week 10 journal

11
CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013 WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO) NAME: ZEYU LI (VICKY) STUDENT NUMBER: 634091 PHOTOS & ANNOTATE DRAWINGS & WRITTEN DESCRIPTION AND ANALYSISI (MATERIALITY, FUNCTION, ARCHITECTURAL AND STRUCTURAL ELEMENTS) ·Timber --- Frame structure Timber columns carry load STOP 1.

Upload: melon

Post on 22-Mar-2016

227 views

Category:

Documents


0 download

DESCRIPTION

WEEKLY JOURNAL CONSTRUCTING ENVIRONMENTS UNIVERSITY OF MELBOURNE

TRANSCRIPT

Page 1: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091PHOTOS & ANNOTATE DRAWINGS & WRITTEN DESCRIPTION AND ANALYSISI(MATERIALITY, FUNCTION, ARCHITECTURAL AND STRUCTURAL ELEMENTS)

·Timber --- Frame structureTimber columns carry load

STOP 1.

Page 2: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091

·LVL --- Laminate Veneer Lamberdifferent veneers glue together in the same directionCharacteristics: 1.Very common used in construction site today

2.Cheap3.Very resistant, can take long distance and used in big span4.Quite light so it’s very easy to handle

·reinforcing steel bars

Form Ply wood ---used in formwook

Page 3: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091·Masonry wall (bricks) --- Construction type·Retaining wall --- Resisting the lateral force or pressure from the soil.

--- Gravity retaining wall: depends on their materials, uses concreteblock here, uses their mass to resist, so it’s gravity retaining wallor cantilevered concrete retaining wall

(Google image 2013, Cantilevered concrete retaining wall)

Water Drainage Pipe

Page 4: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091

·water drainage --- to keep water away: when it rains, water come to site and it cankeep stormwater away to low level

--- Hole: water can drip from wall to the hole and into the pipe.--- Edge drainge always as high as footing to keep water seek intothe gaps between the drainge and the footing.

·Bracing --- a indispensable member in timber structure

Categories:welded Just:bracing Fix

money saving can it and material light Very :bracing Rod

In all structures, it can strongly resists the lateral forces, such as windforce and earthquake → very stable member

* In here, it uses rod bracing a lot

Retaining wallhole

Page 5: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091·Formwork --- a box which used to shape the concrete

*With reinforcing bar, it is a reinforced concrete

·Roof system:

Purlin → timber → batten → insulationMoistureHeatNoise

→ roof

·Top window --- for air circulationWaterproofing: flashing over cladding

·Glazing --- non structural member, can support by them themselves (selfsupporting)

Page 6: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091

·Timber wall --- Tongue and Groove--- Pros: it’s difficult to recognize joint area

easy to assemble

STOP 2.

Page 7: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091

(Builder bill 2013, tongue and groove ioints)

·Props --- a temporary support the formwork until concerte is cured, prevent failing--- In concrete, it needs 28 days to cure, but commonly props can remove

after 2 weeks when concrete pour into the formwork

Connection detail

Page 8: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091

·Insulation

Insula on Rigid

Insula on Loose

Page 9: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091

·Insulation sheet colour:1. Blue --- water2. White --- common3. Orange --- electricity

·Z shaped purlin --- can used in the long span--- second structure member

--- V.S. C shaped purlin: Z shaped purlin is much easier to connectwith each other

Page 10: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091

·flashing --- waterproofing--- prevent water seek into the coner or the gaps between two things.

Stop 3.

Ribbon --- Waterproofing·water cell/drianage cellto allow water in theback

·wall systemSisalation

↑Frame↑

Insulation↑

Plaster board

Page 11: Week 10 journal

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013WEEK 10 JOURNAL DETAILNG VOLUME (PART TWO)NAME: ZEYU LI (VICKY)STUDENT NUMBER: 634091

REFERENCESBuilder Bill 2013, Tongue and Groove Joint, viewed 13th October 2013,<http://www.builderbill-diy-help.com/tongue-and-groove-joint.html>Ching, F 2008, Building Construction Illustrated (4th edition), John Wiley&Sons, Inc.,HobokenGoogle images 2013, Retaining wall, viewed 13th October 2013,<https://www.google.com.au/search?q=retaining+wall&source=lnms&tbm=isch&sa=X&ei=2RxaUoCdDMLElAW-NQ&ved=0CAcQ_AUoAQ&biw=1366&bih=614&dpr=1>