot mix plants, crushers and batching plants.
� Provide adequate stack height and dust extraction systems for the hot mix plants.
� Ensure water spreading to suppress dusts particularly during dry and windy weather.
� Provide grass cover immediately after completion of final earth surface along with watering until they grow and survive.
� Tree plantation on the slopes all along the main corridor and other areas of feeder roads, construction yards, construction camps, to reduce the effect of emission of dust and pollutants on the adjacent/nearby communities.
� Disposal of Bitumen will not be allowed to enter either running or dry streambeds and nor will be disposed of in ditches or small waste disposal sites prepared by the contractor.
� Bitumen storage and mixing areas must be protected against spills.
� Proper handling of contaminated soil should be comply with DoE standards.
Fully complied
Flora � Loss of habitat due to tree cutting.
� Vegetation loss due to site preparation and construction activities.
� Suitable Trees to be planted as per TCRP provided by RHD;
� Flowering and fruiting shrubs to be planted along the RoW to beautify the landscape;
� Contractor’s personnel to be directed not to damage any vegetation such as trees or bushes;
� Construction vehicles, equipment and machinery to be limited to their designated areas of movement;
� Gas cylinders to be used for fuel at the camps for cooking purposes. Cutting of trees/bushes for fuel not to be allowed;
� Camp sites and asphalt plants to be
Fully complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 38 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
established on waste/barren land rather than on forested or agriculturally productive land. However if such land is not available, it must be ensured that vegetation clearing is minimized and minimum damage is caused to the trees, undergrowth and crops.
Wildlife Hunting wildlife and birds during construction.
� Bangladesh Forest Department should check and confirm that no hunting occurs.
� New and good condition machinery with low noise generation characteristics to be used in construction.
� Construction work not to be carried out at night.
� Borrow pits to be fenced to protect animals.
Fully complied
Fisheries � Impact on fishing activity (production, spawning and breeding grounds).
� Disturbance to aquatic life including migration of fish due to bridge construction.
� Construction not to be undertaken during high flood.
� Construction along the riverbanks must be avoided during the fish breeding season (July to September).
� Deep water channel to be maintained during bridge construction.
Fully complied
Land use � Land disputes, soil erosion, loss of potential cropland and vegetation, landscape degradation, and damage to road embankments.
� Land use change due to borrowing of earth.
� Land use change and loss of productive top soil.
� Agricultural areas not to be used as borrow areas.
� Land acquisition for borrow areas to be minimized. River sand to be used for embankment.
� Necessary permits to be obtained for any borrow pits from the competent authorities and all environmental considerations to be ensured.
� Topsoil from borrow areas to be preserved and borrow pits to be rehabilitated after completion of borrow operations.
� Borrow pits to be sited on waste land and at least 500 m away from the road.
� Priority to be given to borrowing from humps (including from digging of wells) above the general ground level.
� Priority should be given to borrowing by excavating/enlarging existing borrow areas.
Fully complied
Traffic Congestion and Road Accidents
� A total of about 45,493 different types of vehicles are moved both way daily and as a result, traffic congestion and road accidents are occurred. During construction stage, traffic congestion and road accidents will be increased.
� Prior to start of site works, update and implement updated Traffic Management Plan (TMP) prepared by EPCM Consultant during detailed design phase (See Annex-8). Updated TMP by the contractor to be approved by the EPCM CONSULTANT prior to start construction of the project. Contractor to implement updated
Partially complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 39 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
TMP adequately in time; � Communicate to the public through
local officials regarding the scope and schedule of construction, as well as construction activities causing disruptions or access restrictions;
� In coordination with local traffic authorities, implement appropriate traffic diversion schemes to avoid inconvenience to road users due to project operations, ensure smooth traffic flow, and avoid or minimize accidents, traffic hold ups, and congestion;
� In coordination with local traffic officials, schedule transport of materials to avoid congestion, and set up clear traffic signal boards and traffic advisory signs at the roads going in and out of the construction sites to minimize traffic build-up;
� Provide safe vehicle and pedestrian access around construction areas;
� Install bold diversion signs that would be clearly visible even at night, and provide flag persons to warn of dangerous conditions (24 hours/as necessary).
� Provide sufficient lighting at night within and in the vicinity of construction sites.
� Designate traffic officers in construction sites.
Income and Employment
� Income loss due to the loss of agricultural lands, private structures and common property resources
� Contractor as far as practicable to recruit construction workers from amongst the locals and to maintain gender equity while employing the locals.
� Priority will always be given to project affected persons, the unemployed and lower income groups.
� Set aside areas within the contractor’s camps and offices for local people to sell their products.
Partially complied
Health and Safety of the Community
� Health and safety risks due presence of construction camp and ongoing construction activities.
� Include in WPSP barriers (e.g., temporary fence) to be installed at construction areas to deter pedestrian access to the roadway except at designated crossing points.
� The workers with different transmittable diseases should be restricted to the construction site and sent for treatment or replaced as an urgent measure.
� The general public/local residents will not be allowed in high-risk areas, e.g., excavation sites and areas where heavy equipment is in
Partially complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 40 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
operation and such sites will have a watchman to keep public out.
� Drivers operating construction vehicles to be trained in road safety awareness;
� Provision of proper safety and diversion signage.
� Crossing provision to be made for pedestrians and vehicles near settlements.
� Use of water not to disturb water availability for the public.
� Close consultation with local communities to maintain community integrity and social links and avoid conflict situations with respect to resource use.
� RHD to Prepare and implement plan for avoiding spread of STDs.
Occupational Health and Safety - Workers
� Accidental risk and health risks due to unsafe working conditions.
� Contractor will update draft Worker and Public Safety Plan (WPSP) prepared by EPCM Consultant, and instruct workers in health and safety matters. Updated plan to be approved by EPCM Consultant 1 month prior to starting of works. Contractor to implement WPSP provisions.
� Establish safety measures as required by law and by good engineering practice, and provide first aid facilities that are readily accessible by workers;
� Fencing on all excavation, borrow pits, and sides of temporary bridge, flyovers etc.
� Worker’s compensation insurance for all project staff;
� Basic medical training to be given to specified work staff.
� Basic medical service and supplies to be made available for workers.
� Appropriate personal protective equipment (hearing protection, safety glasses, helmets, protective footwear and gloves, high visibility vests and other protective clothing) to be provided to all workers.
� Provision of adequate sanitation, washing, cooking and dormitory facilities including lighting.
� Adequate signage, lighting, barriers, yellow tape and persons with flags during construction to manage traffic at construction sites, haulage and access roads.
Partially complied
Environmental Monitoring and Completion Reporting
� Prepare Monthly and Quarterly Monitoring Reports.
� Prepare a project completion report containing environmental management and residual impacts if any.
Partially complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 41 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
IMPLEMENTATION PHASE: OPERATION Tree Planting Ensuring survival of flora and fauna
in the new environment. � Monitor survival of replanted trees
(also compensatory planting) and replant, as necessary.
� Undertake proper measures for watering, fertilizing and nursing of trees/ plants/ grasses.
� Plantation of additional varieties of trees that supports birds and having high wood value.
Not applicable
Soil Quality � Soil contamination due to accidental spillage from vehicular movement.
� Proper measures must be ensured to prevent any oil spillage and leakage from the vehicles.
� Efforts will be made to clean the spills of oil, toxic chemicals etc. as early as possible.
Not applicable
Noise and Vibration � Though both noise level and vibration is expected to reduce, special measures/strategies will be required to keep them within limits.
� According to monitoring results, additional sound barriers in the form of trees and hedges will be discussed with the affected people and planted, if agreed;
� Signs for sensitive zones (health centres / educational institutions etc.) to prevent the use of pressure horns;
� Enforcement and penalties against traffic rules violators;
� Monitoring to protect the trees.
Not applicable
Air Quality � Increased traffic levels and congestion will lead to air pollution levels.
� Air conditioning gas emission from BRT buses.
� Roadside tree plantations as applicable and feasible under the climatic conditions.
� Regular road maintenance to ensure good surface condition.
� Carry out regular onsite testing for assessing emission levels of pollutants from vehicles running on road.
� Enforcement and penalties against traffic rules violators.
� All work done on air conditioners will follow the Industry Code of Practices for automotive air conditioning. Approved refrigerant gas recycling and storage equipment will be used in these circumstances.
� Ambient air quality monitoring should be carried out during operation phase.
Not applicable
Water Quality � Contamination of water bodies from runoff from bus depot, terminal, stations and roads containing oils and grease;
� Groundwater may get polluted due to contaminated road runoff.
� In order to discharge rapid removal of storm-water/road runoff, cross slopes and longitudinal drainage will be provided in the design.
� Proper drainage system with sedimentation ponds and oil separators will be provided to avoid contamination by run-off and oil spills.
� Retention basins with reed beds provided in the design will improve the quality of polluted storm-
Not applicable
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 42 Jul - Dec 2017
Environmental Parameters
Potential Impacts Mitigation Measures Mitigation Measures Undertaken during period
water/road runoff. � Prior to operation, an emergency
response plan for spills of hazardous materials and oil will be prepared.
� Water quality monitoring will be carried out as per schedule suggested in the Environmental Monitoring Plan.
Cultural Sites � Noise and vibration near cultural sites specially 2 mosques at Ch 11+360, 18+590 & temple at ch 20+150 which are located adjacent to the road.
� Noise problem can be mitigated through installation of noise barrier and plantation of trees along the boundary of the cultural sites.
� Avoid unnecessary noise generation at sensitive cultural sites with regulations.
Not applicable
Road Safety � Increase in the number of road accidents
� Speed limits will be imposed. � Safety signal will need to be
displayed along the road along with display and monitoring of speed limits especially along settlements.
� Traffic signs must be provided to warn road users about speed limits, rest areas, eating establishments etc.
� Lanes, median, and sharp bends will be marked with reflectorized signs to improve road visibility at night time.
� Foot overpasses will be provided near schools, markets areas for safe crossing of the roads.
� Proper lighting will be provided along the project road.
Not applicable
Gazipur Bus Depot (C04)
Table II.2 Mitigation Measures implemented in Bus Depot Construction Site
Environmental Parameters Potential Impacts Mitigation Measures
Mitigation Measures Undertaken during
period IMPLEMENTATION PHASE: CONSTRUCTION STAGE Filling up of water logged area
� Loss of retention area; � Earthwork activities during
construction stage may block connectivity with other water bodies;
� Drainage congestion due to waste disposal and construction activities.
� To deal carefully at design and planning stages based on hydrological data.
� Regular cleaning of channels to avoid choking.
� Wastes should not be disposed near water bodies. All waste depending on its characteristics, should be disposed of at approved locations.
Fully complied
Fisheries � Filling of the canal/pond due to construction might affect aquaculture and captive fisheries.
� The excavations for fill materials may be used retention and aquaculture
Fully complied
Wildlife � The terrestrial wildlife species might be disturbed due to noise and vibration at construction sites and tree felling to cause
� New and good condition machinery with low noise generation characteristics to be used in construction.
Partially complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 43 Jul - Dec 2017
Environmental Parameters Potential Impacts Mitigation Measures
Mitigation Measures Undertaken during
period dislocation of habitats. However, presences of threatened or endangered wildlife species were not reported at the site.
� Construction work not to be carried out at night.
Heritage and Culture
� A mosque was identified at 50m north-west side of the project area and may be in risk of negative impacts of construction activities.
� Use of modern plant and equipment with appropriate muffling devices.
� Install temporary noise barriers near the mosque.
� Proper dust collection and control systems to be installed.
Partially complied
Surface water � Pollution of surface water may be caused due to disposal of junk, cement refuse and effluents in open water bodies during the construction of bus depot.
� The workforce to be trained in proper means for storage and handling of materials and chemicals.
� Work camps and work sites to be provided with toilets and septic tanks.
� Washing of machinery and vehicles in surface waters to be prohibited.
� Conduct regular water quality monitoring according to the determined sampling schedule.
� Prevent construction debris from entering drainage or irrigation canals.
� Wastes to be collected, stored and taken to approve disposal sites.
Partially complied
Groundwater Quality
� Contamination of ground water table from leachate of construction waste and wastes from workers’ camp
� Workforce camp will be located away from water resources. All practical measures such as provision of septic tanks, garbage bags and other sanitation facilities will be implemented at the construction camp to prevent the wastewater and solid wastes from entering well and groundwater recharge areas.
� Groundwater quality monitoring to be carried out as per the schedule in the environmental monitoring plan.
Partially complied
Air Quality
� Dust Generation due to construction activities and transport of construction materials.
� Emissions from vehicles, equipment and machinery.
� Regular watering at the exposed sites needed to control dust blowing.
� Vehicles transporting construction material to be covered.
� Construction equipment to be maintained to a good standard and idling of engines discouraged.
� Machinery emitting visible smoke to be banned from construction sites.
� Dust masks to be provided to workers where dust hazards exist.
� Conduct regular air quality monitoring according to the determined sampling schedule.
Partially complied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 44 Jul - Dec 2017
Environmental Parameters Potential Impacts Mitigation Measures
Mitigation Measures Undertaken during
period Noise and vibration
� Noise from construction vehicles, equipment and machinery.
� Vibration caused by construction activities.
� All powered mechanical equipment and machinery to be fitted with noise abating gear such as mufflers for effective noise control, in compliance with DoE regulations.
� Providing the construction workers with suitable hearing protection like ear cap, or earmuffs etc.
� Noise measurement to be carried out as per the schedule in the environmental monitoring plan.
Partially complied
Soil contamination � Contamination of soils at camp and work sites due to accidental spillage of noxious chemical, petroleum derivatives and bituminous material may happen.
� The chemicals, cement, petroleum derivatives and bituminous materials to be handled, operate and stored cautiously.
� The construction materials be stored properly, garbage removed regularly and sites kept clean and tidy.
The contractor assures for future precautions
Construction Camp and Workshop
� Loss of plantation and vegetation. � Social disturbance for nearby
community
� Construction camp and workshop to be located away from sensitive areas.
� Water and good sanitation facilities to be provided for the camp.
� Minimise vegetation loss while making site arrangements for construction camp and other facilities.
Complied
OHS – Workers � Health risks due to unsafe working conditions
� Provision of safe water, sanitary toilet facility and hygienic accommodation for workers at camp sites. In addition, ensure provision of PPEs and First-Aid facility for them.
Complied
Community Health and Safety
� Safety risks due to construction works
� The labour works with different transmittable diseases should be restricted within the construction site and replaced.
� Drivers operating construction vehicles to be trained in road safety awareness.
� Close consultation with local communities to identify optimal solutions for diversions to maintain community integrity and social links.
� Provision of proper safety and diversion signage.
Complied
IMPLEMENTATION PHASE: OPERATION Tree plantation
� Survival of flora and fauna in the
new environment. � Undertake monitoring and
maintenance efforts for ensuring survival of planted trees.
� Plantation of tree varieties that supports birds and sustainable and having high wood value
Not applicable
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 45 Jul - Dec 2017
Environmental Parameters Potential Impacts Mitigation Measures
Mitigation Measures Undertaken during
period Soil � Contamination of soil caused due
to spillage of petroleum derivatives and other chemicals due to machinery and vehicle maintenance activities, and leakage from store-house.
� Service machinery and vehicles strictly at designated maintenance workshops where waste oils and lubricants be collected and recycled.
� Storage of coolant and oils should be above ground with bunds so that immediate soil contamination due to spillage or leakage can be prevented.
Not applicable
Repair and Maintenance of vehicles
� Accidental spills and leakage of fuels is to be anticipated in the Fuelling area.
� In the storage area spillage of Engine cooling liquids, Used motor oil and Used transmission oil will be a problem that can have significant adverse impacts if these find their way in to soil, surface or ground water.
� The wash water will contain oil and grease in addition to dust and particulate matter from exhaust.
� Diesel combustion gases are rich in carbon oxide (CO) and could be fatal if inhaled. The effect of CO is also cumulative.
� Where repair /maintenance work is performed on wet vehicles the floor may become slippery and may cause accidents affecting the safety of the workers.
�
� All spillage of liquids including diesel, oils, grease and waters will be collected in a central area and drain to a common location. This includes rain waters which will eventually wash spilled liquids on the surface. These waters will be treated with decantation and oil and grease traps to separate oil and greases to conform to local regulations prior to releasing them outside the depot.
� Used engine cooling liquids, used motor oil and used transmission oil will be stored in leak proof containers and disposed of safely using approved methods, to avoid environmental contamination.
� All work stations will be equipped with devices for complete evacuation of the engine exhaust gases. The workshop will be ventilated at any time and will include appropriate equipment to extract fumes. Further, the workshop will be equipped with CO detectors.
� The floor covering will be of material that it is easy to clean and is slip resistant
Not applicable
Water quality � Contamination of water bodies from runoff from the bus depot containing oils and grease
� Proper drainage system with oil separators will be provided to avoid contamination by run-off and oil spills.
Not applicable
Waste generation � Solid waste and waste water form market stalls could contaminate the area and water bodies. Wash water from meat and fish stalls could be issues if proper collection and disposal is not provided
� If proper sanitary facilities are not provided sanitation problems could arise.
� Solid waste will be managed by provision of collection bins and disposal facilities. Provisions will be made to dispose meat and fish waste separately at approved locations.
� Stall floors will be sealed to collect and divert the wash water for proper management.
� Public toilet facilities with utilities as water supply, electricity, drainage system etc. will be constructed within the market areas
Not applicable
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 46 Jul - Dec 2017
Baseline and Sampling Program Results and Analysis
Construction of At-Grade Section including 6 Flyovers (C01)
58. The Contractor conducted the Baseline Monitoring including Sampling of Environmental Parameters in August 2017 and the next Environmental Sampling as per the EMP of EIA report on November 2017. The Contractor submitted the Draft Environmental Management System (EMS), Site Safety Manual, Site Personnel Health and Epidemic Prevention Program, and plans to survey and measure the trees of Ch 0+000 to Ch 0+260. The draft documents have been reviewed and the Contractor was requested to address the comments in a final version without delay.
Surface Water
59. Surface Water samples were collected from two project influenced locations on 27th August for baseline monitoring and on 27th November, 2017 for the first routine sampling. (Figure II.1).
Figure II.1: Surface Water Sample Collection
60. All samples were collected in plastic sampling bottles, kept in an ice cooler, after necessary stabilization/fixing, and analyzed within 72 hours of being collected. Only the samples for oil & grease were collected in glass bottles. Tests have been carried out in the Laboratories of the DPHE, and the University of Dhaka. The laboratory test results are given in Appendix 9. A summary of the Test Results of surface water sampling of the Contract influenced area is given at Table II.3.
Table II.3: Results for Surface Water Quality
Parameters Unit
Results of November, 2017 Results of August, 2017 Standards for Inland
Surface Water*
Analysis Method Hajir Pukur Soydana
Hajir Pukur Hajir
Pukur Soydana
Hajir Pukur SW_HF SW_SD SW_HF SW_SD
Temperature °C 24.1 24.0 25 25.1 NYS Thermometer
Turbidity NTU 15.5 111 26.5 24.2 NYS Turbidity Meter
pH - 7.5 7.4 7.0 7.4 6.5-8.5 pH Meter Total
Dissolved Solids (TDS)
mg/L 524 1340 190 90 NYS TDS Meter
Electrical Conductivity
(EC) μs/cm 1045 2635 418 228 NYS Multimeter
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 47 Jul - Dec 2017
Parameters Unit
Results of November, 2017 Results of August, 2017 Standards for Inland
Surface Water*
Analysis Method Hajir Pukur Soydana
Hajir Pukur Hajir
Pukur Soydana
Hajir Pukur SW_HF SW_SD SW_HF SW_SD
Total Suspended Solids (TSS)
mg/L 27 48 21 18 NYS Gravity Multimeter
Iron (Fe) mg/L 0.24 0.06 0.87 0.80 NYS AAS
Ammonium Nitrogen (NH4-N)
μg/ml 4.42 2.94 <MDL 0.02 NYS Kjeldahl Method
Arsenic (As) mg/L 0.001 0.001 0.002 0.003 NYS AAS
Manganese (Mn) mg/L 0.14 0.08 0.04 0.05 NYS AAS
Dissolved Oxygen (DO) mg/L 4.13 5.82 7.50 6.15 5 or more Multimeter
Chemical Oxygen Demand
(COD)
mg/L 64 104 48 88 NYS CRM
Biochemical Oxygen Demand (BOD5)
mg/L 16 27 20 19 6 or less 5 days Incubation
Total Coliform (TC) N/100ml 924 400 71 60 NYS MFM
Faecal Coliform (FC) N/100mL 500 235 32 27 NYS MFM
Total Nitrogen (TN) μg/ml 11.67 7.78 2.3 2.3 NYS Kjeldahl
Method Total
Phosphorus (TP)
μg/ml 0.208 0.180 1.16 0.33 NYS Ascorbic acid
blue color method
Oil & Grease mg/L 19.4 9.60 23.4 269.0 NYS 5520.B *Standards for Inland Surface Water is followed Environmental Conservation Rule (ECR)’97 NYS = Not Yet Standardized
61. Standards for the most of the parameters for surface water have not been established by DoE. The concentrations of BOD5 in the tested samples did not comply with the national standard during the measurements. Several tested parameters for the samples from Soydana Hajir Pukur increased significantly in Nov 2017 compared with Aug 2017. Though there were no major construction activities beside the water source the more likely reason for these pollutants is from the nearby industries.
Groundwater
62. Groundwater samples were collected from three Contract influenced locations on 27th August 2017 for baseline monitoring and on 27th November, 2017 for the first routine sampling (Figure II.2).
Figure II.2: Groundwater Sample Collection
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 48 Jul - Dec 2017
63. All samples were collected in plastic sampling bottles, kept in an ice cooler, after necessary stabilization/fixing, and analyzed within 72 hours of being collected. Only the samples for oil & grease were collected in glass bottles. Tests were done at the Laboratories of the DPHE, and University of Dhaka. The laboratory test results are included in Appendix 9. A summary of the Test Results of surface water sampling of the Contract influenced area is given at Table II.4. 64. The comparative analysis of the values of TSS, NH4-N, Mn, and BOD5 show that, for all the locations the concentration was increased. Additionally, the values of those parameters did comply with the national standard. The reason may be from over extraction for the construction activities or due to the sampling during the dry season when water level is lowered. The results need to be compared again with the results from the next sampling during wet season to draw a reasonable conclusion.
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
– E
PCM
ADB
Loan
No’
s 286
2/28
63/2
864-
BAN
Se
mi-A
nnua
l Env
ironm
enta
l Mon
itorin
g Re
port
#3
49
Jul -
Dec
201
7
Tabl
e II.
4: T
est R
esul
t of G
roun
dwat
er S
ampl
ing
Anal
ysis
Para
met
ers
Uni
t
Resu
lts o
f Nov
embe
r, 20
17
Resu
lts o
f Aug
ust,
2017
St
anda
rds f
or
Inla
nd
Gro
undw
ater
* An
alys
is M
etho
d G
azip
ur
Term
inal
Ca
mps
ite
Gaz
ipur
a G
azip
ur T
erm
inal
Ca
mps
ite
Gaz
ipur
a
GW
_GT
GW
_CS
GW
_GP
GW
_GT
GW
_CS
GW
_GP
Tem
pera
ture
°C
24
24
.1
24.1
24
.9
25.2
25
.1
20-3
0 Th
erm
omet
er
Turb
idity
N
TU
1.2
0.93
1
0.8
0.7
0.5
10
Turb
idity
Met
er
pH
- 7.
1 7
6.7
7.2
7.1
6.8
6.5-
8.5
pH M
eter
To
tal
Diss
olve
d So
lids
(TDS
) m
g/L
167
190
212
190
90
120
1000
TD
S M
eter
Elec
tric
al
Cond
uctiv
ity
(EC)
μs
/cm
33
1 82
42
5 34
9 38
9 41
8 N
YS
Mul
timet
er
Tota
l Su
spen
ded
Solid
s (T
SS)
mg/
L 11
14
13
2
2 1.
5 10
Gr
avity
Mul
timet
er
Iron
(Fe)
m
g/L
0.06
0.
08
0.00
7 0.
84
0.88
0.
91
0.3-
1 AA
S Am
mon
ia
Nitr
ogen
(N
H 4-N
) μg
/ml
2.90
2.
90
2.90
<M
DL
<MDL
<M
DL
0.5
Kjel
dahl
Met
hod
Arse
nic
(As)
m
g/L
0.00
1 0.
002
0.00
1 0.
003
0.00
4 0.
004
0.05
AA
S M
anga
nese
(Mn)
m
g/L
0.52
0.
21
0.15
0.
09
0.04
0.
03
0.1
AAS
Diss
olve
d O
xyge
n (D
O)
mg/
L 4.
75
4.01
6.
91
6.70
5.
91
6.17
6.
0 M
ultim
eter
Ch
emic
al
Oxy
gen
Dem
and
(CO
D)
mg/
L 4
4 16
4
8 4
4.0
CRM
Bioc
hem
ical
O
xyge
n De
man
d (B
OD 5
) m
g/L
2 1
6 0.
015
0.01
0.
019
0.2
5 da
ys in
cuba
tion
Tota
l Col
iform
(TC)
N
/100
ml
0 0
0 0
0 0
0 M
FM
Faec
al C
olifo
rm (F
C)
N/1
00m
L 0
0 0
0 0
0 0
MFM
To
tal N
itrog
en (T
N)
μg/m
l 5.
83
7.78
9.
72
<MDL
<M
DL
0.5
NYS
Kj
elda
hl M
etho
d
Tota
l Pho
spho
rus (
TP)
μg/m
l 0.
069
0.07
4 0.
044
0.62
0.
52
0.48
N
YS
Asco
rbic
aci
d bl
ue c
olor
m
etho
d *S
tand
ards
for G
roun
dwat
er is
follo
wed
Env
ironm
enta
l Con
serv
atio
n Ru
le (E
CR)’9
7
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 50 Jul - Dec 2017
Air Quality
65. Ambient air quality data at the Contract site was measured initially to collect the baseline air quality data and then to compare this data with the air quality data measured during project activities to check if there are any significant changes. If there are any increased air pollution levels as a result of the construction activities then appropriate mitigation measures will need to be decided and implemented as applicable. 66. The main air pollutants in Greater Dhaka City are nitrogen oxides (NOx), sulphur dioxide (SO2), total suspended particles (TSP), PM10 (particulate matter with diameter of 10 microns or smaller), carbon monoxide (CO), carbon dioxide (CO2), ozone (O3), volatile organic compounds (VOCs) and hydrogen sulphide (H2S).
Figure II.3: Air Quality Monitoring at Project Site
67. The Baseline air quality sampling was performed at and around the Contract location from 28th August to 30th August and from 28th November to 30th November, 2017 for the first routine sampling (Figure II.3.). The laboratory test results are given in Appendix 9 and are summarized in Table II.5 and II.6.
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
– E
PCM
ADB
Loan
No’
s 286
2/28
63/2
864-
BAN
Se
mi-A
nnua
l Env
ironm
enta
l Mon
itorin
g Re
port
#3
51
Jul -
Dec
201
7
Tabl
e II.
5: T
est R
esul
t of A
mbi
ent A
ir Q
ualit
y An
alys
is
Para
met
er
Uni
t
Conc
entr
atio
n Pr
esen
t on
Nov
embe
r 201
7 Co
ncen
trat
ion
Pres
ent o
n Au
gust
201
7
Bang
lade
sh
Stan
dard
**
Dura
tion
(hou
rs)
Wea
ther
Co
nditi
on
Met
hod
of
Anal
ysis
AAQ
_GT
23.9
9717
°N
90.4
1799
°E
AAQ
_BB
23.9
4732
°N
90.3
8178
°E
AAQ
_AP
23.8
5004
°N
90.4
0919
°E
AAQ
_GT
23.9
9717
°N
90.4
1799
°E
AAQ
_BB
23.9
4732
°N
90.3
8178
°E
AAQ
_AP
23.8
5004
°N
90.4
0919
°E
Gaz
ipur
Te
rmin
al
Boar
d Ba
zar
Airp
ort
Gaz
ipur
Te
rmin
al
Boar
d Ba
zar
Airp
ort
PM10
μg
/m3
115.
7 10
4.2
270.
2 10
5.4
137.
9 31
5.7
150
24
Sunn
y
Grav
imet
ric
SPM
μg
/m3
528.
04
986.
51
1257
.84
642.
72
1006
.58
1620
.64
200
24
Grav
imet
ric
PM2.
5 μg
/m3
65.7
57
.7
103.
9 62
.7
79.2
94
.3
65
24
Grav
imet
ric
SO2
μg/m
3 44
.32
65.2
9 11
3.82
27
.79
50.4
4 10
6.53
36
5 24
W
est-
Gea
ke
NO
x μg
/m3
52.7
5 88
.27
250.
41
95.8
9 19
8.47
39
0.75
10
0 An
nual
Ja
cob
and
Hoch
heise
r
H 2S
μg/m
3 0.
013
0.00
4 0.
071
0.00
9 0.
025
0.04
3 N
YS
8 El
ectr
o-Ch
emic
al
Sens
or
O3
μg/m
3 5.
61
8.75
17
.94
9.27
17
.36
22.4
5 N
YS
8 Ph
otom
etric
O2
%
16.4
3 19
.39
17.6
3 18
.93
20.1
7 19
.59
NYS
8
Elec
tro-
Chem
ical
Se
nsor
TVO
C μg
/m3
528
764
1075
72
4 93
7 11
17
NYS
8
Elec
tro-
Chem
ical
Se
nsor
CO*
ppm
3
1 2
2 3
4 9
8 CO
-Met
er
CO2
μg/m
3 27
8.51
38
6.93
55
6.27
32
1.07
45
2.27
55
3.86
N
YS
8 El
ectr
o-Ch
emic
al
Sens
or
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
– E
PCM
ADB
Loan
No’
s 286
2/28
63/2
864-
BAN
Se
mi-A
nnua
l Env
ironm
enta
l Mon
itorin
g Re
port
#3
52
Jul -
Dec
201
7
Tabl
e II.
6: T
est R
esul
t of A
mbi
ent A
ir Q
ualit
y An
alys
is (W
eath
er D
ata)
Sam
ple
ID
Loca
tion
GPS
Loc
atio
n Ti
me
Hum
idity
(%
) Te
mpe
ratu
re
0 C
Win
d Sp
eed
Km
/h
Win
d D
irect
ion
Resu
lts o
f Nov
embe
r, 20
17
AAQ
_AP
Airp
ort
23.8
5004
°N
90.4
0919
°E
1:00
pm-2
:00p
m
42
28.6
1.
28
Sout
h-Ea
st
AAQ
_BB
Tong
i Boa
rd B
azar
23
.947
32°N
90
.381
78°E
4:
00pm
-5:0
0pm
27
.75
23.6
1.
1 W
est-
Sout
h
AAQ
_GT
Gaz
ipur
Ter
min
al
23.9
9717
°N
90.4
1799
°E
3:00
pm-4
:00p
m
42.7
5 24
.4
1.27
So
uth-
East
Resu
lts o
f Aug
ust,
2017
AAQ
_AP
Airp
ort
23.8
5004
°N
90.4
0919
°E
13.3
0 to
14.
30
51.5
33
.9
2.2
NW
to S
E
AAQ
_BB
Tong
i Boa
rd B
azar
23
.947
32°N
90
.381
78°E
14
.00
to 1
5.00
57
.5
33
1.5
SW to
NE
AAQ
_GT
Gaz
ipur
Ter
min
al
23.9
9717
°N
90.4
1799
°E
14.0
0 to
15.
00
46.5
35
7.
5 S
to N
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 53 Jul - Dec 2017
68. The results of the air quality sampling tests show that the dust particles (SPM, PM10, and PM2.5) in the sampling locations are above the DoE standard. Since there were no earthworks during the monitoring period in the sampling locations so it can be said that the pollutants are not due to the project activities. Additionally, the baseline monitoring values were also higher than the national standard. The reason is likely to be the existing high volume of traffic and many commercial and industrial activities along the corridor. 69. The weather monitoring results (temperature, humidity, wind speed and directions) during both the monitoring periods showed in Table II.6.
Noise
70. Baseline Noise Level Measurements were taken at Contract influenced locations from 28th August to 30th August 2017 and from 28th November to 30th November, 2017 for the first routine sampling (Figure II.4). The laboratory test results are given in Appendix 9 of this report.
Figure II.4: Noise Level Monitoring at Day and Night Time in the Project Area
71. Noise level measurements taken during the day and night time are summarized in Table II.6. Noise measurements at each location were taken continuously for 15 minutes during the day and for 15 minutes during the night.
Table II.7: Noise Level at the Project Location
Sample ID Sample Location GPS Location Land Use
Category Time Noise Level
(dBA) (LAeq)
Bangladesh Standard dB (A)** (LAeq)
Day Night Day Night Day Night Results of November, 2017
NM_GT Gazipur Terminal 23.99718 N, 90.41805 E Commercial 13:38 21:10 65.58 62.04 65 55
NM_JC JoydebpurChowrasta, Gazipur
23.98951 N, 90.38261 E Commercial 12:30 20:40 72.13 74.53 65 55
NM_BhB Bhogra Bazar, Gazipur 23.97762 N, 90.38057 E Commercial 12:05 22:11 74.56 73.34 65 55
NM_CS Campsite, Gazipur 23.97778 N. 90.37052 E Residential 11:42 21:48 57.72 53.28 55 45
NM_BB Board Bazar, Gazipur 23.94734 N, Commercial 16:05 22:36 76.88 73.18 65 55
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 54 Jul - Dec 2017
Sample ID Sample Location GPS Location Land Use
Category Time Noise Level
(dBA) (LAeq)
Bangladesh Standard dB (A)** (LAeq)
Day Night Day Night Day Night 90.38173 E
NM_AP Airport, Uttara, Dhaka 23.85024 N, 90.40909 E Commercial 11:39 23:25 74.46 72.93 65 55
Results of August, 2017
NM_GT Gazipur Terminal 23.99717 N, 90.41799 E Commercial 12:35 21:00 66.63 67.30 65 55
NM_JC JoydebpurChowrasta, Gazipur
23.98956 N, 90.38252 E Commercial 16:53 21:25 75.11 79.27 65 55
NM_BhB Bhogra Bazar, Gazipur 23.97767 N, 90.38057 E Commercial 15:41 22:31 80.15 76.43 65 55
NM_CS Campsite, Gazipur 23.97796 N. 90.37050 E Residential 16:03 22:53 59.07 56.69 55 45
NM_BB Board Bazar, Gazipur 23.94731 N, 90.38178 E Commercial 12:10 23:26 74.07 73.80 65 55
NM_AP Airport, Uttara, Dhaka 23.85004 N, 90.40919 E Commercial 12:43 00:34 76.22 76.74 65 55
Notes:
� Land use category is based on the classification provided in the Noise Pollution Control Rules (2006) � Shaded cell indicate noise levels in excess of Noise Pollution Control Rules ambient noise limits for a given land use area � The sound level standards for residential area is 55, commercial area is 65 dBA at day time and residential area 45, commercial area 55 at
night time. � Noise Level is the average noise recorded over the duration of the monitoring period
72. The results show that time-weighted average value of the noise levels monitored within the Contract area exceeded the standard set for all the locations during the both sampling periods. However, from the comparative analysis with the baseline monitoring it is seen that the noise levels decreased during both day and night time at all the locations in November 2017.
Vibration Level
73. Baseline Vibration Levels were monitored at the Contract influenced locations from 28th August to 30th August 2017 and from 29th November to 30th November, 2017 for the first routine sampling (Figure II.5). The results of the Vibration Levels are shown in Table II.8. The laboratory test result is given in Appendix 9 of this report.
Figure II.5: Vibration Level Measurement
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
– E
PCM
ADB
Loan
No’
s 286
2/28
63/2
864-
BAN
Se
mi-A
nnua
l Env
ironm
enta
l Mon
itorin
g Re
port
#3
55
Jul -
Dec
201
7
Tabl
e II.
8: T
est R
esul
ts fo
r Vib
ratio
n Le
vel M
easu
rem
ent
Sam
ple
ID
Loca
tion
Velo
city
(mm
/s)
Acce
lera
tion
(m/s
2 ) D
ispl
acem
ent (
mm
)
Max
. M
in.
Stan
dard
De
viat
ion
Mea
n Va
lue
Max
. M
in.
Stan
dard
De
viat
ion
Mea
n Va
lue
Max
. M
in.
Stan
dard
De
viat
ion
Mea
n Va
lue
Resu
lts o
f Nov
embe
r, 20
17
VB_G
T G
azip
ur T
erm
inal
, Gaz
ipur
28
.77
0.05
2.
049
0.56
1 94
.6
0.1
27.0
27
16.3
00
0.13
4 0
0.02
0 0.
032
VB_J
C Jo
ydeb
purC
how
rast
a,
Gazip
ur
0.33
0.
05
0.07
6 0.
113
0.2
0 0.
094
0.13
3 0.
036
0 0.
007
0.00
9
VB_B
hB
Bhog
ra B
azar
, Gaz
ipur
0.
33
0.05
0.
054
0.08
8 0.
3 0
0.09
1 0.
100
0.04
8 0.
001
0.00
5 0.
009
VB_C
S Ca
mps
ite, G
azip
ur
0.67
0.
05
0.11
5 0.
179
0.1
0.1
0.00
0 0.
100
0.07
8 0
0.01
3 0.
021
VB_B
B Bo
ard
Baza
r, G
azip
ur
0.17
0.
05
0.04
5 0.
094
0.1
0 0.
006
0.00
0 0.
18
0 0.
003
0.00
6
VB_A
P Ai
rpor
t, U
ttar
a, D
haka
0.
75
0.05
0.
091
0.12
6 11
.4
0 2.
484
1.09
5 0.
055
0 0.
008
0.00
9
Resu
lts o
f Aug
ust,
2017
VB_G
T G
azip
ur T
erm
inal
, Gaz
ipur
1.
21
0.05
0.
205
0.41
4 2.
7 0
0.73
1 0.
367
0.12
3 0.
005
0.01
8 0.
046
VB_J
C Jo
ydeb
purC
how
rast
a,
Gazip
ur
0.23
0.
05
0.05
4 0.
102
0.1
0.1
0 0.
100
0.05
3 0
0.00
7 0.
011
VB_B
hB
Bhog
ra B
azar
, Gaz
ipur
0.
87
0.05
0.
139
0.20
5 0.
3 0
0.12
2 0.
100
0.08
5 0.
001
0.01
3 0.
021
VB_C
S Ca
mps
ite, G
azip
ur
1.83
0.
05
0.19
7 0.
290
0 0
0 0
0.05
8 0.
001
0.01
0 0.
019
VB_B
B Bo
ard
Baza
r, G
azip
ur
0.71
0.
05
0.11
8 0.
173
1.8
0 0.
715
0.62
5 0.
091
0.00
1 0.
014
0.02
3
VB_A
P Ai
rpor
t, U
ttar
a, D
haka
16
.91
0.05
3.
365
1.11
8 0.
1 0.
1 0
0.10
0 0.
062
0 0.
007
0.00
7
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 56 Jul - Dec 2017
74. The vibration level measurement results during both the monitoring periods shows that the peak particle velocity of all the measured locations were within the permitted vibration level set in the Technical Specifications (Sub-Clause 1.10 [Environmental Management]) of the Contract. The standard for the other two parameters (acceleration, displacement) of vibration measurement have not been set in the Technical Specifications or by the DoE.
Soil
75. The investigation of chemical releases to the soil usually requires the collection of composite samples to characterize a large area or volume of near-surface soil in likely contaminated areas. In this context a composite soil sampling technique was followed to measure the contaminant.
Figure II.6: Soil Sampling at Project Site
76. Baseline Soil samples were collected from all the Contract influenced locations on 27th August 2017 and on 27th November, 2017 for the first routine sampling (Figure II.6). Test results of the soil analyses of the Contract influenced area is given in Table II.9. The Laboratory test results are included in Appendix 9 of this report. 77. The standards for soil parameters have not been set by the DoE or other relevant national agencies in Bangladesh. However, from the comparative analysis with the baseline results it is seen that at all the parameters in all measured locations increased and the values for Cadmium were higher than the EU standard for land application. The reason may be due to earthworks and the landfilling in the sampled locations for the construction works. The sand for the filling in terminal area and campsite locations is sourced from other locations and this might be polluted already.
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
– E
PCM
ADB
Loan
No’
s 286
2/28
63/2
864-
BAN
Se
mi-A
nnua
l Env
ironm
enta
l Mon
itorin
g Re
port
#3
57
Jul -
Dec
201
7
Tabl
e II.
9: T
est R
esul
ts fo
r Soi
l Qua
lity
Para
met
ers
Uni
t
Resu
lts o
f Nov
embe
r, 20
17
Resu
lts o
f Aug
ust,
2017
EU D
irect
ive
86/2
78/E
EC fo
r La
nd A
pplic
atio
n
Met
hod
of
Anal
ysis
Joyd
evpu
r Ch
owra
sta
Gaz
ipur
Te
rmin
al
Cam
psite
Jo
ydev
pur
Chow
rast
a G
azip
ur T
erm
inal
Ca
mps
ite
SS_J
C SS
_GT
SS_C
S SS
_JC
SS_G
T SS
_CS
23.9
8975
° N
90.3
8274
° E
23.9
9692
° N
90.3
6852
° E
23.9
7787
° N
90.3
7039
° E
23.9
8975
° N
90.3
8274
° E
23.9
9692
° N
90.3
6852
° E
23.9
7787
° N
90.3
7039
° E
pH
- 6
6 6.
5 6
6 7
- -
Arse
nic
(As)
m
g/kg
8.
11
10.2
5 3.
07
0.69
0.
71
0.33
-
USE
PA 2
06.2
; SM
31
13 B
Lead
(Pb)
m
g/kg
0
217
0 0
24
2.3
1200
U
SEPA
200
.9 R
ev
2.2;
SM
311
1B
Mer
cury
(Hg)
m
g/kg
0
0 0
0 0
0 25
-
Cadm
ium
(C
d)
mg/
kg
72
78
77
0 0
0 40
U
SEPA
213
.2; S
M
3113
B
Chro
miu
m
(Cr)
m
g/kg
12
8 20
8 40
17
.3
19.8
2.
9 -
USE
PA 2
00.9
Rev
2.
2; S
M 3
111B
Zinc
(Zn)
m
g/kg
80
7 13
03
312
90.9
87
.7
3.29
40
00
USE
PA 2
00.9
; SM
31
11B
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 58 Jul - Dec 2017
Fisheries Resource 78. No information was provided as there are no fisheries resources in this project site.
Wildlife
79. No information was provided regarding wildlife.
Construction of BRT Bus Depot (C04)
Surface Water
80. In the construction site, there is only a small ditch. In a portion of this ditch fish are being cultivated. This water body is also used for different types of work including bathing purpose of laborers, small scale construction water source, etc. There is a waste dumping site beside this ditch but no water pollution occurs from the waste. However, during heavy rainfall, water washes out to the ditch from the construction site.
Figure II.7: Surface Water Sample Collection
81. Surface water samples were collected from the Contract location on 5th December 2017 (Figure II.7) and the collected samples were sent to the Department of Public Health Engineering (DPHE) and University of Dhaka (DU) for the testing of several parameters. The results of the surface water quality monitored at the C04 location have been summarised in Table II.10.
Table II.10: Results for Surface Water Quality
Parameters Unit Test Results of
Dec, 2017 Test Results of
May, 2017
Standards for Surface Water*
Analysis Method
Temperature °C 26.2 25.1 NYS Thermometer Turbidity NTU 8.50 1.3 NYS Turbidity Meter pH - 7.5 9.6 6.5-8.5 pH Meter Total Dissolved Solids (TDS) mg/L 135 340 NYS TDS Meter Electrical Conductivity (EC) μS/cm 272 127 NYS Multimeter
Total Suspended Solids (TSS) mg/L 3 25 NYS Gravity
Multimeter Iron (Fe) mg/L 0.49 0.34 NYS AAS
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 59 Jul - Dec 2017
Parameters Unit Test Results of
Dec, 2017 Test Results of
May, 2017
Standards for Surface Water*
Analysis Method
Ammonia Nitrogen (NH3-N) mg/L 0.8 <MDL NYS USEPA 350.1;
SM 4500-NH3 B Arsenic (As) mg/L 0.003 0.001 NYS AAS Manganese (Mn) mg/L 0.26 0.02 NYS AAS Dissolved Oxygen (DO) mg/L 6.86 4.19 5 or more Multimeter Chemical Oxygen Demand (COD)
mg/L 4 28 NYS CRM
Biological Oxygen Demand (BOD5)
mg/L 2 9 6 or less 5 Days
Incubation Total Coliform (TC) N/100ml 86 280 NYS MFM Fecal Coliform (FC) N/100ml 40 128 NYS MFM
Total N micro
mho/cm 5.83 2.6 NYS
Kjeldahi Method
Total P mg/L 0.262 0.52 NYS Ascorbic Acid
Blue Color Method
Note: for NH3-N, MDL=0.017 *Environment Conservation Rules, 1997 82. Standards for the most of the parameters for surface water have not been established by DoE. The results show that the pH value of the water is higher than the national standard. From the comparative analysis with the results of May, 2017 it can be seen that, the values of Temperature, Turbidity, Electrical Conductivity, Iron, Ammonia Nitrogen, Arsenic, Manganese, Dissolved Oxygen and Total Nitrogen has increased. This is to be expected since the sampling was conducted during the dry period and water quality usually decreases in this season. Additionally, no visible pollutants were found due to Contract activities during the sampling. The Laboratory test results are included in Appendix 9 of this report.
Groundwater
83. In and around Dhaka, groundwater is a stable source of water for various activities including irrigation (both shallow and deep tube wells), domestic purposes (hand pumps) and industrial applications (deep wells). There is a tube well in the construction site. The depth of the tube well is around 70ft. It is used as the source of drinking water for the construction workers. This water is also used as construction water. Sometimes the labors use this was for bathing purpose. 84. The groundwater sample was collected from the Contract location on 5th December 2017 (Figure II.8) and the collected sample was sent to the Department of Public Health Engineering (DPHE) and University of Dhaka (DU) for the testing of several parameters. Results of the groundwater sampled at the C04 site have been summarised in Table II.11.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 60 Jul - Dec 2017
Figure II.8: Groundwater Sample Collection
Table II.11: Results for Groundwater Quality
Parameters Unit Test Results of
Dec, 2017 Test Results of
May, 2017
Standards for Potable Water*
Analysis Method
Temperature °C 26.3 25.3 20-30 Thermometer Turbidity NTU 1.29 2.40 10 Turbidity Meter pH - 6.7 7.8 6.5-8.5 pH Meter
Total Dissolved Solids (TDS) mg/L 186 190 1000 TDS Meter
EC μS/cm 375 182 NYS Multimeter
Total Suspended Solids (TSS) mg/L 24 1 10 Gravity
Multimeter
Fe mg/L 0.07 0.07 0.3-1.0 AAS
NH3-N mg/L 0.01 <MDL 0.5 USEPA 350.1;
SM 4500-NH3 B
As mg/L 0.002 0.001 0.05 AAS
Mn mg/L 0.43 1.67 0.1 AAS
DO mg/L 5.48 8.05 6 Multimeter
COD mg/L 8 1 4 CRM
BOD5 mg/L 6 0.2 0.2 5 days
Incubation
Total Coliform(TC) N/100ml 0 0 0 MFM
Fecal Coliform(FC) N/100ml 0 0 0 MFM
Total N mg/L 3.89 <MDL NYS Kjeldahi Method
Total P mg/L 0.104 0.56 NYS Ascorbic Acid
Blue Color Method
Note: for NH3-N, MDL=0.017 and for Total Nitrogen MDL=0.5 *Environment Conservation Rules, 1997
85. The laboratory test results of the groundwater samples and the GoB standards for potable water (ECR, 1997) are shown in Table II.11. The results show that except Manganese, COD and BOD5, all the other
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 61 Jul - Dec 2017
parameters are within the National Standard. The laboratory test results are included in Appendix 9 of this report. 86. The comparative analysis of the values of TSS, COD, and BOD5 show that the concentration was increased whereas the values for Mn and DO decreased. Additionally, the values of those parameters did not comply with the national standard. The reason may be the over extraction for the construction activities or due to the dry period of sampling; since during the dry period water level changes and is lowered.
Air Quality
87. Ambient air quality data at the C04 site was measured initially to collect the baseline air quality data and then to compare this data with air quality data measured during project activities to verify if there are any significant changes caused by the C04 activities. If there are significantly increased air pollution levels due to the construction activities then appropriate mitigation measures will need to be decided and implemented as applicable. 88. The main air pollutants in Greater Dhaka and Gazipur City are nitrogen oxides (NOx), sulphur dioxide (SO2), total suspended particles (TSP) and PM10 (particulate matter with diameter of 10 microns or smaller), carbon monoxide (CO), carbon dioxide (CO2), ozone (O3), volatile organic compounds (VOCs), and hydrogen sulphide (H2S). 89. Motor vehicles are the major source of particulate matters (PM) pollution. Most of the PM pollutants (greater than 80%) come from diesel-run vehicles. In the low-lying agricultural land surrounding Dhaka city, hundreds of brick kilns which contribute to high levels of particulate matter operate during the dry months November– April. Dispersal of pollutants depends upon factors like prevailing wind direction and other weather conditions, atmospheric stability, height of the source. 90. Air quality measurements were carried out at the C04 site on 5th December, 2017 (Figure II.3). The results of the air quality sampled at the C04 site have been summarised in Table II.4.
Figure II.9: Air Quality Monitoring at Project Site
91. The results show (Table II.4) that the concentration of the measured air quality parameter for the ambient air did not exceed the national standard except for the value of SPM. The details of the results are included in Appendix 9 of this report.
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
– E
PCM
ADB
Loan
No’
s 286
2/28
63/2
864-
BAN
Se
mi-A
nnua
l Env
ironm
enta
l Mon
itorin
g Re
port
#3
62
Ju
l - D
ec 2
017
Tabl
e II.
12: T
est R
esul
t of A
mbi
ent A
ir Q
ualit
y An
alys
is
Sam
ple
Desc
riptio
n N
ame
of th
e Pa
ram
eter
s
SPM
PM
10
SO2
NO
x TV
OC
CO
CO2
O3
H 2S
O2
Uni
ts
μg/m
3 μg
/m3
μg/m
3 μg
/m3
μg/m
3 pp
m
ppm
μg
/m3
ppm
μg
/m3
Met
hod
of A
naly
sis
Grav
imet
ric
(EPA
St
anda
rd)
Grav
imet
ric
(EPA
Sta
ndar
d)
Wes
t-Ge
ake
Jaco
b an
d Ho
chhe
iser
Elec
tro-
Chem
ical
Se
nsor
Elec
tro-
Chem
ical
Se
nsor
Elec
tro-
Chem
ical
Se
nsor
Elec
tro-
Chem
ical
Se
nsor
Elec
tro-
Chem
ical
Se
nsor
Elec
tro-
Chem
ical
Se
nsor
Test
Res
ult f
or
Dece
mbe
r, 20
17
290.
73
108.
04
18.5
4 8.
62
387
2 48
2 16
.04
0.07
0 18
.63
Dura
tion
(Hou
rs)
8 24
24
An
nual
-
8 -
8 -
-
Bang
lade
sh (D
oE)
Stan
dard
for A
mbi
ent A
ir 20
0 15
0 36
5 10
0 N
F 9
NF
157
0.02
-0.2
-
Inte
rnat
iona
l/Wor
ld B
ank
Stan
dard
N
F 15
0 12
5 15
0 75
0 10
<1
100
160
0.15
21
%
Rem
ark
High
er
Goo
d G
ood
Good
Go
od
Good
Go
od
Good
Go
od
Good
Test
Res
ults
for M
ay,
2017
30
5.2
103.
5 27
.6
30.3
43
5 14
56
5 21
0.
010
19.6
%
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 63 Jul - Dec 2017
92. From the above test results, it can be seen that the level of PM10 and H2S has increased from the level of May, 2017. The values of the other parameters decreased from the level of May, 2017.
Noise 93. Noise from the machines and vibrations caused by the construction activities were expected to be the major pollutants at the C04 bus depot site. Being a residential area, the ambient standard is Leq 55 dB (A) (daytime) and Leq 45 dB (A) (night time) (DoE, 2006). 94. Noise level data was collected during day time only at the construction site on the 5th December, 2017 (Figure II.10). The results of the noise level monitored along with details of the sampling locations have been summarised in Table II.13.
Figure II.10: Noise Level Monitoring at Day Time in the Project Area
Table II.13: Noise Level at the Project Location
Location GPS Location Land Use Category Time Noise Level (dBA)
(LAeq)
Inside Project Area 23.99541° N 90.39645° E
Residential 12:57 49.01
Result for May, 2017
Inside Project Area 23.995408° N 90.396857° E
Residential 10:01 67.05
Inside Project Area 23.995312° N 90.397937° E
Residential 14:24 58.02
Inside Project Area 23.995064°N 90.394895°E
Residential 15:07 51.49
Notes: � Land use category is based on the classification provided in the Noise Pollution Control Rules (2006) � Shaded cells indicate noise levels in excess of Noise Pollution Control Rules ambient noise limits for a given land use
area � The sound level standards for residential area at day and night are 55 dBA and 45 dBA respectively. � Noise Level is the average noise recorded over the duration of the monitoring period
95. The result shows that time weighted average value of the sound monitored inside the C04 site did not exceed the standard set for the residential area. During the noise measurement an excavator was
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 64 Jul - Dec 2017
running and the laborers were on lunch break. So, the construction works were less in volume during the period which may have resulted in the decreased noise level. The analysis results of the noise measurement are included in Appendix 9 of this report. 96. From the result of May 2017, it can be seen that the Noise Level decreased at all the locations in the Contract site from the previous level.
Vibration Level
97. Vibration caused by the construction activities was expected to be a major problem in the construction site of the bus depot. Vibration measurement was conducted during day time at the construction site on the 05 December, 2017 (Figure II.11). the result of the vibration measurement have been sumarised in Table II.14. The details of the results are given in Appendix 9 of this report.
Figure II.11: Vibration Level Measurement at Project Site
98. The above results show that the Maximum Velocity was 0.39 mm/s, the maximum acceleration was 1.1 m/s2 and the maximum displacement was 0.042 mm. Again, the Mean value for velocity was 0.110 mm/s, for acceleration was 0.021 m/s2 and for displacement was 0.008mm.
Table II.14: Vibration Level at the Project Location
Sample ID
Location
Velocity (mm/s) Acceleration (m/s2) Displacement (mm)
Max
.
Min
.
Stan
dard
De
viat
ion
Mea
n Va
lue
Max
.
Min
.
Stan
dard
De
viat
ion
Mea
n Va
lue
Max
.
Min
.
Stan
dard
De
viat
ion
Mea
n Va
lue
VB_BD
23.992524° N 90.39626° E
(Inside Project Area)
0.39 0.05 0.062 0.110 1.1 0 0.099 0.021 0.042 0 0.008 0.008
Fisheries Resource
99. No information was provided as there are no fisheries resources in this site.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 65 Jul - Dec 2017
Wildlife
100. No information was provided regarding wildlife.
Soil
101. Soil samples were collected at the Contract location on 5 December, 2017 (Figure II.12). A Hand auger was used for collecting the soil samples and the composite sampling method was followed. The samples were collected in zipped lock bags and kept in plastic containers. The samples were submitted for analysis at the Bangladesh University of Engineering & Technology (BUET) Laboratory within 72 hours of collection. The result of the soil tests along with details of the sampling location has been summarised in Table II.7.
Figure II.12: Soil Sampling at Project Site
102. The national standard for almost all the parameters have not yet been standardized. The only two parameters which are standardized are below the standard as per EU directive for land application. The details of the results are given in Appendix 9 of this report.
Table II.15: Test Result of Soil Quality Analysis
Parameters Unit Concentration Present
EU Directive 86/278/EEC for Land Application Method of Analysis
Arsenic (As) mg/kg 3.63 - USEPA 206.2; SM 3113 B
Cadmium (Cd) mg/kg 0 40 USEPA 213.2; SM 3113 B
Chromium (Cr) mg/kg 7 - USEPA 200.9 Rev 2.2; SM 3111 B
Zinc (Zn) mg/kg 3 4000 USEPA 200.9; SM 3111 B
pH mg/kg 7.5 -
C. OVERALL ASSESSMENT OF SAMPLING PROGRAM At-Grade Section including 6 Flyovers (C01)
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 66 Jul - Dec 2017
103. Although the baseline environmental monitoring was delayed all field surveys were completed within the monitoring period as defined in the ToR. No information was provided regarding fisheries resources, wildlife and waste management. The data from other environmental parameter sampling showed that the construction work appeared to have very few longer-term impacts on the biophysical environment. Though the results show that time weighted equivalent continuous sound levels of the sound monitored along the project corridor exceed the standard set for the land use area this is because the noise monitoring was done during the peak periods and the traffic volume along the project corridor is very high. The ambient air quality results also show that the concentration of air pollutants is higher than the national standard. This is also because of the high traffic volume and the many industrial and commercial activities along the Contract influenced area. Gazipur Bus Depot Contract (C04) 104. All field surveys were completed on time and as defined in the ToR. Soil quality sampling was also conducted, but no information was provided regarding fisheries resources and wildlife. However, in the construction site, there is only a small ditch. The data from other environmental quality sampling showed that the construction work appeared to have very few longer-term impacts on biophysical environment. The test results show that time weighted equivalent continuous sound level, ambient air quality, and water quality comply with the Bangladesh standards. D. CONTRACTOR COMPLIANCE At Grade Section including Flyovers (C01) 105. The Contractor for the Construction of At Grade Section including Flyovers (C01) has fully complied with Environmental monitoring and mitigation program as per the EMP of the EIA. The baseline environmental monitoring and the first environmental quality monitoring has been conducted during the monitoring period. The Contractor submitted the draft Environmental Management System (EMS) after incorporating the comments from the Consultant. The Contractor has been notified several times to submit the final HSMP, Site Safety Manual, Site Personnel Health and Epidemic Prevention Program for approval from consultant. The Contractor has not yet deployed their Environmental Management Officers (EMOs) despite several reminder letters regarding the issue. 106. Mitigation measures regarding surface water, ground water, air quality, noise and dust pollution were fully complied. The Results of the noise level monitoring during day and night time and the ambient air quality monitoring along the project corridor shows that the values were higher than the national standard. the reason for this high ambient noise reading may be a result of the high traffic volume and several industrial and commercial activities along the project influenced area and not construction activities. Elevated Section including Tongi Bridge (C02) 107. Since the Contract for Elevated Section including Tongi Bridge (C02) started on 15 December 2017 major works have not commenced and thus there was no scope for environmental monitoring. The Contractor has not yet submitted their Environmental Management System (EMS)/Construction Environmental Management Plan (CEMP) for approval from Consultant. The Contractor also yet not complied with the Baseline Monitoring of Environmental Parameters and has not yet not deployed their Environmental Management Officers (EMOs). Local Roads and Kitchen Markets (C03)
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 67 Jul - Dec 2017
108. Since the Contract for Local Roads and Kitchen Markets (C03) started on 10 December 2017 major civil works have not commenced thus there was no scope for environmental monitoring. However, the Contractor has submitted their Draft Environmental Protection Plan, and the HIV-AIDS Awareness Program for approval from Consultant. The Contractor has not yet complied with the Baseline Monitoring of Environmental Parameters. Gazipur Bus Depot (C04) 109. The Contractor for the Construction of Bus Depot (C04) has fully complied with Environmental monitoring and mitigation program for filling up of water logged area, fisheries, occupational health and safety and community health and safety issues. Mitigation measures regarding surface water, ground water, air quality, and noise and dust pollution were partially complied. The result of the noise level during day time at the construction site (49.01 dBA) was within the ambient standard (Leq 55 dBA) although the noise recorded was higher than the standard during the previous monitoring period. Moreover, soil quality sampling was conducted during this monitoring period. There is a risk of contamination of soils at camp and work sites due to accidental spillage of noxious chemical, petroleum derivatives and bituminous material may happen. Therefore, mitigation and monitoring measures for preventing soil pollution was stressed to the Contractor.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 68 Jul - Dec 2017
III. ENVIRONMENTAL MANAGEMENT
A. KEY ENVIRONMENTAL ISSUES IDENTIFIED 110. As the remaining major civil works contracts are just commencing the identification of key issues related to implementation of the EMP is premature. However, the level of understanding of EMP issues of the local Contractor engaged on the Bus Depot works (C04) and the slow implementation of the At-Grade Section Contractor (C01) to carry out the Baseline Monitoring and the first environmental quality monitoring indicates that there is likely to be a need to develop more awareness with all Contractors on their requirements for the implementation of the EMPs in their contract. B. COMPLIANCE WITH ENVIRONMENT RELATED PROJECT COVENANTS Compliance with National Environmental Laws 111. The environmental legislation of GOB emphasises reducing the negative impacts of infrastructure development projects and enhancement of the positive impacts. This conforms to the National Environmental Policy 1992 that was enacted based on the Agenda 21 of Rio Conference and subsequent enactments of the Bangladesh Environmental Conservation Act (BECA) 1995 and Bangladesh Environmental Conservation Rules (BECR) 1997. The status of compliance with the national laws is as follows:
Table III.1: Compliance with National Laws
Environment Policy/Rule
Compliance Requirement
Relevance for BRT-2 BRT-2 Performance
Bangladesh Environmental Conservation Act (BECA) 1995 and Bangladesh Environmental Conservation Rules (BECR) 1997
Requires all construction / reconstruction / expansion of roads and bridges projects to submit an EIA with EMP to obtain an Environmental Clearance (EC)
BRT-2 is required to secure and maintain an EC
The environmental clearance (valid for 1 year) for the project was obtained from the DOE on 22nd May 2016. Subsequently the renewal issued on 16th May 2017 for another one year which validity is up to 01 May 2018.
112. The Environmental Clearance Certificate issued for the Project on 22 May 2016 following approval by the DoE of the EIA and the renewal issued on 16 May 2017 for another one year with validity up to 01 May 2018 are included in Appendix 2. Compliance with ADB Guidelines 113. According to the safeguard policy statement, 2009 of ADB the project falls under Category B and hence an IEE was sufficient to meet the environmental requirements. An IEE report was prepared by the Consultant engaged by the ADB during appraisal in 2012. However, during the detailed design stage between 2013 and 2015 an updated IEE was prepared with the appropriate EMPs being included into the various Bidding Documents. The project is also in conformity with the latest Guideline of ADB i.e. Safeguard Policy Statement 2009. 114. Comments on the Initial Environmental Examination (IEE) were received from ADB on July 2016 and further comments were received on September 2016 with a request to expedite the review and
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 69 Jul - Dec 2017
resubmission of the IEE. A draft of the updated IEE was submitted on 15 Feb 2017 with formal approval of the IEE by ADB remaining prior to the posting of the document for public disclosure on the ADB Website. Compliance with Loan Agreement 115. Schedule 5 of the Agreements for Loan No’s 2863-BAN and 2864-BAN includes covenants for environmental issues4. The Project’s compliance with the contractual environmental safeguards covenants are shown in the Table III.2.
Table III.2: Compliance with Environmental Considerations of Loan Agreements
Covenant Reference in the Loan Agreement
Status of Compliance
Environment
The Borrower shall ensure or cause the EA and the IAs to ensure that the preparation, design, construction, implementation, operation and decommissioning of the Project and all Project facilities comply with: (a) All applicable laws and regulations of the Borrower
relating to environment, health and safety; (b) the Environmental Safeguards; and (c) all measures and requirements set forth in the IEE, the
EMP, and any corrective or preventative actions set forth in a Safeguards Monitoring Report.
Schedule 5, Para 6. Complied. All requirements addressed in preparation and design stages including contract documentation.
Safeguards – Related procedures in Bidding Documents and Works Contracts
The Borrower shall ensure or cause the EA and the IAs to ensure that all bidding documents and contracts for Works contain provisions that require contractors to:
Schedule 5, Para 11 Complied.
(a) comply with the measures relevant to the contractor set forth in the IEE, the EMP and RP (to the extent they concern impacts on affected people during construction), and any corrective or preventative actions set forth in the Safeguards Monitoring Report;
Complied. All Bidding Documents and Contracts contain the required provisions
(b) make available a budget for all such environmental and social measures;
Complied.
(c) provide the Borrower with a written notice of any unanticipated environmental, resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP and the RP;
Complied.
(d) adequately record the condition of roads, agricultural land and other infrastructure prior to starting to transport materials and construction; and
Complied.
(e) reinstate pathways, other local infrastructure, and agricultural land to at least their per-project condition upon the completion of construction.
Not applicable until all contracts have been completed.
4 These clauses are the environmentally specific Loan Covenants in the Legal Agreement also referred to in the ADB Consultation Mission in March 2016 (see para 48, Chapter I of this report)
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 70 Jul - Dec 2017
Covenant Reference in the Loan Agreement
Status of Compliance
Safeguards Monitoring and Reporting
The Borrower shall do the following or cause the EA and IAs to do the following:
Schedule 5, Para 12.
(a) submit semi-annual Safeguards Monitoring Reports to ADB and disclose relevant information from such reports to affected persons promptly upon submission;
Complied.
(b) if any unanticipated environmental and/or social risks and impacts arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP and the RP, promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan;
Complied.
(c) no later than 6 months after the Effective Date, engage qualified and experienced external expert[s] or qualified NGO[s] under a selection process and terms of reference acceptable to ADB, to verify information produced through the Project monitoring process, and facilitate the carrying out of any verification activities by such external experts; and
(d) report any actual or potential breach of compliance with the measures and requirements set forth in the EMP and the RP promptly after becoming aware of the breach.
Complied.
C. SITE INSPECTIONS AND AUDITS 116. A site inspection of works of the At Grade Section including Flyovers and the Gazipur Bus Depot was carried out on 09 November 2017 during the ADB Consultation Mission. 117. Under the guidance of the Environmental Specialist, inspectors of the EPCM Consultant regularly conducted environmental monitoring started from April 2017 for the Contracts. The regular site inspections for the bus depot on environmental issues were done by the consultant engineers / environmental specialist with assistance by the Contractor’s junior environmental specialist at the Contract site. The Environmental Specialist has conducted meetings with the Contractor representatives (C01 & C04) several times for detailed discussion on the environmental requirements. D. CONSULTATIONS AND COMPLAINTS 118. Consultations were held with local people in the vicinity of the At Grade Section including Flyovers and Gazipur Bus Depot prior to these works proceeding although the works of Bus Depot are on vacant land of BTCL that has been transferred for the use of the Project to MoRTB. To date no complaints have been received or grievances registered in relation to these works. E. NON-COMPLIANCE NOTICES 119. During the previous six-month period, the Construction Supervision Consultant had been actively monitoring the Contractor’s performance in respect to Environmental Safeguards. Issues were identified and communicated formally to the Contractor in the form of official letters.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 71 Jul - Dec 2017
120. No Non-Compliance Notices have been issued to date with the major civil works contracts just commencing and the Contractor for the Bus Depot Contract having carried out the sampling of the various parameters in the EMP.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II – EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 72 Jul - Dec 2017
IV. CONCLUSION AND RECOMMENDATIONS
A. KEY ISSUES 121. There have been no key Environmental Safeguard issues identified to date at Gazipur Bus Depot (C04) site and the first of the main civil works contract (C01) for the At-Grade section. The Contractor of the first contract (C01) mobilized staff, prepared the required management plans as per EMP implementation and initiated the environmental quality monitoring. The C01 Contractor has submitted his Environmental Management System, Safety Manuals and Health Programme which have been reviewed by the Consultant environmental specialist and returned for correction and further improvements. The monthly environmental monitoring report up to August 2017 has also been submitted by the Co1 Contractor for approval. 122. The relevant Environmental Safeguards identified through the EIA and the IEE have been addressed in the EMPs that have been included in the bidding documents for each of the civil works contracts with both their implementation and monitoring to continue as the major activities proceed.
123. It is expected however that there will be a requirement for extensive awareness training workshops to be carried out once these major activities have commenced to ensure that the implementation of the EMPs is carried out as required by all parties. B. ADJUSTMENTS TO MONITORING REQUIREMENTS 124. No adjustments have been identified to date for the Monitoring Requirements in the EMPs. C. NEXT REPORT 125. The next Environmental Monitoring Report will cover the period from January to June 2018 during which all the Civil Works Contracts will have commenced and the procedures for implementation of the EMPs on each contract will have been established with updated base line information recorded. 126. The focus of this report will be to identify if the Contractors have adequately understood their Environmental obligations as set out in the EMP and other relevant provisions of their Contracts, have been able to submit their EMPs and other related documents and have initiated the relevant procedures on site to ensure compliance with these requirements.
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 73
Ju
l - D
ec 2
017
APPE
NDI
X 1:
Pro
ject
Wor
ks S
ched
ules
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 74 Jul - Dec 2017
APPENDIX 2: Environmental Clearance Certificates
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 75 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 76 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 77 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 78 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 79 Jul - Dec 2017
APPENDIX 3: Contract Environmental Clauses
Sl. No.
Clause, S/C No.
Subject Details
SECTION 7- GENERAL CONDITIONS/ SECTION 8- PARTICULAR CONDITIONS 1 GCC 4.8
PCC 4.8 Safety Procedures The contractor shall comply with all safety regulations (6.13, 6.14, 6.15, 6.18)
2 Take care of safety of all persons entitled to be on the site 3 Use reasonable effort to keep the worksite clear of unnecessary obstructions so
as to avoid dangers to these persons.
4 Provide fencing, lighting, guarding and watching of the works. 5 Provide any temporary works (including roadways, footways, guards and
fences) which may be necessary, because of the execution of the works, for the use and protection of the public.
6 Within 28 days of the Commencement Date, the Contractor shall provide a Site Safety Plan and Safety Manual, which shall be subject to the Engineer’s consent. The Manual shall establish all of the requirements for planning, operating and maintaining a safe working environment for the Contractor’s and Employer’s Personnel and any other personnel authorised to enter the Site. The Plan and Manual shall include safety requirements for all Site activities, public traffic and personal protective equipment required for each working area. The Site Safety Plan and Manual shall be improved as deemed necessary by the Engineer or by the Contractor’s Safety Engineer without relieving the Contractor of any of his obligations or responsibilities under the Contract.
7 The Contractor shall be required to implement specific safety measures such as temporary works and well controlled traffic management to ensure that the public and adjacent property are not endangered in any way whatsoever. The Contractor shall obtain the written approval of the Engineer for all such safety measures at the work location before proceeding with the Works. However, any such approval by the Engineer shall not relieve the Contractor of any of his obligations under the Contract.
8 GCC 4.10 The Contractor The Employer shall have made available to the Contractor for his information, prior to the Base Date, all relevant data in the Employer’s possession on sub-surface and hydrological conditions at the Site, including environmental aspects.
9 The Employer shall similarly make available to the Contractor all such data which come into the Employer’s possession after the Base Date. The Contractor shall be responsible for interpreting all such data.
10 GCC 4.18 PCC 4.18
Protection of Environment
The Contractor shall take all reasonable steps to protect the environment (both on and off the Site) and to limit damage and nuisance to people and property resulting from pollution, noise and other results of his operations.
11 The Contractor shall ensure that emissions, surface discharges and effluent from the Contractor’s activities shall not exceed the values stated in the Specification or prescribed by applicable Laws.
12 The Contractor shall comply with all applicable national, provincial, and local Environmental laws and regulations.
13 The Contractor shall (a) establish an operational system for managing environmental impacts, (b) carry out all of the monitoring and mitigation measures set forth in the Environmental Management Plan (EMP) attached hereto in Volume 5 of 5 and (c) allocate a budget required to ensure that such measures are carried out. The Contractor shall submit [quarterly]/ [semi-annual] report on carrying out of such measurers to the Employer.
14 More particularly, the Contractor shall comply with (i) the measures and requirements set forth in the Environmental Management Plan (EMP) attached hereto in Volume 5 of 5; and (ii) any corrective or preventive actions set out in safeguards monitoring reports that the Employer will prepare from time to time to monitor implementation of the Environmental Management Plan.
15 The Contractor shall allocate a budget for compliance with these measures, requirements and actions.
16 SCC 6.7 PCC 6.7
Health and Safety The contractor shall at all times take all reasonable precautions to maintain the health and safety of the contractor’s personnel.
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 80 Jul - Dec 2017
Sl. No.
Clause, S/C No.
Subject Details
17 The contractor shall appoint an accident prevention officer at the site, responsible for maintaining safety and protection against accidents.
18 In the event of a fatal accident the Contractor shall notify the Engineer immediately by verbal communication and submit a formal report as soon as practicable after its occurrence. For all accidents, whether fatal or not, the Contractor shall notify the appropriate local authorities in accordance with the Laws of the Country.
19 The Contractor shall conduct health and safety programs for workers employed under the project, and shall include information on Human Trafficking and any other dangerous and commonly prevailing disease/illness together with the risk of sexuality transmitted diseases, including HIV/AIDS in such programs.
SECTION 9- TECHNICAL SPECIFICATION, DIVISION 1- GENERAL REQUIREMENTS
20 D1.1.3 Maintenance and Protection of Traffic on Access Road to The Bus Depot
Local traffic flow (including car, rickshaw) on access road to the Bus Depot shall be maintained during the entire period of construction.
21 Traffic flow shall be maintained by making and regularly maintaining diversion roads during the entire period of construction in locations where construction of culverts are to be made.
22 D1.1.3.4 Barriers The Contractor shall supply all lights, signs, skilled and unskilled labour, equipment and barriers required to ensure the control of traffic and the safety of the public and workmen employed in the Works. Barriers shall be used for closing of lanes or roads, the protection of workmen and guidance of vehicular traffic.
D1.1.7 Protection of Environment
23 D1.1.7.1 General The Contractor must act in accordance with Environmental Management Plan (EMP), which has been prepared for this project.
24 The Contractor shall be solely responsible for any remedial or mitigation measures required by the environment-related effects of any of his construction activities. In case of an environmental problem, the Contractor shall immediately notify the Engineer and advice on his proposed corrective action.
25 The Contractor shall also be required to compensate for any damage, loss, spoilage, or disturbance of the properties and health of the project affected people during construction. Specific requirements in this regard are noted below. In conformance with the Contract Documents of which this Environmental Specifications is a part, the Engineer may withhold payments and/or stop construction in the event of serious or repeated violations of the conditions stipulated herein.
26 D1.1.7.2 Compliance with Environmental Laws and Regulations
The Contractor shall follow the laws of the Government of Bangladesh for the Protection of the Environment and other relevant legislation in force, or in the absence of these, with Asian Development Bank requirements.
27 D1.1.7.3 Environmental Management System
The Contractor shall submit a detail of environmental management system which shall include the following and submit to the Engineer for approval.
28 The means, by which the environmental management systems will be supervised, monitored and audited to ensure compliance with the principles and objectives of the environmental management plan (EMP) at all times. Records to be prepared and maintained by environmental management staff and communication procedures to be followed so that the Engineer and others associated with the Works are kept fully informed on matters relating to the EMP and applicable regulations throughout the Contract period;
29 Proposals to ensure that construction methods do not compromise the Contractor’s commitment to the EMP and compliance with all relevant statutory regulations;
30 An organizational structure showing the appointed environmental management staff and the responsibilities of environmental protection participants;
31 The criteria to be used for the appointment of the principal staff;
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 81 Jul - Dec 2017
Sl. No.
Clause, S/C No.
Subject Details
32 The proposed interaction and communications procedures between the Contractor’s personnel and the environmental protection staff, including proposals for the communications facilities to be provided. In particular, the establishment of a regular communications and reporting system;
33 An undertaking signed by the Contractor to the effect the company will ensure that environmental protection will be given the highest priority during all aspects of the Works and in discharging the Contractual Obligations;
34 The frequency, coverage and intent of environmental management meetings together with the rationale for attendance;
35 D1.1.7.4 Environmental Management Officer (EMO)
The Contractor shall appoint an Environmental Management Officer (EMO)/Environmental Specialist (ES) whose duties throughout the construction period, shall be entirely connected with environmental management on the site;
36 D1.1.7.5 EMO’s Lines of Communication
The Contractor’s staff organization plan shall show direct lines of communication and reporting between the EMO/ES and the Contractor’s project manager and between the EMO for the Contract. The Contractor shall instruct and require the project manager responsible to be directly accountable for all matters concerning the environment.
37 D1.1.7.6 Environmental Report The Contractor shall submit regular environmental reports to the Engineer as required by the EMP. A summary report shall be submitted as part of the Monthly Progress Report. Prior to the submission, the Contractor’s Project Manager shall endorse the report. Reports shall comprehensively address all relevant aspects of environmental regulations and requirements and in particular, report on all environmental audits undertaken during the reporting period. Contents and formats of the report are to be agreed by the Engineer prior to preparing the report.
38 D1.1.7.7 Environmental Management Meetings
The Contractor shall convene regular environmental management meetings in accordance with the EMP and shall require the attendance of the EMO/ES unless otherwise agreed by the Engineer. Notice of all environmental management meetings shall be given to the Engineer who may attend in person or send a representative. The minutes of all such meetings shall be recorded and circulated to the attendees and the Engineer within seven days of the date of the meeting.
39 D1.1.7.8 Environmental Inspections
All project locations including construction areas, sites, plant and equipment areas, staff offices, camps and accommodations that are directly or indirectly associated with the Contract shall be regularly inspected for compliance with the requirements of the EMP and related statutory regulations.
40 D1.1.7.9 Assistance to the Engineer
The Contractor shall provide full co-operation and assistance in all environmental management surveillance to be carried out by the Engineer
41 D1.1.7.10 Measurement and Payment
Environmental Management shall be measured on Lump Sum basis. Payment for Environmental Management including employment of the staff shall be deemed to be full compensation for all supervision, labor, equipment and apparatus necessary or required for complying with the requirements of EMP;
42 D1.1.8.1 HEALTH, SAFETY AND SITE SECURITY: Health
The Contractor shall in addition to complying with the requirements of GCC and PCC Sub-Clauses 6.7 [Health and Safety], Sub-Clause 6.13 [Supply of Foodstuff], Sub-Clause 6.14 [Supply of Water], Sub-Clause 6.15 [Measures against Insect and Pest Nuisance], Sub-Clause 6.18 [Festivals and Religious Customs], as well as the national standards of the Government of Bangladesh in respect of health and safety, observe and maintain standards, towards the health and safety, of all of his employees, not less than those laid down by his own national standards or statutory regulations.
43 D1.1.8.2.1 SAFETY: Health and Safety Management Plan
The Contractor shall prepare a Health and Safety Plan (HS Plan) and submit to the Engineer for approval within 56 days of receiving the order to commence.
44 How the Contractor will implement and comply specifically with all duties responsibilities and obligations stipulated in the relevant sub-clauses of Clause 6
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 82 Jul - Dec 2017
Sl. No.
Clause, S/C No.
Subject Details
of the Conditions of Contract and any other relevant clauses in the Conditions of Contract in addition to any duties, obligations and responsibilities contained within the Specifications and the EMP.
45 The HS Plan shall specify the Contractor’s organisational structure through which all health, safety and environmental issues will be mitigated and managed.
46 Appropriate controls and measures to eliminate and or reduce as appropriate, safety risks in accordance with internationally accepted good practice.
47 Specific induction and training needs for: Employer’s personnel, Supervising Engineer’s personnel, Contractor’s personnel, subcontractors’ personnel and any other person who are authorised to be on the Site, by the Engineer and or the Employer working on the Site.
48 D1.1.8.2.2 Safety Officer The Contractor shall appoint both a Safety Manager and an Accident Prevention Officer at the Site, jointly responsible for maintaining health and safety and protection against accidents.
49 D1.1.8.2.3 Personal Protective Equipment
The Contractor shall provide all his personnel and that of the Engineer and Employer, with sufficient quantities of personal protective equipment (PPE) appropriate to the work being carried out and ensure its’ proper use. For clarification, PPE includes but is not limited to safety helmets, high visibility reflective jackets, hearing protectors, safety goggles, gloves, safety shoes, waterproof clothing, full body safety harnesses, shock absorbing lanyards, self-retracting lifelines, welding gloves and aprons and the like. The Contractor shall take disciplinary action against any personnel who do not properly utilise or who misuse or abuse the supplied PPE.
50 D1.1.8.3 Site Security Referring to Conditions of Contract Sub-Clause 4.22, the Contractor shall be responsible for the security of the Site and all Site Offices and accommodations which are provided for his own use for that of the Engineer. The responsibility extends to maintaining a safe working environment at all times.
51 The Contractor shall prepare a register of all persons authorised to be upon the Site which shall include the Employer’s and the Engineer’s personnel. The Contractor shall maintain such register and shall have it available for inspection by the Engineer at any reasonable time.
52 D1.1.8.3.1 Project Signboards A project signboard as per Drawing submitted by the Contractor and approved by the Engineer, shall be placed at each end of the Works facing the traffic entering the working area.
53 D1.1.8.4 HIV-AIDS Prevention/Awareness Programme
In compliance with the requirements of Conditions of Contract, Sub-Clause 6.7, the Contractor shall comply with HIV-AIDS Prevention/awareness programme and engage the services of an approved service provider.
54 D1.1.10 CONTRACTOR’S SITE FACILITIES AND TEMPORARY WORKS: Contractor’s Site Facilities
The potable water supplied to the offices, accommodation and work sites shall be of acceptable quality as specified by the World Health Organisation (WHO). The Contractor shall be solely responsible for establishing and carrying out any and all chemical and/or mechanical treatment of the water in order to have it conform to the standards of the WHO.
SECTION 9- TECHNICAL SPECIFICATION, DIVISION 2- EARTHWORKS D2.2.1 CLEARING AND
GRUBBING
55 D2.2.1.1 Tree Cutting Contractor shall make a survey jointly with the Engineer of the existing trees within the limitation of project area. The Contractor shall submit the location inventory of these trees mentioning their serial numbers, types (local Bengali names), and girths measured one metre above the ground level to the Engineer for his scrutiny and approval.
56 D2.2.1.3.1 Clearing The material to be cleared shall include but not necessarily be limited to trees, stumps, logs, brush, undergrowth, grass, crops, loose vegetable matter and structures unless provided for elsewhere. Trees and stumps shall be cut to ground level.
57 D2.2.1.3.2
Grubbing Grubbing shall be confined to major roots beneath the embankment, ditches, canal diversions and footing excavations. In these areas grubbing shall consist of the removal of all major stumps, embedded logs, tree roots and other material, except as otherwise directed by the Engineer.
58 Utility Holes/trench left by relocating utilities services (Power and Telephone poles, Water line, Gas line, etc.) shall be filled with suitable material compacted to
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 83 Jul - Dec 2017
Sl. No.
Clause, S/C No.
Subject Details
comply with section 2.6 of the Specification with the cost of this being deemed to be included in the rate for clearing and grubbing.
59 Top Soil Topsoil of minimum depth of 100 mm (typically 150mm) shall be stripped and stockpiled separately for possible re-use as landscaping material.
D2.2.2 Excavation 60 D2.2.2.1 Excavation- Description The Contractor shall not excavate beyond the lines and grades shown on the
Drawings. When an excavation for the permanent works has been carried out to the specified elevation, the Engineer will inspect the excavation and may instruct the Contractor to remove any unstable or unsuitable material from the floor of the excavation and replace it with competent backfill material.
61 D2.2.2.3.2 Use of Excavated Material Material excavated from existing road pavement which is to be reconstructed may be used in the new road pavement provided the material after suitable breaking and mixing satisfies all requirements of these Specifications.
D2.2.3 BORROW PIT 62 D2.2.3.2.1 Acquisition and Use of
Borrow Pits The use, depth, location, and dimensions of borrow pits within the right-of-way shall be subject to the approval of the Engineer.
63 D2.2.3.2.2 The Contractor may open borrow pits outside the right-of-way and in such cases the Contractor shall be fully and solely responsible for the expenses incurred and any legal consequences
D2.2.4 CHANNEL EXCAVATION 64 D2.2.4.1
Description This work shall consist of excavation for channels for discharging water from
side ditches where shown on the Drawings, required in the Specifications or as directed by the Engineer. The work shall include the proper utilisation and hauling or disposal of all excavated materials, and constructing, shaping and finishing of all earthworks.
65 D2.2.4.3.2 Excavation Deepening and realignment of existing canals and channels shall be carried out in a way to allow free flow of the water.
66 During excavation of new channels these shall as far as possible be kept drained.
D2.2.6 EMBANKMENT 67 D2.2.6.1 Description This work shall consist of the construction of embankment and fill by
furnishing, placing, compacting and shaping suitable material of acceptable quality obtained from approved sources in accordance with these Specifications and to the lines, levels, grades, dimensions and cross sections shown on the Drawings or as required by the Engineer.
68 D2.2.6.2 Materials
Materials for embankments shall be from sources which the Contractor shall propose and which shall be approved by the Engineer.
SECTION 9- TECHNICAL SPECIFICATION, DIVISION 3- PAVEMENT 69 D3.3.1.2 Preparation and
Stockpiling of Materials Materials to be used in pavement works shall be processed and stockpiled only in designated areas as approved by the Engineer. The Contractor shall make all arrangements and bear all costs associated with the provision of these storage areas. Preparation and storage of materials along the alignment will not be allowed.
70 The designated areas shall be cleared of all vegetation and topsoil prior to commencing work and the arrival of any materials. The area will be graded and drained, and, where the Engineer deems it necessary, the area shall be surfaced with a 100 mm layer of approved stone or with brick flat soling.
71 D3.3.5.2.4 Bituminous Materials Details as to the source and type of bitumen must be submitted for approval at least 14 days before the proposed use of the material and should conform to the requirements of Section 3.4.
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 84
Ju
l - D
ec 2
017
APPE
NDI
X 4:
Env
ironm
enta
l Man
agem
ent P
lan
Tabl
e 1:
Env
ironm
enta
l Man
agem
ent P
lan:
Env
ironm
enta
l Miti
gatio
n Ta
ble
for B
RT C
orrid
or
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
IMPL
EMEN
TATI
ON
PHA
SE:
DESI
GN
/PRE
-CO
NST
RUCT
ION
Prov
ision
of
Ea
rly T
rain
ing
�
Awar
enes
s an
d Tr
aini
ng
on
envi
ronm
enta
l pr
otec
tion
aspe
cts
rele
vant
to
go
od
cons
truc
tion
prac
tices
m
ay a
void
/ re
duce
som
e co
nstr
uctio
n im
pact
s.
� EP
CM
Cons
ulta
nt
and
RHD
to
prov
ide
trai
ning
as
pa
rt
of
the
over
all
awar
enes
s an
d tr
aini
ng
prog
ram
to
be
de
liver
ed
befo
re
cons
truc
tion.
� Pr
oof
of
com
plet
ion.
�
Post
ing
of p
roof
of
com
plet
ion
at
wor
ksite
s
Safe
guar
d Co
mpl
ianc
e O
rient
atio
n
Loca
tion
to
be
conf
irmed
EP
CM
CON
SULT
ANT/
RHD
EP
CM
CON
SULT
ANT/
RHD
/PIU
s/PM
U
Clim
ate
Chan
ge
� Ch
ange
s in
cl
imat
e an
d lo
ng t
erm
impa
cts
on t
he
envi
ronm
ent;
� Co
nsid
er
pote
ntia
l im
pact
s fr
om
extr
eme
clim
ate
chan
ge s
cena
rio in
de
signi
ng b
ridge
and
cul
vert
s.
� Co
nsid
erat
ion
of
clim
ate
chan
ge
in p
roje
ct d
esig
n
Com
plia
nce
with
N
atio
nal g
uide
line
Th
roug
hout
th
e pr
ojec
t are
a
EPCM
CO
NSU
LTAN
T
RHD
Topo
grap
hy
�
Chan
ge in
topo
grap
hy d
ue
to
cons
truc
tion-
rela
ted
stru
ctur
es s
uch
as b
ridge
s,
flyov
ers,
stat
ions
etc
.; an
d
� Vi
sual
ch
ange
s to
to
pogr
aphy
.
� Tr
ee
plan
ting
for
stre
et
beau
tific
atio
n as
pe
r th
e Tr
ee
Cutt
ing
and
Repl
anta
tion
Plan
Pla
n (T
CRP)
dev
elop
ed b
y RH
D.
Tran
spor
t ro
ute
and
wor
ksite
cl
eare
d of
an
y du
st/m
ud
Com
plia
nce
with
N
atio
nal g
uide
line
for
land
us
e po
licy.
Thro
ugho
ut
the
proj
ect
area
s an
d ot
her
suita
ble
land
ide
ntifi
ed b
y RH
D
RHD
PIU
s/FD
Land
Acq
uisit
ion
� Ac
quisi
tion
of 5
.510
acr
e la
nd;
� Re
sett
lem
ent
of A
ffect
ed
Pers
ons (
APs)
.
� Al
l ef
fort
s ha
ve b
een
mad
e in
BRT
de
sign
to re
duce
land
acq
uisit
ion;
�
Care
ful
alig
nmen
t an
d ro
ute
sele
ctio
n by
th
e de
sign
team
to
m
inim
ize re
sett
lem
ent;
�
Deve
lopi
ng
prop
er
and
adeq
uate
co
mpe
nsat
ion
pack
age
for
affe
cted
pe
rson
s;
� Pr
ior
to
site
wor
ks,
paym
ent
of
com
pens
atio
n to
af
fect
ed
peop
le
base
d on
the
Rese
ttle
men
t Pla
n.
� La
nd
subs
titut
ion
� Ca
sh
com
pens
atio
n of
pr
oper
ties
acqu
ired.
Com
plia
nce
with
RP
Th
roug
hout
th
e pr
ojec
t are
as
EPCM
CO
NSU
LTAN
T;
PIU
s
PIU
s
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 85
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
Loss
of
St
ruct
ures
(D
wel
lings
, Co
mm
erci
al
Build
ings
an
d In
dust
rial
Stru
ctur
es)
� A
tota
l 216
0 of
str
uctu
res
will
be
affe
cted
thr
ough
st
rip-t
akin
g al
ong
the
proj
ect
corr
idor
w
here
w
iden
ing
is re
quire
d.
� Co
mpe
nsat
ion
for
the
loss
of
land
, ho
use,
tr
ees,
st
ruct
ures
, cr
ops,
w
age/
inco
me
to b
e in
clud
ed in
the
Re
sett
lem
ent P
lan.
�
In c
ase
of r
eloc
atio
n pr
ovisi
on o
f sim
ilar o
r bet
ter l
ivin
g co
nditi
ons
for
proj
ect a
ffect
ed p
erso
ns (P
APs)
.
� N
umbe
r of
pu
blic
gr
ieva
nces
re
- res
ettle
men
t an
d co
mpe
nsat
ion;
�
Num
ber
of
com
plai
nts
from
se
nsiti
ve
rece
ptor
s
Com
plia
nce
with
RP
Th
roug
hout
th
e pr
ojec
t are
as
RHD;
PI
Us
EPCM
CO
NSU
LTAN
T
Cons
truc
tion
activ
ities
ne
ar
Educ
atio
nal
Inst
itutio
ns,
Relig
ious
an
d ,
Cultu
rally
Se
nsiti
ve
Stru
ctur
es
� Ed
ucat
iona
l, re
ligio
us, a
nd
cultu
ral i
nstit
utio
ns in
the
pr
ojec
t ar
ea
will
be
di
rect
ly
and
indi
rect
ly
affe
cted
fro
m t
he p
roje
ct
activ
ities
. �
The
mon
umen
t “J
agro
to
Chow
rong
i’ w
ill h
ave
to b
e re
loca
ted
or p
rote
cted
.
� Th
e pr
ojec
t im
plem
enta
tion
shou
ld
take
in to
con
sider
atio
n co
nstr
uctio
n of
the
alig
nmen
t or m
akin
g pr
ovisi
on
of a
lloca
ting
finan
cial
res
ourc
es f
or
reha
bilit
atio
n of
th
e M
adra
ssa,
M
osqu
e an
d th
e ed
ucat
iona
l in
stitu
tion.
�
Prov
ision
sho
uld
be m
ade
for
two
row
s of
tre
es b
etw
een
RoW
of
the
alig
nmen
t an
d th
e se
nsiti
ve
stru
ctur
es,
and
suita
ble
noise
ba
rrie
rs to
abs
orb
the
noise
. �
The
scul
ptur
e sh
ould
be
dism
antle
d w
ith
care
an
d in
stal
led
in
an
appr
opria
te lo
catio
n se
lect
ed b
y DC
, Ga
zipur
or
pr
otec
ted
durin
g co
nstr
uctio
n.
� Im
plem
ent
the
“cha
nce
find”
pr
oced
ures
for
mat
eria
ls th
at m
ay
be
disc
over
ed
durin
g pr
ojec
t im
plem
enta
tion.
� Re
cord
s of
ch
ance
find
s
� Te
mpo
rary
ac
cess
pro
visio
n;
� Pe
rman
ent
acce
ss re
stor
ed
Com
plia
nce
with
RP
Th
roug
hout
th
e pr
ojec
t are
as
EPCM
CO
NSU
LTAN
T PI
Us
Dam
age
to
Publ
ic U
tiliti
es
� U
tility
line
s w
ill h
ave
to b
e m
oved
disr
uptin
g se
rvic
es
� Th
e el
ectr
icity
lin
e is
abov
e th
e un
derg
roun
d ga
s lin
e in
th
e sa
me
vert
ical
al
ignm
ent
may
� Pr
ovisi
on i
n th
e de
sign
and
budg
et
for
the
relo
catio
n of
the
exi
stin
g ut
ility
in
fras
truc
ture
s,
whe
reve
r re
quire
d;
� Al
l pu
blic
ut
ilitie
s (e
.g.
wat
er/g
as
pipe
s,
pow
er/t
elep
hone
lin
es,
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
re
cept
ors
� N
os
of
elec
tric
po
les r
eloc
ated
;
Com
plia
nce
with
RP
and
em
erge
ncy
resp
onse
pla
n
Thro
ugho
ut
the
proj
ect a
reas
EP
CM C
ON
SULT
ANT
U
tility
se
rvic
e Pr
ovid
ers;
PIU
s/PM
U
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 86
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
caus
e an
acc
iden
t du
e to
th
e sh
ort c
ircui
ting
mob
ile to
wer
like
ly to
be
affe
cted
by
the
prop
osed
pr
ojec
t ro
ad
expa
nsio
n w
ill b
e re
loca
ted
befo
re
the
actu
al c
omm
ence
men
t of
the
co
nstr
uctio
n w
ork.
�
Info
rmin
g
all
hosp
itals,
sc
hool
s,
plac
es
of
wor
ship
, an
d af
fect
ed
com
mun
ities
wel
l in
adva
nce;
�
Util
ities
will
onl
y be
rem
oved
and
re
loca
ted
with
pr
oper
ag
ency
ap
prov
als a
nd p
erm
issio
n;
� If
utili
ties
are
dam
aged
du
ring
cons
truc
tion,
it
will
be
repo
rted
to
the
Cons
ulta
nts
and
utili
ty a
utho
rity
and
repa
irs
will
be
ar
rang
ed
imm
edia
tely
at
th
e co
ntra
ctor
’s
expe
nse.
�
Reco
nnec
tion
of
utili
ties
will
be
co
mpl
eted
at
th
e sh
orte
st
prac
ticab
le ti
me
befo
re c
onst
ruct
ion
com
men
ces.
�
It is
nece
ssar
y to
sep
arat
e th
e liv
e pa
rts
and
insu
latin
g m
ater
ial
from
un
derg
roun
d w
ater
pip
es/g
as p
ipes
. To
pre
vent
shor
t circ
uit f
ires,
ele
ctric
fir
e al
arm
s (s
hort
circ
uit
fire
alar
ms)
sh
ould
be
inst
alle
d in
the
nec
essa
ry
loca
tions
.
� Te
mpo
rary
po
wer
supp
ly
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 87
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
5 Tre
e Cu
ttin
g
�
Arou
nd
4716
tr
ees
incl
udin
g 23
0 la
rge,
190
9 m
ediu
m, 1
904
smal
l tre
es
and
685
sapl
ings
will
be
cut
alon
g th
e Ro
W a
nd
with
in t
he b
us d
epot
site
fo
r site
pre
para
tion.
� M
inim
ize
the
tree
cu
ttin
g by
se
lect
ing
road
w
iden
ing
optio
n ba
sed
on te
chni
cal
� Tr
ees
shou
ld n
ot b
e cu
t pr
ior
the
perm
issio
n fr
om F
ores
t Dep
artm
ent.
�
Affo
rest
atio
n w
ill b
e do
ne a
t th
e ra
tio o
f 1 (c
ut):2
(new
pla
ntin
g).
� A
tota
l of
9456
sap
ling
tree
s w
ill b
e pl
ante
d as
per
TCR
P de
velo
ped
by
RHD.
�
For
soci
al
fore
stry
, af
fore
stat
ion
ratio
will
be
as p
er t
he c
onsu
ltatio
n w
ith tr
ee o
wne
r.
� In
dige
nous
tre
es m
ost
suite
d to
the
tr
act w
ill b
e pl
ante
d;
� An
aw
aren
ess
cam
paig
n ta
rget
ed o
n th
e ne
ighb
orho
od a
ffect
ed p
erso
ns
will
be
carr
ied
to p
opul
arize
tre
e pl
antin
g an
d sa
plin
gs
shou
ld
be
prov
ided
to in
tere
sted
par
ties;
� N
o of
tr
ee
felle
d;
� Co
mpe
nsat
ory
plan
tatio
n sit
e id
entif
ied.
Com
plia
nce
with
tr
ee m
anag
emen
t pl
an
Thro
ugho
ut
the
proj
ect a
rea
Cont
ract
or;
RHD;
N
GOs
EPCM
CO
NSU
LTAN
T/
DF/P
IUs/
PM
U
IMPL
EMEN
TATI
ON
PHA
SE:
CON
STRU
CTIO
N
Chan
ges
to
Hydr
olog
ic
Regi
me
� Te
mpo
rary
dr
aina
ge
bloc
kage
, es
peci
ally
at
br
idge
, cu
lver
ts,
serv
ice
area
s,
and
cons
truc
tion
sites
.
� Pr
ovisi
on o
f dra
ins
of s
uffic
ient
size
s to
take
des
ign
flow
s.
� W
aste
s an
d dr
edge
d sp
oils
shou
ld
not
be
disp
osed
ne
ar
any
wat
er
body
. Al
l w
aste
dep
endi
ng o
n its
ch
arac
teris
tics,
sho
uld
be d
ispos
ed
of in
a c
ontr
olle
d an
d fo
llow
ing
loca
l re
quire
men
ts.
� M
inim
ize a
ltera
tions
in
the
surf
ace
drai
nage
pa
tter
n as
m
uch
as
poss
ible
.
� De
signs
of
both
Cr
oss
and
side
drai
ns;
� N
o of
cul
vert
s;
� N
umbe
r and
size
of
pip
es
� Co
mpl
ianc
e w
ith
Desig
n re
port
Brid
ge a
nd c
ulve
rt
sites
EP
CM C
onsu
ltant
; Co
ntra
ctor
EP
CM
CON
SULT
ANT/
P I
Us/
PMU
Drai
nage
�
Drai
nage
con
gest
ion
due
� Re
gula
r cl
eani
ng
of
chan
nels
to
�
Desig
ns o
f bo
th �
Com
plia
nce
with
Dr
aina
ge
Cont
ract
or
EPCM
5 Siz
e of
the
trees
refe
r her
e ci
rcum
fere
nce
of th
e tre
es w
hich
are
: Lar
ge=5
' and
Abo
ve; M
ediu
m=
2'7'
'-5';
Sm
all=
7''-
2'7'
'; S
aplin
gs=
<6''
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 88
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
chan
ges
to
was
te/s
edim
ent
disp
osal
and
con
stru
ctio
n of
road
cor
ridor
.
avoi
d ch
okin
g.
� Ad
equa
te c
ross
dra
inag
e st
ruct
ures
w
ill b
e pr
ovid
ed t
o ea
sily
drai
n of
f w
ater
to
cana
ls an
d ot
her
low
land
ar
eas;
�
Ensu
re t
hat
stor
m w
ater
dra
ins
and
high
way
dr
aina
ge
syst
ems
are
perio
dica
lly
clea
red
to
mai
ntai
n st
orm
w
ater
flo
ws
durin
g co
nstr
uctio
n.
� Al
l irr
igat
ion
cana
ls al
ong
the
alig
nmen
t w
ill b
e cl
early
mar
ked
on
the
grou
nd t
o pr
even
t ac
cide
ntal
du
mpi
ng o
f fil
l mat
eria
ls in
to t
hese
ca
nals.
Cros
s an
d sid
e dr
ains
; �
Num
ber
of
culv
erts
; �
Num
ber a
nd s
ize
of p
ipes
Desig
n re
port
stru
ctur
e sit
es
CON
SULT
ANT/
PIU
s/PM
U
Soil
Eros
ion
and
Silta
tion
�
Soil
eros
ion
due
to
cons
truc
tion
activ
ities
, ea
rthw
orks
, cu
t an
d fil
l op
erat
ions
an
d fr
om
stoc
kpile
s.
� E
rosio
n an
d su
bseq
uent
de
posit
ion
in t
he a
djac
ent
land
.
� Ad
opt g
ood
cons
truc
tion
prac
tices
. �
Adju
stin
g co
nstr
uctio
n sc
hedu
le f
or
brid
ge d
urin
g no
n-m
onso
on se
ason
. �
Turf
ing
of r
oad
shou
lder
s to
pro
tect
slo
pes.
�
Eart
h st
ockp
iles
to b
e pr
ovid
ed w
ith
gent
le sl
opes
. �
Ensu
ring
vege
tatio
n on
ro
ad
emba
nkm
ents
an
d ro
ad
cutt
ings
w
ith f
ast
grow
ing
crop
and
a n
ativ
e se
ed
mix
im
med
iate
ly
afte
r fil
l pl
acem
ent
to p
reve
nt s
cour
and
to
enco
urag
e st
abili
zatio
n.
� U
sing
ston
e pi
tchi
ng o
r rip
rap
at
appr
opria
te p
lace
s esp
ecia
lly a
roun
d ov
erpa
sses
, brid
ge, c
ulve
rts.
� Re
ceip
t of
co
mpl
aint
re
gard
ing
sedi
men
t lo
ss o
r w
ater
turb
idity
. �
Brid
ge lo
catio
ns;
� Re
tain
ing
wal
ls �
Num
ber
of a
ny
non-
com
plia
nce
repo
rts
� Co
mpl
ianc
e w
ith
Nat
iona
l/Int
erna
tiona
l gu
idel
ine
limits
fo
r so
il qu
ality
The
full
leng
th o
f th
e ro
ad
alig
nmen
t
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us
Soil
Com
pact
ion
and
Cont
amin
atio
n
� Co
mpa
ctio
n of
soi
l due
to
mov
emen
t of v
ehic
les
and
equi
pmen
t �
Cont
amin
atio
n of
soi
l due
to
lea
kage
/spi
llage
of
oil,
bitu
min
ous
and
non-
bitu
min
ous d
ebris
� Co
nstr
uctio
n ve
hicl
es,
mac
hine
ry,
and
equi
pmen
t to
be
stat
ione
d in
th
e de
signa
ted
RoW
to
av
oid
com
pact
ion.
�
Haul
age
rout
es
to
be
desig
nate
d al
ong
fallo
w a
nd c
onso
lidat
ed s
oil
area
s to
re
duce
co
mpa
ctio
n of
� N
umbe
r of
any
no
n- c
ompl
ianc
e re
port
s �
Mai
nten
ance
of
te
mpo
rary
pa
ssag
es;
� Co
mpl
ianc
e w
ith
Nat
iona
l/Int
erna
tiona
l gu
idel
ine
limits
fo
r so
il qu
ality
Cons
truc
tion
sites
al
ong
the
full
leng
th
of
the
proj
ect
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
s
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 89
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
ar
able
land
. �
Fuel
st
orag
e an
d fil
ling
to
be
unde
rtak
en i
n ar
eas
with
con
cret
e su
rfac
ing
and
bund
s an
d in
terc
epto
r tr
aps
� O
il in
terc
epto
rs t
o be
pro
vide
d at
w
ash
dow
n an
d re
fuel
ing
sites
�
Oil
and
grea
se s
pill
and
oil-s
oake
d m
ater
ials
will
be
so
ld
off
to
auth
orize
d re
cycl
ers.
Ri
verb
ed
Sedi
men
t
� Di
stur
banc
e of
riv
erbe
d se
dim
ents
due
to d
redg
ing
activ
ities
;
� Co
ntam
inat
ion
of b
otto
m
sedi
men
ts
by
acci
dent
al
spill
ing
of
bitu
min
ous
mat
eria
ls an
d ot
her p
etro
-ch
emic
als.
� Pr
even
t co
nstr
uctio
n de
bris
from
en
terin
g dr
aina
ge
or
irrig
atio
n ca
nals;
�
Cons
truc
tion
wor
k cl
ose
to r
iver
to
be
min
imize
d es
peci
ally
du
ring
mon
soon
seas
on;
� Co
nduc
t re
gula
r riv
erbe
d se
dim
ent
qual
ity m
onito
ring
acco
rdin
g to
the
de
term
ined
sam
plin
g sc
hedu
le.
� Tr
ain
cons
truc
tion
wor
kers
on
safe
ha
ndlin
g of
pe
tro-
chem
ical
s to
pr
even
t sp
illag
e or
lea
kage
to
the
river
or o
ther
wat
er b
odie
s;
� Re
stric
t disp
osal
of a
ny c
onst
ruct
ion
was
te in
to th
e riv
er o
r nea
rby
wat
er
bodi
es;
� Re
sults
of
se
dim
ent
qual
ity
anal
ysis
� Br
idge
loca
tions
;
� Co
mpl
ianc
e w
ith
Nat
iona
l/Int
erna
tiona
l gu
idel
ine
limits
for
Rive
rbed
se
dim
ent.
Brid
ge
cons
truc
tion
site
on T
urag
Riv
er
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
/BBA
Tops
oil r
emov
al �
Rem
oval
of
to
p so
il fo
r co
nstr
uctio
n ou
tsid
e th
e Ro
W.
� Co
mpa
ctio
n of
tops
oil.
� Lo
ss o
f to
p so
il by
win
d an
d w
ater
ero
sion.
�
Cove
ring
of
top
soil
by
proj
ect w
orks
.
� Th
e st
ockp
ile s
lope
to b
e no
ste
eper
th
an 2
(H)
:1 (
V) t
o re
duce
sur
face
ru
noff
and
enha
nce
perc
olat
ion
thro
ugh
the
mas
s of s
tore
d so
il.
� Lo
cate
to
psoi
l st
ockp
iles
outs
ide
drai
nage
line
s an
d pr
otec
t sto
ckpi
les
from
ero
sion.
�
Cons
truc
t div
ersio
n ch
anne
ls an
d sil
t fe
nces
aro
und
the
tops
oil s
tock
pile
s to
pr
even
t er
osio
n an
d lo
ss
of
tops
oil.
� N
umbe
r of
non
-co
mpl
ianc
es
obse
rved
/ re
port
ed
� Co
mpl
ianc
e w
ith
Nat
iona
l/Int
erna
tiona
l gu
idel
ine
limits
fo
r so
il qu
ality
Cons
truc
tion
sites
th
roug
hout
th
e ro
ad a
lignm
ent
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
s
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 90
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
� U
se
strip
ped
tops
oil
to
cove
r al
l di
stur
bed
area
s an
d al
ong
the
prop
osed
tree
pla
ntat
ion
sites
. �
Rip
grou
nd
surf
ace
prio
r to
th
e sp
read
ing
of to
psoi
l,
� Li
mit
equi
pmen
t an
d ve
hicu
lar
mov
emen
ts t
o w
ithin
the
app
rove
d co
nstr
uctio
n zo
ne.
� Re
mov
e un
wan
ted
mat
eria
ls fr
om
tops
oil s
uch
as ro
ots
of tr
ees,
rubb
le
and
was
te e
tc.
Air
Qua
lity
chan
ges
� Du
st
gene
ratio
n du
e to
co
nstr
uctio
n ac
tiviti
es a
nd
tran
spor
t of
con
stru
ctio
n m
ater
ials.
�
Emiss
ions
fr
om
vehi
cles
, eq
uipm
ent
and
mac
hine
ry.
� Ve
hicl
es
tran
spor
ting
cons
truc
tion
mat
eria
l to
be c
over
ed;
� Co
nstr
uctio
n eq
uipm
ent
to
be
mai
ntai
ned
to a
goo
d st
anda
rd a
nd
disc
oura
ging
idlin
g of
eng
ines
. �
Mac
hine
ry e
mitt
ing
visib
le s
mok
e to
be
ban
ned
from
con
stru
ctio
n sit
es;
� Co
ntra
ctor
to
pr
epar
e a
dust
su
ppre
ssio
n pr
ogra
m
deta
iling
ac
tion
to b
e ta
ken
to m
inim
ize d
ust
gene
ratio
n (e
.g.
spra
ying
of
road
s w
ith w
ater
), an
d th
e eq
uipm
ent
to
be u
sed.
�
Equi
ppin
g as
phal
t ho
t m
ix
and
batc
hing
pla
nts
with
fabr
ic fi
lters
or
wet
sc
rubb
ers
to
redu
ce
dust
em
issio
ns;
� Lo
cate
asp
halt
and
crus
hing
pla
nts
away
fr
om
resid
entia
l ar
eas
and
soci
al
infr
astr
uctu
re
such
as
ho
spita
ls,
mos
ques
, sc
hool
s an
d m
adra
sas.
(R
efer
to
An
nex
2 fo
r lo
catio
ns o
f the
se).
Clea
ranc
e sh
ould
be
at
leas
t 50
0 m
and
tak
e in
to
acco
unt
the
prev
ailin
g w
ind
dire
ctio
n.
� Du
st
mas
ks
to
be
prov
ided
to
� Lo
catio
n of
st
ockp
iles;
�
Num
ber
of
com
plai
nts
from
se
nsiti
ve
rece
ptor
s;
� He
avy
equi
pmen
t an
d m
achi
nery
w
ith
air
pollu
tion
cont
rol d
evic
es;
� Am
bien
t ai
r qu
ality
foun
d be
yond
th
e na
tiona
l st
anda
rds
� Co
mpl
ianc
e w
ith
DoE
and
Nat
iona
l gu
idel
ine
limits
fo
r Ai
r at
se
nsi ti
ve
rece
ptor
s.
� Ce
rtifi
catio
n th
at v
ehic
les
are
com
plia
nt
with
ai
r qu
ality
st
anda
rds.
Cons
truc
tion
sites
al
ong
the
full
leng
th
of
the
proj
ect
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us/
DoE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 91
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
wor
kers
whe
re d
ust h
azar
ds e
xist
; �
Prop
er d
ust
colle
ctio
n an
d co
ntro
l sy
stem
s to
be in
stal
led
at c
rush
ers;
�
Air
qual
ity m
onito
ring
to b
e ca
rrie
d ou
t as
pe
r th
e sc
hedu
le
in
the
envi
ronm
enta
l mon
itorin
g pl
an.
Noi
se
and
Vibr
atio
n
� N
oise
fr
om
cons
truc
tion
vehi
cles
, eq
uipm
ent
and
mac
hine
ry.
� Vi
brat
ion
caus
ed
by
cons
truc
tion
activ
ities
.
� U
se o
f mod
ern
plan
t and
equ
ipm
ent
with
app
ropr
iate
muf
fling
dev
ices
. �
All
pow
ered
mec
hani
cal
equi
pmen
t an
d m
achi
nery
to
be
fit
ted
with
no
ise a
batin
g ge
ar s
uch
as m
uffle
rs
for
effe
ctiv
e no
ise
cont
rol,
in
com
plia
nce
with
DoE
regu
latio
ns.
� Co
nstr
uctio
n op
erat
ions
to
be
re
stric
ted
to 0
700
to 1
800
hour
s.
� Lo
cate
ro
ck
crus
hing
, co
ncre
te
mix
ing
and
mat
eria
l shi
pmen
t ya
rds
away
fr
om
resid
entia
l ar
eas,
sc
hool
s, c
olle
ges a
nd h
ospi
tals.
�
Inst
all t
empo
rary
noi
se b
arrie
rs n
ear
sens
itive
loc
atio
ns s
uch
as s
choo
ls,
relig
ious
pla
ces
and
hosp
itals
(Ref
er
to A
nnex
2 fo
r loc
atio
ns)
� Pr
ovid
ing
the
cons
truc
tion
wor
kers
w
ith s
uita
ble
hear
ing
prot
ectio
n as
ea
r cap
, or e
arm
uffs
etc
. �
Surr
ound
th
e pi
ers
durin
g co
nstr
uctio
n w
ith
an
air
bubb
le
curt
ain
syst
em o
r cof
fer d
am.
� U
se a
smal
ler h
amm
er to
redu
ce th
e so
und
pres
sure
. Th
e so
und
prod
uced
in p
ile d
rivin
g ha
s a
dire
ct
rela
tions
hip
to t
he f
orce
use
d to
dr
ive
the
pile
. A sm
alle
r ham
mer
will
ha
ve
less
fo
rce
on
the
pile
th
eref
ore,
pro
duci
ng le
ss so
und.
�
Noi
se a
nd v
ibra
tion
leve
l mon
itorin
g to
be
carr
ied
out a
s per
the
sche
dule
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
re
cept
ors;
�
Noi
se
mea
sure
men
t da
ta
� U
se o
f sil
ence
rs
in
noise
-pr
oduc
ing
equi
pmen
t an
d so
und
barr
iers
;
� Eq
uiva
lent
da
y an
d ni
ght
time
noise
leve
ls �
Com
plia
nce
with
Do
E an
d N
atio
nal
guid
elin
e lim
its
for
Noi
se
at
sens
itive
re
cept
ors.
Cons
truc
tion
sites
al
ong
the
full
leng
th
of
the
proj
ect
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
s/Do
E
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 92
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
in
the
envi
ronm
enta
l m
onito
ring
plan
.
Chan
ges
to
Topo
grap
hy a
nd
Land
scap
e
� Vi
sual
intr
usio
n fr
om la
rge
pile
s of
em
bank
men
t an
d co
nstr
uctio
n m
ater
ials
obst
ruct
ing
view
s;
� La
nd d
egra
datio
n du
e to
ex
cava
tion
in b
orro
w a
rea.
� M
ater
ial s
tock
pile
s w
ill b
e re
mov
ed
as s
oon
as w
ork
is co
mpl
eted
and
th
e ar
ea re
-land
scap
ed
� To
p so
il to
be
pr
eser
ved
for
reha
bilit
atio
n of
bor
row
pits
�
Borr
ow p
its t
o be
eith
er c
lose
d or
co
nver
ted
to
pond
s at
th
e co
mpl
etio
n of
wor
k;
� Co
nstr
uctio
n w
aste
s to
be
used
in
cons
truc
tion
activ
ities
;
� W
orks
ite
clea
r of
ha
zard
ous
was
tes
such
as
oi
l/fue
l �
Wor
ksite
cl
ear
of
any
was
tes,
co
llect
ed
mat
eria
ls fr
om
drai
nage
s,
unut
ilize
d m
ater
ials
and
debr
is
� Tr
ansp
ort
rout
e an
d w
orks
ite
clea
red
of
any
dust
/mud
� Co
mpl
ianc
e w
ith
Nat
iona
l gu
idel
ine
for
land
use
pol
icy.
�
Com
plia
nce
with
W
aste
m
anag
emen
t pl
an
Borr
ow a
reas
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PI
Us
Sitt
ing
of
Cons
truc
tion
and
Labo
ur
cam
ps,
plan
s an
d eq
uipm
ent
and
Wor
ksho
ps
� Lo
ss
of
plan
tatio
n an
d ve
geta
tion;
�
Perm
anen
t ph
ysic
al
and
visu
al im
pact
on
the
area
; �
Heal
th ri
sk o
f the
wor
kers
. �
Soci
al
dist
urba
nce
to
near
by c
omm
unity
.
� Co
nstr
uctio
n ca
mps
, pl
ant
and
equi
pmen
t a
nd w
orks
hops
to
be
loca
ted
away
fro
m s
ensit
ive
area
s an
d no
t w
ithin
500
m o
f ex
istin
g se
ttle
men
ts (
Refe
r to
Ann
ex 2
for
ch
aina
ge k
m) u
nles
s ag
reed
to
afte
r co
nsul
tatio
n w
ith lo
cal p
eopl
e;
� Pr
ovid
e ad
equa
te
hous
ing
for
all
wor
kers
at
the
cons
truc
tion
cam
ps
and
esta
blish
cle
an c
ante
en/e
atin
g an
d co
okin
g ar
eas;
�
Cam
p sit
e w
ill b
e cl
eane
d up
to
the
satis
fact
ion
of t
he lo
cal c
omm
unity
af
ter u
se;
� St
andi
ng w
ater
will
not
be
allo
wed
to
ac
cum
ulat
e in
th
e te
mpo
rary
dr
aina
ge
faci
litie
s or
al
ong
the
road
side
to p
reve
nt p
rolif
erat
ion
of
� W
orks
ite
clea
r of
ha
zard
ous
was
tes
such
as
oi
l/fue
l �
Wor
ksite
cl
ear
of
any
was
tes,
co
llect
ed
mat
eria
ls fr
om
drai
nage
s,
unut
ilize
d m
ater
ials
and
debr
is
� Tr
ansp
ort
rout
e an
d w
orks
ite
clea
red
of
any
dust
/mud
� Co
mpl
ianc
e w
ith
Was
te
man
agem
ent
plan
Cons
truc
tion
cam
ps, w
orks
hops
an
d la
bour
cam
ps
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us/
PMU
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 93
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
mos
quito
es.
� Br
iefin
g an
d/or
on-
site
trai
ning
for
th
e co
ntra
ctor
’s
wor
kers
on
th
e en
viro
nmen
tal
requ
irem
ent
of t
he
proj
ect
and
the
impl
emen
tatio
n of
m
itiga
tion
mea
sure
s;
� M
inim
ize
vege
tatio
n lo
ss
whi
le
mak
ing
site
arra
ngem
ents
fo
r co
nstr
uctio
n ca
mps
an
d ot
her
faci
litie
s;
� Go
od
sani
tatio
n fa
cilit
ies
to
be
prov
ided
for t
he c
amps
; �
Was
tew
ater
fr
om
cont
ract
ors’
w
orks
hops
and
equ
ipm
ent
was
hing
ya
rds
will
be
pa
ssed
th
roug
h gr
avel
/san
d be
ds, a
nd a
ll oi
l/gre
ase
cont
amin
ants
w
ill
be
rem
oved
, be
fore
disc
harg
ing.
Oil
and
grea
se
resid
ues
will
be
stor
ed i
n dr
ums
awai
ting
disp
osal
in
line
with
the
ag
reed
w
aste
m
anag
emen
t pl
an,
and
cons
isten
t w
ith
natio
nal
and
loca
l reg
ulat
ions
; �
Solid
was
te m
ust
not
be d
umpe
d,
burie
d or
bur
ned
at o
r ne
ar t
he
proj
ect
site,
but
will
be
disp
osed
of
at th
e ne
ares
t san
itary
land
fill o
r site
ha
ving
an
d co
mpl
ying
w
ith
the
nece
ssar
y pe
rmits
; �
The
sites
for
cam
ps a
nd a
ssoc
iate
d fa
cilit
ies
will
be
reha
bilit
ated
aft
er
com
plet
ion
of th
e pr
ojec
t.
� HI
V/AI
DS a
war
enes
s an
d pr
even
tion
prog
ram
will
be
impl
emen
ted
in li
ne
with
soci
al p
lans
und
er th
e pr
ojec
t. �
Cons
truc
tion
wor
kers
sh
ould
be
un
der
inst
ruct
ion
not
to
be
invo
lved
/ in
terf
ere
in s
ocia
l iss
ues
of
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 94
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
neig
hbor
hood
com
mun
ities
.
Rive
r pr
otec
tion
and
brid
ge
cons
truc
tion
� M
ovem
ent
of b
arge
s an
d ot
her
cons
truc
tion
vess
els
and
brid
ge
cons
truc
tion
activ
ities
with
in t
he r
iver
w
ill
inte
rfer
e w
ith
loca
l na
viga
tion
and
inte
rrup
t th
e riv
er tr
affic
; �
Silt
and
Cont
amin
ated
ru
noff
reac
hing
riv
er
wat
er
� U
nder
wat
er n
oise
impa
cts
on
fishe
ries
and
othe
r aq
uatic
life
.
� In
brid
ge r
epai
r an
d de
mol
ition
, the
br
idge
str
uctu
re w
ill n
ot b
e dr
oppe
d in
to th
e riv
er, b
ut a
ltern
ativ
e m
eans
w
ill b
e us
ed t
o av
oid
"dro
ppin
g th
e br
idge
" in
to r
iver
s/st
ream
s. T
his
will
be
don
e by
"sa
win
g" a
ppro
pria
te
sect
ions
of
th
e br
idge
an
d us
ing
cran
es to
lift
thes
e se
ctio
ns a
way
, or
alte
rnat
ivel
y, b
y co
nstr
uctio
n of
a
plat
form
on
to
whi
ch
the
brid
ge
coul
d be
low
ered
. �
Rock
s an
d st
ones
will
be
disp
osed
of
so a
s not
to b
lock
rive
rs a
nd st
ream
s �
Coffe
rdam
s,
silt
fenc
es,
sedi
men
t ba
rrie
rs,
or o
ther
dev
ices
will
be
used
as
appr
opria
te b
ased
on
the
desig
n to
pre
vent
spr
eadi
ng o
f sil
t du
ring
exca
vatio
n an
d bo
ring
oper
atio
ns
with
in
stre
ams.
If
coffe
rdam
s ar
e us
ed,
thes
e w
ill b
e de
wat
ered
and
cle
aned
to
prev
ent
silta
tion
by
pum
ping
fr
om
coffe
rdam
s to
a s
ettli
ng b
asin
or
a co
ntai
nmen
t uni
t. �
Oth
er r
unof
f co
ntro
l mea
sure
s su
ch
as
cove
ring
open
su
rfac
es
with
gr
asse
s an
d cr
eepe
rs
to
redu
ce
runo
ff w
ill b
e im
plem
ente
d as
ear
ly
as p
ossib
le in
con
stru
ctio
n.
� If
hydr
aulic
ham
mer
are
to
be u
sed
the
impa
ct o
f pile
driv
ing
cann
ot b
e av
oide
d. H
owev
er,
the
forc
e of
the
ha
mm
er
blow
ca
n be
co
ntro
lled
with
hy
drau
lic
ham
mer
s,
and
� N
umbe
r of
non
-co
mpl
ianc
es
obse
rved
/ re
port
ed
� In
corp
orat
ion
of
IEE
reco
mm
enda
tion
in d
esig
n an
d bi
d do
cum
ents
� Co
mpl
ianc
e w
ith
BIW
TA g
uide
line
limits
for
Nav
igat
ion.
Brid
ge
cons
truc
tion
site
on T
urag
rive
r
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
s/PM
U/B
IWT
A
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 95
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
redu
cing
th
e im
pact
fo
rce
will
re
duce
the
inte
nsity
of t
he r
esul
ting
soun
d.
Surf
ace
Wat
er
Bodi
es
� Lo
ss
of
surf
ace
wat
er
bodi
es a
nd im
pact
on
fish.
�
Avoi
d or
min
imize
dam
age
to w
ater
ch
anne
ls;
� A
void
or
m
inim
ize
use
of
the
river
bed
mat
eria
ls.
� N
o bi
tum
inou
s or
ha
zard
ous
mat
eria
ls to
be
used
for
fill
ing
of
wat
er b
odie
s;
� In
cas
e of
acc
iden
tal o
bstr
uctio
n or
da
mag
e, d
rain
age
ditc
hes a
nd p
onds
w
ill
be
clea
ned
or
repa
ired
imm
edia
tely
.
� N
o vi
sible
de
grad
atio
n to
ne
arby
dr
aina
ges,
kha
ls or
wat
er b
odie
s du
e to
co
nstr
uctio
n ac
tiviti
es
� Ef
fect
iven
ess
of
wat
er
man
agem
ent
mea
sure
s
All
wat
er
bodi
es
likel
y to
be
af
fect
ed a
long
the
pr
ojec
t ro
ad
(Ref
er
to
Anne
x 2)
.
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
s
Surf
ace
Wat
er
Qua
lity
�
Cont
amin
atio
n of
sur
face
w
ater
by
di
spos
al
of
cons
truc
tion
was
te.
� Po
llutio
n of
do
mes
tic
wat
er su
pplie
s.
� Th
e w
orkf
orce
to
be
tr
aine
d in
pr
oper
m
etho
ds
for
stor
age
and
hand
ling
of m
ater
ials
and
chem
ical
s;
� W
ork
cam
ps a
nd w
ork
sites
to
be
prov
ided
w
ith
toile
ts
and
sept
ic
tank
s;
� Pr
oper
dr
aina
ge
syst
em
with
se
dim
enta
tion
pond
s an
d oi
l se
para
tors
to
be p
rovi
ded
to c
ope
with
the
rain
wat
er a
nd o
il sp
ills;
�
Stoc
kpile
d m
ater
ials
will
be
cove
red
to re
duce
silt
in ru
noff;
�
No
stoc
kpili
ng o
r bo
rrow
site
s le
ss
than
100
m fr
om a
wat
er b
ody;
�
Was
hing
of
mac
hine
ry a
nd v
ehic
les
in su
rfac
e w
ater
s to
be p
rohi
bite
d;
� Se
aled
w
ashi
ng
area
s w
ill
be
prov
ided
an
d w
aste
wat
er
will
be
co
llect
ed
in
a se
dim
enta
tion/
re
tent
ion
pond
for
tre
atm
ent
prio
r to
rele
ase;
�
Wor
k in
riv
ers
will
be
sche
dule
d du
ring
dry
seas
on,
and
wor
k
� Ar
eas
for
stoc
kpile
s,
stor
age
of f
uels
and
lubr
ican
ts
and
was
te
mat
eria
ls;
� N
umbe
r of
sil
t tr
aps
inst
alle
d al
ong
tren
ches
le
adin
g to
wat
er
bodi
es
� Re
cord
s of
su
rfac
e w
ater
qu
ality
in
spec
tion
� Co
mpl
ianc
e w
ith
Nat
iona
l gu
idel
ine
limits
fo
r Su
rfac
e w
ater
.
Cons
truc
tion
sites
al
ong
the
full
leng
th
of
the
proj
ect
part
icul
arly
in
ar
eas
whe
re t
here
ar
e be
el /
low
land
/
pond
/ d
itche
s (R
efer
to
An
nex
2).
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
s/Do
E
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 96
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
dura
tion
will
be
as sh
ort a
s pos
sible
; �
Cond
uct
regu
lar
wat
er
qual
ity
mon
itorin
g ac
cord
ing
to
the
reco
mm
ende
d sa
mpl
ing
sche
dule
; �
Prev
ent
cons
truc
tion
debr
is fr
om
ente
ring
drai
nage
or
irr
igat
ion
cana
ls;
� Co
nstr
uctio
n w
ork
clos
e to
pon
ds o
r ot
her
wat
er b
odie
s to
be
min
imiz
ed
espe
cial
ly d
urin
g m
onso
on se
ason
; �
Was
tes
to b
e co
llect
ed,
stor
ed a
nd
take
n to
app
rove
disp
osal
site
s.
Grou
ndw
ater
Q
ualit
y
� De
plet
ion
of g
roun
dwat
er
tabl
e du
e to
ex
cess
ive
with
draw
al.
�
Cont
amin
atio
n of
un
derg
roun
d w
ater
tab
le
from
le
acha
te
of
cons
truc
tion
was
te.
� As
sess
av
aila
bilit
y of
w
ater
an
d ev
alua
te
impa
ct
on
use
of
loca
l w
ater
re
sour
ces
to
ensu
re
that
w
ater
util
izatio
n fo
r pr
ojec
t w
ill n
ot
depl
ete
loca
l vill
age
supp
lies.
�
Arra
ngem
ents
fo
r sa
fe
drin
king
w
ater
to
be m
ade
prio
r to
sta
rt
wor
k.
� W
ater
fo
r co
nsum
ptio
n to
be
su
pplie
d on
ly
afte
r ad
equa
te
anal
ysis
and
requ
isite
trea
tmen
t.
� Tr
ain
wor
kers
on
th
e ne
ed
for
judi
ciou
s us
e of
fr
eshw
ater
re
sour
ces;
�
Wat
er
rese
rves
to
be
pr
otec
ted
from
co
ntam
inat
ion
such
as
co
nstr
uctio
n an
d oi
ly w
aste
. �
Mai
ntai
n cl
ose
liaiso
n w
ith
loca
l co
mm
uniti
es
to
ensu
re
that
an
y po
tent
ial
conf
licts
re
late
d to
co
mm
on
reso
urce
ut
iliza
tion
for
proj
ect
purp
oses
ar
e re
solv
ed
quic
kly.
� M
onito
ring
in
acco
rdan
ce
with
mon
itorin
g pr
ogra
m.
� N
o br
each
es o
f M
ater
ial
Safe
ty
Data
Sh
eet
(MSD
S)
for
haza
rdou
s su
bsta
nces
.
� Co
mpl
ianc
e w
ith
Nat
iona
l gu
idel
ine
limits
fo
r Gr
ound
wat
er.
Cons
truc
tion
sites
al
ong
the
full
leng
th
of
the
proj
ect
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
s/Do
E
Mat
eria
ls Ex
ploi
tatio
n an
d M
anag
emen
t of
� La
nd u
se c
hang
e du
e to
bo
rrow
ing
of e
arth
. �
Upd
ate
draf
t mat
eria
ls m
anag
emen
t pl
an o
r MM
P (w
hich
will
als
o in
clud
e a
mas
s ha
ulag
e ch
art)
pre
pare
d by
� Ai
r (P
M10
) an
d no
ise
leve
l m
easu
rem
ents
;
� Co
mpl
ianc
e w
ith
Was
te
man
agem
ent
Mat
eria
ls Ex
ploi
tatio
n sit
es
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
s/PM
U
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 97
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
Qua
rry
and
Borr
ow a
reas
�
Land
use
cha
nge
and
loss
of
pro
duct
ive
top
soil.
�
Chro
nic
eros
ion
and
silta
tion
� De
terio
ratio
n of
air
qual
ity
as
wel
l as
vi
sual
an
d ae
sthe
tic in
trus
ion.
EPCM
CO
NSU
LTAN
T du
ring
deta
iled
desig
n ph
ase.
Upd
ated
pla
n to
be
appr
oved
by
EP
CM
Cons
ulta
nt
1 m
onth
prio
r to
com
men
cem
ent
of
wor
ks.
Cont
ract
or
to
agre
e an
d im
plem
ent M
MP
prov
ision
s.
� Ba
lanc
e cu
t-an
d-fil
l req
uire
men
ts t
o m
inim
izatio
n im
pact
s fr
om
extr
actio
n of
agg
rega
tes.
�
Proc
ure
mat
eria
ls on
ly
from
Do
E au
thor
ized
quar
ries
and
borr
ow
sites
. �
If th
e co
ntra
ctor
will
ope
rate
the
qu
arry
site
, req
uire
d en
viro
nmen
tal
perm
its
will
be
se
cure
d pr
ior
to
oper
atio
n of
qua
rry/
borr
ow a
reas
. �
Use
qu
arry
w
ith
high
est
ratio
be
twee
n ex
trac
tive
capa
city
(bot
h in
te
rms
of q
ualit
y) a
nd lo
ss o
f nat
ural
st
ate.
�
Use
qua
rry
sites
lyi
ng c
lose
to
the
alig
nmen
t, w
ith
a hi
gh
leve
l of
ac
cess
ibili
ty.
� Do
no
t us
e qu
arrie
s in
ar
eas
of
natu
ral
woo
dlan
d or
ne
ar
river
s w
hich
pro
vide
foo
d an
d sh
elte
r fo
r bi
rds a
nd o
ther
ani
mal
s.
� Bo
rrow
/qua
rry
sites
w
ill
not
be
loca
ted
in
prod
uctiv
e la
nd
and
fore
sted
are
as.
� Du
ring
quar
ry/b
orro
w
site
oper
atio
n,
prov
ide
adeq
uate
dr
aina
ge t
o av
oid
accu
mul
atio
n of
st
agna
nt w
ater
. �
Ensu
re b
orro
w p
its a
re le
ft in
a t
idy
stat
e w
ith s
tabl
e sid
e slo
pes
and
prop
er d
rain
age
in o
rder
to
avoi
d cr
eatio
n of
wat
er b
odie
s fa
vora
ble
� Du
st
pollu
tion
and
com
plai
n of
lo
cal r
esid
ents
�
Num
ber
of n
on-
com
plia
nces
ob
serv
ed/
repo
rted
plan
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 98
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
for m
osqu
ito b
reed
ing.
�
Upo
n co
mpl
etio
n of
ex
trac
tion
activ
ities
, qu
arry
and
bor
row
pits
w
ill b
e st
abili
zed
and
reha
bilit
ated
. Be
fore
st
abili
zatio
n th
ese
will
be
de
wat
ered
an
d fe
nces
w
ill
be
inst
alle
d,
as
appr
opria
te,
to
min
imize
hea
lth a
nd sa
fety
risk
s.
Was
te
gene
ratio
n:
Gene
ral
Cons
truc
tion
Was
te D
ispos
al,
Spoi
l Di
spos
al
and
Haza
rdou
s W
aste
Disp
osal
� U
nhyg
ieni
c co
nditi
ons,
he
alth
risk
to
wor
kfor
ce
and
gene
ral p
ublic
at
and
arou
nd th
e ca
mp
site;
�
Visu
al in
trus
ion
from
larg
e pi
les
of
spoi
l di
spos
al
obst
ruct
ing
view
s;
� Dr
aina
ge c
onge
stio
n du
e to
was
te d
ispos
al;
�
Cont
amin
atio
n by
Oil
and
lubr
ican
ts
from
ve
hicl
e m
aint
enan
ce a
reas
;
� U
pdat
e th
e dr
aft
Was
te
Man
agem
ent
and
Spoi
l Di
spos
al
Plan
(W
MSD
P)
prep
ared
by
th
e EP
CM c
onsu
ltant
one
mon
th b
efor
e co
nstr
uctio
n to
cov
er a
ll as
pect
s of
w
aste
st
orag
e,
disp
osal
, an
d ac
cide
ntal
spi
lls t
o be
app
rove
d by
EP
CM C
onsu
ltant
1 m
onth
prio
r to
co
mm
ence
men
t of
w
orks
. Co
ntra
ctor
to
im
plem
ent
WM
SDP
prov
ision
s.
� Ar
eas
for
disp
osal
sh
ould
be
fin
alize
d th
roug
h a
mut
ual
agre
emen
t in
bet
wee
n la
ndow
ner
and
DoE;
�
Disp
osal
are
as t
o be
reh
abili
tate
d m
onito
red,
cat
alog
ued,
and
mar
ked.
�
Segr
egat
ion
of
was
tes
will
be
ob
serv
ed.
� Re
cycl
able
s w
ill b
e re
cove
red
and
sold
to re
cycl
ers.
�
Solid
and
liq
uid
was
tes
will
not
be
disp
osed
of i
n riv
ers
and
stre
ams
or
othe
r na
tura
l dr
aina
ge
path
; on
fr
agile
slo
pes,
floo
d w
ays,
farm
land
, fo
rest
, re
ligio
us o
r ot
her
cultu
rally
se
nsiti
ve a
reas
, or
are
as w
here
a
livel
ihoo
d is
evol
ved.
� Sp
oils
will
be
disp
osed
of i
n di
suse
d qu
arrie
s an
d ab
ando
ned
borr
ow p
its
� Ai
r (P
M10
) an
d no
ise
leve
l m
easu
rem
ents
;
� Du
st p
ollu
tion;
�
Num
ber
of n
on-
com
plia
nces
ob
serv
ed/
repo
rted
� Co
mpl
ianc
e w
ith
Was
te
man
agem
ent
plan
Cons
truc
tion
sites
al
ong
the
full
leng
th
of
the
proj
ect,
and
vehi
cle
mai
nten
ance
an
d re
fuel
ing
area
s.
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
s/PM
U
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 99
Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
whe
re p
ract
icab
le;
� Di
spos
ed s
poils
will
be
spre
ad in
15
cm
laye
rs
and
com
pact
ed
to
optim
um m
oist
ure
cont
ent,
cove
red
with
to
psoi
l, la
ndsc
aped
, an
d pr
ovid
ed
with
dr
aina
ge
and
vege
tatio
n to
pre
vent
run
off
in li
ne
with
bes
t pra
ctic
es;
� W
aste
di
spos
al
shou
ld
not
caus
e se
dim
enta
tion
and
obst
ruct
ion
of
regu
lar
drai
nage
, or
da
mag
e to
ag
ricul
tura
l la
nd
and
dens
ely
vege
tate
d ar
eas.
�
Was
te d
ispos
al s
ites
will
be
loca
ted
at
leas
t 50
m
fr
om
surf
ace
wat
erco
urse
s an
d w
ill b
e pr
otec
ted
from
run
off b
y en
surin
g m
ild s
lope
s an
d gr
assin
g.
� Sa
nita
ry
was
tes
gene
ratin
g fr
om
staf
f an
d la
bour
ca
mps
to
be
di
spos
ed o
f in
an
envi
ronm
enta
lly
frie
ndly
m
anne
r, i.e
. pr
ovisi
on
of
sept
ic ta
nk e
tc. f
or to
ilet w
aste
s.
� Th
ere
will
be
no si
te-s
peci
fic la
ndfil
ls es
tabl
ished
by
the
cont
ract
ors.
All
solid
was
te w
ill b
e co
llect
ed a
nd
rem
oved
fro
m t
he w
ork
cam
ps a
nd
disp
osed
in
lo
cal
was
te
disp
osal
sit
es.
� Ha
zard
ous
was
te t
o be
tra
nspo
rted
to
nea
rby
inci
nera
tion
faci
lity;
�
It sh
ould
be
ensu
red
that
all
stor
age
cont
aine
rs
are
in
good
co
nditi
on
with
pro
per l
abel
ing;
�
Cont
aine
rs s
houl
d be
che
cked
for
le
akag
e an
d ne
cess
ary
repa
irs
unde
rtak
en o
r rep
lace
d.
� Eq
uipm
ent/
vehi
cle
mai
nten
ance
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 10
0 Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
and
refu
elin
g ar
eas
will
be
conf
ined
to
ar
eas
in
cons
truc
tion
sites
de
signe
d to
co
ntai
n sp
illed
lu
bric
ants
and
fue
ls. S
uch
area
s w
ill
be p
rovi
ded
with
dra
inag
e le
adin
g to
an
oil-w
ater
sepa
rato
r tha
t will
be
regu
larly
sk
imm
ed
of
oil
and
mai
ntai
ned
to e
nsur
e ef
ficie
ncy.
�
All
area
s in
tend
ed f
or s
tora
ge o
f ha
zard
ous
mat
eria
ls w
ill
be
quar
antin
ed
and
prov
ided
w
ith
adeq
uate
fa
cilit
ies
to
com
bat
emer
genc
y sit
uatio
ns
com
plyi
ng
with
al
l th
e ap
plic
able
st
atut
ory
stip
ulat
ion.
�
The
cont
ract
or w
ill i
dent
ify n
amed
pe
rson
nel
in
the
man
agem
ent
plan
/CEM
P in
cha
rge
of t
he s
ites,
an
d en
sure
th
ey
are
prop
erly
tr
aine
d to
con
trol
acc
ess
to t
hese
ar
eas;
ent
ry w
ill b
e al
low
ed o
nly
unde
r aut
horiz
atio
n.
Ope
ratio
n of
As
phal
t pl
ant
Rock
cr
ushe
rs,
and
use
of
Bitu
men
� Ai
r po
llutio
n an
d du
st
gene
ratio
n.
� Sp
ills
from
Bitu
men
pla
nts
may
con
tam
inat
e su
rfac
e w
ater
qua
lity.
� U
nder
take
pre
caut
iona
ry m
easu
res
for
redu
cing
du
st
emiss
ions
fro
m
dies
el
gene
rato
r se
ts,
hot
mix
pl
ants
, cru
sher
s and
bat
chin
g pl
ants
. �
Prov
ide
adeq
uate
sta
ck h
eigh
t an
d du
st e
xtra
ctio
n sy
stem
s fo
r th
e ho
t m
ix p
lant
s.
� En
sure
wat
er s
prea
ding
to
supp
ress
du
sts
part
icul
arly
du
ring
dry
and
win
dy w
eath
er.
� Pr
ovid
e gr
ass
cove
r im
med
iate
ly
afte
r co
mpl
etio
n of
fin
al
eart
h su
rfac
e al
ong
with
wat
erin
g un
til
they
gro
w a
nd su
rviv
e.
� Tr
ee p
lant
atio
n on
the
slo
pes
all
alon
g th
e m
ain
corr
idor
and
oth
er
� Ai
r (P
M10
) an
d no
ise
leve
l m
easu
rem
ents
;
� Du
st p
ollu
tion
� N
umbe
r of
non
-co
mpl
ianc
es
obse
rved
/ re
port
ed
� Co
mpl
ianc
e w
ith
Was
te
man
agem
ent
plan
Cons
truc
tion
sites
al
ong
the
full
leng
th
of
the
proj
ect c
orrid
or
Cont
ract
or
EPCM
CO
NSU
LTAN
T/
PIU
s
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 10
1 Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
area
s of
fee
der
road
s, c
onst
ruct
ion
yard
s,
cons
truc
tion
cam
ps,
to
redu
ce th
e ef
fect
of e
miss
ion
of d
ust
and
pollu
tant
s on
th
e ad
jace
nt/n
earb
y co
mm
uniti
es.
� Di
spos
al
of
Bitu
men
w
ill
not
be
allo
wed
to
ente
r ei
ther
run
ning
or
dry
stre
ambe
ds
and
nor
will
be
di
spos
ed o
f in
ditc
hes o
r sm
all w
aste
di
spos
al
sites
pr
epar
ed
by
the
cont
ract
or.
� Bi
tum
en s
tora
ge a
nd m
ixin
g ar
eas
mus
t be
prot
ecte
d ag
ains
t spi
lls.
� Pr
oper
ha
ndlin
g of
co
ntam
inat
ed
soil
shou
ld
be
com
ply
with
Do
E st
anda
rds.
Fl
ora
�
Loss
of h
abita
t due
to tr
ee
cutt
ing.
�
Vege
tatio
n lo
ss d
ue to
site
pr
epar
atio
n an
d co
nstr
uctio
n ac
tiviti
es.
� Su
itabl
e Tr
ees
to b
e pl
ante
d as
per
TC
RP p
rovi
ded
by R
HD;
� Fl
ower
ing
and
frui
ting
shru
bs t
o be
pl
ante
d al
ong
the
RoW
to
beau
tify
the
land
scap
e;
� Co
ntra
ctor
’s
pers
onne
l to
be
di
rect
ed
not
to
dam
age
any
vege
tatio
n su
ch a
s tre
es o
r bus
hes;
�
Cons
truc
tion
vehi
cles
, eq
uipm
ent
and
mac
hine
ry to
be
limite
d to
thei
r de
signa
ted
area
s of m
ovem
ent;
�
Gas
cylin
ders
to
be u
sed
for
fuel
at
the
cam
ps
for
cook
ing
purp
oses
. Cu
ttin
g of
tre
es/b
ushe
s fo
r fu
el n
ot
to b
e al
low
ed;
� Ca
mp
sites
and
asp
halt
plan
ts t
o be
es
tabl
ished
on
w
aste
/bar
ren
land
ra
ther
th
an
on
fore
sted
or
ag
ricul
tura
lly
prod
uctiv
e la
nd.
How
ever
if
such
la
nd
is no
t av
aila
ble,
it
mus
t be
ens
ured
tha
t ve
geta
tion
clea
ring
is m
inim
ized
and
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
re
cept
ors
on
dist
urba
nce
of
vege
tatio
n.
� Ill
egal
fel
ling
of
tree
s �
PMO
and
PIU
to
repo
rt in
writ
ing
the
num
ber
of
tree
s cu
t an
d pl
ante
d if
tree
-cu
ttin
g w
ill
be
requ
ired
(to
be
dete
rmin
ed
durin
g de
taile
d de
sign
stag
e)
� Co
mpl
ianc
e w
ith
Tree
m
anag
emen
t pl
an
Cons
truc
tion
sites
al
ong
the
full
leng
th
of
the
proj
ect
RHD
EMCM
/PIU
s/PM
U/F
D
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 10
2 Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
min
imum
dam
age
is ca
used
to
the
tree
s, u
nder
grow
th a
nd c
rops
. W
ildlif
e
Hunt
ing
wild
life
and
bird
s du
ring
cons
truc
tion.
�
Bang
lade
sh
Fore
st
Depa
rtm
ent
shou
ld c
heck
and
con
firm
tha
t no
hu
ntin
g oc
curs
. �
New
and
goo
d co
nditi
on m
achi
nery
w
ith
low
no
ise
gene
ratio
n ch
arac
teris
tics
to
be
used
in
co
nstr
uctio
n.
� Co
nstr
uctio
n w
ork
not
to b
e ca
rrie
d ou
t at n
ight
. �
Borr
ow p
its t
o be
fenc
ed t
o pr
otec
t an
imal
s.
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
re
cept
ors
on
dist
urba
nce
of
poac
hing
. �
Illeg
al h
untin
g
Com
plia
nce
with
N
atio
nal/I
nter
nati
onal
gui
delin
e fo
r w
ildlif
e
Alon
g th
e ro
ad
alig
nmen
t and
bus
de
pot
Cont
ract
or
EMCM
/PIU
s/FD
Fish
erie
s �
Impa
ct o
n fis
hing
act
ivity
(p
rodu
ctio
n,
spaw
ning
an
d br
eedi
ng g
roun
ds).
�
Dist
urba
nce
to a
quat
ic li
fe
incl
udin
g m
igra
tion
of fi
sh
due
to
brid
ge
cons
truc
tion.
� Co
nstr
uctio
n no
t to
be
unde
rtak
en
durin
g hi
gh fl
ood.
�
Cons
truc
tion
alon
g th
e riv
erba
nks
mus
t be
av
oide
d du
ring
the
fish
bree
ding
se
ason
(Ju
ly
to
Sept
embe
r).
� De
ep
wat
er
chan
nel
to
be
mai
ntai
ned
durin
g br
idge
co
nstr
uctio
n.
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
re
cept
ors
on
dist
urba
nce
of
fishi
ng;
� An
y ev
iden
ce o
f fis
h m
orta
lity.
Com
plia
nce
with
N
atio
nal/I
nter
nati
onal
gui
delin
e
Thro
ugho
ut
the
road
co
rrid
or
part
icul
arly
in
po
nd
/ di
tch
/ riv
er a
reas
(Re
fer
to A
nnex
2).
Cont
ract
or
EMCM
/PIU
s
Land
use
�
Land
di
sput
es,
soil
eros
ion,
los
s of
pot
entia
l cr
opla
nd a
nd v
eget
atio
n,
land
scap
e de
grad
atio
n,
and
dam
age
to
road
em
bank
men
ts.
� La
nd u
se c
hang
e du
e to
bo
rrow
ing
of e
arth
. �
Land
use
cha
nge
and
loss
of
pro
duct
ive
top
soil.
� Ag
ricul
tura
l are
as n
ot t
o be
use
d as
bo
rrow
are
as.
� La
nd a
cqui
sitio
n fo
r bor
row
are
as to
be
min
imize
d. R
iver
san
d to
be
used
fo
r em
bank
men
t.
� N
eces
sary
per
mits
to
be o
btai
ned
for
any
borr
ow
pits
fr
om
the
com
pete
nt
auth
oriti
es
and
all
envi
ronm
enta
l con
sider
atio
ns t
o be
en
sure
d.
� To
psoi
l fr
om b
orro
w a
reas
to
be
pres
erve
d an
d bo
rrow
pits
to
be
reha
bilit
ated
af
ter
com
plet
ion
of
borr
ow o
pera
tions
. �
Borr
ow p
its t
o be
site
d on
was
te
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
re
cept
ors;
�
Reco
rds
of
sour
ces
of
mat
eria
ls
Com
plia
nce
with
N
atio
nal/I
nter
nati
onal
gui
delin
e
Cons
truc
tion
sites
al
ong
the
full
leng
th o
f
Cont
ract
or
EMCM
/PIU
s
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 10
3 Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
land
and
at
leas
t 50
0 m
aw
ay f
rom
th
e ro
ad.
� Pr
iorit
y to
be
give
n to
bor
row
ing
from
hum
ps (
incl
udin
g fr
om d
iggi
ng
of w
ells)
abo
ve t
he g
ener
al g
roun
d le
vel.
� Pr
iorit
y sh
ould
be
gi
ven
to
borr
owin
g by
ex
cava
ting/
enla
rgin
g ex
istin
g bo
rrow
are
as.
Traf
fic
Cond
ition
�
Due
to
cons
truc
tion
vehi
cles
, tra
ffic
cong
estio
n ca
usin
g in
conv
enie
nce
to
the
peop
le.
� Pr
ior
to s
tart
of
site
wor
ks,
upda
te
and
impl
emen
t up
date
d te
mpo
rary
tr
affic
m
anag
emen
t pl
an
(TTM
P)
prep
ared
by
EP
CM
Cons
ulta
nt
durin
g de
taile
d de
sign
phas
e.
Upd
ated
pla
n to
be
appr
oved
by
EPCM
CO
NSU
LTAN
T on
e m
onth
pr
ior
to c
omm
ence
men
t of
wor
ks.
Cont
ract
or
to
impl
emen
t TT
MP
prov
ision
s;
� Co
mm
unic
ate
to t
he p
ublic
thr
ough
lo
cal
offic
ials
rega
rdin
g th
e sc
ope
and
sche
dule
of
co
nstr
uctio
n,
as
wel
l as
co
nstr
uctio
n ac
tiviti
es
caus
ing
disr
uptio
ns
or
acce
ss
rest
rictio
ns;
� In
co
ordi
natio
n w
ith
loca
l tr
affic
au
thor
ities
, im
plem
ent
appr
opria
te
traf
fic d
iver
sion
sche
mes
to
avoi
d in
conv
enie
nce
to r
oad
user
s du
e to
pr
ojec
t op
erat
ions
, en
sure
sm
ooth
tr
affic
flo
w,
and
avoi
d or
min
imize
ac
cide
nts,
tr
affic
ho
ld
ups,
an
d co
nges
tion;
�
In
coor
dina
tion
with
lo
cal
traf
fic
offic
ials,
sc
hedu
le
tran
spor
t of
m
ater
ials
to a
void
con
gest
ion,
and
se
t up
clea
r tra
ffic
signa
l boa
rds
and
traf
fic a
dviso
ry s
igns
at
the
road
s
� Tr
affic
ro
ute
durin
g co
nstr
uctio
n w
orks
in
clud
ing
num
ber
of
perm
anen
t sig
nage
, ba
rric
ades
an
d fla
gmen
on
w
orks
ite a
s pe
r Tr
affic
M
anag
emen
t Pl
an
(App
endi
x 8)
; �
Num
ber
of
com
plai
nts
from
se
nsiti
ve
rece
ptor
s;
� N
umbe
r of
sig
nage
s pl
aced
at
pr
ojec
t lo
catio
n;
� N
umbe
r of
w
alkw
ays,
sig
nage
, an
d m
etal
sh
eets
pl
aced
at p
roje
ct
loca
tion
Com
plia
nce
with
Tr
affic
m
anag
emen
t pla
n
Cons
truc
tion
sites
al
ong
the
full
leng
th o
f cor
ridor
Cont
ract
or
EPCM
Co
nsul
tant
s/PI
Us/
PMU
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 10
4 Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
goin
g in
and
out
of t
he c
onst
ruct
ion
sites
to m
inim
ize tr
affic
bui
ld-u
p;
� Pr
ovid
e sa
fe v
ehic
le a
nd p
edes
tria
n ac
cess
aro
und
cons
truc
tion
area
s;
� In
stal
l bo
ld
dive
rsio
n sig
ns
that
w
ould
be
cl
early
vi
sible
ev
en
at
nigh
t, an
d pr
ovid
e fla
g pe
rson
s to
w
arn
of d
ange
rous
con
ditio
ns (
24
hour
s/as
nec
essa
ry).
� Pr
ovid
e su
ffici
ent
light
ing
at n
ight
w
ithin
an
d in
th
e vi
cini
ty
of
cons
truc
tion
sites
. �
Desig
nate
tr
affic
of
ficer
s in
co
nstr
uctio
n sit
es.
Inco
me
and
Empl
oym
ent
� In
com
e lo
ss
due
to
the
loss
of
agric
ultu
ral
land
s,
priv
ate
stru
ctur
es
and
com
mon
pr
oper
ty
reso
urce
s
� Co
ntra
ctor
as
far
as p
ract
icab
le t
o re
crui
t co
nstr
uctio
n w
orke
rs f
rom
am
ongs
t th
e lo
cals
and
to m
aint
ain
gend
er e
quity
whi
le e
mpl
oyin
g th
e lo
cals.
�
Prio
rity
will
al
way
s be
gi
ven
to
proj
ect
affe
cted
pe
rson
s,
the
unem
ploy
ed
and
low
er
inco
me
grou
ps.
� Se
t as
ide
area
s w
ithin
th
e co
ntra
ctor
’s c
amps
and
offi
ces
for
loca
l peo
ple
to se
ll th
eir p
rodu
cts.
Empl
oym
ent
reco
rds.
Co
mpl
ianc
e to
Ba
ngla
desh
Lab
or
Law
of 2
006
and
othe
r app
licab
le
stan
dard
s
Alon
g th
e ro
ad
alig
nmen
t Co
ntra
ctor
EM
CM/P
IUs
Heal
th
and
Safe
ty o
f the
Co
mm
unity
� He
alth
an
d sa
fety
ris
ks
due
pres
ence
of
co
nstr
uctio
n ca
mp
and
ongo
ing
cons
truc
tion
activ
ities
.
� Ba
rrie
rs (
e.g.
, te
mpo
rary
fen
ce)
to
be in
stal
led
at c
onst
ruct
ion
area
s to
de
ter
pede
stria
n ac
cess
to
th
e ro
adw
ay
exce
pt
at
desig
nate
d cr
ossin
g po
ints
. �
The
wor
kers
w
ith
diffe
rent
tr
ansm
ittab
le
dise
ases
sh
ould
be
re
stric
ted
to t
he c
onst
ruct
ion
site
and
sent
for
tre
atm
ent
or r
epla
ced
as a
n ur
gent
mea
sure
. �
The
gene
ral
publ
ic/lo
cal
resid
ents
w
ill
not
be
allo
wed
in
hi
gh-r
isk
� N
umbe
r of
ac
cide
nts;
�
Num
ber
of
perm
anen
t sig
nage
, ba
rric
ades
an
d fla
gmen
on
w
orks
ite a
s pe
r Tr
affic
M
anag
emen
t Pl
an
(App
endi
x 5)
;
Com
plia
nce
to
emer
genc
y re
spon
se p
lan
Cons
truc
tion
sites
al
ong
the
full
leng
th
of
the
proj
ect
Cont
ract
or;
RHD
EMCM
/PIU
s/PM
U
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 10
5 Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
area
s,
e.g.
, ex
cava
tion
sites
an
d ar
eas
whe
re h
eavy
equ
ipm
ent
is in
op
erat
ion
and
such
site
s w
ill h
ave
a w
atch
man
to k
eep
publ
ic o
ut.
� Dr
iver
s op
erat
ing
cons
truc
tion
vehi
cles
to b
e tr
aine
d in
roa
d sa
fety
aw
aren
ess;
�
Prov
ision
of
pr
oper
sa
fety
an
d di
vers
ion
signa
ge.
� Cr
ossin
g pr
ovisi
on t
o be
mad
e fo
r pe
dest
rians
an
d ve
hicl
es
near
se
ttle
men
ts.
� U
se o
f w
ater
not
to
dist
urb
wat
er
avai
labi
lity
for t
he p
ublic
. �
Clos
e co
nsul
tatio
n w
ith
loca
l co
mm
uniti
es
to
mai
ntai
n co
mm
unity
inte
grity
and
soc
ial l
inks
an
d av
oid
conf
lict
situa
tions
with
re
spec
t to
reso
urce
use
. �
RHD
to P
repa
re a
nd im
plem
ent p
lan
for a
void
ing
spre
ad o
f STD
s.
� To
pr
even
t sh
ort
circ
uit
fires
, el
ectr
ic fi
re a
larm
s (s
hort
circ
uit
fire
alar
ms)
sho
uld
be i
nsta
lled
in t
he
nece
ssar
y lo
catio
ns.
Sepa
rate
th
e liv
e pa
rts
and
insu
latin
g m
ater
ial
from
und
ergr
ound
wat
er p
ipes
/gas
pi
pes.
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
re
cept
ors;
�
Num
ber
of
wal
kway
s,
signa
ge,
and
met
al
shee
ts
plac
ed a
t pro
ject
lo
catio
n �
Perm
anen
t sig
n bo
ards
fo
r ha
zard
ous a
reas
�
Agre
emen
t be
twee
n la
ndow
ner
and
cont
ract
ors
in
case
of
us
ing
priv
ate
land
s as
w
ork
cam
ps,
stor
age
area
s,
etc.
Occ
upat
iona
l He
alth
an
d Sa
fety
-
Wor
kers
� Ac
cide
ntal
risk
and
hea
lth
risks
du
e to
un
safe
w
orki
ng c
ondi
tions
.
� Co
ntra
ctor
w
ill
upda
te
draf
t Em
erge
ncy
Resp
onse
Pla
n pr
epar
ed
by E
PCM
Con
sulta
nt,
and
inst
ruct
w
orke
rs
in
heal
th
and
safe
ty
mat
ters
. U
pdat
ed
plan
to
be
ap
prov
ed
by
EPCM
Co
nsul
tant
1
mon
th p
rior
to s
tart
ing
of w
orks
. Co
ntra
ctor
to
im
plem
ent
ERP
prov
ision
s.
� Es
tabl
ish
safe
ty
mea
sure
s as
� Eq
uipp
ed
first
-ai
d st
atio
ns
� M
edic
al
insu
ranc
e co
vera
ge
for
wor
kers
�
Num
ber
of
acci
dent
s �
Reco
rds
of
supp
ly o
f
Com
plia
nce
to
emer
genc
y re
spon
se p
lan
Cons
truc
tion
sites
al
ong
the
full
leng
th
of
the
proj
ect
Cont
ract
or
EMCM
/PIU
s
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 10
6 Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
requ
ired
by
law
an
d by
go
od
engi
neer
ing
prac
tice,
an
d pr
ovid
e fir
st a
id f
acili
ties
that
are
rea
dily
ac
cess
ible
by
wor
kers
; �
Fenc
ing
on a
ll ex
cava
tion,
bor
row
pi
ts, a
nd s
ides
of
tem
pora
ry b
ridge
, fly
over
s etc
. �
Wor
ker’s
co
mpe
nsat
ion
insu
ranc
e fo
r all
proj
ect s
taff;
�
Basic
med
ical
trai
ning
to b
e gi
ven
to
spec
ified
wor
k st
aff.
�
Basic
med
ical
serv
ice
and
supp
lies t
o be
mad
e av
aila
ble
for w
orke
rs.
� Ap
prop
riate
pe
rson
al
prot
ectiv
e eq
uipm
ent
(hea
ring
prot
ectio
n,
safe
ty g
lass
es,
helm
ets,
pro
tect
ive
foot
wea
r an
d gl
oves
, hi
gh v
isibi
lity
vest
s an
d ot
her
prot
ectiv
e cl
othi
ng)
to b
e pr
ovid
ed to
all
wor
kers
. �
Prov
ision
of
ad
equa
te
sani
tatio
n,
was
hing
, co
okin
g an
d do
rmito
ry
faci
litie
s inc
ludi
ng li
ghtin
g.
� Ad
equa
te s
igna
ge, l
ight
ing,
bar
riers
, ye
llow
tap
e an
d pe
rson
s w
ith f
lags
du
ring
cons
truc
tion
to
man
age
traf
fic a
t co
nstr
uctio
n sit
es, h
aula
ge
and
acce
ss ro
ads.
�
Prov
ision
for
tra
inin
g to
wor
kers
, do
cum
enta
tion
and
repo
rtin
g of
oc
cupa
tiona
l acc
iden
ts, d
iseas
es a
nd
inci
dent
s.
� Pr
ovisi
on
for
impl
emen
ting
the
prop
osed
em
erge
ncy
resp
onse
pla
n w
hich
is a
ttac
hed
in th
e An
nex
9.
unco
ntam
inat
ed
wat
er
� Co
nditi
on
of
eatin
g ar
eas
of
wor
kers
�
Use
of
pers
onal
pr
otec
tive
equi
pmen
t �
%
of
mov
ing
equi
pmen
t ou
tfitt
ed
with
au
dibl
e ba
ck-u
p al
arm
s �
Perm
anen
t sig
n bo
ards
fo
r ha
zard
ous a
reas
�
Sign
age
for
stor
age
and
disp
osal
are
as
� Co
nditi
on
of
sani
tatio
n fa
cilit
ies
for
wor
kers
. �
Reco
rd
of
H&S
orie
ntat
ion
trai
ning
s
Envi
ronm
enta
l M
onito
ring
and
Com
plet
ion
Repo
rtin
g
�
Prep
are
Mon
thly
an
d Q
uart
erly
M
onito
ring
Repo
rts.
�
Prep
are
a pr
ojec
t com
plet
ion
repo
rt
cont
aini
ng
envi
ronm
enta
l
� Av
aila
bilit
y an
d co
mpe
tenc
y of
ap
poin
ted
supe
rviso
r
Com
plia
nce
with
Re
port
ing
proc
edur
e
N/A
Cont
ract
or
EP
CM
Cons
ulta
nts
/PIU
s/PM
U
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 10
7 Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
man
agem
ent a
nd re
sidua
l im
pact
s if
any.
�
Mon
thly
repo
rt
IMPL
EMEN
TATI
ON
PH
ASE:
OPE
RATI
ON
Tree
Pla
ntin
g
Ensu
ring
surv
ival
of
flo
ra
and
faun
a in
th
e ne
w
envi
ronm
ent.
� M
onito
r su
rviv
al o
f re
plan
ted
tree
s (a
lso
com
pens
ator
y pl
antin
g)
and
repl
ant,
as n
eces
sary
. �
Und
erta
ke
prop
er
mea
sure
s fo
r w
ater
ing,
fer
tilizi
ng a
nd n
ursin
g of
tr
ees/
pla
nts/
gra
sses
. �
Plan
tatio
n of
add
ition
al v
arie
ties
of
tree
s th
at s
uppo
rts
bird
s an
d ha
ving
hi
gh w
ood
valu
e.
� N
o of
tr
ee
surv
ived
;
Com
plia
nce
with
gu
idel
ine
of F
ores
t De
part
men
t an
d th
e tr
ee
man
agem
ent p
lan
Alon
g th
e pr
ojec
t co
rrid
or
RHD/
NG
O
PIU
s/PM
U/D
F
Soil
Qua
lity
�
Soil
cont
amin
atio
n du
e to
ac
cide
ntal
sp
illag
e fr
om
vehi
cula
r mov
emen
t.
� Pr
oper
mea
sure
s m
ust
be e
nsur
ed
to
prev
ent
any
oil
spill
age
and
leak
age
from
the
vehi
cles
. �
Effo
rts
will
be
mad
e to
cle
an t
he
spill
s of
oil,
tox
ic c
hem
ical
s et
c. a
s ea
rly a
s pos
sible
.
No
com
plai
nts
from
se
nsiti
ve
rece
ptor
s
� Co
mpl
ianc
e w
ith
Nat
iona
l/ In
tern
atio
nal
guid
elin
e lim
its
for
soil
Alon
g th
e pr
ojec
t co
rrid
or
BRT
Ope
rato
r PI
Us/
DoE
Noi
se
and
Vibr
atio
n
� Th
ough
bot
h no
ise l
evel
an
d vi
brat
ion
is ex
pect
ed
to
redu
ce,
spec
ial
mea
sure
s/st
rate
gies
w
ill
be r
equi
red
to k
eep
them
w
ithin
lim
its.
� Ac
cord
ing
to
mon
itorin
g re
sults
, ad
ditio
nal
soun
d ba
rrie
rs
in
the
form
of
tree
s an
d he
dges
will
be
disc
usse
d w
ith t
he a
ffect
ed p
eopl
e an
d pl
ante
d, if
agr
eed;
�
Sign
s fo
r se
nsiti
ve
zone
s (h
ealth
ce
ntre
s /
educ
atio
nal
inst
itutio
ns
etc.
) to
pre
vent
the
use
of
pres
sure
ho
rns;
�
Enfo
rcem
ent
and
pena
lties
aga
inst
tr
affic
rule
s vio
lato
rs;
� M
onito
ring
to p
rote
ct th
e tr
ees.
No
com
plai
nts
from
se
nsiti
ve
rece
ptor
s
� Co
mpl
ianc
e w
ith
Nat
iona
l gu
idel
ine
limits
fo
r N
oise
leve
l.
Alon
g th
e pr
ojec
t co
rrid
or
part
icul
arly
in
the
maj
or
road
in
ters
ectio
ns
and
dens
ely
popu
late
d ar
eas
BRT
Ope
rato
r PI
Us/
DoE
Air Q
ualit
y
� In
crea
sed
traf
fic le
vels
and
cong
estio
n w
ill le
ad t
o ai
r po
llutio
n le
vels.
�
Air
cond
ition
ing
gas
emiss
ion
from
BRT
bus
es.
� Ro
adsid
e tr
ee
plan
tatio
ns
as
appl
icab
le a
nd f
easib
le u
nder
the
cl
imat
ic c
ondi
tions
. �
Regu
lar r
oad
mai
nten
ance
to e
nsur
e go
od su
rfac
e co
nditi
on.
� Ca
rry
out
regu
lar
onsit
e te
stin
g fo
r
No
com
plai
nts
from
se
nsiti
ve
rece
ptor
s
� Co
mpl
ianc
e w
ith
Nat
iona
l gu
idel
ine
limits
fo
r Ai
r qua
lity.
Alon
g th
e pr
ojec
t co
rrid
or
part
icul
arly
in
the
maj
or
road
in
ters
ectio
ns
and
dens
ely
BRT
Ope
rato
r PI
Us/
DoE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 10
8 Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
asse
ssin
g em
issio
n le
vels
of
pollu
tant
s fr
om v
ehic
les
runn
ing
on
road
. �
Enfo
rcem
ent
and
pena
lties
aga
inst
tr
affic
rule
s vio
lato
rs.
�
All
wor
k do
ne o
n ai
r co
nditi
oner
s w
ill
follo
w
the
Indu
stry
Co
de
of
Prac
tices
fo
r au
tom
otiv
e ai
r co
nditi
onin
g.
Appr
oved
re
frig
eran
t ga
s rec
yclin
g an
d st
orag
e eq
uipm
ent
will
be
used
in th
ese
circ
umst
ance
s.
� Am
bien
t ai
r qu
ality
m
onito
ring
shou
ld
be
carr
ied
out
durin
g op
erat
ion
phas
e.
sett
lem
ent
area
s,
and
Bus D
epot
Wat
er Q
ualit
y
� Co
ntam
inat
ion
of
wat
er
bodi
es f
rom
run
off
from
bu
s de
pot,
term
inal
, st
atio
ns
and
road
s co
ntai
ning
oils
and
gre
ase;
�
Grou
ndw
ater
m
ay
get
pollu
ted
due
to
cont
amin
ated
road
runo
ff.
� In
ord
er t
o di
scha
rge
rapi
d re
mov
al
of
stor
m-w
ater
/roa
d ru
noff,
cr
oss
slope
s an
d lo
ngitu
dina
l dra
inag
e w
ill
be p
rovi
ded
in th
e de
sign.
�
Prop
er
drai
nage
sy
stem
w
ith
sedi
men
tatio
n po
nds
and
oil
sepa
rato
rs w
ill b
e pr
ovid
ed t
o av
oid
cont
amin
atio
n by
ru
n-of
f an
d oi
l sp
ills.
�
Rete
ntio
n ba
sins
with
re
ed
beds
pr
ovid
ed in
the
des
ign
will
impr
ove
the
qual
ity
of
pollu
ted
stor
m-
wat
er/r
oad
runo
ff.
� Pr
ior
to o
pera
tion,
an
emer
genc
y re
spon
se p
lan
for s
pills
of h
azar
dous
m
ater
ials
and
oil w
ill b
e pr
epar
ed.
� W
ater
qu
ality
m
onito
ring
will
be
ca
rrie
d ou
t as
pe
r sc
hedu
le
sugg
este
d in
th
e En
viro
nmen
tal
Mon
itorin
g Pl
an.
No
visib
le
degr
adat
ion
to
near
by d
rain
ages
, kh
als
or
wat
er
bodi
es
due
to
cons
truc
tion
activ
ities
� Co
mpl
ianc
e w
ith
Nat
iona
l gu
idel
ine
limits
fo
r Su
rfac
e an
d Gr
ound
wat
er.
Thro
ugho
ut
the
proj
ect
road
pa
rtic
ular
ly
in
river
/pon
d/di
tch
area
s
BRT
Ope
rato
r PI
Us/
DoE
Cultu
ral S
ites
�
Noi
se a
nd v
ibra
tion
near
cu
ltura
l sit
es l
ike
scho
ol,
colle
ge,
mad
rasa
, he
alth
co
mpl
ex,
tem
ple,
ch
urch
� N
oise
pr
oble
m
can
be
miti
gate
d th
roug
h in
stal
latio
n of
noi
se b
arrie
r an
d pl
anta
tion
of t
rees
alo
ng t
he
boun
dary
of t
he c
ultu
ral s
ites.
No
com
plai
nts
from
se
nsiti
ve
rece
ptor
s
� Co
mpl
ianc
e w
ith
Nat
iona
l gu
idel
ine
limits
fo
r
Alon
g th
e pr
ojec
t co
rrid
or
BRT
Ope
rato
r PI
Us
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 10
9 Ju
l - D
ec 2
017
Activ
ity
Pote
ntia
l Im
pact
s M
itiga
tion
Mea
sure
s M
onito
ring
Indi
cato
r Pe
rfor
man
ce
Targ
et
Loca
tion
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
etc.
�
Avoi
d un
nece
ssar
y no
ise g
ener
atio
n at
se
nsiti
ve
cultu
ral
sites
w
ith
regu
latio
ns.
Noi
se a
nd d
ust.
Road
Saf
ety
�
Incr
ease
in t
he n
umbe
r of
ro
ad a
ccid
ents
�
Spee
d lim
its w
ill b
e im
pose
d.
� Sa
fety
sig
nal
will
ne
ed
to
be
disp
laye
d al
ong
the
road
alo
ng w
ith
disp
lay
and
mon
itorin
g of
sp
eed
limits
esp
ecia
lly a
long
sett
lem
ents
. �
Traf
fic s
igns
mus
t be
pro
vide
d to
w
arn
road
use
rs a
bout
spe
ed li
mits
, re
st
area
s,
eatin
g es
tabl
ishm
ents
et
c.
� La
nes,
med
ian,
and
sha
rp b
ends
will
be
mar
ked
with
ref
lect
orize
d sig
ns
to i
mpr
ove
road
visi
bilit
y at
nig
ht
time.
�
Foot
ov
erpa
sses
w
ill
be
prov
ided
ne
ar s
choo
ls, m
arke
ts a
reas
for
safe
cr
ossin
g of
the
road
s.
� Pr
oper
lig
htin
g w
ill
be
prov
ided
al
ong
the
proj
ect r
oad.
No
com
plai
nts
from
se
nsiti
ve
rece
ptor
s
Zero
acc
iden
t Al
ong
the
proj
ect
corr
idor
pa
rtic
ular
ly
at
road
inte
rsec
tions
BRT
Ope
rato
r PI
Us/
PMU
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 11
0 Ju
l - D
ec 2
017
Tabl
e 2:
Env
ironm
enta
l Man
agem
ent P
lan:
Env
ironm
enta
l Mon
itorin
g Ta
ble
for B
RT C
orrid
or
Envi
ronm
enta
l Co
mpo
nent
Pa
ram
eter
s St
anda
rds /
Gui
delin
es
Loca
tions
Mon
itorin
g
Perio
d/
Freq
uenc
y/
Sam
plin
g,
No/
year
Resp
onsi
bilit
y
Impl
emen
tatio
n
Supe
rvis
ion
PRE-
CON
STRU
CTIO
N S
TAG
E
Tree
cut
ting
� M
onito
ring
activ
ities
�
Chec
k w
heth
er
prop
er
com
pens
atio
n as
men
tione
d in
RP
is re
ceiv
ed b
y PA
Ps.
Insp
ectio
n Th
roug
hout
the
proj
ect a
reas
Durin
g tr
ee
felli
ng
and
site
clea
ring
oper
atio
ns
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us/
PMU
/FD
CON
STRU
CTIO
N S
TAG
E
Air Q
ualit
y H 2
S,
SOx,
N
Ox,
CO
, O
3, O
2,CO
2, TV
OC,
TSP
, PM
10,
Hum
idity
, W
ind
dire
ctio
n, W
ind
spee
d, T
empe
ratu
re
Air q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h Th
roug
hout
the
proj
ect a
reas
Twic
e a
year
/ on
com
plai
nts
for 2
yea
rs
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us/
Do
E
Dust
Du
st c
ontr
ol
Air q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h Th
roug
hout
the
proj
ect a
reas
Re
gula
rly
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us/
Do
E
Noi
se a
nd V
ibra
tion
dB
(A) a
nd P
PV
Noi
se P
ollu
tion
Cont
rol
Rule
s (20
06)
Thro
ugho
ut th
e pr
ojec
t are
as
Twic
e a
year
/ on
co
mpl
aint
s fo
r 2 y
ears
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
s/
DoE
Wat
er Q
ualit
y
� Su
rfac
e w
ater
: Te
mpe
ratu
re,
Turb
idity
, pH
, TD
S, E
C, T
SS,
Fe,
NH 3
–N,
As,
Fe,
Mn,
DO
, CO
D,
BOD 5
, TC,
FC,
Tot
al N
, Tot
al P
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Surf
ace
wat
er
near
pro
ject
co
rrid
or
Qua
rter
ly a
yea
r / o
n co
mpl
aint
s fo
r 2 y
ears
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
s/
DoE
� Gr
ound
wat
er:
Tem
pera
ture
, Tu
rbid
ity,
pH,
TDS,
EC,
TSS
, Fe
, N
H 3–N
, As
, Fe
, M
n,
DO,
COD,
BO
D 5, T
C, F
C, T
otal
N, T
otal
P
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Grou
ndw
ater
ne
ar p
roje
ct
corr
idor
Twic
e a
year
/ on
co
mpl
aint
s fo
r 2 y
ears
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
s/
DoE
Rive
rbed
Mat
eria
l �
As, P
b, C
d, C
r, Hg
, Fe,
pH
Go
vern
men
t of
Bang
lade
sh (G
oB) a
nd
Inte
rnat
iona
l Sta
ndar
d
Tong
i Brid
ge si
te
at T
urag
Riv
er
Twic
e a
year
/ on
co
mpl
aint
s fo
r 2 y
ears
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us/
Do
E
Soil
Pollu
tion
� pH
, As,
Pb,
Hg,
Cd,
Cr,
Zn;
� Ch
eck
liqui
d w
aste
is
carr
ied
out
by e
xper
ienc
ed p
erso
nnel
and
in
prop
er w
ay.
�
Care
ful a
nd p
rope
r ha
ndlin
g of
oil
Gove
rnm
ent o
f Ba
ngla
desh
(GoB
) and
In
tern
atio
nal S
tand
ard
At a
ll pr
ojec
t site
s in
clud
ing
Bus
Depo
t
Twic
e a
year
/ on
co
mpl
aint
s fo
r 2 y
ears
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
s/
DoE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 11
1 Ju
l - D
ec 2
017
Envi
ronm
enta
l Co
mpo
nent
Pa
ram
eter
s St
anda
rds /
Gui
delin
es
Loca
tions
Mon
itorin
g
Perio
d/
Freq
uenc
y/
Sam
plin
g,
No/
year
Resp
onsi
bilit
y
Impl
emen
tatio
n
Supe
rvis
ion
and
othe
r haz
ardo
us li
quid
s.
Soil
Eros
ion
� Vi
sual
che
ck f
or s
oil
eros
ion
and
silta
tion.
�
Visu
al
insp
ectio
n of
er
osio
n pr
even
tion
mea
sure
s an
d oc
curr
ence
of e
rosio
n.
Gove
rnm
ent o
f Ba
ngla
desh
(GoB
) and
In
tern
atio
nal S
tand
ard
Mat
eria
l sto
rage
sit
es a
nd a
ll th
e w
ater
bod
ies n
ear
the
proj
ect
corr
idor
Mon
thly
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
s
Drai
nage
con
gest
ion
� Ch
eck
drai
nage
pla
n im
plem
ente
d co
rrec
tly
� Co
nduc
t reg
ular
insp
ectio
n M
onito
ring
Thro
ugho
ut th
e pr
ojec
t are
as
Wee
kly
durin
g m
onso
on
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us/
PMU
Wild
life
�
Wild
life
habi
tat a
nd m
ovem
ent
Non
e Sp
ecifi
c
Area
s alo
ngsid
e ro
ad c
orrid
or
Qua
rter
ly
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us
Fish
erie
s
� Im
pact
on
fis
h pr
oduc
tivity
, br
eedi
ng a
nd sp
awni
ng
Al
l maj
or w
ater
bo
dies
O
nce
in y
ear
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us
Was
te M
anag
emen
t
� Ch
eck
stor
age,
tr
ansp
orta
tion,
di
spos
al,
hand
ling
of
haza
rdou
s w
aste
�
Was
te
and
efflu
ents
to
be
co
llect
ed a
nd d
ispos
ed s
afel
y fr
om
all c
amps
; �
Was
te a
nd g
arba
ge f
rom
brid
ge
cons
truc
tion
site
to b
e di
spos
ed
safe
ly.
Mon
itorin
g Th
roug
hout
the
proj
ect a
reas
W
eekl
y Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
s/PM
U
Heal
th a
nd
Safe
ty
� Ch
eck
qual
ity
of
food
an
d ac
com
mod
atio
n at
co
nstr
uctio
n ca
mp.
�
Chec
k sa
fe w
ater
sup
ply,
hyg
ieni
c to
ilet a
t cam
ps a
nd c
onst
ruct
ion
of
drai
n at
cam
p sit
es.
� Ch
eck
toile
ts
are
clos
e to
co
nstr
uctio
n sit
e an
d se
para
te
toile
t for
fem
ale
wor
kers
; �
Firs
t-Ai
d ki
t w
ith r
equi
red
tool
s an
d m
edic
ine;
�
The
heav
y co
nstr
uctio
n m
ater
ial t
o ha
ndle
d an
d st
ored
saf
ely
putt
ing
due
care
on
publ
ic sa
fety
; �
Heav
y co
nstr
uctio
n m
ater
ials
at
Mon
itorin
g
Cons
truc
tion
sites
, la
bour
ca
mps
and
bus
de
pot
Regu
larly
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
s/PM
U
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 11
2 Ju
l - D
ec 2
017
Envi
ronm
enta
l Co
mpo
nent
Pa
ram
eter
s St
anda
rds /
Gui
delin
es
Loca
tions
Mon
itorin
g
Perio
d/
Freq
uenc
y/
Sam
plin
g,
No/
year
Resp
onsi
bilit
y
Impl
emen
tatio
n
Supe
rvis
ion
brid
ge
cons
truc
tion
site
to
be
stor
ed a
nd h
andl
ed sa
fely
; and
�
Chec
k of
pe
rson
al
prot
ectiv
e eq
uipm
ent (
PPE)
for w
orke
r at t
he
sites
.
OPE
RATI
ON
STA
GE
Tree
Pl
anta
tion
Chec
k th
e pl
anta
tion
met
hod
and
num
ber o
f tre
e sp
ecie
s
Insp
ectio
n to
ens
ure
prop
er p
lant
atio
n w
ith
prop
er sp
ecie
s
Thro
ugho
ut th
e pr
ojec
t are
as
Durin
g Ju
ne/ J
uly
NGO
PI
Us/
PMU
/FD
Air Q
ualit
y H 2
S, S
Ox,
NO
x, C
O, O
3, O
2,CO
2, TV
OC,
TSP
, PM
10, H
umid
ity, W
ind
dire
ctio
n, W
ind
spee
d, T
empe
ratu
re
Air q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h Th
roug
hout
the
proj
ect a
reas
Mon
thly
insid
e th
e De
pot;
Twic
e a
year
fo
r 3 y
ears
BRT
Ope
rato
r PI
Us/
DoE
Noi
se a
nd V
ibra
tion
dB
(A) a
nd P
PV
Noi
se P
ollu
tion
Cont
rol
Rule
s (20
06)
Thro
ugho
ut th
e pr
ojec
t are
as
Mon
thly
insid
e th
e De
pot ;
Tw
ice
a ye
ar
for 3
yea
rs
BRT
Ope
rato
r PI
Us/
DoE
Wat
er Q
ualit
y
� Su
rfac
e w
ater
: Te
mpe
ratu
re,
Turb
idity
, pH,
TDS
, EC,
TSS
, Fe,
NH
3 –N
, As
, Fe
, M
n, D
O,
COD,
BO
D 5,
TC, F
C, T
otal
N, T
otal
P
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Surf
ace
wat
er
near
pro
ject
co
rrid
or
Twic
e a
year
fo
r 3 y
ears
BR
T O
pera
tor
PIU
s/Do
E
� Gr
ound
wat
er:
Tem
pera
ture
, Tu
rbid
ity, p
H, T
DS, E
C, T
SS, F
e, N
H3
–N,
As,
Fe,
Mn,
DO
, CO
D, B
OD 5
, TC
, FC,
Tot
al N
, Tot
al P
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Surf
ace
wat
er
near
pro
ject
co
rrid
or
Twic
e a
year
fo
r 3 y
ears
BR
T O
pera
tor
PIU
s/Do
E
Traf
fic S
afet
y
� Re
cord
of a
ccid
ents
, diff
eren
t lev
el
of d
isabi
litie
s/ fa
talit
ies.
N
one
Spec
ific
Th
roug
hout
the
proj
ect s
ectio
n
Full
oper
atio
n pe
riod
BRT
Ope
rato
r PI
Us/
PMU
Soil
Qua
lity
�
pH, A
s, P
b, H
g, C
d, C
r, Zn
; Go
vern
men
t of
Bang
lade
sh (G
oB) a
nd
Inte
rnat
iona
l Sta
ndar
d
At e
ach
cons
truc
tion
cam
p po
st
rest
orat
ion
of
cons
truc
tion
cam
p sit
e
Year
ly c
lose
to b
us
depo
t BR
T O
pera
tor
PIU
s/Do
E
Wild
life
� W
ildlif
e ha
bita
t and
mov
emen
t N
one
Spec
ific
Ar
eas a
long
side
the
road
cor
ridor
Q
uart
erly
BR
T O
pera
tor
PIU
s
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 11
3 Ju
l - D
ec 2
017
Envi
ronm
enta
l Co
mpo
nent
Pa
ram
eter
s St
anda
rds /
Gui
delin
es
Loca
tions
Mon
itorin
g
Perio
d/
Freq
uenc
y/
Sam
plin
g,
No/
year
Resp
onsi
bilit
y
Impl
emen
tatio
n
Supe
rvis
ion
Fish
erie
s �
Impa
ct
on
fish
prod
uctiv
ity,
bree
ding
and
spaw
ning
All m
ajor
wat
er
bodi
es
End
of fi
rst y
ear o
f op
erat
ion
BR
T O
pera
tor
PIU
s
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 11
4 Ju
l - D
ec 2
017
Tabl
e 3:
Env
ironm
enta
l Man
agem
ent P
lan:
Env
ironm
enta
l Miti
gatio
n Ta
ble
for B
us D
epot
, Kitc
hen
Mar
kets
and
LGE
D ro
ads
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n
Supe
rvis
ion
&
Mon
itorin
g
IMPL
EMEN
TATI
ON
PH
ASE:
PRE
-CO
NST
RUCT
ION
Prov
ision
of E
arly
Tr
aini
ng
Awar
enes
s an
d Tr
aini
ng
on
envi
ronm
enta
l pr
otec
tion
aspe
cts
rele
vant
to
go
od
cons
truc
tion
prac
tices
may
avo
id
cons
truc
tion
perio
d im
pact
s.
EPCM
Co
nsul
tant
an
d LG
ED
to
prov
ide
trai
ning
as
part
of t
he o
vera
ll aw
aren
ess
and
trai
ning
pro
gram
s to
be
de
liver
ed
befo
re
cons
truc
tion
begi
n.
� Pr
oof o
f com
plet
ion.
�
Post
ing
of
proo
f of
co
mpl
etio
n at
w
orks
ites
Safe
guar
d Co
mpl
ianc
e O
rient
atio
n
Loca
tion
to b
e co
nfirm
ed
EPCM
CO
NSU
LTAN
T/LG
ED
EPCM
CO
NSU
LTAN
T/PI
U/P
MU
/LGE
D
6 Tre
e Cu
ttin
g
�
Arou
nd
586
tree
s in
clud
ing
6 la
rge,
57
m
ediu
m,
260
smal
l an
d 26
3 sa
plin
gs w
ill b
e cu
t do
wn
with
in
bus
depo
t sit
e du
e to
sit
e pr
epar
atio
n an
d co
nstr
uctio
n ac
tiviti
es
resu
lting
in
po
tent
ial
ecol
ogic
al
and
econ
omic
loss
.
� Pr
ohib
it cu
ttin
g of
tr
ees
for
firew
ood
and
for u
se in
pro
ject
. Gas
cy
linde
rs t
o be
use
d fo
r fu
el a
t th
e ca
mp
for c
ooki
ng p
urpo
ses.
Cut
ting
of t
rees
/bus
hes
for
fuel
not
to
be
allo
wed
. �
Inva
sive
spec
ies
will
no
t be
in
trod
uced
into
new
env
ironm
ent.
�
Whe
n co
nstr
uctio
n w
ork
is co
mpl
eted
, tr
ees
and
unde
rsto
ry
vege
tatio
n m
ust
be
plan
ted,
in
or
der
to h
elp
the
clea
red
area
s in
an
effo
rt t
o at
trac
t so
me
wild
life
such
as b
irds.
�
Plan
t at
lea
st t
wo
tree
s fo
r ev
ery
one
tree
cut
.
� N
o of
tree
felle
d;
� Co
mpe
nsat
ory
plan
tatio
n sit
e id
entif
ied.
Com
plia
nce
with
tr
ee
man
agem
ent
plan
With
in
bus
depo
t are
a LG
ED/
EPCM
CO
NSU
LTAN
T PI
U/P
MU
6 Size
of t
he tr
ees r
efer
her
e to
circ
umfe
renc
e of
the
tree
s whi
ch a
re: L
arge
=5' a
nd A
bove
; Med
ium
= 2'
7''-5
'; Sm
all=
7''-
2'7'
'; Sa
plin
gs=
<6''
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 11
5 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n
Supe
rvis
ion
&
Mon
itorin
g
Loss
of S
truc
ture
s an
d Pu
blic
Util
ity
� Th
e ho
use
with
in
prop
osed
bu
s de
pot
site
will
be
relo
cate
d.
� In
conv
enie
nce
caus
ed
by
disr
uptio
n of
pub
lic
utili
ty
(Pow
er/
Tele
phon
e lin
es).
� Th
e ho
useh
olde
rs w
ill b
e in
clud
ed
in t
he R
AP f
or c
ompe
nsat
ion
and
relo
catio
n;
� Pr
ovisi
on in
the
des
ign
and
budg
et
for
the
relo
catio
n of
the
exi
stin
g ut
ility
in
fras
truc
ture
s w
here
ver
requ
ired.
� N
umbe
r of
pu
blic
gr
ieva
nces
re
-res
ettle
men
t an
d co
mpe
nsat
ion;
�
Num
ber
of
com
plai
nts
from
se
nsiti
ve re
cept
ors
�
Nos
of
elec
tric
pol
es
relo
cate
d;
� Te
mpo
rary
po
wer
su
pply
Com
plia
nce
with
RP
and
em
erge
ncy
resp
onse
pla
n
With
in t
he b
us
depo
t are
a LG
ED/
EPCM
CO
NSU
LTAN
T
PIU
/PM
U
IMPL
EMEN
TATI
ON
PH
ASE:
CO
NST
RUCT
ION
STA
GE
Filli
ng u
p of
wat
er
logg
ed a
rea
� Lo
ss
of
rete
ntio
n ar
ea;
� Ea
rthw
ork
activ
ities
du
ring
cons
truc
tion
stag
e m
ay
bloc
k co
nnec
tivity
w
ith
othe
r w
ater
bo
dies
; �
Drai
nage
co
nges
tion
due
to
was
te d
ispos
al a
nd
cons
truc
tion
activ
ities
.
� To
de
al
care
fully
at
de
sign
and
plan
ning
st
ages
ba
sed
on
hydr
olog
ical
dat
a.
� Re
gula
r cl
eani
ng
of
chan
nels
to
av
oid
chok
ing.
�
Was
tes s
houl
d no
t be
disp
osed
nea
r w
ater
bod
ies.
All
was
te d
epen
ding
on
its
ch
arac
teris
tics,
sh
ould
be
di
spos
ed o
f at a
ppro
ved
loca
tions
.
� De
signs
of b
oth
Cros
s an
d sid
e dr
ains
; �
No
of c
ulve
rts;
�
Num
ber
and
size
of
pipe
s
� Co
mpl
ianc
e w
ith
Desig
n re
port
Nea
r an
d ar
ound
w
ater
bo
dies
adj
acen
t to
bu
s de
pot
area
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U
Fish
erie
s �
Filli
ng
of
the
cana
l/pon
d du
e to
co
nstr
uctio
n m
ight
af
fect
aq
uacu
lture
an
d ca
ptiv
e fis
herie
s.
� Th
e ex
cava
tions
for
fill
m
ater
ials
may
be
us
ed
rete
ntio
n an
d aq
uacu
lture
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
re
cept
ors
on
dist
urba
nce
of
fishi
ng;
� An
y ev
iden
ce o
f fis
h m
orta
lity.
Com
plia
nce
with
N
atio
nal/I
nter
nat
iona
l gu
idel
ine
With
in
bus
depo
t are
a Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
Wild
life
� Th
e te
rres
tria
l w
ildlif
e sp
ecie
s �
New
and
goo
d co
nditi
on m
achi
nery
w
ith
low
no
ise
gene
ratio
n �
Num
ber
of
com
plai
nts
from
Co
mpl
ianc
e w
ith
With
in
bus
depo
t are
a
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 11
6 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n
Supe
rvis
ion
&
Mon
itorin
g
mig
ht b
e di
stur
bed
due
to n
oise
and
vi
brat
ion
at
cons
truc
tion
sites
an
d tr
ee f
ellin
g to
ca
use
dislo
catio
n of
ha
bita
ts.
How
ever
, pr
esen
ces
of
thre
aten
ed
or
enda
nger
ed
wild
life
spec
ies
wer
e no
t re
port
ed
at th
e sit
e.
char
acte
ristic
s to
be
us
ed
in
cons
truc
tion.
�
Cons
truc
tion
wor
k no
t to
be c
arrie
d ou
t at n
ight
.
sens
itive
re
cept
ors
on
dist
urba
nce
of
poac
hing
. �
Illeg
al h
untin
g
Nat
iona
l/Int
ern
atio
nal
guid
elin
e fo
r w
ildlif
e
Herit
age
and
Cultu
re
� A
mos
que
was
id
entif
ied
at
50m
no
rth-
wes
t sid
e of
th
e pr
ojec
t ar
ea
and
may
be
in r
isk
of n
egat
ive
impa
cts
of
cons
truc
tion
activ
ities
.
� U
se
of
mod
ern
plan
t an
d eq
uipm
ent
with
ap
prop
riate
m
uffli
ng d
evic
es.
� In
stal
l te
mpo
rary
no
ise
barr
iers
ne
ar th
e m
osqu
e.
� Pr
oper
dus
t co
llect
ion
and
cont
rol
syst
ems t
o be
inst
alle
d.
� Re
cord
s of
ch
ance
fin
ds
� Te
mpo
rary
ac
cess
pr
ovisi
on;
� Pe
rman
ent
acce
ss
rest
ored
� Co
mpl
ianc
e w
ith R
P �
Com
plia
nce
with
Nat
iona
l/ In
tern
atio
nal
guid
elin
e
With
in
bus
depo
t are
a LG
ED/ C
ontr
acto
r EP
CM
CON
SULT
ANT/
PIU
Surf
ace
wat
er
� Po
llutio
n of
sur
face
w
ater
m
ay
be
caus
ed
due
to
disp
osal
of
ju
nk,
cem
ent
refu
se a
nd
efflu
ents
in
op
en
wat
er
bodi
es
durin
g th
e co
nstr
uctio
n of
bus
de
pot.
� Th
e w
orkf
orce
to
be
tr
aine
d in
pr
oper
m
eans
fo
r st
orag
e an
d ha
ndlin
g of
m
ater
ials
and
chem
ical
s.
� W
ork
cam
ps a
nd w
ork
sites
to
be
prov
ided
w
ith
toile
ts
and
sept
ic
tank
s.
� W
ashi
ng o
f m
achi
nery
and
veh
icle
s in
surf
ace
wat
ers t
o be
pro
hibi
ted.
�
Cond
uct
regu
lar
wat
er
qual
ity
mon
itorin
g ac
cord
ing
to
the
dete
rmin
ed sa
mpl
ing
sche
dule
. �
Prev
ent
cons
truc
tion
debr
is fr
om
ente
ring
drai
nage
or
irr
igat
ion
cana
ls.
� Ar
eas
for
stoc
kpile
s,
stor
age
of f
uels
and
lubr
ican
ts a
nd w
aste
m
ater
ials;
�
Num
ber
of s
ilt t
raps
in
stal
led
alon
g tr
ench
es
lead
ing
to
wat
er b
odie
s
� Re
cord
s of
su
rfac
e w
ater
qu
ality
in
spec
tion
� Co
mpl
ianc
e w
ith
Nat
iona
l gu
idel
ine
limits
for
Surf
ace
wat
er.
Nea
r an
d ar
ound
w
ater
bo
dies
adj
acen
t to
bu
s de
pot
area
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 11
7 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n
Supe
rvis
ion
&
Mon
itorin
g
� W
aste
s to
be
colle
cted
, sto
red
and
take
n to
app
rove
disp
osal
site
s.
Grou
ndw
ater
Q
ualit
y
� Co
ntam
inat
ion
of
grou
nd w
ater
tab
le
from
le
acha
te
of
cons
truc
tion
was
te
and
was
tes
from
w
orke
rs’ c
amp
� W
orkf
orce
ca
mp
will
be
lo
cate
d aw
ay
from
w
ater
re
sour
ces.
Al
l pr
actic
al
mea
sure
s su
ch
as
prov
ision
of
sept
ic t
anks
, ga
rbag
e ba
gs a
nd o
ther
san
itatio
n fa
cilit
ies
will
be
im
plem
ente
d at
th
e co
nstr
uctio
n ca
mp
to p
reve
nt t
he
was
tew
ater
and
sol
id w
aste
s fr
om
ente
ring
wel
l an
d gr
ound
wat
er
rech
arge
are
as.
� Gr
ound
wat
er q
ualit
y m
onito
ring
to
be c
arrie
d ou
t as
per
the
sch
edul
e in
th
e en
viro
nmen
tal
mon
itorin
g pl
an.
� M
onito
ring
in
acco
rdan
ce
with
m
onito
ring
prog
ram
. �
No
brea
ches
of
M
ater
ial
Safe
ty D
ata
Shee
t (M
SDS)
for h
azar
dous
su
bsta
nces
.
Com
plia
nce
with
N
atio
nal
guid
elin
e lim
its
for
Grou
nd
wat
er.
Cons
truc
tion
site
at
bus
depo
t are
a
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U
Air Q
ualit
y
�
Dust
G
ener
atio
n du
e to
con
stru
ctio
n ac
tiviti
es
and
tran
spor
t of
co
nstr
uctio
n m
ater
ials.
�
Emiss
ions
fr
om
vehi
cles
, eq
uipm
ent
and
mac
hine
ry.
� Re
gula
r w
ater
ing
at t
he e
xpos
ed
sites
ne
eded
to
co
ntro
l du
st
blow
ing.
�
Vehi
cles
tra
nspo
rtin
g co
nstr
uctio
n m
ater
ial t
o be
cov
ered
. �
Cons
truc
tion
equi
pmen
t to
be
m
aint
aine
d to
a g
ood
stan
dard
and
id
ling
of e
ngin
es d
iscou
rage
d.
� M
achi
nery
em
ittin
g vi
sible
sm
oke
to
be
bann
ed
from
co
nstr
uctio
n sit
es.
� Du
st
mas
ks
to
be
prov
ided
to
w
orke
rs w
here
dus
t haz
ards
exi
st.
� Co
nduc
t re
gula
r ai
r qu
ality
m
onito
ring
acco
rdin
g to
th
e de
term
ined
sam
plin
g sc
hedu
le.
� Lo
catio
n of
st
ockp
iles;
�
Num
ber
of
com
plai
nts
from
se
nsiti
ve re
cept
ors;
�
Heav
y eq
uipm
ent
and
mac
hine
ry
with
ai
r po
llutio
n co
ntro
l de
vice
s;
� Am
bien
t ai
r qu
ality
fo
und
beyo
nd
the
natio
nal s
tand
ards
� Co
mpl
ianc
e w
ith
DoE
and
Nat
iona
l gu
idel
ine
limits
for
Air
at
sens
itive
re
cept
ors.
�
Cert
ifica
tion
that
ve
hicl
es
are
com
plia
nt
with
ai
r qu
ality
st
anda
rds.
Cons
truc
tion
site
at
bus
depo
t are
a
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 11
8 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n
Supe
rvis
ion
&
Mon
itorin
g
Noi
se
and
vibr
atio
n
� N
oise
fr
om
cons
truc
tion
vehi
cles
, eq
uipm
ent
and
mac
hine
ry.
� Vi
brat
ion
caus
ed
by
cons
truc
tion
activ
ities
.
� Al
l pow
ered
mec
hani
cal e
quip
men
t an
d m
achi
nery
to
be f
itted
with
no
ise a
batin
g ge
ar s
uch
as m
uffle
rs
for
effe
ctiv
e no
ise
cont
rol,
in
com
plia
nce
with
DoE
regu
latio
ns.
� Pr
ovid
ing
the
cons
truc
tion
wor
kers
w
ith su
itabl
e he
arin
g pr
otec
tion
like
ear c
ap, o
r ear
muf
fs e
tc.
� N
oise
mea
sure
men
t to
be
carr
ied
out
as
per
the
sche
dule
in
th
e en
viro
nmen
tal m
onito
ring
plan
.
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
rece
ptor
s;
� N
oise
m
easu
rem
ent
data
�
Use
of
sil
ence
rs
in
noise
-pro
duci
ng
equi
pmen
t an
d so
und
barr
iers
;
� Eq
uiva
lent
da
y an
d ni
ght
time
noise
le
vels
� Co
mpl
ianc
e w
ith
� Do
E an
d N
atio
nal
guid
elin
e lim
its
for
Noi
se
at
sens
itive
re
cept
ors.
Cons
truc
tion
site
at
bus
depo
t are
a
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U
Soil
cont
amin
atio
n �
Cont
amin
atio
n of
so
ils a
t ca
mp
and
wor
k sit
es d
ue t
o ac
cide
ntal
sp
illag
e of
no
xiou
s ch
emic
al,
petr
oleu
m
deriv
ativ
es
and
bitu
min
ous
mat
eria
l m
ay
happ
en.
� Th
e ch
emic
als,
cem
ent,
petr
oleu
m
deriv
ativ
es
and
bitu
min
ous
mat
eria
ls to
be
hand
led,
ope
rate
an
d st
ored
cau
tious
ly.
� Th
e co
nstr
uctio
n m
ater
ials
be
stor
ed p
rope
rly,
garb
age
rem
oved
re
gula
rly a
nd s
ites
kept
cle
an a
nd
tidy.
� N
umbe
r of
any
non
- co
mpl
ianc
e re
port
s �
Mai
nten
ance
of
te
mpo
rary
pas
sage
s;
Com
plia
nce
with
N
atio
nal/
Inte
rnat
iona
l gu
idel
ine
limits
fo
r soi
l qua
lity
At
wor
k ca
mp
and
cons
truc
tion
site
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U
Cons
truc
tion
Cam
p an
d W
orks
hop
� Lo
ss o
f pl
anta
tion
and
vege
tatio
n.
� So
cial
di
stur
banc
e fo
r ne
arby
co
mm
unity
� Co
nstr
uctio
n ca
mp
and
wor
ksho
p to
be
loca
ted
away
fro
m s
ensit
ive
area
s.
� W
ater
and
goo
d sa
nita
tion
faci
litie
s to
be
prov
ided
for t
he c
amp.
�
Min
imise
ve
geta
tion
loss
w
hile
m
akin
g sit
e ar
rang
emen
ts
for
cons
truc
tion
cam
p an
d ot
her
faci
litie
s.
� W
orks
ite
clea
r of
ha
zard
ous
was
tes
such
as o
il/fu
el
� W
orks
ite c
lear
of a
ny
was
tes,
co
llect
ed
mat
eria
ls fr
om
drai
nage
s,
unut
ilize
d m
ater
ials
and
debr
is
� Tr
ansp
ort
rout
e an
d w
orks
ite
clea
red
of
any
dust
/mud
Com
plia
nce
with
W
aste
m
anag
emen
t pl
an
Wor
k sit
e an
d pa
rtic
ular
ly
at
Cons
truc
tion
cam
p
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 11
9 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n
Supe
rvis
ion
&
Mon
itorin
g
OHS
- W
orke
rs
� He
alth
risk
s du
e to
un
safe
w
orki
ng
cond
ition
s
� Pr
ovisi
on
of
safe
w
ater
, sa
nita
ry
toile
t fa
cilit
y an
d hy
gien
ic
acco
mm
odat
ion
for
wor
kers
at
ca
mp
sites
. In
ad
ditio
n,
ensu
re
prov
ision
of
PP
Es
and
Firs
t-Ai
d fa
cilit
y fo
r the
m.
� Eq
uipp
ed
first
-aid
st
atio
ns
� M
edic
al
insu
ranc
e co
vera
ge fo
r wor
kers
�
Num
ber o
f acc
iden
ts
� Re
cord
s of s
uppl
y of
un
cont
amin
ated
w
ater
�
Cond
ition
of
ea
ting
area
s of w
orke
rs
� U
se
of
pers
onal
pr
otec
tive
equi
pmen
t �
%
of
mov
ing
equi
pmen
t ou
tfitt
ed
with
aud
ible
bac
k-up
al
arm
s �
Perm
anen
t sig
n bo
ards
for
haz
ardo
us
area
s
� Si
gnag
e fo
r st
orag
e an
d di
spos
al a
reas
�
Cond
ition
of
sa
nita
tion
faci
litie
s fo
r wor
kers
. �
Reco
rd
of
H&S
orie
ntat
ion
trai
ning
s
Com
plia
nce
to
emer
genc
y re
spon
se p
lan
Wor
k sit
e an
d pa
rtic
ular
ly
at
Cons
truc
tion
cam
p
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/P
MU
Com
mun
ity H
ealth
an
d Sa
fety
�
Safe
ty r
isks
due
to
cons
truc
tion
wor
ks �
The
labo
ur
wor
ks
with
di
ffere
nt
tran
smitt
able
di
seas
es
shou
ld
be
rest
ricte
d w
ithin
the
con
stru
ctio
n sit
e an
d re
plac
ed.
� Dr
iver
s op
erat
ing
cons
truc
tion
vehi
cles
to b
e tr
aine
d in
road
saf
ety
awar
enes
s.
� Cl
ose
cons
ulta
tion
with
lo
cal
com
mun
ities
to
id
entif
y op
timal
so
lutio
ns fo
r di
vers
ions
to
mai
ntai
n co
mm
unity
in
tegr
ity
and
soci
al
� N
umbe
r of a
ccid
ents
; �
Num
ber
of
perm
anen
t sig
nage
, ba
rric
ades
an
d fla
gmen
on
wor
ksite
as
pe
r Tr
affic
M
anag
emen
t Pl
an
(App
endi
x 5)
; �
Num
ber
of
com
plai
nts
from
se
nsiti
ve re
cept
ors;
Com
plia
nce
to
emer
genc
y re
spon
se p
lan
Wor
k sit
e an
d pa
rtic
ular
ly
at
Cons
truc
tion
cam
p
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/P
MU
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 12
0 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n
Supe
rvis
ion
&
Mon
itorin
g
links
. �
Prov
ision
of
pr
oper
sa
fety
an
d di
vers
ion
signa
ge.
� N
umbe
r of
wal
kway
s,
signa
ge,
and
met
al
shee
ts
plac
ed
at
proj
ect l
ocat
ion
� Pe
rman
ent
sign
boar
ds f
or h
azar
dous
ar
eas
�
Agre
emen
t be
twee
n la
ndow
ner
and
cont
ract
ors
in c
ase
of
usin
g pr
ivat
e la
nds
as
wor
k ca
mps
, st
orag
e ar
eas,
etc
. IM
PLEM
ENTA
TIO
N P
HAS
E: O
PERA
TIO
N
Tree
pla
ntat
ion
� Su
rviv
al
of
flora
an
d fa
una
in
the
new
env
ironm
ent.
� U
nder
take
m
onito
ring
and
mai
nten
ance
ef
fort
s fo
r en
surin
g su
rviv
al o
f pla
nted
tree
s.
� Pl
anta
tion
of
tree
va
rietie
s th
at
supp
orts
bird
s an
d su
stai
nabl
e an
d ha
ving
hig
h w
ood
valu
e
No
of tr
ee su
rviv
ed;
Co
mpl
ianc
e w
ith
the
tree
m
anag
emen
t pl
an
Bus d
epot
are
a N
GO/R
HD
PIU
/PM
U/L
GED
BBA/
FD
Soil
�
Cont
amin
atio
n of
so
il ca
used
due
to
spill
age
of
petr
oleu
m
deriv
ativ
es
and
othe
r ch
emic
als
due
to
mac
hine
ry
and
vehi
cle
mai
nten
ance
ac
tiviti
es,
and
leak
age
from
stor
e-ho
use.
� Se
rvic
e m
achi
nery
an
d ve
hicl
es
stric
tly a
t de
signa
ted
mai
nten
ance
w
orks
hops
whe
re w
aste
oils
and
lu
bric
ants
be
co
llect
ed
and
recy
cled
. �
Stor
age
of c
oola
nt a
nd o
ils s
houl
d be
abo
ve g
roun
d w
ith b
unds
so th
at
imm
edia
te s
oil
cont
amin
atio
n du
e to
sp
illag
e or
le
akag
e ca
n be
pr
even
ted.
No
com
plai
nts
from
se
nsiti
ve re
cept
ors
Co
mpl
ianc
e w
ith
Nat
iona
l/ In
tern
atio
nal
guid
elin
e lim
its
for s
oil
Nea
r an
d ar
ound
the
bus
de
pot a
rea
Bus
Ope
rato
r/LG
ED
LGED
/DoE
Repa
ir an
d M
aint
enan
ce
of
vehi
cles
� Ac
cide
ntal
sp
ills
and
leak
age
of
fuel
s is
to
be
antic
ipat
ed
in
the
Fuel
ling
area
.
� Al
l sp
illag
e of
liq
uids
in
clud
ing
dies
el,
oils,
gre
ase
and
wat
ers
will
be
col
lect
ed i
n a
cent
ral
area
and
dr
ain
to a
com
mon
loc
atio
n. T
his
incl
udes
ra
in
wat
ers
whi
ch
will
� Re
pair
and
Mai
nten
ance
cle
ar o
f ha
zard
ous
was
tes
such
as o
il/fu
el
� Re
pair
and
Com
plia
nce
with
W
aste
m
anag
emen
t pl
an
Nea
r an
d in
th
e b
us d
epot
ar
ea
LGED
/Bus
O
pera
tor
LGED
/ DoE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 12
1 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n
Supe
rvis
ion
&
Mon
itorin
g
� In
the
sto
rage
are
a sp
illag
e of
En
gine
co
olin
g liq
uids
, U
sed
mot
or o
il an
d U
sed
tran
smiss
ion
oil
will
be
a
prob
lem
th
at
can
have
sig
nific
ant
adve
rse
impa
cts
if th
ese
find
thei
r w
ay
in
to
soil,
su
rfac
e or
gro
und
wat
er.
� Th
e w
ash
wat
er
will
con
tain
oil
and
grea
se i
n ad
ditio
n to
du
st
and
part
icul
ate
mat
ter
from
exh
aust
. �
Dies
el
com
bust
ion
gase
s ar
e ric
h in
ca
rbon
oxi
de (
CO)
and
coul
d be
fat
al
if in
hale
d.
The
effe
ct o
f CO
is a
lso
cum
ulat
ive.
�
Whe
re
repa
ir /m
aint
enan
ce w
ork
is pe
rfor
med
on
w
et
vehi
cles
th
e flo
or m
ay b
ecom
e sli
pper
y an
d m
ay
caus
e ac
cide
nts
affe
ctin
g th
e sa
fety
of
the
wor
kers
.
even
tual
ly w
ash
spill
ed l
iqui
ds o
n th
e su
rfac
e. T
hese
wat
ers
will
be
trea
ted
with
dec
anta
tion
and
oil
and
grea
se tr
aps
to s
epar
ate
oil a
nd
grea
ses
to
conf
orm
to
lo
cal
regu
latio
ns p
rior
to r
elea
sing
them
ou
tsid
e th
e de
pot.
�
Use
d en
gine
coo
ling
liqui
ds,
used
m
otor
oil
and
used
tra
nsm
issio
n oi
l w
ill
be
stor
ed
in
leak
pr
oof
cont
aine
rs a
nd d
ispos
ed o
f sa
fely
us
ing
appr
oved
met
hods
, to
avo
id
envi
ronm
enta
l con
tam
inat
ion.
�
All
wor
k st
atio
ns w
ill b
e eq
uipp
ed
with
de
vice
s fo
r co
mpl
ete
evac
uatio
n of
the
eng
ine
exha
ust
gase
s.
The
wor
ksho
p w
ill
be
vent
ilate
d at
an
y tim
e an
d w
ill
incl
ude
appr
opria
te e
quip
men
t to
ex
trac
t fu
mes
. Fu
rthe
r, th
e w
orks
hop
will
be
equi
pped
with
CO
de
tect
ors.
�
The
floor
co
verin
g w
ill
be
of
mat
eria
l tha
t it i
s ea
sy to
cle
an a
nd
is sli
p re
sista
nt
Mai
nten
ance
cle
ar o
f an
y w
aste
s, c
olle
cted
m
ater
ials
from
dr
aina
ges,
un
utili
zed
mat
eria
ls an
d de
bris
�
Tran
spor
t ro
ute
and
wor
ksite
cl
eare
d of
an
y du
st/m
ud
Wat
er q
ualit
y
� Co
ntam
inat
ion
of
wat
er b
odie
s fr
om �
Prop
er
drai
nage
sy
stem
w
ith
oil
sepa
rato
rs w
ill b
e pr
ovid
ed to
avo
id
No
visib
le d
egra
datio
n to
ne
arby
dr
aina
ges,
Co
mpl
ianc
e w
ith N
atio
nal
Nea
r an
d ar
ound
the
bus
LG
ED
LGED
/ DoE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 12
2 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n
Inst
itutio
nal R
espo
nsib
ility
Impl
emen
tatio
n
Supe
rvis
ion
&
Mon
itorin
g
runo
ff fr
om
the
bus
depo
t co
ntai
ning
oils
and
gr
ease
cont
amin
atio
n by
run
-off
and
oil
spill
s.
khal
s or
wat
er b
odie
s du
e to
co
nstr
uctio
n ac
tiviti
es
guid
elin
e lim
its
for S
urfa
ce a
nd
Grou
nd w
ater
.
depo
t are
a
Was
te g
ener
atio
n �
Solid
w
aste
an
d w
aste
wat
er f
orm
m
arke
t st
alls
coul
d co
ntam
inat
e th
e ar
ea
and
wat
er
bodi
es.
Was
h w
ater
fr
om
mea
t an
d fis
h st
alls
coul
d be
iss
ues
if pr
oper
co
llect
ion
and
disp
osal
is
not
prov
ided
�
If pr
oper
sa
nita
ry
faci
litie
s ar
e no
t pr
ovid
ed s
anita
tion
prob
lem
s co
uld
arise
.
� So
lid w
aste
will
be
man
aged
by
prov
ision
of
co
llect
ion
bins
an
d di
spos
al fa
cilit
ies.
Pro
visio
ns w
ill b
e m
ade
to
disp
ose
mea
t an
d fis
h w
aste
se
para
tely
at
ap
prov
ed
loca
tions
. �
Stal
l flo
ors
will
be
seal
ed t
o co
llect
an
d di
vert
th
e w
ash
wat
er
for
prop
er m
anag
emen
t.
� Pu
blic
toi
let
faci
litie
s w
ith u
tiliti
es
as
wat
er
supp
ly,
elec
tric
ity,
drai
nage
sy
stem
et
c.
will
be
co
nstr
ucte
d w
ithin
th
e m
arke
t ar
eas
� Ai
r (P
M10
) an
d no
ise
leve
l mea
sure
men
ts ;
�
Dust
pol
lutio
n;
� N
umbe
r of
no
n-co
mpl
ianc
es
obse
rved
/ rep
orte
d
� Co
mpl
ianc
e w
ith
Was
te
man
agem
ent
plan
Kitc
hen
mar
kets
LG
ED
DoE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 12
3 Ju
l - D
ec 2
017
Tabl
e 4:
Env
ironm
enta
l Man
agem
ent P
lan:
Env
ironm
enta
l Mon
itorin
g Ta
ble
for B
us D
epot
, Kitc
hen
Mar
kets
and
LGE
D Ac
cess
Roa
ds
Envi
ronm
enta
l Co
mpo
nent
Pa
ram
eter
s St
anda
rds /
Gui
delin
es
Loca
tions
Mon
itorin
g Pe
riod/
Fr
eque
ncy/
Sa
mpl
ing,
N
o/ye
ar
Resp
onsi
bilit
y
Impl
emen
tatio
n Su
perv
isio
n
PRE-
CON
STRU
CTIO
N S
TAG
E
Tree
cut
ting
� M
onito
ring
activ
ities
In
spec
tion
Cons
truc
tion
sites
at
bus
dep
ot,
kitc
hen
mar
kets
an
d LG
ED ro
ad
sites
Durin
g tr
ee fe
lling
an
d sit
e cl
earin
g op
erat
ions
LGED
/ EPC
M
CON
SULT
ANT
LGED
/ PIU
/ PM
U/E
PCM
CO
NSU
LTAN
T
CON
STRU
CTIO
N S
TAG
E
Air Q
ualit
y H 2
S, S
Ox,
NO
x, C
O, O
3, O
2,CO
2, TV
OC,
TSP
, PM
10 H
umid
ity, W
ind
dire
ctio
n, W
ind
spee
d, T
empe
ratu
re
Air q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Cons
truc
tion
sites
at
bus
dep
ot,
kitc
hen
mar
kets
an
d LG
ED ro
ad
sites
Twic
e in
a y
ear;
for 2
ye
ars
Cont
ract
or
LGED
/ PIU
/DoE
/ EPC
M
CON
SULT
ANT
Dust
Du
st c
ontr
ol
Air q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Cons
truc
tion
sites
at
bus
dep
ot,
kitc
hen
mar
kets
an
d LG
ED ro
ad
sites
Regu
larly
Co
ntra
ctor
LG
ED/ P
IU/ D
oE/ E
PCM
CO
NSU
LTAN
T
Noi
se a
nd V
ibra
tion
dB
(A) a
nd P
PV
Noi
se P
ollu
tion
Cont
rol
Rule
s (20
06)
Cons
truc
tion
sites
; at b
us
depo
t, ki
tche
n m
arke
ts a
nd
LGED
road
site
s
Twic
e in
a y
ear;
for 2
ye
ars
Cont
ract
or
LGED
/ PIU
/ DoE
/ EPC
M
CON
SULT
ANT
Wat
er Q
ualit
y
� Su
rfac
e w
ater
: Te
mpe
ratu
re,
Turb
idity
, pH
, TD
S, E
C, T
SS,
Fe,
NH 3
–N,
As,
Fe,
Mn,
DO
, CO
D,
BOD 5
, TC,
FC,
Tot
al N
, Tot
al P
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Surf
ace
wat
er
sour
ces n
ear b
us
depo
t, ki
tche
n m
arke
ts a
nd
LGED
road
site
s
Qua
rter
ly p
er y
ear f
or
2 ye
ars
Cont
ract
or
LGED
/ PIU
/ DoE
/ EPC
M
CON
SULT
ANT
� Gr
ound
wat
er:
Tem
pera
ture
, Tu
rbid
ity,
pH,
TDS,
EC,
TSS
, Fe
, N
H 3–N
, As
, Fe
, M
n,
DO,
COD,
BO
D 5, T
C, F
C, T
otal
N, T
otal
P
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Grou
ndw
ater
so
urce
s nea
r bus
de
pot,
kitc
hen
mar
kets
and
LG
ED ro
ad si
tes
Twic
e in
a y
ear;
for 2
ye
ars
Cont
ract
or
LGED
/PIU
/ Do
E/ E
PCM
CO
NSU
LTAN
T
Soil
Pollu
tion
�
pH, A
s, P
b, H
g, C
d, C
r, Zn
; �
Chec
k liq
uid
was
te i
s ca
rrie
d ou
t by
exp
erie
nced
per
sonn
el a
nd i
n
Gove
rnm
ent o
f Ba
ngla
desh
(GoB
) and
In
tern
atio
nal S
tand
ard
Cons
truc
tion
sites
; at b
us
depo
t, ki
tche
n
Twic
e pe
r yea
r for
2
year
s
Cont
ract
or
LGED
/ PIU
/ DoE
/ EPC
M
CON
SULT
ANT
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 12
4 Ju
l - D
ec 2
017
Envi
ronm
enta
l Co
mpo
nent
Pa
ram
eter
s St
anda
rds /
Gui
delin
es
Loca
tions
Mon
itorin
g Pe
riod/
Fr
eque
ncy/
Sa
mpl
ing,
N
o/ye
ar
Resp
onsi
bilit
y
Impl
emen
tatio
n Su
perv
isio
n
prop
er w
ay.
�
Care
ful a
nd p
rope
r ha
ndlin
g of
oil
and
othe
r haz
ardo
us li
quid
s.
mar
kets
and
LG
ED ro
ad si
tes
Soil
Eros
ion
� Vi
sual
che
ck f
or s
oil
eros
ion
and
silta
tion.
�
Visu
al
insp
ectio
n of
er
osio
n pr
even
tion
mea
sure
s an
d oc
curr
ence
of e
rosio
n.
Gove
rnm
ent o
f Ba
ngla
desh
(GoB
) and
In
tern
atio
nal S
tand
ard
Mat
eria
l sto
rage
sit
es a
nd a
ll th
e w
ater
bod
ies n
ear
bus d
epot
, ki
tche
n m
arke
ts
and
LGED
road
sit
es
Onc
e du
ring
rain
y se
ason
of t
he
Cons
truc
tion
perio
d Co
ntra
ctor
LG
ED/ P
IU/ D
oE/ E
PCM
CO
NSU
LTAN
T
Drai
nage
con
gest
ion
� Ch
eck
drai
nage
pla
n im
plem
ente
d co
rrec
tly
� Co
nduc
t reg
ular
insp
ectio
n M
onito
ring
Cons
truc
tion
site
at b
us d
epot
W
eekl
y du
ring
mon
soon
Co
ntra
ctor
LG
ED/ P
IU/P
MU
/DoE
/ EP
CM C
ON
SULT
ANT
Wild
life
�
Wild
life
habi
tat a
nd m
ovem
ent
Not
Spe
cifie
d
Area
s adj
acen
t to
bus d
epot
, ki
tche
n m
arke
ts
and
LGED
road
sit
es
Qua
rter
ly
Cont
ract
or
LGED
/ PIU
/ EPC
M
CON
SULT
ANT
Fish
erie
s
� Im
pact
on
fis
h pr
oduc
tivity
, br
eedi
ng a
nd sp
awni
ng
Area
s adj
acen
t to
bus d
epot
, ki
tche
n m
arke
ts
and
LGED
road
sit
es
Onc
e in
yea
r Co
ntra
ctor
LG
ED/ P
IU/ E
PCM
CO
NSU
LTAN
T
Was
te M
anag
emen
t �
Chec
k st
orag
e,
tran
spor
tatio
n,
disp
osal
, ha
ndlin
g of
ha
zard
ous
was
te
Mon
itorin
g
Cons
truc
tion
sites
; at b
us
depo
t, ki
tche
n m
arke
ts a
nd
LGED
road
site
s
Wee
kly
Cont
ract
or
LGED
/ PIU
/PM
U/D
oE/
EPCM
CO
NSU
LTAN
T
Heal
th a
nd
Safe
ty
� Ch
eck
qual
ity
of
food
an
d ac
com
mod
atio
n at
co
nstr
uctio
n ca
mp.
�
Chec
k sa
fe w
ater
sup
ply,
hyg
ieni
c to
ilet a
t cam
ps a
nd c
onst
ruct
ion
of
drai
n at
cam
p sit
es.
� Fi
rst-
Aid
kit
with
req
uire
d to
ols
and
med
icin
e.
Mon
itorin
g
Cons
truc
tion
sites
; at b
us
depo
t, ki
tche
n m
arke
ts a
nd
LGED
road
site
s
Regu
larly
Co
ntra
ctor
LG
ED/ P
IU/P
MU
/DoE
/ EP
CM C
ON
SULT
ANT
OPE
RATI
ON
STA
GE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 12
5 Ju
l - D
ec 2
017
Envi
ronm
enta
l Co
mpo
nent
Pa
ram
eter
s St
anda
rds /
Gui
delin
es
Loca
tions
Mon
itorin
g Pe
riod/
Fr
eque
ncy/
Sa
mpl
ing,
N
o/ye
ar
Resp
onsi
bilit
y
Impl
emen
tatio
n Su
perv
isio
n
Tree
Pl
anta
tion
Chec
k th
e pl
anta
tion
met
hod
and
num
ber o
f tre
e sp
ecie
s
Insp
ectio
n to
ens
ure
prop
er p
lant
atio
n w
ith
prop
er sp
ecie
s
Bus
depo
t, ki
tche
n m
arke
ts
and
LGED
ro
ad
sides
Durin
g Ju
ne/ J
uly
LGED
LG
ED/ P
IU/P
MU
Air Q
ualit
y H 2
S, S
Ox,
NO
x, C
O, C
O2,
TSP,
PM
10,
Hum
idity
, Win
d di
rect
ion,
Win
d sp
eed,
Tem
pera
ture
Air q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Bus d
epot
, ki
tche
n m
arke
ts
and
LGED
road
sit
es
Twic
e pe
r yea
r fo
r 3 y
ears
LG
ED
LGED
/ PIU
/ DoE
Noi
se a
nd V
ibra
tion
dB
(A) a
nd P
PV
Noi
se P
ollu
tion
Cont
rol
Rule
s (20
06)
Bus d
epot
, ki
tche
n m
arke
ts
and
LGED
road
sit
es
Twic
e pe
r yea
r fo
r 3 y
ears
LG
ED
LGED
/ PIU
/ DoE
Wat
er Q
ualit
y
� Su
rfac
e w
ater
: Te
mpe
ratu
re,
Turb
idity
, pH,
TDS
, EC,
TSS
, Fe,
NH
3 –N
, As
, Fe
, M
n, D
O,
COD,
BO
D 5,
TC, F
C, T
otal
N, T
otal
P
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Surf
ace
wat
er
near
bus
dep
ot,
kitc
hen
mar
kets
an
d LG
ED ro
ad
sites
Twic
e pe
r yea
r fo
r 3 y
ears
LG
ED
LGED
/ DoE
� Gr
ound
wat
er:
Tem
pera
ture
, Tu
rbid
ity, p
H, T
DS, E
C, T
SS, F
e, N
H3
–N,
As,
Fe,
Mn,
DO
, CO
D, B
OD 5
, TC
, FC,
Tot
al N
, Tot
al P
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Grou
ndw
ater
ne
ar b
us d
epot
, ki
tche
n m
arke
ts
and
LGED
road
sit
es
Twic
e pe
r yea
r fo
r 3 y
ears
LG
ED
LGED
/ DoE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 12
6 Ju
l - D
ec 2
017
Tabl
e 5:
Env
ironm
enta
l Man
agem
ent P
lan:
Env
ironm
enta
l Miti
gatio
n Ta
ble
for E
leva
ted
Sect
ion
incl
udin
g To
ngi B
ridge
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n In
stitu
tiona
l Res
pons
ibili
ty
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
DESI
GN
/PRE
-CO
NST
RUCT
ION
PH
ASE
Prov
ision
of E
arly
Tr
aini
ng
� Aw
aren
ess
and
Trai
ning
on
en
viro
nmen
tal
prot
ectio
n as
pect
s re
leva
nt
to
good
co
nstr
uctio
n pr
actic
es
may
av
oid
cons
truc
tion
perio
d im
pact
s af
fect
ing
river
hy
drol
ogy
and
wat
er q
ualit
y
� EP
CM
Cons
ulta
nt
and
BBA
to
prov
ide
trai
ning
as
pa
rt
of
the
over
all
awar
enes
s an
d tr
aini
ng
prog
ram
s to
be
de
liver
ed
befo
re
cons
truc
tion
begi
n.
� Pr
oof
of
com
plet
ion.
�
Post
ing
of p
roof
of
com
plet
ion
at
wor
ksite
s
Safe
guar
d Co
mpl
ianc
e O
rient
atio
n
Loca
tion
to
be
conf
irmed
EP
CM
CON
SULT
ANT/
BBA
EPCM
CO
NSU
LTAN
T/PI
U/P
MU
/BBA
Clim
ate
Chan
ge
� Ch
ange
s in
clim
ate
and
long
te
rm
impa
cts
on
the
envi
ronm
ent;
� Co
nsid
er
pote
ntia
l im
pact
s fr
om
extr
eme
clim
ate
chan
ge s
cena
rio i
n de
signs
fo
r th
e To
ngi
Brid
ge
and
elev
ated
sect
ion.
Cons
ider
atio
n of
cl
imat
e ch
ange
in
pr
ojec
t des
ign
Com
plia
nce
with
N
atio
nal
guid
elin
e
Thro
ugho
ut
the
elev
ated
se
ctio
n in
clud
ing
Tong
i Br
idge
EPCM
CO
NSU
LTAN
T PI
Us
7 Tre
e Cu
ttin
g
�
Diffe
rent
typ
es o
f pl
ants
nee
d to
be
rem
oved
as
a pa
rt
of si
te p
repa
ratio
n fo
r co
nstr
uctio
n ac
tiviti
es
whi
ch
will
re
sult
in
pote
ntia
l ec
olog
ical
an
d ec
onom
ic lo
ss.
� Pr
ohib
it cu
ttin
g of
tree
s fo
r fire
woo
d an
d fo
r us
e in
pro
ject
. Gas
cyl
inde
rs
to b
e us
ed f
or f
uel a
t th
e ca
mp
for
cook
ing
purp
oses
�
Inva
sive
spec
ies
will
no
t be
in
trod
uced
into
new
env
ironm
ent.
�
Whe
n co
nstr
uctio
n w
ork
is co
mpl
eted
, tr
ees
and
unde
rsto
rey
vege
tatio
n m
ust b
e pl
ante
d, in
ord
er
to h
elp
the
clea
red
area
s in
an
effo
rt
to a
ttra
ct w
ildlif
e su
ch a
s bird
s.
� Pl
ant a
t lea
st tw
o tr
ees f
or e
very
one
tr
ee c
ut.
� N
o of
tree
felle
d;
� Co
mpe
nsat
ory
plan
tatio
n sit
e id
entif
ied.
Com
plia
nce
with
tr
ee
man
agem
ent
plan
With
in
elev
ated
se
ctio
n in
clud
ing
Tong
i Brid
ge
Cont
ract
or;
RHD
EPCM
CO
NSU
LTAN
T/PI
U/P
MU
/BBA
/FD
7 Size
of t
he tr
ees r
efer
her
e ci
rcum
fere
nce
of th
e tr
ees w
hich
are
: Lar
ge=5
' and
Abo
ve; M
ediu
m=
2'7'
'-5';
Smal
l= 7
''-2'
7'';
Sapl
ings
= <6
''
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 12
7 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n In
stitu
tiona
l Res
pons
ibili
ty
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
Loss
of S
truc
ture
s an
d Pu
blic
U
tiliti
es
� So
me
hous
es
with
in
prop
osed
se
ctio
n an
d br
idge
sit
e w
ill
be
relo
cate
d.
� In
conv
enie
nce
caus
ed
by
disr
uptio
n to
pu
blic
ut
ilitie
s
(Pow
er/
Tele
phon
e lin
es).
� N
eed
to c
ompe
nsat
e fo
r th
e lo
ss o
f st
ruct
ures
. �
Prov
ision
in t
he c
onst
ruct
ion
budg
et
for
the
relo
catio
n of
th
e ex
istin
g ut
ility
in
fras
truc
ture
s w
here
ver
requ
ired.
� N
umbe
r of
pub
lic
grie
vanc
es
re-r
eset
tlem
ent
and
com
pens
atio
n;
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
rece
ptor
s �
Nos
of
el
ectr
ic
pole
s rel
ocat
ed;
� Te
mpo
rary
po
wer
su
pply
Com
plia
nce
with
RP
and
em
erge
ncy
resp
onse
pla
n
With
in
elev
ated
se
ctio
n in
clud
ing
Tong
i Brid
ge
EPCM
CO
NSU
LTAN
T/BB
A
EPCM
CO
NSU
LTAN
T/PI
U/P
MU
/BBA
The
Brid
ge si
te
The
impa
ct
at
brid
ge
site
may
re
sult
from
de
cisio
ns o
n w
here
to
pl
ace
the
wor
k ca
mps
an
d th
e co
ncre
te
and
stee
l fa
bric
atio
n ar
eas
as
wel
l as
the
batc
hing
pl
ant(
s)
EPCM
Co
nsul
tant
an
d BB
A in
co
nsul
tatio
n w
ith
loca
l co
mm
uniti
es
will
ag
ree
on
sites
. Co
nstr
uctio
n ca
mps
, pl
ant
and
equi
pmen
t an
d w
orks
hops
to
be l
ocat
ed a
way
fro
m
sens
itive
are
as a
nd n
ot w
ithin
500
m.
� N
umbe
r of
no
n-co
mpl
ianc
es
obse
rved
/ re
port
ed
� In
corp
orat
ion
of
IEE
reco
mm
enda
tion
in d
esig
n an
d bi
d do
cum
ents
� Co
mpl
ianc
e w
ith
BIW
TA
guid
elin
e lim
its
for
Nav
igat
ion.
At a
nd a
roun
d th
e br
idge
site
EP
CM
CON
SULT
ANT/
BBA
EPCM
CO
NSU
LTAN
T/PI
U/B
BA
CON
STRU
CTIO
N P
HAS
E
Road
and
N
avig
atio
n Ch
anne
l Di
srup
tion
� Dur
ing
tran
spor
tatio
n of
bo
x gi
rder
s to
the
sit
e th
e ro
ad m
ay
be
com
plet
ely
bloc
ked
� M
ovem
ent
of
barg
es
and
othe
r co
nstr
uctio
n ve
ssel
s an
d br
idge
co
nstr
uctio
n w
orks
w
ithin
th
e riv
er
will
int
erfe
re w
ith
loca
l na
viga
tion
and
inte
rrup
t th
e riv
er tr
affic
.
� Th
e tr
ansp
orta
tion
and
erec
tion
of
box
gird
ers
will
be
so
tim
ed
to
min
imise
th
e im
pact
on
ro
ad
tran
spor
tatio
n.
� Th
e ro
ad u
sers
and
nea
rby
resid
ents
w
ill b
e in
form
ed o
f th
e ac
tivity
and
co
nsen
t of
po
lice
and
loca
l au
thor
ities
will
be
obta
ined
bef
ore
com
men
cing
the
activ
ity. F
urth
er, a
ll pr
ecau
tions
will
be
take
n to
ens
ure
the
safe
ty o
f th
e w
orke
rs a
nd r
oad
user
s.
� In
br
idge
de
mol
ition
, th
e br
idge
st
ruct
ure
will
not
be
drop
ped
into
th
e riv
er, b
ut a
ltern
ativ
e m
eans
will
be
us
ed
to
avoi
d "d
ropp
ing
the
� N
umbe
r of
no
n-co
mpl
ianc
es
obse
rved
/ re
port
ed
� Co
mpl
ianc
e w
ith
BIW
TA
guid
elin
e lim
its
for
Nav
igat
ion.
Brid
ge si
te
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/P
MU
/BBA
/ BI
WTA
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 12
8 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n In
stitu
tiona
l Res
pons
ibili
ty
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
brid
ge"
into
riv
ers/
stre
ams.
Thi
s w
ill
be
done
by
"sa
win
g" a
ppro
pria
te
sect
ions
of
th
e br
idge
an
d us
ing
cran
es to
lift
thes
e se
ctio
ns a
way
, or
alte
rnat
ivel
y, b
y co
nstr
uctio
n of
a
plat
form
on
to
whi
ch
the
brid
ge
coul
d be
low
ered
�
Coffe
rdam
s,
silt
fenc
es,
sedi
men
t ba
rrie
rs,
or o
ther
dev
ices
will
be
used
as
appr
opria
te b
ased
on
the
desig
n to
pre
vent
mig
ratio
n of
silt
du
ring
exca
vatio
n an
d bo
ring
oper
atio
ns
with
in
stre
ams.
If
coffe
rdam
s ar
e us
ed,
thes
e w
ill b
e de
wat
ered
and
cle
aned
to
prev
ent
silta
tion
by
pum
ping
fr
om
coffe
rdam
s to
a s
ettli
ng b
asin
or
a co
ntai
nmen
t uni
t. Ri
verb
ed
Sedi
men
t
� Di
stur
banc
e of
riv
erbe
d se
dim
ents
due
to
dred
ging
ac
tiviti
es;
�
Cont
amin
atio
n of
bo
ttom
sed
imen
ts
by
acci
dent
al
spill
ing
of
bitu
min
ous
mat
eria
ls an
d ot
her
petr
o-ch
emic
als.
� Tr
ain
cons
truc
tion
wor
kers
on
safe
ha
ndlin
g of
pet
role
um p
rodu
cts
and
chem
ical
s to
pr
even
t sp
illag
e or
le
akag
e to
the
riv
er o
r ot
her
wat
er
bodi
es;
� Re
stric
t di
spos
al o
f an
y co
nstr
uctio
n w
aste
into
the
riv
er o
r ne
arby
wat
er
bodi
es;
� Pr
even
t co
nstr
uctio
n de
bris
from
en
terin
g dr
aina
ge
or
irrig
atio
n ca
nals;
�
Cons
truc
tion
wor
k cl
ose
to r
iver
to
be
min
imize
d es
peci
ally
du
ring
mon
soon
seas
on;
� Co
nduc
t re
gula
r riv
erbe
d se
dim
ent
qual
ity m
onito
ring
acco
rdin
g to
the
re
com
men
ded
sam
plin
g sc
hedu
le.
� Re
sults
of
se
dim
ent
qual
ity
anal
ysis
� Br
idge
loca
tions
;
� Co
mpl
ianc
e w
ith
Nat
iona
l/Int
ern
atio
nal
guid
elin
e lim
its
for
Rive
rbed
se
dim
ent.
At a
nd a
roun
d th
e br
idge
site
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
/BBA
/DoE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 12
9 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n In
stitu
tiona
l Res
pons
ibili
ty
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
Air Q
ualit
y ch
ange
s �
Dust
ge
nera
tion
due
to
cons
truc
tion
activ
ities
an
d tr
ansp
ort
of
cons
truc
tion
mat
eria
ls.
� Em
issio
ns
from
ve
hicl
es,
equi
pmen
t an
d m
achi
nery
.
� Ve
hicl
es
tran
spor
ting
cons
truc
tion
mat
eria
l to
be c
over
ed;
� Co
nstr
uctio
n eq
uipm
ent
to
be
mai
ntai
ned
to a
goo
d st
anda
rd a
nd
disc
oura
ging
idlin
g of
eng
ines
. �
Mac
hine
ry e
mitt
ing
visib
le s
mok
e to
be
ban
ned
from
con
stru
ctio
n sit
es;
� Co
ntra
ctor
to
pr
epar
e a
dust
su
ppre
ssio
n pr
ogra
m d
etai
ling
actio
n to
be
ta
ken
to
min
imiz
e du
st
gene
ratio
n (e
.g.
spra
ying
of
road
s w
ith w
ater
), an
d th
e eq
uipm
ent
to
be u
sed.
�
Equi
ppin
g as
phal
t ho
t m
ix
and
batc
hing
pla
nts
with
fab
ric f
ilter
s or
w
et
scru
bber
s to
re
duce
du
st
emiss
ions
; �
Loca
te a
spha
lt an
d cr
ushi
ng p
lant
s aw
ay
from
re
siden
tial
area
s an
d so
cial
in
fras
truc
ture
su
ch
as
hosp
itals,
m
osqu
es,
scho
ols
and
mad
rasa
s.
(Ref
er
to
Anne
x 2
for
loca
tions
of t
hese
). Cl
eara
nce
shou
ld
be a
t le
ast
500
m a
nd t
ake
into
ac
coun
t th
e pr
evai
ling
win
d di
rect
ion.
�
Dust
m
asks
to
be
pr
ovid
ed
to
wor
kers
whe
re d
ust h
azar
ds e
xist
; �
Prop
er d
ust
colle
ctio
n an
d co
ntro
l sy
stem
s to
be in
stal
led
at c
rush
ers;
�
Air
qual
ity m
onito
ring
to b
e ca
rrie
d ou
t as
pe
r th
e sc
hedu
le
in
the
envi
ronm
enta
l mon
itorin
g pl
an.
� Lo
catio
n of
st
ockp
iles;
�
Num
ber
of
com
plai
nts
from
se
nsiti
ve
rece
ptor
s;
� He
avy
equi
pmen
t an
d m
achi
nery
w
ith
air
pollu
tion
cont
rol d
evic
es;
� Am
bien
t air
qual
ity
foun
d be
yond
th
e na
tiona
l sta
ndar
ds
� Co
mpl
ianc
e w
ith
DoE
and
Nat
iona
l gu
idel
ine
limits
fo
r Ai
r at
sen
sitiv
e re
cept
ors.
�
Cert
ifica
tion
that
ve
hicl
es
are
com
plia
nt
with
air
qual
ity
stan
dard
s.
Cons
truc
tion
sites
al
ong
the
full
leng
th
of th
e pr
ojec
t
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us/
DoE
Noi
se a
nd
Vibr
atio
n
� Du
ring
erec
tion
of
box
gird
ers
high
no
ise
and
vibr
atio
n m
ay
resu
lt.
� Th
e ro
ad u
sers
and
nea
rby
resid
ents
w
ill b
e in
form
ed o
f th
e ac
tivity
and
co
nsen
t of
po
lice
and
loca
l au
thor
ities
will
be
obta
ined
bef
ore
com
men
cing
the
activ
ity. F
urth
er, a
ll
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
re
cept
ors;
�
Noi
se
� Eq
uiva
lent
da
y an
d ni
ght
time
noise
leve
ls �
Com
plia
nce
with
Cons
truc
tion
sites
al
ong
the
full
leng
th
of th
e pr
ojec
t
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
Us/
DoE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 13
0 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n In
stitu
tiona
l Res
pons
ibili
ty
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
� N
oise
fr
om
cons
truc
tion
vehi
cles
, eq
uipm
ent
and
mac
hine
ry.
� Vi
brat
ion
caus
ed
by
cons
truc
tion
activ
ities
.
prec
autio
ns w
ill b
e ta
ken
to e
nsur
e th
e sa
fety
of
the
wor
kers
and
roa
d us
ers.
�
Use
of m
oder
n pl
ant a
nd e
quip
men
t w
ith a
ppro
pria
te m
uffli
ng d
evic
es.
� Al
l po
wer
ed m
echa
nica
l eq
uipm
ent
and
mac
hine
ry
to
be
fitte
d w
ith
noise
aba
ting
gear
suc
h as
muf
flers
fo
r ef
fect
ive
noise
co
ntro
l, in
co
mpl
ianc
e w
ith D
oE re
gula
tions
. �
Cons
truc
tion
oper
atio
ns
to
be
rest
ricte
d to
ap
prop
riate
tim
e sc
hedu
les.
BoX
gird
er t
rans
port
and
er
ectio
n m
ay h
ave
to b
e ca
rrie
d ou
t du
ring
the
nigh
t.
� Lo
cate
ro
ck
crus
hing
, co
ncre
te
mix
ing
and
mat
eria
l shi
pmen
t ya
rds
away
from
resid
entia
l are
as, s
choo
ls,
colle
ges a
nd h
ospi
tals.
�
Inst
all t
empo
rary
noi
se b
arrie
rs n
ear
sens
itive
loc
atio
ns s
uch
as s
choo
ls,
relig
ious
pla
ces
and
hosp
itals
(Ref
er
to A
nnex
2 fo
r loc
atio
ns)
� Pr
ovid
ing
the
cons
truc
tion
wor
kers
w
ith s
uita
ble
ear
prot
ectio
n as
ear
ca
p, o
r ear
muf
fs e
tc.
� Su
rrou
nd
the
pier
s du
ring
cons
truc
tion
with
an
ai
r bu
bble
cu
rtai
n sy
stem
or c
offe
r dam
. �
Use
a s
mal
ler h
amm
er to
redu
ce th
e so
und
pres
sure
. Th
e so
und
prod
uced
in p
ile d
rivin
g ha
s a
dire
ct
rela
tions
hip
to t
he f
orce
use
d to
dr
ive
the
pile
. A s
mal
ler h
amm
er w
ill
have
less
forc
e on
the
pile
ther
efor
e,
prod
ucin
g le
ss so
und.
�
Noi
se a
nd v
ibra
tion
leve
l mon
itorin
g to
be
carr
ied
out a
s per
the
sche
dule
mea
sure
men
t dat
a �
Use
of
silen
cers
in
noise
-pro
duci
ng
equi
pmen
t an
d so
und
barr
iers
;
DoE
and
Nat
iona
l gu
idel
ine
limits
fo
r N
oise
at
se
nsiti
ve
rece
ptor
s.
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 13
1 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n In
stitu
tiona
l Res
pons
ibili
ty
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
in
the
envi
ronm
enta
l m
onito
ring
plan
. Su
rfac
e W
ater
Q
ualit
y an
d Hy
drol
ogy
� Co
nstr
uctio
n of
pi
ers,
esp
ecia
lly i
n th
e w
ater
fil
led
sect
ions
co
uld
resu
lt in
te
mpo
rary
ero
sion
and
depo
sitio
n,
pote
ntia
lly
impa
ctin
g sh
orel
ine
and
caus
ing
wat
er
pollu
tion.
� Th
e br
idge
is
to b
e de
signe
d an
d bu
ilt in
line
with
exi
stin
g br
idge
and
la
test
hyd
rolo
gic
stud
y re
sults
. Th
e w
ater
qua
lity
test
ing
will
foc
us i
n sa
mpl
ing
both
up
stre
am
and
dow
nstr
eam
of
th
e br
idge
co
nstr
uctio
n sit
e to
est
ablis
h ch
ange
ov
er t
ime.
Par
amet
ers
to b
e te
sted
as
show
n in
mai
n EM
P.
� Ar
eas
for
stoc
kpile
s, s
tora
ge
of
fuel
s an
d lu
bric
ants
an
d w
aste
mat
eria
ls;
� N
umbe
r of
sil
t tr
aps
inst
alle
d al
ong
tren
ches
le
adin
g to
w
ater
bo
dies
�
Reco
rds
of s
urfa
ce
wat
er
qual
ity
insp
ectio
n
� Co
mpl
ianc
e w
ith
Nat
iona
l gu
idel
ine
limits
fo
r Su
rfac
e w
ater
.
Take
sa
mpl
es
U/S
an
d D/
S of
the
Ton
gi
Brid
ge
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/B
BA/D
oE
Dred
ging
and
Dr
edge
d M
ater
ials
� Ri
ver b
ank
eros
ion
and
pollu
tion
due
to
spill
ing/
seep
age
of
oil i
n th
e riv
er.
� In
crea
se
in
sedi
men
tatio
n an
d di
sper
sion
of
pollu
tant
s in
dr
edge
d m
ater
ial
� Pe
rmits
/NO
C to
be
obta
ined
, fr
om
rele
vant
au
thor
ity
such
as
BI
WTA
pr
ior t
o ex
trac
tion
�
Whi
le d
redg
ing,
spe
cial
car
e to
be
give
n to
pr
even
t an
y sp
illag
e/se
epag
e of
oi
l fr
om
the
dred
ging
mac
hine
s;
� M
ovem
ent
of
barg
es
shou
ld
be
with
in th
e de
signa
ted
stud
y ar
eas;
�
Dred
ged
mat
eria
l fro
m th
e riv
er b
ank
to b
e te
sted
for
pre
senc
e of
hea
vy
met
als
and
othe
r po
lluta
nts
befo
re
its u
se.
Not
e –
som
e ar
eas
wer
e te
sted
dur
ing
the
prep
arat
ion
of IE
E (r
efer
to A
nnex
2).
� Re
sults
of
Dred
ged
Mat
eria
ls
qual
ity
anal
ysis
� Br
idge
loca
tions
;
� Co
mpl
ianc
e w
ith
Nat
iona
l/ In
tern
atio
nal
guid
elin
e lim
its
for
Dred
ged
Mat
eria
ls.
At a
nd a
roun
d th
e br
idge
site
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
/BBA
/ BW
TA/D
oE
Fish
erie
s
� Di
stur
banc
e to
aq
uatic
lif
e in
clud
ing
mig
ratio
n of
fis
h du
e to
br
idge
co
nstr
uctio
n.
� Co
nstr
uctio
n no
t to
be
unde
rtak
en
durin
g hi
gh fl
ood.
�
Cons
truc
tion
alon
g th
e riv
erba
nks
mus
t be
av
oide
d du
ring
the
fish
bree
ding
seas
on (J
uly
to S
epte
mbe
r).
� De
ep
wat
er
chan
nel
to
be
mai
ntai
ned
durin
g br
idge
co
nstr
uctio
n.
� N
umbe
r of
co
mpl
aint
s fr
om
sens
itive
rec
epto
rs
on d
istur
banc
e of
fis
hing
; �
Any
evid
ence
of
fis
h m
orta
lity.
� Co
mpl
ianc
e w
ith
Nat
iona
l/Int
ern
atio
nal
guid
elin
e
Thro
ugho
ut th
e ro
ad
corr
idor
pa
rtic
ular
ly
in
pond
/
ditc
h /
river
are
as (
Refe
r to
An
nex
2).
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/B
BA
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 13
2 Ju
l - D
ec 2
017
Envi
ronm
enta
l Pa
ram
eter
s Po
tent
ial I
mpa
cts
Miti
gatio
n M
easu
res
Mon
itorin
g In
dica
tor
Perf
orm
-anc
e Ta
rget
Lo
catio
n In
stitu
tiona
l Res
pons
ibili
ty
Impl
emen
tatio
n Su
perv
isio
n &
M
onito
ring
OPE
RATI
ON
PHA
SE
Rive
rbed
Se
dim
ent
Cont
amin
atio
n
Rive
rbed
sed
imen
ts
cont
amin
atio
n du
e to
ac
cide
ntal
sp
illag
e fr
om
vehi
cula
r m
ovem
ent.
� Pr
oper
mea
sure
s m
ust b
e en
sure
d to
pr
even
t an
y oi
l spi
llage
and
leak
age
from
th
e ve
hicl
e re
achi
ng
river
w
ater
. �
Effo
rts
will
be
mad
e to
cle
an t
he
spill
s of
oil,
tox
ic c
hem
ical
s et
c. a
s ea
rly a
s pos
sible
.
No
com
plai
nts
from
se
nsiti
ve re
cept
ors
� Co
mpl
ianc
e w
ith
Nat
iona
l/ In
tern
atio
nal
guid
elin
e lim
its
for
Rive
rbed
se
dim
ent
Brid
ge a
rea
BBA
BBA/
DoE
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 13
3 Ju
l - D
ec 2
017
Tabl
e 6:
Env
ironm
enta
l Man
agem
ent P
lan:
Env
ironm
enta
l Mon
itorin
g Ta
ble
for E
leva
ted
Sect
ion
incl
udin
g To
ngi B
ridge
Envi
ronm
enta
l Co
mpo
nent
Pa
ram
eter
s St
anda
rds /
Gui
delin
es
Loca
tions
Mon
itorin
g Pe
riod/
Fr
eque
ncy/
Sa
mpl
ing,
N
o/ye
ar
Resp
onsi
bilit
y
Impl
emen
tatio
n Su
perv
isio
n
PRE-
CON
STRU
CTIO
N S
TAG
E
Tree
cut
ting
� M
onito
ring
activ
ities
�
Chec
k w
heth
er
prop
er
com
pens
atio
n as
men
tione
d in
RP
is re
ceiv
ed b
y PA
Ps.
Insp
ectio
n Ar
eas
surr
ound
ing
elev
ated
sect
ion
Durin
g tr
ee
felli
ng
and
site
clea
ring
oper
atio
ns
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/P
MU
/BBA
/FD
CON
STRU
CTIO
N S
TAG
E
Air Q
ualit
y H 2
S,
SOx,
N
Ox,
CO
, O
3, O
2,CO
2, TV
OC,
TSP
, PM
10,
Hum
idity
, W
ind
dire
ctio
n, W
ind
spee
d, T
empe
ratu
re
Air q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Area
s su
rrou
ndin
g el
evat
ed se
ctio
n
Twic
e in
a y
ear;
for 2
yea
rs
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/B
BA/D
oE
Dust
Du
st c
ontr
ol
Air q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Area
s su
rrou
ndin
g el
evat
ed se
ctio
n Re
gula
rly
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/B
BA/D
oE
Noi
se a
nd V
ibra
tion
dB
(A) a
nd P
PV
Noi
se P
ollu
tion
Cont
rol
Rule
s (20
06)
Area
s su
rrou
ndin
g el
evat
ed se
ctio
n
Twic
e in
a y
ear;
for 2
yea
rs
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/B
BA/D
oE
Wat
er Q
ualit
y
� Su
rfac
e w
ater
: Te
mpe
ratu
re,
Turb
idity
, pH
, TD
S, E
C, T
SS,
Fe,
NH 3
–N,
As,
Fe,
Mn,
DO
, CO
D,
BOD 5
, TC,
FC,
Tot
al N
, Tot
al P
.
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Surf
ace
wat
er
sour
ces n
ear
elev
ated
sect
ion
Qua
rter
ly in
a y
ear;
fo
r 2 y
ears
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
/BBA
/DoE
� Gr
ound
wat
er:
Tem
pera
ture
, Tu
rbid
ity,
pH,
TDS,
EC,
TSS
, Fe
, N
H 3–N
, As
, Fe
, M
n,
DO,
COD,
BO
D 5, T
C, F
C, T
otal
N, T
otal
P.
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Grou
ndw
ater
ne
ar e
leva
ted
sect
ion
Twic
e in
a y
ear;
for 2
yea
rs
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
/BBA
/DoE
Rive
rbed
Mat
eria
l �
pH, F
e, A
s, P
b, H
g, C
d, C
r Go
vern
men
t of
Bang
lade
sh (G
oB) a
nd
Inte
rnat
iona
l Sta
ndar
d
Tong
i Brid
ge si
te
at T
urag
Riv
er
Twic
e a
year
/ on
co
mpl
aint
s fo
r 2 y
ears
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/B
BA
Soil
Eros
ion
� Vi
sual
che
ck f
or s
oil
eros
ion
and
silta
tion.
�
Visu
al
insp
ectio
n of
er
osio
n pr
even
tion
mea
sure
s an
d oc
curr
ence
of e
rosio
n.
Gove
rnm
ent o
f Ba
ngla
desh
(GoB
) and
In
tern
atio
nal S
tand
ard
Mat
eria
l sto
rage
sit
es a
nd a
ll th
e w
ater
bod
ies n
ear
the
elev
ated
se
ctio
n
Onc
e du
ring
rain
y se
ason
of t
he
Cons
truc
tion
perio
d Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
/BBA
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 13
4 Ju
l - D
ec 2
017
Envi
ronm
enta
l Co
mpo
nent
Pa
ram
eter
s St
anda
rds /
Gui
delin
es
Loca
tions
Mon
itorin
g Pe
riod/
Fr
eque
ncy/
Sa
mpl
ing,
N
o/ye
ar
Resp
onsi
bilit
y
Impl
emen
tatio
n Su
perv
isio
n
Drai
nage
con
gest
ion
� Ch
eck
drai
nage
pla
n im
plem
ente
d co
rrec
tly
� Co
nduc
t reg
ular
insp
ectio
n M
onito
ring
Area
s su
rrou
ndin
g el
evat
ed se
ctio
n
Wee
kly
durin
g m
onso
on
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/P
MU
/BBA
Wild
life
�
Wild
life
habi
tat a
nd m
ovem
ent
Not
Spe
cifie
d
Area
s su
rrou
ndin
g el
evat
ed se
ctio
n Q
uart
erly
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
/BBA
Fish
erie
s
� Im
pact
on
fis
h pr
oduc
tivity
, br
eedi
ng a
nd sp
awni
ng
Not
Spe
cifie
d
All m
ajor
wat
er
bodi
es n
ear
elev
ated
sect
or
and
Tura
g Ri
ver
Onc
e in
a y
ear;
fo
r 2 y
ears
Co
ntra
ctor
EP
CM
CON
SULT
ANT/
PIU
/BBA
Was
te M
anag
emen
t
� Ch
eck
stor
age,
tr
ansp
orta
tion,
di
spos
al,
hand
ling
of
haza
rdou
s w
aste
�
Was
te
and
efflu
ents
to
be
co
llect
ed a
nd d
ispos
ed s
afel
y fr
om
all c
amps
; �
Was
te a
nd g
arba
ge f
rom
brid
ge
cons
truc
tion
site
to b
e di
spos
ed
safe
ly.
Mon
itorin
g Ar
eas
surr
ound
ing
elev
ated
sect
ion
Wee
kly;
dur
ing
cons
truc
tion
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/B
BA
Heal
th a
nd
Safe
ty
� Ch
eck
qual
ity
of
food
an
d ac
com
mod
atio
n at
co
nstr
uctio
n ca
mp.
�
Chec
k sa
fe w
ater
sup
ply,
hyg
ieni
c to
ilet a
t cam
ps a
nd c
onst
ruct
ion
of
drai
n at
cam
p sit
es.
� Ch
eck
toile
ts
are
clos
e to
co
nstr
uctio
n sit
e an
d se
para
te
toile
t for
fem
ale
wor
kers
; �
Firs
t-Ai
d ki
t w
ith r
equi
red
tool
s an
d m
edic
ine;
�
The
heav
y co
nstr
uctio
n m
ater
ial t
o ha
ndle
d an
d st
ored
saf
ely
putt
ing
due
care
on
publ
ic sa
fety
; �
Heav
y co
nstr
uctio
n m
ater
ials
at
brid
ge
cons
truc
tion
site
to
be
stor
ed a
nd h
andl
ed sa
fely
; and
�
Chec
k of
pe
rson
al
prot
ectiv
e
Mon
itorin
g
Cons
truc
tion
sites
, la
bor
cam
ps a
nd a
reas
su
rrou
ndin
g el
evat
ed se
ctio
n
Regu
larly
; dur
ing
cons
truc
tion
Cont
ract
or
EPCM
CO
NSU
LTAN
T/PI
U/B
BA
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 13
5 Ju
l - D
ec 2
017
Envi
ronm
enta
l Co
mpo
nent
Pa
ram
eter
s St
anda
rds /
Gui
delin
es
Loca
tions
Mon
itorin
g Pe
riod/
Fr
eque
ncy/
Sa
mpl
ing,
N
o/ye
ar
Resp
onsi
bilit
y
Impl
emen
tatio
n Su
perv
isio
n
equi
pmen
t (PP
E) fo
r wor
ker a
t the
sit
es.
OPE
RATI
ON
STA
GE
Tree
Pl
anta
tion
Chec
k th
e pl
anta
tion
met
hod
and
num
ber o
f tre
e sp
ecie
s
Insp
ectio
n to
ens
ure
prop
er p
lant
atio
n w
ith
prop
er sp
ecie
s
Area
s su
rrou
ndin
g el
evat
ed se
ctio
n
Durin
g Ju
ne/ J
uly
in
first
yea
r N
GO
PIU
/PM
U/B
BA/F
D
Air Q
ualit
y H 2
S, S
Ox,
NO
x, C
O, O
3, O
2,CO
2, TV
OC,
TSP
, PM
10, H
umid
ity, W
ind
dire
ctio
n, W
ind
spee
d, T
empe
ratu
re
Air q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Area
s su
rrou
ndin
g el
evat
ed se
ctio
n
Twic
e in
yea
r;
for 3
yea
rs
BRT
Ope
rato
r PI
U/B
BA/D
oE
Noi
se a
nd V
ibra
tion
dB
(A) a
nd P
PV
Noi
se P
ollu
tion
Cont
rol
Rule
s (20
06)
Area
s su
rrou
ndin
g el
evat
ed se
ctio
n
Twic
e in
yea
r fo
r 3 y
ears
BR
T O
pera
tor
PIU
/BBA
/DoE
Wat
er Q
ualit
y
� Su
rfac
e w
ater
: Te
mpe
ratu
re,
Turb
idity
, pH,
TDS
, EC,
TSS
, Fe,
NH
3 –N
, As
, Fe
, M
n, D
O,
COD,
BO
D 5,
TC, F
C, T
otal
N, T
otal
P
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Surf
ace
wat
er
sour
ces n
ear
area
s sur
roun
ding
el
evat
ed se
ctio
n
Twic
e pe
r yea
r fo
r 3 y
ears
BR
T O
pera
tor
PIU
/BBA
/DoE
� Gr
ound
wat
er:
Tem
pera
ture
, Tu
rbid
ity, p
H, T
DS, E
C, T
SS, F
e, N
H3
–N,
As,
Fe,
Mn,
DO
, CO
D, B
OD 5
, TC
, FC,
Tot
al N
, Tot
al P
Wat
er q
ualit
y st
anda
rd b
y Do
E, B
angl
ades
h
Grou
nd w
ater
ne
ar a
reas
su
rrou
ndin
g el
evat
ed
Twic
e pe
r yea
r fo
r 3 y
ears
BR
T O
pera
tor
PIU
/BBA
/DoE
Traf
fic S
afet
y
� Re
cord
of a
ccid
ents
, diff
eren
t lev
el
of d
isabi
litie
s/ fa
talit
ies.
N
ot S
peci
fied
Area
s su
rrou
ndin
g el
evat
ed se
ctio
n Fu
ll op
erat
ion
perio
d BR
T O
pera
tor
PIU
/PM
U/B
BA
Wild
life
� W
ildlif
e ha
bita
t and
mov
emen
t N
ot S
peci
fied
Area
s alo
ngsid
e th
e ro
ad c
orrid
or
Qua
rter
ly
BRT
Ope
rato
r PI
U/B
BA
Fish
erie
s �
Impa
ct
on
fish
prod
uctiv
ity,
bree
ding
and
spaw
ning
All m
ajor
wat
er
bodi
es
At th
e be
ginn
ing
and
at E
nd o
f firs
t yea
r of
oper
atio
n
BRT
Ope
rato
r PI
U/B
BA
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 136 Jul - Dec 2017
APPENDIX 5: Environmental Management Implementation Works Schedules
Table 1: EMP Implementation Schedule for Contract 01: At Grade Section and Flyovers
Environmental Components EMP
Time Line Construction Phase
(30 Months) Technical Support Updating of EMP and performance indicators
Flora
Tree cutting along the ROW Compensatory afforestation (Minimum 1:2) Monitoring of Tree Cutting and Plantation Maintenance of tree
Drainage congestion Provision of adequate drainage Monitoring drainage congestion
Erosion, Sedimentation and Soil
River bank protection measures Soil conversation Monitoring of soil erosion
Land Compensation against land acquisition Landscaping on approach road and service areas
Slope/Embankment Covering of embankment with grasses and herbs Protection at approach Road Embankment protection of the approach Road
Water and Drinking Water Supply
Monitoring of Surface Water Quality Monitoring of Groundwater Quality and Levels Installation of oil and grease traps at construction sites
Construction of soak pits at construction and rehabilitation sites
Ensuring arsenic free drinking water for construction camps
Air Quality and Dust Management
Monitoring of Ambient Air Quality Water Spraying/Watering at construction and stockpile sites
Noise Quality and Barriers
Monitoring of Noise and Vibration Provision of Noise Barriers
Construction Safety Provision of PPEs Health Issues Health Check-up Camps Capacity Development and Training Environmental safety and awareness
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 137 Jul - Dec 2017
APPENDIX 6: Sampling Program Environmental monitoring requires a set of indicators that can be conveniently measured, assessed and evaluated periodically to establish trends of change in baseline environment quality. A list of parameters to be tested, sample number and sampling frequency are given in Table 1 to Table 6. These indicators may be independent or may be functionally related. The physico-chemical, ecological, human interest and socio-economic indicators should be well defined and a mutual relationship among the indicators should be well understood. The sampling program, in view of the possible impacts as assessed earlier, should consider the indicators for the impact assessment related to the following parameters:
Table 1: Proposed Monitoring Items: Surface water
Parameter Unit Country
Standards
Referred International
Standards
Remarks (Measurement site, Frequency, Method, etc.)
Temperature 0C 20-300C Construction Phase: Quarterly per year for 2 years Operation Phase: Twice per year for 3 years Monitoring Site: 1. Upstream of Tongi Bridge 2. Downstream of Tongi Bridge 3. Bus depot 4. Near Road side/ Construction yard Sampling period: dry season and rainy season
pH - 6.5–8.5
TDS mg/L Not Yet Set
EC μS/cm 2250 at 250C
Turbidity NTU Not Yet Set
DO mg/L ≥5
BOD mg/L ≤10
As COD mg/L Not Yet Set
TSS mg/L Not Yet Set
Fe mg/L Not Yet Set
Mn mg/L Not Yet Set
NH3-N mg/L 1.2
Total N mg/L Not Yet Set
Total P mg/L Not Yet Set
As mg/L Not Yet Set
Total Coliform CFU/100ml ≥1000
Fecal Coliform CFU/100ml Not Yet Set
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 138 Jul - Dec 2017
Table 2: Proposed Monitoring Items: Groundwater
Parameter Unit Country
Standards
Referred International
Standards
Remarks (Measurement site, Frequency, Method, etc.)
Temperature 0C 20-300C Construction Phase: Twice per year for 2 years
Operation Phase: Twice per year for 3 years
Monitoring Site:
1. Bridge site 2. Bus depot 3. Construction yard 4. Near Road side/ Kitchen market
site
Sampling period: dry season and rainy season
pH - 6.5–8.5
TDS mg/L 1000
EC μS/cm Not Yet Set
Turbidity NTU 10
DO mg/L 6
BOD mg/L 0.2
As COD mg/L 4
TSS mg/L 10
Fe mg/L 0.3-1.0
Mn mg/L 0.1
NH3-N mg/L Not Yet Set
Total N mg/L 1.0
Total P mg/L 0.0
As mg/L 0.05
Total Coliform CFU/100ml 0.0
Fecal Coliform CFU/100ml 0.0
Table 3: Proposed Monitoring Items: Ambient Air Quality
Parameter Unit Country Standards Referred
International Standards
Remarks (Measurement site, Frequency, Method, etc.)
CO μg/m3 40000 (1 hour) Construction Phase: Twice per year or on complaints for 2 years
Operation Phase: Twice per year for 3 years
Monitoring Site:
1. Bridge site 2. Bus depot 3. Busy intersection area near feeder
road 4. Construction yard 5. Kitchen market site
Measurement Period: 8 hours (dry
NOx μg/m3 100 (Annual)
SOx μg/m3 365 (24 hour)
O3 μg/m3 235 (1 hour)
TSP μg/m3 200 (8 hour)
PM10 μg/m3 150 (24 hour)
TVOC mg/m3 -
H2S mg/m3 -
O2 % -
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 139 Jul - Dec 2017
Parameter Unit Country Standards Referred
International Standards
Remarks (Measurement site, Frequency, Method, etc.)
CO2 mg/m3 - season, rainy season)
Humidity, Wind direction, Wind speed, Temperature
Table 4: Proposed Monitoring Items: Noise/Vibration
Unit Country Standards Referred
International Standards
Remarks (Measurement site, Frequency, Method, etc.) Zone Day Night
LAeq dB
Silent zone 50 40
Construction Phase: Twice per year or on complaints for 2 years Operation Phase: Twice per year for 3 years Monitoring Site: 1. Bridge site 2. Bus depot 3. Busy intersection area near feeder
road 4. Construction yard 5. Kitchen market site Measurement Period: 8 hours (dry season, rainy season) Day time: 6 a.m. to 9 p.m. Night time: 9 p.m. to 6 a.m.
Residential Area 55 45 Mixed area 60 50
Commercial Area 70 60 Industrial 75 70
PPV - BS 5228-2:2009
Table 5: Proposed Monitoring Items: Soil Quality
Parameter Unit Country
Standards
International Standards
(EU Directive 86/278/EEC for Land
Application)
Remarks (Measurement site, Frequency, Method, etc.)
Arsenic (As) mg/kg - - Construction Phase: Twice per year for 2 years Operation Phase: Once per year for 3 years Monitoring Site: 1. Bus depot 2. Construction yard 3. kitchen market site 4. LGED Road sites 5. All construction sites
Sampling period: dry season and rainy season
Lead (Pb) mg/kg - 1200
Cadmium (Cd) mg/kg - 40
Chromium (Cr) mg/kg - -
Zinc (Zn) mg/kg - 4000
Mercury (Hg) mg/kg - 25
pH - - -
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 140 Jul - Dec 2017
Table 6: Proposed Monitoring Items: Riverbed Sediment
Parameter Unit Country
Standards
International Standards
(Probable Effect Concentration: USEPA,
2000)
Remarks (Measurement site, Frequency, Method, etc.)
Arsenic (As) mg/kg - 33 Construction Phase: Twice per year for 2 years Monitoring Site: 1. Upstream of Tongi Bridge 2. Downstream of Tongi Bridge Sampling period: dry season and rainy season
Lead (Pb) mg/kg - 128
Cadmium (Cd) mg/kg - 4.98
Chromium (Cr) mg/kg - 111
Iron (Fe) mg/kg - -
Mercury (Hg) mg/kg - 1.06
pH - - -
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 14
1 Ju
l - D
ec 2
017
APPE
NDI
X 7:
Com
plia
nce
Mon
itorin
g Ch
eckl
ist –
At G
rade
Sec
tion
Incl
udin
g Fl
yove
rs (C
01)
No.
As
pect
s of E
nviro
nmen
tal i
ssue
s Co
mpl
ianc
e St
atus
Re
mar
ks
FC
PC
NC
Con
ditio
ns a
t pro
ject
site
s
A.
Gen
eral
1.
Site
Offi
ce a
nd c
amp
sites
loca
tions
app
ropr
iate
� �
Th
e sit
e of
fice
is w
ithin
the
pro
ject
are
a an
d th
e sit
e ca
mp
is w
ithin
the
site
are
a.
Ther
e is
no d
istur
banc
e oc
curr
ing
due
to th
e es
tabl
ishm
ent o
f the
site
offi
ce a
nd si
te
cam
p to
the
loca
lity.
2.
Envi
ronm
ent,
Heal
th a
nd S
afet
y O
ffice
r des
igna
ted
�
Envi
ronm
enta
l of
ficer
is
yet
not
appo
inte
d bu
t a
Depu
ty
Envi
ronm
enta
l M
anag
emen
t Offi
cer (
EMO
) is w
orki
ng w
ithou
t app
rova
l his
CV fr
om th
e Co
nsul
tant
. Th
ere
is no
med
ical
offi
cer
appo
inte
d fo
r en
surin
g he
alth
and
saf
ety
but
ther
e ar
e Sa
fety
Sup
ervi
sors
in th
e sit
e fo
r mon
itorin
g.
3.
Empl
oym
ent R
ecor
d ke
epin
g ar
rang
emen
t
�
Th
e em
ploy
men
t rec
ords
are
kep
t in
a re
gist
er b
ook
man
ually
eve
ry d
ay in
the
field
an
d th
en c
ompi
led
in c
ompu
ter.
4.
Paym
ent R
ecor
d ke
epin
g ar
rang
emen
t
�
Th
e pa
ymen
t rec
ords
are
kep
t in
a re
gist
er b
ook
man
ually
eve
ry d
ay in
the
field
and
th
en c
ompi
led
in c
ompu
ter.
5.
Lega
l wor
king
hou
rs a
ppro
val
�
The
wor
kers
wor
k 10
hou
rs a
day
at s
ite in
clud
ing
1-ho
ur lu
nch
brea
k.
6.
Prov
ision
for m
onth
ly m
eetin
g fo
r ins
pect
ion
of si
te a
ctiv
ities
�
M
eetin
gs a
re c
alle
d ab
out w
orki
ng p
rogr
ess a
nd fu
ture
pla
nnin
g ev
ery
mon
th.
B.
Heal
th a
nd S
anita
tion
B1
Publ
ic H
ealth
& S
afet
y
1.
Hygi
enic
labo
ur s
heds
kitc
hens
and
san
itatio
n fa
cilit
ies
at c
amp
and
wor
k sit
es
�
The
toile
ts a
nd b
athr
oom
wer
e un
hygi
enic
and
nee
ds im
prov
emen
t. A
disc
ussio
n w
as c
ondu
cted
to im
prov
e th
e fa
cilit
ies.
2.
Sani
tary
toile
ts c
onst
ruct
ion
with
sept
ic ta
nks
�
The
toile
ts fo
r the
labo
urer
s in
the
cam
psite
are
pro
vide
d w
ith se
ptic
tank
but
nee
ds
impr
ovem
ent.
How
ever
, the
re is
no
prop
er sa
nita
ry fa
cilit
y at
the
wor
k sit
e.
3.
Safe
wat
er su
pply
arr
ange
men
ts
�
Drin
king
wat
er is
supp
lied
from
dee
p tu
be w
ell b
ut n
eeds
impr
ovem
ent.
4.
Emer
genc
y m
edic
al f
acili
ties
and
Firs
t Ai
d Bo
x at
Fie
ld O
ffice
an
d w
ork
sites
�
A
wel
l-equ
ippe
d fir
st a
id b
ox is
kep
t at
the
site
but
yet
not
the
re is
an
appo
inte
d m
edic
al o
ffice
r in
the
site
for e
mer
genc
y
5.
Was
te d
ispos
al a
rran
gem
ent a
t cam
p an
d w
ork
sites
�
N
o de
finite
pla
ce is
des
igne
d to
disp
ose
the
was
tes.
But
all
type
s of
was
tes
are
not
mix
ed. D
iffer
ent t
ypes
of w
aste
s are
gat
here
d an
d di
spos
ed se
para
tely
6.
Adeq
uate
tra
ffic
signs
and
war
ning
not
ices
pro
vide
d on
site
an
d da
nger
ous a
reas
�
Th
ey c
ontr
acto
r is
wor
king
with
the
ir fu
ll ca
paci
ty.
How
ever
, it
need
s to
be
impr
oved
.
B2
Occ
upat
iona
l Hea
lth &
Saf
ety
1.
Firs
t-Ai
d Bo
x av
aila
bilit
y at
wor
k sit
es
�
A w
ell-e
quip
ped
first
aid
box
is a
vaila
ble
at th
e sit
e
2.
Fire
ext
ingu
isher
s/fig
htin
g fa
cilit
ies
prop
erly
mai
ntai
ned
and
not e
xpire
d
�
N
o fir
e ex
tingu
isher
is k
ept a
t the
site
offi
ce.
3.
Prov
ision
of
pe
rson
al
prot
ectio
n eq
uipm
ent’s
(P
PEs)
an
d
�
Th
ough
the
PPEs
are
ava
ilabl
e at
site
but
the
wor
kers
are
not
usin
g th
ese
at a
ll th
e
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 14
2 Ju
l - D
ec 2
017
No.
As
pect
s of E
nviro
nmen
tal i
ssue
s Co
mpl
ianc
e St
atus
Re
mar
ks
FC
PC
NC
wor
king
clo
thin
g to
wor
kers
tim
e. T
o co
nduc
t an
awar
enes
s risi
ng p
rogr
amm
es w
as a
dvise
d to
the
Cont
ract
or.
4.
Hand
ling
of c
emen
t and
oth
er h
azar
dous
mat
eria
ls by
wor
kers
��
W
orke
rs u
se g
love
s, b
oots
in
case
of
hand
ling
conc
rete
. Du
ring
the
mon
itorin
g pe
riod
only
, co
ncre
te w
as h
andl
ed.
No
haza
rdou
s m
ater
ials
are
used
. In
cas
e of
lif
ting
conc
rete
to th
e ro
of, p
ump
is us
ed m
ostly
.
5.
Wor
king
hou
r and
vac
atio
n da
ys m
aint
aine
d
�
Th
e la
bour
ers
wor
k fo
r 10
hou
rs a
day
inc
ludi
ng a
lun
ch b
reak
of
1 ho
ur a
nd
vaca
tion
days
are
mai
ntai
ned
6.
Prov
ision
of r
ecre
atio
nal f
acili
ties a
t cam
p sit
es
�
Ther
e ar
e fe
w p
rovi
sion
of re
crea
tiona
l fac
ilitie
s in
the
site
7.
Wor
kers
’ com
plai
nts t
aken
car
e of
by
the
supe
rviso
r
�
A
supe
rviso
r for
the
wor
kers
is a
ppoi
nted
to ta
ke c
are
of th
e pr
oble
ms a
nd re
ceiv
ing
com
plai
nts f
rom
the
wor
kers
8.
Pr
ovisi
on o
f lea
ve (n
atio
nal a
nd e
mer
genc
y)
�
Nat
iona
l lea
ves a
re p
rovi
ded
and
the
wor
kers
can
take
em
erge
ncy
leav
e to
o.
9.
Child
ren
belo
w 1
5 em
ploy
men
t
�
Th
ere
is no
chi
ld o
f bel
ow 1
5 ye
ars
of a
ge w
orki
ng in
the
site.
How
ever
, som
etim
es
few
chi
ldre
n ar
e w
orki
ng fo
r the
pro
ject
indi
rect
ly.
C.
Envi
ronm
enta
l Pol
lutio
n
C1
Dust
and
em
issi
on c
ontr
ol
1.
Prop
er s
tora
ge o
f m
ater
ials
and
regu
lar
wat
erin
g of
dus
t bl
owin
g co
nstr
uctio
n ar
ea.
�
Wat
erin
g is
done
reg
ular
ly t
o re
duce
dus
t an
d m
itiga
te a
ir po
llutio
n bu
t th
e fr
eque
ncy
shou
ld b
e in
crea
sed.
2.
Drop
ping
of
fill m
ater
ial
ever
ywhe
re d
urin
g tr
ansp
orta
tion
is
avoi
ded
�
Durin
g tr
ansp
orta
tion
the
fill
mat
eria
ls ar
e co
vere
d w
ith p
last
ic c
over
s to
avo
id
drop
ping
eve
ryw
here
3.
Cons
truc
tion
vehi
cles
an
d pl
ants
m
aint
aine
d pr
oper
ly
to
redu
ce e
miss
ions
�
Th
ere
is no
pla
nt in
the
site
area
yet
but
veh
icle
s are
bei
ng m
aint
aine
d pr
oper
ly.
C2
Noi
se P
ollu
tion
1.
Mov
emen
t of v
ehic
les
and
oper
atio
n of
pla
nts
fixed
at d
esire
d ho
urs
�
Heav
y ve
hicl
es m
ovem
ents
are
don
e m
ostly
from
mor
ning
to a
fter
noon
.
2.
Heav
y eq
uipm
ent
mai
ntai
ned
prop
erly
an
d op
erat
ed
at
sche
dule
d ho
urs
�
Tim
e sc
hedu
le is
mai
ntai
ned
for o
pera
ting
heav
y eq
uipm
ent
3.
Noi
se c
ontr
ol m
easu
res a
t sen
sitiv
e sit
es
�
The
heav
y no
ise w
orks
are
don
e w
ithin
the
aft
erno
on m
ostly
whi
ch a
ffect
s le
ss o
n th
e su
rrou
ndin
g ho
useh
olds
. The
labo
urer
s ar
e pr
ovid
ed w
ith a
ir pl
ugs
and
cott
on
balls
dur
ing
the
oper
atio
n of
hea
vy m
achi
nerie
s.
C3
Wat
er P
ollu
tion
1.
Was
tes,
cem
ent,
efflu
ents
and
junk
s not
disp
osed
in w
ater
�
N
o w
aste
s ar
e di
spos
ed in
wat
er. P
rope
r m
easu
res
are
take
n fo
r pr
even
ting
rain
w
ash.
How
ever
, due
to h
eavy
rain
fall,
som
e ra
in w
ashe
s al
read
y oc
curr
ed. I
n fu
ture
m
ore,
pre
caut
ion
will
be
take
n to
pre
vent
this.
2.
Sani
tary
, ki
tche
n an
d ot
her
orga
nic
was
tes
not
disp
osed
in
wat
er b
odie
s �
Th
e ki
tche
n w
aste
s ar
e m
ostly
org
anic
. Th
e sa
nita
ry w
aste
s ar
e m
anag
ed b
y th
e se
ptic
tank
. How
ever
, no
was
tes a
re d
ispos
ed in
wat
er b
odie
s.
C4
Flor
a an
d Fa
una
1.
Tr
ees a
nd b
ushe
s out
side
the
cons
truc
tion
area
pre
serv
ed fr
om
�
Out
side
the
cons
truc
tion
area
, the
tre
es a
nd b
ushe
s ar
e no
t fu
lly p
rese
rved
fro
m
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 14
3 Ju
l - D
ec 2
017
No.
As
pect
s of E
nviro
nmen
tal i
ssue
s Co
mpl
ianc
e St
atus
Re
mar
ks
FC
PC
NC
dam
ages
da
mag
es. D
ust
and
emiss
ions
som
etim
es h
arm
the
m. B
ut in
futu
re t
he p
reve
ntio
n m
easu
res w
ill b
e st
rong
er.
2.
No
old
tree
s cu
t do
wn
or i
mpa
cted
by
the
cons
truc
tion
or
oper
atio
n ��
N
o ol
d tr
ees
are
cut d
own
by th
e co
nstr
uctio
n op
erat
ion
and
all a
ctio
ns w
ere
take
n ac
cord
ingl
y th
e gu
idel
ines
of E
MP.
3.
Cutt
ing
dow
n ha
s no
t tak
en p
lace
with
out t
he p
rior a
ppro
val o
f th
e re
leva
nt lo
cal a
utho
ritie
s �
Th
e tr
ees w
ill b
e cu
t dow
n af
ter t
akin
g ap
prov
al fr
om th
e su
perv
ision
eng
inee
rs.
4.
Dist
urba
nce
to te
rres
tria
l fau
na m
inim
ized
�
Ther
e ar
e no
t muc
h hi
gh s
ound
freq
uenc
y w
orks
goi
ng o
n in
the
site.
But
if n
eede
d,
wor
ks a
re d
one
with
in d
ay t
ime
whe
n al
read
y th
e no
ise le
vel i
s pe
ak t
o m
inim
ize
the
dist
urba
nce.
C5
Was
te M
anag
emen
t
1.
Was
te d
ispos
al a
rran
gem
ent a
t cam
p an
d w
ork
sites
�
N
o de
finite
pla
ce is
des
igne
d to
disp
ose
the
was
tes.
But
all
type
s of
was
tes
are
not
mix
ed. D
iffer
ent
type
s of
was
tes
are
gath
ered
and
disp
osed
sep
arat
ely.
No
was
tes
are
disp
osed
in w
ater
.
2.
Sepa
rate
d la
belle
d co
ntai
ners
/are
as p
rovi
ded
for
faci
litat
ing
recy
clin
g an
d w
aste
segr
egat
ion
�
No
labe
lled
cont
aine
rs a
re u
sed.
How
ever
, di
ffere
nt t
ype
was
tes
are
disp
osed
se
para
tely
.
3.
Cons
truc
tion
was
tes/
recy
clab
le
was
tes
and
gene
ral
refu
se
rem
oved
off
site
regu
larly
�
Th
e w
aste
s are
kep
t in
a sp
ecifi
c pl
ace
and
they
are
rem
oved
off
site
regu
larly
4.
Chem
ical
was
tes,
if a
ny, c
olle
cted
and
disp
osed
of p
rope
rly
�
Durin
g th
e m
onito
ring
perio
d, n
o so
urce
s of
che
mic
al w
aste
s ar
e se
en. I
n ca
se o
f co
ncre
te w
aste
s, a
ll ar
e di
spos
ed p
rope
rly
D.
Envi
ronm
enta
l doc
umen
ts a
t Fie
ld O
ffice
and
Pro
ject
site
s
1.
Fiel
d O
ffice
pos
sess
es c
opie
s of
EM
P, c
ontr
act
docu
men
t an
d Te
chni
cal S
peci
ficat
ions
�
Al
l the
doc
umen
ts a
re k
ept i
n th
e fie
ld o
ffice
.
2.
All a
ccid
ents
at w
ork
sites
reco
rded
and
repo
rted
�
N
o se
rious
acc
iden
ts h
ave
occu
rred
in t
he s
ite a
rea.
Sm
all a
ccid
ents
whi
ch c
an b
e cu
red
by f
irst
aid
trea
tmen
t ar
e no
t re
cord
ed u
sual
ly. H
owev
er, i
n fu
ture
rec
ords
w
ill b
e ke
pt in
cas
e of
all
acci
dent
s.
3.
Heav
y eq
uipm
ent m
aint
enan
ce re
cord
s �
N
ot m
uch
heav
y eq
uipm
ent
oper
atin
g in
the
site.
How
ever
, onc
e he
avy
equi
pmen
t is
oper
ated
, the
mai
nten
ance
reco
rds a
re k
ept.
Not
e: F
C =
fully
com
plie
d, P
C =
part
ially
com
plie
d an
d N
C =
not c
ompl
ied
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 14
4 Ju
l - D
ec 2
017
APPE
NDI
X 8:
Com
plia
nce
Mon
itorin
g Ch
eckl
ist –
Gaz
ipur
Bus
Dep
ot C
ontr
act (
C04)
No.
As
pect
s of E
nviro
nmen
tal i
ssue
s Co
mpl
ianc
e St
atus
Re
mar
ks
FC
PC
NC
Con
ditio
ns a
t pro
ject
site
s
A.
Gen
eral
1.
Site
Offi
ce a
nd c
amp
sites
loca
tions
app
ropr
iate
� �
Th
e sit
e of
fice
is w
ithin
the
pro
ject
are
a an
d th
e sit
e ca
mp
is w
ithin
the
site
are
a.
Ther
e is
no d
istur
banc
e oc
curr
ing
due
to th
e es
tabl
ishm
ent o
f the
site
offi
ce a
nd si
te
cam
p to
the
loca
lity.
2.
Envi
ronm
ent,
Heal
th a
nd S
afet
y O
ffice
r des
igna
ted
�
Envi
ronm
enta
l offi
cer
is ap
poin
ted
and
a di
plom
a m
edic
al o
ffice
r is
also
app
oint
ed
for e
nsur
ing
heal
th a
nd sa
fety
3.
Empl
oym
ent R
ecor
d ke
epin
g ar
rang
emen
t �
Th
e em
ploy
men
t rec
ords
are
kep
t in
a re
gist
er b
ook
man
ually
eve
ry d
ay in
the
field
an
d th
en c
ompi
led
in c
ompu
ter.
4.
Paym
ent R
ecor
d ke
epin
g ar
rang
emen
t �
Th
e pa
ymen
t rec
ords
are
kep
t in
a re
gist
er b
ook
man
ually
eve
ry d
ay in
the
field
and
th
en c
ompi
led
in c
ompu
ter.
5.
Lega
l wor
king
hou
rs a
ppro
val
�
The
wor
kers
wor
k 10
hou
rs a
day
at s
ite in
clud
ing
1 ho
ur lu
nch
brea
k.
6.
Prov
ision
for m
onth
ly m
eetin
g fo
r ins
pect
ion
of si
te a
ctiv
ities
�
M
eetin
gs a
re c
alle
d ab
out w
orki
ng p
rogr
ess a
nd fu
ture
pla
nnin
g ev
ery
mon
th.
B.
Heal
th a
nd S
anita
tion
B1
Publ
ic H
ealth
& S
afet
y
1.
Hygi
enic
labo
ur s
heds
kitc
hens
and
san
itatio
n fa
cilit
ies
at c
amp
and
wor
k sit
es
�
The
toile
ts a
nd b
athr
oom
wer
e un
hygi
enic
and
nee
ds im
prov
emen
t. A
disc
ussio
n w
as c
ondu
cted
to im
prov
e th
e fa
cilit
ies.
2.
Sa
nita
ry to
ilets
con
stru
ctio
n w
ith se
ptic
tank
s
�
Th
e to
ilets
for t
he la
bour
ers a
re p
rovi
ded
with
sept
ic ta
nk b
ut n
eeds
impr
ovem
ent.
3.
Safe
wat
er su
pply
arr
ange
men
ts
�
Drin
king
wat
er is
supp
lied
from
dee
p tu
be w
ell b
ut n
eeds
impr
ovem
ent.
4.
Emer
genc
y m
edic
al f
acili
ties
and
Firs
t Ai
d Bo
x at
Fie
ld O
ffice
an
d w
ork
sites
�
A
wel
l-equ
ippe
d fir
st a
id b
ox is
kep
t at
the
site
and
a d
iplo
ma
med
ical
offi
cer
is ap
poin
ted
in th
e sit
e fo
r em
erge
ncy
5.
Was
te d
ispos
al a
rran
gem
ent a
t cam
p an
d w
ork
sites
�
N
o de
finite
pla
ce is
des
igne
d to
disp
ose
the
was
tes.
But
all
type
s of
was
tes
are
not
mix
ed. D
iffer
ent t
ypes
of w
aste
s are
gat
here
d an
d di
spos
ed se
para
tely
6.
Adeq
uate
tra
ffic
signs
and
war
ning
not
ices
pro
vide
d on
site
an
d da
nger
ous a
reas
�
Th
ey c
ontr
acto
r is
wor
king
with
the
ir fu
ll ca
paci
ty.
How
ever
, it
need
s to
be
impr
oved
.
B2
Occ
upat
iona
l Hea
lth &
Saf
ety
1.
Fi
rst-
Aid
Box
avai
labi
lity
at w
ork
sites
�
A
wel
l-equ
ippe
d fir
st a
id b
ox is
ava
ilabl
e at
the
site
2.
Fire
ext
ingu
isher
s/fig
htin
g fa
cilit
ies
prop
erly
mai
ntai
ned
and
not e
xpire
d �
A
fire
extin
guish
er is
kep
t at t
he si
te o
ffice
.
3.
Prov
ision
of
pe
rson
al
prot
ectio
n eq
uipm
ent’s
(P
PEs)
an
d w
orki
ng c
loth
ing
to w
orke
rs
�
Thou
gh th
e PP
Es a
re a
vaila
ble
at s
ite b
ut th
e w
orke
rs a
re n
ot u
sing
thes
e at
all
the
time.
To
cond
uct a
n aw
aren
ess r
ising
pro
gram
mes
was
adv
ised
to th
e Co
ntra
ctor
.
4.
Hand
ling
of c
emen
t and
oth
er h
azar
dous
mat
eria
ls by
wor
kers
�
W
orke
rs u
se g
love
s, b
oots
in
case
of
hand
ling
conc
rete
. Du
ring
the
mon
itorin
g pe
riod
only
con
cret
e w
as h
andl
ed.
No
haza
rdou
s m
ater
ials
are
used
. In
cas
e of
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 14
5 Ju
l - D
ec 2
017
No.
As
pect
s of E
nviro
nmen
tal i
ssue
s Co
mpl
ianc
e St
atus
Re
mar
ks
FC
PC
NC
liftin
g co
ncre
te to
the
roof
, pum
p is
used
mos
tly.
5.
Wor
king
hou
r and
vac
atio
n da
ys m
aint
aine
d
� �
Th
e la
bour
ers
wor
k fo
r 10
hou
rs a
day
inc
ludi
ng a
lun
ch b
reak
of
1 ho
ur a
nd
vaca
tion
days
are
mai
ntai
ned
6.
Prov
ision
of r
ecre
atio
nal f
acili
ties a
t cam
p sit
es
�
Ther
e ar
e fe
w p
rovi
sion
of re
crea
tiona
l fac
ilitie
s in
the
site
7.
Wor
kers
’ com
plai
nts t
aken
car
e of
by
the
supe
rviso
r
�
A
supe
rviso
r for
the
wor
kers
is a
ppoi
nted
to ta
ke c
are
of th
e pr
oble
ms a
nd re
ceiv
ing
com
plai
nts f
rom
the
wor
kers
8.
Pr
ovisi
on o
f lea
ve (n
atio
nal a
nd e
mer
genc
y)
�
Nat
iona
l lea
ves a
re p
rovi
ded
and
the
wor
kers
can
take
em
erge
ncy
leav
e to
o.
9.
Child
ren
belo
w 1
5 em
ploy
men
t
�
Th
ere
is no
chi
ld o
f bel
ow 1
5 ye
ars
of a
ge w
orki
ng in
the
site.
How
ever
, som
etim
es
few
chi
ldre
n ar
e w
orki
ng fo
r the
pro
ject
indi
rect
ly.
C.
Envi
ronm
enta
l Pol
lutio
n
C1
Dust
and
em
issi
on c
ontr
ol
1.
Prop
er s
tora
ge o
f m
ater
ials
and
regu
lar
wat
erin
g of
dus
t bl
owin
g co
nstr
uctio
n ar
ea.
�
Wat
erin
g is
done
reg
ular
ly t
o re
duce
dus
t an
d m
itiga
te a
ir po
llutio
n bu
t th
e fr
eque
ncy
shou
ld b
e in
crea
sed.
2.
Drop
ping
of
fill m
ater
ial
ever
ywhe
re d
urin
g tr
ansp
orta
tion
is
avoi
ded
�
Durin
g tr
ansp
orta
tion
the
fill
mat
eria
ls ar
e co
vere
d w
ith p
last
ic c
over
s to
avo
id
drop
ping
eve
ryw
here
3.
Cons
truc
tion
vehi
cles
an
d pl
ants
m
aint
aine
d pr
oper
ly
to
redu
ce e
miss
ions
�
Th
ere
is no
pla
nt in
the
site
area
yet
but
veh
icle
s are
bei
ng m
aint
aine
d pr
oper
ly.
C2
Noi
se P
ollu
tion
1.
Mov
emen
t of v
ehic
les
and
oper
atio
n of
pla
nts
fixed
at d
esire
d ho
urs
�
Heav
y ve
hicl
es m
ovem
ents
are
don
e m
ostly
from
mor
ning
to a
fter
noon
.
2.
Heav
y eq
uipm
ent
mai
ntai
ned
prop
erly
an
d op
erat
ed
at
sche
dule
d ho
urs
�
Tim
e sc
hedu
le is
mai
ntai
ned
for o
pera
ting
heav
y eq
uipm
ent
3.
Noi
se c
ontr
ol m
easu
res a
t sen
sitiv
e sit
es
�
The
heav
y no
ise w
orks
are
don
e w
ithin
the
aft
erno
on m
ostly
whi
ch a
ffect
s le
ss o
n th
e su
rrou
ndin
g ho
useh
olds
. The
labo
urer
s ar
e pr
ovid
ed w
ith a
ir pl
ugs
and
cott
on
balls
dur
ing
the
oper
atio
n of
hea
vy m
achi
nerie
s.
C3
Wat
er P
ollu
tion
1.
Was
tes,
cem
ent,
efflu
ents
and
junk
s not
disp
osed
in w
ater
�
N
o w
aste
s ar
e di
spos
ed in
wat
er. P
rope
r m
easu
res
are
take
n fo
r pr
even
ting
rain
w
ash.
How
ever
, due
to h
eavy
rain
fall,
som
e ra
in w
ashe
s al
read
y oc
curr
ed. I
n fu
ture
m
ore,
pre
caut
ion
will
be
take
n to
pre
vent
this.
2.
Sani
tary
, ki
tche
n an
d ot
her
orga
nic
was
tes
not
disp
osed
in
wat
er b
odie
s �
Th
e ki
tche
n w
aste
s ar
e m
ostly
org
anic
. Th
e sa
nita
ry w
aste
s ar
e m
anag
ed b
y th
e se
ptic
tank
. How
ever
, no
was
tes a
re d
ispos
ed in
wat
er b
odie
s.
C4
Flor
a an
d Fa
una
1.
Tree
s and
bus
hes o
utsid
e th
e co
nstr
uctio
n ar
ea p
rese
rved
from
da
mag
es
�
Out
side
the
cons
truc
tion
area
, the
tre
es a
nd b
ushe
s ar
e no
t fu
lly p
rese
rved
fro
m
dam
ages
. Dus
t an
d em
issio
ns s
omet
imes
har
m t
hem
. But
in fu
ture
the
pre
vent
ion
mea
sure
s will
be
stro
nger
. 2.
N
o ol
d tr
ees
cut
dow
n or
im
pact
ed b
y th
e co
nstr
uctio
n or
�
So
me
old
tree
s ar
e cu
t do
wn
by t
he c
onst
ruct
ion
oper
atio
n bu
t al
l act
ions
wer
e
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 14
6 Ju
l - D
ec 2
017
No.
As
pect
s of E
nviro
nmen
tal i
ssue
s Co
mpl
ianc
e St
atus
Re
mar
ks
FC
PC
NC
oper
atio
n ta
ken
acco
rdin
gly
the
guid
elin
es o
f EM
P.
3.
Cutt
ing
dow
n ha
s no
t tak
en p
lace
with
out t
he p
rior a
ppro
val o
f th
e re
leva
nt lo
cal a
utho
ritie
s ��
Th
e tr
ees w
ere
cut d
own
afte
r tak
ing
appr
oval
from
the
supe
rvisi
on e
ngin
eers
.
4.
Dist
urba
nce
to te
rres
tria
l fau
na m
inim
ized
�
Ther
e ar
e no
t muc
h hi
gh s
ound
freq
uenc
y w
orks
goi
ng o
n in
the
site.
But
if n
eede
d,
wor
ks a
re d
one
with
in d
ay t
ime
whe
n al
read
y th
e no
ise le
vel i
s pe
ak t
o m
inim
ize
the
dist
urba
nce.
C5
Was
te M
anag
emen
t
1.
Was
te d
ispos
al a
rran
gem
ent a
t cam
p an
d w
ork
sites
�
N
o de
finite
pla
ce is
des
igne
d to
disp
ose
the
was
tes.
But
all
type
s of
was
tes
are
not
mix
ed. D
iffer
ent
type
s of
was
tes
are
gath
ered
and
disp
osed
sep
arat
ely.
No
was
tes
are
disp
osed
in w
ater
.
2.
Sepa
rate
d la
belle
d co
ntai
ners
/are
as p
rovi
ded
for
faci
litat
ing
recy
clin
g an
d w
aste
segr
egat
ion
�
No
labe
lled
cont
aine
rs a
re u
sed.
How
ever
, di
ffere
nt t
ype
was
tes
are
disp
osed
se
para
tely
.
3.
Cons
truc
tion
was
tes/
recy
clab
le
was
tes
and
gene
ral
refu
se
rem
oved
off
site
regu
larly
�
Th
e w
aste
s are
kep
t in
a sp
ecifi
c pl
ace
and
they
are
rem
oved
off
site
regu
larly
4.
Chem
ical
was
tes,
if a
ny, c
olle
cted
and
disp
osed
of p
rope
rly
�
Durin
g th
e m
onito
ring
perio
d, n
o so
urce
s of
che
mic
al w
aste
s ar
e se
en. I
n ca
se o
f co
ncre
te w
aste
s, a
ll ar
e di
spos
ed p
rope
rly
D.
Envi
ronm
enta
l doc
umen
ts a
t Fie
ld O
ffice
and
Pro
ject
site
s
1.
Fiel
d O
ffice
pos
sess
es c
opie
s of
EM
P, c
ontr
act
docu
men
t an
d Te
chni
cal S
peci
ficat
ions
�
Al
l the
doc
umen
ts a
re k
ept i
n th
e fie
ld o
ffice
.
2.
All a
ccid
ents
at w
ork
sites
reco
rded
and
repo
rted
�
N
o se
rious
acc
iden
ts h
ave
occu
rred
in t
he s
ite a
rea.
Sm
all a
ccid
ents
whi
ch c
an b
e cu
red
by f
irst
aid
trea
tmen
t ar
e no
t re
cord
ed u
sual
ly. H
owev
er, i
n fu
ture
rec
ords
w
ill b
e ke
pt in
cas
e of
all
acci
dent
s.
3.
Heav
y eq
uipm
ent m
aint
enan
ce re
cord
s �
N
ot m
uch
heav
y eq
uipm
ent
oper
atin
g in
the
site.
How
ever
, onc
e he
avy
equi
pmen
t is
oper
ated
, the
mai
nten
ance
reco
rds a
re k
ept.
Not
e: F
C =
fully
com
plie
d, P
C =
part
ially
com
plie
d an
d N
C =
not c
ompl
ied
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 147 Jul - Dec 2017
APPENDIX 8: Photographs
Monitoring by RHD and Supervision Consultant
Labourers wearing PPE
Project Site Visit by ADB, RHD, LGED and Supervision
Consultant
Sanitary Latrines for labourers
Drinking water supply for the labourers Living arrangements for the labourers
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 148 Jul - Dec 2017
Filling of Gazipur Terminal Area
Preparation of Construction Yard for C01
Meeting with Contractor at Site Office General View of Works in progress
Security Personnel at the Project Area Filling of Construction Yard for C01
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 149 Jul - Dec 2017
APPENDIX 9: The Laboratory Test Report
At Grade Section including Flyovers – C01 Baseline Monitoring in August, 2017
Ambient Air Quality Monitoring Result
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 150 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 151 Jul - Dec 2017
Noise Level Monitoring Result
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 152 Jul - Dec 2017
Surface Water Quality Test Results
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 153 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 154 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 155 Jul - Dec 2017
Groundwater Quality Test Results
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 156 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 157 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 158 Jul - Dec 2017
Vibration Level Measurement Results
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 159 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 160 Jul - Dec 2017
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 16
1 Ju
l - D
ec 2
017
Soil
Qua
lity
Test
Res
ults
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 16
2 Ju
l - D
ec 2
017
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
AD
B Lo
an N
o’s 2
862/
2863
/286
4-BA
N
Sem
i-Ann
ual E
nviro
nmen
tal M
onito
ring
Repo
rt #
3 16
3 Ju
l - D
ec 2
017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 164 Jul - Dec 2017
First Environmental Sampling November, 2017 Ambient Air Quality Monitoring Result
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 165 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 166 Jul - Dec 2017
Surface Water and Groundwater Quality Test Results
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 167 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 168 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 169 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 170 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 171 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 172 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 173 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 174 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 175 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 176 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 177 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 178 Jul - Dec 2017
Noise Level Measurement Results
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 179 Jul - Dec 2017
Vibration Level Measurement Results
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 180 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 181 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 182 Jul - Dec 2017
Soil Quality Test Results
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 183 Jul - Dec 2017
Construction of BRT Bus Depot Ambient Air Quality Monitoring Result
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 184 Jul - Dec 2017
Noise Level Measurement Result
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 185 Jul - Dec 2017
Water Quality Test Results
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 186 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 187 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 188 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 189 Jul - Dec 2017
GDSUTP: Bus Rapid Transit (BRT), Airport-Gazipur, Package II - EPCM ADB Loan No’s 2862/2863/2864-BAN
Semi-Annual Environmental Monitoring Report #3 190 Jul - Dec 2017
Vibration Level Measurement Results
G
DSU
TP: B
us R
apid
Tra
nsit
(BRT
), Ai
rpor
t-G
azip
ur, P
acka
ge II
- EP
CM
ADB
Loan
No’
s 286
2/28
63/2
864-
BAN
Se
mi-A
nnua
l Env
ironm
enta
l Mon
itorin
g Re
port
#3
191
Jul -
Dec
201
7
Soil
Qua
lity
Test
Res
ults