© 2009 gss pty ltd 1 sdrb s ystem using p umpable r esin considerable improvements to the crawler...
TRANSCRIPT
© 2009 GSS Pty Ltd © 2009 GSS Pty Ltd 11
SDRB SSDRB SYSTEMYSTEM USING USING PPUMPABLEUMPABLE R RESINESIN SDRB SSDRB SYSTEMYSTEM USING USING PPUMPABLEUMPABLE R RESINESIN
Considerable improvements to the Considerable improvements to the crawler rig crawler rig
Development work on a new pumpable resin including Development work on a new pumpable resin including investigations into investigations into resin viscosityresin viscosity and and pumping pumping pressurespressures to reduce installation cycle times to reduce installation cycle times
Development of an Development of an improved resin sealing systemimproved resin sealing system
Underground 1,000 bolt trial planned with Xstrata is Underground 1,000 bolt trial planned with Xstrata is imminentimminent
Considerable improvements to the Considerable improvements to the crawler rig crawler rig
Development work on a new pumpable resin including Development work on a new pumpable resin including investigations into investigations into resin viscosityresin viscosity and and pumping pumping pressurespressures to reduce installation cycle times to reduce installation cycle times
Development of an Development of an improved resin sealing systemimproved resin sealing system
Underground 1,000 bolt trial planned with Xstrata is Underground 1,000 bolt trial planned with Xstrata is imminentimminent
Considerable development work has been undertaken to improve the Considerable development work has been undertaken to improve the overall system, specifically:overall system, specifically:Considerable development work has been undertaken to improve the Considerable development work has been undertaken to improve the overall system, specifically:overall system, specifically: