you can reach new heights with a reliable partner drilling...

43
0 Drilling, Sidetracking and Fracturing You can reach new heights with a reliable partner

Upload: tranngoc

Post on 01-Apr-2018

220 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

0

Drilling, Sidetracking and Fracturing

You can reach new heights with a reliable partner

Page 2: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

1

1

Организационная структура

.

Hydraulic fracturing, CT, Primary and remedial cementing

C.A.T. oil AG Viena / Moscow

CAToil Drilling

Samara

Offices in Buzuluk, Orenburg and Nizhnevartovsk

CATKoneft

Kogalym Branches in Nizhnevartovsk and Aktau, Kazakhstan

CATOBNEFT Nizhnevartovsk

Offices in Nefteyugansk, Kogalym and Buzuluk

Sidetracking

Exploration and development well drilling

Operations

Page 3: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

2

Nizhnevartovsk

Samara

Noyabrsk

Urengoy

Buzuluk

Nefteyugansk

Kogalym

Offices Headquarters Operations

Geographic Presence

Page 4: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

3

CATOBNEFT Sidetracking

Page 5: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

4

CATOBNEFT, ООО

Incorporated on May 17, 1994.

Headquartered in Nizhnevartovsk,

Khanty-Mansi Autonomous Okrug — Yugra.

With offices in areas of operation:

Kogalym, Nefteyuganks, Buzuluk.

The company’s core activities:

Sidetracking services under turnkey or day-rate contracts.

CATOBNEFT drills the following types of wells:

directional;

horizontal;

horizontal with pilot holes.

Mobile rig capacity: 120 to180 tonnes.

Page 6: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

5

Activities

Sidetrack design

Window cutting in a production

string

Sidetrack drilling

Well completion and cementing General contract

Page 7: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

6

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

1 2 5

10 10 10 12 17

22 24 26

Number of operating rigs

Capacity Allocation to Customers

Capacity building

11 RIGS

2 RIGS

3 RIGS

RN-Yuganskneftegaz

7 RIGS 3

RIGS

Page 8: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

7

Number of Completed Sidetracking Jobs

7

7 22 27 26 43 53 59 49 4

22 16 18 6 8 22 60

6 15 22

27 40 48 67

101 101

91

6 15

33

71 83

92

116

162 182

200

6 21 54

125

208

300

416

578

760

960

-250

-50

150

350

550

750

950

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

НН ГПС ГС Всего: Итого с накоплением Directional Horizontal w/pilot Horizontal Total Total cumulative

Page 9: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

8

САТ-ТВ-180 Rig (3 units)

Mobile Rig Fleet

MBU-125 Mobile Drilling Rig (11 units)

САТ-ТВ-120 Rig (9 units)

The drilling crews have nine САТ-ТВ-120 rigs (with a capacity of 120 tonnes) made by Satvia (Germany), three САТ-ТВ-180 rigs (180 tonnes) made by Satvia (Germany), eleven MBU-125 (with a capacity of 125 tonnes) rigs made by Kungurskiy Mashinostroitelniy Zavod (Kungur Machine-Building Plant) (Kungur, Russia). Four Dragon SP-650 (Cooper) rigs (Texas, USA) with a capacity of 136 tonnes were commissioned early in 2015.

Dragon SP-650 (Cooper) Rig (4 units)

Page 10: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

9

Dragon SP-650 (Cooper) Mobile Drilling Rig

Capacity: 136 tonnes. Mast height: 36.8 meters. Power: 550 hp. Hydraulic tongs: UNIVERSE 01F05C . Made in Victoria, Texas, USA.

New Sidetracking Rigs

Capacity: 227 tonnes (250 tonnes in accordance with API-8C PSL-1). Rated power: 475 hp. Speed: up to 200 RPM. Working torque: 28.47 kN (21000 ft-lb). Maximum torque: 31.95 kN (23500 ft-lb).

Tesco 250-HMIS-475 Top Drive

Page 11: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

10

PVG-2000 Top Drive

Available Topdrives

PVG-2000R Top Drive Tesco 250-HMIS-475 Top Drive

Mobile drilling rigs are equipped with PVG-2000 and PVG-2000R topdrives (with reduction drive) made by ZAP Promtechinvest (St.

Petersburg), Tesco 250-HMIS-475 topdrives made by Tesco Corp. (Texas, USA) or KDK-220 topdrives made by Satvia (Germany).

KDK-220 Top Drive

Page 12: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

11

Available Mud Pumps

Modern plunger mud pumps made by Halliburton (НТ-400) and SPM (TWS-600) produce sufficient flow and pressure for well drilling.

Mud pump characteristics: • Power: 600 hp (477 kW) • Flow rate: maximum 35 l/s at 117 kg/cm2 (550 gpm @ 1660 psi); operating 21 l/s at 145 kg/cm2 (330 gpm @ 2060 psi); • Pressure: maximum 443 kg/cm2 (6300 psi)

Page 13: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

12

Drilling Fluid Circulation and Cleaning Systems

All drilling crews have 90-m3 (566-bbl) mobile circulation and

cleaning systems installed on special semitrailers for ease of

relocation in the areas of operation.

The systems are equipped with advanced MI-Swaco Mud Cleaners

for high-quality separation of drilling fluid and cuttings and quick

preparation of new drilling fluid.

Page 14: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

13

PPSG – 180x35 Ram-type Preventer (Russia). PUG – 180x35 Annular Preventer (Russia). SG-24M Control Unit (Russia). Choke and kill manifolds installed in a heated container.

Blowout Preventers

Page 15: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

14

Drilling Equipment and Tools

14-trailer Kedr camp is fully equipped for accommodation and rest between shifts.

A set of heated and insulated backup water tanks, V = 60 m3 (2120 cu ft).

Each crew has 15-m3 (530 cu ft) fuel storage tanks. High-capacity ASO-VK screw compressors installed in a heated

container. Hydraulic tongs made by leading international manufacturers:

Weatherford, Farr, Universe. SPG-100 and SPG-160 spiders.

Tripping equipment made by Blohm&Voss (Germany).

Page 16: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

15

Operations Support Base

The base can perform all maintenance and repair of drilling and other equipment in-house. To this end, it is provided with

modern machines and diagnostic equipment made in Russia or abroad. Positive displacement downhole motor bay is equipped with

DRECO (Canada) bench for testing and diagnostics of large and small size PDMs and hydraulic jars.

Page 17: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

16

Well Design

We design sidetracks using Landmark (COMPASS™), the best-in-class software for directional drilling design, measurement control, plotting and well-collision avoidance. Our engineers can accomplish the following through the application of integrated technologies: ~ engineering studies and BHA selection, predicting BHA performance in specific geological environment; ~ prediction and analysis of loads, moments and friction coefficients for drill strings and casing strings during downhole operations; ~hydraulic calculation of parameters for drilling and openhole reaming; ~modeling of pressure surges caused by drill string or casing string movement in adverse downhole environment, design of drilling and tripping hydraulics; ~stuck pipe release analysis and design; ~cementing design, detection of possible problems, adjustments to the cementing process.

Page 18: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

17

OIL AND GAS WELL DRILLING

Page 19: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

18

Allocation of Drilling Crews to Customers

15 mobile drilling rigs

Gazpromneft – Orenburg

Megionneftegaz

4 3

7

1

Page 20: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

19

Performance

Drilling, 1000 m.

2012 2013 2014 2015 target

102 153

226

350

Page 21: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

20

20

Drilling Rigs

NOV 900 MD. Manufacturer: National Oilwell Varco

Capacity: 200 tonnes Mast height: 37 meters Power: 1080 hp Self-propelled carrier Electric topdrive Made in Pampa, Texas, USA

High mobility and fast relocation and rig-up

Page 22: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

21

Dragon TR-900 (Cooper) Mobile Drilling Rig

Key characteristics

Capacity: 200 tonnes.

Mast height: 37.8 meters.

Power: 1000 hp.

Electric topdrive. Made in Victoria, Texas, USA.

Drilling Rigs

Page 23: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

22

Tesco 250-EMI-400

Key characteristics

Capacity 227 tonnes (250 tonnes in

accordance with API-8C PSL-1).

400-hp electric motor.

Speed: 200 RPM.

Constant torque: 33.8 kN (25000 ft-

lb).

Maximum intermittent torque: 43.3

kN (32000 ft-lb).

Available Topdrives

NOV TDS-10

Page 24: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

23

QWS-2500 SD Pump Skid

Caterpillar 32C ACERT QWS-2500 SD Quintuplex Pump

Key parameters

Wet mass: ≈22 tonnes. Overall dimensions: 7.95 m x 2.50 m x 2.81 m (LxWxH). Pressure line connection: 3” Fig 1502. Maximum flow rate with 5” plunger: 53 l/s at

320 atm* (840 gpm @ 4700 psi).

* Calculated value based on the drive power in continuous operating mode.

Drilling Rigs

Page 25: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

24

Mobile Circulation System

Modules mounted on a carrier to ensure mobility;

Working volume: 140 m3 (4940 cu ft) and 200 m3 (7060 cu ft);

Drilling fluid cleaning system includes two linear-motion MI Swaco Mongoose PT shale shakers, Mongoose PT mud cleaner as well as OGSh-50 and MI Swaco centrifuges;

Drilling fluid is fed into mud cleaners by MI Swaco and Halco feed pumps;

The system includes Kaskad-40M mud degasser;

Steam lines installed inside vessels and air heaters permit the system operation at low temperatures;

Cuttings are transported into a pit by a screw conveyor.

Page 26: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

25

Blowout Prevention Equipment

NL SHАFFER and INTEGRATED 13 5/8”-5000 psi (350 atm) ram-type preventers.

NL SHАFFER and INTEGRATED 13

5/8’’-5000 psi (350 atm) annular preventers.

C.A.T. and CPC control units. OP-5 Blowout Prevention Package.

Choke and kill manifolds installed in a

heated container.

Page 27: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

26

Quality

We remain leaders amongst oilfield service companies through the use of high-performance technologies

and state-of-the-art reliable equipment

Page 28: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

27

Quality Management

Our quality management system is certified to international standards ISO 9001:2008 Quality management systems — Requirements, ISO 14001:2004 Environmental management systems — Requirements with guidance for use and OHSAS 18001:2007 Occupational health and safety management systems – Requirements, with compliance confirmed by conformity certificates issued by an international certifying body, Bureau Veritas Certification.

Page 29: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

28

CATKoneft Hydraulic fracturing of formation (Frac), Remedial cementing (well cementing),

Coiled tubing.

Page 30: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

29

LLC CATKoneft

Founded in 1991.

Headquarters is in Kogalym,

Khanty-Mansi Autonomous Area– Yugra.

industrial bases: Kogalym,

Nefteyugansk,

Khanty-Mansiysk,

Nizhnevartovsk,

Aktau in the Republic of Kazakhstan.

Primary activities of the Company are:

- Hydraulic fracturing of formation,

- Remedial cementing of wells,

- Coiled tubing operations.

Page 31: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

30

Dynamics of Frac operations

Number of jobs

Page 32: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

31

Distribution of Frac facilities among the Customers

4 Frac Fleets

2 Frac Fleets 2 Frac Fleets RN-Yuganskneftegas

2 frac Fleets 1 frac Fleet

3 Frac Fleets

2 Frac Fleets

Page 33: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

32

Hydration Unit

Frac equipment

Blender

Pump Unit Manifold Unit

Data Van

Sandtruck Chemical Truck

Technological tanks

«CATKoneft» has 16 Frac Fleets

Page 34: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

33

Frac equipment

Data Van is a computer control center for pump units and for collecting Frac information, manufactured for the

usage on the Mercedes-Benz cross-country chassis. Data Van has a computer system (Data Acquisition System, Siemens) and three service computers. Computers are

used for Frac designs, for data logging and treatment. Registration possibility is up to 64 data channels. Data Van has two rooms: one is for the master, the other is for the Customers. Truck’s chassis with high clearance and big tire profile is good for roads which are difficult to traverse.

Page 35: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

34

Frac equipment

Hydration unit is used for Frac operations without preliminary gelling of fluids in tanks.

Maximum working rate is up to 5m3/min. It has 3 pumps for liquid chemicals’ delivery with

maximum rate up to 50 l/min.

Maximum pressure is 1 050 bar Triplex high pressure plunger pump SPM TWS-2200

/ TWS-2250 with the rate from 0,5 m3/min up to 1,5 m3/min

Pump drive - engine «Detroit Diesel» or «MTU» with water cooling, 2250 HP.

Automatic power shift «Allison» transmission

Pump Units

Page 36: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

35

Frac equipment

Blender is a mobile unit for preliminary mixing of oilfield fracturing fluids in tanks with following pumping of this fluid through manifold system on the suction of the pumps. The mixing unit is mounted on a truck frame , driven by a diesel engine. Capacity: 460 HP. Flow volume: 4 000 kg/min of proppant max.; 12 m3/min of fluid max. Chemical additive components : dry(2)/liquid(2) Suction joints: 9 Discharge joints: 6 Recirculation

Page 37: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

36

Frac equipment

Chemical truck is manufactured for transporting and feeding chemicals both while preparing Frac fluid and while pumping Frac fluid (on the fly).

Equipment: 1. 5 individual pumps Pump delivery is 1-50 l/min each 2. Computer controlled chemical addition 3. Field mini-laboratory for testing water and linear gel 4. Tanks for storage and transporting chemicals 5. Temperature conditions for operations are from -40°C to +50°C 6. Autonomous running mode 7. Generator 220v

Chemical Truck

Page 38: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

37

Number of remedial cementing jobs in years

0

200

400

600

800

1000

1200

1400

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

20

189173 180

333393

259 215251

431544

472589

654757

931971

1131

1320

Num

ber o

f ope

ratio

ns

Page 39: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

38

6 Fleets for remedial cementing

Special equipment of the remedial cementing Fleet

Double pump unit is mounted on Mercedes Benz chassis. Two top Detroit Deisel engines with 350 HP each, with «Allison» transmissions allowing to adjust flow rate continuously. Triplex plunger pump NT-400 has maximum working pressure up to 785 atm. It has two measuring tanks for 1,50 m³ volume each for flush with 100 liters gauging.

Unit for preparation of cement slurry, buffer and gelling slurry allows to prepare plugging material of high quality from 0,5 up to 27m3. Separated tanks have heavy mixers equipped with hydraulic or electrical drive. Mixer is equipped with two centrifugal pumps and two high pressure pumps for adding liquid chemicals.

Twin pump cementing unit with the system of recirculation. Twin pump cementing unit with automatic control «АТСТ-

800» manufactured by С.А.Т. is the unit for preparation and squeezing of cement slurry, which is mounted on Mercedes Benz Actros 4141 8Х8 suitable for use in rough terrain oilfields environments. The unit has automatic mixing system of cement slurry with computer control.

Page 40: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

39

Coiled tubing Fleet

Coiled Tubing Reel Unit The equipment of world well-known companies such as «Mersedes Benz», «HydraRig», «Vanoil» is used for manufacturing of the unit. The equipment is designed and constructed for work in severe conditions of Far North.

CT Pumping Unit 6000 liter fluid holding tank, acid resistant and stable for high temperatures. Triplex pump SPM TWS600 of high pressure with regular pumping 450 l/min. Working pressure of injection line of SPM is 700 атм .

Mobile CT crane with repair shop. Wireless remote operating system for Crane, lifting capacity 12 tons. Boom reach is 15,4 m. Heated repair shop is equipped with BOP Service and Pressure test station and with sliding hatch to load equipment.

Page 41: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

40

Laboratory for physical-chemical analysis

The laboratory for physical-chemical analysis of LLC «CATKoneft» has modern testing equipment made by CHANDLER ENGINEERING, OFITE USA.

The equipment is tested and certified with full package of standard technical documentation.

The lab has all necessary facilities for work with cement slurries and different gelling additives.

Page 42: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

41

Our Partners

Cooperation with major oil companies and leaders in oilfield servicing and equipment manufacture helps us maintain leadership in the oilfield service market.

Page 43: You can reach new heights with a reliable partner Drilling ...pewete.com/files/f/news/30251d/companypresentation.pdf · Drilling, Sidetracking . and Fracturing. You can reach new

42

Thank you!