widening of the huey p. long bridge

159
Widening of the Huey P. Long Bridge EXISTING PROPOSED WIDENING Tulane Engineering Forum - 2010

Upload: dave-kanger

Post on 12-Jul-2015

645 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: Widening of the Huey P. Long Bridge

Widening of the

Huey P. Long

Bridge

EXISTING

PROPOSED WIDENING

Tulane

Engineering

Forum - 2010

Page 2: Widening of the Huey P. Long Bridge

Introduction• Background

• 4 Construction Contracts

– Main Bridge – Substructure

– Main Bridge – Superstructure Truss Widening

– Railroad Modifications

– Approaches and Main Bridge Deck Widening

• Project Status

– Project Timeline

– Construction Photographs

EXISTING

PROPOSED WIDENING

Page 3: Widening of the Huey P. Long Bridge

Location

French

Quarter

Huey P. Long Bridge

New Orleans Metro Area

Page 4: Widening of the Huey P. Long Bridge

Before the Bridge

Page 5: Widening of the Huey P. Long Bridge

Construction of The Existing Bridge

Page 6: Widening of the Huey P. Long Bridge

Construction of The Existing Bridge

Page 7: Widening of the Huey P. Long Bridge

Background – Huey P. Long Bridge

• Combined railroad –highway bridge

– 2 tracks

– 4 lanes – 9 ft. width

Page 8: Widening of the Huey P. Long Bridge

Background – Huey P. Long Bridge

• Very heavily built

• Carries largest modern RR load without distress

• Many years of service life remaining

Page 9: Widening of the Huey P. Long Bridge

Project Background

• By widening the existing structure rather than constructing a new river crossing:

– Reduce environmental impact, property takings.

– Reduce project cost.

– Reuse existing right-of-way and traffic corridors.

• Final report published April 1988.

Page 10: Widening of the Huey P. Long Bridge

Project Background

EXISTING PROPOSED WIDENING

Page 11: Widening of the Huey P. Long Bridge

START PROJECT

END PROJECT

WEST BANK

APPR.

WEST BANK RR MOD

EAST BANK RR MOD

EAST BANK APPR.

MAIN BRIDGE PIER, TRUSS, AND

DECK WIDENING

Huey P. Long Widening Project

Page 12: Widening of the Huey P. Long Bridge

START PROJECT

END PROJECT

WEST BANK

APPR.

WEST BANK RR MOD

EAST BANK RR MOD

EAST BANK APPR.

MAIN BRIDGE PIER, TRUSS, AND

DECK WIDENING

Main Bridge Pier Widening

Page 13: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Pier A Piers I & II Pier III Pier IV

EXISTING

PROPOSED WIDENING

Page 14: Widening of the Huey P. Long Bridge

Widened Pier

Caisson

Steel Frame

Lower Encase

Upper Encase

Page 15: Widening of the Huey P. Long Bridge

Existing Pier Conditions

Pier I – North Face

Page 16: Widening of the Huey P. Long Bridge

Existing Pier Conditions

Pier II – West Nose

Page 17: Widening of the Huey P. Long Bridge

START PROJECT

END PROJECT

WEST BANK

APPR.

WEST BANK RR MOD

EAST BANK RR MOD

EAST BANK APPR.

MAIN BRIDGE PIER, TRUSS, AND

DECK WIDENING

Main Bridge Truss Widening

Page 18: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

Cantilever Truss Span

Simple Through

Truss Span EXISTING

PROPOSED WIDENING

Page 19: Widening of the Huey P. Long Bridge

Cross Sections – Existing Bridge

Page 20: Widening of the Huey P. Long Bridge

• 2 new trusses added, parallel to existing trusses.

• Roadways widened from 18 ft. to 43 ft.

• Currently: 2 – 9 ft. lanesNo offset

• Proposed: 3 – 11 ft. lanes

8 ft. shoulder2 ft. offset

Widened Main Bridge Features

Page 21: Widening of the Huey P. Long Bridge

Construction and Erection

• Sequence of construction

– Widening Truss

• Imbalance

– Widened Floor System

Page 22: Widening of the Huey P. Long Bridge

Maintenance of Traffic Through Construction

• Marine Traffic Maintained – same vertical and horizontal

clearances

• Rail Traffic Maintained

• Vehicular Traffic Maintained – by use of staged construction

Page 23: Widening of the Huey P. Long Bridge

Main Bridge

Maintenance of Traffic

WORK PERFORMED IN TRUSS WIDENING

CONTRACT

Page 24: Widening of the Huey P. Long Bridge

START PROJECT

END PROJECT

WEST BANK

APPR.

WEST BANK RR MOD

EAST BANK RR MOD

EAST BANK APPR.

MAIN BRIDGE PIER, TRUSS, AND

DECK WIDENING

Railroad Modifications - Westbank

Page 25: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Project Site

LA 18 Hwy. 90

Railroad

EXISTING

Page 26: Widening of the Huey P. Long Bridge

Huey P. Long Widening Project

Westbank Railroad Modifications

Existing Site Conditions

To Huey P. Long Bridge

LA

18

US HWY 90

Page 27: Widening of the Huey P. Long Bridge

Huey P. Long Widening Project

Westbank Railroad Modifications

Final Site Conditions

To Huey P. Long Bridge

LA

18

US HWY 90Future Roadway

Replacement Support

Page 28: Widening of the Huey P. Long Bridge

Huey P. Long Widening Project

Westbank Railroad Modifications

Page 29: Widening of the Huey P. Long Bridge

Huey P. Long Widening Project

Westbank Railroad Modifications

Page 30: Widening of the Huey P. Long Bridge

START PROJECT

END PROJECT

WESTBANK

APPR.

WESTBANK RR MOD

EASTBANK RR MOD

EASTBANK APPR.

MAIN BRIDGE PIER, TRUSS, AND

DECK WIDENING

Railroad Modifications - Eastbank

Page 31: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Project Site

Jefferson Hwy

Clearview Pkwy.

EXISTING

Page 32: Widening of the Huey P. Long Bridge

Huey P. Long Widening Project

Eastbank Railroad Modifications

Existing Site Conditions

QWEST Line

Vacan

t Gas

Sta

tion

Clearview Pkwy.

Jeff

ers

on

Hw

y.

To Huey P. Long Bridge

Power Poles & Power Line

Existing Superstructure and Towers to be

Replaced

Page 33: Widening of the Huey P. Long Bridge

Huey P. Long Widening Project

Eastbank Railroad Modifications

Final Site Conditions

QWEST Line

Vacan

t Gas

Sta

tion

Clearview Pkwy.

Jeff

ers

on

Hw

y.

To Huey P. Long Bridge

Future Roadway

Future Elevated

Roadway

New Bents

Page 34: Widening of the Huey P. Long Bridge

Huey P. Long Widening Project

Eastbank Railroad Modifications

Page 35: Widening of the Huey P. Long Bridge

START PROJECT

END PROJECT

WEST BANK

APPR.

WEST BANK RR MOD

EAST BANK RR MOD

EAST BANK APPR.

MAIN BRIDGE PIER, TRUSS, AND

DECK WIDENING

Approaches & Deck Widening

Page 36: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

WEST BANK APPROACH

Start Project Bridge City Ave.

Interchange

Conflict w/

Existing Rdwy

Page 37: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Cantilever Truss Span

Simple Through

Truss Span EXISTING

PROPOSED WIDENING

Page 38: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

EAST BANK APPROACH

End Project

Jefferson Hwy

Interchange

Conflict w/

Existing Rdwy

NOPBRR Spur

Page 39: Widening of the Huey P. Long Bridge

WORK PERFORMED IN

APPROACH CONTRACT

Main Bridge Deck Widening

Page 40: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Page 41: Widening of the Huey P. Long Bridge

Project Timeline

• Work Completed

– Railroad Modifications

– Main Bridge Pier Widening

• Work Under Construction

– Main Bridge Truss Widening

– West Bank Approach, Main Bridge Deck Widening, East Bank Approach

Project Schedule

Main Bridge Substructure

Railroad Modifications

Superstructure Fabrication & Erection

Approaches & Main Bridge Re-decking

2012 20132004 2005 2006 2007 2008 2009 2010 2011

Page 42: Widening of the Huey P. Long Bridge

Project Status – Completed

Main Bridge Pier Widening

• Letting Date:

– December 14, 2005

• Notice To Proceed Date:

– April 10, 2006

• Construction Bid:

– $ 98,826,907

• Contractor:

– Massman Construction Co.

Page 43: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Pier A Piers I & II Pier III Pier IV

EXISTING

PROPOSED WIDENING

Page 44: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 45: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 46: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 47: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 48: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Distribution Block

Page 49: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 50: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 51: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 52: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 53: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 54: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 55: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 56: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 57: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 58: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 59: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 60: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

New Orleans

G&G Steel

Page 61: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 62: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 63: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 64: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 65: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 66: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 67: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 68: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 69: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 70: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 71: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 72: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 73: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 74: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 75: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 76: Widening of the Huey P. Long Bridge

Main Bridge Pier Widening

Page 77: Widening of the Huey P. Long Bridge

Project Status - Completed

Railroad Modifications

• Letting Date:

– May 10, 2006

• Notice To Proceed Date:

– August 28, 2006

• Construction Bid:

– $ 13,782,713

• Contractor:

– Boh Bros. Construction Co.

Page 78: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Project Site

LA 18 Hwy. 90

Railroad

EXISTING

Page 79: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Page 80: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Page 81: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Page 82: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

New Orleans

G&G Steel

Page 83: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Page 84: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Page 85: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Page 86: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Page 87: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Page 88: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Page 89: Widening of the Huey P. Long Bridge

Railroad Modifications - Westbank

Page 90: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Project Site

Jefferson Hwy

Clearview Pkwy.

EXISTING

Page 91: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 92: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 93: Widening of the Huey P. Long Bridge

Huey P. Long Widening Project

Eastbank Railroad Modifications

Page 94: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 95: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 96: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 97: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 98: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 99: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 100: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 101: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 102: Widening of the Huey P. Long Bridge

Railroad Modifications - Eastbank

Page 103: Widening of the Huey P. Long Bridge

Project Status – Under Construction

Main Bridge Truss Widening

• Letting Date:

– March 28, 2007

• Notice to Proceed Date:

– November 5, 2007

• Construction Bid:

– $ 452,605,568

• Contractor:

– Massman Construction Co., Traylor Brothers Inc., and IHI, Inc.

Page 104: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

Cantilever Truss Span

Simple Through

Truss Span EXISTING

PROPOSED WIDENING

Page 105: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

New Orleans

Industrial Steel Construction

Gary, IN

American Bridge

Manufacturing

Coraopolis, PA

Page 106: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

Truss MonitoringSTATIC MONITORING

SYSTEM– 433 Members (777

Vibrating Wire Strain Gages)

– 5 Piers (10 Vibrating Wire Tilt Meters)

– Wind Speed/Direction

DYNAMIC (LIVE LOAD) MONITORING SYSTEM

– 31 Members (50 Electrical Resistance Strain Gages)

Page 107: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

Work Platform

Page 108: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

Work Platform

Page 109: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

Floorbeam Modifications

Template Fit Up Check

Page 110: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

Floorbeam Modifications

Installation of Wedge Fill

Page 111: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

Floorbeam Modifications

Installation of Wedge Fill

Page 112: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningWork on Existing Structure – Bottom Chord

Page 113: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

Work on Existing Structure – Top Chord

Page 114: Widening of the Huey P. Long Bridge

Main Bridge Truss Widening

Widening Truss Bottom Laterals

Page 115: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningRemove Existing Sidewalk – Install Temporary Steel Barrier

Page 116: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection - Methods

A = “Stick Build” B = “Span by Span”

A B A B B

Page 117: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection

Page 118: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection

Page 119: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection

Page 120: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection

Page 121: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection

Page 122: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection

Page 123: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection

Page 124: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection

Page 125: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection

December 2009

Page 126: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningMain Bridge Erection

December 2009

Page 127: Widening of the Huey P. Long Bridge

Main Bridge Truss WideningContractor’s Erection Scheme – “Span by Span” Erection

• East Anchor Arm

• Suspended Span

• Through Truss Span

Page 128: Widening of the Huey P. Long Bridge

Project Status – Under Construction

West Bank Approach, Main Bridge Deck Widening, East Bank Approach

• Letting Date:

– March 19, 2008

• Notice to Proceed Date:

– May 5, 2008

• Construction Bid:

– $ 433,950,000

• Contractor:

– Kiewit Massman Traylor Constructors

Page 129: Widening of the Huey P. Long Bridge

START PROJECT

END PROJECT

WEST BANK

APPR.

WEST BANK RR MOD

EAST BANK RR MOD

EAST BANK APPR.

MAIN BRIDGE PIER, TRUSS, AND

DECK WIDENING

Approaches & Deck Widening

Page 130: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Box Culverts

Page 131: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

At Grade Roadways – West Bank

Page 132: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Foundations - Westbank

Page 133: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Foundations - Westbank

Page 134: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure - Westbank

Page 135: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure -

Westbank

Page 136: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure -

Westbank

Page 137: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure -

Westbank

Page 138: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure -

Westbank

Page 139: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure -

Westbank

Page 140: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Superstructure

- Westbank

Page 141: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Superstructure

- Westbank

Page 142: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Superstructure

- Westbank

Page 143: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Superstructure - Westbank

Page 144: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Superstructure - Westbank

Page 145: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Superstructure - Westbank

Page 146: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Superstructure - Westbank

Page 147: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Created using

Google SketchUp

Substructure – Pier IVA

Page 148: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure – Pier IVA

Page 149: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure – Pier IVA

Page 150: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure – Pier IVA

Page 151: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure – Pier IVA

Page 152: Widening of the Huey P. Long Bridge

Approaches & Deck Widening

Substructure – Pier IVA

Page 153: Widening of the Huey P. Long Bridge

Acknowledgements

Ray MumphreyProject Manager, Bridge Engineer

Manager

Jan GrenfellEnvironmental Representative

Hossein GharaBridge Engineer

Tony DucoteProject Management Administrator

Page 154: Widening of the Huey P. Long Bridge

Acknowledgements

J. BridgerGeneral Manager

R. KollmarChief Engineer

D. SponselGeneral Superintendant,

Bridge

M. DumasBridge Supervisor

A. MarinelloChief Engineer (Ret.)

Page 155: Widening of the Huey P. Long Bridge

Acknowledgements

Juan Murillo

D. McDaniels

B. Frederick

T. Todd

W. Aymond

Page 156: Widening of the Huey P. Long Bridge

Design TeamEUSTIS ENGINEER (Geotechnical)

• Gwen Sanders

• William Gwyn

COASTAL ENVIRONMENTS (Environmental)

• Karen Wicker

• Ed Fike

• D.Kelley

Coco Architects (HAER / HABS)

• Wayne L. Coco, AIA

GCR & Associates (Real Estate)

• Gregory Rigamer

• Mona Nosari

Riverlands Surveying

• Stephen Flynn

Page 157: Widening of the Huey P. Long Bridge

Design Team – M & M• W. B. Conway

• D. F. Sorgenfrei

• Z. Prucz

• N. Soong

• B. E. Peterson

• M. L. Sternitzke

• Y. Ouyang

S. P. Carr

D. A. Kanger

C. J. Ledet

• G. P. Doyle

G. P. Taravella

T. A. Cole

J. A. Martin

J. J. Moore

• R. Mertz

• R. Jackson

• A. Temeles

J. E. Schade

B. T. Martin

• L. V. Borden

• G. L. Fasick

Denotes Tulane University Graduate

Page 158: Widening of the Huey P. Long Bridge

Design Team – M & M (cont)Former Team Members

M. Zeihl

B. Y. Ikeda

B. M. Hassett

• J. B. Johnson

• F. A. Aksin

• F. L. Suthon

Denotes Tulane University Graduate

Page 159: Widening of the Huey P. Long Bridge

Widening of the Huey P. Long Bridge

Tulane Engineering

Forum - 2010