workshop riba 23 november 2015 - construction industry...

20
Workshop RIBA 23 November 2015 Jim Chapman– DQI Facilitator to CIC Architect/Client Adviser

Upload: others

Post on 02-Feb-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

Workshop RIBA23 November 2015

Jim Chapman– DQI Facilitator to CICArchitect/Client Adviser

Page 2: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

What is the Challenge ?

At the moment many hospital environments say to the patient and staff :

“How you feel is unimportant. You are not of value. Fit in with us, not uswith you.”

With very little effort and money this could be changed to something like:

“ Welcome, do not worry! We are here to reassure you and yourtreatment will be good and helpful to you”

Maggie Jenks

Page 3: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

DH Briefing/Procurement

• Best Buy/Harness/Nucleus/PfI/Procure 21/Smart PfI/Procure21+

• Constant investment centrally, excellent knowledge base.

Why; to reduce risk, improve quality, reduce cost, promote the use of“standard” solutions.

Page 4: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Introducing DQI

• Design Quality Indicator is…

…a process that enables all aspects of design quality to be assessed frombriefing to post occupancy.

DQI empowers stakeholders to be involved actively in workshops withdesign professionals and construction teams at appropriate stages to settargets for design quality.

Page 5: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Workstages

Page 6: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Initial Use of DQI

• Developed between 2000 and 2003

• Over 1400 projects mainly schools

• 55% new build; 10% refurbishment; 34% mixed

• In February 2014 launched in Health supporting NHS England

• It has been used on a range of projects of varying scales [over 40 requests]

• Feedback, some Trust have used more than one stage assessment,recognising the importance of the building life cycle and learning process.

Page 7: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Benefits of the DQI Process

• Early stakeholder engagement

• Stakeholder ownership of and understanding of the needs before thedesign and construction process

• Set quality standards

• Fit for purpose [Scale and programme]

• Measure quality/value

• Importance of place and individual needs [Designed to meet your needs]

• Establish quality of environment for patients and staff

Page 8: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Who attends the “workshops”?

• Medical Staff, consultants and nurses

• External groups patients/carers

• Trust management representatives

• Design Champion......

• Design team and contractors

• Local Authority [Planners and Highways]

Page 9: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Format of Discussions/Panels

• Will vary over time from briefing to completion

• Initially develop realistic aspirations, what are the major concerns/needs?

• Encourage forward thinking [Encourage visits!]

• DQI enables the team to evaluate design from briefing through the designstages to completion and PoE

• Link to other processes, gateway reviews and design reviews, [see NHSEngland advice]

Page 10: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Linkages

Page 11: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

DQI Framework

Page 12: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Briefing

Functionality Default Notes Value

17 The brief and design will facilitate the[patient care model of theNHE/Client organisation

Required Critical early question ?

Build Quality

30 The engineering systems will be welldesigned and will be unobtrusive,flexible and efficient to use

Required Difficult to answer for some panelmambers at an early stage

?

Impact

50 The building will respect the needsof patients and allow appropriatelevels of privacy, dignity andconfidentiality

Inspired ?

Page 13: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Timing

Page 14: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

DQI in the project cycle – 5 stages

Page 15: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Initial PSC

Page 16: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

After 2 stage DQI

Page 17: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Vision

Page 18: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

The Future

• Is standardisation speeding up theprocess, improving quality?

• Does standardisation meet localneeds?

• Capex/opex ,do we evaluate this well?

• Sustainability

• How will the healthcare estate beprocured in the future?

Page 19: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

BIM

• Is BIM the panacea for all our ills?

• Feedback fromLondon and UCH

• Outputs

• User needs

Page 20: Workshop RIBA 23 November 2015 - Construction Industry Councilcic.org.uk/admin/resources/jim-chapmandqi-presentation-riba-11-15-ppt.pdf · Workshop RIBA 23 November 2015 Jim Chapman–

www.dqi.org.uk©Design Quality Indicator 2013

Quality

• “...quality, above all, is about care ,people,passion, consistency, eyeball contact and gutreaction.”

• Quality is not atechnique, nomatter how good”

• Tom Peters “A passion for Excellence”