© 2012 Delmar, Cengage Learning

Chapter 9Safety Permit Systems

Page 2: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Types of Permits

• Each plant has its own permitting system.

• Three permits common in the industry:• The control of hazardous energy• Confined space entry• Hot work

Page 3: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Hot Work Permits

• Hot work is any maintenance procedure that produces a spark or excessive heat, or requires welding or burning.

Page 4: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage LearningFigure 9-1 Example of a Hot Work Permit

Page 5: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Confined Space Entry

• A confined space is defined as a space large enough so a person can enter, has restricted entry, and is not designed for continuous occupancy.

• Additional permits are required for hot work, cold work, opening/blinding, or energy isolation inside the enclosed space.

Page 6: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Figure 9-3 Confined Space Entry

Page 7: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Confined Space Entry Team

• The team is composed of an entry supervisor, a standby or attendant, and an entrant.

• Each member of the team will have specific training prior to performing confined space work.

Page 8: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Control of Hazardous Energy• The purpose of the hazardous energy

standard is to protect employees from the hazards associated with the accidental release of uncontrolled energy.

• The are seven basic forms of energy in the industry: electrical, pneumatic, hydraulic, compressed gas and liquids, gravity, and spring tension.

Page 9: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Figure 9-4 Lockout/Tagout Permit

Page 10: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Six Steps for Locking Out Equipment

• Prepare for shut down• Shut down of the equipment• Isolation of equipment• Application of lockout/tagout devices to

breakers and disconnect switches, valves, and energy-isolating devices.

• Control of stored energy• Verification step

Page 11: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Figure 9-5 Pump-around System

Page 12: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Opening or Blinding Permits

• The purpose of the opening or blinding permits to limit accidents through improved communications and structured guidelines for removing blinds, installing blinds, or opening vessels, lines, and equipment.

Page 13: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Figure 9-6 Opening or Blinding Permit

Page 14: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Figure 9-7 Opening or Blinding a Vessel

Page 15: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Routine Maintenance Permits

• The routine maintenance permit system is designed to prevent accidents by improving communications between process technicians and the mechanical craftsperson doing the mechanical work.

Page 16: © 2012 Delmar, Cengage Learning Chapter 9 Safety Permit Systems

© 2012 Delmar, Cengage Learning

Figure 9-8 Example of a Routine Maintenance Permit