New Jersey Shore Protection New Jersey Shore Protection West Atlantic City, Egg Harbor Township West Atlantic City, Egg Harbor Township New Jersey Dept. of Environmental Protection New Jersey Dept. of Environmental Protection Office of Engineering & Construction Office of Engineering & Construction Bureau of Coastal Engineering Bureau of Coastal Engineering Benjamin Keiser, Manager Benjamin Keiser, Manager Township of Egg Harbor Township of Egg Harbor Atlantic County, New Jersey Atlantic County, New Jersey James J. McCullough, Mayor James J. McCullough, Mayor West Atlantic City Gabion Installation West Atlantic City Gabion Installation

Upload: trinhkhanh

Post on 20-Jul-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

New Jersey Shore ProtectionNew Jersey Shore Protection West Atlantic City, Egg Harbor TownshipWest Atlantic City, Egg Harbor Township

New Jersey Dept. of Environmental ProtectionNew Jersey Dept. of Environmental ProtectionOffice of Engineering & ConstructionOffice of Engineering & Construction

Bureau of Coastal EngineeringBureau of Coastal EngineeringBenjamin Keiser, ManagerBenjamin Keiser, Manager

Township of Egg HarborTownship of Egg HarborAtlantic County, New JerseyAtlantic County, New JerseyJames J. McCullough, MayorJames J. McCullough, Mayor

West Atlantic City Gabion InstallationWest Atlantic City Gabion Installation

New JerseyNew Jersey’’s s Shore Protection ProgramShore Protection Program

State of New Jersey State of New Jersey Chris Christie, GovernorChris Christie, Governor

Kim Kim GuadagnoGuadagno, Lt. Governor, Lt. Governor

Dept. of Environmental ProtectionDept. of Environmental ProtectionBob Martin, CommissionerBob Martin, Commissioner

Natural & Historic ResourcesNatural & Historic ResourcesAmy Amy CradicCradic, Assistant Commissioner, Assistant Commissioner

Office of Engineering & ConstructionOffice of Engineering & ConstructionDavid Rosenblatt, AdministratorDavid Rosenblatt, Administrator

Bureau of Coastal Engineering Bureau of Coastal Engineering --PurposePurpose……

To administer beach nourishment, shore To administer beach nourishment, shore protection and navigational dredging projects protection and navigational dredging projects throughout the State to: throughout the State to: •• Provide for the protection of life and property Provide for the protection of life and property

along the coastalong the coast

•• Preserve our StatePreserve our State’’s vital coastal resourcess vital coastal resources

•• Maintain safe and navigable waterwaysMaintain safe and navigable waterways

New Jersey Dept. Environmental ProtectionNew Jersey Dept. Environmental ProtectionBureau of Coastal EngineeringBureau of Coastal Engineering Shore Protection ProgramShore Protection Program

New Jersey Dept. Environmental ProtectionNew Jersey Dept. Environmental ProtectionBureau of Coastal EngineeringBureau of Coastal Engineering Shore Protection ProgramShore Protection Program

Shore Protection Fund Shore Protection Fund ––Dedicated forDedicated for……

““To protect existing development and To protect existing development and infrastructure from storm surges, seainfrastructure from storm surges, sea--level rise level rise and shoreline migration through dune creation and shoreline migration through dune creation and maintenance, beach nourishment projects, and maintenance, beach nourishment projects,

and construction and repair of shore and construction and repair of shore protection structures.protection structures.””

$25 million dedicated annually $25 million dedicated annually Realty Transfer Tax (N.J.S.A. C.13:19Realty Transfer Tax (N.J.S.A. C.13:19--16.1)16.1)

Shore Protection Funding Shore Protection Funding ––How ItHow It’’s Divideds Divided

New Jersey Dept. Environmental ProtectionNew Jersey Dept. Environmental ProtectionBureau of Coastal EngineeringBureau of Coastal Engineering Shore Protection ProgramShore Protection Program

Federal ProjectsFederal Projects -- NJDEP NJDEP -- local sponsor in these projectslocal sponsor in these projects•• StudiesStudies

•• Storm Damage Reduction/Shore ProtectionStorm Damage Reduction/Shore Protection

•• Environmental RestorationEnvironmental Restoration

State ProjectsState Projects -- Municipalities Municipalities -- local sponsor in these projectslocal sponsor in these projects•• Storm Damage Reduction/Shore ProtectionStorm Damage Reduction/Shore Protection

Professional and Technical ServicesProfessional and Technical Services --•• Stevens Institute of TechnologyStevens Institute of Technology

•• Richard Stockton College of New JerseyRichard Stockton College of New Jersey

•• Division of Fish and WildlifeDivision of Fish and Wildlife

•• New Jersey Geological SurveyNew Jersey Geological Survey

Shore Protection Construction Shore Protection Construction ––Cost Share StructureCost Share Structure

FEDERAL STATE

75%State

25%Local

65%Federal

35% State/Local

25%Local

75%State

Shore Protection Project

New Jersey Dept. Environmental ProtectionNew Jersey Dept. Environmental ProtectionBureau of Coastal EngineeringBureau of Coastal Engineering Shore Protection ProgramShore Protection Program

West Atlantic City Gabion InstallationWest Atlantic City Gabion Installation Egg Harbor Township, NJEgg Harbor Township, NJ

Bureau of Coastal EngineeringBureau of Coastal EngineeringNew Jersey Dept. of Environmental ProtectionNew Jersey Dept. of Environmental Protection

Office of Engineering & ConstructionOffice of Engineering & Construction

Problem AreasProblem Areas

Problem AreasProblem Areas

Existing ConditionsExisting Conditions

Existing ConditionsExisting Conditions

Gabion ConstructionGabion Construction

Project SpecificsProject Specifics

•• Cordova Avenue Cordova Avenue –– Fox PlaceFox Place

•• Contract Timeframe Contract Timeframe –– 120 days120 days–– Estimated Bid Estimated Bid –– Late Summer/Early FallLate Summer/Early Fall

•• Must minimize traffic obstructionsMust minimize traffic obstructions

•• Must maintain a clean and safe work siteMust maintain a clean and safe work site

•• Must abide by all Federal, State, and Local Must abide by all Federal, State, and Local regulationsregulations

ProjectProject SpecificsSpecifics•• Rock Gabion BasketsRock Gabion Baskets

–– 3,500 S.Y.3,500 S.Y.–– 1,000 C.Y. 61,000 C.Y. 6”” DGA Base w/ DGA Base w/ GeotextileGeotextile

UnderlayerUnderlayer–– Stone size Stone size -- 4 to 8 inches4 to 8 inches–– Manta Ray Anchoring SystemManta Ray Anchoring System

•• Sand Dune CoverSand Dune Cover–– 10,000 C.Y.10,000 C.Y.–– RevegetationRevegetation (native dune plant species)(native dune plant species)

•• Mr. Boardwalk RollMr. Boardwalk Roll--OutOut–– 459 Combine L.F.459 Combine L.F.–– Located Near StreetLocated Near Street--EndsEnds

Required PermitsRequired Permits

•• State State –– CAFRA CAFRA –– Waterfront DevelopmentWaterfront Development–– Water Quality CertificateWater Quality Certificate

•• FederalFederal–– Individual PermitIndividual Permit

Reimbursement ProjectReimbursement Project

•• Project Cost Share StructureProject Cost Share Structure–– Municipal FEMA Mitigation AssistanceMunicipal FEMA Mitigation Assistance

–– State Shore Protection GrantState Shore Protection Grant•• State = $200,000.00State = $200,000.00•• Municipality = $66,666.66Municipality = $66,666.66

•• Town Responsible for Future MaintenanceTown Responsible for Future Maintenance•• Executed State Aid Agreement RequiredExecuted State Aid Agreement Required•• DEP Easement Required for ReimbursementDEP Easement Required for Reimbursement

New Jersey Department of Environmental ProtectionNew Jersey Department of Environmental ProtectionShore Protection ProgramShore Protection Program

www.nj.gov/dep/shoreprotectionwww.nj.gov/dep/shoreprotection