yosemite slough restoration, phase 1
TRANSCRIPT
YOSEMITE SLOUGH RESTORATION PROJECTPhase 1 Construction
Preconstruction Conditions
Historic Yosemite Slough
2010 Preconstruction Conditions
2010
Preconstruction Shoreline
Plant Elevation Surveys
Construction Documents
3D Topographic and Habitat Modeling
Preconstruction Shoreline
Mass Grading of Tidal Wetlands
Mass Grading of Tidal Wetlands
Soil Remediation
Soil Remediation
Fine Grading Tidal Wetland
Importing Bay Mud
Pulverizing and Spreading Bay Mud
Pulverizing and Spreading Bay Mud
Constructing a Snowy Plover Nesting Island
Preparing for the Breach
Preparing for the Breach
Preparing for the Breach During Low Tide
Breach During Low Tide
Breach During Low Tide
Breach During Low Tide
Breach During Low Tide
Breach During Low Tide
Daybreak After the Breach
First Incoming Tide
San Francisco Celebrates New Wetlands