OVERVIEW 19 YEARS: E&CS Engineer for Polysilicon, mining and metals, chemicals, microelectronics, pharmaceutical, foods, paper, soap and paint industries. Lead engineer and engineering team leader on projects for Ma’aden, Ivanhoe Mining, ALCOA, LDK Polysilicon, BASF, IBM, Procter & Gamble, Eli Lilly. On site startup experience for LDK Polysilicon and Procter & Gamble Papermaking Project. Construction Management for Eli Lilly pharmaceutical manufacturing facilities. PMC Lead Engineer for large distributed-execution projects. EDUCATION BS University of Pennsylvania, 1996 (Electrical Engineering) PROFESSIONAL LICENSE Professional Engineer, Ohio, 2004-Present SIGNIFICANT EXPERIENCE FLUOR (1996 - Present) Umm Wu’al Phosphate Project Umm Wu’al, Saudi Arabia (March 2013-Present) Project Management Consultancy lead automation engineer. Client engineering representative for the controls and instrumentation front end engineering and detailed design. Prepared tender package and performed bid evaluation for Main Automation Contractor (MAC) (Yokogawa). Oversaw development of the program-wide standard designs for the MAC. Managed Main Automation Contractor during detailed design and testing of control systems for 8 Engineering Procurement and Construction Contractors. Simandou Iron Mine, Guinea, West Africa (June 2012 – January 2013) Project Management Consultancy Lead for Electrical, Control Systems and Telecomms engineering. Managed completion of front end design specifications. Coordinated area lead engineers. Oversaw development of Main Automation Vendor tender package. Led technical evaluation of Main Electrical Vendor technical evaluation. Alcoa Automotive Expansion Project (January 2012 – May 2012) Electrical and Control Systems site project engineer. Create project equipment and design specifica- tions. Coordinate engineering between Greenville engineering office, equipment vendors and client. LDK Polysilicon Manufacturing Project, Xinyu, Jiangxi, PRC (February 2008 – December 2011) Control system lead engineer for world’s largest Polysilicon plant. Coordinated control systems and instrument design between the China, Philippines, and US design centers and the project MAV (Emerson PM). Site responsibilities included supervising additional control systems engineering, startup and checkout of MAV equipment and packaged unit control systems, and assisting the client in setting up maintenance and operations procedures. 1/3 EMAIL: ward.miller@fluor.com PHONE: 646-480-0328 WILLIAM WH MILLER ELECTRICAL AND CONTROL SYSTEMS ENGINEER

Upload: ward-miller

Post on 10-Feb-2017

370 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: William Miller Resume Feb, 2016

OV E R V I E W19 YEARS: E&CS Engineer for Polysilicon, mining and metals, chemicals, microelectronics, pharmaceutical, foods, paper, soap and paint industries. Lead engineer and engineering team leader on projects for Ma’aden, Ivanhoe Mining, ALCOA, LDK Polysilicon, BASF, IBM, Procter & Gamble, Eli Lilly. On site startup experience for LDK Polysilicon and Procter & Gamble Papermaking Project. Construction Management for Eli Lilly pharmaceutical manufacturing facilities. PMC Lead Engineer for large distributed-execution projects.

E D U C AT I O N BS University of Pennsylvania, 1996 (Electrical Engineering)

P R O F E S S I O N A L L I C E N S E Professional Engineer, Ohio, 2004-Present

S I G N I F I C A N T E X P E R I E N C E FLUOR (1996 - Present)

Umm Wu’al Phosphate Project Umm Wu’al, Saudi Arabia (March 2013-Present)Project Management Consultancy lead automation engineer. Client engineering representative for the controls and instrumentation front end engineering and detailed design. Prepared tender package and performed bid evaluation for Main Automation Contractor (MAC) (Yokogawa). Oversaw development of the program-wide standard designs for the MAC. Managed Main Automation Contractor during detailed design and testing of control systems for 8 Engineering Procurement and Construction Contractors.

Simandou Iron Mine, Guinea, West Africa (June 2012 – January 2013)Project Management Consultancy Lead for Electrical, Control Systems and Telecomms engineering. Managed completion of front end design specifications. Coordinated area lead engineers. Oversaw development of Main Automation Vendor tender package. Led technical evaluation of Main Electrical Vendor technical evaluation.

Alcoa Automotive Expansion Project (January 2012 – May 2012)Electrical and Control Systems site project engineer. Create project equipment and design specifica-tions. Coordinate engineering between Greenville engineering office, equipment vendors and client.

LDK Polysilicon Manufacturing Project, Xinyu, Jiangxi, PRC (February 2008 – December 2011)Control system lead engineer for world’s largest Polysilicon plant. Coordinated control systems and instrument design between the China, Philippines, and US design centers and the project MAV (Emerson PM). Site responsibilities included supervising additional control systems engineering, startup and checkout of MAV equipment and packaged unit control systems, and assisting the client in setting up maintenance and operations procedures.

1/3

EMAIL: [email protected] • PHONE: 646-480-0328

WILLIAM WH MILLERELECTRICAL AND CONTROL SYSTEMS ENGINEER

Page 2: William Miller Resume Feb, 2016

Oyu Tolgoi Mining Project, Ivanhoe Mines Ltd., Oyu Tolgoi, Mongolia (May 2006-February 2008)Infrastructure electrical, controls and communications lead engineer on green-field copper and gold mine in South-central Mongolia. Supervised/contracted engineering for 250MW 220kV and 35kV power reticulation including on-site and bore field transmission lines and substations, 24 MW diesel power station; control systems for infrastructure facilities; site-wide communication backbone, DTR system, security and fire alarm system and LAN/telephone system. Supervised electrical and auxiliary systems design for camp facilities and boiler. Assisted in coordination of E&CS engineering between design centers in China, Mongolia and Canada including selection of the Main Electrical Vendor (MEV) and creation of project electrical equipment catalogue.

Integrated Isocyanates Project, BASF/HUNTSMAN, Caojing, China (August 2004- May 2006)Supervised control and instrumentation design by Chinese Design Institutes. Coordinated DCS hardware design with Emerson Process Management(MAV). Coordinated design between Shanghai Taiwan and Korean design centers. Lead on-site controls and instrumentation engineer. Coordinated loop checking by MAV and construction contractors.

PR05 Humalog Production Facility, Eli Lilly, Carolina, Puerto Rico (January 2004-July 2004)Supervised the work of fire alarm, telecommunications, security and HVAC control systems sub- contractors. Directed the work of the Fluor Daniel electrical and controls craft on the last phase of construction. Negotiated and awarded new contracts for remaining electrical and controls scope and oversaw the scope completion by sub-contractors.

Humalog Capacity Integration Project, Eli Lilly, Indianapolis, Indiana (July 2003 – January 2004)Superintendant for the construction of the electrical, control, life safety, and security systems in new Humalog production area with 30 electricians and foremen. Provided on-site engineering support. Developed quality plan and oversaw the completion of construction quality assurance documentation.

Quality Upgrade Projects, Eli Lilly, Indianapolis, Indiana (May 2002 – June 2003)Lead electrical and controls engineer on projects to bring existing production building into compliance with FDA cleanliness protocols and GMP regulations. Developed and presented to the client a new airlock scheme to be incorporated site-wide.

Rate Increase Project, ICI Paint, Commerce, California (January 2002-May 2002)Designed electrical and control systems to more than double output capacity of existing plant without interrupting production. Interfaced with vendors for security system and motor control center packages. Developed single lines, elementaries, and equipment specifications. Performed field audit of electrical and control systems. Assisted power study of existing power distribution system.

Ivorydale Soap Plant, Procter & Gamble, Cincinnati, OH (July 2001-December 2001)Retrofitted 100 year old manufacturing building with new Allen Bradley ControlLogix control system. Upgraded electrical and controls for dust control and airvey systems. Provided construction support and coordinated startup activities for soap making line.

2/3

EMAIL: [email protected] • PHONE: 646-481-2603

WILLIAM WH MILLERELECTRICAL AND CONTROL SYSTEMS ENGINEER

Page 3: William Miller Resume Feb, 2016

B6 Pilot Facility, Genentech, So. San Francisco, California. (May-July 2001)Power Distribution and lighting design for world’s largest bio-pharmaceutical research facility. Developed lighting plan in accordance with California Title 24 efficiency standards. Provided detailed power plan including UPS and 100% emergency backup power system.

Fabrication Facility, Intel, Hudson, Massachusetts (Feb.-April 2001)Construction support for controls and life safety systems. Oversaw construction for new microchip fabrication facility. Provided construction support as required. Verified contractor installation.

Fabrication Upgrade Projects, IBM, Burlington, Vermont (2000 – 2001)Lead controls engineer on the design and construction of manufacturing and testing cleanroom areas. Participated as controls lead in the focus process for new 30MM chip testing facility. Designed controls for clean room air handling and particle monitoring systems. Developed scheme for IBM main lobby security system. Responsible for design of life safety installations and upgrades including the life safety notification, site monitoring, CCTV, fire alarm, and tool monitoring systems. Upgraded voice and data telecommunications for chip fabrication area.

New Site Paper Project, Procter & Gamble, Cape Girardeau, Missouri (1998 - 2000)Controls engineer for electrical checkout and startup of product recycling system. Performed electrical checkout and startup of two burner systems controlled by Triconex PLC. Established communication between Triconex , Honeywell , Modicon, and Allen Bradley control systems. Developed logic and programmed Modicon PLC for product recycling and chemical additives.

Pringles Global One Project, Procter & Gamble, Jackson Tennessee (1997 - 1998)Responsible for specification of instrumentation on global Pringles design. Performed studies for motor safety verification on global electrical design. Managed Access database containing instrument and electrical information for several manufacturing lines.

6A Paper Project, Procter & Gamble, Cincinnati, Ohio (1996 - 1997)Responsible for instrument specification and procurement. Developed Logic and programmed Modicon PLC for new air threading system. Designed panel for testing of Modicon control program. Assisted in development of standard instrument database design for all projects within the operating company.

GMP ASSOCIATES Honolulu HI (Summers, 1993 - 1996)Engineering Intern