ACEC/WisDOT Transportation Improvement Conference. WisDOT Updates. March 10, 2011 Jerry Zogg, P. E. WisDOT – Bureau of Project Development. WisDOT Updates. Preventive Maintenance (PM) Agreement 3D Technology Initiatives in: Design Construction. PM Agreement. PM Agreement. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: WisDOT Updates

WISDOT UPDATESMarch 10, 2011

Jerry Zogg, P. E.

WisDOT – Bureau of Project Development

ACEC/WisDOT Transportation Improvement Conference

Page 2: WisDOT Updates

WisDOT Updates

Preventive Maintenance (PM) Agreement

3D Technology Initiatives in:DesignConstruction

Page 3: WisDOT Updates

PM Agreement

Page 4: WisDOT Updates

PM Agreement

Current Status: PM Agreement executed by WisDOT and

FHWA in Nov 2010

WisDOT published the new PM Agreement and FDM 3-1-5 in FDM TransmittalNo. 379 on 12/21/10

Page 5: WisDOT Updates

PM Agreement

Key Improvements: Provides definition of a “pavement in

good condition” to better clarify eligible work

Reformatted PM Agreement for easier use by creating table of eligible work and requirements.

Page 6: WisDOT Updates

PM Agreement

Page 7: WisDOT Updates

PM Agreement

Key Improvements (con’t): Identifies 3 Groups of Pav’t Treatments Provides proper balance between:

Engineering efforts Safety requirements Need to preserve infrastructure

Page 8: WisDOT Updates

PM Agreement

Page 9: WisDOT Updates

PM Agreement

Key Improvements (con’t): Provides more flexibility to allow

substandard roadside slopes to remain depending on crash history

Allows PM projects to continue if safety issues identified. Document safety issues and address with future programming

Page 10: WisDOT Updates

PM Agreement

Abbreviated DSR for some PM Projects

In-house Statewide Webinar on new PM Agreementon April 11

Page 11: WisDOT Updates

3D Initiatives Design & Construction

Page 12: WisDOT Updates

Building Information Modeling

Page 13: WisDOT Updates

3D InitiativesDesign & Construction

Today’s Topics:

Civil 3D Implementation

2011Pilot Efforts on USH 10 Use of WisDOT produced 3D Models Automated Machine Guidance (AMG) for HMA Base

Course

Building Information Model (BIM) Implementation in SE Region

Page 14: WisDOT Updates

Civil 3D Implementation Began statewide implementation mid-July

of 2010 Currently have approx:

130 staff statewide engaged in training 15-20 projects underway

Have requested Regions to begin new projects with Civil 3D

Methods Staff: Rick Larson Brad Hollister Eric Arneson Lisa Herrmann

Page 15: WisDOT Updates

Pilot Efforts – USH 10

Wis Rapids in-house staff wrapping up 4 major grading/base/paving projects in Civil 3D

1st - 3D Models designed/produced in Civil 3D

Key PD staff: Nick Voss Kyle Harris Kevin Garrigan Jeff Stewart Matt Bronson

Page 16: WisDOT Updates

Next Steps for 3D Models Determine ultimate requirements for 3D

Models

Feedback from USH 10 pilots very important

Set future dates for: 3D models to be a required PSE deliverable Sunsetting CAiCE Transitioning out of

Microstation forRoadways

Page 17: WisDOT Updates

Next Steps for AMG Finalize AMG spec for HMA base &

incorporate into Std Specs Begin efforts to prepare for the use of AMG

for: PCC pav’t & base HMA pav’t

Above uses of AMG willrequire combination of GPS Laserto achieve vertical accuracy

Page 18: WisDOT Updates

BIM Implementation in SE Static/Mobile LiDAR - Data Collection: Integrated Static/Mobile LiDAR Project-Zoo IC

BIM/CAD - Design/Construction: 3D-4D BIM Pilot Project-Mitchell IC

Tunnels/Zoo IC

AMG Grading/GPS Rovers-Construction Inspection:

I-94 North-South Project

BIM/GIS - Assets/Infrastructure Lifecycle: O&M-As-Builts, Planning-PIP, etc.

Page 19: WisDOT Updates

BIM Implementation in SE

Page 20: WisDOT Updates

BIM Implementation in SE

Page 21: WisDOT Updates

BIM Work Flows & Data Flows

Roadways, Structures, Geotech, Utilities, FTMS, Signals, Survey, Geotech, Materials, Traffic, Environmental, Materials Lighting Environmental

WisDOT Design-Construction Oversight/Integration/Coordination

Paving/Structures/Misc-(Roads, Ramps, Tunnels, Bridges, Ret./Sound Walls, Sign Bridges, RRs, PM, Traffic, Geotech, etc.)

Utilities-UG/AG/OH(Storm, Sanitary, Water, Electric, Gas, FO, TV, Tel, Comm, FTMS, Lighting, Fire Protection, etc.)

Surfaces-DTMs/TINs (Conventional/Photogrammetric/GPS/LiDAR generated DTMs & Field-checked DTMs)

Existing & Proposed 3D Models (MS/In-roads & C3D to LandXML to Navisworks &

Revit Structures/MEP to Navisworks + Construction Tasks/Sequences/Scheduling (Primavera Expedition/MS Project Schedules to Autodesk Navisworks/Bentley Navigator)

Clash Resolution (Navisworks/ Navigator-Civil 3D Microstation) (RFIs/DINs/Plan Revs)

Clash Detection, Analysis, Simulation & Visualization (Navisworks/Navigator)

Page 22: WisDOT Updates

BIM Implementation in SE 3D-4D BIM - Mitchell IC Tunnels

Existing & Proposed

Page 23: WisDOT Updates

BIM Implementation in SE3D-4D BIM - Mitchell IC Tunnels – Proposed

Page 24: WisDOT Updates

BIM Implementation in SE 3D-4D BIM - Mitchell IC Tunnels

Proposed with Utilities

Page 25: WisDOT Updates

BIM Implementation in SE 3D-4D BIM - Mitchell IC Tunnels

Construction with Schedule

Page 26: WisDOT Updates