wm process cycle

45
G.V. Shivakkumar E-mail [email protected] , [email protected] WM - STEP BY STEP END USER DOCUMENTATION Create Transfer Requirement Definition:- Transfer Requirement indicates the details of activity to be performed in the warehouse for any material. It is the request to perform any movements in the warehouse. It can be created automatically or manually. Prerequisite:- Authorization Enterprise structure setup Material must have warehouse views extended Menu Path:- Logistics Logistics Execution Internal Whse processes TransRqmt LB01 - Create Double Click LB01 Enter warehouse number. E.g. IN6 Enter movement number. E.g. 311 Enter the requirement tracking number. E.g. 1 Optional entry:- Planned date and Transfer Priority

Upload: vjeevan5

Post on 23-Nov-2014

121 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Create Transfer Requirement

Definition:-

Transfer Requirement indicates the details of activity to be performed in the warehouse for any material.

It is the request to perform any movements in the warehouse.

It can be created automatically or manually.

Prerequisite:-

AuthorizationEnterprise structure setupMaterial must have warehouse views extended

Menu Path:-

Logistics Logistics Execution Internal Whse processes TransRqmt LB01 - Create

Double Click LB01

Enter warehouse number. E.g. IN6

Enter movement number. E.g. 311

Enter the requirement tracking number. E.g. 1

Optional entry:- Planned date and Transfer Priority

Click

EnterPlantStorage locationMaterial number

Page 2: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Quantity

Click

Click

Message appear at the bottom

Change Transfer Requirement

Definition:-

Transfer Requirement indicates the details of activity to be performed in the warehouse for any material.

It is the request to perform any movements in the warehouse.

It can be created automatically or manually.

Page 3: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATIONPrerequisite:-

TR must exist

Menu Path:-

Logistics Logistics Execution Internal Whse processes TransRqmt LB02 - Change

Double Click LB02

Enter warehouse number. E.g. IN6

Enter TR number. E.g. 11

Click

Enter the source storage type if required.

Click

Double click on the item row

Page 4: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

change the quantity to 6Note: -

tick this check box if it is not to be processed any more. Other wise this will be set automatically when creating TO with reference to this TR.

set this indicator to delete the TR item.

Click to know the status of this TR

Page 5: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click Enter on the key board to get out of this screen

Click Create Transfer Order through TR

Definition:-

Transfer Order is the second step in moving the material in the warehouse. Transfer order can be created with or without reference to Transfer Requirement.

Transfer order can be created directly also.

There are more ways to create Transfer Order.

Based on

Transfer requirement (as explained in the display TR manual)

Directly with No source reference. (LT01) From stock list (LT10) - stock must be available in the interim

storage area.

Prerequisite:-

TR must exist to create TO with reference to TR.

Page 6: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Menu Path:-

Logistics Logistics Execution Internal Whse processes Stock Transfer Create Transfer Order LT01 – No source object Double Click LT01.

Enter warehouse number. E.g. IN6

Enter requirement type and requirement number. E.g. K and 5 respectively.

Enter movement type. E.g. 201

Enter material. E.g. TESTWM1

Enter quantity requested. E.g. 1

Enter plant and storage location. E.g. IND6 and RM01 respectively.

Click

Enter source storage type and storage section

Click

Note: - the storage bin will be determined automation.

Create Transfer Order through TR LIST

Definition:-

Transfer Order is the second step in moving the material in the warehouse. Transfer order can be created with or without reference to Transfer Requirement.

Page 7: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATIONTransfer order can be created directly also.

There are more ways to create Transfer Order.

Based on

Transfer requirement (as explained in the display TR manual)

Directly with No source reference. (LT01) From stock list (LT10) - stock must be available in the interim

storage area.

Prerequisite:-

TR must exist to create TO with reference to TR.

Menu Path:-

Logistics Logistics Execution Internal Whse processes TransRqmt Display LB11 – By Material Double Click LB11.

Enter Material number. E.g. TESTWM1Enter warehouse number. E.g. IN6Enter Plant. E.g. IND6Enter transfer type. E.g. *

Click

Select the check box of the required transfer order.

Click

Click

Click to put away in foreground

Page 8: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Note: - If the storage unit is required, storage unit information has to be maintained. In this example, it is explained with storage unit.

Enter storage unit type. E.g. E1 in this example

Click

Note: - Destination storage type and bin will be proposed automatically. Bin can be changed if required.

Click

Click

Create Direct Transfer Order

Definition:-

Transfer Order is the second step in moving the material in the warehouse. Transfer order can be created with or without reference to Transfer Requirement.

Transfer order can be created directly also.

There are more ways to create Transfer Order.

Based on

Transfer requirement (as explained in the display TR manual)

Directly with No source reference. (LT01) From stock list (LT10) - stock must be available in the interim

storage area.

Prerequisite:-

Page 9: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATIONTR must exist to create TO with reference to TR.

Menu Path:-

Logistics Logistics Execution Internal Whse processes Stock Transfer Create Transfer Order LT01 – No source object Double Click LT01.

Enter warehouse number. E.g. IN6

Enter requirement type and requirement number. E.g. K and 5 respectively.

Enter movement type. E.g. 201

Enter material. E.g. TESTWM1

Enter quantity requested. E.g. 1

Enter plant and storage location. E.g. IND6 and RM01 respectively.

Click

Enter source storage type and storage section

Click

Note: - the storage bin will be determined automaticall

Confirm Transfer Order

Definition:-

Transfer Order is the second step in moving the material in the warehouse. Transfer order can be created with or without reference to Transfer Requirement.

Page 10: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Transfer order can be confirmed manually or automatically. It is preferred to have manual confirmation in many cases to ensure the item is placed in the right bin.

Prerequisite:-

TO must exist to confirm.

Menu Path:-

Logistics Logistics Execution Internal Whse processes Stock Transfer Confirm Transfer Order LT12 – In one step Double Click LT12.

Enter transfer order number. E.g. 4

Enter warehouse number. E.g. IN6

Click

Click

Click

Message appear at the bottom

Confirm TO created automatically

Definition:-

Transfer Order is the second step in moving the material in the warehouse. Transfer order can be created with or without reference to Transfer Requirement.

Transfer order can be created directly also.

Page 11: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATIONTransfer Orders are created automatically when making GR according to the configuration.

Let us try to look at the TO created when making GR and confirm it.

Prerequisite:-

TO must exist to confirm.

Menu Path:-

Logistics Logistics Execution Internal Whse processes Stock Transfer Display Transfer Order LT24 – By Material Double Click LT24.

Enter warehouse number. E.g. IN6Enter Material number. E.g. TESTWM1Select radio button

Click

Click

Click on the TO number

Through the menu path from the top Transfer Order Confirm Transfer Order

Page 12: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click on item

In the next screen TO number will appear (this is similar to LT11 transaction initial screen)

Click

Enter the actual quantity and difference if any.

Click

Message appear at the bottom

Page 13: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Cancel Transfer Order

Definition:-

Transfer Order is the second step in moving the material in the warehouse. Transfer order can be created with or without reference to Transfer Requirement.

Transfer order can be cancelled if it is not required to be processed.

Prerequisite:-

TO must exist to cancel.

Menu Path:-

Logistics Logistics Execution Internal Whse processes Stock Transfer Cancel Transfer Order LT15 – By single document Double Click LT15.

Enter transfer order number. E.g. 1

Enter warehouse number. E.g. IN6

Click

Click the row which is to be cancelled

Click

Message appear at the bottomCreate Posting Change

Page 14: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATIONDefinition:-

Posting change notice is similar to Transfer Requirement indicates the details of activity to be performed in the warehouse for any material.

It is used when transferring between the stocks. E.g. moving from Quality stock to unrestricted stock with 321 movement type.

It can be created automatically or manually.

Prerequisite:-

AuthorizationEnterprise structure setupMaterial must have warehouse views extended

Menu Path:-

Logistics Logistics Execution Internal Whse processes PostChange Posting Change Notice LU01 - Create

Double Click LU01 - Create

Enter warehouse number. E.g. IN6

Enter movement number. E.g. 321

Click

Maintain the entries as shown below

Page 15: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Note: - From material stock and To material stock, should be different. In this case it is both as Q. Let us create it as it is we shall change it through change mode.

Click

Click

Message appear at the bottom

Change Posting Change

Definition:-

Posting change notice is similar to Transfer Requirement indicates the details of activity to be performed in the warehouse for any material.

It is used when transferring between the stocks. E.g. moving from Quality stock to unrestricted stock with 321 movement type.

It can be changed.

Prerequisite:-

Page 16: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Posting change notice must exist

Menu Path:-

Logistics Logistics Execution Internal Whse processes PostChange Posting Change Notice LU02 - Change

Double Click LU02 - Change

Enter warehouse number. E.g. IN6

Enter Posting change number. E.g. 1

Click

Change the To material stock category from Q to blank to indicate it is to be transferred to available stock.

Change the quantity to 6

Click

Create Material Master with warehouse

Definition:-

Page 17: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Every Material must be identified with a code number in SAP. Material master contains entire information related to a material with respect to all department in an organization.

Material master information are divided in to the different views and each department will maintain their own information through the respective views.

Material master must contains details about warehouse if a materials is to be managed in warehouse.

Prerequisite:-

AuthorizationEnterprise structure setup

Menu Path:-

Logistics Materials Management Material master Materials Create (General) MM01-Immediately

Note:- Material master itself is a big requiring knowledge of various modules. However by following this user manual one will be able to create the material master and go ahead.

Double Click MM01

Page 18: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Enter Material E.g. TESTWM1Select material type as Raw material with sales

Page 19: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click

Select the views as shown below by clicking the grey box in the left side

Page 20: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click Pagedown key in the key board to navigate to remaining part of the screen

Select the views as shown below

Page 21: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click

Enter Plant, Storage location and warehouse details as shown below

Page 22: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click

Maintain the following entries as shown below in the screen shot.

Note:- Please note that the Mandatory fields are filled and displayed.

Page 23: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click

Nothing mandatory in this screen.

Click

Page 24: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Note:- Purchasing value key become mandatory field with the configuration setting.

Maintain 1 in the purchasing value key.

Click

Page 25: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click

Page 26: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click

Click

Page 27: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Note: - No mandatory entries in MRP4 view

Click

Note: - Tick the Batch management check box to activate batch management to this material

Page 28: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click

Note: - No mandatory entries in Storage 1 and 2

Click

Note: - Maintain the stock removal, stock placement storage type if required in the material master

Maintain storage section if required.

Click

Page 29: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click

Click

Page 30: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Note:- No mandatory entries in Accounting2 view

Click

Note: - Ensure to tick the check boxes . This is related to product costing.

Click

Page 31: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Note:- No mandatory entries in costing2 view

Click

Click

Message will appear at the bottom

Block Bin

Definition:-

Page 32: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Storage bin in a warehouse can be blocked from usage.

Let us block few bins from storage.

Prerequisite:-

Bins must be created

Menu Path:-

Logistics Logistics Execution Internal Whse processes Bins and Stock Block LS06 - Storage Bin Selection

Double Click LS06

Enter warehouse number. E.g. IN6

Enter storage type. E.g. 011

Page 33: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click

Select the bins as shown

Click to block and to unblock if blocked.

Enter the block and blocking reason

Click

Storage bin will be displayed as shown below

Click

Page 34: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Bin Stock per material – LX24

Definition:-

This report is used to display the bins and its stock in a given ware house for a given material.

Let us try to look at the report for IN6 and for material TESTWM1.

Prerequisite:-

Stock must be available.

Menu Path:-

Logistics Logistics Execution Internal Whse processes Bins and Stock Display LX24 – Bin Stock per Material

Double click LX24

Enter warehouse number. E.g. IN6Enter Material. E.g. TEST@M1Enter Plant. E.g. IND6

Click

Page 35: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Note: - By changing layout, many fields can be displayed.

Click till main report screen is reached

Bin Status Report – LX03

Definition:-

This report is used to display the status of bins and its stock in a given ware house.

Let us try to look at the report for IN6 and storage type 001.

Prerequisite:-

TO must exist

Page 36: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Menu Path:-

Logistics Logistics Execution Internal Whse processes Bins and Stock Display LX03 – Bin Status Report

Double click LX03

Enter warehouse number. E.g. IN6

Click

Note: - More information can be displayed by changing the layout.

Page 37: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click to change the display layout

Choose the field from the right side

Click to move it to left side to display

Click

Click to reach the main report screen

Empty Storage Bins – LX01

Definition:-

This report is used to display the list of empty bins in a given ware house along with any blocking reasons. It provides the list for a combination of warehouse and storage type.

Page 38: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Let us try to look at the report for IN6 and storage type 001.

Prerequisite:-

TO must exist

Menu Path:-

Logistics Logistics Execution Internal Whse processes Bins and Stock Display LX01 – List of Empty Storage bins

Double click LX01

Enter warehouse number. E.g. IN6Enter storage type. E.g. 001

Click

Page 39: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

Click to reach the main report screenEmpty Storage Bins – LS04

Definition:-

This report is used to display the list of empty bins in a given ware house. It provides the list for a combination of warehouse and storage type.

Let us try to look at the report for IN6 and storage type 001.

Prerequisite:-

TO must exist

Menu Path:-

Logistics Logistics Execution Internal Whse processes Bins and Stock Display LS04 – Empty Storage bins

Double click LS04

Enter warehouse number. E.g. IN6Enter storage type. E.g. 001

Click

Double click on the desired bin to look at the details

Click to reach the main report screen

Page 40: WM PROCESS CYCLE

G.V. Shivakkumar E-mail [email protected], [email protected] - STEP BY STEP END USER DOCUMENTATION

AUTHORG.V.SHIVAKKUMAR