Cleanrooms Case Study Challenge Wrightington, Wigan & Leigh and Salford Royal NHS Foundation Trusts wanted to let an empty 24,081 sq ft industrial unit and transform it into a sterilisation unit. It was in the perfect location to support all of their local hospitals and in the longer term would reduce costs, meet their future requirements and reduce lead times for sterilisation surgical equipment. The challenge was to transform this huge empty space into a high specification sterilisation unit. Solution Building Projects (UK) worked as part of the construction team for Boulting Environmental Services who undertook the design and mechanical and electrical installation. Building Projects (UK) completed the fit out of the empty 24,081 sq ft industrial unit, the building works completed included: • Full construction and fit out of all partitions covering 14,180 sq ft • Fire protection • Burgess metal pan ceilings covering 5,600 sq ft • Cleanroom construction • Fitting out changing areas • Fitting out toilet blocks • 3,600 sq ft of mineral fibre lay in ceilings • 10,400 sq ft of plastic faced lay in ceilings Benefits Fitting out the largest sterilisation unit in the UK was completed ahead of schedule and the state of the art facility now provides sterilisation services for all surgical equipment at Wrightington, Wigan & Leigh and Salford Royal NHS Foundation Trusts. The client was particularly impressed with the high standard of workmanship and attention to detail, the company’s own Health and Safety measures, site cleanliness and the highly trained and skilled operatives. Tel 01457 861702 Fax 01457 864210 Email [email protected] Web www.buildingprojectsuk.com Wrightington, Wigan & Leigh NHS Foundation Trust Building Projects (UK) were part of the team contracted on the largest sterilisation facilitiy in the UK. Location: Bolton Project: Internal fit out of a major sterilisation unit Duration: 20 weeks

Upload: others

Post on 06-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wrightington, Wigan & Leigh NHS Foundation Trust€¦ · Wrightington, Wigan & Leigh and Salford ... the design and mechanical and electrical installation. Building Projects (UK)

Cleanrooms Case Study

ChallengeWrightington, Wigan & Leigh and Salford Royal NHS Foundation Trusts wanted to let an empty 24,081 sq ft industrial unit and transform it into a sterilisation unit. It was in the perfect location to support all of their local hospitals and in the longer term would reduce costs, meet their future requirements and reduce lead times for sterilisation surgical equipment. The challenge was to transform this huge empty space into a high specification sterilisation unit.

SolutionBuilding Projects (UK) worked as part of the construction team for Boulting Environmental Services who undertook the design and mechanical and electrical installation. Building Projects (UK) completed the fit out of the empty 24,081 sq ft industrial unit, the building works completed included:

• Full construction and fit out of all partitions covering 14,180 sq ft

• Fire protection

• Burgess metal pan ceilings covering 5,600 sq ft

• Cleanroom construction

• Fitting out changing areas

• Fitting out toilet blocks

• 3,600 sq ft of mineral fibre lay in ceilings

• 10,400 sq ft of plastic faced lay in ceilings

BenefitsFitting out the largest sterilisation unit in the UK was completed ahead of schedule and the state of the art facility now provides sterilisation services for all surgical equipment at Wrightington, Wigan & Leigh and Salford Royal NHS Foundation Trusts.

The client was particularly impressed with the high standard of workmanship and attention to detail, the company’s own Health and Safety measures, site cleanliness and the highly trained and skilled operatives.

Tel 01457 861702 Fax 01457 864210 Email [email protected] Web www.buildingprojectsuk.com

Wrightington, Wigan & Leigh NHS Foundation Trust

Building Projects (UK) were part of the team contracted on the largest sterilisation facilitiy in the UK.

Location: Bolton Project: Internal fit out of a major sterilisation unitDuration: 20 weeks