wurster hall sub-metering (2) - 2010 tgif project

1
400 kwh 350 kW 300 kW 250 kW 200 kW 150 kW 100 kW 50 kW 4 ft /min 3.5 ft /min 3 ft /min 2.5 ft /min 2 ft /min 1.5 ft /min 1 ft /min .5 ft /min 0 January February March April May June July August September October November December January Spring 2011 Fall 2011 Spring 2012 Winter Recess Thanks- giving Spring Break Summer 2011 thanks- giving reading/ review/ recitation week final exams administrative holiday last day of instruction (fall 2011) first day of instruction (spring 2012) final studio reviews December November January December November January 50 kW 100 kW 150 kW 200 kW 250 kW 300 kW 350 kW 0 studio plug loads elevators ramona’s cafe kilns heating ventilation 10.6 kW 0 kW 3.9 kW 4.0 kW 25.7 0.8 kW 1.0 kW 2.1 kW 2.5 kW 6.0 kW 1.7 kW 24.2 ` kW 9.4 kW 10.9 kW 7.7 kW 46.4 kW 3.9 kW 11.7 kW 5.8 kW 7.6 kW 9.5 kW 5.2 kW 0.5 ` kW 0 kW 2.8 kW 2.7 kW 16.8 kW 180.0 kW 372.4 kW 126.7 kW 0.7 kW 0.8 kW 1.9 kW 1.8 kW 3.9 kW 1.4 kW whole building ventilation heating kilns ramona’s elevators 9th floor studio 8th floor studio 7th floor studio 6th floor studio 5th floor studio 4th floor studio minimum median maximum Breakdown: Electric Usage Data from November 21, 2011 - January 22, 2012 Whole Building Water & Electric Usage Data from January 22, 2011 to January 22, 2012 Wurster Hall Submetering Project How low can we go ? low Eliahu Perszyk Facilities Manager Gita Khandagle Data Analysis & Layout University of California, Berkeley The G een Initiative Fund

Upload: the-green-initiative-fund

Post on 31-Mar-2016

222 views

Category:

Documents


0 download

DESCRIPTION

Project Poster

TRANSCRIPT

400 kwh

350 kW

300 kW

250 kW

200 kW

150 kW

100 kW

50 kW

4 ft /min

3.5 ft /min

3 ft /min

2.5 ft /min

2 ft /min

1.5 ft /min

1 ft /min

.5 ft /min

0

January February March April May June July August September October November December January

Spring 2011 Fall 2011 Spring2012

WinterRecessThanks-

giving

SpringBreak

Summer 2011

thanks-giving

reading/review/

recitationweek

finalexams

administrativeholiday

last

day

of i

nstru

ctio

n (f

all 2

011)

first

day

of i

nstru

ctio

n (s

pring

201

2)

final studioreviews

DecemberNovember JanuaryDecemberNovember January

50 kW

100 kW

150 kW

200 kW

250 kW

300 kW

350 kW

0

studio plug loadselevators

ramona’s cafekilns

heatingventilation

10.6 kW

0 kW

3.9 kW

4.0 kW

25.7

0.8 kW1.0 kW

2.1 kW2.5 kW

6.0 kW1.7kW

24.2 ̀kW

9.4 kW

10.9 kW

7.7 kW

46.4 kW

3.9 kW11.7 kW

5.8 kW7.6 kW

9.5 kW

5.2 kW

0.5 ̀kW

0 kW

2.8 kW

2.7 kW

16.8 kW180.0 kW 372.4 kW126.7 kW

0.7 kW

0.8 kW

1.9 kW1.8 kW

3.9 kW

1.4 kW

whole building

ventilation

heating

kilns

ramona’s

elevators

9th floor studio

8th floor studio

7th floor studio

6th floor studio

5th floor studio

4th floor studio

minimum median maximum Breakdown: Electric Usage Data from November 21, 2011 - January 22, 2012

Whole Building Water & Electric Usage Data from January 22, 2011 to January 22, 2012

Wurster Hall Submetering ProjectHow low can we go?low Eliahu PerszykFacilities Manager

Gita KhandagleData Analysis & Layout

University of California, BerkeleyThe G een Initiative Fund